High-leg bolt-flexible node for assembled internal support and installation method thereof
By designing the high-leg bolt-activated node, using the combination of the top screw, barrel nut and fixed base, the problem of insufficient tensile performance of the steel wedge node in the prior art is solved, and the uniform tensile force bearing and welding of the nodes is achieved Effects, simplifying the difficulty of component setting and use.
Patent Information
- Application Number
- CN202410415779.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-08
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-04-08
AI Technical Summary
The steel wedge nodes in the prior art have weak tensile performance, poor integrity, insufficient bearing capacity, and cannot adjust the height, which cannot meet the requirements of active end nodes that can resist both compression and tensile strength, and the round table nut volume is relatively Large, large weight, inconvenient use.
A high-leg bolt-moving node is designed, including a top screw, barrel nut, fixed base and high-leg bolt. By setting the bolt holes evenly arranged on the end plate and the top flange, using rotation The handle moves the barrel nut at any position, enabling the locking and unlocking of the nodes, and applying preloading force through the hydraulic jack to ensure the stability and flexibility of the active nodes.
It realizes that the nodes are uniformly subjected to tensile loads when generating tension, improves bending resistance and integrity, ensures the flexibility of the elongation of the active nodes and welding effect, simplifies the clear and reasonable component settings and stress, and reduces the difficulty of use.
Smart Images

Figure CN118241661B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a high-leg bolt-active node for assembled internal support and an installation method thereof. Background Art
[0002] With the increasing number of foundation pit projects, dark excavated tunnels and pits, bridges and construction projects, reinforced concrete supports or steel supports are generally used for the first support. For the ground-connected wall of the soft soil foundation pit in the south, there will be displacement outside the pit, and the first support is often reinforced concrete support. Practice has proved that reinforced concrete support is a lock structure with good tensile and compressive properties, but the weight and volume of reinforced concrete support are large, the construction is relatively complex, and the concrete solidification time is relatively long.
[0003] However, the steel wedge-type nodes commonly used in steel supports have relatively weak tensile properties, poor integrity, weak bearing capacity, insufficient rigidity and stability, and cannot be adjusted in height. They have poor flexibility and uneven force. For flexible end nodes that can resist both compression and tension, the commonly used steel wedge-type nodes and steel support connections obviously cannot meet the requirements.
[0004] Chinese patent CN 113944168 A discloses a screw-type flexible joint for assembled internal support, which includes a movable component, a fixed component and a locking component. The movable component and the fixed component are nested with each other through a fan ring plate, and the two can slide coaxially relative to each other. The locking component is arranged on the screw of the movable component. The contact surfaces of the locking component and the fixed component are respectively provided with serrated discs. However, the patent has the following defects in the process of implementation:
[0005] (1) Through the coordination of the above components, this scheme can achieve axial compression and has good compressive resistance. However, since all parts are rigidly connected, it cannot achieve sufficient tensile resistance. When the force is too great, there is a risk of rollover.
[0006] (2) The truncated cone nut is large in size and heavy in weight, and the rotating handle provided thereon has insufficient rotation space, making it difficult for the truncated cone nut body to move on the screw, making it inconvenient to use. Summary of the invention
[0007] The object of the present invention is to provide a high-bolt-flexible node for assembled internal support and an installation method thereof, so as to solve the above-mentioned problems of the prior art.
[0008] In order to achieve the above-mentioned purpose, the present invention provides the following technical solutions: a high-foot bolt-active node for assembled internal support, comprising: a top screw, the top screw comprises an end plate, the end plate is a circular plate, a screw is arranged in the middle, a plurality of end plate stiffening ribs are arranged between the screw and the end plate, a plurality of end plate bolt holes are arranged on the end plate, and the end plate bolt holes are evenly arranged on the end plate at an azimuth angle of 60°; a barrel-shaped nut, which is passed through the screw and has a plurality of rotating handles arranged thereon; a fixed base, which comprises a top flange, the top flange is a circular plate, and is fixed to the end plate. The top flange is of equal size, a flange circular hole of the same size as the diameter of the screw is arranged in the middle part, an inner steel pipe and an outer steel pipe are arranged on one side of the top flange, the diameter of the inner steel pipe is equal to the diameter of the flange circular hole, an outer steel pipe is arranged on the outer side of the inner steel pipe, a bottom flange is arranged at one end of the inner and outer steel pipes away from the top flange, flange stiffening ribs are arranged on the bottom flange, the top flange and the outer steel pipe, and the end of the screw away from the end plate is inserted into the flange and the inner steel pipe; high foot bolts, multiple high foot bolts bolt the end plate and the top flange together.
