Intelligent control method and system for building refrigeration room
By extracting the operating status chain data of the building refrigeration machine room and the multi-round state trend prediction transformation of the predefined control strategy, combined with the matching of the machine room control knowledge base, the problem of low energy efficiency of the traditional control method is solved, and efficient and accurate machine room control is achieved. and reduced energy consumption.
Patent Information
- Application Number
- CN202410437348.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-11
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-04-11
AI Technical Summary
Traditional building refrigeration machine room control methods are difficult to adapt to different environments and load conditions, resulting in low energy efficiency and waste of energy consumption. Existing data-driven intelligent algorithms are ineffective when processing complex operating status data.
Extract the target operating status chain data of the refrigeration machine room of the target building, perform multiple rounds of status trend prediction conversion through predefined control strategies, generate the initial status trend conversion vector, and use the machine room control knowledge base to match control instructions and generate corresponding control instructions.
It achieves efficient and precise control of building refrigeration machine rooms, improves operating efficiency, reduces energy consumption, is adaptive and scalable, and adapts to the control needs of building refrigeration machine rooms of different sizes and types.
Smart Images

Figure CN118210233B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of smart building technology, and more specifically, to a smart control method and system for a building refrigeration room. Background Art
[0002] With the continuous improvement of the intelligent level of buildings, the operation efficiency and control accuracy of building refrigeration rooms, as an important part of building energy consumption, are of great significance for energy conservation and emission reduction. Traditional building refrigeration room control methods often rely on fixed control logic and manual operation, which are difficult to adapt to changes in different environments and load conditions, resulting in low energy efficiency and energy waste.
[0003] In order to solve the above problems, in recent years, relevant technologies have begun to explore building refrigeration room control methods based on data-driven and intelligent algorithms. These methods collect and analyze the operating status data of the room, learn the operating characteristics and control laws of the room, and achieve more accurate and efficient control. However, the existing control methods still have some challenges when processing complex operating status data, such as high data dimension, strong nonlinearity, dynamic changes, etc., resulting in poor control effect. Summary of the invention
[0004] In view of this, the purpose of this application is to provide a method and system for intelligent control of a building refrigeration room, by extracting the target operating state chain data of the target building refrigeration room, and combining the predefined control strategy to perform multiple rounds of state trend prediction conversion to generate an initial state trend conversion vector. Among them, the predefined control strategy is selected from multiple basic control strategies through a cyclic strategy learning and updating process, and can adaptively adapt to the operating characteristics and control requirements of the room, so as to achieve efficient and accurate control of the building refrigeration room, improve the operating efficiency of the room, reduce energy consumption, and provide new solutions for intelligent building management. In addition, it is scalable and adaptable, and can adapt to the control requirements of building refrigeration rooms of different sizes and types, and has broad application prospects and market value.
[0005] According to a first aspect of the present application, a method for intelligent control of a building refrigeration room is provided, the method comprising:
[0006] Extracting target operation status chain data of a refrigeration room of a target building; wherein the target operation status chain data includes a plurality of first state control factors;
[0007] Obtaining a predefined control strategy, wherein the predefined control strategy is selected from the multiple final control strategies finally generated by executing a cyclic strategy learning and updating process based on multiple basic control strategies and after satisfying the strategy convergence requirement; wherein, in each strategy learning and updating process, strategy learning and updating are performed on multiple basic control strategies of the current strategy learning and updating process based on the template operation state chain data sequence to generate multiple final control strategies, and if the strategy convergence requirement is not satisfied, the multiple final control strategies are used as multiple basic control strategies of the next strategy learning and updating process;
[0008] According to the predefined control strategy, the target operation state chain data is subjected to multiple rounds of state trend prediction conversion to generate an initial state trend conversion vector; wherein, during each round of state trend prediction conversion, part of the multiple first state control factors is converted into a second state control factor in the initial state trend conversion vector;
[0009] According to the initial state trend conversion vector, control instruction matching is performed in a computer room control knowledge base to generate a control instruction matching result corresponding to the target building refrigeration computer room.
[0010] In a possible implementation of the first aspect, the strategy learning and updating of multiple basic control strategies in the current strategy learning and updating process is performed according to the template operation state chain data sequence to generate multiple final control strategies, including:
[0011] For the multiple basic control strategies, according to one basic control strategy, each template operation state chain data in the template operation state chain data sequence is converted into a corresponding template state trend conversion vector, and according to each generated template state trend conversion vector, a strategy utility value corresponding to the one basic control strategy is determined;
[0012] Determining the strategy attention weights corresponding to the multiple basic control strategies respectively according to the strategy utility values corresponding to the multiple basic control strategies respectively;
[0013] According to the strategy attention weights respectively corresponding to the multiple basic control strategies, multiple rounds of selection are performed from the multiple basic control strategies to generate multiple reference control strategies; wherein each time, one basic control strategy is selected from the multiple basic control strategies as the reference control strategy;
[0014] The multiple reference control strategies are subjected to strategy learning to generate the multiple final control strategies.
[0015] In a possible implementation manner of the first aspect, determining the strategy utility value corresponding to the one basic control strategy according to the generated template state trend conversion vectors includes:
[0016] Performing standardized conversion on each template state trend conversion vector respectively to generate each standardized state trend conversion vector, and using a part of the standardized state trend conversion vectors as a reference vector sequence and another part of the standardized state trend conversion vectors as a tracking vector sequence;
[0017] For each reference vector, matching is performed from the tracking vector sequence according to a reference vector to generate a corresponding matching result;
[0018] According to the control effect data corresponding to each of the reference vectors, an evaluation parameter value of each generated matching result is determined, and the evaluation parameter value is used as a strategy utility value of the one basic control strategy.
[0019] In a possible implementation of the first aspect, determining the evaluation parameter value of each generated matching result according to the control effect data corresponding to each reference vector includes:
[0020] For each of the reference vectors, determining a validity parameter of a matching result corresponding to the reference vector according to the control effect data of the reference vector;
[0021] The evaluation parameter value is generated according to the validity parameters of the matching results corresponding to the reference vectors.
[0022] In a possible implementation of the first aspect, determining the strategy attention weights corresponding to the multiple basic control strategies respectively according to the strategy utility values corresponding to the multiple basic control strategies respectively includes:
[0023] For the multiple basic control strategies, a ratio of a strategy utility value corresponding to one basic control strategy to a sum of strategy utility values respectively corresponding to the multiple basic control strategies is used as a strategy attention weight corresponding to the one basic control strategy.
