A process for preventing sand collapse by controlling grouting and advanced transformation of roof in underground directional pipe drilling in thin bedrock area under saturated sand layer
Through the underground directional pipe drilling and valve-type grouting pipe technology, the problem of large number of drilling holes and poor results in grouting transformation in thin bedrock area under saturated sand layer is solved, and efficient and environmentally friendly sand blasting prevention and control is achieved. Suitable for safe production in large coal mines.
Patent Information
- Application Number
- CN202410038578.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-10
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-01-10
AI Technical Summary
The grouting transformation method for thin bedrock areas under saturated sand layers in the prior art requires a large number of drilling holes, poor environmental damage effect and large volume of auxiliary projects, making it difficult to effectively prevent sand collapse accidents.
The underground directional pipe drilling technology is adopted, and long-distance directional horizontal drilling is designed, combined with valve-type grouting pipes and dual-powered drilling rigs to achieve segmented high-pressure split grouting to ensure uniform diffusion of grouting liquid and top plate reinforcement.
It reduces ecological damage to ground construction, improves grouting efficiency and effect, and the single treatment distance exceeds 500m, reducing the project volume and is suitable for large-scale coal mine applications.
Smart Images

Figure CN118008138B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of coal mining, and particularly relates to a process for preventing sand collapse by controlling grouting of a roof plate in advance through directional pipe drilling in an underground well in a thin bedrock area under a saturated sand layer. Background Art
[0002] my country's coal resources are very rich. Taking the Shenfu mining area and the Ordos mining area as examples, most of them are famous throughout the country for their shallow burial depth, thick coal seams and easy mining. In some areas of the region, the coal seam roof has weathered due to the scouring, cutting and erosion of ancient rivers, which has caused the bedrock of the coal seam roof to become thinner, or even directly become weathered bedrock. The sand or mud formed by the weathering of the bedrock has caused certain difficulties in the construction of anchor rods and anchor cables. The support failure is prone to occur during the tunnel excavation process, resulting in roof collapse accidents. During the mining process, the coal seam has no stable roof bedrock layer to protect it; if the thin bedrock is covered by a saturated sand layer, when the water head height reaches a certain height, it is very easy to cause water and sand burst accidents during the mining process of the working face, and even cause well flooding and casualties, which seriously endangers the safety of mine production. Therefore, it is necessary to transform and manage the thin bedrock area under the saturated sand layer.
[0003] In the prior art, the advanced transformation and treatment of thin bedrock areas under saturated sand layers is generally divided into ground grouting treatment. Ground treatment generally adopts plum blossom-shaped vertical holes and sleeve valve pipe grouting for treatment.
[0004] This method has many disadvantages, including the large number of holes required (usually 500-600), and the large amount of drilling and grouting work will further damage the ecological environment; at the same time, the weathered bedrock is directly covered with sand layers, there is no stable stop layer, and the grouting effect is poor; in addition, due to natural conditions such as transportation, topography, construction conditions such as water and electricity, and social and human factors, the amount of ancillary projects is large, sometimes even exceeding the main project. For large mines, especially coal mines with a capacity of tens of millions of tons, the above-mentioned treatment methods seriously restrict the development of coal mine production capacity. Summary of the invention
[0005] The purpose of the present invention is to provide a process for advanced transformation of the top plate to prevent sand collapse by directional pipe drilling in underground wells in thin bedrock areas under saturated sand layers and controllable grouting, so as to solve the problems in the prior art of grouting transformation methods, such as large number of drilling holes required, damage to the local environment, poor grouting effect and large amount of ancillary engineering.
[0006] In order to solve the above technical problems, the present invention adopts the following technical solutions to achieve the above problems:
[0007] A process for preventing sand collapse by controlling grouting of the top plate in advance by directional pipe drilling in a thin bedrock area under a saturated sand layer, comprising the following steps:
[0008] Step 1: Collect relevant geological data to determine the thickness and distribution of the intact bedrock layer, weathered bedrock layer, impermeable layer and sand layer in the roof of the coal mining face in the area to be transformed; draw a geological profile of the grouting transformation of the roof of the coal mining face, and establish a corresponding slurry diffusion control model for the injected weathered bedrock formation.
[0009] Step 2, design the number of drilling sites and the location of each drilling site; design a corresponding directional drilling hole-forming layer in each drilling site, and determine the horizontal trajectory of the directional drilling hole-forming layer.
[0010] Step 3, designing a plurality of directional boreholes to be drilled in each directional drilling hole forming layer, and designing a trajectory of each directional borehole to be drilled.
[0011] Step 4, a plurality of grouting holes are opened on the wall of the geological casing, and a check valve with matching specifications is installed at each grouting hole to form a valve-type grouting pipe.
[0012] Step 5, select a directional borehole to be drilled, and use a dual-power head directional drilling rig to perform the drilling operation.
[0013] One power head of the dual-power head directional drilling rig drives the drill tool to drill along the designed trajectory, forms a directional borehole and then withdraws the drill tool, while the other power head drives the valve-type grouting pipe to simultaneously install the valve-type grouting pipe during the drilling operation; a directional borehole is formed and a drilling operation is completed;
[0014] Select a directional borehole that has not yet been drilled, and follow the steps in step 5 until all drilling operations are completed.
[0015] Step 6, select a directional drill hole, use a grouting pipe to go down to the bottom of the directional drill hole, inject casing material, and stop injecting when the casing material returns from the hole mouth.
[0016] Select other directional drill holes that have not been filled with casing material, and fill them with casing material according to the above method in step 6 until all directional drill holes have been filled with casing material.
