A waterproof structure for subway station roof slabs and its construction method

By installing a multi-layered waterproof structure consisting of a waterproof coating layer, a grouting layer, a high-strength plastic sheet, and sealing mortar on the roof of the subway station, the problem of easy damage to the roof waterproof structure was solved, and a better waterproof effect was achieved.

CN118187159BActive Publication Date: 2026-11-17CHINA CONSTR SEVENTH ENG DIVISION CORP LTD +2
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410442014.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-12
Publication Date
2026-11-17
Estimated Expiration
2044-04-12

AI Technical Summary

Technical Problem

The waterproof structure of subway station roof slabs is easily damaged, resulting in poor waterproofing performance. Existing technologies often involve cracking of the concrete protective layer, damage to the waterproof coating layer, and a lack of multiple waterproofing measures.

Method used

A multi-layered waterproof structure consisting of a waterproof coating layer, a grouting layer, a high-strength plastic sheet, and sealing mortar is adopted. Combined with grouting pipes and earthwork backfilling, multiple waterproof measures are formed to enhance the waterproof effect.

Benefits of technology

Without increasing costs, it significantly improves the waterproofing of the roof slab, prevents leakage, and enhances the protection and density of the waterproof coating layer.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118187159B_ABST
    Figure CN118187159B_ABST
Patent Text Reader

Abstract

This invention relates to a waterproof structure for subway station roof slabs and its construction method, effectively solving the problems of easy damage and poor waterproofing effect of subway station roof slab waterproof structures. The technical solution includes a waterproof coating layer applied to the station roof slab, a grouting layer on top of the waterproof coating layer, a high-strength plastic sheet laid on top of the grouting layer, and the high-strength plastic sheet connecting to the station's retaining structure on both sides. A strip of sealing mortar is poured along the retaining structure on both sides of the high-strength plastic sheet, pressing the high-strength plastic sheet underneath and connecting the sealing mortar to the retaining structure. Backfill soil is placed above the high-strength plastic sheet. The grouting layer is injected after backfilling, using the pressure of the soil to compact the grout and protect the grouting layer. This invention, without increasing costs, effectively improves the waterproofing capacity of the roof slab by adding multiple waterproofing measures and eliminating the influence of the concrete protective layer on the waterproof coating layer.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of waterproofing construction of subway stations, specifically a waterproofing structure for the roof of a subway station and its construction method. Background Technology

[0002] As underground concrete structures, the construction of waterproofing structures for subway stations is particularly important, as improper handling can easily lead to water leakage. Currently, the commonly used method for waterproofing roof slabs is to apply polyurethane waterproof coating to the surface of the roof slab and then add a concrete waterproof protective layer. However, this method has two drawbacks: first, the concrete protective layer is prone to cracking and breaking during construction, directly damaging the waterproof coating layer; second, this method relies solely on one layer of waterproof coating as a true waterproof barrier, and if the coating is not applied properly or damaged by external forces, there are no other water-proofing measures. Summary of the Invention

[0003] To address the problem of easily damaged and poorly waterproofed structures on subway station roof slabs, this invention provides a waterproof structure for subway station roof slabs and its construction method.

[0004] A waterproof structure for a subway station roof includes a waterproof coating layer applied to the station roof, a grouting layer above the waterproof coating layer, a high-strength plastic sheet laid on top of the grouting layer, the left and right sides of the high-strength plastic sheet connecting to the station's retaining structure, and a strip of sealing mortar poured along the station's retaining structure on each side of the high-strength plastic sheet, pressing the high-strength plastic sheet underneath and connecting the sealing mortar to the retaining structure; backfill soil is placed above the high-strength plastic sheet.