[0024] In a possible implementation manner of the first aspect, performing strategy learning on the multiple reference control strategies to generate the multiple final control strategies includes:
[0025] Dividing the multiple reference control strategies into multiple strategy combinations, each strategy combination including two reference control strategies;
[0026] For the multiple strategy combinations, when a crossover operation is randomly determined to be performed on a strategy combination according to a preset crossover weight coefficient, for two reference control strategies covered by the strategy combination, a part of the control knowledge vector in one reference control strategy is exchanged with a corresponding part of the control knowledge vector in another reference control strategy to generate two reference control strategies after the crossover operation;
[0027] The multiple final control strategies are generated according to the multiple reference control strategies after the crossover operation and the multiple reference control strategies before the crossover operation.
[0028] In a possible implementation manner of the first aspect, generating the multiple final control strategies according to the multiple reference control strategies after the crossover operation and the multiple reference control strategies without the crossover operation includes:
[0029] For multiple reference control strategies after the crossover operation and multiple reference control strategies without the crossover operation, for each evolution factor in a reference control strategy, when randomly determining to perform a transition operation on the control knowledge vector according to a preset transition probability, the control knowledge vector is transformed from an initial state to a final state to generate a reference control strategy after the transition operation;
[0030] The multiple reference control strategies after the transition operation and the multiple reference control strategies without the transition operation are used as the multiple final control strategies.
[0031] In a possible implementation of the first aspect, the method further includes:
[0032] For each reference building refrigeration machine room covered in the machine room control knowledge base, extract reference operation status chain data of a reference building refrigeration machine room;
[0033] According to the predefined control strategy, converting the reference operating state chain data into a corresponding reference state trend conversion vector;
[0034] The reference state trend conversion vector is subjected to a standardized conversion to generate a standardized state trend conversion vector corresponding to the reference building refrigeration room.
[0035] In a possible implementation of the first aspect, performing control instruction matching in a computer room control knowledge base according to the initial state trend conversion vector to generate a control instruction matching result corresponding to the refrigeration computer room of the target building includes:
[0036] Performing a standardized transformation on the initial state trend transformation vector to generate a standardized state trend transformation vector corresponding to the refrigeration room of the target building;
[0037] According to the standardized state trend transition vector corresponding to the target building refrigeration room, matching is performed with the standardized state trend transition vectors corresponding to each reference control instruction set covered in the room control knowledge base to generate a control instruction matching result corresponding to the building refrigeration room, wherein the control instruction matching result includes at least one matched reference control instruction set.
[0038] According to the second aspect of the present application, a building refrigeration room intelligent control system is provided, the building refrigeration room intelligent control system includes a machine-readable storage medium and a processor, the machine-readable storage medium stores machine-executable instructions, and when the processor executes the machine-executable instructions, the building refrigeration room intelligent control system implements the aforementioned building refrigeration room intelligent control method.
[0039] According to a third aspect of the present application, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer-executable instructions, and when the computer-executable instructions are executed, the aforementioned intelligent control method for a building refrigeration room is implemented.
[0040] According to any one of the above aspects, the technical effect of the present application is:
[0041] The embodiment of the present application extracts the operating status data of the refrigeration room of the target building, and performs multiple rounds of state trend prediction conversion in combination with a predefined control strategy to generate an initial state trend conversion vector. In this process, part of the first state control factor is converted into a second state control factor, thereby achieving a refined description of the operating status of the room. Furthermore, the room control knowledge base is used to match control instructions to generate control instructions that match the refrigeration room of the target building. Through this intelligent control method, efficient and precise control of the building refrigeration room can be achieved, the operating efficiency of the room can be improved, energy consumption can be reduced, and the purpose of energy conservation and emission reduction can be achieved. At the same time, it also has adaptability and scalability, and can adapt to the control needs of building refrigeration rooms of different sizes and types, providing a new solution for intelligent building management. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0043] Figure 1 A flow chart of a method for intelligent control of a building refrigeration room provided in an embodiment of the present application.
[0044] Figure 2A schematic diagram of the component structure of an intelligent control system for a building refrigeration room provided in an embodiment of the present application for implementing the above-mentioned intelligent control method for a building refrigeration room is shown. DETAILED DESCRIPTION
[0045] In order to make the purpose, technical scheme and advantages of the embodiment of the present application clearer, the technical scheme in the embodiment of the present application will be clearly and completely described below according to the drawings in the embodiment of the present application. It should be understood that the drawings in the present application only serve the purpose of explanation and description, and are not used to limit the scope of protection of the present application. In addition, it should be understood that the schematic drawings are not drawn in real proportion. The flowchart used in this application shows the operations implemented according to some embodiments of the embodiment of the present application. It should be understood that the operations of the flowchart can be implemented out of sequence, and the steps without logical context can be reversed in order or implemented simultaneously. In addition, those skilled in the art can add multiple other operations to the flowchart under the guidance of the content of the present application, and can also destroy multiple operations from the flowchart.
[0046] Figure 1 The flowchart of the intelligent control method and system for a building refrigeration room provided by the embodiment of the present application is shown. It should be understood that in other embodiments, the order of some steps of the intelligent control method for a building refrigeration room of the present embodiment can be shared with each other according to actual needs, or some steps can be omitted or maintained. The detailed steps of the intelligent control method for a building refrigeration room include:
[0047] Step S110, extracting target operation status chain data of the refrigeration room of the target building, wherein the target operation status chain data includes a plurality of first status control factors.
[0048] In detail, the target building refrigeration room may refer to a refrigeration room of a specific building that needs to be monitored and controlled for operation status, which is an important component inside the building and is responsible for providing cooling to maintain a comfortable environment in the building. For example, a refrigeration room is set up in the basement of an office building, and equipment such as a chiller, a cooling water pump, a freezing water pump, a piping system, and a control system are installed in the room, and a cooling tower is installed outdoors, which together constitute a refrigeration system.
[0049] The target operation status chain data may refer to a series of continuous data sets generated during the operation of the refrigeration room that describe its operation status. These data are arranged in chronological order to form a chain, reflecting the change in the operation status of the room from one moment to another. For example, the target operation status chain data may include the measured values of multiple parameters such as the temperature, pressure, and flow of chilled water and cooling water. These data are collected in real time by sensors installed in the room and transmitted to the database of the intelligent control system of the building refrigeration room.
[0050] In the target operation status chain data, the first state control factors refer to those parameters or variables that can directly affect the operation status of the refrigeration room, which are usually key factors that need to be monitored and controlled. For example, the first state control factors may include the inlet temperature of the cooling water, the fan speed of the cooling tower, the compressor operating frequency of the chiller, etc. The changes of these first state control factors will directly affect the cooling effect, energy consumption and equipment life.