[0017] Step 7, select a directional drill hole that has been filled with casing material for grouting; when the slurry reaches the grouting volume required by the design, withdraw the grouting device and carry out the next grouting; and so on, carry out multiple grouting sections until the first horizontal section full grouting is completed.
[0018] Between the initial setting and final setting of the slurry of the first horizontal section full-section grouting, use a grouting device with two packers to go down to the bottom of the hole, and carry out the next grouting from the bottom of the hole to the hole mouth until the grouting end standard is reached;
[0019] Select other holes that have been filled with casing material and perform grouting according to the above method in step 7 until all directional holes have been grouted.
[0020] Step 8: Seal all directional drilled holes with cement slurry.
[0021] The present invention also has the following features:
[0022] Furthermore, in the step 1, the collected data include: tunnel excavation and working face recovery technology, production time, relevant geological reports, geological profiles, drilling data, up and down well comparison diagrams, mining engineering layout diagrams and geophysical exploration results data.
[0023] Furthermore, the step 2 specifically includes the following sub-steps:
[0024] Step 21, at the relative positions on both sides of the two drifts of the coal mining working face, chambers are excavated near the withdrawal passage and drilling sites are arranged.
[0025] Step 22, determining the extended length of the coal mining working face.
[0026] If the extended length of the coal mining face is less than 500m, only one drilling site shall be set up at each drift.
[0027] If the extended length of the coal mining face is greater than 500m, take the smallest integer greater than the value obtained by dividing the extended length of the subsequent coal mining face by 500, and set up multiple drilling sites in sequence along the length direction of the coal mining face at each drift.
[0028] Step 23, designing the directional drilling trajectory in the strongly weathered bedrock layer above the caving zone, so that the horizontal trajectory of each directional drilling hole layer is 5 to 10 meters higher than the upper part of the caving zone.
[0029] Furthermore, the step 3 specifically includes the following steps:
[0030] Step 31, in each directional drilling hole formation layer, design at least one directional drill hole to be drilled along the two longitudinal grooves of the working face.
[0031] Step 32, determining the minimum distance l between the directional drilling hole layer and the top boundary of the fully weathered layer for each directional borehole to be drilled according to the geological report.
[0032] According to the influence of the properties of slurries with different water-cement ratios on the slurry diffusion radius, combined with the grouting pressure and the diffusion law of slurry in weathered rock formations, the left and right lateral diffusion radius r of the slurry in the directional drilling hole layer is determined.
[0033] Step 33, the lateral spacing l' of all directional holes to be drilled in the directional drilling hole formation layer is set to follow l'<2r.
[0034] The number of directional boreholes to be drilled in each drilling site of the coal mining face is not less than n, n = (W / 2r+1), and n is rounded upwards to an integer.
[0035] The number of all directional drill holes to be drilled in the coal mining face is N, N = (L / 500)*n, N is rounded upwards.
[0036] Step 34, designing the trajectory of each directional borehole to be drilled, so that each directional borehole to be drilled extends upward in an inclined direction until it enters the strongly weathered bedrock layer and then extends in a horizontal direction.
[0037] Furthermore, the step 4 specifically includes the following sub-steps:
[0038] Step 41, designing a valve type grouting pipe.
[0039] A plurality of slurry outlet holes are evenly opened along the circumferential direction on the side wall of the geological casing to form a slurry outlet group.
[0040] A plurality of slurry discharge groups evenly distributed along the axial direction are arranged on the side wall of the geological casing.
[0041] Make the plane angle of each slurry outlet hole distributed at 120° or 90°.
[0042] Step 42, a check valve is nested on the outside of each slurry outlet.
[0043] Furthermore, in the step 41, a steel geological casing with a specification of Ф89 mm and a thickness of 4 mm is used.
[0044] Each slurry discharge group includes 3-4 slurry discharge holes.
[0045] A slurry discharge group is set up in the geological casing every 2m.
[0046] The specifications of all the slurry outlet holes mentioned are Ф6mm.
[0047] In step 42, a plurality of small check valves are mounted one by one on corresponding positions of the slurry discharge group, so that each of the small check valves is connected to the slurry discharge hole one by one.
[0048] Furthermore, the step 5 specifically includes the following sub-steps:
[0049] Step 50, randomly select a directional borehole to be drilled.
[0050] Step 51, select a dual-power head directional drilling rig with a first drill bit diameter of 150 mm, a second drill bit diameter of 120 mm, and a hole depth of 7 m; select an orifice pipe with a length of 6 m and a diameter of 127 mm.
[0051] Step 52, the opening angle of the orifice pipe is 10° to 30°, a drill rod with a length of 3 m is selected, and the inclination angle decreases by 0.5° to 1° each time a drill rod is drilled.
[0052] Step 53, use a dual-power head directional drilling rig to drill along the designed route, so that one power head of the dual-power head directional drilling rig drives the drill tool to drill in the inner circle according to the designed trajectory; the other power head drives the steel valve grouting pipe to follow up in the outer circle, and the valve grouting pipe is installed synchronously during the drilling operation.
[0053] Step 54, when the valve grouting pipe reaches the designed bottom of the borehole, the drilling tool is withdrawn to complete a drilling operation.
[0054] Step 55, select a directional borehole to be drilled that has not yet been drilled, and repeat steps 51-54 until all the designed directional boreholes to be drilled have completed the drilling operation.
[0055] Furthermore, the step 7 includes the following sub-steps:
[0056] Step 70, randomly select a directional drill hole.
[0057] Step 71, use the following formula to estimate the grouting volume Q of the directional drilling: 注 :
[0058] Q 注 =(1+A)×V×n×η,
[0059] Wherein, A represents the slurry loss coefficient.
