Automatic placement device and construction method for laying pads for high-speed rail rails

By designing an automatic placement device, the problem of dislocation of the pad material and low construction efficiency during the construction of high-speed rail track slabs was solved. Automatic positioning and automatic scattering of the pads were realized, which improved construction efficiency and safety and reduced labor intensity.

CN118127863BActive Publication Date: 2024-10-29CHINA RAILWAY FIRST GROUP CO LTD +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410411877.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-08
Publication Date
2024-10-29
Estimated Expiration
2044-04-08

AI Technical Summary

Technical Problem

In the existing technology, during the construction of high-speed railway track slabs, the discharging of the backing plate is easy to be misaligned, resulting in low construction efficiency, high labor intensity of manual handling, and potential safety hazards.

Method used

An automatic placement device for high-speed rail rail laying pads is designed, including a running device, a clamping device and a loose plate device. The track plate is clamped from both sides through the clamping arm and clamping wheel to ensure that the walking device walks along the track plate, and The backing plate is automatically placed on the track slab sleeper through the slide and funnel structure.

Benefits of technology

It realizes the automatic positioning and automatic scattering of backing plates, improves construction efficiency, reduces workers' labor intensity, enhances construction safety and accuracy, and reduces labor costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118127863B_ABST
    Figure CN118127863B_ABST
Patent Text Reader

Abstract

The present invention discloses an automatic placement device and construction method for laying pads for high-speed rails, which belongs to the technical field of railway construction, and includes a running device, a clamping device and a loose plate device; the loose plate device is connected to the rear of the running device; the clamping device is arranged on both sides of the running device for clamping the track plate; the running device and the loose plate device are both arranged on the track plate, and the running route of the running device is parallel to the track plate. A construction method is also disclosed, and the specific steps include arranging the running device and the loose plate device on the track plate; assembling the clamping device, clamping the clamping arm support pin with a slot, adjusting the clamping arm adjustment bolt and then tightening the locking nut to fix it; connecting the loose plate device and the frame; turning on the running device, and the clamping device controls the travel direction of the running device, and the loose plate is placed on the track plate sleeper through the coordination of the material blocking structure and the rotating arm structure. The present invention solves the problems of misalignment of the pad discharge and low construction efficiency in the prior art, and has the advantages of automatic positioning, automatic loose plate, and high construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of railway construction, and more specifically relates to an automatic placement device for laying pads for high-speed railway rails and a construction method. Background Art

[0002] After the construction of the high-speed railway track slab is completed, it is necessary to install pads, spring bars, and bolts on the track slab to fix the rails. At present, the transportation and installation of these parts are all transported and installed by manual carts or riding tricycles, and they can only run in the middle of the two-way track. The spring bars and bolts are relatively light in weight and the labor intensity is not high, but the pad weighs 6kg per piece. A tricycle is calculated based on a load of 600kg and can load a maximum of 100 pieces at a time. Since the high-speed railway is made up of track slabs piece by piece, one track slab can hold 18 pads, which means 36 pads in both directions. Each tricycle can only install the length of three track slabs for each pad. A tricycle is continuously transported and placed by 4-5 workers, and then loaded and transported. The labor intensity is very high. Transporting and constructing with multiple vehicles together is not only prone to collision accidents, but also poses major safety hazards such as injuring workers. Since the tricycle transports the loose slabs and places them on the inner side of the two-way lane, they need to be transported to the installation position for the second time, which seriously affects the construction progress. The function of the pad is to fill and adjust the height difference on the track caused by the shape of the foundation and the unevenness of the ground to maintain the flatness of the track. Manually placing the pad at the predetermined position on the track slab sleeper is prone to large errors, and there are problems of omission or misplacement, low efficiency and high problem rate.

[0003] In the current technology, the invention patent CN117166301A discloses a construction device for automatic ballastless track elevation pads, which distributes pads to corresponding sleepers by setting a walking device and multiple sets of material distribution components. However, the corresponding positions of the pads and sleepers cannot be controlled, and left-right misalignment is prone to occur during the process of pad discharging and falling, resulting in reduced construction efficiency. Therefore, how to provide a device that can walk on the track plate and can automatically position and automatically distribute the plate and a construction method are problems that technicians in this field need to solve urgently. Summary of the invention

[0004] In view of this, the present invention provides an automatic placement device and construction method for high-speed railway rail laying pads, which solves the problems of misplaced discharge of pads and low construction efficiency in the prior art, and has the advantages of automatic positioning, automatic plate dispersion and high construction efficiency.

