A two-stage drying, preheating and incineration system for high-moisture gasification ash

By designing a two-stage drying, preheating and incineration system for high-moisture gasified ash and slag, using a variety of components to achieve oxygen guidance, intelligent detection and heating, the problem of separation and incineration of moisture and carbon ash in high-moisture ash and slag is solved, and high efficiency is achieved. Environmentally friendly ash disposal.

CN118049654BActive Publication Date: 2024-10-29SHANDONG HUAYUAN BOILER
View PDF 19 Cites 0 Cited by

Patent Information

Application Number
CN202410266914.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-08
Publication Date
2024-10-29
Estimated Expiration
2044-03-08

AI Technical Summary

Technical Problem

In the existing technology, during the two-stage drying, preheating and incineration operation of high-moisture gasified ash and slag, it is difficult to efficiently separate moisture and carbon ash, and it is impossible to effectively achieve efficient incineration of high-moisture and ultra-low calorific value ash and slag.

Method used

A two-stage drying, preheating and incineration system for high-moisture gasified ash and slag is designed, using oxygen supply fans, PLC controllers, microwave drying adjustment components, pneumatic iris valves, infrared heating furnaces and cyclone separators to achieve oxygen guidance. , intelligent detection, microwave heating, drying preheating and separation to ensure efficient separation and incineration of moisture and carbon ash.

Benefits of technology

It achieves efficient drying, preheating and incineration of high moisture (>50%) flame retardant ash, reduces the generation of harmful gases, stabilizes combustion, reduces energy consumption, and is suitable for environmentally friendly treatment of high moisture ash.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118049654B_ABST
    Figure CN118049654B_ABST
Patent Text Reader

Abstract

The invention discloses a two-stage drying, preheating and incineration system for high-moisture gasified ash, which relates to the technical field of gasified ash recycling and utilization, and comprises a boiler side frame, an incineration boiler is installed inside the boiler side frame, the top of the incineration boiler is connected with a feed pump, a flow sensor is installed on the top of the feed pump, the side end of the feed pump is connected with a feed preheating multistage pipe, a hot mist collector is installed on the outer peripheral side of the pipe end of the feed preheating multistage pipe, the side end of the feed preheating multistage pipe is connected with a first drying treatment tank, and a steam convergence tank is installed on the top of the first drying treatment tank. The overall device effectively realizes the efficient separation of moisture and carbon ash in the drying, preheating and modification integrated device of high-moisture (>50%) difficult-to-burn ash, breaks through the efficient and clean incineration of high-moisture ash and solid waste in a composite cycle, reduces the generation of harmful gases, has stable combustion, and a relatively small excess coefficient, can prevent the generation of excessive ammonia oxides, and is environmentally friendly and easy to promote.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of gasification ash recovery and utilization, and in particular to a two-stage drying, preheating and incineration system for high-moisture gasification ash. Background Art

[0002] High-efficiency coal gasification technology is an important application direction in clean coal technology. During the coal gasification process, most of the carbon contained in the coal reacts with H2O, CO2, O2, etc. to generate raw coal gas, and other inorganic minerals and unburned carbon contained in the coal are converted into gasified ash under high temperature conditions. At present, the treatment and utilization rate of gasified ash is low. Except for a small amount of usable gasified ash, it is mainly used in building materials, soil remediation, road construction, and aluminum silicon ceramic preparation. A large amount of waste gasified ash is disposed of by landfill, which causes waste of resources and environmental pollution. Gasified ash contains a lot of unburned carbon. Sending the gasified ash into the boiler for combustion to generate steam is an efficient and environmentally friendly way to treat gasified ash.

[0003] However, in the existing technology, during the two-stage drying, preheating and incineration process of high-moisture gasification ash, it is difficult to efficiently separate the moisture and carbon ash of high-moisture (>50%) difficult-to-burn ash in the integrated drying, preheating and modification device. At the same time, the existing incineration technology and equipment cannot effectively achieve efficient incineration of high-moisture and ultra-low calorific value ash. Therefore, it is necessary to propose a two-stage drying, preheating and incineration system for high-moisture gasification ash. Summary of the invention

[0004] The purpose of the present invention is to provide a two-stage drying, preheating and incineration system for high-moisture gasified ash, so as to solve the problem that in the two-stage drying, preheating and incineration process of high-moisture gasified ash, it is difficult to efficiently separate the moisture and carbon ash of high-moisture (>50%) non-combustible ash in the drying, preheating and modification integrated device, and the existing incineration technology and equipment cannot effectively achieve efficient incineration of high-moisture and ultra-low calorific value ash.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a two-stage drying, preheating and incineration system for high-moisture gasified ash, comprising a boiler side frame, an incineration boiler is installed inside the boiler side frame, the top of the incineration boiler is connected to a feed pump, a flow sensor is installed on the top of the feed pump, the side end of the feed pump is connected to a feed preheating multistage pipe, a hot mist collector is installed on the outer peripheral side of the pipe end of the feed preheating multistage pipe, the side end of the feed preheating multistage pipe is connected to a first drying treatment tank, a steam convergence tank is installed on the top of the first drying treatment tank, a first electric iris valve structure is installed at the bottom end of the first drying treatment tank, a second drying treatment tank is installed at the bottom end of the first electric iris valve structure, a second drying treatment tank is installed at the bottom end of the second drying treatment tank, a third drying treatment tank is installed at the bottom end of the second electric iris valve structure, and the second electric iris valve structure is installed at the bottom end of the second drying treatment tank. The membrane valve structure is the same as the first electric iris valve structure, the side ends of the first drying process tank, the second drying process tank and the third drying process tank are installed with microwave drying adjustment components, the side ends of the boiler side frames are fastened with supporting side frames, the side ends of the supporting side frames are mounted with bottom shaft rotating rail seats, the side ends of the first drying process tank are connected with secondary drying components, the top of the first drying process tank is installed with a transmission component, a plurality of groups of pressure balance regulators are installed on the outer circumference of the conduction shaft of the transmission component, a plurality of groups of pressure balance regulators are provided with a plurality of upward hot air pipes on the side wall surfaces, the outer circumferences of the plurality of upward hot air pipes are connected with heat collecting valve ports, the interior of the second drying process tank is installed with spiral drying rakes, the interior of the third drying process tank is installed with a slag powder drying component, the axis of the bottom shaft rotating rail seat is integrated with the conduction shafts of the slag powder drying component and the transmission component in turn.

