Method and device for scheduling cooling equipment at communication sites
By deploying multiple thermometers at mobile communication sites, the actual cooling capacity and energy efficiency ratio of the cooling equipment are dynamically learned and calculated, and the operation of the cooling equipment is optimally scheduled, which solves the problem in the existing technology that the cooling equipment scheduling cannot accurately match the actual environment. It achieves low energy consumption and energy-saving operation of cooling equipment and reduces carbon emissions.
Patent Information
- Application Number
- CN202410274102.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-11
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-03-11
AI Technical Summary
The scheduling of cooling equipment at mobile communication sites currently relies on theoretical calculations, which cannot accurately match the actual environment. As a result, it is impossible to achieve optimal selection, obtain the best cooling energy efficiency ratio, and achieve the lowest total cooling energy consumption.
By deploying multiple thermometers at the communication site, the actual cooling capacity and energy efficiency ratio of the cooling equipment are dynamically learned and calculated, and the operation of the cooling equipment is optimally scheduled. The energy efficiency evaluation time window and the temperature difference deviation coefficient are used for weight calculation to achieve low-energy cooling equipment. Energy-saving operation.
It realizes dynamic optimal dispatching of the actual energy efficiency of cooling equipment, reduces carbon emissions, and improves the energy-saving effect of communication site buildings.
Smart Images

Figure CN118175800B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of cooling equipment, and in particular to a method and device for scheduling cooling equipment at a communication site. Background Art
[0002] The communication sites of mobile communication operators mainly use air conditioners as site cooling equipment. In order to avoid the risk of cooling due to equipment failure, at least two air conditioners are usually configured for primary and backup operation. A single air conditioner has the ability to meet the site cooling requirements under normal climatic conditions. For some large-area equipment rooms with heavy equipment loads, more than two air conditioners will be configured. In addition to air conditioners, in recent years, operators have also begun to deploy water curtain fresh air equipment in sites, using the natural indoor and outdoor temperature difference for cooling, thereby reducing air conditioning energy consumption.
[0003] However, the operation and dispatching of cooling equipment in communication sites is still in the extensive dispatching mode, and there are the following problems:
[0004] 1. Due to the spatial layout of the site, the placement of the two air conditioners is somewhat or even significantly different from each other, resulting in different cooling ducts and cooling energy efficiencies even if the air conditioners are of the same manufacturer and model. The scheduling of air conditioners is mainly based on their rated cooling capacity and energy efficiency ratio, and it is impossible to select the one with better actual energy efficiency from two identical air conditioners.
[0005] 2. Fresh air air conditioners are mainly based on theoretical calculation formulas. The cooling capacity and energy efficiency ratio are calculated using the rated air volume and the indoor and outdoor temperature difference. However, they are also affected by factors such as the installation position of the air inlet and the air duct, and there are deviations from the actual results.
[0006] 3. When air conditioning and fresh air equipment coexist, when to schedule the air conditioning to run and when to schedule the fresh air to run is mostly based on theoretical energy efficiency values or human experience, and it is impossible to achieve optimal scheduling.
[0007] Therefore, the mobile communication site cooling equipment in the prior art mainly relies on theoretical calculation results in equipment optimization scheduling, which cannot accurately match the actual environment, cannot achieve real-time optimization selection, cannot obtain the best cooling energy efficiency ratio, and cannot support the minimum total cooling energy consumption. Summary of the invention
[0008] In view of this, the object of the present invention is to provide a method and device for scheduling cooling equipment at a communication site, so as to dynamically learn and calculate the actual cooling capacity and energy efficiency ratio of the cooling equipment, so as to accurately and optimally schedule the operation of the cooling equipment.
[0009] In a first aspect, an embodiment of the present invention provides a method for scheduling cooling equipment of a communication site, the method comprising: on each designated date in each cycle, cyclically selecting at least one first cooling equipment from a plurality of cooling equipment, controlling the operation of each first cooling equipment in turn, and obtaining the operation data of the first cooling equipment; the operation data comprises: time data, temperature data, heat load data and power consumption data of the cooling equipment; after each designated date in each cycle, determining the energy efficiency evaluation time window of each first cooling equipment based on the temperature data of the first cooling equipment obtained on the previous designated date, and determining the cooling capacity and energy efficiency ratio of the first cooling equipment based on the operation data corresponding to each energy efficiency evaluation time window; wherein the energy efficiency evaluation time window is the time from the start time of the operation of the first cooling equipment to the time when the joint control temperature after the operation of the first cooling equipment ends is restored to the joint control temperature before the operation of the first cooling equipment; the joint control temperature is calculated based on the temperature data; on other dates in each cycle except the designated date, determining the second cooling equipment from the plurality of cooling equipment based on the cooling capacity and energy efficiency ratio of the cooling equipment, and controlling the operation of the second cooling equipment.
[0010] In an optional embodiment of the present application, the cooling equipment of the above-mentioned communication site includes: air conditioning and fresh air cooler; multiple thermometers are respectively arranged indoors and outdoors of the communication site for collecting temperature data; wherein the indoor thermometers include: a thermometer at a location with qualified ventilation conditions and not affected by equipment heat dissipation, a thermometer for monitoring the ambient temperature of the main equipment, a thermometer for monitoring the ambient temperature of the energy storage battery, and a thermometer for detecting the return air temperature of the air conditioner.
[0011] In an optional embodiment of the present application, the above-mentioned steps of cyclically selecting at least one first cooling device from multiple cooling devices and controlling the operation of each first cooling device in turn include: determining the joint control temperature of the communication site based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point; determining the indoor heat load of the communication site based on the equipment heat load and the building heat load of the communication site; if the joint control temperature is greater than the start-up temperature of the cooling device and no cooling device is running, cyclically selecting at least one first cooling device from multiple cooling devices, controlling the operation of the first cooling device, and re-determining the joint control temperature of the communication site based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point after a specified time.
[0012] In an optional embodiment of the present application, the above method also includes: if the joint control temperature is greater than the start-up temperature of the cooling equipment and the operation of the first cooling equipment exceeds the specified time, performing an exception handling operation; if the joint control temperature is less than or equal to the start-up temperature of the cooling equipment and the joint control temperature is greater than or equal to the shutdown temperature of the cooling equipment, after the specified time, re-determining the joint control temperature of the communication site based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point; if the joint control temperature is less than or equal to the start-up temperature of the cooling equipment and the joint control temperature is less than the shutdown temperature of the cooling equipment, shutting down the running first cooling equipment.
[0013] In an optional embodiment of the present application, the above-mentioned steps of determining the energy efficiency evaluation time window of each first cooling device based on the temperature data of the first cooling device obtained on the previous specified date, and determining the cooling capacity and energy efficiency ratio of the first cooling device based on the operating data corresponding to each energy efficiency evaluation time window, include: determining at least one energy efficiency evaluation time window of the first cooling device based on the temperature data of the first cooling device obtained on the previous specified date; determining the total indoor heat load corresponding to each energy efficiency evaluation time window, the average cooling capacity of the first cooling device, and the energy efficiency ratio of the first cooling device in turn based on the operating data corresponding to each energy efficiency evaluation time window, and determining the corresponding temperature difference deviation coefficient; wherein the temperature difference deviation coefficient is the average of the absolute values of the temperature difference between the start time and the end time of each temperature monitoring point; determining the cooling capacity and energy efficiency ratio of the first cooling device based on the total indoor heat load corresponding to each energy efficiency evaluation time window, the cooling capacity of the first cooling device, the energy efficiency ratio of the first cooling device and the temperature difference deviation coefficient.
