A power station flood prevention early warning method and system based on water diversion inflow forecast

Through the application of water diversion prediction and flood prevention early warning knowledge base for hydropower stations, flood prevention early warning strategies are determined, automatic flood prevention early warning is realized, the flood risk caused by excessive water inflow of hydropower stations is solved, and the operational stability is improved.

CN118211701BActive Publication Date: 2024-10-01CHINA YANGTZE POWER
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410262145.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-07
Publication Date
2024-10-01
Estimated Expiration
2044-03-07

AI Technical Summary

Technical Problem

Hydropower stations face the risk of floods caused by excessive water inflows, and existing technologies are difficult to respond to them in a timely manner, affecting operational stability.

Method used

Adopt a power station flood prevention early warning method based on water diversion prediction. By predicting water diversion for hydropower stations, the prediction results are obtained and the flood prevention early warning strategy is determined based on the preset flood prevention early warning knowledge base to achieve automatic flood prevention early warning and avoid the occurrence of floods.

Benefits of technology

It effectively avoids the situation where the hydropower station cannot respond to excessive incoming water in time, greatly improves the stability of the hydropower station operation and prevents the occurrence of floods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118211701B_ABST
    Figure CN118211701B_ABST
Patent Text Reader

Abstract

The present invention provides a method and system for flood prevention and early warning of power stations based on water diversion inflow forecast, wherein the method comprises: forecasting water diversion inflow for a hydropower station and obtaining forecast results; determining a flood prevention and early warning strategy based on the forecast results and a preset flood prevention and early warning knowledge base corresponding to the hydropower station; and executing the flood prevention and early warning strategy in the hydropower station. The method and system for flood prevention and early warning of power stations based on water diversion inflow forecast of the present invention first forecasts water diversion inflow for a hydropower station, and determines and executes a flood prevention and early warning strategy based on the forecast results and the flood prevention and early warning knowledge base, thereby realizing automatic flood prevention and early warning of the hydropower station, avoiding the situation where the hydropower station cannot respond to excessive water inflow in a timely manner, and further avoiding the occurrence of floods, which greatly improves the stability of the operation of the hydropower station.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of flood prevention and early warning for power stations, and in particular to a method and system for flood prevention and early warning for power stations based on water diversion inflow prediction. Background Art

[0002] At present, hydropower stations are mostly set up in river basins in a cascade form, which can not only provide power generation but also regulate river runoff.

[0003] However, different hydropower stations have different water inflows due to factors such as their locations. If the water inflow to a hydropower station is suddenly too large and the hydropower station cannot respond in time, it may cause a flood and affect the normal operation of the hydropower station.

[0004] Therefore, it is necessary to carry out flood prevention warnings for hydropower stations in advance and take necessary preventive measures. Summary of the invention

[0005] In order to solve the current technical problems, the main purpose of the present invention is to provide a power station flood prevention and warning method and system based on water diversion inflow forecast. First, the water diversion inflow forecast is carried out for the hydropower station, and based on the forecast result and the flood prevention and warning knowledge base, the flood prevention and warning strategy is determined and executed to realize automatic flood prevention and warning of the hydropower station, so as to avoid the situation where the hydropower station cannot respond to the excessive water inflow in time, and avoid the occurrence of floods, thereby greatly improving the stability of the operation of the hydropower station.

[0006] In order to realize the above technical features, the purpose of the present invention is achieved as follows: an embodiment of the present invention provides a power station flood prevention early warning method based on water diversion water forecasting, comprising:

[0007] Carry out water diversion inflow forecast for hydropower stations and obtain forecast results;

[0008] Determining a flood prevention warning strategy based on the prediction result and a preset flood prevention warning knowledge base corresponding to the hydropower station;

[0009] The flood prevention and early warning strategy is implemented in the hydropower station.

[0010] Preferably, the determining of the flood prevention warning strategy based on the prediction result and a preset flood prevention warning knowledge base corresponding to the hydropower station includes:

[0011] Constructing a first description vector of the prediction result;

[0012] Trying to determine first knowledge from the flood warning knowledge base; the vector similarity between a preset standard second description vector corresponding to the first knowledge and the first description vector is equal to a preset first similarity threshold;

[0013] When the attempt is successful, determining the flood prevention warning strategy based on the first knowledge;

[0014] Otherwise, second knowledge is determined from the flood warning knowledge base; the vector similarity between a preset standard third description vector corresponding to the second knowledge and the first description vector is greater than or equal to a preset second similarity threshold;

[0015] The auxiliary warning personnel formulate the flood prevention warning strategy based on the second knowledge.