[0006] Preferably, the slag powder drying component includes a material receiving chassis, the axial end of the material receiving chassis is connected to an installation shaft connecting column, and multiple groups of honeycomb rotating heat conductive plates are installed on the outer circumference of the shaft connecting column, and there are grinding gaps between the bottom walls of the multiple groups of honeycomb rotating heat conductive plates and the top wall surfaces of the material receiving chassis, the surfaces of the multiple groups of honeycomb rotating heat conductive plates are provided with pin sharp groove plates, and the outer side wall surfaces of the multiple groups of honeycomb rotating heat conductive plates are fastened with volute bulk material trays.

[0007] Preferably, the first electric iris valve structure includes a bottom connection plate, and the two side surfaces of the bottom connection plate are respectively installed and connected to the bottom of the first drying treatment tank and the top of the second drying treatment tank. A pneumatic iris valve is installed inside the bottom connection plate, and a sealing connection groove is provided at the axial closed end of the pneumatic iris valve. The sealing connection groove and the conduction shaft are fit-connected by a sealing ring.

[0008] Preferably, the secondary drying component includes a feed pipe, the side end of the feed pipe is connected to a pneumatic conveying device, the side end of the pneumatic conveying device is connected to a centrifuge tank, an infrared heating furnace is installed on the outside of the side end of the centrifuge tank, and the infrared heating furnace is interspersed and moved inside the centrifuge tank through multiple groups of infrared radiation heaters to form a ring distribution, the side end of the feed pipe is connected to the third drying treatment tank, the side end of the centrifuge tank is connected to a waste residue collection box, the side end of the infrared heating furnace is fastened to a bracket, a return device is installed on the top of the bracket, the top of the return device is connected to a return pipe, and the top side end of the return pipe is connected to the surface of the first drying treatment tank.

[0009] Preferably, a metering doser is installed on the top of the infrared heating furnace, and the side end of the metering doser is connected to a first modifier dosing pipe, and the side end of the first modifier dosing pipe is connected to the top of the centrifuge tank, and the top of the metering doser is connected to a second modifier dosing pipe, and the side end of the second modifier dosing pipe is connected to the side wall of the third drying treatment tank, and flow control valves are installed on the outside of the side ends of the first modifier dosing pipe and the second modifier dosing pipe.

[0010] Preferably, a cyclone separator is installed at the bottom side end of the bottom shaft rotating rail seat, and the cyclone separator runs along the inner walls of the second drying treatment tank and the third drying treatment tank in sequence through a separation pipeline.

[0011] Preferably, the microwave drying adjustment component includes a bottom mounting bracket, a microwave generator is installed on the top of the bottom mounting bracket, the side ends of the microwave generator are respectively connected to three groups of microwave generating tubes, guides are installed on the outside of the side ends of the three groups of microwave generating tubes, the side ends of the three groups of microwave generating tubes are connected to the surfaces of the first drying treatment tank, the second drying treatment tank, and the third drying treatment tank in turn, and regulating valves are installed on the outer circumferences of the three groups of microwave generating tubes.

[0012] Preferably, the transmission assembly includes a transmission motor, the bottom output end of the transmission motor is connected to a first driving gear, the tooth angle end of the first driving gear is meshedly connected with a toothed belt, the inner side end of the toothed belt is meshedly connected with a second driving gear, and the bottom axial end of the second driving gear is equipped with a speed regulator.

[0013] Preferably, the side wall surface of the steam convergence tank is connected to a heat transfer pipe, a throttle valve is installed on the side end of the heat transfer pipe, the bottom end of the heat transfer pipe is connected to a heat pump, the side end of the heat pump is connected to an air pipe, the side end of the air pipe is connected to a heat collection chamber, and the top of the heat collection chamber is connected to the bottom of the incineration boiler.

[0014] Preferably, an air flow guide is installed at the side end of the incineration boiler, the side end of the air flow guide is connected to an oxygen supply fan, an air supply plate tube is installed at the top of the incineration boiler, and a PLC controller is installed on the side wall surface of the first drying tank.