[0051] Therefore, in this embodiment, the building refrigeration room intelligent control system as a server is first connected to the monitoring system of the target building refrigeration room, which records the operating status data of the room in real time, such as multiple parameters including machine chilled water and cooling water temperature, cooling water flow, cooling tower fan speed, compressor operating status, etc. These parameters constitute the operating status chain of the room. The server extracts these status chain data from the monitoring system regularly or in real time through a predetermined data interface, and stores these status chain data in the server's memory or database for subsequent processing.
[0052] After extracting the original state chain data, the server can perform a series of data preprocessing operations to ensure the accuracy and availability of the data. These operations can include data cleaning (such as removing outliers and filling missing values), data conversion (such as unit unification and data standardization), and data aggregation (such as calculating statistics such as average, maximum, minimum, etc.). The preprocessed data will be more suitable for subsequent strategy learning and state trend prediction.
[0053] Step S120, obtaining a predefined control strategy, wherein the predefined control strategy is selected from the multiple final control strategies generated after executing a cyclic strategy learning and updating process based on multiple basic control strategies and satisfying the strategy convergence requirements. In each strategy learning and updating process, strategy learning and updating are performed on multiple basic control strategies of the current strategy learning and updating process based on the template operation state chain data sequence to generate multiple final control strategies. If the strategy convergence requirements are not satisfied, the multiple final control strategies are used as multiple basic control strategies of the next strategy learning and updating process.
[0054] In detail, the predefined control strategy refers to a set of control logic or methods that are predefined according to a specific algorithm or rule in the control process of the refrigeration room, which can be used to guide how to adjust the control parameters according to the actual operating status of the room to achieve the expected operating goals. For example, the predefined control strategy can be a temperature control strategy based on the PID algorithm, or a complex control strategy based on intelligent algorithms such as fuzzy logic or neural networks. These control strategies usually dynamically adjust the operating parameters of the equipment according to the real-time collected operating status data, such as adjusting the speed of the cooling water pump to control the circulation flow of the cooling water. The basic control strategy refers to a simple or basic control logic or method that serves as the initial input or reference in the formation process of the predefined control strategy. It may not be directly applied to the actual control process, but provides a basis or starting point for more complex control strategies. For example, the basic control strategy can be a manual control strategy based on empirical rules, such as "when the indoor temperature is higher than 26°C, turn on the chiller; when the indoor temperature is lower than 24°C, turn off the chiller". Although these simple rules may not be able to adapt to all complex and changeable operating conditions, they provide an initial framework or inspiration for higher-level automated control strategies.
[0055] The cyclic strategy learning and updating process refers to an iterative optimization method that gradually improves the control effect by repeatedly learning, evaluating and updating the control strategy. In this process, the current control strategy will be evaluated and adjusted and optimized accordingly based on the evaluation results. For example, the server can evaluate the performance of the current control strategy based on the target operation status chain data and historical control effect records collected in real time, and automatically adjust the set values of the control parameters or change the control logic based on the evaluation results to improve the future control effect. This process of evaluation, adjustment and re-evaluation will be repeated until a satisfactory control effect is achieved or certain termination conditions are met. In this cyclic process, the control strategy of each stage will serve as the basis for learning and updating in the next stage.
[0056] The strategy convergence requirements refer to a set of conditions or standards set during the cyclic strategy learning and updating process, which are used to determine whether the current control strategy has reached a sufficiently good performance level and further iterative optimization can be stopped. These requirements usually include indicators in terms of control accuracy, stability, energy consumption, etc. For example, strategy convergence requirements may include specific indicators such as "the reduction in control error is less than 1% after three consecutive iterations" or "the total energy consumption is reduced to below a preset value." When these requirements are met, the server will stop further iterative optimization and output the current control strategy as the final selected predefined control strategy to the actuator for execution. If the convergence requirements are not met, it is necessary to continue iterative optimization until the conditions are met.
[0057] Therefore, in this embodiment, the server can have a built-in policy learning module, which is based on reinforcement learning or other machine learning algorithms. In the initial stage, multiple basic control strategies are defined in the policy learning module, and these basic control strategies can be formulated based on expert experience, historical data or simple control logic. The server will use these basic control strategies, combined with the template operation status chain data sequence (i.e., historical or simulated operation status data), to perform multiple rounds of policy learning and updating processes.
[0058] In each round of strategy learning and updating, the server will evaluate the performance of each basic control strategy based on the current control effect (such as energy consumption, temperature stability and other indicators), and adjust or optimize the strategy based on the evaluation results. This process may involve parameter adjustment, rule modification or generation of new strategies.
[0059] When the policy convergence requirements are met (such as the difference in learning results for multiple consecutive rounds is less than a certain threshold, or the predetermined number of learning rounds is reached), the server will select the best performing policy from the multiple control policies finally generated as the predefined control policy. If the convergence requirements are not met, the multiple control policies generated in the current round will be used as the input for the next round of policy learning and updating process.
[0060] Step S130, according to the predefined control strategy, the target operation state chain data is subjected to multiple rounds of state trend prediction conversion to generate an initial state trend conversion vector. In each round of state trend prediction conversion, part of the first state control factors among the multiple first state control factors are converted into a second state control factor in the initial state trend conversion vector.
[0061] In detail, the state trend prediction conversion refers to processing the target operation state chain data using a predefined control strategy to predict the possible future state change trend of the refrigeration room. This conversion usually involves data analysis, model application, and algorithm calculation, aiming to convert the current state data into a prediction of the future state. For example, assuming that the indoor temperature of the current building is rising, the server predicts that if no measures are taken, the temperature will continue to rise and may exceed the comfort range based on the predefined control strategy and historical data. This prediction process is a state trend prediction conversion, which converts the current temperature data into a prediction of future temperature changes.
[0062] The second state control factor refers to the prediction parameter or variable generated during the state trend prediction conversion process, which is used to describe the future state trend of the refrigeration room. These factors are usually calculated based on the current first state control factor and the predefined control strategy. For example, in the above example, the predicted future temperature can be regarded as a second state control factor. It is calculated based on the current first state control factor (such as current temperature, outdoor temperature, etc.) and the predefined control strategy (such as temperature control algorithm) to describe the future state trend of the refrigeration room.
[0063] Therefore, in this embodiment, once the predefined control strategy is obtained, the server will use the predefined control strategy to perform multiple rounds of state trend prediction conversion on the extracted target operation state chain data. In each round of conversion, the server will convert part of the first state control factors (such as current temperature, humidity, etc.) in the state chain data into second state control factors (such as predicted temperature, predicted humidity, etc.) for predicting the indoor operation state of the building in the future period of time according to the rules and logic in the predefined control strategy.
[0064] Through multiple rounds of conversion, the server can generate an initial state trend conversion vector including multiple second state control factors. This initial state trend conversion vector describes the expected operating state of the computer room in the future.