[0014] In an optional embodiment of the present application, the step of determining the cooling capacity and energy efficiency ratio of the first cooling equipment based on the total operating indoor heat load, the cooling capacity of the first cooling equipment, the energy efficiency ratio of the first cooling equipment and the temperature difference deviation coefficient corresponding to each of the above energy efficiency evaluation time windows includes: determining the weight of each energy efficiency evaluation time window based on the temperature difference deviation coefficient of each energy efficiency evaluation time window; wherein the weight of the energy efficiency evaluation time window is inversely correlated with the temperature difference deviation coefficient of the energy efficiency evaluation time window; dividing the energy efficiency evaluation time window into multiple batches based on the collection time of the operating data, and calculating the cooling capacity and energy efficiency ratio of the first cooling equipment of each batch respectively; determining the cooling capacity and energy efficiency ratio of the first cooling equipment based on the pre-set weights of each batch and the cooling capacity and energy efficiency ratio of the first cooling equipment of each batch.
[0015] In an optional embodiment of the present application, the above-mentioned step of determining a second cooling device from multiple cooling devices based on the cooling capacity and energy efficiency ratio of the cooling devices, and controlling the operation of the second cooling device, includes: determining the joint control temperature of the communication site based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point; determining the indoor heat load of the communication site based on the equipment heat load and the building heat load of the communication site; if the joint control temperature is greater than the start-up temperature of the cooling device and no cooling device is running, determining from multiple cooling devices a second cooling device with a cooling capacity greater than or equal to the indoor heat load and the best energy efficiency ratio, controlling the operation of the second cooling device, and after a specified time, re-determining the joint control temperature of the communication site based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point.
[0016] In an optional embodiment of the present application, the above method also includes: if the joint control temperature is greater than the start-up temperature of the cooling equipment and the operation of the second cooling equipment exceeds the specified time, determine whether there is a third cooling equipment that is not currently turned on and has the best energy efficiency ratio; if there is a third cooling equipment, control the operation of the third cooling equipment, and after the specified time, re-determine the joint control temperature of the communication site based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point; if there is no third cooling equipment, perform exception handling operations.
[0017] In an optional embodiment of the present application, the above method also includes: if the joint control temperature is less than or equal to the startup temperature of the cooling equipment and the joint control temperature is less than the shutdown temperature of the cooling equipment, shutting down the running cooling equipment; re-determining the joint control temperature of the communication site based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point after a specified time; if the joint control temperature is less than or equal to the startup temperature of the cooling equipment and the joint control temperature is greater than or equal to the shutdown temperature of the cooling equipment, judging whether there is a third cooling equipment with a cooling capacity greater than or equal to the indoor heat load and a better energy efficiency ratio for the running second cooling equipment; if there is a third cooling equipment, controlling the second cooling equipment to shut down and controlling the third cooling equipment to operate; re-determining the joint control temperature of the communication site based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point after a specified time.
[0018] In a second aspect, an embodiment of the present invention further provides a cooling equipment scheduling device for a communication site, the device comprising: an equipment actual energy efficiency evaluation scheduling module, which is used to cyclically select at least one first cooling equipment from multiple cooling equipment on each specified date in each cycle, control the operation of each first cooling equipment in turn, and obtain the operation data of the first cooling equipment; the operation data includes: time data, temperature data, heat load data and power consumption data of the cooling equipment; an equipment actual energy efficiency evaluation calculation module, which is used to determine the energy efficiency evaluation time window of each first cooling equipment based on the temperature data of the first cooling equipment obtained on the previous specified date after each specified date in each cycle, and determine the cooling capacity and energy efficiency ratio of the first cooling equipment based on the operation data corresponding to each energy efficiency evaluation time window; wherein the energy efficiency evaluation time window is the time from the start time of the operation of the first cooling equipment to the time when the joint control temperature is restored to the joint control temperature before the operation of the first cooling equipment after the operation of the first cooling equipment ends; the joint control temperature is calculated based on the temperature data; an equipment scheduling daily operation module, which is used to determine the second cooling equipment from the multiple cooling equipment based on the cooling capacity and energy efficiency ratio of the cooling equipment on other dates in each cycle except the specified date, and control the operation of the second cooling equipment.
[0019] The embodiments of the present invention bring the following beneficial effects:
[0020] The embodiment of the present invention provides a method and device for scheduling cooling equipment of a communication site. On each designated date in each cycle, at least one first cooling equipment is cyclically selected from multiple cooling equipment, and the operation of each first cooling equipment is controlled in turn to obtain the operation data of the first cooling equipment; the operation data includes: time data, temperature data, heat load data and power consumption data of the cooling equipment; after each designated date in each cycle, the energy efficiency evaluation time window of each first cooling equipment is determined based on the temperature data of the first cooling equipment obtained on the previous designated date, and the cooling capacity and energy efficiency ratio of the first cooling equipment are determined based on the operation data corresponding to each energy efficiency evaluation time window; wherein the energy efficiency evaluation time window is the time from the start time of the operation of the first cooling equipment to the time when the joint control temperature after the operation of the first cooling equipment ends is restored to the joint control temperature before the operation of the first cooling equipment; the joint control temperature is calculated based on the temperature data; on other dates in each cycle except the designated date, the second cooling equipment is determined from the multiple cooling equipment based on the cooling capacity and energy efficiency ratio of the cooling equipment, and the operation of the second cooling equipment is controlled. In this way, the actual cooling capacity and energy efficiency ratio of the cooling equipment can be dynamically learned and calculated, so as to accurately optimize the scheduling and control of the cooling equipment for low-energy consumption and energy-saving operation, reduce carbon emissions, and achieve energy conservation in communication site buildings.
[0021] Other features and advantages of the present disclosure will be set forth in the following description, or some features and advantages may be inferred or unambiguously determined from the description, or may be learned by implementing the above-mentioned technology of the present disclosure.
[0022] In order to make the above-mentioned objectives, features and advantages of the present disclosure more obvious and easy to understand, preferred embodiments are specifically cited below and described in detail with reference to the attached drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0024] Figure 1 A flowchart of a cooling equipment scheduling method for a communication site provided by an embodiment of the present invention;
[0025] Figure 2 A schematic diagram of a cooling equipment scheduling system for a communication site provided by an embodiment of the present invention;
[0026] Figure 3 A schematic diagram of a process for evaluating and scheduling the actual energy efficiency of a device provided by an embodiment of the present invention;
[0027] Figure 4 A schematic diagram of a calculation process for evaluating actual energy efficiency of a device provided by an embodiment of the present invention;
[0028] Figure 5 A schematic diagram of a daily operation scheduling process of equipment scheduling provided by an embodiment of the present invention;
[0029] Figure 6 A schematic diagram of the structure of a cooling equipment scheduling device for a communication site provided by an embodiment of the present invention;
[0030] Figure 7 A schematic diagram of the structure of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0031] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] At present, the mobile communication site cooling equipment in the existing technology mainly relies on theoretical calculation results in equipment optimization and scheduling. It cannot accurately match the actual environment, cannot achieve real-time optimization selection, cannot obtain the best cooling energy efficiency ratio, and cannot support the minimum total cooling energy consumption.
[0033] Based on this, an embodiment of the present invention provides a method and device for scheduling cooling equipment at a communication site, and specifically provides a method and system for optimizing scheduling of cooling equipment at a communication site, which can be applied to the scenario of digital operation scheduling of cooling equipment at communication sites in the mobile communication industry. By dynamically learning and calculating the actual cooling capacity and energy efficiency ratio of the cooling equipment (typically configured with 2 air conditioners and 1 fresh air cooler), the operation of the cooling equipment can be accurately optimized and scheduled.