[0060] V represents the volume of the grouting range, V = πr 2 ×L; r represents the diffusion radius; L represents the length of the grouting section.
[0061] n represents the average porosity.
[0062] η represents the grouting filling coefficient.
[0063] Step 72, determining the multi-level water-cement ratio of the grouting material and manufacturing the corresponding grouting material.
[0064] Step 73, select the lowest water-cement ratio, use a directional drill to send the packer into the directional borehole, and set the distance between the two packers to be 10m.
[0065] Step 74, using a conversion valve to achieve expansion and contraction of the corresponding packer, forming an independent grouting section in the valve-type grouting pipe, and grouting the directional borehole.
[0066] Step 75, during the grouting operation, determine the pressure gauge reading of the grouting orifice in real time.
[0067] If the pressure gauge at the grouting orifice shows a pressure less than 0.3 MPa, use a slurry with a water-cement ratio of no more than 1:1 for low-pressure slow injection; control the flow rate at 300 L / min, and take a 10-minute break after every grouting for 20 minutes; return to step 74 until the first grouting is completed and enter step 76.
[0068] If the pressure gauge at the grouting orifice shows a pressure greater than 0.3 MPa and less than 1 MPa, return to step 74 and proceed to step 76 after the first grouting is completed.
[0069] If the pressure gauge at the grouting orifice shows a pressure greater than 1Mpa, use a slurry with a water-cement ratio of not less than 1.5:1, increase the gear of the grouting pump to perform high-pressure splitting grouting until the pressure is less than 1Mpa, and then determine the pressure value shown on the pressure gauge at the grouting orifice again.
[0070] Step 76, segmented grouting is performed from the bottom of the hole to the hole mouth through the packer and the valve-type grouting pipe.
[0071] After the first grouting of the horizontal grouting section of the entire hole is completed, the next grouting operation is started from the bottom of the hole to the hole mouth after the initial setting and before the final setting of the slurry. The grouting is stopped after the grouting volume requirement is reached, thus completing the grouting of a borehole.
[0072] Step 77, select a directional borehole that has not been grouted, and repeat steps 71-76 until all directional boreholes have completed grouting transformation.
[0073] Furthermore, in step 71: n is 35%; η is 0.7.
[0074] Furthermore, in step 72, a water pressure test is first performed, and the water-cement ratio for the first grouting is determined based on the test result;
[0075] Among them, the water-cement ratio of the grouting material adopts four levels of water-cement ratio, which are 2:1, 1.5:1, 1:1, and 0.8:1 respectively.
[0076] Furthermore, in step 76, the grouting termination criteria are: the grouting pressure is not less than 6.0 MPa, the grouting volume is less than 30 L / min, and the duration is not less than 10 min.
[0077] Compared with the prior art, the present invention has the following technical effects:
[0078] The invention discloses a process for the advance transformation of the anti-sand collapse of the top plate by underground directional pipe drilling and controllable grouting in the thin bedrock area under the saturated sand layer, which adopts underground long-distance directional horizontal drilling to replace the ground vertical hole, thereby eliminating the influence of land acquisition, damage to the ground ecological environment and buildings caused by ground construction; at the same time, only a few long-distance directional horizontal drilling holes are needed to replace 500 to 600 ordinary short drilling holes in the prior art, and the directional drilling can realize "replacing points with lines and forming surfaces with multiple lines", and the single advance treatment distance exceeds 500m, which greatly improves the construction efficiency; in addition, the method A valve-type grouting pipe is designed to use a dual-power head drill for follow-up drilling, which solves the problem of difficulty in drilling holes in weathered bedrock and overlying saturated sand layers after drill withdrawal; during grouting, the valve-type grouting pipe is converted into an outer grouting pipe, realizing grouting processes such as segmented, multiple, high-pressure splitting, and low-pressure slow injection, ensuring more uniform grouting diffusion; after the grouting is completed, the valve-type grouting pipe remaining in the formation can play the role of a pipe shelf, reinforce the roof, and improve the strength of the roof, realizing "one pipe for multiple uses", improving the grouting effect, reducing the amount of engineering, and is suitable for large-scale use and promotion in industry. BRIEF DESCRIPTION OF THE DRAWINGS
[0079] Figure 1 It is a process flow chart of the present invention;
[0080] Figure 2 It is a schematic diagram of the thickness changes of the intact bedrock, weathered bedrock, aquiclude and sand layer in the coal seam roof;
[0081] Figure 3 is a plane distribution diagram of directional drilling trajectories when the working surface length is L and the width is W in one embodiment of the present invention;
[0082] Figure 4 is a schematic diagram of the distribution of pulp outlet holes in one embodiment of the present invention;
[0083] Figure 5 It is a schematic diagram of the valve type grouting pipe of the present invention;
[0084] Figure 6 is a schematic diagram of a grouting device for two packers of the present invention;
[0085] Figure 7 This is a situation after the directional drilling hole is filled with casing material in one embodiment of the present invention;
[0086] Figure 8 is a schematic diagram of grouting in a directional borehole in one embodiment of the present invention;
[0087] Fig. 9 This is the roof reconstruction after treatment in one embodiment of the present invention.
[0088] The meanings of the numbers in the figure are: 1. grouting outer tube; 2. grouting hole; 3. fixing ring; 4. copper sheet; 5. spring pin; 6. spring; 7. grouting inner tube; 8. packer conversion controller; 9. packer connecting pipe; 10. packer; 11. casing material; 12. drill hole; 13. orifice pipe; 14. flange; 15. gauge seat; 16. pressure gauge. DETAILED DESCRIPTION
[0089] It should be noted that, unless otherwise specified, all components in the present invention are components known in the prior art. For example, the packer is a known and commonly used packer.