[0005] The construction method for the waterproof structure of the subway station roof slab mentioned above includes the following steps: Step 1: Waterproof coating application; Before application, the station roof should be cleaned to ensure it is free of laitance, water droplets, and water seepage, and the corners should be treated according to the design requirements. Then, the waterproof coating is applied and solidified to form a waterproof coating layer. Step 2, process the first grouting pipe; drill the first grouting holes at equal intervals on the side wall of the first grouting pipe and roughen the surface of the first grouting pipe; then wrap the first grouting holes one by one with tape, making sure that the tape can be pushed open during grouting. Step 3: Lay the first grouting pipe; After the waterproof coating layer is completely dry, lay the first grouting pipe on the waterproof coating layer. The first grouting pipe is arranged horizontally along the station, and all the first grouting pipes are arranged at equal intervals along the longitudinal direction of the station. One end of each first grouting pipe is pressed against the surface of one side of the station's retaining structure and sealed. The other end turns through a bend and rises at least 60cm above the ground along the station's retaining structure and is sealed. Step 4: Lay high-strength plastic sheeting; After the first grouting pipes are laid out, lay high-strength plastic sheeting on top of the first grouting pipes, with the left and right sides of the high-strength plastic sheeting abutting against the surface of the retaining structure. Step 5: Lay the second grouting pipe; Drill second grouting holes at equal intervals on the side wall of the second grouting pipe, and lay two second grouting pipes on top of the high-strength plastic sheeting. The two second grouting pipes are laid close to the two sides of the station's retaining structure. Step 6, earthwork backfilling; After the high-strength plastic sheeting is laid, backfill earthwork on top of the high-strength plastic sheeting, and compact it in layers. The backfilling height shall not be less than 50cm. Step 7, pour the grouting layer; inject grout into the first grouting pipe one by one from the upper pipe opening. During grouting, strictly follow the grouting sequence of the pre-arranged grouting pipes. After the grout solidifies, it forms a grouting layer located under the high-strength plastic sheet. Step 8: Pour sealing mortar; After the grouting layer has solidified, excavate the vertical section of the first grouting pipe, remove the vertical section and bend of the first grouting pipe, and adjust the high-strength plastic sheet and the second grouting pipe as required. Then, backfill the excavated part, and then grout the second grouting pipe to form strip-shaped sealing mortar that connects with the station enclosure structure on both sides of the high-strength plastic sheet. After the grouting is completed, continue to backfill the earthwork to the design elevation.

[0006] In step three, before laying the first grouting pipe, the surfaces of the retaining structures on both sides are cleaned and roughened. The roughening height must be greater than the total height of the grouting layer plus the sealing mortar.

[0007] In step four, the two high-strength plastic sheets are overlapped. When overlapping, the high-strength plastic sheet above the first grouting pipe that is poured later overlaps the high-strength plastic sheet above the first grouting pipe that is poured earlier, and the overlap is firmly glued with waterproof adhesive. The overlap width is not less than 10cm.

[0008] This invention, without increasing costs, effectively improves the waterproofing capability of the roof slab by adding multiple waterproofing measures and eliminating the influence of the concrete protective layer on the waterproof coating layer. Attached Figure Description

[0009] Figure 1 This is a front sectional view of the present invention.

[0010] Figure 2 for Figure 1 A magnified view of position A in the middle. Detailed Implementation

[0011] Referring to the attached drawings, a waterproof structure for a subway station roof includes a waterproof coating layer 1 applied to the station roof, a grouting layer 2 above the waterproof coating layer 1, a high-strength plastic sheet 3 laid on top of the grouting layer 2, the left and right sides of the high-strength plastic sheet 3 connecting to the station's retaining structure, and a strip of sealing mortar 4 poured along the station's retaining structure on each of the left and right sides of the high-strength plastic sheet 3, pressing the high-strength plastic sheet 3 underneath, and connecting the sealing mortar 4 to the retaining structure to prevent the left and right sides of the high-strength plastic sheet 3 from curling up or leaking; backfill soil 5 is placed above the high-strength plastic sheet 3.