[0009] In a preferred embodiment, a thread is provided on the lead screw, and the rotating handle provided on the barrel nut is a cylinder, which is welded around the barrel nut at an azimuth angle of 90°. A gasket is passed through the lead screw between the barrel nut and the top flange, and the gasket is circular, and its outer diameter is the same as the outer diameter of the barrel nut.
[0010] In a preferred embodiment, the end plate stiffening ribs are hollow steel plates, and a plurality of end plate stiffening ribs are symmetrically arranged.
[0011] In a preferred embodiment, a nut is provided at one end of the high foot bolt. The nut is a cylinder and is arranged in the bolt hole of the end plate. The volume of the nut is equal to the volume of the bolt hole of the end plate. The top of the nut is flush with the side of the end plate away from the screw. A small nut is provided on the screw rod below the nut, and the small nut abuts against the end plate; the other end of the high foot bolt passes through the bolt hole of the top flange, and a small nut is provided on the high foot bolt and on the side of the top flange away from the end plate, and the small nut abuts against the top flange; a small nut is provided in the middle of the high foot bolt.
[0012] In a preferred embodiment, one end of the end plate stiffening rib is connected to the end plate and the other end is connected to the lead screw. The end plate bolt hole is arranged between the two end plate stiffening ribs, and the portion where the lead screw is connected to the end plate stiffening rib is not threaded.
[0013] In a preferred embodiment, the flange stiffening rib is an isosceles triangle, one right-angled side of which is fixedly connected to the bottom flange, and the other right-angled side is fixedly connected to the external steel pipe. There are 12 flange stiffening ribs evenly distributed at an azimuth angle of 30°.
[0014] In a preferred embodiment, a plurality of bottom flange bolt holes are arranged on the bottom flange, and the bottom flange bolt holes are arranged between two flange stiffening ribs.
[0015] In a preferred embodiment, the diameter of the outer steel pipe is larger than the diameter of the inner steel pipe, the diameter of the outer steel pipe is smaller than the diameter of the top flange, and the diameter of the bottom flange is larger than the diameter of the top flange.
[0016] The present invention also discloses a method for installing a high-leg bolt-active node for an assembled internal support, comprising the following steps:
[0017] S1. A plurality of end plate bolt holes are provided on the end plate, the end plate bolt holes are arranged at an azimuth angle of 60°, an end plate stiffening rib is provided between every two end plate bolt holes, and the end plate stiffening rib is fixedly connected to the end plate and the lead screw;
[0018] S2. Insert the barrel nut onto the lead screw, set a rotating handle on the barrel nut, and then insert the gasket onto the lead screw;
[0019] S3. Open the top flange bolt holes on the top flange. The top flange bolt hole arrangement is consistent with the end plate. The top flange and the bottom flange are welded by internal steel pipe and external steel pipe. The internal steel pipe and the external steel pipe are coaxial. Multiple flange stiffening ribs are evenly arranged on the top flange, the external steel pipe and the bottom flange. A bottom flange bolt hole is arranged between every two flange stiffening ribs. The arrangement of the bottom flange bolt holes is consistent with the steel support flange used.
[0020] S4. Assemble the lead screw with the barrel nut and gasket, pass the high foot bolts through the end plate bolt holes and the top flange bolt holes, tighten the small nuts, and pass the lead screw into the fixed base to make the entire active node in the shortest state;
[0021] S5. Transport the assembled flexible node to the site and connect it with the short-circuit section of the steel support. Hoist the connected steel support into the foundation pit, place both ends on the embedded tray of the ground-connected wall, and weld the end plate of the flexible node to the embedded steel plate of the ground-connected wall.