[0065] In an alternative embodiment, the present embodiment may set the number of rounds of state trend prediction conversion (eg, N rounds), and prepare a list of first state control factors required for each round of conversion.
[0066] For each round of transformation,
[0067] a. Selecting the first state control factor: Selecting some factors from multiple first state control factors as inputs for this round of conversion. The selection of these factors may be based on rules or algorithms in a predefined control strategy.
[0068] b. Apply the prediction model: Use a predefined prediction model (such as a time series analysis model, a machine learning model, etc.) to convert the selected first state control factor into the second state control factor. This conversion process may involve mathematical operations, statistical analysis, or model reasoning of the data.
[0069] c. Update the state trend conversion vector: Add the second state control factor obtained by conversion to the initial state trend conversion vector. With each round of conversion, this vector will gradually improve and contain more information about the state trend of the computer room.
[0070] End condition judgment: When the set number of conversion rounds is reached, the loop execution ends. At this time, the initial state trend conversion vector already contains the results of multiple rounds of predicted conversions.
[0071] Finally, the results of multiple rounds of state trend prediction conversion are integrated and formatted to generate a complete initial state trend conversion vector. This initial state trend conversion vector will serve as the basis for subsequent control instruction matching and room operation optimization. Then, the initial state trend conversion vector is stored in the server database and transmitted to other related systems or modules for further processing and analysis as needed.
[0072] Step S140, performing control instruction matching in a computer room control knowledge base according to the initial state trend conversion vector, and generating a control instruction matching result corresponding to the refrigeration computer room of the target building.
[0073] In detail, the computer room control knowledge base is a database or knowledge management system that stores a large number of control instructions, rules, strategies and related knowledge. This knowledge is accumulated based on expert experience, historical data, best practices, etc., and is used to guide the control operations of the refrigeration room. For example, the computer room control knowledge base may contain various control instructions, such as "when the indoor temperature exceeds 28°C, turn on the second chiller" or "when the outdoor humidity is lower than 30%, turn off the humidification equipment." These control instructions are based on the understanding of the operating laws of the refrigeration room and the summary of long-term practical experience, and are intended to achieve efficient, stable and safe operation of the computer room.
[0074] The control instruction matching refers to the process of searching and selecting control instructions suitable for the current state of the refrigeration room in the computer room control knowledge base. This process usually involves the analysis of the initial state trend conversion vector, the comparison with the control instructions in the knowledge base, and the application of the matching algorithm. For example, when the server generates the initial state trend conversion vector, it searches for control instructions that match it in the computer room control knowledge base. For example, if the initial state trend conversion vector shows that the temperature is rising and may exceed the comfort range, the server may find and execute a control instruction in the knowledge base to "turn on the chiller to lower the indoor temperature." This matching and execution process is how control instruction matching is implemented.
[0075] That is, in this embodiment, the server has a computer room control knowledge base, which stores a large number of control instructions and corresponding applicable scenarios, effect evaluation and other information. These control instructions can be specific operations such as turning on or off a certain device, adjusting device parameters, switching operating modes, etc. After generating the initial state trend conversion vector, the server will match the control instructions in the computer room control knowledge base. The matching process may include steps such as calculating the similarity between the initial state trend conversion vector and the applicable scenarios of each control instruction in the knowledge base, and evaluating the improvement effect of each control instruction on the expected operating state. Finally, the server will generate one or more control instruction matching results based on the matching results, and these control instruction matching results will serve as the basis for the subsequent actual control of the computer room. The control instructions can be sent to the control system of the computer room through the output interface of the server, thereby realizing real-time adjustment and optimization of the operating state of the computer room.
[0076] Based on the above steps, the embodiment of the present application extracts the operating status data of the target building's refrigeration room, and combines it with the predefined control strategy to perform multiple rounds of state trend prediction conversion to generate an initial state trend conversion vector. In this process, part of the first state control factor is converted into a second state control factor, thereby achieving a refined description of the operating status of the room. Furthermore, the room control knowledge base is used to match control instructions to generate control instructions that match the target building's refrigeration room. Through this intelligent control method, efficient and precise control of the building's refrigeration room can be achieved, the room's operating efficiency can be improved, energy consumption can be reduced, and the purpose of energy conservation and emission reduction can be achieved. At the same time, it also has adaptability and scalability, and can adapt to the control needs of building refrigeration rooms of different sizes and types, providing a new solution for intelligent building management.
[0077] In a possible implementation, step S120 may include:
[0078] Step S121, for the multiple basic control strategies, according to one basic control strategy, each template operation status chain data in the template operation status chain data sequence is converted into a corresponding template state trend conversion vector, and based on the generated template state trend conversion vectors, the strategy utility value corresponding to the one basic control strategy is determined.
[0079] In this embodiment, the server first obtains the template operation status chain data sequence of the refrigeration room, which is a record of the room's operation status at different time points. Then, the server selects one of multiple basic control strategies, such as "temperature control strategy based on time period". According to this strategy, the server converts each data in the template operation status chain data sequence into a template state trend conversion vector that describes the future state trend. For example, a data may show that the temperature continues to rise in a certain time period. According to the basic control strategy, the server predicts that if no measures are taken, the temperature will continue to rise, so it generates a template state trend conversion vector that represents the temperature rise trend.
[0080] The server then evaluates the utility of the basic control strategy in dealing with different state trends based on the generated state trend transition vectors for each template. The utility value can be a numerical value that represents the effectiveness of the strategy in achieving the control goal (such as maintaining the temperature within a comfortable range). For example, if the strategy can effectively control the temperature within the target range in multiple simulations, then its utility value will be high.
[0081] Step S122: determining the strategy attention weights respectively corresponding to the plurality of basic control strategies according to the strategy utility values respectively corresponding to the plurality of basic control strategies.
[0082] In this embodiment, the server assigns attention weights to the multiple basic control strategies according to their strategy utility values calculated in the previous step. The attention weight reflects the importance the server attaches to each basic control strategy in the subsequent strategy selection process. For example, if a basic control strategy can show a high utility value in most cases, it will be assigned a high attention weight. Conversely, if a strategy performs poorly in most cases, its attention weight will be lower.
[0083] Step S123, performing multiple rounds of selection from the multiple basic control strategies according to the strategy attention weights respectively corresponding to the multiple basic control strategies to generate multiple reference control strategies, wherein each time one basic control strategy is selected from the multiple basic control strategies as the reference control strategy.
[0084] In this embodiment, the server performs multiple rounds of selection process according to the attention weights of each basic control strategy. In each round of selection, the server will randomly select a basic control strategy as a reference control strategy according to the weight or according to certain rules. This process may be repeated multiple times to generate multiple reference control strategies. These reference control strategies are the focus of the server in the subsequent strategy learning process.