[0016] Preferably, the auxiliary warning personnel formulate the flood prevention warning strategy based on the second knowledge, including:

[0017] Displaying the preset flood prevention warning decision model corresponding to the hydropower station to the warning personnel;

[0018] Identifying the decision-making object of the warning personnel in the flood prevention warning decision model;

[0019] Determining third knowledge related to the object to be decided from the second knowledge;

[0020] The first number of the third knowledge and the second number of the fourth knowledge are counted respectively; the fourth knowledge includes: the second knowledge having at least one first association relationship in a preset knowledge association library with the third knowledge;

[0021] When the first number is equal to a preset first number threshold and the second number is equal to a preset second number threshold, marking the third knowledge next to the object to be decided;

[0022] Otherwise, generating a knowledge list based on the third knowledge;

[0023] Marking the knowledge list next to the object to be decided;

[0024] When the warning personnel selects the third knowledge from the knowledge list, determining a collaborative decision object in the flood control warning decision model that is related to the fourth knowledge corresponding to the third knowledge selected by the warning personnel;

[0025] When the straight-line distance between the collaborative decision object and the object to be decided is less than or equal to a preset distance threshold, the fourth knowledge corresponding to the third knowledge selected by the early warning personnel and the corresponding first association relationship are marked next to the collaborative decision object;

[0026] Otherwise, the fourth knowledge corresponding to the third knowledge selected by the early warning personnel and the corresponding first association relationship are marked next to the object to be decided.

[0027] Preferably, the identifying the object to be decided by the warning personnel in the flood prevention warning decision model includes:

[0028] Obtaining trigger thresholds of different model objects in the flood prevention warning decision model;

[0029] Obtaining a model operation sequence generated by the early warning personnel operating the flood prevention early warning decision model within a recent preset time;

[0030] Preprocessing the model operation sequence to obtain a preprocessing result;

[0031] Traversing the model objects in order from small to large according to the trigger threshold;

[0032] During each traversal, a local operation sequence related to the model object is determined from the preprocessing result;

[0033] Based on the local operation sequence, determining a trigger value;

[0034] When the trigger value is greater than or equal to the trigger threshold of the traversed model object, the traversed model object is used as the object to be decided.

[0035] Preferably, the step of obtaining trigger thresholds of different model objects in the flood prevention warning decision model includes:

[0036] Obtaining the personnel information of the warning personnel;

[0037] determining whether the model object is related to the personnel information;

[0038] When the answer is yes, obtaining the correlation value between the model object and the personnel information;

[0039] Determining the trigger threshold based on the correlation value and a preset trigger threshold comparison table;

[0040] Otherwise, the trigger threshold is calculated based on the preset target threshold.

[0041] Preferably, the preprocessing of the model operation sequence to obtain a preprocessing result includes:

[0042] Determine a local operation sequence to be eliminated that meets the elimination condition from the model operation sequence;

[0043] Eliminating the to-be-eliminated local operation sequence from the model operation sequence;

[0044] When all the local operation sequences to be eliminated are eliminated, the current model operation sequence is used as the preprocessing result;

[0045] The elimination conditions include:

[0046] The model operation in the local operation sequence to be eliminated is related to at least two of the model objects, and there is no second association relationship in the preset object association library between the related model objects;

[0047] The average operation time interval of the model operations in the local operation sequence to be eliminated is less than or equal to a preset interval threshold;

[0048] At least N operation types of the model operations in the local operation sequence to be eliminated exist in a preset elimination indication library; N is a positive integer; and the quotient of N divided by the total number of the model operations in the local operation sequence to be eliminated is greater than or equal to a preset quotient threshold.

[0049] Preferably, determining the trigger value based on the local operation sequence includes:

[0050] constructing a fourth description vector of the local operation sequence;

[0051] The trigger value is determined based on the fourth description vector and a preset trigger value comparison table.

[0052] An embodiment of the present invention provides a power station flood prevention early warning system based on water diversion water inflow forecasting, comprising:

[0053] The prediction module is used to predict the water inflow of the hydropower station and obtain the prediction results;

[0054] A determination module, used to determine a flood prevention warning strategy based on the prediction result and a preset flood prevention warning knowledge base corresponding to the hydropower station;

[0055] An execution module is used to execute the flood prevention and early warning strategy in the hydropower station.

[0056] Preferably, the determination module determines the flood prevention warning strategy based on the prediction result and a preset flood prevention warning knowledge base corresponding to the hydropower station, including:

[0057] Constructing a first description vector of the prediction result;

[0058] Trying to determine first knowledge from the flood warning knowledge base; the vector similarity between a preset standard second description vector corresponding to the first knowledge and the first description vector is equal to a preset first similarity threshold;

[0059] When the attempt is successful, determining the flood prevention warning strategy based on the first knowledge;

[0060] Otherwise, second knowledge is determined from the flood warning knowledge base; the vector similarity between a preset standard third description vector corresponding to the second knowledge and the first description vector is greater than or equal to a preset second similarity threshold;

[0061] The auxiliary warning personnel formulate the flood prevention warning strategy based on the second knowledge.