[0022] In a preferred embodiment, two jack trays are welded on the bottom flange of the fixed base. The two trays are placed symmetrically, and the hydraulic jack is placed inside the tray to apply preload. The hydraulic jack applies axial preload in three stages. The barrel nut and the high foot bolt are tightened at each stage to ensure that the contact surface between the barrel nut and the fixed base fits. After the preloaded axial force requirement is met, the oil gauge pressure is maintained. At this time, the barrel nut is rotated by rotating the handle to move the barrel nut toward the fixed base until the gasket is tightly attached to the top flange and the barrel nut cannot retract. The small nut on the high foot bolt is further tightened to lock the top lead screw and the fixed base. At this time, the flexible joint is installed.
[0023] Compared with the prior art, the present invention has the following characteristics and beneficial effects:
[0024] 1. The present invention evenly arranges six bolt holes at an azimuth angle of 60° on the end plate and the top flange to ensure that the end plate bears a uniform tensile load when tension is generated at the node, and the top of the nut is flush with the side of the end plate bolt hole away from the screw, so that when the end plate is welded to the embedded steel plate connected to the wall, there is no nut protruding from the end plate surface, thereby ensuring the welding effect.
[0025] 2. The present invention can cause the axis of the active node to be compressed by coaxially arranging the top lead screw, the barrel nut, the inner steel pipe, the outer steel pipe, the top flange, and the bottom flange.
[0026] 3. The present invention arranges a rotating handle on the barrel nut to move the barrel nut to any position of the lead screw, thereby completing the locking and unlocking of the active node, ensuring that the elongation of the active node is arbitrary within a certain range. The rotating handles are evenly distributed at 90°, and the spacing left is large enough to facilitate the rotation of the barrel nut.
[0027] 4. The main compression components of the present invention are the top screw, the barrel nut and the fixed base, and the main tension components are the high bolts, the end plate of the top screw and the upper flange of the fixed base. The component arrangement is simple and the force is clear and reasonable. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] The present invention will be further described in detail below in conjunction with the accompanying drawings.
[0029] Figure 1 It is a schematic diagram of the structure of the present invention;
[0030] Figure 2 It is a schematic diagram of the top lead screw structure of the present invention;
[0031] Figure 3 It is a schematic diagram of the structure of the high foot bolt of the present invention;
[0032] Figure 4It is a schematic diagram of the gasket structure of the present invention;
[0033] Figure 5 It is a schematic diagram of the structure of the barrel-shaped nut of the present invention;
[0034] Figure 6 It is a schematic diagram of the fixed base structure of the present invention;
[0035] Figure 7 It is a schematic diagram of a barrel-shaped nut fixing a flexible node of the present invention.
[0036] Figure numbers: 1-end plate, 2-screw, 3-end plate bolt hole, 4-end plate stiffening rib, 5-barrel nut, 6-high bolt, 7-rotating handle, 8-gasket, 9-top flange bolt hole, 10-nut, 11-top flange, 12-bottom flange, 13-bottom flange bolt hole, 14-external steel pipe, 15-flange stiffening rib, 16-internal steel pipe. DETAILED DESCRIPTION
[0037] The technical solutions in the embodiments of the present invention are described clearly and completely below. The embodiments of the present invention and all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present invention.
[0038] Embodiment 1:
[0039] See Example Figure 1 As shown in Figure 7, the high-foot bolt-active node for assembled internal support of the present invention includes a top screw, which includes an end plate 1. The end plate 1 is a circular plate with a diameter of 510mm. A plurality of end plate bolt holes 3 are arranged on the end plate 1. A screw 2 is arranged in the middle of the end plate 1. The screw length is 350mm and the screw diameter is 200mm. The screw 2 is provided with threads. A barrel nut 5 is passed through the screw 2. The barrel nut has a wall thickness of 90mm and a height of 100mm. A plurality of rotating handles 7 are arranged on the barrel nut 5 at 90°. The rotating handle 7 is 50mm long and 30mm in diameter. The rotating handle 7 arranged on the barrel nut 5 is a cylinder. By arranging a rotating handle on the barrel nut 5, the barrel nut can be moved to any position of the screw to complete the locking and unlocking of the active node, thereby ensuring that the elongation of the active node is arbitrary within a certain range, and the reserved spacing is large enough to facilitate the rotation of the barrel nut 5.