[0085] Step S124, performing strategy learning on the multiple reference control strategies to generate the multiple final control strategies.
[0086] In this embodiment, the server further learns the multiple reference control strategies generated in the previous step. In this process, the server may use machine learning algorithms, optimization algorithms, or other intelligent technologies to adjust and optimize the reference control strategies to generate a final control strategy that is more suitable for the current operating status of the refrigeration room. For example, the server may test the effects of different control strategies through simulation experiments, and adjust the strategies according to the experimental results until a set of final control strategies that can effectively maintain the stable operation of the room under various conditions is found.
[0087] In a possible implementation, step S121 may include:
[0088] Step S1211, respectively perform standardization conversion on the template state trend conversion vectors to generate standardized state trend conversion vectors, and use a part of the standardized state trend conversion vectors as a reference vector sequence and another part of the standardized state trend conversion vectors as a tracking vector sequence.
[0089] In this embodiment, the server first processes each template state trend conversion vector and performs standardized conversion on them. The purpose of standardized conversion is to eliminate the dimension and scale differences between different data so that each state trend conversion vector can be compared and analyzed on the same scale. For example, the state trend conversion vector may contain data of multiple dimensions such as temperature, humidity, and pressure, and the numerical range and unit of each dimension may be different. Through standardized conversion, the server can convert these data into a unified numerical range, such as converting all numerical values to between 0 and 1.
[0090] After the normalization conversion, the server generates normalized state trend conversion vectors. These normalized vectors have the same scale and can be directly used for subsequent comparison and matching operations.
[0091] Next, the server divides the standardized state trend transition vectors into two groups: reference vector sequence and tracking vector sequence. The reference vector sequence is used as a reference standard to evaluate the effectiveness of the basic control strategy. The tracking vector sequence is used to simulate the state changes during actual operation.
[0092] For example, the server can select a portion of the standardized vectors as reference vector sequences, which represent the operating trends of the computer room under ideal conditions. Then, the server uses the remaining standardized vectors as tracking vector sequences, which simulate various state changes that the computer room may encounter during actual control.
[0093] Step S1212: for each reference vector, matching is performed from the tracking vector sequence according to a reference vector to generate a corresponding matching result.
[0094] In this embodiment, the server performs a matching operation in the tracking vector sequence for each reference vector. The purpose of the matching is to find the tracking vector that is most similar to the reference vector to evaluate the effect of the control strategy in actual operation. The matching process can use different algorithms and indicators, such as calculating the distance and similarity between vectors.
[0095] For example, the server can select a reference vector and then calculate the distance between it and each vector in the tracking vector sequence. The tracking vector with the smallest distance is considered to be the most similar to the reference vector and is therefore selected as the match. This process is repeated for each reference vector until a match is found for all reference vectors.
[0096] Step S1213, determining the evaluation parameter value of each generated matching result according to the control effect data corresponding to each reference vector, and using the evaluation parameter value as the strategy utility value of the one basic control strategy.
[0097] Finally, the server determines the evaluation parameter value of each matching result according to the control effect data corresponding to each reference vector. The control effect data can be a predefined evaluation index, such as temperature deviation, energy consumption, etc. The evaluation parameter value reflects the degree to which the control strategy achieves the expected effect in actual operation.
[0098] For example, if a reference vector represents an ideal temperature control trend, and the corresponding matching result shows that the temperature deviation is large in actual operation, then the evaluation parameter value will be low. The server will calculate the evaluation parameter value of each matching result and use these values as the policy utility value of the current basic control strategy. This utility value will be used in the subsequent policy learning and optimization process.
[0099] In a possible implementation, step S1213 may include:
[0100] Step S1213-1, for each of the reference vectors, determine the validity parameter of the matching result corresponding to the reference vector according to the control effect data of the reference vector.
[0101] In this embodiment, the server now processes each reference vector and determines the validity parameter of the matching result according to the control effect data for each reference vector. The control effect data is usually collected in advance and used to quantify the effect of the control strategy in actual application. Such data may include key indicators such as energy consumption reduction percentage and temperature maintenance stability.
[0102] Taking the temperature control of a server room as an example, a reference vector may represent an expected temperature drop curve of the room. The server will match this curve with the actual temperature data in the tracking vector sequence and find the closest tracking vector as the matching result. Then, the server will evaluate the control effect of this matching result, such as whether the actual temperature drops smoothly according to the expected curve, whether there is any fluctuation beyond the range, etc.
[0103] Based on these control effect data, the server calculates an effectiveness parameter for each matching result of the reference vector. This effectiveness parameter may be a numerical score that reflects the closeness of the matching result to the ideal control effect. For example, if the actual temperature curve is very consistent with the expected curve without large deviations or fluctuations, then the effectiveness parameter will be high; on the contrary, if the actual temperature curve is far from the expected curve and frequently exceeds the range, then the effectiveness parameter will be low.
[0104] Step S1213-2: Generate the evaluation parameter value according to the validity parameters of the matching results corresponding to the reference vectors.
[0105] In this embodiment, after the server collects the validity parameters of the matching results of all reference vectors, it further processes these data to generate an evaluation parameter value. This evaluation parameter value is a comprehensive quantitative evaluation of the effect of the basic control strategy.
[0106] Specifically, the server can use different methods to integrate these effectiveness parameters into an evaluation parameter value. For example, the server can calculate the average value, weighted average value, minimum value or maximum value of all effectiveness parameters as the overall evaluation parameter value. This value will reflect the overall performance of the control strategy when dealing with various computer room states.
[0107] During the integration process, the server can also consider the importance or weight of different reference vectors. Some reference vectors may represent more critical or common computer room states, so they should be given higher weights when calculating the evaluation parameter values. In this way, the server can more accurately evaluate the comprehensive effect of the control strategy in actual application.
[0108] Ultimately, the evaluation parameter values obtained by the server will be used as a basis for measuring the pros and cons of the basic control strategy, providing an important reference for subsequent strategy learning, updating, and optimization.
[0109] In a possible implementation, step S122 may include: for the multiple basic control strategies, taking the ratio of the strategy utility value corresponding to one basic control strategy to the sum of the strategy utility values corresponding to the multiple basic control strategies as the strategy attention weight corresponding to the one basic control strategy.
[0110] In this embodiment, the server has calculated the policy utility values corresponding to the multiple basic control strategies. These utility values reflect the effects of different control strategies in dealing with specific problems. Now, the server needs to determine the policy attention weight of each basic control strategy based on these utility values.
[0111] Assume that the server has three basic control strategies A, B and C, and their corresponding strategy utility values are U_A, U_B and U_C respectively. The server first calculates the sum of these three utility values, that is, U_total = U_A + U_B + U_C.