[0062] Preferably, the determination module assists the warning personnel in formulating the flood prevention warning strategy based on the second knowledge, including:

[0063] Displaying the preset flood prevention warning decision model corresponding to the hydropower station to the warning personnel;

[0064] Identifying the decision-making object of the warning personnel in the flood prevention warning decision model;

[0065] Determining third knowledge related to the object to be decided from the second knowledge;

[0066] The first number of the third knowledge and the second number of the fourth knowledge are counted respectively; the fourth knowledge includes: the second knowledge having at least one first association relationship in a preset knowledge association library with the third knowledge;

[0067] When the first number is equal to a preset first number threshold and the second number is equal to a preset second number threshold, marking the third knowledge next to the object to be decided;

[0068] Otherwise, generating a knowledge list based on the third knowledge;

[0069] Marking the knowledge list next to the object to be decided;

[0070] When the warning personnel selects the third knowledge from the knowledge list, determining a collaborative decision object in the flood control warning decision model that is related to the fourth knowledge corresponding to the third knowledge selected by the warning personnel;

[0071] When the straight-line distance between the collaborative decision object and the object to be decided is less than or equal to a preset distance threshold, the fourth knowledge corresponding to the third knowledge selected by the early warning personnel and the corresponding first association relationship are marked next to the collaborative decision object;

[0072] Otherwise, the fourth knowledge corresponding to the third knowledge selected by the early warning personnel and the corresponding first association relationship are marked next to the object to be decided.

[0073] Preferably, the determination module identifies the object to be decided of the warning personnel in the flood prevention warning decision model, including:

[0074] Obtaining trigger thresholds of different model objects in the flood prevention warning decision model;

[0075] Obtaining a model operation sequence generated by the early warning personnel operating the flood prevention early warning decision model within a recent preset time;

[0076] Preprocessing the model operation sequence to obtain a preprocessing result;

[0077] Traversing the model objects in order from small to large according to the trigger threshold;

[0078] During each traversal, a local operation sequence related to the model object is determined from the preprocessing result;

[0079] Based on the local operation sequence, determining a trigger value;

[0080] When the trigger value is greater than or equal to the trigger threshold of the traversed model object, the traversed model object is used as the object to be decided.

[0081] Preferably, the determination module obtains the triggering thresholds of different model objects in the flood prevention warning decision model, including:

[0082] Obtaining the personnel information of the warning personnel;

[0083] determining whether the model object is related to the personnel information;

[0084] When the answer is yes, obtaining the correlation value between the model object and the personnel information;

[0085] Determining the trigger threshold based on the correlation value and a preset trigger threshold comparison table;

[0086] Otherwise, the trigger threshold is calculated based on the preset target threshold.

[0087] Preferably, the determining module preprocesses the model operation sequence to obtain a preprocessing result, including:

[0088] Determine a local operation sequence to be eliminated that meets the elimination condition from the model operation sequence;

[0089] Eliminating the to-be-eliminated local operation sequence from the model operation sequence;

[0090] When all the local operation sequences to be eliminated are eliminated, the current model operation sequence is used as the preprocessing result;

[0091] The elimination conditions include:

[0092] The model operation in the local operation sequence to be eliminated is related to at least two of the model objects, and there is no second association relationship in the preset object association library between the related model objects;

[0093] The average operation time interval of the model operations in the local operation sequence to be eliminated is less than or equal to a preset interval threshold;

[0094] At least N operation types of the model operations in the local operation sequence to be eliminated exist in a preset elimination indication library; N is a positive integer; and the quotient of N divided by the total number of the model operations in the local operation sequence to be eliminated is greater than or equal to a preset quotient threshold.

[0095] Preferably, the determining module determines the trigger value based on the local operation sequence, including:

[0096] constructing a fourth description vector of the local operation sequence;

[0097] The trigger value is determined based on the fourth description vector and a preset trigger value comparison table.

[0098] The present invention has the following beneficial effects:

[0099] 1. The present invention first predicts the water inflow of the hydropower station, and based on the prediction results and the flood warning knowledge base, determines and executes the flood warning strategy to realize automatic flood warning of the hydropower station, avoids the situation where the hydropower station cannot respond to the excessive water inflow in time, and avoids the occurrence of floods, thereby greatly improving the stability of the operation of the hydropower station. BRIEF DESCRIPTION OF THE DRAWINGS

[0100] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0101] Figure 1 The present invention is a flowchart of a power station flood prevention and early warning method based on water diversion inflow prediction in an embodiment of the present invention.

[0102] Figure 2 It is a schematic diagram of a power station flood prevention and early warning system based on water diversion inflow prediction in an embodiment of the present invention. DETAILED DESCRIPTION

[0103] The embodiments of the present invention are further described below in conjunction with the accompanying drawings.

[0104] Embodiment 1:

[0105] The embodiment of the present invention provides a flood prevention and early warning method for a power station based on water diversion water inflow prediction, such as Figure 1 As shown, including:

[0106] Step S1: forecast water inflow of the hydropower station and obtain forecast results;

[0107] Step S2: Determine a flood prevention warning strategy based on the prediction result and a preset flood prevention warning knowledge base corresponding to the hydropower station;

[0108] Step S3: Execute the flood prevention warning strategy in the hydropower station.