[0015] Compared with the prior art, the present invention has the following beneficial effects:

[0016] 1. In the present invention, when the whole device is operating, the oxygen supply fan is used in cooperation with the air flow guide to provide a directional supply of oxygen guide airflow to the incineration boiler, thereby ensuring the operating efficiency of the incineration boiler and reducing the operating energy consumption. In cooperation with the PLC controller, the temperature, air pressure, flow rate and balance inside the whole device are effectively controlled and adjusted in cooperation with the corresponding sensor group. In cooperation with the wind plate tube, it is convenient for the operation of the whole device to form a secondary air supply operation, further reducing the energy consumption used by the device. Then, the high-moisture gasified ash is transported in cooperation with the suction pump and the feed preheating multi-stage pipe, and the flow rate of the high-moisture gasified ash is controlled according to the flow sensor. At the same time, the hot mist collector is started to collect and process the particulate matter in the high-moisture gasified ash during transportation, and according to the first drying treatment tank and the second The sensor group installed on the inner wall surface of the drying tank and the third drying tank performs real-time intelligent detection on the overall device. When preheating and drying are insufficient, the microwave generator is started, and the microwave heating generated is used to cooperate with the guiding effect of the guides in the three groups of microwave generating tubes to efficiently, accurately and quickly heat the slag ash inside the first drying tank, the second drying tank and the third drying tank, thereby reducing the high content of water in the carbon ash and improving the separation of water and carbon ash. The overall device effectively realizes the efficient separation of water and carbon ash in the drying, preheating and modification integrated device of high-moisture (>50%) difficult-to-burn ash, breaks through the efficient and clean incineration of high-moisture ash and solid waste in a composite cycle, reduces the generation of harmful gases, has stable combustion, and a relatively small excess coefficient, which can prevent the generation of excessive ammonia oxides, and is environmentally friendly and easy to promote.

[0017] 2. In the present invention, the pneumatic iris valve is opened after the processing operation inside the first drying tank, so that the sealing connection slot and the conduction shaft are separated, so that the processed material can be transported to the second drying tank. With the cooperation of the spiral drying rake, the ash and slag that fall into the tank are dried and preheated. After that, the second electric iris valve structure is started according to the preset program, so that the material after spiral drying falls into the third drying tank. When the material falls into the receiving bottom plate, the large pieces of ash and slag will vibrate with the cooperation of the zigzag-shaped bulk material plate, so that the large pieces of ash and slag will be The slag and ash are formed into small particles due to mutual forces, and the slag and ash are further processed and ground with the cooperation of the grinding gap between the pin sharp groove plate surface, the bottom wall of multiple groups of honeycomb rotating heat conduction plates and the top wall surface of the receiving bottom plate. In addition, the heat transfer efficiency is improved with the cooperation of multiple groups of honeycomb rotating heat conduction plates, which facilitates the drying of water molecules in the slag and ash. In addition, with the cooperation of the cyclone separator, it is convenient to adsorb and separate the moisture, gas and carbon ash particles generated in the second drying treatment tank and the third drying treatment tank, so as to ensure the overall efficient incineration of high-moisture and ultra-low calorific value ash.

[0018] 3. In the present invention, when it is detected that the water content of the carbon ash in the centrifugal tank is too high with the cooperation of the return device, the carbon ash and moisture will be adsorbed, and the adsorbed material will be returned to the first drying treatment tank for drying and preheating again. When the centrifugal tank is operating, the modifier in the metering feeder is adjusted according to the demand by using the first modifier feeding pipe and the second modifier feeding pipe under the action of the flow control valve according to the temperature sensor group and the balance sensor group on the side wall of the third drying treatment tank and the inside of the centrifugal tank, so that the preheating drying, moisture and carbon ash content in the centrifugal tank are in a safe balance. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a main structural schematic diagram of a two-stage drying, preheating and incineration system for high-moisture gasified ash of the present invention;

[0020] Figure 2 It is a schematic structural diagram of a side view of a two-stage drying, preheating and incineration system for high-moisture gasified ash of the present invention;

[0021] Figure 3 It is a structural schematic diagram of a microwave drying regulating component in a two-stage drying, preheating and incineration system for high-moisture gasified ash of the present invention;

[0022] Figure 4 It is a schematic diagram of the installation position structure of the secondary drying component in a two-stage drying, preheating and incineration system of high-moisture gasified ash of the present invention;

[0023] Figure 5 It is a structural schematic diagram of a secondary drying component in a two-stage drying, preheating and incineration system for high-moisture gasified ash of the present invention;

[0024] Figure 6 It is a structural schematic diagram of a transmission component in a two-stage drying, preheating and incineration system for high-moisture gasified ash of the present invention;

[0025] Figure 7 It is a schematic diagram of the installation position structure of the slag powder drying component in the two-stage drying, preheating and incineration system of high-moisture gasified ash of the present invention;

[0026] Figure 8 The invention relates to a two-stage drying, preheating and incineration system for high-moisture gasified ash. Figure 7 A schematic diagram of the enlarged structure at point A;

[0027] Fig. 9 It is a structural schematic diagram of a slag powder drying component in a two-stage drying, preheating and incineration system for high-moisture gasified ash of the present invention;

[0028] Fig.10 The present invention is a schematic structural diagram of a first electric iris valve structure in a two-stage drying, preheating and incineration system for high-moisture gasified ash.