[0040] A plurality of end plate stiffening ribs 4 are arranged between the lead screw 2 and the end plate 1. The end plate stiffening ribs 4 are 50 mm high and 20 mm thick. The end plate stiffening ribs 4 are hollow steel plates. One end of the end plate stiffening ribs 4 is connected to the end plate 1 and the other end is connected to the lead screw 2. The end plate stiffening ribs 4 can effectively improve the integrity of the top lead screw and increase the bending resistance of the active node. The plurality of end plate stiffening ribs 4 are symmetrically arranged to avoid eccentric compression of the active joint. At the same time, it is ensured that when the pre-axial force is applied, the lead screw 2 slides coaxially with the fixed base to reduce the friction between the lead screw 2 and the fixed base during the sliding process.
[0041] The inner diameter of the end plate bolt hole 3 is 26mm, and it is set between the two end plate stiffening ribs 4. The part where the lead screw 2 is connected to the end plate stiffening rib 4 is not provided with threads. The fixed base includes a top flange 11, which is a circular plate with a diameter of 510mm and a thickness of 20mm, and is the same size as the end plate 1. A plurality of top flange bolt holes 9 are arranged on the top flange 11, and each bolt hole is evenly arranged on the end plate 1 at an azimuth angle of 60°. The number of the end plate bolt holes 3 and the top flange bolt holes 9 are equal and correspondingly arranged. A plurality of high foot bolts 6 bolt the end plate 1 and the top flange 11. The high foot bolts 6 are M24 type bolts with a diameter of 26mm and a length of 425mm. The high foot bolts 6 are evenly distributed around the end plate 1 to ensure that the end plate 1 bears a uniform tensile load when tension is generated at the node. A nut 10 is provided at one end of the high-foot bolt 6. The nut 10 is a cylinder and is arranged in the end plate bolt hole 3. The volume of the nut 10 is equal to the volume of the end plate bolt hole 3, and the bolt hole at the end plate 1 can ensure that the nut 10 is sunken into the end plate 1 and maintains the same plane with the end plate 1. When the end plate 1 is welded to the embedded steel plate of the ground-connected wall, there is no nut 10 protruding from the end plate 1 surface, thereby ensuring the welding effect.
[0042] A small nut is provided on the screw rod below the nut 10, and the small nut abuts against the end plate 1. The other end of the high foot bolt 6 passes through the bolt hole 9 of the top flange. A small nut is provided on the high foot bolt 6 and on the side of the top flange 11 away from the end plate 1. The small nut abuts against the top flange 11. A small nut is provided in the middle of the high foot bolt 6.
[0043] A flange hole with the same diameter as the screw 2 is provided in the middle of the top flange 11, and an internal steel pipe 16 and an external steel pipe 14 are provided on one side of the top flange 11. The internal steel pipe 16 has an inner diameter of 200 mm and a wall thickness of 25 mm. The diameter of the internal steel pipe 16 is equal to the diameter of the flange hole. An external steel pipe 14 is provided on the outside of the internal steel pipe 16. The diameter of the external steel pipe 14 is larger than the diameter of the internal steel pipe 16. The internal steel pipe 14 has an inner diameter of 400 mm and a wall thickness of 30 mm. The diameter of the external steel pipe 14 is smaller than the diameter of the top flange 11. The heights of the external steel pipe 14 and the internal steel pipe 16 are both 190 mm.
[0044] The inner steel pipe 16 and the outer steel pipe 14 are provided with a bottom flange 12 at one end away from the top flange 11. The diameter of the bottom flange 12 is greater than the diameter of the top flange 11. The diameter of the bottom flange 12 is 764 mm and the thickness is 20 mm. Flange stiffening ribs 15 are provided on the bottom flange 12 and the outer steel pipe 14. The flange stiffening ribs 15 are isosceles triangles, one right-angled side of which is fixedly connected to the bottom flange 12 and the other right-angled side is fixedly connected to the outer steel pipe 14. The flange stiffening ribs 15 can increase the connection effect between the bottom flange 12 and the outer steel pipe 14, increase the integrity of the fixed base, and increase the bearing capacity of the active node.