[0109] Hydropower stations are divided into Longtou hydropower stations and other hydropower stations; for the water inflow forecast of Longtou hydropower station, the water inflow forecast can be made according to the current water flow in the water inflow area of ​​Longtou hydropower station and the future precipitation forecast; for the water inflow forecast of other hydropower stations, the water inflow forecast can be made according to the current water flow in the water inflow area of ​​other hydropower stations, the future precipitation forecast and the future outflow water flow of the superior hydropower station; there is a large amount of flood warning knowledge applicable to hydropower stations in the flood warning knowledge base, and the flood warning knowledge indicates what kind of prediction results are suitable for what kind of flood warning strategy; the flood warning strategy is the warning method for flood warning of hydropower stations, the flood prevention measures implemented, etc.

[0110] This application first predicts the water inflow of the hydropower station, and based on the prediction results and the flood warning knowledge base, determines and executes the flood warning strategy, realizes automatic flood warning of the hydropower station, avoids the situation where the hydropower station cannot respond to the excessive water inflow in time, and avoids the occurrence of floods, which greatly improves the stability of the operation of the hydropower station.

[0111] In one embodiment, the determining of the flood prevention warning strategy based on the prediction result and a preset flood prevention warning knowledge base corresponding to the hydropower station includes:

[0112] Constructing a first description vector of the prediction result;

[0113] Trying to determine first knowledge from the flood warning knowledge base; the vector similarity between a preset standard second description vector corresponding to the first knowledge and the first description vector is equal to a preset first similarity threshold;

[0114] When the attempt is successful, determining the flood prevention warning strategy based on the first knowledge;

[0115] Otherwise, second knowledge is determined from the flood warning knowledge base; the vector similarity between a preset standard third description vector corresponding to the second knowledge and the first description vector is greater than or equal to a preset second similarity threshold;

[0116] The auxiliary warning personnel formulate the flood prevention warning strategy based on the second knowledge.

[0117] The first description vector of the prediction result is constructed based on the vector construction technology; the first similarity threshold is 100%; when the vector similarity between the second description vector and the third description vector is equal to the first similarity threshold, it means that the first knowledge is suitable for determining the flood prevention warning strategy under the future water inflow of the hydropower station represented by the prediction result; the first knowledge and the second description vector can be set in advance by professionals according to actual needs, for example: the first knowledge is to control the discharge of A tons of water from the hydropower station, and the data constructed into the second description vector is B tons of future water inflow of the hydropower station; when the first knowledge is attempted to be determined, it means that there is flood prevention warning knowledge that can be directly used for determining the flood prevention warning strategy, and the flood prevention warning strategy is determined directly based on the first knowledge; the second similarity threshold can be, for example: 70%; the meaning and working principle of the second knowledge and the third description vector are the same as those of the first knowledge and the second description vector, and will not be repeated; the determined second knowledge cannot be directly used for determining the flood prevention warning strategy, but is suitable for determining the flood prevention warning strategy under the future water inflow of the hydropower station represented by the prediction result to a high degree, and can assist warning personnel in formulating flood prevention warning strategies.

[0118] When determining the flood warning strategy based on the prediction results and the flood warning knowledge base, two situations are taken into consideration, which improves the applicability of the system.

[0119] In one embodiment, the auxiliary warning personnel formulate the flood prevention warning strategy based on the second knowledge, including:

[0120] Displaying the preset flood prevention warning decision model corresponding to the hydropower station to the warning personnel;

[0121] Identifying the decision-making object of the warning personnel in the flood prevention warning decision model;

[0122] Determining third knowledge related to the object to be decided from the second knowledge;

[0123] respectively counting the first number of the third knowledge and the second number of the fourth knowledge;

[0124] When the first number is equal to a preset first number threshold and the second number is equal to a preset second number threshold, marking the third knowledge next to the object to be decided;

[0125] Otherwise, generating a knowledge list based on the third knowledge;

[0126] Marking the knowledge list next to the object to be decided;

[0127] When the warning personnel selects the third knowledge from the knowledge list, determining a collaborative decision object in the flood control warning decision model that is related to the fourth knowledge corresponding to the third knowledge selected by the warning personnel;

[0128] When the straight-line distance between the collaborative decision object and the object to be decided is less than or equal to a preset distance threshold, the fourth knowledge corresponding to the third knowledge selected by the early warning personnel and the corresponding first association relationship are marked next to the collaborative decision object;

[0129] Otherwise, the fourth knowledge corresponding to the third knowledge selected by the early warning personnel and the corresponding first association relationship are marked next to the object to be decided.