[0029] In the figure: 1, boiler side frame; 2, wind plate tube; 3, air flow guide; 4, oxygen supply fan; 5, incineration boiler; 6, heat collection chamber; 7, suction pump; 8, flow sensor; 9, material feeding preheating multi-stage tube; 10, transmission assembly; 101, transmission motor; 102, first drive gear; 103, second drive gear; 104, toothed belt; 105, speed regulator; 11, first drying tank; 12, first electric iris valve structure; 121, bottom plate; 122, pneumatic iris valve; 123, sealing connection notch; 13, steam collection tank; 14, second drying tank; 15, second electric iris valve structure; 16, microwave drying adjustment assembly; 161, bottom mounting bracket; 162, microwave generator; 163, guide; 164, microwave generating tube; 165, regulating valve; 17. Support side frame; 18. Secondary drying component; 181. Feed pipe; 182. Pneumatic conveying device; 183. Infrared heating furnace; 184. Bracket; 185. Returner; 186. Return pipe; 187. Centrifugal tank; 188. Metering feeder; 189. First modifier feeding pipe; 1890. Second modifier feeding pipe; 19. Air pipe; 20. Heat pump; 21. Heat transfer pipe; 22. Throttle valve; 23. PLC controller; 24. Cyclone separator; 25. Bottom shaft rotating rail seat; 26. Slag powder drying component; 261. Material receiving bottom plate; 262. Honeycomb rotating heat conduction plate; 263. Shaft connecting column; 264. Pin sharp groove plate surface; 265. Hui pattern bulk material tray; 27. Spiral drying rake blade; 28. Pressure balance regulator; 29. ​​Upward hot air pipe; 30. Heat collecting valve port. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the implementation regulations described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] Reference Figure 1-Figure 10 As shown: a high-moisture gasification ash two-stage drying preheating and incineration system, including a boiler side frame 1, an incineration boiler 5 is installed inside the boiler side frame 1, the top of the incineration boiler 5 is connected to a suction pump 7, a flow sensor 8 is installed on the top of the suction pump 7, the side end of the suction pump 7 is connected to a feed preheating multistage pipe 9, a hot mist collector is installed on the outer peripheral side of the pipe end of the feed preheating multistage pipe 9, the side end of the feed preheating multistage pipe 9 is connected to a first drying treatment tank 11, a steam gathering tank 13 is installed on the top of the first drying treatment tank 11, a first electric iris valve structure 12 is installed at the bottom end of the first drying treatment tank 11, a second drying treatment tank 14 is installed at the bottom end of the first electric iris valve structure 12, a second drying treatment tank 14 is installed at the bottom end of the second drying treatment tank 14, a third drying treatment tank is installed at the bottom end of the second electric iris valve structure 15, and the second electric iris valve structure 15 and the first electric iris valve structure 12 are connected. The first drying tank 11, the second drying tank 14 and the third drying tank have the same structure. A microwave drying regulating assembly 16 is installed on the side ends of the first drying tank 11, a supporting side frame 17 is fastened to the side end of the boiler side frame 1, and a bottom shaft rotating rail seat 25 is mounted on the side end of the supporting side frame 17. The side end of the first drying tank 11 is connected with a secondary drying assembly 18. A transmission assembly 10 is installed on the top of the first drying tank 11. A plurality of pressure balance regulators 28 are installed on the outer peripheral side of the conduction shaft of the transmission assembly 10. A plurality of upward hot air pipes 29 are arranged on the side wall surfaces of the plurality of pressure balance regulators 28. The outer peripheral side of the plurality of upward hot air pipes 29 is connected with a heat collecting valve port 30. A spiral drying rake 27 is installed inside the second drying tank 14. A slag powder drying assembly 26 is installed inside the third drying tank. The axis of the bottom shaft rotating rail seat 25 is integrated with the slag powder drying assembly 26 and the conduction shaft of the transmission assembly 10 in sequence.

[0032] according to Figure 7 and Fig. 9As shown, the slag powder drying assembly 26 includes a material receiving chassis 261, the axial end of the material receiving chassis 261 is connected to the installation shaft connecting column 263, and multiple groups of honeycomb rotating heat conducting plates 262 are installed on the outer peripheral side of the shaft connecting column 263. There are grinding gaps between the bottom walls of the multiple groups of honeycomb rotating heat conducting plates 262 and the top wall surface of the material receiving chassis 261. The surfaces of the multiple groups of honeycomb rotating heat conducting plates 262 are provided with pin sharp groove plate surfaces 264. The outer wall surfaces of the multiple groups of honeycomb rotating heat conducting plates 262 are fastened with the zigzag pattern bulk material tray 26 5. When the material falls into the receiving bottom plate 261, the large pieces of ash will vibrate with the cooperation of the zigzag bulk material plate 265, so that the large pieces of ash will form small particles due to the mutual force, and the ash will be further processed and ground with the cooperation of the grinding gap between the pin sharp groove plate surface 264 and the bottom wall of the multiple groups of honeycomb rotating heat conductive plates 262 and the top wall surface of the receiving bottom plate 261, and the heat transfer efficiency is improved with the cooperation of the multiple groups of honeycomb rotating heat conductive plates 262, so as to facilitate the drying of water molecules in the ash.

[0033] according to Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 6 , Figure 7 and Fig.10 As shown, the first electric iris valve structure 12 includes a bottom plate 121, and the two side surfaces of the bottom plate 121 are respectively installed and connected to the bottom of the first drying treatment tank 11 and the top of the second drying treatment tank 14. A pneumatic iris valve 122 is installed inside the bottom plate 121. A sealing connection slot 123 is opened at the axial closed end of the pneumatic iris valve 122. The sealing connection slot 123 and the conductive shaft are fitted and connected through a sealing ring. By utilizing the first electric iris valve structure 12 and the second electric iris valve structure 15, that is, the bottom plate 121, the first drying treatment tank 11, the second drying treatment tank 14 and the third drying treatment tank are connected in stages. After the internal processing operation of the first drying treatment tank 11, the second drying treatment tank 14 and the third drying treatment tank is completed, the pneumatic iris valve 122 is opened to separate the sealing connection slot 123 and the conductive shaft, so as to facilitate the transportation of the processed materials.