[0112] Next, for each basic control strategy, the server uses the ratio of its corresponding strategy utility value to the total utility value as the strategy attention weight of the strategy. Specifically:
[0113] For the basic control strategy A, its strategy attention weight W_A = U_A / U_total.
[0114] For the basic control strategy B, its strategy attention weight W_B = U_B / U_total.
[0115] For the basic control strategy C, its strategy attention weight W_C = U_C / U_total.
[0116] In this way, the server obtains the policy attention weights of each basic control policy. These weights reflect the importance or priority of different control policies in solving problems. The higher the weight, the more attention and importance will be paid to the policy in the subsequent policy learning and updating process.
[0117] In this way, the server can dynamically adjust the attention it pays to the strategies according to their actual performance, so as to learn and optimize the strategies more effectively. This is of great significance for dealing with complex and changing practical problems.
[0118] In a possible implementation, step S124 may include:
[0119] Step S1241: divide the multiple reference control strategies into multiple strategy combinations, each strategy combination including two reference control strategies.
[0120] In this embodiment, for example, the server has six reference control strategies, labeled S1, S2, S3, S4, S5, and S6. The server divides these strategies into multiple strategy combinations, each of which contains two reference control strategies. Possible divisions include: (S1, S2), (S3, S4), (S5, S6), etc. In this way, the server obtains multiple strategy combinations, each of which contains two strategies that can learn from and intersect with each other.
[0121] Step S1242, for the multiple strategy combinations, when a crossover operation is randomly determined to be performed on a strategy combination based on a preset crossover weight coefficient, for two reference control strategies covered by the strategy combination, a portion of the control knowledge vectors in one reference control strategy is exchanged with a corresponding portion of the control knowledge vectors in another reference control strategy to generate two reference control strategies after the crossover operation.
[0122] In this embodiment, before learning the strategy, the server will preset a crossover weight coefficient, which is used to determine the probability of performing a crossover operation. The crossover operation refers to exchanging part of the control knowledge vectors in two reference control strategies to generate a new strategy.
[0123] Assuming that the crossover weight coefficient is set to 0.5, it means that in each iteration, the server has a 50% probability of selecting a strategy combination for crossover operation. The server will randomly select a strategy combination, such as (S1, S2).
[0124] Once the server determines that a certain strategy combination should be cross-operated, it will start to perform the specific cross-operation steps. The cross-operation usually involves the exchange of control knowledge vectors.
[0125] Take (S1, S2) as an example, assuming that S1 and S2 contain a series of control parameters and rules respectively. The server will randomly select a part of the control knowledge vector in S1 (such as parameters about temperature control), and then exchange it with the corresponding part of the control knowledge vector in S2 (also parameters about temperature control). In this way, S1 and S2 each obtain part of the control knowledge of the other party, and generate new strategies S1' and S2' after the cross operation.
[0126] Step S1243 , generating the plurality of final control strategies according to the plurality of reference control strategies after the crossover operation and the plurality of reference control strategies before the crossover operation.
[0127] After multiple rounds of iterations and crossover operations, the server will obtain a series of reference control strategies after crossover operations and the original reference control strategies without crossover operations. These strategies together constitute the final strategy library.
[0128] The server may further evaluate and optimize these strategies and select the best performing strategies as the final control strategies. These final control strategies will be applied to the actual control system to achieve effective management and control of the target system.
[0129] In a possible implementation, step S1243 may include:
[0130] Step S1243-1, for multiple reference control strategies after crossover operation and multiple reference control strategies without crossover operation, for each evolution factor in a reference control strategy, when it is randomly determined to perform a transition operation on the control knowledge vector based on a preset transition probability, the control knowledge vector is transformed from an initial state to a final state to generate a reference control strategy after the transition operation.
[0131] In this embodiment, the server now has multiple reference control strategies after crossover operation and multiple reference control strategies without crossover operation. In order to further enhance the diversity and adaptability of these strategies, the server will perform transition operation on them.
[0132] The transition operation refers to randomly selecting an evolution factor (such as a control parameter, rule or part of an algorithm) in a reference control strategy according to a preset transition probability, and transforming its corresponding control knowledge vector from the initial state to the final state. This transformation can be a fine-tuning of the numerical value, a change in the logic rule or an adjustment of the algorithm structure.
[0133] Taking the specific reference control strategy S1 as an example, it contains an evolution factor F1 for temperature control. The server will first check the preset transition probability, such as setting it to 0.3. This means that when performing a transition operation, there is a 30% probability that F1 will be selected for change. If the server randomly determines that a transition operation is to be performed on F1, it will adjust the control knowledge vector corresponding to F1 according to a certain rule or algorithm (such as random perturbation, mutation operation in genetic algorithm, etc.). For example, the original control parameter of F1 is 25°C. After the transition operation, this parameter may be adjusted to 26°C or 24°C, etc.
[0134] Through such jump operations, the server can introduce new variations and possibilities for each reference control strategy, thereby increasing the diversity and innovation of the strategy library.
[0135] Step S1243-2: Use the multiple reference control strategies after the transition operation and the multiple reference control strategies without the transition operation as the multiple final control strategies.
[0136] After the transition operation, the server obtains a series of reference control strategies after the transition and the original reference control strategies without the transition operation. These strategies together constitute the final strategy library.
[0137] The server may further evaluate and optimize these strategies and select the best performing strategies as the final control strategies. The evaluation can be based on the performance, stability, energy consumption and other indicators of the strategies in the actual control system. By comparing and analyzing these indicators, the server can select the final control strategy that best suits the current control task.
[0138] These final control strategies will be applied to the actual control system to achieve effective management and control of the target system. For example, in the temperature control task of the server room, the server may choose a final control strategy that can stably maintain the room temperature within the set range for implementation. In this way, it can ensure that the equipment in the room operates under good environmental conditions, thereby improving the reliability and performance of the system.
[0139] In a possible implementation, the method further includes:
[0140] Step A110: extracting reference operation status chain data of a reference building refrigeration machine room for each reference building refrigeration machine room covered in the machine room control knowledge base.
[0141] In this embodiment, the server first accesses the computer room control knowledge base, which stores the operating status data of multiple reference building refrigeration computer rooms. Each reference building refrigeration computer room has a series of operating status chain data, which records the operating status of the computer room at different time points, such as temperature, flow, equipment load, etc.
[0142] The server selects one of the reference building refrigeration rooms and extracts its reference operating status chain data. This data may exist in the form of a time series, with each time point corresponding to a status record. For example, the server may extract the hourly operating status data of a room in the past 24 hours, including parameters such as indoor temperature, outdoor temperature, cooling water temperature, and equipment current.