[0130] The flood prevention warning decision model is a three-dimensional model of a hydropower station, which can be simulated based on BIM or GIS technology; the object to be decided is the object for which the warning personnel want to make a flood prevention warning decision for the hydropower station, which can be the working equipment, staff, etc. in the hydropower station; the third knowledge is related to the object to be decided, which means that the user object of the third knowledge is the object to be decided, for example: the third knowledge is to remind the water outflow management personnel of the hydropower station, then the user object is the water outflow management personnel, if the object to be decided is the water outflow management personnel, it is related to the third knowledge; the fourth knowledge includes: the second knowledge that has at least one first association relationship in a preset knowledge association library with the third knowledge; the first association relationship includes: the user object of the flood prevention warning knowledge belongs to the same department (for example: the fourth knowledge is to remind the water outflow management personnel C of the hydropower station, the third knowledge is to remind the water outflow management personnel B of the hydropower station, B and C belong to the same department), belongs to the same equipment room, etc.; the first number threshold can be 1, and the second number threshold can be 0; when the third knowledge is unique or does not exist, and the fourth knowledge does not exist, it means that only one third knowledge can assist the warning personnel, and the third knowledge The fourth knowledge corresponding to the third knowledge refers to the fourth knowledge having the above-mentioned first association relationship with the third knowledge; the collaborative decision-making object related to the fourth knowledge is the user object of the fourth knowledge, which is the same as the user object of the third knowledge; the distance threshold can be, for example: 100 meters; the corresponding first association relationship refers to the first association relationship directly existing between the fourth knowledge and the third knowledge; when the straight-line distance between the collaborative decision-making object and the object to be decided is less than or equal to the distance threshold, it means that the collaborative decision-making object is close to the object to be decided, and the fourth knowledge corresponding to the third knowledge selected by the early warning personnel and the corresponding first association relationship are directly marked next to the collaborative decision-making object, so that the early warning personnel can simultaneously view the collaborative decision-making object and the object to be decided, as well as the first association relationship, to formulate flood prevention and early warning strategies; otherwise, it means that the collaborative decision-making object is far away from the object to be decided, and the fourth knowledge corresponding to the third knowledge selected by the early warning personnel and the corresponding first association relationship are marked next to the object to be decided.

[0131] When the early warning personnel operate the flood prevention warning decision model to implement flood prevention warning strategies, due to the large area of ​​the hydropower station, the early warning personnel can only operate the flood prevention warning decision model locally. In this way, it may not be possible to coordinate and coordinate flood prevention warnings for the hydropower station. The embodiment of the present invention can solve this problem, introduce the first association relationship, and display the necessary fourth knowledge and the first association relationship to help the early warning personnel coordinate and coordinate flood prevention warnings for the hydropower station, which greatly improves the user experience and the comprehensiveness of its flood prevention warning strategy formulation.

[0132] In one embodiment, the step of identifying the object to be decided by the warning personnel in the flood prevention warning decision model includes:

[0133] Obtaining trigger thresholds of different model objects in the flood prevention warning decision model;

[0134] Obtaining a model operation sequence generated by the early warning personnel operating the flood prevention early warning decision model within a recent preset time;

[0135] Preprocessing the model operation sequence to obtain a preprocessing result;

[0136] Traversing the model objects in order from small to large according to the trigger threshold;

[0137] During each traversal, a local operation sequence related to the model object is determined from the preprocessing result;

[0138] Based on the local operation sequence, determining a trigger value;

[0139] When the trigger value is greater than or equal to the trigger threshold of the traversed model object, the traversed model object is used as the object to be decided.

[0140] The model objects are different working equipment and staff of the hydropower station; the preset time can be, for example, 5 minutes; the model operation sequence includes model operations arranged in chronological order according to the operation generation time, and the model operation can be browsing operations and browsing objects, etc.; the local operation sequence can be used to determine whether the warning personnel want to make flood warning decisions on the model objects, and the trigger value is determined based on the local operation sequence. The trigger value represents the degree to which the warning personnel want to make flood warning decisions on the model objects. When the trigger value is greater than or equal to the trigger threshold of the model object, it means that the warning personnel want to make flood warning decisions on the model objects as the objects to be decided; the purpose of preprocessing the model operation sequence is to eliminate irrelevant model operations; traversing the model objects in order from small to large according to the trigger threshold can make the model objects that are more easily triggered be traversed first, that is, determining whether the warning personnel want to make flood warning decisions, which greatly improves the efficiency of identifying the objects to be decided by the warning personnel.

[0141] In one embodiment, the step of obtaining trigger thresholds of different model objects in the flood prevention warning decision model includes:

[0142] Obtaining the personnel information of the warning personnel; the personnel information includes: scope of responsibilities, etc.;

[0143] Determine whether the model object is related to the personnel information; the model object being related to the personnel information means, for example, that the model object falls within the scope of responsibility of the early warning personnel;

[0144] When the answer is yes, the correlation value between the model object and the personnel information is obtained; the larger the correlation value is, the higher the correlation between the model object and the personnel information is, for example, if the model object falls within the scope of responsibility of the early warning personnel, the correlation value is 10;

[0145] Determine the trigger threshold based on the correlation value and a preset trigger threshold comparison table; the trigger threshold comparison table has trigger thresholds corresponding to different correlation values, and the higher the correlation value, the higher the correlation between the model object and the personnel information, and the lower the trigger threshold;

[0146] Otherwise, the trigger threshold is calculated as a preset target threshold. The target threshold may be, for example, 8; the target threshold is smaller than any trigger threshold.