[0005] In order to achieve the above object, the present invention adopts the following technical solution:

[0006] A device for automatically placing pads for laying high-speed rail rails, comprising a traveling device, a clamping device and a loose plate device; the loose plate device is connected to the rear of the traveling device; the clamping device is arranged on both sides of the traveling device; the traveling device and the loose plate device are both arranged on a track plate, the traveling route of the traveling device is parallel to the track plate, and the clamping devices are arranged on both sides of the track plate for clamping the track plate.

[0007] Furthermore, the traveling device includes a transport head, a frame, a power structure and a walking wheel structure, the transport head is arranged above the frame; the walking wheel structure is arranged below the frame and connected to the transport head through the power structure; the walking wheel structure includes at least two groups of walking wheels, which travel in parallel along the track slabs and sleepers.

[0008] Furthermore, at least three groups of the clamping devices are arranged on both sides of the walking device, and two of the clamping devices in each group are symmetrically arranged to clamp the track plate from both sides; the clamping device includes a clamping arm, a clamping arm adjusting bolt, a locking nut, a clamping wheel and a clamping wheel frame; the upper end of the clamping arm is connected to the walking device through the clamping arm adjusting bolt; the locking nut is rotatably connected to the clamping arm adjusting bolt for locking the clamping arm adjusting bolt; the lower end of the clamping arm is fixedly connected to the clamping wheel frame; the clamping wheel is rotatably connected in the clamping wheel frame; the clamping wheel is arranged on the side of the track plate and moves along the side of the track plate; a clamping groove is provided on the middle part of the clamping arm close to one side of the walking device, and a clamping arm support pin is fixedly provided on the side of the walking device, and the clamping groove and the clamping arm support pin cooperate to fix the clamping arm and the walking device.

[0009] Furthermore, the rear end of the walking device is rotatably connected to the scattering plate device via a scattering plate rotating shaft; the scattering plate device includes a movable bracket, a conveying device and an arranging device; the movable bracket is fixedly connected to the conveying device; and the arranging device is fixedly connected to the conveying device.

[0010] Furthermore, the mobile bracket includes a bracket and a bracket wheel group; the bracket wheel group is arranged under the bracket and is used for the movement of the mobile bracket; the mobile bracket is arranged between two track plate sleepers; the bracket wheel group is provided with at least three groups of support wheels; each group of support wheels is symmetrically arranged on both sides of the bracket.

[0011] Furthermore, the conveying device includes a slide and a funnel; the slide is arranged obliquely, the head end is rotatably connected to the walking device, the tail end is rotatably connected to the arranging device, and the middle part is fixedly connected to the bracket; the funnel is fixedly arranged at the upper end of the slide.

[0012] Furthermore, the arranging device includes a material blocking structure and a rotating arm structure; the material blocking structure is rotatably connected to the slideway for supporting the pad; the rotating arm structure is rotatably connected to the material blocking structure for tilting the material blocking structure to allow the pad to fall.

[0013] Furthermore, the material blocking structure includes a material blocking clamping arm, a material blocking clamping arm shaft, a baffle, a clamping spring and a return spring; the material blocking clamping arm is L-shaped, and the middle part is rotatably connected to the slide through the material blocking clamping arm shaft; a groove is arranged at the upper end of the material blocking clamping arm, and a through hole is arranged on the slide, and the clamping spring passes through the through hole and is fixedly connected to the inner wall of the groove; a baffle is arranged on the other side of the slide located at the material blocking clamping arm, and the center line of the baffle is colinear with the center axis of the clamping spring; the return spring is arranged on the side of the material blocking clamping arm shaft away from the clamping spring, and is used for resetting and buffering the material blocking clamping arm; a shock-absorbing rubber pad is arranged on the inner wall of one corner end of the material blocking clamping arm.

[0014] Furthermore, the pivoting arm structure includes a pressure wheel, a rotating shaft, a pivoting arm and a pivoting arm wheel; the pivoting arm is rotatably connected to the slideway via a rotating shaft; the pressure wheel is rotatably connected to one end of the pivoting arm, and the pivoting arm wheel is rotatably connected to the other end of the pivoting arm; the pressure wheel is arranged between the material blocking structure and the slideway.