[0143] Step A120: converting the reference operating state chain data into a corresponding reference state trend conversion vector according to the predefined control strategy.
[0144] The server then converts the extracted reference operating state chain data into a reference state trend conversion vector according to the predefined control strategy. This conversion process is designed to convert the original operating state data into a form that is easier to analyze and process.
[0145] The predefined control strategy may specify a series of data processing rules and algorithms to extract key information from the raw data and generate a state trend conversion vector. For example, the server may calculate the change in state parameters between adjacent time points and combine these changes into a vector. This vector represents the change trend of the computer room state.
[0146] Taking indoor temperature as an example, the server may calculate the change in indoor temperature within each hour (current hour temperature minus previous hour temperature) and combine these changes into a temperature trend conversion vector. Similarly, the server can also generate corresponding trend conversion vectors for other state parameters.
[0147] Step A130, performing a standardized transformation on the reference state trend transformation vector to generate a standardized state trend transformation vector corresponding to the refrigeration room of the reference building.
[0148] In order to facilitate comparison and subsequent processing between different computer rooms, the server needs to standardize the reference state trend conversion vector. The purpose of standardization conversion is to convert data of different ranges and units to a unified scale.
[0149] The server may use some common normalization methods, such as min-max normalization or Z-score normalization. In min-max normalization, the server scales the change of each state parameter to a fixed range (such as between 0 and 1). In Z-score normalization, the server calculates the standard score of each change, that is, the standard deviation multiple of the change relative to the mean.
[0150] After the standardized conversion, the server obtains a standardized state trend conversion vector corresponding to the reference building refrigeration room. This vector can be used in subsequent strategy learning, optimization and control operations.
[0151] In a possible implementation, step S140 may include:
[0152] Step S141, performing a standardized transformation on the initial state trend transformation vector to generate a standardized state trend transformation vector corresponding to the refrigeration room of the target building.
[0153] In this embodiment, the server has obtained the initial state trend conversion vector of the target building refrigeration room, which reflects the change trend of the current state of the room. However, since the state parameter ranges and units of different rooms may be different, direct comparison and matching may lead to inaccurate results. Therefore, the server needs to first perform a standardized conversion on this initial state trend conversion vector.
[0154] The purpose of standardization conversion is to convert the original data to a uniform scale for comparison and analysis. The server can use the minimum-maximum standardization method to scale the change of each state parameter to a fixed range (such as between 0 and 1). In this way, the state trend conversion vectors of different computer rooms can be compared on the same scale.
[0155] By executing the standardized conversion algorithm, the server converts each element in the initial state trend conversion vector into a standardized value, thereby generating a standardized state trend conversion vector corresponding to the refrigeration room of the target building.
[0156] Step S142, according to the standardized state trend transition vector corresponding to the target building refrigeration room, the standardized state trend transition vectors corresponding to each reference control instruction set covered in the room control knowledge base are matched to generate a control instruction matching result corresponding to the building refrigeration room, and the control instruction matching result includes at least one matched reference control instruction set.
[0157] After completing the standardized conversion, the server starts to match the control instructions in the room control knowledge base according to the standardized state trend conversion vector corresponding to the target building refrigeration room. The room control knowledge base stores multiple reference control instruction sets, each of which corresponds to a standardized state trend conversion vector.
[0158] In detail, the server uses a matching algorithm (such as cosine similarity matching or Euclidean distance matching) to compare the standardized state trend transition vector of the target computer room with the standardized state trend transition vector corresponding to each reference control instruction set in the knowledge base. By calculating indicators such as similarity or distance, the server can evaluate which reference control instruction set best matches the current state of the target computer room.
[0159] After the matching process, the server generates the control instruction matching result corresponding to the building refrigeration room. This result may include one or more matching reference control instruction sets, each of which contains a series of control instructions for the room equipment. These control instructions can be used to adjust the operating status of the room to achieve a more efficient and stable cooling effect.
[0160] Figure 2 The building refrigeration room intelligent control system 100 shown includes: a processor 1001 and a memory 1003. The processor 1001 and the memory 1003 are connected, such as through a bus 1002. Optionally, the building refrigeration room intelligent control system 100 may also include a transceiver 1004, which can be used for data interaction between the server and other servers, such as data transmission and / or data reception. It should be noted that the transceiver 1004 is not limited to one in actual scheduling, and the structure of the building refrigeration room intelligent control system 100 does not constitute a limitation on the embodiments of the present application.
[0161] Processor 1001 may be a CPU (Central Processing Unit), a general-purpose processor, a DSP (Digital Signal Processor), an ASIC (Application Specific Integrated Circuit), an FPGA (Field Programmable Gate Array) or other programmable logic devices, transistor logic devices, hardware components or any combination thereof. It may implement or execute various exemplary logic blocks, modules and circuits described in conjunction with the disclosure of this application. Processor 1001 may also be a combination that implements computing functions, such as a combination of one or more microprocessors, a combination of a DSP and a microprocessor, etc.
[0162] The bus 1002 may include a path to transmit information between the above components. The bus 1002 may be a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus. The bus 1002 may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 2 Only one thick line is used in the diagram, but this does not mean that there is only one bus or only one type of bus.
[0163] The memory 1003 can be a ROM (Read Only Memory) or other types of static storage devices that can store static information and instructions, a RAM (Random Access Memory) or other types of dynamic storage devices that can store information and instructions, or an EEPROM (Electrically Erasable Programmable Read Only Memory), a CD-ROM (Compact Disc Read Only Memory) or other optical disk storage, optical disk storage (including compressed optical disk, laser disk, optical disk, digital versatile disk, Blu-ray disk, etc.), magnetic disk storage medium, other magnetic storage devices, or any other medium that can be used to carry or store program code and can be read by a computer, without limitation herein.
[0164] The memory 1003 is used to store program codes for executing the embodiments of the present application, and the execution is controlled by the processor 1001. The processor 1001 is used to execute the program codes stored in the memory 1003 to implement the steps shown in the above method embodiments.
[0165] An embodiment of the present application provides a computer-readable storage medium having program code stored thereon. When the program code is executed by a processor, the steps and corresponding contents of the aforementioned method embodiment can be implemented.
[0166] It should be understood that, although each operation step is indicated by arrows in the flowchart of the embodiment of the present application, the implementation order of these steps is not limited to the order indicated by the arrows. Unless there is a clear description in this article, in some implementation scenarios of the embodiment of the present application, the implementation steps in each flowchart can be performed in other orders based on demand. In addition, some or all of the steps in each flowchart may include multiple sub-steps or multiple stages according to the actual implementation scenario. Some or all of these sub-steps or stages can be executed at the same time, and each sub-step or stage in these sub-steps or stages can also be executed at different times respectively. In different scenarios at the execution time, the execution order of these sub-steps or stages can be flexibly configured based on demand, and the embodiment of the present application does not limit this.