[0147] In one embodiment, preprocessing the model operation sequence to obtain a preprocessing result includes:

[0148] Determine a local operation sequence to be eliminated that meets the elimination condition from the model operation sequence;

[0149] Eliminating the to-be-eliminated local operation sequence from the model operation sequence;

[0150] When all the local operation sequences to be eliminated are eliminated, the current model operation sequence is used as the preprocessing result;

[0151] The elimination conditions include:

[0152] Condition A: the model operation in the local operation sequence to be eliminated is related to at least two of the model objects, and there is no second association relationship in the preset object association library between the related model objects;

[0153] Condition B: the average operation time interval of the model operations in the local operation sequence to be eliminated is less than or equal to a preset interval threshold;

[0154] Condition C: at least N operation types of the model operations in the local operation sequence to be eliminated exist in a preset elimination indication library; N is a positive integer; the quotient of N divided by the total number of the model operations in the local operation sequence to be eliminated is greater than or equal to a preset quotient threshold.

[0155] The second association relationship includes: model objects belong to the same object type, etc.; the model operation is related to the model object, which means that the operation object of the model operation is the model object; when condition A is met, it means that the model objects performing model operations within a short period of time are unrelated to each other, and the warning personnel have generated irrelevant model operations; the interval threshold can be, for example, 10 seconds; when condition B is met, it means that the warning personnel frequently perform model operations within a short period of time, and the warning personnel have generated irrelevant model operations; the quotient threshold can be, for example, 1 / 2; there are a large number of irrelevant operation types in the elimination indication library. When the operation type of the model operation exists in the elimination indication library, it means that the model operation is an irrelevant operation; when condition C is met, it means that the warning personnel frequently perform model operations within a short period of time; the embodiment of the present invention preprocesses the model operation sequence, improves the work efficiency of the system, and further improves the applicability of the system.

[0156] In one embodiment, determining a trigger value based on the local operation sequence includes:

[0157] constructing a fourth description vector of the local operation sequence;

[0158] The trigger value is determined based on the fourth description vector and a preset trigger value comparison table.

[0159] Based on the vector construction technology, the fourth description vector of the local operation sequence is constructed; the trigger value comparison table contains trigger values ​​corresponding to different fourth description vectors, and the trigger value comparison table can be set in advance by professionals according to actual needs; the trigger value comparison table is queried to determine the trigger value corresponding to the fourth description vector.

[0160] The embodiment of the present invention provides a power station flood prevention early warning system based on water diversion water forecasting, such as Figure 2 As shown, including:

[0161] Prediction module 1, used to predict water inflow of hydropower station and obtain prediction results;

[0162] Determination module 2, used for determining a flood prevention warning strategy based on the prediction result and a preset flood prevention warning knowledge base corresponding to the hydropower station;

[0163] The execution module 3 is used to execute the flood prevention and early warning strategy in the hydropower station.

[0164] The determination module 2 determines a flood prevention warning strategy based on the prediction result and a preset flood prevention warning knowledge base corresponding to the hydropower station, including:

[0165] Constructing a first description vector of the prediction result;

[0166] Trying to determine first knowledge from the flood warning knowledge base; the vector similarity between a preset standard second description vector corresponding to the first knowledge and the first description vector is equal to a preset first similarity threshold;

[0167] When the attempt is successful, determining the flood prevention warning strategy based on the first knowledge;

[0168] Otherwise, second knowledge is determined from the flood warning knowledge base; the vector similarity between a preset standard third description vector corresponding to the second knowledge and the first description vector is greater than or equal to a preset second similarity threshold;

[0169] The auxiliary warning personnel formulate the flood prevention warning strategy based on the second knowledge.

[0170] The determination module 2 assists the warning personnel in formulating the flood prevention warning strategy based on the second knowledge, including:

[0171] Displaying the preset flood prevention warning decision model corresponding to the hydropower station to the warning personnel;

[0172] Identifying the decision-making object of the warning personnel in the flood prevention warning decision model;

[0173] Determining third knowledge related to the object to be decided from the second knowledge;

[0174] The first number of the third knowledge and the second number of the fourth knowledge are counted respectively; the fourth knowledge includes: the second knowledge having at least one first association relationship in a preset knowledge association library with the third knowledge;

[0175] When the first number is equal to a preset first number threshold and the second number is equal to a preset second number threshold, marking the third knowledge next to the object to be decided;

[0176] Otherwise, generating a knowledge list based on the third knowledge;

[0177] Marking the knowledge list next to the object to be decided;

[0178] When the warning personnel selects the third knowledge from the knowledge list, determining a collaborative decision object in the flood control warning decision model that is related to the fourth knowledge corresponding to the third knowledge selected by the warning personnel;

[0179] When the straight-line distance between the collaborative decision object and the object to be decided is less than or equal to a preset distance threshold, the fourth knowledge corresponding to the third knowledge selected by the early warning personnel and the corresponding first association relationship are marked next to the collaborative decision object;

[0180] Otherwise, the fourth knowledge corresponding to the third knowledge selected by the early warning personnel and the corresponding first association relationship are marked next to the object to be decided.