[0015] A construction method for automatically placing pads for laying high-speed rail rails, comprising: setting a traveling device and a dispersing plate device on a track plate, setting a slideway of the dispersing plate device at a position colinear with the track plate sleeper; assembling the clamping device, clamping the slot on the clamping arm on the clamping arm support pin, adjusting the clamping arm adjusting bolt to the clamping wheel to clamp the track plate, tightening the locking nut to fix the clamping arm adjusting bolt, and completing the installation of the clamping arm; connecting the dispersing plate device to a vehicle frame through a dispersing plate rotating shaft, and starting the dispersing plate operation; a locomotive operator turns on the traveling device, and the clamping device controls the travel direction of the traveling device, and the dispersing plate device places the pads on the track plate sleepers through the cooperation of the material blocking structure and the rotating arm structure, thereby completing the arrangement of the pads.

[0016] The beneficial effects of the present invention are:

[0017] The present invention provides an automatic placement device and construction method for laying pads for high-speed rail tracks, which changes the traditional manual slat spreading into automatic slat spreading. The working walking device drives the slat spreading device to automatically place the pads on the track plate pads to complete the slat spreading, which not only improves the track laying efficiency and reduces the labor intensity of workers, but also greatly improves the safety and accuracy of construction, and effectively reduces labor costs. By setting the clamping device on both sides of the frame, the track plate is clamped from both sides by the clamping arm and the clamping wheel, so as to control the walking device to always walk along the track plate, and also ensure that the slideway is always located above the track plate sleeper, which solves the problem that the prior art cannot ensure the accurate placement of the pad, and further improves the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0019] Figure 1 It is a schematic diagram of the overall structure of the present invention.

[0020] Figure 2 It is a rear view of the present invention.

[0021] Figure 3 for Figure 2 Middle AA cross section.

[0022] Figure 4 It is a schematic structural diagram of the clamping device of the present invention.

[0023] Figure 5 It is a schematic structural diagram of the scattered plate device of the present invention.

[0024] Among them, in the figure:

[0025] 1-transport vehicle; 2-pad; 3-funnel; 4-slide; 5-bracket; 6-baffle; 7-compression spring; 8-material blocking and clamping arm; 9-material blocking and clamping arm shaft; 10-reset spring; 11-pressure wheel; 12-rotating shaft; 13-shock-absorbing rubber pad; 14-swivel arm; 15-swivel arm wheel; 16-bracket wheel set; 17-track plate and sleeper; 18-clamping arm; 19-clamping arm support pin; 20-transport vehicle rubber tire; 21-transport vehicle shock-absorbing spring; 22-clamping wheel; 23-clamping wheel frame; 24-transport vehicle frame; 25-clamping arm adjusting bolt; 26-locking nut; 27-track plate; 28-slot; 29-loose plate rotating shaft; 30-support wheel; 31-track plate gap. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0027] Please refer to the attached Figure 1-5 The present invention provides an automatic placement device for laying pads for high-speed railway rails, comprising a traveling device, a clamping device and a loose plate device; the loose plate device is connected to the rear of the traveling device; the clamping device is arranged on both sides of the traveling device; the traveling device and the loose plate device are both arranged on a track plate 27, the traveling route of the traveling device is parallel to the track plate 27, and the clamping device is arranged on both sides of the track plate 27, for clamping the track plate 27 to play a limiting role.

[0028] The traveling device includes a transport head 1, a frame 24, a power structure and a walking wheel structure. The transport head 1 is arranged above the frame 24, and a pad 2 and a carrying staff are placed above the frame 24 behind the transport head 1. The walking wheel structure is arranged below the frame 24 and connected to the transport head 1 through the power structure; a transport vehicle shock absorbing spring 21 is also arranged between the walking wheel structure and the frame 24 for shock absorbing the vehicle body to avoid affecting the operation of the rear scattered board device. The walking wheel structure includes at least two groups of walking wheels 20, each group of walking wheels 20 includes two walking wheels 20, and the two walking wheels 20 are arranged on one side of two track plate sleepers 17, and travel parallel to the track plate sleepers 17.

[0029] At least three groups of the clamping devices are arranged on both sides of the vehicle frame 24 and the track plate 27 , and two clamping devices in each group are symmetrically arranged to clamp the track plate 27 from both sides.