[0045] A plurality of bottom flange bolt holes 13 are provided on the bottom flange 12, and the bottom flange bolt holes 13 are provided between two flange stiffening ribs 15. The end of the lead screw 2 away from the end plate 1 is inserted into the flange circular hole and the internal steel pipe 16. A gasket 8 is provided on the lead screw 2 between the barrel nut 5 and the top flange 11. The gasket 8 is circular, and the inner diameter of the gasket 8 is 200 mm, the outer diameter is 370 mm, and the thickness is 20 mm. The outer diameter thereof is equal to the outer diameter of the barrel nut 5, and the material of the gasket 8 is consistent with that of the barrel nut 5. The technical effect of this design scheme is that the gasket 8 increases the friction effect between the barrel nut 5 and the fixed base, thereby increasing the preload force.
[0046] The main compression parts of the present invention are the top screw, the barrel nut 5 and the fixed base, and the main tension parts are the high bolts 6, the end plate 1 of the top screw and the upper flange of the fixed base. The parts are simply arranged and the force is clear and reasonable.
[0047] Embodiment 2:
[0048] The present invention also provides a method for installing a high-leg bolt-active node for an assembled internal support, the steps of which are as follows:
[0049] Step S1: multiple end plate bolt holes 3 are opened on the end plate 1, the end plate bolt holes 3 are arranged at an azimuth angle of 60°, and the center of the bolt hole is 40 mm away from the edge of the end plate 1. An end plate stiffening rib 4 is arranged between every two end plate bolt holes 3, and the end plate stiffening rib 4 is fixedly connected to the end plate 1 and the lead screw 2;
[0050] Step S2: insert the barrel nut 5 onto the lead screw 2, set a rotating handle 7 on the barrel nut 5, weld a plurality of rotating handles 7 around the barrel nut 5 at an azimuth angle of 90°, and then insert the gasket 8 onto the lead screw 2;
[0051] Step S3: a top flange bolt hole 9 is opened on the top flange 11, and the arrangement of the top flange bolt hole 9 is consistent with that of the end plate 1. The top flange 11 and the bottom flange 12 are welded by an internal steel pipe 16 and an external steel pipe 14, and the internal steel pipe 16 and the external steel pipe 14 are coaxial. A plurality of flange stiffening ribs 15 are arranged on the external steel pipe 14 and the bottom flange 12. There are 12 flange stiffening ribs 15 in total, which are evenly distributed at an azimuth angle of 30°. A bottom flange bolt hole 13 is arranged between every two flange stiffening ribs 15, and the arrangement of the bottom flange bolt holes 13 is consistent with that of the adopted steel support flange.
[0052] Step S4: Assemble the lead screw 2 with the barrel nut 5 and the gasket 8, pass the high foot bolt 6 through the end plate bolt hole 3 and the top flange bolt hole 9 of the fixed base, and tighten the small nut, and the lead screw 2 penetrates into the interior of the fixed base to make the entire active node in the shortest state;
[0053] Step S5: transport the assembled flexible node to the site and connect it to the short-circuit section of the steel support, hoist the connected steel support into the foundation pit, place both ends on the embedded tray of the ground-connected wall, and weld the flexible node end plate 1 to the embedded steel plate of the ground-connected wall;
[0054] Step 6: Weld two jack trays on the bottom flange 12 of the fixed base, and place the two trays symmetrically. Place the hydraulic jack inside the tray and apply preload. The hydraulic jack applies axial preload in three stages. Tighten the barrel nut 5 and the high foot bolt 6 at each stage to ensure that the contact surface between the barrel nut 5 and the fixed base fits. After the preload axial force requirement is met, at this time, rotate the barrel nut 5 by rotating the handle 7 to move the barrel nut 5 toward the fixed base until the gasket 8 is in close contact with the top flange 11 and the barrel nut 5 cannot retract. Further tighten the small nut on the high foot bolt 6 to lock the top lead screw and the fixed base. At this time, the flexible joint is installed.