[0034] according to Figure 1 , Figure 4 and Figure 5As shown, the secondary drying component 18 includes a feed pipe 181, the side end of the feed pipe 181 is connected to a pneumatic conveying device 182, the side end of the pneumatic conveying device 182 is connected to a centrifugal tank 187, an infrared heating furnace 183 is installed on the outside of the side end of the centrifugal tank 187, and the infrared heating furnace 183 is interspersed and moved inside the centrifugal tank 187 through multiple groups of infrared radiation heaters to form a ring distribution, the side end of the feed pipe 181 is connected to the third drying treatment tank, the side end of the centrifugal tank 187 is connected to a waste residue collection box, the side end of the infrared heating furnace 183 is fastened to a bracket 184, a return device 185 is installed on the top of the bracket 184, and the top end of the return device 185 is connected to a return pipe 186, and the return pipe 186 The top side end is connected to the surface of the first drying treatment tank 11. When the processed carbon slag material is transported to the centrifugal tank 187 for centrifugal operation through the feed pipe 181 with the cooperation of the pneumatic conveying device 182, and the infrared heating furnace 183 is started. According to the sensor group on the inner wall of the centrifugal tank 187, multiple groups of infrared radiation heaters that are interspersed and run in the centrifugal tank 187 to form a ring distribution are started to evaporate water molecules from the carbon ash to achieve rapid drying. Then, with the cooperation of the return device 185, when it is detected that the water content of the carbon ash in the centrifugal tank 187 is too high, the carbon ash and moisture will be adsorbed, and the adsorbed material will be returned to the first drying treatment tank 11 for another drying preheating operation.

[0035] according to Figure 1 , Figure 4 and Figure 5 As shown, a metering doser 188 is installed on the top of the infrared heating furnace 183, and the side end of the metering doser 188 is connected to a first modifier dosing pipe 189, and the side end of the first modifier dosing pipe 189 is connected to the top of the centrifugal tank 187, and the top of the metering doser 188 is connected to a second modifier dosing pipe 1890, and the side end of the second modifier dosing pipe 1890 is connected to the side wall of the third drying treatment tank, and the side ends of the first modifier dosing pipe 189 and the second modifier dosing pipe 1890 are connected to the side wall of the third drying treatment tank. A flow control valve 1891 is installed on the outside. When the centrifugal tank 187 is operating, the modifying agent in the metering feeder 188 is adjusted according to the demand by using the first modifying agent adding pipe 189 and the second modifying agent adding pipe 1890 under the action of the flow control valve 1891 according to the temperature sensor group and the balance sensor group on the side wall of the third drying treatment tank and inside the centrifugal tank 187, so that the preheating drying, moisture and carbon ash content in the centrifugal tank 187 are in a safe balance.

[0036] according to Figure 2 , Figure 4 , Figure 6 and Figure 7As shown, a cyclone separator 24 is installed at the bottom side end of the bottom shaft rotating rail seat 25. The cyclone separator 24 runs on the inner walls of the second drying treatment tank 14 and the third drying treatment tank in sequence through a separation pipeline. With the cooperation of the cyclone separator 24, it is convenient to adsorb and separate the moisture, gas and carbon ash particles generated in the second drying treatment tank 14 and the third drying treatment tank, thereby ensuring the overall efficient incineration of high-moisture and ultra-low calorific value ash.

[0037] according to Figure 2 and Figure 3 As shown, the microwave drying regulating assembly 16 includes a bottom mounting bracket 161, a microwave generator 162 is installed on the top of the bottom mounting bracket 161, and the side ends of the microwave generator 162 are respectively connected with three groups of microwave generating tubes 164, and the side ends of the three groups of microwave generating tubes 164 are externally installed with guides 163, and the side ends of the three groups of microwave generating tubes 164 are connected with the surfaces of the first drying treatment tank 11, the second drying treatment tank 14, and the third drying treatment tank in sequence, and the external peripheral sides of the three groups of microwave generating tubes 164 are installed with regulating valves 165. When the high-moisture gasification ash is preheated in two stages, the microwave generator 162 is connected to the surface of the first drying treatment tank 11, the second drying treatment tank 14, and the third drying treatment tank. During operation, the entire device is intelligently detected in real time according to the sensor group installed on the inner wall surface of the first drying tank 11, the second drying tank 14, and the third drying tank. When preheating and drying are insufficient, the microwave generator 162 is started, and the microwave heating generated is used to cooperate with the guiding function of the guide 163 in the three groups of microwave generating tubes 164 to efficiently, accurately and quickly heat the slag ash inside the first drying tank 11, the second drying tank 14, and the third drying tank, thereby reducing the high content of water in the carbon ash and improving the separation of water and carbon ash.

[0038] according to Figure 1 , Figure 2 , Figure 4 and Figure 6 As shown, the transmission assembly 10 includes a transmission motor 101, the bottom output end of the transmission motor 101 is connected to a first driving gear 102, the tooth angle end of the first driving gear 102 is meshedly connected with a toothed belt 104, the inner side end of the toothed belt 104 is meshedly connected with a second driving gear 103, and a speed regulator 105 is installed at the bottom axial end of the second driving gear 103. With the cooperation of the transmission motor 101, it is convenient to make the first driving gear 102, the toothed belt 104 and the second driving gear 103 rotate in sequence under the action of the speed regulator 105, thereby driving the conduction shaft to drive the spiral drying rakes 27 and the slag powder drying assembly 26, which are respectively located inside the second drying treatment tank 14 and the third drying treatment tank to form an operation.