[0030] The clamping device comprises a clamping arm 18 , a clamping arm adjusting bolt 25 , a locking nut 26 , a clamping wheel 22 and a clamping wheel frame 23 .

[0031] The upper end of the clamp arm 18 is connected to the frame 24 through a clamp arm adjusting bolt 25; the locking nut 26 is rotatably connected to the clamp arm adjusting bolt 25 and is used to lock the clamp arm adjusting bolt 25; the lower end of the clamp arm 18 is fixedly connected to the clamp wheel frame 23; the clamp wheel 22 is rotatably connected to the clamp wheel frame 23; the clamp wheel 22 is arranged on the side of the track plate 27 and moves along the side of the track plate 27. The clamp arm adjusting bolt 25 can adjust the tightness of the clamp wheel 22 clamping the track plate 27. A clamping groove 28 is arranged on the middle part of the clamp arm 18 close to the side of the frame 24, and a clamp arm support pin 19 is fixedly arranged on the side of the frame 24. The clamping groove 28 cooperates with the clamp arm support pin 19 to fix the clamp arm 18 and the frame 24.

[0032] The walking device is placed on the track plate 27 and moves along the track plate 27. The clamping arm 18 inserts the slot 28 into the clamping arm support pin 19, and the clamping arm adjustment bolt 25 is adjusted to clamp the two clamping wheels 22 from both sides of the track plate 27. Then, the locking nut is tightened to complete the installation of the clamping arm 18.

[0033] The rear end of the frame 24 is rotatably connected to the scattering plate device through a scattering plate rotating shaft 29. The scattering plate device includes a movable bracket, a conveying device and an arranging device. The movable bracket is fixedly connected to the conveying device; the arranging device is fixedly connected to the conveying device.

[0034] The mobile support includes a support 5 and a support wheel set 16; the support wheel set 16 is arranged below the support 5 and is used for the mobile support to move; the mobile support is arranged between two track slab sleepers 17. Since there is a gap of 80-180mm between the front and rear of the laid track slab 27, the support wheel set 16 is provided with at least three groups of support wheels 30, and the spacing between each group of support wheels 30 is 200mm, so as to prevent the mobile support from getting stuck in the gap 30 of the track slab or causing bumps to cause the pad 2 to fall off; each group of support wheels 30 is symmetrically arranged on both sides of the support 5.

[0035] The conveying device includes a slideway 4 and a hopper 3; the slideway 4 is arranged obliquely, the head end is rotatably connected to the frame 24 through the plate-scattering shaft 29, the tail end is rotatably connected to the arrangement device, and the middle part is fixedly connected to the bracket 5; the hopper 3 is fixedly arranged at the upper end of the slideway 4 and overlapped on the operating platform for the staff to put the pad 2. The plate-scattering device is rotatably connected to the frame 24 through the slideway 4, and the staff puts the pad 2 into the hopper 3 above the slideway 4 on the frame 24, and the pad 2 moves downward along the slideway 4 and is arranged on the track sleeper 17 by the arrangement device.

[0036] The arrangement device includes a material blocking structure and a rotating arm structure; the material blocking structure is rotatably connected to the slideway 4 for supporting the pad 2; the rotating arm structure is rotatably connected to the material blocking structure for tilting the material blocking structure so that the pad 2 thereon falls.

[0037] The material blocking structure includes a material blocking clamping arm 8, a material blocking clamping arm shaft 9, a baffle 6, a clamping spring 7 and a reset spring 10; the material blocking clamping arm 8 is L-shaped, and the middle part is rotatably connected to the slide 4 through the material blocking clamping arm shaft 9; the material blocking clamping arm 8 is tilted together with the slide 4, a groove is arranged at the upper end, a through hole is arranged on the slide 4, and the clamping spring 7 passes through the through hole and is fixedly connected to the inner wall of the groove; the slide 4 is provided with a baffle 6 on the other side of the material blocking clamping arm 8, and the center line of the baffle 6 is colinear with the center axis of the clamping spring 7; the reset spring 10 is arranged on the side of the material blocking clamping arm shaft 9 away from the clamping spring 7, and is used for the reset buffering of the material blocking clamping arm 8. A shock-absorbing rubber pad 13 is arranged on the inner wall of one end of the corner of the material blocking clamping arm 8 to prevent the pad 2 from colliding with the material blocking clamping arm 8 when it slides down and causing damage. The backing plate 2 slides to the corner position of the material blocking and pressing arm 8 through the slideway 4, and the backing plate 2 is prevented from falling by the material blocking and pressing arm 8.