[0012] The construction method for the waterproof structure of the subway station roof slab mentioned above includes the following steps: Step 1, Waterproof coating construction; Before construction, the station roof slab should be cleaned, free of laitance, water droplets, and seepage, and the inside and outside corners should be treated according to the design requirements. Then, the waterproof coating is applied and solidified to form a waterproof coating layer 1. Step 2: Process the first grouting pipe 6. The first grouting pipe 6 is a DN10 stainless steel pipe. Drill the first grouting holes 7 at equal intervals on the side wall of the first grouting pipe 6. The spacing of the first grouting holes 7 is usually 1m, and the hole spacing can be adjusted according to the actual situation. Use tools such as steel wool to roughen the surface of the first grouting pipe 6 to ensure a tighter connection between the mortar and the steel pipe and to prevent the formation of seepage channels due to the excessive smoothness of the steel pipe surface. Then, use tape 8 to wrap the first grouting holes 7 one by one to ensure that no foreign matter enters the first grouting pipe 6 and that the inside is clean and tidy. When wrapping the tape 8, it is necessary to ensure that the tape 8 can be pushed open during grouting. Step 3: Lay the first grouting pipe 6; After the waterproof coating layer 1 is completely dry, lay the first grouting pipe 6 on the waterproof coating layer 1. The first grouting pipe 6 is arranged horizontally along the station, and all the first grouting pipes 6 are arranged at equal intervals along the longitudinal direction of the station. The pipe sections of the first grouting pipe 6 are connected by threaded connections. The spacing between two adjacent first grouting pipes 6 is usually 4m, and the spacing can be adjusted according to the actual situation. One end of each first grouting pipe 6 is against the surface of one side of the station's retaining structure and is sealed. The other end turns through a bend 9 and rises at least 60cm above the ground along the station's retaining structure and is sealed to prevent garbage from falling in. Step 4: Lay high-strength plastic sheet 3; After the first grouting pipe 6 is arranged, lay high-strength plastic sheet 3 on top of the first grouting pipe 6, with the left and right sides of the high-strength plastic sheet 3 abutting against the surface of the enclosure structure. Step 5: Lay the second grouting pipe 10; the second grouting pipe 10 is made of ordinary plastic pipe. Second grouting holes 11 are drilled at equal intervals on the side wall of the second grouting pipe 10. Two second grouting pipes 10 are laid above the high-strength plastic sheet 3. The two second grouting pipes 10 are laid close to the two sides of the station's retaining structure, pressing the high-strength plastic sheet 3 underneath. Step 6, earthwork backfilling; After the high-strength plastic sheet 3 is laid, backfill earthwork 5 on top of the high-strength plastic sheet 3 and compact it in layers. The backfilling height shall not be less than 50cm. When backfilling, backfill horizontally from the middle to both ends. During the backfilling process, observe carefully to keep the high-strength plastic sheet 3 flat and prevent it from turning over. The layering and compaction of backfill earthwork 5 can be done according to the design requirements. The main purpose is to use the earthwork pressure to compact the grout during subsequent grouting. At the same time, it can ensure that the earthwork layer can protect the grout after it solidifies, preventing mechanical damage to the mortar layer during the later backfilling construction. Step 7: Pour grouting layer 2; Grout is injected one by one from the upper pipe opening into the first grouting pipe 6. During grouting, the grouting sequence of the pre-arranged grouting pipes is strictly followed. After the grout solidifies, grouting layer 2 is formed below the high-strength plastic sheet 3. Grouting can be observed by digging a hole between two grouting steel pipes; alternatively, a test section can be selected in advance to record the grouting pressure. During subsequent construction, the grouting pressure can be controlled to observe whether the grouting is completed. Ordinary cement mortar, waterproof mortar, etc. can be selected for grouting according to the actual site conditions. Step 8: Pour sealing mortar 4; observe whether the grout has solidified by excavating a hole; after the grouting layer 2 has solidified, excavate the vertical section of the first grouting pipe 6, remove the vertical section and bend 9 of the first grouting pipe 6, and adjust the high-strength plastic sheet and the second grouting pipe 10 as required. Then backfill the excavated part, and then grout the second grouting pipe 10 to form strip-shaped sealing mortar 4 connected to the station enclosure structure on both sides of the high-strength plastic sheet 3. After the grouting is completed, continue to backfill the soil to the design elevation.

[0013] In step three, before laying the first grouting pipe 6, the surfaces of the retaining structures on both sides are cleaned and roughened. The roughening height must be greater than the total height of the grouting layer 2 plus the sealing mortar 4 to ensure that the grouting layer 2 and the sealing mortar 4 are firmly connected to the surface of the retaining structure.

[0014] In step four, the two high-strength plastic sheets 3 are overlapped. When overlapping, the high-strength plastic sheet 3 above the first grouting pipe 6 that is poured later overlaps the high-strength plastic sheet 3 above the first grouting pipe 6 that is poured earlier, and the overlap is firmly glued with waterproof adhesive. The overlap width is not less than 10cm.