[0039] according to Figure 1 and Figure 4As shown, the side wall surface of the steam convergence tank 13 is connected with a heat transfer pipe 21, a throttle valve 22 is installed at the side end of the heat transfer pipe 21, the bottom end of the heat transfer pipe 21 is connected with a heat pump 20, the side end of the heat pump 20 is connected with an air pipe 19, the side end of the air pipe 19 is connected with a heat collection chamber 6, the top of the heat collection chamber 6 is connected to the bottom of the incineration boiler 5, with the cooperation of the heat pump 20, when the first drying treatment tank 11, the second drying treatment tank 14 and the third drying treatment tank are operating, the evaporation heat generated will, under the action of the heat transfer pipe 21, transport the low heat source steam to the heat collection chamber 6 through the air pipe 19, so as to facilitate the energy supply to the incineration boiler 5 and reduce the overall operation energy consumption.

[0040] according to Figure 1 and Figure 2 As shown, an air flow guide 3 is installed at the side end of the incineration boiler 5, and the side end of the air flow guide 3 is connected to an oxygen supply fan 4. An air supply plate tube 2 is installed on the top of the incineration boiler 5, and a PLC controller 23 is installed on the side wall surface of the first drying treatment tank 11. When performing the overall operation, the oxygen supply fan 4 is used in cooperation with the air flow guide 3 to provide a directional supply of oxygen guide airflow to the incineration boiler 5, thereby ensuring the operating efficiency of the incineration boiler 5 and reducing the operating energy consumption. In addition, in cooperation with the PLC controller 23, the temperature, air pressure, flow rate and balance inside the overall device are effectively controlled and adjusted in cooperation with the corresponding sensor group. In cooperation with the air plate tube 2, it is convenient for the operation of the overall device to form a secondary air supply operation, thereby further reducing the energy consumption used by the device.

[0041] The wiring diagram of the wind plate tube 2, air flow guide 3, oxygen supply fan 4, suction pump 7, transmission motor 101, microwave generator 162, return feeder 185, centrifugal tank 187, metering feeder 188, heat pump 20, PLC controller 23, cyclone separator 24 and pressure balance regulator 28 in the present invention belongs to the common knowledge in the field, and its working principle is a well-known technology. The model is selected according to the actual use. Therefore, the control method and wiring arrangement of the wind plate tube 2, air flow guide 3, oxygen supply fan 4, suction pump 7, transmission motor 101, microwave generator 162, return feeder 185, centrifugal tank 187, metering feeder 188, heat pump 20, PLC controller 23, cyclone separator 24 and pressure balance regulator 28 are no longer explained in detail.

[0042] The method of use and working principle of this device: First, when the entire device is operating, the oxygen supply fan 4 is used in cooperation with the airflow guide 3 to provide a directional supply of oxygen guide airflow to the incineration boiler 5, thereby ensuring the operating efficiency of the incineration boiler 5 and reducing the operating energy consumption. In cooperation with the PLC controller 23, the temperature, air pressure, flow rate, and balance inside the entire device are effectively controlled and adjusted in cooperation with the corresponding sensor group. In cooperation with the wind plate tube 2, it is convenient for the operation of the entire device to form a secondary air supply operation, further reducing the energy consumption used by the device. Then, the high-moisture gasified ash is transported in cooperation with the suction pump 7 and the feed preheating multi-stage pipe 9, and the flow rate of the high-moisture gasified ash is controlled according to the flow sensor 8, and the hot mist is started at the same time. The gas collector collects and processes the particulate matter in the high-moisture gasified ash during transportation, and performs real-time intelligent detection of the entire device based on the sensor group (pressure sensor, temperature sensor and temperature difference balance sensor) installed on the inner wall surface of the first drying tank 11, the second drying tank 14 and the third drying tank. When the preheating drying is insufficient, the microwave generator 162 is started, and the microwave heating generated is used to cooperate with the guiding effect of the guide 163 from the three groups of microwave generating tubes 164 to efficiently, accurately and quickly heat the slag ash inside the first drying tank 11, the second drying tank 14 and the third drying tank, thereby reducing the high content of water in the carbon ash and improving the separation of water and carbon ash, and then transporting it to the first drying tank. In the treatment tank 11, with the cooperation of multiple groups of pressure balance regulators 28 in the first drying treatment tank 11, wind pressure regulation is generated inside the first drying treatment tank 11, so that after the internal hot steam is affected by the wind pressure, it will form a pressure balance with the wind pressure, so that the hot steam generated as a whole is restricted and cannot expand upward. Then, with the cooperation of multiple upward hot air pipes 29 and heat collection valve ports 30, it is convenient to adsorb the restricted hot steam and rise and gather in the steam gathering tank 13, so that with the cooperation of the heat pump 20 later, when the first drying treatment tank 11, the second drying treatment tank 14 and the third drying treatment tank are operating, the evaporated hot gas generated will be transported to the heat collection chamber 6 through the air pipe 19 under the action of the heat transfer pipe 21. It is convenient to supply energy to the incineration boiler 5 and reduce the overall energy consumption. Then, with the cooperation of the transmission motor 101, it is convenient to rotate the first drive gear 102, the toothed belt 104 and the second drive gear 103 in sequence under the action of the speed regulator 105, and then drive the transmission shaft to drive the spiral drying rake 27 and the slag powder drying component 26 to form a rotation operation inside the second drying treatment tank 14 and the third drying treatment tank respectively. Secondly, after the processing operation inside the first drying treatment tank 11, the pneumatic iris valve 122 is opened to separate the sealing connection notch 123 and the transmission shaft, so that the processed material is transported to the second drying treatment tank 14. With the cooperation of the spiral drying rake 27, the ash and slag that fall into it are dried and preheated.Afterwards, the second electric iris valve structure 15 is started according to the preset program, so that the spiral dried material falls into the third drying tank. When the material falls into the receiving bottom plate 261, the large pieces of ash will vibrate with the cooperation of the spiral pattern bulk material plate 265, so that the large pieces of ash will form small-sized ash particles due to mutual force, and the ash will be further processed and ground with the cooperation of the grinding gap between the pin sharp groove plate surface 264 and the bottom wall of the multiple groups of honeycomb rotating heat conducting plates 262 and the top wall surface of the receiving bottom plate 261, and the multiple groups of honeycomb rotating heat conducting plates 262 are cooperated to improve the heat transfer. Thermal efficiency is convenient for drying water molecules in the slag ash, and with the cooperation of the cyclone separator 24, it is convenient to adsorb and separate the moisture, gas and carbon ash particles generated in the second drying treatment tank 14 and the third drying treatment tank, so as to ensure the overall high-moisture and ultra-low calorific value ash slag efficient incineration. After that, the treated carbon slag material is transported to the centrifugal tank 187 by the feed pipe 181 in cooperation with the pneumatic conveying device 182 for centrifugal operation, and the infrared heating furnace 183 is started. According to the sensor group on the inner wall of the centrifugal tank 187, the sensor group 183 is inserted into the centrifugal tank 187. The multiple groups of infrared radiation heaters distributed in an annular manner are started to evaporate water molecules from the carbon ash to achieve rapid drying. Then, with the cooperation of the return device 185, when it is detected that the water content of the carbon ash in the centrifugal tank 187 is too high, the carbon ash and water will be adsorbed, and the adsorbed materials will be returned to the first drying treatment tank 11 for drying and preheating again. When the centrifugal tank 187 is operating, the modified additive in the metering feeder 188 cooperates with the temperature sensor group and the balance sensor group on the side wall of the third drying treatment tank and the inside of the centrifugal tank 187, and according to the demand The first modifier dosing pipe 189 and the second modifier dosing pipe 1890 are adjusted under the action of the flow control valve 1891, so that the preheating drying, moisture and carbon ash content in the centrifugal tank 187 are in a safe balance, so that the overall device effectively realizes the efficient separation of moisture and carbon ash in the drying, preheating and modification integrated device of high-moisture (>50%) refractory ash, and breaks through the high-efficiency and clean incineration of high-moisture ash and solid waste in a composite cycle, reduces the generation of harmful gases, has stable combustion, and a relatively small excess coefficient, which can prevent the generation of excessive ammonia oxides, and is environmentally friendly and easy to promote.