[0090] Specific embodiments of the present invention are given below. It should be noted that the present invention is not limited to the following specific embodiments, and all equivalent changes made on the basis of the technical solution of this application fall within the protection scope of the present invention.
[0091] A process for preventing sand collapse by controlling grouting of the roof in advance by directional pipe drilling in a thin bedrock area under a saturated sand layer, such as Figure 1 As shown, the following steps are included:
[0092] Step 1: Collect relevant geological data to determine the thickness and distribution of the intact bedrock layer, weathered bedrock layer, impermeable layer and sand layer in the roof of the working face to be transformed; draw a geological profile of the grouting transformation of the roof of the coal mining working face, and establish the corresponding slurry diffusion control model for the injected weathered bedrock formation.
[0093] Among them, the main data collected are tunneling and working face recovery technology, production time, relevant geological reports, geological profiles, drilling data, well top and bottom comparison diagrams, mining engineering layout diagrams and geophysical exploration results, to determine the thickness and distribution of the intact bedrock layer, weathered bedrock layer, impermeable layer and sand layer of the working face roof in the area to be transformed. Analyze the surface elevation corresponding to the working face that needs grouting to transform the roof, the elevation of the working face roof, the distribution sequence and layer thickness of the overlying rock layer (bedrock layer, weathered rock layer) of the working face, the thickness of the coal seam and the height of the "three zones" caused by mining, the width of the working face roadway, the length of the working face, related geophysical work and the delineated water-rich abnormal area, and rainfall statistics in the past five years.
[0094] Based on the above information, the geological profile of the roof grouting transformation of the coal mining face was drawn, and the corresponding slurry diffusion control model of the injected weathered bedrock formation was established.
[0095] Step 2, design the number of drilling sites and the location of each drilling site; design a corresponding directional drilling hole-forming layer in each drilling site, and determine the horizontal trajectory of the directional drilling hole-forming layer.
[0096] According to the collected data, we analyze and master the thickness variation law of intact bedrock, weathered bedrock, aquiclude and sand layer in the coal seam roof, determine the distribution layers of slightly weathered, moderately weathered, strongly weathered and fully weathered layers in the weathered bedrock layer, understand the water-containing / rich characteristics of the aquiclude and loose sand layer, such as Figure 2 According to the properties and thickness distribution of the transformed roof layer, the directional drilling trajectory is mainly located in the strongly weathered bedrock layer with high porosity and medium slurry consumption.
[0097] Step 3, designing a certain number of directional drilling holes to be drilled in each directional drilling hole forming layer, and designing the trajectory of each directional drilling hole to be drilled;
[0098] Step 4, a plurality of grouting holes are opened on the wall of the geological casing, each grouting hole is at an angle of 120° or 90° to the horizontal plane, and a check valve of matching specifications is installed at each grouting hole to form a valve-type grouting pipe.
[0099] The purpose of this step is to prevent the slurry injected into the formation from flowing back through the slurry outlet when the injection is stopped, so as to achieve the purpose of unidirectional and controllable grouting.
[0100] Step 5, selecting a directional borehole to be drilled, and using a dual-power head directional drilling rig to perform drilling operations;
[0101] One power head of the dual-power head directional drilling rig drives the drill tool to drill along the designed trajectory, forms a directional borehole and then withdraws the drill tool, while the other power head drives the valve-type grouting pipe to simultaneously install the valve-type grouting pipe during the drilling operation; a directional borehole is formed and a drilling operation is completed;
[0102] Select a directional borehole that has not yet been drilled, and follow the steps in step 5 until all drilling operations are completed.
[0103] It should be noted that the dual-power head directional drilling rig in step 5 is a conventional device in the art, and its corresponding method of synchronously installing the valve-type grouting pipe is also an existing conventional method.
[0104] Step 6, select a directional drill hole, use a grouting pipe to go down to the bottom of the directional drill hole, pour in the casing material, and stop pouring the casing material when the casing material returns from the hole mouth;
[0105] Select other directional drill holes that have not been filled with casing material, and fill them with casing material according to the above method in step 6 until all directional drill holes have been filled with casing material;
[0106] Step 7, select a directional drill hole that has been filled with casing material for grouting; when the grout reaches the grouting volume required by the design, withdraw the grouting device and carry out the next stage of grouting; and so on, carry out multiple stages of grouting until the first horizontal stage of full-stage grouting is completed;
[0107] Between the initial setting and final setting of the slurry of the first grouting, a grouting device with two packers is lowered, and the next grouting is carried out from the bottom of the hole to the hole mouth in sequence, and multiple grouting is realized until the grouting end standard is reached;
[0108] Select other holes that have been filled with casing material and perform grouting according to the above method in step 7 until all directional holes have been grouted.
[0109] Among them, a directional drilling rig is used to lower a grouting device with two packers into the bottom of the hole. The two packers of the grouting device are opened through a conversion valve to expand them, forming an independent grouting section in the valve-type grouting pipe, and controllable grouting is performed on the grouting section. When the slurry reaches the grouting volume required by the design, the hole is washed with clean water, and the two packers of the grouting device are contracted and withdrawn through the conversion valve to carry out the next section of controllable grouting. The segmented grouting is realized by analogy until the full grouting of the first horizontal section is completed.
[0110] After the initial setting and before the final setting of the previous grouting slurry, a grouting device with two packers is lowered to carry out the next grouting from the bottom of the hole to the hole mouth in sequence to achieve multiple grouting; and so on to achieve segmented and multiple grouting; according to the formation conditions and the degree of weathering of the local formation penetrated by the directional drilling, a low-pressure slow grouting process is used in places with a large grouting volume, and a high-pressure splitting grouting process is used in places with a small grouting volume, so as to achieve controllable grouting; the entire grouting process is carried out through a long-distance segmented, multiple, low-pressure slow injection, and high-pressure splitting controllable grouting process to ensure the uniformity of grouting in the entire transformation area until the grouting end standard is met.