[0167] The above is only an optional implementation method for some implementation scenarios of the present application. It should be pointed out that for ordinary technicians in this technical field, without departing from the technical concept of the scheme of the present application, other similar implementation methods based on the technical ideas of the present application are also within the protection scope of the embodiments of the present application.
Claims
1. A method for intelligent control of a building refrigeration room, characterized in that: The method comprises: Extracting target operation status chain data of a refrigeration room of a target building; wherein the target operation status chain data includes a plurality of first state control factors; Obtaining a predefined control strategy, wherein the predefined control strategy is selected from the multiple final control strategies finally generated by executing a cyclic strategy learning and updating process based on multiple basic control strategies and after satisfying the strategy convergence requirement; wherein, in each strategy learning and updating process, strategy learning and updating are performed on multiple basic control strategies of the current strategy learning and updating process based on the template operation state chain data sequence to generate multiple final control strategies, and if the strategy convergence requirement is not satisfied, the multiple final control strategies are used as multiple basic control strategies of the next strategy learning and updating process; According to the predefined control strategy, the target operation state chain data is subjected to multiple rounds of state trend prediction conversion to generate an initial state trend conversion vector; wherein, during each round of state trend prediction conversion, part of the multiple first state control factors is converted into a second state control factor in the initial state trend conversion vector; According to the initial state trend conversion vector, control instruction matching is performed in the computer room control knowledge base to generate a control instruction matching result corresponding to the target building refrigeration computer room; The template operation state chain data sequence is used to perform strategy learning and updating on multiple basic control strategies in the current strategy learning and updating process, and multiple final control strategies are generated, including: For the multiple basic control strategies, according to one basic control strategy, each template operation state chain data in the template operation state chain data sequence is converted into a corresponding template state trend conversion vector, and according to each generated template state trend conversion vector, a strategy utility value corresponding to the one basic control strategy is determined; Determining the strategy attention weights corresponding to the multiple basic control strategies respectively according to the strategy utility values corresponding to the multiple basic control strategies respectively; According to the strategy attention weights respectively corresponding to the multiple basic control strategies, multiple rounds of selection are performed from the multiple basic control strategies to generate multiple reference control strategies; wherein each time, one basic control strategy is selected from the multiple basic control strategies as the reference control strategy; Performing strategy learning on the multiple reference control strategies to generate the multiple final control strategies; Determining the strategy utility value corresponding to the one basic control strategy according to the generated template state trend conversion vectors includes: Performing standardized conversion on each of the template state trend conversion vectors to generate each standardized state trend conversion vector, and using a part of the standardized state trend conversion vectors as a reference vector sequence and another part of the standardized state trend conversion vectors as a tracking vector sequence; For each reference vector, matching is performed from the tracking vector sequence according to a reference vector to generate a corresponding matching result; Determine the evaluation parameter value of each generated matching result according to the control effect data corresponding to each reference vector, and use the evaluation parameter value as the strategy utility value of the one basic control strategy; The step of performing strategy learning on the multiple reference control strategies to generate the multiple final control strategies includes: Dividing the multiple reference control strategies into multiple strategy combinations, each strategy combination including two reference control strategies; For the multiple strategy combinations, when a crossover operation is randomly determined to be performed on a strategy combination according to a preset crossover weight coefficient, for two reference control strategies covered by the strategy combination, a part of the control knowledge vector in one reference control strategy is exchanged with a corresponding part of the control knowledge vector in another reference control strategy to generate two reference control strategies after the crossover operation; The multiple final control strategies are generated according to the multiple reference control strategies after the crossover operation and the multiple reference control strategies before the crossover operation.
2. The intelligent control method for building refrigeration room according to claim 1 is characterized in that: Determining the evaluation parameter values of each generated matching result based on the control effect data corresponding to each reference vector includes: For each of the reference vectors, determining a validity parameter of a matching result corresponding to the reference vector according to the control effect data of the reference vector; The evaluation parameter value is generated according to the validity parameters of the matching results corresponding to the reference vectors.
3. The intelligent control method for building refrigeration room according to claim 1 is characterized in that: The determining, based on the strategy utility values respectively corresponding to the multiple basic control strategies, the strategy attention weights respectively corresponding to the multiple basic control strategies comprises: For the multiple basic control strategies, a ratio of a strategy utility value corresponding to one basic control strategy to a sum of strategy utility values respectively corresponding to the multiple basic control strategies is used as a strategy attention weight corresponding to the one basic control strategy.
4. The intelligent control method for building refrigeration room according to claim 1 is characterized in that: Generating the multiple final control strategies according to the multiple reference control strategies after the crossover operation and the multiple reference control strategies without the crossover operation includes: For multiple reference control strategies after the crossover operation and multiple reference control strategies without the crossover operation, for each evolution factor in a reference control strategy, when randomly determining to perform a transition operation on the control knowledge vector according to a preset transition probability, the control knowledge vector is transformed from an initial state to a final state to generate a reference control strategy after the transition operation; The multiple reference control strategies after the transition operation and the multiple reference control strategies without the transition operation are used as the multiple final control strategies.
5. The intelligent control method for a building refrigeration room according to any one of claims 1 to 4, characterized in that: The method further comprises: For each reference building refrigeration machine room covered in the machine room control knowledge base, extract reference operation status chain data of a reference building refrigeration machine room; According to the predefined control strategy, converting the reference operating state chain data into a corresponding reference state trend conversion vector; The reference state trend conversion vector is subjected to a standardized conversion to generate a standardized state trend conversion vector corresponding to the reference building refrigeration room.
6. The intelligent control method for building refrigeration room according to claim 5 is characterized in that: According to the initial state trend conversion vector, control instruction matching is performed in the machine room control knowledge base to generate a control instruction matching result corresponding to the refrigeration machine room of the target building, including: Performing a standardized transformation on the initial state trend transformation vector to generate a standardized state trend transformation vector corresponding to the refrigeration room of the target building; According to the standardized state trend transition vector corresponding to the target building refrigeration room, matching is performed with the standardized state trend transition vectors corresponding to each reference control instruction set covered in the room control knowledge base to generate a control instruction matching result corresponding to the building refrigeration room, wherein the control instruction matching result includes at least one matched reference control instruction set.
7. An intelligent control system for a building refrigeration room, characterized in that: It comprises a processor and a computer-readable storage medium, wherein the computer-readable storage medium stores machine-executable instructions, and when the machine-executable instructions are executed by the processor, the intelligent control method for a building refrigeration room according to any one of claims 1 to 6 is implemented.