[0043] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A two-stage drying, preheating and incineration system for high-moisture gasified ash, characterized in that: The invention comprises a boiler side frame (1), wherein an incineration boiler (5) is installed inside the boiler side frame (1), the top of the incineration boiler (5) is connected to a feed pump (7), the top of the feed pump (7) is provided with a flow sensor (8), the side end of the feed pump (7) is connected to a feed preheating multistage pipe (9), a hot mist collector is installed on the outer peripheral side of the pipe end of the feed preheating multistage pipe (9), the side end of the feed preheating multistage pipe (9) is connected to a first drying treatment tank (11), the top of the first drying treatment tank (11) is provided with a A steam gathering tank (13) is arranged, a first electric iris valve structure (12) is installed at the bottom end of the first drying treatment tank (11), a second drying treatment tank (14) is installed at the bottom end of the first electric iris valve structure (12), a second electric iris valve structure (15) is installed at the bottom end of the second drying treatment tank (14), a third drying treatment tank is installed at the bottom end of the second electric iris valve structure (15), the second electric iris valve structure (15) and the first electric iris valve structure (12) have the same structure, and the first drying treatment tank (11) is provided with a steam gathering tank (13), a first electric iris valve structure (12) is installed at the bottom end of the first drying treatment tank (11), a second electric iris valve structure (15) is installed at the bottom end of the second drying treatment tank (14), and a third drying treatment tank is installed at the bottom end of the second electric iris valve structure (15), the second electric iris valve structure (15) and the first electric iris valve structure (12) have the same structure, and the first drying treatment tank (11) is provided with a steam gathering tank (13), a first electric iris valve structure (12) and a second electric iris valve structure (15) are provided with a steam gathering tank (13), the first electric iris valve structure (12) and the first electric iris valve structure (12 ... A microwave drying adjustment assembly (16) is installed at the side ends of the treatment tank (11), the second drying treatment tank (14) and the third drying treatment tank; the side ends of the boiler side frame (1) are fastened to a supporting side frame (17); the side ends of the supporting side frame (17) are mounted with a bottom shaft rotating rail seat (25); the side end of the first drying treatment tank (11) is connected to a secondary drying assembly (18); the top of the first drying treatment tank (11) is installed with a transmission assembly (10); and a plurality of pressure components are installed on the outer circumference of the conduction shaft of the transmission assembly (10). A force balance regulator (28), a plurality of groups of the pressure balance regulators (28) are provided with a plurality of upward hot air pipes (29) running on the side wall surface, the outer peripheral sides of the plurality of upward hot air pipes (29) are connected with a heat collecting valve port (30), the interior of the second drying treatment tank (14) is provided with a spiral drying rake (27), the interior of the third drying treatment tank is provided with a slag powder drying assembly (26), the axis of the mounting bottom shaft rotating rail seat (25) is connected with the slag powder drying assembly (26) and the transmission shaft of the transmission assembly (10) in turn to form an integrated connection; The slag powder drying component (26) comprises a material receiving chassis (261), the axial end of the material receiving chassis (261) is connected to an installation shaft connecting column (263), and multiple groups of honeycomb rotating heat conducting plates (262) are installed on the outer peripheral side of the shaft connecting column (263), and there are grinding gaps between the bottom walls of the multiple groups of honeycomb rotating heat conducting plates (262) and the top wall surfaces of the material receiving chassis (261), and the surfaces of the multiple groups of honeycomb rotating heat conducting plates (262) are provided with pin sharp groove plate surfaces (264), and the outer side wall surfaces of the multiple groups of honeycomb rotating heat conducting plates (262) are fastened with a serpentine-shaped bulk material tray (265).