[0034] To facilitate understanding of this embodiment, a cooling equipment scheduling method for a communication site disclosed in an embodiment of the present invention is first introduced in detail.
[0035] Embodiment 1:
[0036] The embodiment of the present invention provides a method for scheduling cooling equipment at a communication site, see Figure 1 The flowchart of a method for scheduling cooling equipment at a communication site is shown, and the method for scheduling cooling equipment at the communication site includes the following steps:
[0037] Step S102, on each designated date in each cycle, cyclically selecting at least one first cooling device from a plurality of cooling devices, controlling the operation of each first cooling device in turn, and acquiring the operation data of the first cooling device.
[0038] For example, in this embodiment, a month can be taken as a cycle, and the 1st, 11th, and 21st of each month can be taken as designated cycles. In each cycle, the refrigeration equipment can be determined as the first refrigeration equipment through a cyclic selection method, the operation of the refrigeration equipment can be controlled, and the operation data of the first refrigeration equipment can be obtained.
[0039] The operation data includes: time data, temperature data, heat load data and power consumption data of cooling equipment. Time data and temperature data can be used to determine the energy efficiency evaluation time window of cooling equipment, and heat load data and power consumption data of cooling equipment can be used to determine the cooling capacity and energy efficiency ratio of cooling equipment.
[0040] Step S104, after each designated date in each cycle, determine the energy efficiency evaluation time window of each first cooling device based on the temperature data of the first cooling device obtained on the previous designated date, and determine the cooling capacity and energy efficiency ratio of the first cooling device based on the operating data corresponding to each energy efficiency evaluation time window.
[0041] Among them, the energy efficiency evaluation time window is the time from the start of operation of the first refrigeration device to the time when the joint control temperature is restored to the joint control temperature before the operation of the first refrigeration device after the operation of the first refrigeration device ends; the joint control temperature is calculated based on the temperature data.
[0042] For example, in this embodiment, the actual energy efficiency evaluation calculation module can be performed on the 2nd, 12th, and 22nd of each month. That is, in this embodiment, the actual energy efficiency of the first cooling device can be calculated based on the operation data of the first cooling device obtained on the previous specified date.
[0043] Step S106, on other dates in each cycle except the designated date, determine a second cooling device from a plurality of cooling devices based on the cooling capacity and energy efficiency ratio of the cooling devices, and control the operation of the second cooling device.
[0044] After determining the actual energy efficiency of the first refrigeration equipment, for example, in this embodiment, on dates other than the 1st, 11th, and 21st of each month, a second refrigeration equipment with sufficient cooling capacity and optimal energy efficiency ratio can be determined from multiple refrigeration equipment based on the cooling capacity and energy efficiency ratio of the refrigeration equipment, and the operation of the second refrigeration equipment can be controlled, thereby accurately optimizing and scheduling the operation of the refrigeration equipment.
[0045] An embodiment of the present invention provides a cooling equipment scheduling method for a communication site. On each designated date in each cycle, at least one first cooling equipment is cyclically selected from a plurality of cooling equipment, and the operation of each first cooling equipment is controlled in turn to obtain the operation data of the first cooling equipment; the operation data includes: time data, temperature data, heat load data and power consumption data of the cooling equipment; after each designated date in each cycle, the energy efficiency evaluation time window of each first cooling equipment is determined based on the temperature data of the first cooling equipment obtained on the previous designated date, and the cooling capacity and energy efficiency ratio of the first cooling equipment are determined based on the operation data corresponding to each energy efficiency evaluation time window; wherein the energy efficiency evaluation time window is the time from the start time of the operation of the first cooling equipment to the time when the joint control temperature after the operation of the first cooling equipment ends is restored to the joint control temperature before the operation of the first cooling equipment; the joint control temperature is calculated based on the temperature data; on other dates in each cycle except the designated date, a second cooling equipment is determined from a plurality of cooling equipment based on the cooling capacity and energy efficiency ratio of the cooling equipment, and the operation of the second cooling equipment is controlled. In this way, the actual cooling capacity and energy efficiency ratio of the cooling equipment can be dynamically learned and calculated, so as to accurately optimize the scheduling and control of the cooling equipment for low-energy consumption and energy-saving operation, reduce carbon emissions, and achieve energy conservation in communication site buildings.
[0046] Embodiment 2:
[0047] This embodiment provides another method for scheduling cooling equipment of a communication site. The method is implemented on the basis of the above embodiment. In some embodiments, the cooling equipment of the communication site includes: air conditioners and fresh air coolers; multiple thermometers are respectively arranged indoors and outdoors of the communication site for collecting temperature data; wherein the indoor thermometers include: thermometers at locations with qualified ventilation conditions and not affected by equipment heat dissipation, thermometers for monitoring the ambient temperature of the main equipment, thermometers for monitoring the ambient temperature of the energy storage battery, and thermometers for detecting the return air temperature of the air conditioner.
[0048] In this embodiment, the cooling equipment dispatching system of the communication site can realize real-time operation monitoring of air conditioners and fresh air equipment, storage of historical data, calculation of actual cooling capacity and energy efficiency ratio parameters, and dispatching control based on the optimal energy efficiency ratio.
[0049] See also Figure 2 A schematic diagram of a cooling equipment scheduling system for a communication site is shown, the system mainly comprising:
[0050] 1. Monitoring and control module:
[0051] a) Air conditioning monitoring and control module: monitors the air conditioning operation status, working mode, working temperature, return air temperature, air supply mode and other data; controls the start and stop of the air conditioning, sets the working mode, working temperature, air supply mode, etc.;
[0052] b) Fresh air monitoring and control module: monitors and collects data on fresh air operation status, indoor and outdoor temperature difference, etc.; controls the start and stop of fresh air;
[0053] c) Temperature monitoring module: monitors the values of each temperature monitoring point in the communication site;
[0054] d) Power consumption monitoring module: monitors the power consumption of air conditioning, fresh air and DC load.
[0055] 2. Computing module:
[0056] Calculate the indoor heat load of the communication site; calculate the joint control temperature of the communication site; calculate the energy efficiency evaluation time window of the cooling equipment; calculate the total indoor heat load within the energy efficiency time window; calculate the average cooling capacity of the cooling equipment within the energy efficiency time window; calculate the energy efficiency ratio of the cooling equipment within the energy efficiency time window; calculate the temperature difference deviation coefficient within the energy efficiency time window; calculate the historical mobile weighted cooling capacity and energy efficiency ratio of the cooling equipment.
[0057] 3. Scheduling module:
[0058] a) Scheduling calculation module to calculate various parameters;
[0059] b) Execute the actual energy efficiency evaluation and scheduling process of the equipment, and dynamically schedule the operation and shutdown of the cooling equipment according to the relationship between the combined control temperature and the site on / off temperature;
[0060] c) Based on the energy efficiency evaluation scheduling result data, execute the actual energy efficiency evaluation calculation process of the equipment;
[0061] d) Execute the daily cooling scheduling process. When new cooling equipment needs to be started, for the current indoor heat load of the communication site, the equipment with a cooling capacity greater than or equal to the heat load and the best energy efficiency ratio is preferably used, and the equipment is dynamically switched according to changes in temperature field conditions.