[0015] This invention patent not only adds two waterproofing measures, a mortar layer and a plastic sheet, but also eliminates the concrete waterproofing protective layer. It uses a mortar layer to reinforce and protect the waterproof coating layer 1, and uses the gravity of the backfill soil 5 to make the mortar layer more compact and effective. It uses strip-shaped sealing mortar 4 to seal both sides of the high-strength plastic sheet 3, which effectively improves the waterproofing capability of the roof slab.

Claims

1. A construction method for a waterproof structure of a subway station roof slab, characterized in that, Includes the following steps: Step 1, Waterproof coating construction; Before construction, the station roof should be cleaned, free of laitance, water droplets, and seepage, and the internal and external corners should be treated according to the design requirements. Then, the waterproof coating is applied and solidified to form a waterproof coating layer (1). Step 2, process the first grouting pipe (6); drill the first grouting holes (7) at equal intervals on the side wall of the first grouting pipe (6) and roughen the surface of the first grouting pipe (6); then use tape (8) to wrap the first grouting holes (7) one by one. When wrapping the tape (8), it is necessary to ensure that the tape (8) can be pushed open during grouting. Step 3, lay the first grouting pipe (6); after the waterproof coating layer (1) is completely dry, lay the first grouting pipe (6) on the waterproof coating layer (1). The first grouting pipe (6) is arranged horizontally along the station, and all the first grouting pipes (6) are arranged at equal intervals along the longitudinal direction of the station; one end of each first grouting pipe (6) is against the surface of one side of the station's retaining structure and sealed, and the other end turns through a bend (9) and rises at least 60cm above the ground along the station's retaining structure and is sealed. Step 4, lay high-strength plastic sheet (3); after the first grouting pipe (6) is arranged, lay high-strength plastic sheet (3) above the first grouting pipe (6), with the left and right sides of the high-strength plastic sheet (3) against the surface of the enclosure structure. Step 5, lay the second grouting pipe (10); drill the second grouting holes (11) at equal intervals on the side wall of the second grouting pipe (10), and lay two second grouting pipes (10) above the high-strength plastic cloth (3). The two second grouting pipes (10) are laid close to the two sides of the station's retaining structure. Step 6, earthwork backfilling; After the high-strength plastic sheet (3) is laid, backfill earthwork (5) on top of the high-strength plastic sheet (3) and compact it in layers. The backfilling height shall not be less than 50cm. Step 7, pour the grouting layer (2); pour grout into the first grouting pipe (6) one by one from the upper pipe opening. When grouting, strictly follow the grouting sequence of the grouting pipes arranged in advance. After the grout solidifies, it forms the grouting layer (2) located below the high-strength plastic cloth (3). Step 8, pour sealing mortar (4); after the grouting layer (2) has solidified, dig open the vertical section of the first grouting pipe (6), remove the vertical section and bend (9) of the first grouting pipe (6), and adjust the high-strength plastic sheet and the second grouting pipe (10) as required. Then backfill the excavated part, and then grout the second grouting pipe (10) to form a strip of sealing mortar (4) connected to the station enclosure structure on both sides of the high-strength plastic sheet (3). After the grouting is completed, the soil can be backfilled to the design elevation.

2. The construction method for a waterproof structure for a subway station roof slab according to claim 1, characterized in that, In step three, before laying the first grouting pipe (6), the surfaces of the two retaining structures are cleaned and roughened. The roughening height must be greater than the total height of the grouting layer (2) plus the sealing mortar (4).

3. The construction method for a waterproof structure of a subway station roof slab according to claim 1, characterized in that, In step four, the two high-strength plastic sheets (3) are overlapped. When overlapping, the high-strength plastic sheet (3) above the first grouting pipe (6) poured later overlaps the high-strength plastic sheet (3) above the first grouting pipe (6) poured earlier, and the overlap is firmly glued with waterproof glue. The overlap width is not less than 10cm.

Citation Information

Patent Citations

  • Waterproof structure of underground structure of station and construction method of waterproof structure

    CN114855887A

  • Waterproof structure for joints of sidewall and top and bottom plates of peat soft soil stratum subway station

    CN203583528U