2. The high-moisture gasification ash two-stage drying, preheating and incineration system according to claim 1 is characterized in that: The first electric iris valve structure (12) comprises a bottom plate (121), the two side surfaces of the bottom plate (121) are respectively mounted and connected to the bottom of the first drying treatment tank (11) and the top of the second drying treatment tank (14), a pneumatic iris valve (122) is installed inside the bottom plate (121), and a sealing connection groove (123) is provided at the axial closed end of the pneumatic iris valve (122), and the sealing connection groove (123) and the conductive shaft are fitted and connected via a sealing ring.

3. The high-moisture gasification ash two-stage drying, preheating and incineration system according to claim 1 is characterized in that: The secondary drying component (18) comprises a feed pipe (181), the side end of the feed pipe (181) is connected to a pneumatic conveying device (182), the side end of the pneumatic conveying device (182) is connected to a centrifugal tank (187), an infrared heating furnace (183) is installed outside the side end of the centrifugal tank (187), and the infrared heating furnace (183) is arranged in an annular shape by interlacing multiple groups of infrared radiation heaters inside the centrifugal tank (187). The side end of the feed pipe (181) is connected to the third drying treatment tank, the side end of the centrifugal tank (187) is connected to the waste residue collection box, the side end of the infrared heating furnace (183) is fastened with a bracket (184), a return device (185) is mounted on the top of the bracket (184), the top end of the return device (185) is connected to a return pipe (186), and the top side end of the return pipe (186) is connected to the surface of the first drying treatment tank (11).

4. The high-moisture gasification ash two-stage drying, preheating and incineration system according to claim 3 is characterized in that: A metering doser (188) is installed on the top of the infrared heating furnace (183), and the side end of the metering doser (188) is connected to a first modifier dosing pipe (189), and the side end of the first modifier dosing pipe (189) is connected to the top of the centrifuge tank (187). The top of the metering doser (188) is connected to a second modifier dosing pipe (1890), and the side end of the second modifier dosing pipe (1890) is connected to the side wall of the third drying treatment tank. Flow control valves (1891) are installed on the outside of the side ends of the first modifier dosing pipe (189) and the second modifier dosing pipe (1890).

5. The high-moisture gasification ash two-stage drying, preheating and incineration system according to claim 1 is characterized in that: A cyclone separator (24) is installed at the bottom side end of the bottom shaft rotating rail seat (25), and the cyclone separator (24) runs along the inner walls of the second drying treatment tank (14) and the third drying treatment tank in sequence through a separation pipeline.

6. The high-moisture gasification ash two-stage drying, preheating and incineration system according to claim 1 is characterized in that: The microwave drying regulating assembly (16) comprises a bottom mounting bracket (161), a microwave generator (162) is mounted on the top of the bottom mounting bracket (161), the side ends of the microwave generator (162) are respectively connected to three groups of microwave generating tubes (164), guides (163) are mounted on the outside of the side ends of the three groups of microwave generating tubes (164), the side ends of the three groups of microwave generating tubes (164) are connected to the surfaces of the first drying treatment tank (11), the second drying treatment tank (14), and the third drying treatment tank in turn, and regulating valves (165) are mounted on the outer circumference of the three groups of microwave generating tubes (164).

7. The high-moisture gasification ash two-stage drying, preheating and incineration system according to claim 1 is characterized in that: The transmission assembly (10) comprises a transmission motor (101), the bottom output end of the transmission motor (101) is connected to a first driving gear (102), the tooth angle end of the first driving gear (102) is meshedly connected to a toothed belt (104), the inner side end of the toothed belt (104) is meshedly connected to a second driving gear (103), and the bottom axial end of the second driving gear (103) is equipped with a speed regulator (105).

8. The high-moisture gasification ash two-stage drying, preheating and incineration system according to claim 1 is characterized in that: The side wall surface of the steam convergence tank (13) is connected to a heat transfer pipe (21), a throttle valve (22) is installed at the side end of the heat transfer pipe (21), the bottom end of the heat transfer pipe (21) is connected to a heat pump (20), the side end of the heat pump (20) is connected to an air pipe (19), the side end of the air pipe (19) is connected to a heat collection chamber (6), and the top of the heat collection chamber (6) is connected to the bottom of the incineration boiler (5).

9. The high-moisture gasification ash two-stage drying, preheating and incineration system according to claim 1 is characterized in that: An air flow guide (3) is installed at the side end of the incineration boiler (5), and the side end of the air flow guide (3) is connected to an oxygen supply fan (4). An air supply plate tube (2) is installed at the top of the incineration boiler (5), and a PLC controller (23) is installed on the side wall surface of the first drying tank (11).

Citation Information

Patent Citations

  • Coal gasification and purification system and method for recycling fly ash and wastewater

    CN106190327A

  • Biomass gasification power generation system based on graded multielement gas purification

    CN108913213A

  • Energy-saving and environment-friendly coal gasification solid waste treatment device and treatment method

    CN110553495A

  • Intelligent thermal cracking treatment method and system for slag-state solid waste

    CN112268279A

  • Garbage pyrolysis and gasification system device with drying function and garbage pyrolysis and gasification method

    CN113048482A