[0062] In this embodiment, multiple thermometers can be deployed at the communication site to build temperature field monitoring: at the communication site, select a location with good ventilation conditions and not affected by equipment heat dissipation to deploy an indoor ambient thermometer (or directly reuse the fresh air indoor ambient thermometer); deploy an outdoor thermometer outside the communication site (or directly reuse the fresh air outdoor thermometer); select typical wireless cabinets, transmission cabinets and other equipment cabinets or wall-mounted wireless devices, transmission equipment, deploy thermometers to monitor the ambient temperature of the main equipment; deploy thermometers near the energy storage system to monitor the ambient temperature of the energy storage battery; combine the above temperature monitoring points with the return air temperature of the two air conditioners to realize temperature field monitoring of the communication site.
[0063] In this embodiment, one day (the 1st, 11th, and 21st) can be selected from the first, middle, and last part of each month as the actual energy efficiency evaluation day for the equipment (i.e., the designated date of each cycle in this embodiment), and the actual energy efficiency evaluation scheduling process for the equipment is executed; on other dates, the daily cooling scheduling process is executed, and the cooling equipment is preferentially scheduled for operation according to the actual energy efficiency calculation results of the equipment. Before the actual energy efficiency data is calculated, the equipment is scheduled for operation according to the rated value.
[0064] In some embodiments, the joint control temperature of the communication site can be determined based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point; the indoor heat load of the communication site can be determined based on the equipment heat load and the building heat load of the communication site; if the joint control temperature is greater than the start-up temperature of the cooling equipment and no cooling equipment is running, at least one first cooling equipment is cyclically selected from multiple cooling equipment, the operation of the first cooling equipment is controlled, and after a specified time, the joint control temperature of the communication site is re-determined based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point.
[0065] See also Figure 3 The schematic diagram of the actual energy efficiency evaluation and scheduling process of an equipment is shown. In this embodiment, the joint control temperature Tj can be calculated: Tj = ∑ (temperature monitoring point × monitoring point weight coefficient) / total number of monitoring points; the temperature monitoring points are the indoor temperature monitoring points and the return air temperatures of two air conditioners, excluding the outdoor temperature monitoring points; the monitoring point weight coefficients are set manually, and the sum is 1; if the values of individual monitoring points are abnormally distorted, they will be eliminated to avoid the impact of single-point failures on temperature control.
[0066] like Figure 3 As shown, the indoor heat load H can be calculated: indoor heat load H = indoor equipment heat load + building heat load, unit kW; indoor equipment heat load = DC load power × indoor equipment power consumption coefficient (artificially specified); the building heat load calculation can follow the relevant industry algorithms.
[0067] In some embodiments, if the joint control temperature is greater than the start-up temperature of the cooling equipment and the operation of the first cooling equipment exceeds a specified time, an exception handling operation is performed; if the joint control temperature is less than or equal to the start-up temperature of the cooling equipment and the joint control temperature is greater than or equal to the shutdown temperature of the cooling equipment, after the specified time, the joint control temperature of the communication site is re-determined based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point; if the joint control temperature is less than or equal to the start-up temperature of the cooling equipment and the joint control temperature is less than the shutdown temperature of the cooling equipment, the running first cooling equipment is shut down.
[0068] like Figure 3 As shown in the figure, when the joint control temperature Tj exceeds the cooling equipment startup temperature specified by the communication site, it is determined whether there is no cooling equipment running at present: if so, one cooling equipment is selected as the first cooling equipment to run. If not, it is determined whether the current equipment has been running for more than 10 minutes (which can be adjusted manually), then it is considered that the actual cooling capacity of the equipment cannot meet the current heat load and cannot reduce the indoor temperature. Its independent operation has a cooling safety risk and is transferred to abnormal processing; among them, the air conditioner operation is carried out according to the unified working temperature and air supply mode for unified evaluation.
[0069] In addition, in the previous step, the refrigeration equipment operation is selected to adopt a cyclic alternation strategy, that is, if device A is selected as the first refrigeration equipment this time, device B can be selected as the first refrigeration equipment next time to ensure that different equipment obtain equal operation evaluation opportunities.
[0070] For fresh air equipment, the indoor and outdoor temperature difference must meet the specified temperature difference T diff If the conditions are not met (for example, the outdoor temperature is high during the day and the temperature difference between indoor and outdoor is small), it will not be included in the scheduling. diff The initial value is set to a minimum temperature difference of 5 degrees.
[0071] The abnormality handling process in this embodiment may be: if the combined control temperature is still higher than the startup temperature after the first cooling device X has been running for a period of time (e.g., 10 minutes), then the actual cooling capacity of the first cooling device X is recorded as < the current heat load H; subsequently, when the heat load is greater than H, the first cooling device is not included in the scheduling operation; the operation of the first cooling device X is stopped, and other verification devices are started; for the fresh air device, the T diff After that, when the indoor and outdoor temperature difference is ≥T diffIn this case, re-verification is allowed; T diff The step size is 1 degree each time; if all devices have abnormalities, the verification operation for the day will be stopped, and two air conditioners will be turned on at the same time, and manual intervention will be initiated.
[0072] like Figure 3 As shown, when the joint control temperature Tj is lower than the shutdown temperature of the cooling device specified by the communication site, the current first cooling device is shut down; wait for 1 minute, and then the next cycle scheduling can be carried out.
[0073] In some embodiments, at least one energy efficiency evaluation time window of the first cooling equipment can be determined based on the temperature data of the first cooling equipment obtained on the previous specified date; the total indoor heat load corresponding to each energy efficiency evaluation time window, the average cooling capacity of the first cooling equipment, and the energy efficiency ratio of the first cooling equipment are determined in turn based on the operating data corresponding to each energy efficiency evaluation time window, and the corresponding temperature difference deviation coefficient is determined; wherein the temperature difference deviation coefficient is the average of the absolute values of the temperature differences between the start time and the end time of each temperature monitoring point; the cooling capacity and energy efficiency ratio of the first cooling equipment are determined based on the total indoor heat load corresponding to each energy efficiency evaluation time window, the cooling capacity of the first cooling equipment, the energy efficiency ratio of the first cooling equipment and the temperature difference deviation coefficient.
[0074] See also Figure 4 The schematic diagram of the calculation process of the actual energy efficiency evaluation of an equipment is shown. On the second day after the actual energy efficiency evaluation day of the equipment in the first, middle and last ten days of each month (the 2nd, 12th and 22nd), the operation results of the previous day are calculated and evaluated. For each first cooling equipment X, the following calculation process is executed:
[0075] Retrieve each energy efficiency evaluation time window W of device X i : The time when the equipment starts to run independently is t i1 minutes, until the operation is finished, and the combined control temperature gradually returns to the start-up temperature at the beginning of the operation. i2 Minutes, during which no other equipment is running, counted as one continuous time period. In addition, it is allowed to have multiple energy efficiency evaluation time windows W of the first cooling equipment X in one day i ;
[0076] For each found W i :Calculate the total indoor heat load H win-i :H win-i =∑(W i Indoor heat load power calculated per minute × calculation period (1 minute) / 60); unit kWh; calculation equipment × average cooling capacity P cool-i :P cool-i =H win / ((t i2 -t i1) / 60); Unit: kW; Based on the data collected by the power consumption monitoring module, the calculation of device X in W i Power consumption E power consumption; computing equipment X energy efficiency ratio EER i :EER i =P cool-i / E 耗电量 For fresh air equipment, its cooling capacity and energy efficiency ratio are related to the indoor and outdoor temperature difference ΔT. Calculate the indoor and outdoor temperature difference ΔT: ΔT = W i The average indoor and outdoor temperature difference during the window period.