[0038] The rotating arm structure includes a pressure wheel 11, a rotating shaft 12, a rotating arm 14 and an arm wheel 15; the rotating arm 14 is rotatably connected to the slideway 4 via the rotating shaft 12; the pressure wheel 11 is rotatably connected to one end of the rotating arm 14, and the arm wheel 15 is rotatably connected to the other end of the rotating arm 14; the pressure wheel 11 is arranged between the material blocking and clamping arm 8 and the slideway 4.

[0039] When the movable bracket drives the arrangement device forward, the rotating arm wheel 15 is lifted upward due to the drop between the track plate 27 and the track plate sleeper 17, and the rotating arm 14 rotates along the rotating shaft 12, so that the pressing wheel 11 presses down one end of the corner of the blocking clamping arm 8, and the other end of the blocking clamping arm 8 compresses the clamping spring 7, so that the clamping spring 7 presses the pad 2 tightly against the baffle 6. As the blocking clamping arm 8 rotates, the corner end of the blocking clamping arm 8 opens one end of the slide 4 downward, and the pad 2 falls onto the track plate sleeper 17. After the pad 2 falls, the blocking clamping arm 8 is reset and the corner end is closed to close the slide 4 due to the action of the reset spring 10.

[0040] The present invention provides a construction method for automatically placing a high-speed railway rail laying pad, and the specific steps include:

[0041] The staff sets the traveling device and the scattered plate device on the track plate 27, and sets the slideway of the scattered plate device in a position colinear with the track plate sleeper 17. After assembling the clamping device, the staff clamps the slot 28 on the clamping arm 18 on the clamping arm support pin 19, adjusts the clamping arm adjustment bolt 25 to a suitable position, tightens the locking nut 26 to fix the clamping arm adjustment bolt 25, and completes the installation of the clamping arm 18. The staff connects the scattered plate device to the frame 24 through the scattered plate rotating shaft 29 and starts the scattered plate operation. The staff at the head of the vehicle turns on the traveling device, and the clamping device controls the direction of travel of the traveling device to ensure that the channel of the scattered plate device is always located on the track plate sleeper. The scattered plate device places the pad on the track plate sleeper 17 through the cooperation of the material blocking structure and the rotating arm structure to complete the arrangement of the pad.

[0042] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.

[0043] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. An automatic placement device for laying high-speed rail rail pads, characterized in that: The utility model comprises a walking device, a clamping device and a loose plate device; the loose plate device is connected to the rear of the walking device; the clamping device is arranged on both sides of the walking device; the walking device and the loose plate device are both arranged on a track plate (27), the walking route of the walking device is parallel to the track plate (27), and the clamping device is arranged on both sides of the track plate (27) for clamping the track plate (27); The arrangement device comprises a material blocking structure and a rotating arm structure; the material blocking structure is rotatably connected to the slideway (4) and is used to support the pad (2); the rotating arm structure is rotatably connected to the material blocking structure and is used to tilt the material blocking structure to make the pad (2) fall; The material blocking structure comprises a material blocking clamping arm (8), a material blocking clamping arm shaft (9), a baffle (6), a clamping spring (7) and a reset spring (10); the material blocking clamping arm (8) is L-shaped, and the middle part is rotatably connected to the slideway (4) through the material blocking clamping arm shaft (9); a groove is arranged at the upper end of the material blocking clamping arm (8), and a through hole is arranged on the slideway (4), and the clamping spring (7) passes through the through hole and is fixedly connected to the inner wall of the groove; a baffle (6) is arranged on the other side of the slideway (4) located at the material blocking clamping arm (8), and the center line of the baffle (6) is colinear with the center axis of the clamping spring (7); the reset spring (10) is arranged on the side of the material blocking clamping arm shaft (9) away from the clamping spring (7), and is used for reset buffering of the material blocking clamping arm (8); a shock-absorbing rubber pad (13) is arranged on the inner wall of one corner end of the material blocking clamping arm (8); The rotating arm structure comprises a pressure wheel (11), a rotating shaft (12), a rotating arm (14) and an arm wheel (15); the rotating arm (14) is rotatably connected to the slideway (4) via the rotating shaft (12); the pressure wheel (11) is rotatably connected to one end of the rotating arm (14), and the arm wheel (15) is rotatably connected to the other end of the rotating arm (14); the pressure wheel (11) is arranged between the material blocking structure and the slideway (4).