[0111] Step 8: Use cement slurry to seal all directional drilled holes. Complete all grouting transformation operations.
[0112] Specifically, step 2 includes the following steps:
[0113] Step 21, excavating chambers and arranging drilling sites at opposite positions on both sides of the two drifts of the coal mining face near the withdrawal passage;
[0114] Step 22, determining the extended length of the coal mining working face;
[0115] If the extended length of the coal mining face is less than 500m, only one drilling site shall be set up at each drift;
[0116] If the extended length of the coal mining face is greater than 500m, take the smallest integer greater than the extended length of the subsequent coal mining face divided by 500, and set up multiple drilling sites in sequence along the length direction of the coal mining face at each drift;
[0117] Step 23, designing the directional drilling trajectory in the strongly weathered bedrock layer at the upper part of the caving zone, so that the horizontal trajectory of each directional drilling layer is 5 to 10 meters higher than the upper part of the caving zone.
[0118] Among them, the advance management of the entire coal mining working face adopts a cyclic advance management mode, that is, first complete the advance transformation of the grouting roof in the area close to the withdrawal channel, and then excavate the tunnel to the corresponding position and start to complete the advance transformation of the grouting roof in the next area, and complete the advance transformation of the grouting roof of the entire working face in turn to ensure the safe mining of the working face.
[0119] As a preferred solution, before the drilling tunnels of the two drifts of the coal mining face begin to be excavated, a chamber is excavated near the withdrawal channel to arrange the drilling site. After the tunnel begins to be excavated, when it reaches the preset drilling site position, a chamber is excavated inside the working face as the drilling site. Construction in the drilling site does not affect the normal production of the mine.
[0120] Specifically, step 3 includes the following steps:
[0121] Step 31, in each directional drilling hole formation layer, design at least one directional drill hole to be drilled along two longitudinal grooves of the working surface;
[0122] Step 32, determining the minimum distance l between the directional drilling hole layer and the top boundary of the fully weathered layer for each directional borehole to be drilled according to the geological report;
[0123] According to the influence of the properties of slurries with different water-cement ratios on the slurry diffusion radius, combined with the grouting pressure and the diffusion law of slurry in weathered rock formations, the left and right lateral diffusion radius r of the slurry in the directional drilling hole formation is determined;
[0124] Step 33, making the lateral spacing l' of all directional holes to be drilled in the directional drilling hole formation layer follow l'<2r;
[0125] The number of directional boreholes to be drilled in each drilling site of the coal mining face is not less than n, n = (W / 2r+1), n is rounded upwards;
[0126] The number of all directional drill holes to be drilled in the coal mining face is N, N = (L / 500)*n, N is rounded upwards;
[0127] Step 34, designing the trajectory of each directional borehole to be drilled, so that each directional borehole to be drilled extends upward in an inclined direction until it enters the strongly weathered bedrock layer and then extends in a horizontal direction.
[0128] This setting can make the directional drilling control ranges of each section overlap with each other, leaving no blank area for management, and forming a large-area grouting advance transformation; among them, one directional drilling hole is arranged along the two drifts of the working face in each drilling site to ensure the effect of grouting transformation of the overlying roof of the tunnel.
[0129] Specifically, step 4 includes the following steps:
[0130] Step 41, designing a valve type grouting pipe;
[0131] like Figure 4 As shown, a plurality of slurry outlet holes are evenly opened along the circumferential direction on the side wall of the steel geological casing to form a slurry outlet group.
[0132] A plurality of slurry outlet groups evenly distributed along the axial direction are arranged on the side wall of the steel geological casing.
[0133] Make the plane angle of each slurry outlet hole distributed at 120° or 90°.
[0134] Step 42, a small check valve is nested on the outside of each slurry outlet.
[0135] Specifically, a steel casing with a specification of Ф89mm and a thickness of 4mm is adopted.
[0136] Each slurry discharge group includes 3-4 slurry discharge holes.
[0137] A slurry discharge group is set up in the geological casing every 2m.
[0138] The specifications of all the slurry outlet holes mentioned are Ф6mm.
[0139] In step 42, a plurality of small check valves are mounted one by one on corresponding positions of the slurry discharge group, so that each of the small check valves is connected to the slurry discharge hole one by one.
[0140] As a further implementation, Figure 5 As shown, according to conventional selection, multiple small check valves can be installed on the same annular sleeve, and the multiple annular sleeves can be sleeved on the corresponding slurry outlet groups, so that the small check valves are installed one by one corresponding to the slurry outlets of the slurry outlet groups, thereby strengthening the connection strength between the components.
[0141] Specifically, step 5 specifically includes the following steps:
[0142] Step 50, randomly selecting a directional borehole to be drilled;
[0143] Step 51, select a dual-power head directional drilling rig with a first drill bit diameter of 150 mm, a second drill bit diameter of 120 mm, and a hole depth of 7 m; select a hole orifice pipe with a length of 6 m and a diameter of 127 mm;
[0144] Step 52, the opening angle of the orifice pipe is 10° to 30°, a drill rod with a length of 3m is selected, and the inclination angle decreases by 0.5° to 1° for each drill rod driven;
[0145] Step 53, use a dual-power head directional drilling rig to drill along the designed route, so that one power head of the dual-power head directional drilling rig drives the drill tool to drill in the inner circle according to the designed trajectory; the other power head drives the steel valve grouting pipe to follow up in the outer circle, and the valve grouting pipe is installed synchronously during the drilling operation;
[0146] Step 54, when the valve grouting pipe reaches the bottom of the designed borehole, the drilling tool is withdrawn to complete a drilling operation;
[0147] Step 55, select a directional borehole to be drilled that has not yet been drilled, and repeat steps 51-54 until all the designed directional boreholes to be drilled have completed the drilling operation.