[0077] Taking into account the data errors in temperature monitoring and the data fluctuations at different monitoring points, the energy efficiency evaluation time window W i , calculate W i The temperature difference deviation coefficient TD-i is the average of the absolute values of the temperature difference at the start and end of each temperature monitoring point. The larger the deviation coefficient, the greater the W i The larger the error of the calculation result, the greater the error of the calculation result. i The absolute value of the temperature difference between the start and end times Δk, k = 1, 2, ..n; n is the number of indoor monitoring points (including air conditioning return air temperature); calculate TD-i: TD-i = the average value of Δk (k = 1, 2, ..n).
[0078] In some embodiments, the weight of each energy efficiency evaluation time window can be determined based on the temperature difference deviation coefficient of each energy efficiency evaluation time window; wherein the weight of the energy efficiency evaluation time window is inversely correlated with the temperature difference deviation coefficient of the energy efficiency evaluation time window; the energy efficiency evaluation time window is divided into multiple batches based on the collection time of the operating data, and the cooling capacity and energy efficiency ratio of the first cooling equipment of each batch are calculated respectively; based on the pre-set weights of each batch and the cooling capacity and energy efficiency ratio of the first cooling equipment of each batch, the cooling capacity and energy efficiency ratio of the first cooling equipment are determined.
[0079] like Figure 4 As shown, if there is a new energy efficiency evaluation time window Wi for the first cooling device X on the previous day, the latest actual cooling capacity and energy efficiency ratio of the device X are calculated in combination with the historical calculation data of the first cooling device X. The specific process is as follows:
[0080] Take the energy efficiency evaluation time window data samples W1, W2, .., W of the first cooling equipment X within one year n , n is the total number of data, including the latest calculated batch of energy efficiency evaluation time window data mentioned above; considering the possible reduction in energy efficiency caused by long-term operation of equipment, the samples can be divided into 4 batches according to the time series, the first batch is the latest calculated energy efficiency evaluation time window within 1 month; the last three batches are the remaining batches divided into 3 equal parts according to quantity;
[0081] For each batch r (r = 1, 2, 3, 4), calculate: For each window W in the batch i , let variable m i =1-(TD-i / ∑(TD-i)); i=1,2,…k; k is the total number of windows in batch r; TD-i is W i Temperature difference deviation coefficient; Calculate the weight Q of each window i :Q i =∑m i / k; the larger the temperature deviation coefficient, the smaller the weight; the actual cooling capacity PP of this batch is calculated based on the weighted results of each calculation r =(∑P i ×Q i ) / k; weighted calculation of the actual energy efficiency ratio PEER of this batch based on each calculation result r =(∑P i ×Q i ) / k.
[0082] For the 4 batches, the batch weights PQp are set from old to new: 0.1:0.2:0.3:0.4, p=1,2,3,4; if there is little historical data available and there is only 1 batch, the PQp weight is 1; if there are only 2 batches, the batch weights are set from old to new to PQp: 0.4:0.6; if there are only 3 batches, it is set to PQp: 0.2:0.3:0.5.
[0083] Calculate the final actual cooling capacity P final =(∑PP i ×PQ i ) / k i =1,2,3,4; the result will be used as a reference for subsequent daily cooling operation scheduling; calculate the final actual cooling capacity EER final =(∑PEER i ×PQ i ) / k i =1,2,3,4; the result will be used as a reference for subsequent daily cooling operation scheduling.
[0084] In addition, for fresh air equipment, its cooling capacity and energy efficiency ratio are related to the indoor and outdoor temperature difference. Therefore, they need to be aggregated into batches according to different indoor and outdoor temperature differences ΔT and calculated independently.
[0085] In some embodiments, the joint control temperature of the communication site can be determined based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point; the indoor heat load of the communication site can be determined based on the equipment heat load and the building heat load of the communication site; if the joint control temperature is greater than the start-up temperature of the cooling equipment and no cooling equipment is running, a second cooling equipment with a cooling capacity greater than or equal to the indoor heat load and the best energy efficiency ratio is determined from multiple cooling equipment, the second cooling equipment is controlled to operate, and after a specified time, the joint control temperature of the communication site is re-determined based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point.
[0086] See also Figure 5 The schematic diagram of a daily operation scheduling process of equipment scheduling is shown, which can calculate the joint control temperature Tj and indoor heat load H.
[0087] In some embodiments, if the joint control temperature is greater than the start-up temperature of the cooling device and the operation of the second cooling device exceeds the specified time, determine whether there is a third cooling device that is not currently turned on and has the best energy efficiency ratio; if there is a third cooling device, control the operation of the third cooling device, and after the specified time, re-determine the joint control temperature of the communication site based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point; if there is no third cooling device, perform exception handling operations.
[0088] like Figure 5 As shown, when Tj exceeds the cooling equipment startup temperature specified by the communication site, it is determined whether there is no cooling equipment running at present: if yes, based on the calculated actual cooling capacity, a cooling equipment with a cooling capacity greater than the heat load H is selected, and the third cooling equipment with the highest energy efficiency ratio is selected and started to run; if no, it is determined whether the current equipment has been running for more than 10 minutes (which can be adjusted manually), then it is considered that the actual cooling capacity of the second cooling equipment cannot meet the current heat load and cannot reduce the indoor temperature, and the equipment with the highest actual energy efficiency ratio of the non-operating equipment is selected and started to run. If all equipment is running but the temperature still cannot be reduced, an alarm is issued and the process is transferred to manual processing.
[0089] In some embodiments, if the joint control temperature is less than or equal to the start-up temperature of the cooling equipment and the joint control temperature is less than the shutdown temperature of the cooling equipment, the cooling equipment in operation is shut down; after a specified time, the joint control temperature of the communication site is re-determined based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point; if the joint control temperature is less than or equal to the start-up temperature of the cooling equipment and the joint control temperature is greater than or equal to the shutdown temperature of the cooling equipment, for the running second cooling equipment, it is determined whether there is a third cooling equipment whose cooling capacity is greater than or equal to the indoor heat load and has a better energy efficiency ratio; if there is a third cooling equipment, the second cooling equipment is controlled to be shut down and the third cooling equipment is controlled to be operated; after a specified time, the joint control temperature of the communication site is re-determined based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point.
[0090] like Figure 5 As shown in the figure, when Tj is less than the shutdown temperature of the cooling equipment specified by the communication site, all running equipment will be shut down; when Tj is between the startup and shutdown temperatures, the current second cooling equipment X will be evaluated. If there is a third cooling equipment Y with a cooling capacity greater than the heat load and a higher energy efficiency ratio, the current running equipment will be switched, the current second cooling equipment X will be shut down, and the third cooling equipment Y will be started; this situation mainly occurs when the indoor and outdoor temperature difference increases as the outdoor temperature drops, resulting in an increase in the actual cooling capacity and energy efficiency ratio of the fresh air equipment. If the equipment has not yet run the actual energy efficiency evaluation process during daily operation scheduling, it will be scheduled and operated according to the rated cooling capacity and energy efficiency ratio of the equipment.
[0091] For fresh air equipment, if the current indoor and outdoor temperature difference ΔT now If there is no corresponding actual energy efficiency ratio calculation result, the fitting algorithm is used to calculate the actual cooling capacity and energy efficiency ratio: select now The closest actual energy efficiency ratio calculation result records ΔT, and the actual cooling capacity P and actual energy efficiency ratio EER corresponding to this data are used as reference; actual cooling capacity P fitting = P×ΔTnow / ΔT; actual energy efficiency ratio EER fitting = EER×ΔTnow / ΔT.