[0181] The determination module 2 identifies the object to be decided by the warning personnel in the flood prevention warning decision model, including:

[0182] Obtaining trigger thresholds of different model objects in the flood prevention warning decision model;

[0183] Obtaining a model operation sequence generated by the early warning personnel operating the flood prevention early warning decision model within a recent preset time;

[0184] Preprocessing the model operation sequence to obtain a preprocessing result;

[0185] Traversing the model objects in order from small to large according to the trigger threshold;

[0186] During each traversal, a local operation sequence related to the model object is determined from the preprocessing result;

[0187] Based on the local operation sequence, determining a trigger value;

[0188] When the trigger value is greater than or equal to the trigger threshold of the traversed model object, the traversed model object is used as the object to be decided.

[0189] The determination module 2 obtains the triggering thresholds of different model objects in the flood prevention warning decision model, including:

[0190] Obtaining the personnel information of the warning personnel;

[0191] determining whether the model object is related to the personnel information;

[0192] When the answer is yes, obtaining the correlation value between the model object and the personnel information;

[0193] Determining the trigger threshold based on the correlation value and a preset trigger threshold comparison table;

[0194] Otherwise, the trigger threshold is calculated based on the preset target threshold.

[0195] The determining module 2 preprocesses the model operation sequence to obtain a preprocessing result, including:

[0196] Determine a local operation sequence to be eliminated that meets the elimination condition from the model operation sequence;

[0197] Eliminating the to-be-eliminated local operation sequence from the model operation sequence;

[0198] When all the local operation sequences to be eliminated are eliminated, the current model operation sequence is used as the preprocessing result;

[0199] The elimination conditions include:

[0200] The model operation in the local operation sequence to be eliminated is related to at least two of the model objects, and there is no second association relationship in the preset object association library between the related model objects;

[0201] The average operation time interval of the model operations in the local operation sequence to be eliminated is less than or equal to a preset interval threshold;

[0202] At least N operation types of the model operations in the local operation sequence to be eliminated exist in a preset elimination indication library; N is a positive integer; and the quotient of N divided by the total number of the model operations in the local operation sequence to be eliminated is greater than or equal to a preset quotient threshold.

[0203] The determining module 2 determines a trigger value based on the local operation sequence, including:

[0204] constructing a fourth description vector of the local operation sequence;

[0205] The trigger value is determined based on the fourth description vector and a preset trigger value comparison table.

[0206] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A flood prevention early warning method for power stations based on water diversion inflow forecasting, It is characterized in that The following steps are involved: Step S1, predicting the water flow of the hydropower station and obtaining the prediction result; Step S2, determining a flood prevention warning strategy based on the prediction result and a preset flood prevention warning knowledge base corresponding to the hydropower station; Step S3, executing the flood prevention warning strategy in the hydropower station; The specific steps in step S2 are: Constructing a first description vector of the prediction result; Trying to determine first knowledge from the flood warning knowledge base; the vector similarity between a preset standard second description vector corresponding to the first knowledge and the first description vector is equal to a preset first similarity threshold; When the attempt is successful, determining the flood prevention warning strategy based on the first knowledge; Otherwise, second knowledge is determined from the flood warning knowledge base; the vector similarity between a preset standard third description vector corresponding to the second knowledge and the first description vector is greater than or equal to a preset second similarity threshold; Assisting early warning personnel to formulate the flood prevention early warning strategy based on the second knowledge; In step S2, the auxiliary warning personnel formulate the flood prevention warning strategy based on the second knowledge, specifically including: Displaying the preset flood prevention warning decision model corresponding to the hydropower station to the warning personnel; Identifying the decision-making object of the warning personnel in the flood prevention warning decision model; Determining third knowledge related to the object to be decided from the second knowledge; The first number of the third knowledge and the second number of the fourth knowledge are counted respectively; the fourth knowledge includes: the second knowledge having at least one first association relationship in a preset knowledge association library with the third knowledge; When the first number is equal to a preset first number threshold and the second number is equal to a preset second number threshold, marking the third knowledge next to the object to be decided; Otherwise, generating a knowledge list based on the third knowledge; Marking the knowledge list next to the object to be decided; When the warning personnel selects the third knowledge from the knowledge list, determining a collaborative decision object in the flood control warning decision model that is related to the fourth knowledge corresponding to the third knowledge selected by the warning personnel; When the straight-line distance between the collaborative decision object and the object to be decided is less than or equal to a preset distance threshold, the fourth knowledge corresponding to the third knowledge selected by the early warning personnel and the corresponding first association relationship are marked next to the collaborative decision object; Otherwise, the fourth knowledge corresponding to the third knowledge selected by the early warning personnel and the corresponding first association relationship are marked next to the object to be decided.