2. The automatic placement device for laying high-speed rail rail pads according to claim 1 is characterized in that: The traveling device comprises a transport head (1), a frame (24), a power structure and a walking wheel structure; the transport head (1) is arranged above the frame (24); the walking wheel structure is arranged below the frame (24) and is connected to the transport head (1) via the power structure; the walking wheel structure comprises at least two groups of walking wheels (20) which travel in parallel along the track slab sleepers (17).

3. The automatic placement device for laying high-speed rail rail pads according to claim 1 is characterized in that: At least three groups of the clamping devices are arranged on both sides of the walking device, and the two clamping devices in each group are symmetrically arranged to clamp the track plate (27) from both sides; the clamping device comprises a clamping arm (18), a clamping arm adjusting bolt (25), a locking nut (26), a clamping wheel (22) and a clamping wheel frame (23); the upper end of the clamping arm (18) is connected to the walking device through the clamping arm adjusting bolt (25); the locking nut (26) is rotatably connected to the clamping arm adjusting bolt (25) and is used to lock the clamping arm adjusting bolt (25); The lower end of the clamping arm (18) is fixedly connected to the clamping wheel frame (23); the clamping wheel (22) is rotatably connected to the clamping wheel frame (23); the clamping wheel (22) is arranged on the side of the track plate (27) and moves along the side of the track plate (27); a clamping groove (28) is arranged in the middle of the clamping arm (18) close to the side of the walking device, and a clamping arm support pin (19) is fixedly arranged on the side of the walking device, and the clamping groove (28) and the clamping arm support pin (19) cooperate to fix the clamping arm (18) and the walking device.

4. The automatic placement device for laying high-speed rail rail pads according to claim 1 is characterized in that: The rear end of the walking device is rotatably connected to the scattering plate device via a scattering plate rotating shaft (29); the scattering plate device comprises a movable bracket, a conveying device and an arranging device; the movable bracket is fixedly connected to the conveying device; and the arranging device is fixedly connected to the conveying device.

5. The automatic placement device for laying high-speed rail rail pads according to claim 4 is characterized in that: The mobile bracket comprises a bracket (5) and a bracket wheel group (16); the bracket wheel group (16) is arranged below the bracket (5) and is used for the movement of the mobile bracket; the mobile bracket is arranged between two track plate sleepers (17); the bracket wheel group (16) is provided with at least three groups of support wheels (30); each group of support wheels (30) is symmetrically arranged on both sides of the bracket (5).

6. The automatic placement device for laying high-speed rail rail pads according to claim 4 is characterized in that: The conveying device comprises a slideway (4) and a funnel (3); the slideway (4) is arranged obliquely, the head end is rotatably connected to the walking device, the tail end is rotatably connected to the arranging device, and the middle part is fixedly connected to the bracket (5); the funnel (3) is fixedly arranged on the upper end of the slideway (4).

7. A construction method for automatically placing a high-speed rail track laying pad, characterized in that: The construction is completed using the automatic placement device for laying pads for high-speed railway rails as described in any one of claims 1 to 6, and the specific steps include: setting the traveling device and the scattered plate device on the track plate (27), and setting the scattered plate device slideway in a position colinear with the track plate sleeper (17); assembling the clamping device, clamping the slot (28) on the clamping arm (18) on the clamping arm support pin (19), adjusting the clamping arm adjustment bolt (25) to the clamping wheel (22) to clamp the track plate (27), tightening the locking nut (26) to fix the clamping arm adjustment bolt (25), and completing the installation of the clamping arm (18); connecting the scattered plate device to the frame (24) through the scattered plate rotating shaft (29), and starting the scattered plate operation; the front staff starts the traveling device, and the clamping device controls the travel direction of the traveling device. The scattered plate device places the pad on the track plate sleeper (17) through the cooperation of the material blocking structure and the rotating arm structure to complete the arrangement of the pad (2).

Citation Information

Patent Citations

  • Construction device and method for automatic ballastless track elevation cushion block

    CN117166301A

  • Bearing movable rack for milling and grinding sleepers

    CN212652764U

  • Method and apparatus for depositing railroad plates along a railroad track bed

    US6807909B1