[0092] The above method of the embodiment of the present invention specifically includes the following contents:
[0093] 1. By deploying multiple temperature monitoring points at the communication site and combining the equipment's own temperature monitoring data, the temperature field of the communication site is constructed. The joint control temperature of the communication site is calculated based on the temperature field, which is used as the core parameter of the site temperature control to reduce the measurement deviation caused by a single indoor ambient thermometer, which is used as a prerequisite for equipment energy efficiency evaluation.
[0094] 2. Establish an equipment energy efficiency evaluation and scheduling process, schedule the cooling equipment one by one, and calculate the actual performance of the equipment in units of the energy efficiency evaluation time window. The window starts when the equipment starts running independently and ends when the joint control temperature returns to the beginning of the operation after it stops running. Based on the energy efficiency evaluation time window, calculate the total indoor heat load of the communication site during this period, and further calculate the average cooling capacity of the cooling equipment, and then divide it by the energy consumption of the cooling equipment in this time window to obtain its energy efficiency ratio.
[0095] 3. Considering the fluctuations and errors in temperature monitoring and heat load calculation, the temperature difference deviation coefficient is calculated for the energy efficiency evaluation time window. The actual cooling capacity and actual energy efficiency ratio data of the equipment calculated multiple times in history are weighted averaged based on the corresponding temperature difference deviation coefficient of the energy efficiency evaluation time window and the historical data time series to obtain the final actual cooling capacity and actual energy efficiency ratio as the basis for equipment scheduling.
[0096] 4. Based on the calculated actual cooling capacity and energy efficiency ratio of the equipment, select the cooling equipment whose cooling capacity meets the current heat load and start operation. During the operation of the cooling equipment, continuously select and adjust the operation of the cooling equipment, and switch the cooling equipment when necessary.
[0097] The above method of the embodiment of the present invention specifically includes the following advantages:
[0098] 1. Adopt the actual energy efficiency evaluation and calculation process of the equipment to realize the calculation and evaluation of the actual energy efficiency of the cooling equipment;
[0099] 2. Use the energy efficiency evaluation time window to establish the evaluation interval of the actual energy efficiency of the cooling equipment, and based on the temperature field monitoring data, use the time window temperature difference deviation coefficient as the weight to participate in the calculation, and then combine the time series data to do the weight division, and comprehensively calculate the actual cooling capacity and energy efficiency ratio of the equipment;
[0100] 3. In the daily operation and scheduling process, based on the joint control temperature, the cooling capacity is optimized to meet the heat load requirements, and the equipment is operated with the best energy efficiency ratio, and dynamic switching of equipment is supported under changing internal and external temperature conditions.
[0101] Embodiment three:
[0102] Corresponding to the above method embodiment, the embodiment of the present invention provides a cooling equipment scheduling device for a communication site, see Figure 6 The schematic diagram of the structure of a cooling equipment scheduling device of a communication site is shown, and the cooling equipment scheduling device of the communication site includes:
[0103] The equipment actual energy efficiency evaluation scheduling module 61 is used to cyclically select at least one first cooling device from multiple cooling devices on each specified date in each cycle, control the operation of each first cooling device in turn, and obtain the operation data of the first cooling device; the operation data includes: time data, temperature data, heat load data and power consumption data of the cooling device;
[0104] The equipment actual energy efficiency evaluation calculation module 62 is used to determine the energy efficiency evaluation time window of each first cooling device based on the temperature data of the first cooling device obtained on the previous specified date after each specified date in each cycle, and determine the cooling capacity and energy efficiency ratio of the first cooling device based on the operation data corresponding to each energy efficiency evaluation time window; wherein the energy efficiency evaluation time window is the time from the start time of the operation of the first cooling device to the time when the joint control temperature is restored to the joint control temperature before the operation of the first cooling device after the operation of the first cooling device ends; the joint control temperature is calculated based on the temperature data;
[0105] The equipment scheduling daily operation module 63 is used to determine a second cooling device from multiple cooling devices based on the cooling capacity and energy efficiency ratio of the cooling devices on other dates in each cycle except the specified date, and control the operation of the second cooling device.
[0106] The embodiment of the present invention provides a cooling equipment scheduling device for a communication site. On each designated date in each cycle, at least one first cooling equipment is cyclically selected from multiple cooling equipment, and the operation of each first cooling equipment is controlled in turn to obtain the operation data of the first cooling equipment; the operation data includes: time data, temperature data, heat load data and power consumption data of the cooling equipment; after each designated date in each cycle, the energy efficiency evaluation time window of each first cooling equipment is determined based on the temperature data of the first cooling equipment obtained on the previous designated date, and the cooling capacity and energy efficiency ratio of the first cooling equipment are determined based on the operation data corresponding to each energy efficiency evaluation time window; wherein the energy efficiency evaluation time window is the time from the start time of the operation of the first cooling equipment to the time when the joint control temperature is restored to the joint control temperature before the operation of the first cooling equipment after the operation of the first cooling equipment ends; the joint control temperature is calculated based on the temperature data; on other dates in each cycle except the designated date, the second cooling equipment is determined from multiple cooling equipment based on the cooling capacity and energy efficiency ratio of the cooling equipment, and the operation of the second cooling equipment is controlled. In this way, the actual cooling capacity and energy efficiency ratio of the cooling equipment can be dynamically learned and calculated, so as to accurately optimize and schedule the operation of the cooling equipment.
[0107] The cooling equipment of the above-mentioned communication site includes: air conditioners and fresh air coolers; multiple thermometers are arranged indoors and outdoors of the communication site for collecting temperature data; among them, the indoor thermometers include: thermometers at locations with qualified ventilation conditions and not affected by equipment heat dissipation, thermometers for monitoring the ambient temperature of the main equipment, thermometers for monitoring the ambient temperature of the energy storage battery, and thermometers for detecting the return air temperature of the air conditioner.
[0108] The above-mentioned equipment actual energy efficiency evaluation scheduling module is used to determine the joint control temperature of the communication site based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point; determine the indoor heat load of the communication site based on the equipment heat load and the building heat load of the communication site; if the joint control temperature is greater than the start-up temperature of the cooling equipment and no cooling equipment is running, cyclically select at least one first cooling equipment from multiple cooling equipment, control the operation of the first cooling equipment, and after a specified time, re-determine the joint control temperature of the communication site based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point.
[0109] The above-mentioned equipment actual energy efficiency evaluation scheduling module is also used to perform exception handling operations if the joint control temperature is greater than the start-up temperature of the cooling equipment and the operation of the first cooling equipment exceeds the specified time; if the joint control temperature is less than or equal to the start-up temperature of the cooling equipment and the joint control temperature is greater than or equal to the shutdown temperature of the cooling equipment, after the specified time, re-determine the joint control temperature of the communication site based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point; if the joint control temperature is less than or equal to the start-up temperature of the cooling equipment and the joint control temperature is less than the shutdown temperature of the cooling equipment, shut down the running first cooling equipment.