2. A power station flood prevention early warning method based on water diversion water forecasting according to claim 1, Features: The step of identifying the object to be decided by the warning personnel in the flood prevention warning decision model includes: Obtaining trigger thresholds of different model objects in the flood prevention warning decision model; Obtaining a model operation sequence generated by the early warning personnel operating the flood prevention early warning decision model within a recent preset time; Preprocessing the model operation sequence to obtain a preprocessing result; Traversing the model objects in order from small to large according to the trigger threshold; During each traversal, a local operation sequence related to the model object is determined from the preprocessing result; Based on the local operation sequence, determining a trigger value; When the trigger value is greater than or equal to the trigger threshold of the traversed model object, the traversed model object is used as the object to be decided.

3. A power station flood prevention early warning method based on water diversion water forecasting according to claim 2, Features: The obtaining of trigger thresholds of different model objects in the flood prevention warning decision model includes: Obtaining the personnel information of the warning personnel; determining whether the model object is related to the personnel information; When the answer is yes, obtaining the correlation value between the model object and the personnel information; Determining the trigger threshold based on the correlation value and a preset trigger threshold comparison table; Otherwise, the trigger threshold is calculated based on the preset target threshold.

4. According to claim 2, a power station flood prevention early warning method based on water diversion water forecasting, Features: The preprocessing of the model operation sequence to obtain a preprocessing result includes: Determine a local operation sequence to be eliminated that meets the elimination condition from the model operation sequence; Eliminating the to-be-eliminated local operation sequence from the model operation sequence; When all the local operation sequences to be eliminated are eliminated, the current model operation sequence is used as the preprocessing result; The elimination conditions include: The model operation in the local operation sequence to be eliminated is related to at least two of the model objects, and there is no second association relationship in the preset object association library between the related model objects; The average operation time interval of the model operations in the local operation sequence to be eliminated is less than or equal to a preset interval threshold; At least N operation types of the model operations in the local operation sequence to be eliminated exist in a preset elimination indication library; N is a positive integer; and the quotient of N divided by the total number of the model operations in the local operation sequence to be eliminated is greater than or equal to a preset quotient threshold.

5. According to claim 2, a power station flood prevention early warning method based on water diversion water forecasting, Features: The determining of a trigger value based on the local operation sequence includes: constructing a fourth description vector of the local operation sequence; The trigger value is determined based on the fourth description vector and a preset trigger value comparison table.

6. A power station flood prevention early warning system based on water diversion inflow forecasting, the power station flood prevention early warning system is used to execute the power station flood prevention early warning method according to any one of claims 1 to 5, It is characterized in that The power station flood prevention early warning system comprises: The prediction module is used to predict the water inflow of the hydropower station and obtain the prediction results; A determination module, used to determine a flood prevention warning strategy based on the prediction result and a preset flood prevention warning knowledge base corresponding to the hydropower station; An execution module, used for executing the flood prevention and early warning strategy in the hydropower station; The determination module determines a flood prevention warning strategy based on the prediction result and a preset flood prevention warning knowledge base corresponding to the hydropower station, including: Constructing a first description vector of the prediction result; Trying to determine first knowledge from the flood warning knowledge base; the vector similarity between a preset standard second description vector corresponding to the first knowledge and the first description vector is equal to a preset first similarity threshold; When the attempt is successful, determining the flood prevention warning strategy based on the first knowledge; Otherwise, second knowledge is determined from the flood warning knowledge base; the vector similarity between a preset standard third description vector corresponding to the second knowledge and the first description vector is greater than or equal to a preset second similarity threshold; Assisting early warning personnel to formulate the flood prevention early warning strategy based on the second knowledge; The determination module assists the warning personnel in formulating the flood prevention warning strategy based on the second knowledge, including: Displaying the preset flood prevention warning decision model corresponding to the hydropower station to the warning personnel; Identifying the decision-making object of the warning personnel in the flood prevention warning decision model; Determining third knowledge related to the object to be decided from the second knowledge; The first number of the third knowledge and the second number of the fourth knowledge are counted respectively; the fourth knowledge includes: the second knowledge having at least one first association relationship in a preset knowledge association library with the third knowledge; When the first number is equal to a preset first number threshold and the second number is equal to a preset second number threshold, marking the third knowledge next to the object to be decided; Otherwise, generating a knowledge list based on the third knowledge; Marking the knowledge list next to the object to be decided; When the warning personnel selects the third knowledge from the knowledge list, determining a collaborative decision object in the flood control warning decision model that is related to the fourth knowledge corresponding to the third knowledge selected by the warning personnel; When the straight-line distance between the collaborative decision object and the object to be decided is less than or equal to a preset distance threshold, the fourth knowledge corresponding to the third knowledge selected by the early warning personnel and the corresponding first association relationship are marked next to the collaborative decision object; Otherwise, the fourth knowledge corresponding to the third knowledge selected by the early warning personnel and the corresponding first association relationship are marked next to the object to be decided.

Citation Information

Cited By

  • Preset content optimization-based flood control'four-pre 'platform large model intention recognition method and device

    CN120873922A