[0148] During the drilling process, the drilling rig is equipped with a directional measurement and control device (wireless inclinometer while drilling) and a gamma probe while drilling to grasp the drilling trajectory parameters in real time and accurately determine the rock properties of the rock formation, ensuring that the directional drilling is carried out according to the set trajectory.
[0149] In addition, according to the conventional choices in this field, during the construction process, geological information and related parameters can be mastered through various means such as cuttings logging (to determine the lithology of the rock formation), logging while drilling (to determine the coordinates of the bottom of the hole and the lithology of the rock formation), hydrological observation (to determine the water level elevation and leakage amount of the aquifer), and water pressure test (to verify the leakage amount of the rock formation, determine the water conduction channel of the rock formation, and determine the injectability of the rock formation), so as to provide a basis for the calculation of grouting volume and grouting ratio parameters.
[0150] Specifically, step 7 includes the following steps:
[0151] Step 70, randomly selecting a directional drilling hole;
[0152] Step 71, use the following formula to estimate the grouting volume Q of the directional drilling: 注 :
[0153] Q 注 =(1+A)×V×n×η,
[0154] Where A represents the slurry loss coefficient;
[0155] V represents the volume of the grouting range, V = πr 2 ×L; r represents the diffusion radius; L represents the length of the grouting section;
[0156] n represents the average porosity;
[0157] η represents the grouting filling coefficient;
[0158] Step 72, determining the multi-level water-cement ratio of the grouting material and manufacturing the corresponding grouting material;
[0159] Step 73, using a directional drill to send a packer into the directional borehole, so that the distance between the two packers is 10m;
[0160] Step 74, using a conversion valve to achieve expansion and contraction of the corresponding packer, forming an independent grouting section in the valve-type grouting pipe, and performing grouting operation on the directional borehole;
[0161] Step 75, determining the pressure gauge reading of the grouting orifice;
[0162] If the pressure gauge at the grouting orifice shows a pressure less than 0.3 MPa, use a slurry with a water-cement ratio of no more than 1:1 for low-pressure slow injection; the flow rate is controlled at 300 L / min, and the grouting is performed for 20 minutes with a rest period of 10 minutes; continue to perform step 74 according to this method until the first grouting is completed and enter step 76;
[0163] If the pressure gauge at the grouting orifice shows a pressure greater than 0.3 MPa and less than 1 MPa, continue to execute step 74 until the first grouting is completed and then proceed to step 76;
[0164] If the pressure gauge at the grouting orifice shows a pressure greater than 1Mpa, use slurry with a water-cement ratio of not less than 1.5:1, increase the gear of the grouting pump to perform high-pressure splitting grouting until the pressure is less than 1Mpa, and then determine the pressure value shown on the pressure gauge at the grouting orifice again;
[0165] Step 76, performing segmented grouting from the bottom of the hole to the hole mouth through the packer and the valve type grouting pipe;
[0166] After the first grouting of the whole hole horizontal grouting section is completed, after the initial setting of the slurry and before the final setting, the next grouting operation starts from the bottom of the hole to the hole mouth, and the grouting is stopped after the grouting volume requirement is reached, thus completing the grouting of a borehole;
[0167] Step 77, select a directional borehole that has not been grouted, and repeat steps 71-76 until all directional boreholes have completed grouting transformation.
[0168] like Figure 6 As shown, a grouting pipe with a single inflatable packer is used to go down to the bottom of the hole; it should be noted that the grouting pipe with a single inflatable packer in this embodiment is an existing conventional device;
[0169] When the casing material is poured in, there is a guide drill bit in the pipe when it is lowered, and the bottom of the pipe is not sealed. Therefore, a single packer is used to form a plug greater than 1m at the bottom of the pipe to prevent the slurry from flowing back from the bottom of the hole during grouting, affecting multiple grouting. When the casing material flows back from the hole mouth, stop pouring the casing material. At this time, the horizontal section of the directional hole is filled with casing material. Figure 7 shown.
[0170] A grouting device with two packers, such as Figure 8 As shown, the two packers are lowered into the bottom of the hole, and the distance between the two packers is about 10m, that is, each grouting section does not exceed 10m;
[0171] Open the two packers of the grouting device to expand them, close the valve grouting pipe of the grouting section, and realize grouting between the two packers. When the slurry reaches a certain amount, wash the hole with water, shrink the packer and withdraw the grouting device to grout the next section, and so on until the first grouting of the entire horizontal section is completed; after the initial setting and before the final setting of the previous grouting slurry, the next grouting is carried out from the bottom of the hole to the outside. And so on, until the grouting end standard is reached.
[0172] Step 76, select a borehole that has not been grouted, and repeat steps 71-75 until all boreholes have been grouted.
[0173] The uniformity of grouting is ensured by grouting in sections and multiple times; grouting with different water-cement ratios is injected according to the differences in each section of the stratum, achieving the purpose of consolidating the weathered bedrock and stabilizing the coal seam roof. Fig. 9 As shown, it can also effectively block loose layer water, eliminate the threat of water damage to the mining face, and play a key role in water-preserving coal mining.