[0110] The above-mentioned equipment actual energy efficiency evaluation calculation module is used to determine at least one energy efficiency evaluation time window of the first cooling equipment based on the temperature data of the first cooling equipment obtained on the previous specified date; determine the total indoor heat load corresponding to each energy efficiency evaluation time window, the average cooling capacity of the first cooling equipment, and the energy efficiency ratio of the first cooling equipment in turn based on the operating data corresponding to each energy efficiency evaluation time window, and determine the corresponding temperature difference deviation coefficient; wherein the temperature difference deviation coefficient is the average of the absolute values of the temperature difference between the start time and the end time of each temperature monitoring point; determine the cooling capacity and energy efficiency ratio of the first cooling equipment based on the total indoor heat load corresponding to each energy efficiency evaluation time window, the cooling capacity of the first cooling equipment, the energy efficiency ratio of the first cooling equipment and the temperature difference deviation coefficient.
[0111] The above-mentioned equipment actual energy efficiency evaluation calculation module is used to determine the weight of each energy efficiency evaluation time window based on the temperature difference deviation coefficient of each energy efficiency evaluation time window; wherein the weight of the energy efficiency evaluation time window is inversely correlated with the temperature difference deviation coefficient of the energy efficiency evaluation time window; the energy efficiency evaluation time window is divided into multiple batches based on the collection time of the operating data, and the cooling capacity and energy efficiency ratio of the first cooling equipment of each batch are calculated respectively; based on the pre-set weights of each batch and the cooling capacity and energy efficiency ratio of the first cooling equipment of each batch, the cooling capacity and energy efficiency ratio of the first cooling equipment are determined.
[0112] The above-mentioned equipment scheduling daily operation module is used to determine the joint control temperature of the communication site based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point; determine the indoor heat load of the communication site based on the equipment heat load and the building heat load of the communication site; if the joint control temperature is greater than the start-up temperature of the cooling equipment and no cooling equipment is in operation, determine from multiple cooling equipment a second cooling equipment with a cooling capacity greater than or equal to the indoor heat load and the best energy efficiency ratio, control the operation of the second cooling equipment, and after a specified time, re-determine the joint control temperature of the communication site based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point.
[0113] The above-mentioned equipment scheduling daily operation module is also used to determine whether there is a third cooling device that is not currently turned on and has the best energy efficiency ratio if the joint control temperature is greater than the start-up temperature of the cooling device and the operation of the second cooling device exceeds the specified time; if there is a third cooling device, control the operation of the third cooling device, and after the specified time, re-determine the joint control temperature of the communication site based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point; if there is no third cooling device, perform exception handling operations.
[0114] The above-mentioned equipment scheduling daily operation module is also used to shut down the running cooling equipment if the joint control temperature is less than or equal to the startup temperature of the cooling equipment and the joint control temperature is less than the shutdown temperature of the cooling equipment; re-determine the joint control temperature of the communication site based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point after a specified time; if the joint control temperature is less than or equal to the startup temperature of the cooling equipment and the joint control temperature is greater than or equal to the shutdown temperature of the cooling equipment, determine whether there is a third cooling equipment with a cooling capacity greater than or equal to the indoor heat load and a better energy efficiency ratio for the running second cooling equipment; if there is a third cooling equipment, control the second cooling equipment to shut down and control the third cooling equipment to operate; after a specified time, re-determine the joint control temperature of the communication site based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point.
[0115] Technicians in the relevant field can clearly understand that, for the convenience and simplicity of description, the specific working process of the cooling equipment scheduling device of the communication site described above can refer to the corresponding process in the embodiment of the cooling equipment scheduling method of the communication site mentioned above, and will not be repeated here.
[0116] Embodiment 4:
[0117] The embodiment of the present invention also provides an electronic device for running the cooling equipment scheduling method of the communication site; see Figure 7 A structural schematic diagram of an electronic device is shown, the electronic device includes a memory 100 and a processor 101, wherein the memory 100 is used to store one or more computer instructions, and the one or more computer instructions are executed by the processor 101 to implement the cooling equipment scheduling method of the above-mentioned communication site.
[0118] Further, Figure 7 The electronic device shown further includes a bus 102 and a communication interface 103 , and the processor 101 , the communication interface 103 and the memory 100 are connected via the bus 102 .
[0119] The memory 100 may include a high-speed random access memory (RAM), and may also include a non-volatile memory, such as at least one disk storage. The communication connection between the system network element and at least one other network element is realized through at least one communication interface 103 (which may be wired or wireless), and the Internet, wide area network, local area network, metropolitan area network, etc. may be used. The bus 102 may be an ISA bus, a PCI bus, or an EISA bus, etc. The bus can be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 7 Only one bidirectional arrow is used in the diagram, but this does not mean that there is only one bus or only one type of bus.
[0120] The processor 101 may be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method can be completed by the hardware integrated logic circuit or software instructions in the processor 101. The above processor 101 can be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it can also be a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components. The methods, steps and logic block diagrams disclosed in the embodiments of the present invention can be implemented or executed. The general processor can be a microprocessor or the processor can also be any conventional processor, etc. The steps of the method disclosed in conjunction with the embodiments of the present invention can be directly embodied as a hardware decoding processor for execution, or a combination of hardware and software modules in the decoding processor for execution. The software module may be located in a storage medium mature in the art, such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory, or an electrically erasable programmable memory, a register, etc. The storage medium is located in the memory 100, and the processor 101 reads the information in the memory 100 and completes the steps of the method of the above embodiment in combination with its hardware.
[0121] An embodiment of the present invention also provides a computer-readable storage medium, which stores computer-executable instructions. When the computer-executable instructions are called and executed by a processor, the computer-executable instructions prompt the processor to implement the cooling equipment scheduling method of the above-mentioned communication site. The specific implementation can be found in the method embodiment, which will not be repeated here.
[0122] The computer program product of the cooling equipment scheduling method and apparatus for a communication site provided in an embodiment of the present invention includes a computer-readable storage medium storing program code. The instructions included in the program code can be used to execute the method in the previous method embodiment. The specific implementation can be found in the method embodiment, which will not be repeated here.
[0123] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the system and / or device described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.
[0124] In addition, in the description of the embodiments of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0125] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc., which can store program codes.
[0126] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0127] Finally, it should be noted that the above-described embodiments are only specific implementations of the present invention, which are used to illustrate the technical solutions of the present invention, rather than to limit them. The protection scope of the present invention is not limited thereto. Although the present invention is described in detail with reference to the above-described embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-described embodiments within the technical scope disclosed by the present invention, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
Claims
1. A method for scheduling cooling equipment at a communication site, It is characterized in that The method comprises: On each designated date in each cycle, at least one first cooling device is cyclically selected from the plurality of cooling devices, and each of the first cooling devices is controlled to operate in turn, and operating data of the first cooling device is obtained; the operating data includes: time data, temperature data, heat load data, and power consumption data of the cooling device; After each of the designated dates in each of the cycles, an energy efficiency evaluation time window of each of the first cooling devices is determined based on the temperature data of the first cooling devices acquired on the previous designated date, and a cooling capacity and an energy efficiency ratio of the first cooling devices are determined based on the operation data corresponding to each of the energy efficiency evaluation time windows; wherein the energy efficiency evaluation time window is the time from the start of operation of the first cooling device to the time when the joint control temperature is restored to the joint control temperature before the operation of the first cooling device after the operation of the first cooling device ends; the joint control temperature is calculated based on the temperature data; On other dates in each of the cycles except the designated date, determining a second cooling device from a plurality of the cooling devices based on the cooling capacity and energy efficiency ratio of the cooling device, and controlling the second cooling device to operate; The steps of determining the energy efficiency evaluation time window of each first cooling device based on the temperature data of the first cooling device obtained on the previous specified date, and determining the cooling capacity and energy efficiency ratio of the first cooling device based on the operating data corresponding to each energy efficiency evaluation time window include: determining at least one energy efficiency evaluation time window of the first cooling device based on the temperature data of the first cooling device obtained on the previous specified date; determining the total indoor heat load corresponding to each energy efficiency evaluation time window, the average cooling capacity of the first cooling device, the energy efficiency ratio of the first cooling device in turn based on the operating data corresponding to each energy efficiency evaluation time window, and determining the corresponding temperature difference deviation coefficient; wherein the temperature difference deviation coefficient is the average of the absolute values of the temperature difference between the start time and the end time of each temperature monitoring point; determining the cooling capacity and energy efficiency ratio of the first cooling device based on the total indoor heat load corresponding to each energy efficiency evaluation time window, the cooling capacity of the first cooling device, the energy efficiency ratio of the first cooling device and the temperature difference deviation coefficient.