[0174] The following is a connection method between the packer of the present invention and the valve type grouting pipe. It should be noted that the packer of the present invention adopts a known and commonly used packer;
[0175] like Figure 4 As shown, the packer is installed on the grouting pipe, and the packer is connected to an expansion valve through a connecting pipe; Figure 5 As shown, two packers are respectively installed at both ends of the grouting pipe, and the grouting holes on the grouting pipe are distributed between the two packers.
[0176] Further, in step 71: n is 35%; η is 0.7.
[0177] Further, in step 72, a water pressure test is first performed, and the water-cement ratio during the first grouting is determined according to the test results;
[0178] Among them, the water-cement ratio of the grouting material adopts four levels of water-cement ratio, which are 2:1, 1.5:1, 1:1, and 0.8:1 respectively.
[0179] Furthermore, in step 76, the grouting end standard is: the grouting pressure is not less than 6.0 MPa, the grouting volume is less than 30 L / min, and the duration is not less than 10 min.
Claims
1. A process for preventing sand collapse by controlling grouting of the top plate in advance in the underground directional pipe drilling in the thin bedrock area under the saturated sand layer, characterized in that: The following steps are involved: Step 1: Collect relevant geological data to determine the thickness and distribution of the intact bedrock layer, weathered bedrock layer, impermeable layer and sand layer in the roof of the coal mining face in the area to be transformed; draw a geological profile of the grouting transformation of the roof of the coal mining face, and establish a corresponding slurry diffusion control model for the injected weathered bedrock stratum; Step 2, design the number of drilling sites and the location of each drilling site; design a corresponding directional drilling hole-forming layer in each drilling site, and determine the horizontal trajectory of the directional drilling hole-forming layer; The step 2 specifically includes the following sub-steps: Step 21, excavating chambers and arranging drilling sites at opposite positions on both sides of the two drifts of the coal mining face near the withdrawal passage; Step 22, determining the extended length of the coal mining working face; If the extended length of the coal mining face is less than 500m, only one drilling site shall be set up at each drift; If the extended length of the coal mining face is greater than 500m, take the smallest integer greater than the extended length of the subsequent coal mining face divided by 500, and set up multiple drilling sites in sequence along the length direction of the coal mining face at each drift; Step 23, designing the directional drilling trajectory in the strongly weathered bedrock layer above the caving zone, so that the horizontal trajectory of each directional drilling hole layer is 5 to 10 meters higher than the upper part of the caving zone; Step 3, designing a plurality of directional drilling holes to be drilled in each directional drilling hole forming layer, and designing a trajectory of each directional drilling hole to be drilled; The step 3 specifically comprises the following steps: Step 31, in each directional drilling hole formation layer, design at least one directional drill hole to be drilled along two longitudinal grooves of the working surface; Step 32, determining the minimum distance l between the directional drilling hole layer and the top boundary of the fully weathered layer for each directional borehole to be drilled according to the geological report; According to the influence of the properties of slurries with different water-cement ratios on the slurry diffusion radius, combined with the grouting pressure and the diffusion law of slurry in weathered rock formations, the left and right lateral diffusion radius r of the slurry in the directional drilling hole formation is determined; Step 33, making the lateral spacing l' of all directional holes to be drilled in the directional drilling hole formation layer follow l'<2r; The number of directional boreholes to be drilled in each drilling site of the coal mining face is not less than n, n = (W / 2r+1), n is rounded upwards; The number of all directional drill holes to be drilled in the coal mining face is N, N = (L / 500)*n, N is rounded upwards; Step 34, designing the trajectory of each directional borehole to be drilled, so that each directional borehole to be drilled extends upward in an inclined manner until it enters the strongly weathered bedrock layer and then extends in a horizontal direction; Step 4, a plurality of grouting holes are opened on the wall of the geological casing, and a check valve with matching specifications is installed at each grouting hole to form a valve-type grouting pipe; Step 5, selecting a directional borehole to be drilled, and using a dual-power head directional drilling rig to perform drilling operations; One power head of the dual-power head directional drilling rig drives the drill tool to drill along the designed trajectory, forms a directional borehole and then withdraws the drill tool, while the other power head drives the valve-type grouting pipe to simultaneously install the valve-type grouting pipe during the drilling operation; a directional borehole is formed and a drilling operation is completed; Select a directional borehole to be drilled that has not yet been drilled, and follow the above steps in step 5 until all drilling operations are completed; Step 6, select a directional drill hole, use a grouting pipe to go down to the bottom of the directional drill hole, pour in the casing material, and stop pouring when the casing material returns from the hole mouth; Select other directional drill holes that have not been filled with casing material, and fill them with casing material according to the method in step 6 until all directional drill holes have been filled with casing material; Step 7, select a directional drill hole that has been filled with casing material for grouting; when the grout reaches the grouting volume required by the design, withdraw the grouting device and carry out the next stage of grouting; and so on, carry out multiple stages of grouting until the first horizontal stage of full-stage grouting is completed; Between the initial setting and final setting of the slurry of the first horizontal section full-section grouting, use a grouting device with two packers to go down to the bottom of the hole, and carry out the next grouting from the bottom of the hole to the hole mouth until the grouting end standard is reached; Select other boreholes that have been filled with casing material and perform grouting according to the above method in step 7 until all directional boreholes are grouted; The step 7 includes the following sub-steps: Step 70, randomly selecting a directional drilling hole; Step 71, use the following formula to estimate the grouting volume Q of the directional drilling: 注 : Q 注 =(1+A)×V×n×η, Where A represents the slurry loss coefficient; V represents the volume of the grouting range, V = πr 2 ×L; r represents the diffusion radius; L represents the length of the grouting section; n represents the average porosity; η represents the grouting filling coefficient; Step 72, determining the multi-level water-cement ratio of the grouting material and manufacturing the corresponding grouting material; Step 73, selecting the lowest water-cement ratio, and using a directional drill to send a packer into the directional borehole, with the distance between the two packers being 10 m; Step 74, using a conversion valve to achieve expansion and contraction of the corresponding packer, forming an independent grouting section in the valve-type grouting pipe, and grouting the directional borehole; Step 75, during the grouting operation, real-time determination of the pressure gauge reading at the grouting orifice; If the pressure gauge at the grouting orifice shows a pressure less than 0.3 MPa, use a slurry with a water-cement ratio of no more than 1:1 for low-pressure slow injection; the flow rate is controlled at 300 L / min, and the grouting is performed for 20 minutes with a rest period of 10 minutes; return to step 74 until the first grouting is completed and enter step 76; If the pressure gauge at the grouting orifice shows a pressure greater than 0.3 MPa and less than 1 MPa, return to step 74 until the first grouting is completed and proceed to step 76; If the pressure gauge at the grouting orifice shows a pressure greater than 1Mpa, use slurry with a water-cement ratio of not less than 1.5:1, increase the gear of the grouting pump to perform high-pressure splitting grouting until the pressure is less than 1Mpa, and then determine the pressure value shown on the pressure gauge at the grouting orifice again; Step 76, performing segmented grouting from the bottom of the hole to the hole mouth through the packer and the valve type grouting pipe; After the first grouting of the whole hole horizontal grouting section is completed, after the initial setting of the slurry and before the final setting, the next grouting operation starts from the bottom of the hole to the hole mouth, and the grouting is stopped after the grouting volume requirement is reached, thus completing the grouting of a borehole; Step 77, select a directional borehole that has not been grouted, and repeat steps 71-76 until all directional boreholes have completed grouting transformation; Step 8: Seal all directional drilled holes with cement slurry.
2. The process for preventing sand collapse by controlling grouting of the top plate in advance in the downhole directional pipe drilling in the thin bedrock area under the saturated sand layer as claimed in claim 1, characterized in that: In the step 1, the collected data include: tunnel excavation and working face recovery technology, production time, relevant geological reports, geological profiles, drilling data, well top and bottom comparison diagrams, mining engineering layout diagrams and geophysical exploration results data.
3. The process for preventing sand collapse by controlling grouting of the top plate in advance in the downhole directional pipe drilling in the thin bedrock area under the saturated sand layer as claimed in claim 1, characterized in that: The step 4 specifically includes the following sub-steps: Step 41, designing a valve type grouting pipe; A plurality of slurry outlet holes are evenly opened along the circumference on the side wall of the geological casing to form a slurry outlet group; A plurality of slurry discharge groups evenly distributed along the axial direction are arranged on the side wall of the geological casing; Make the plane angle of each slurry outlet hole distributed at 120° or 90°; Step 42, a check valve is nested on the outside of each slurry outlet.
4. The process for preventing sand collapse by controlling grouting of the top plate in advance in the downhole directional pipe drilling in the thin bedrock area under the saturated sand layer as claimed in claim 3, characterized in that: In the step 41, a steel geological casing with a specification of 89 mm and a thickness of 4 mm is used; Each slurry discharge group includes 3-4 slurry discharge holes; Every 2m, a slurry discharge group is set in the geological casing; All the slurry outlet holes mentioned above are of 6mm in diameter. In step 42, a plurality of small check valves are mounted one by one on corresponding positions of the slurry discharge group, so that each of the small check valves is connected to the slurry discharge hole one by one.
5. The process for preventing sand collapse by controlling grouting of the top plate in advance in the downhole directional pipe drilling in the thin bedrock area under the saturated sand layer as claimed in claim 1, characterized in that: The step 5 specifically includes the following sub-steps: Step 50, randomly selecting a directional borehole to be drilled; Step 51, select a dual-power head directional drilling rig with a first drill bit diameter of 150 mm, a second drill bit diameter of 120 mm, and a hole depth of 7 m; select a hole orifice pipe with a length of 6 m and a diameter of 127 mm; Step 52, the opening angle of the orifice pipe is 10° to 30°, a drill rod with a length of 3m is selected, and the inclination angle decreases by 0.5° to 1° for each drill rod driven; Step 53, use a dual-power head directional drilling rig to drill along the designed route, so that one power head of the dual-power head directional drilling rig drives the drill tool to drill in the inner circle according to the designed trajectory; the other power head drives the steel valve grouting pipe to follow up in the outer circle, and the valve grouting pipe is installed synchronously during the drilling operation; Step 54, when the valve grouting pipe reaches the bottom of the designed borehole, the drilling tool is withdrawn to complete a drilling operation; Step 55, select a directional borehole to be drilled that has not yet been drilled, and repeat steps 51-54 until all the designed directional boreholes to be drilled have completed the drilling operation.
6. The process for preventing sand collapse by controlling grouting of the top plate in advance in the downhole directional pipe drilling in the thin bedrock area under the saturated sand layer as claimed in claim 1, characterized in that: In the step 71: n is 35%; η is taken as 0.7; In step 72, a water pressure test is first performed, and the water-cement ratio for the first grouting is determined based on the test results; Among them, the water-cement ratio of the grouting material adopts four levels of water-cement ratio, which are 2:1, 1.5:1, 1:1, and 0.8:1 respectively.
7. The process for preventing sand collapse by controlling grouting of the top plate in advance in the downhole directional pipe drilling in the thin bedrock area under the saturated sand layer as claimed in claim 1, characterized in that: In step 76, the grouting end standard is: the grouting pressure is not less than 6.0 MPa, the grouting volume is less than 30 L / min, and the duration is not less than 10 min.