2. The method according to claim 1, It is characterized in that The cooling equipment of the communication site includes: air conditioners and fresh air coolers; A plurality of thermometers are arranged indoors and outdoors of the communication site for collecting temperature data; wherein the indoor thermometers include: a thermometer at a location with qualified ventilation conditions and not affected by equipment heat dissipation, a thermometer for monitoring the ambient temperature of the main equipment, a thermometer for monitoring the ambient temperature of the energy storage battery, and a thermometer for detecting the return air temperature of the air conditioner.
3. The method according to claim 2, It is characterized in that The step of controlling the operation of each of the first cooling devices comprises: Determining the joint control temperature of the communication site based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point; Determining an indoor heat load of the communication site based on a heat load of equipment and a heat load of a building of the communication site; If the joint control temperature is greater than the start-up temperature of the refrigeration equipment and none of the refrigeration equipment is running, at least one first refrigeration equipment is cyclically selected from the multiple refrigeration equipment, and the first refrigeration equipment is controlled to start running, and after a specified time, the joint control temperature of the communication site is re-determined based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point.
4. The method according to claim 3, It is characterized in that The step of controlling the operation of each of the first cooling devices further includes: If the combined control temperature is greater than the startup temperature of the cooling device and the operation of the first cooling device exceeds a specified time, performing an abnormality handling operation; If the joint control temperature is less than or equal to the start-up temperature of the cooling device and the joint control temperature is greater than or equal to the shutdown temperature of the cooling device, re-determine the joint control temperature of the communication site based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point after a specified time; If the combined control temperature is less than or equal to the start-up temperature of the cooling device and the combined control temperature is less than the shutdown temperature of the cooling device, the first cooling device in operation is shut down.
5. The method according to claim 1, It is characterized in that The step of determining the cooling capacity and energy efficiency ratio of the first cooling device according to the total operating indoor heat load, the cooling capacity of the first cooling device, the energy efficiency ratio of the first cooling device and the temperature difference deviation coefficient corresponding to each of the energy efficiency evaluation time windows comprises: Determine the weight of each energy efficiency evaluation time window based on the temperature difference deviation coefficient of each energy efficiency evaluation time window; wherein the weight of the energy efficiency evaluation time window is inversely correlated with the temperature difference deviation coefficient of the energy efficiency evaluation time window; Dividing the energy efficiency evaluation time window into multiple batches based on the collection time of the operating data, and calculating the cooling capacity and energy efficiency ratio of the first cooling equipment in each batch respectively; Based on the preset weights of the respective batches and the cooling capacity and energy efficiency ratio of the first cooling equipment in each batch, the cooling capacity and energy efficiency ratio of the first cooling equipment are determined.
6. The method according to claim 2, It is characterized in that The step of determining a second cooling device from a plurality of the cooling devices based on the cooling capacity and energy efficiency ratio of the cooling devices, and controlling the operation of the second cooling device comprises: Determining the joint control temperature of the communication site based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point; Determining an indoor heat load of the communication site based on a heat load of equipment and a heat load of a building of the communication site; If the joint control temperature is greater than the start-up temperature of the refrigeration equipment and none of the refrigeration equipment is running, a second refrigeration equipment with a cooling capacity greater than or equal to the indoor heat load and the best energy efficiency ratio is determined from the multiple refrigeration equipment, and the operation of the second refrigeration equipment is controlled. After a specified time, the joint control temperature of the communication site is re-determined based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point.
7. The method according to claim 6, It is characterized in that The method further comprises: If the combined control temperature is greater than the startup temperature of the cooling device and the operation of the second cooling device exceeds a specified time, determining whether there is a third cooling device that is not currently started and has the best energy efficiency ratio; If the third cooling device exists, controlling the third cooling device to operate, and re-determining the joint control temperature of the communication site based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point after a specified time; If the third cooling device does not exist, an exception handling operation is performed.
8. The method according to claim 6, It is characterized in that The method further comprises: If the joint control temperature is less than or equal to the start-up temperature of the cooling device and the joint control temperature is less than the shutdown temperature of the cooling device, shut down the cooling device in operation; after a specified time, re-determine the joint control temperature of the communication site based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point; If the combined control temperature is less than or equal to the start-up temperature of the cooling device and the combined control temperature is greater than or equal to the shutdown temperature of the cooling device, for the second cooling device in operation, determine whether there is a third cooling device whose cooling capacity is greater than or equal to the indoor heat load and whose energy efficiency ratio is better; If the third cooling device exists, the second cooling device is controlled to be turned off and the third cooling device is controlled to be operated; after a specified time, the joint control temperature of the communication site is re-determined based on the temperature data collected by the indoor thermometer and the preset weight coefficients of each monitoring point.
9. A cooling equipment scheduling device for a communication site, It is characterized in that The device comprises: The equipment actual energy efficiency evaluation scheduling module is used to cyclically select at least one first cooling device from the plurality of cooling devices on each specified date in each cycle, control the operation of each of the first cooling devices in turn, and obtain the operation data of the first cooling device; the operation data includes: time data, temperature data, heat load data and power consumption data of the cooling device; The actual energy efficiency evaluation calculation module of the equipment is used to determine the energy efficiency evaluation time window of each first cooling device after each designated date in each of the cycles based on the temperature data of the first cooling device acquired on the previous designated date, and determine the cooling capacity and energy efficiency ratio of the first cooling device based on the operation data corresponding to each energy efficiency evaluation time window; wherein the energy efficiency evaluation time window is the time from the start time of the operation of the first cooling device to the time when the joint control temperature is restored to the joint control temperature before the operation of the first cooling device after the operation of the first cooling device ends; the joint control temperature is calculated based on the temperature data; An equipment scheduling daily operation module, configured to determine a second cooling device from a plurality of cooling devices based on the cooling capacity and energy efficiency ratio of the cooling device on other dates in each of the cycles except the designated date, and control the operation of the second cooling device; The equipment actual energy efficiency evaluation calculation module is used to determine at least one energy efficiency evaluation time window of the first cooling equipment based on the temperature data of the first cooling equipment obtained on the previous specified date; determine the total indoor heat load corresponding to each energy efficiency evaluation time window, the average cooling capacity of the first cooling equipment, and the energy efficiency ratio of the first cooling equipment in turn based on the operation data corresponding to each energy efficiency evaluation time window, and determine the corresponding temperature difference deviation coefficient; wherein the temperature difference deviation coefficient is the average of the absolute values of the temperature differences between the start time and the end time of each temperature monitoring point; determine the cooling capacity and energy efficiency ratio of the first cooling equipment based on the total indoor heat load corresponding to each energy efficiency evaluation time window, the cooling capacity of the first cooling equipment, the energy efficiency ratio of the first cooling equipment and the temperature difference deviation coefficient.