[0055] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A high-bolt-active node for assembled internal support, characterized in that: include: A top screw, the top screw comprising an end plate (1), the end plate (1) being a circular plate, a screw (2) being arranged at the middle thereof, a plurality of end plate stiffening ribs (4) being arranged between the screw (2) and the end plate (1), a plurality of end plate bolt holes (3) being arranged on the end plate (1), the end plate bolt holes (3) being evenly arranged on the end plate (1) at an azimuth angle of 60°; A barrel-shaped nut (5), the barrel-shaped nut (5) being inserted into the lead screw (2) and having a plurality of rotating handles (7) disposed thereon; A fixed base, the fixed base comprising a top flange (11), the top flange (11) being a circular plate and being the same size as the end plate (1), the top flange (11) being provided with a plurality of top flange bolt holes (9), the number of the end plate bolt holes (3) being equal to the number of the top flange bolt holes (9) being arranged correspondingly, a flange circular hole being the same size as the diameter of the lead screw (2) being arranged in the middle of the top flange (11), an inner steel pipe (16) and an outer steel pipe (14) being arranged on one side of the top flange (11), The diameter of the inner steel pipe (16) is equal to the diameter of the circular hole of the flange; an outer steel pipe (14) is arranged on the outer side of the inner steel pipe (16); a bottom flange (12) is arranged at one end of the inner steel pipe (16) and the outer steel pipe (14) away from the top flange (11); flange stiffening ribs (15) are arranged on the bottom flange (12), the top flange (11) and the outer steel pipe (14); and an end of the lead screw (2) away from the end plate (1) penetrates into the top flange (11) and the inner steel pipe (16); A high foot bolt (6), wherein a plurality of the high foot bolts (6) are used to bolt the end plate (1) and the top flange (11), a nut (10) is provided at one end of the high foot bolt (6), the nut (10) is a cylinder, which is arranged in the end plate bolt hole (3), the volume of the nut (10) is equal to the volume of the end plate bolt hole (3), the top of the nut (10) is flush with the side of the end plate away from the lead screw (2), a small nut is provided on the screw rod below the nut (10), the small nut abuts against the end plate (1), the other end of the high foot bolt (6) passes through the top flange bolt hole (9), a small nut is provided on the high foot bolt (6) and located on the side of the top flange (11) away from the end plate (1), the small nut abuts against the top flange (11), and a small nut is provided in the middle of the high foot bolt (6).
2. The high-bolt-active joint for assembled internal support according to claim 1, characterized in that: The lead screw (2) is provided with a thread, the rotating handle (7) provided on the barrel nut (5) is a cylinder, and the rotating handle is welded around the barrel nut (5) at an azimuth angle of 90°, and a gasket (8) is passed through the lead screw (2) between the barrel nut (5) and the top flange (11), and the gasket (8) is circular, and its outer diameter is equal to the outer diameter of the barrel nut (5).
3. The high-bolt-active joint for assembled internal support according to claim 1, characterized in that: The end plate stiffening ribs (4) are hollow steel plates, and a plurality of end plate stiffening ribs (4) are symmetrically arranged.
4. The high-bolt-active joint for assembled internal support according to claim 3, characterized in that: One end of the end plate stiffening rib (4) is connected to the end plate (1), and the other end is connected to the lead screw (2); the end plate bolt hole (3) is arranged between the two end plate stiffening ribs (4); and the portion where the lead screw (2) is connected to the end plate stiffening rib (4) is not provided with a thread.
5. The high-bolt-active joint for assembled internal support according to claim 4, characterized in that: The flange stiffening rib (15) is an isosceles triangle, one right-angled side of which is fixedly connected to the bottom flange (12), and the other right-angled side of which is fixedly connected to the external steel pipe (14). Twelve flange stiffening ribs (15) are evenly distributed at an azimuth angle of 30°.
6. The high-bolt-active joint for assembled internal support according to claim 5, characterized in that: A plurality of bottom flange bolt holes (13) are provided on the bottom flange (12), and the bottom flange bolt holes (13) are arranged between two of the flange stiffening ribs (15).
7. The high-bolt-active joint for assembled internal support according to claim 6, characterized in that: The diameter of the outer steel pipe (14) is greater than the diameter of the inner steel pipe (16), the diameter of the outer steel pipe (14) is smaller than the diameter of the top flange (11), and the diameter of the bottom flange (12) is greater than the diameter of the top flange (11).
8. A method for installing a high-bolt-active joint for an assembled internal support according to any one of claims 1 to 7, characterized in that: The steps include: S1. A plurality of end plate bolt holes (3) are provided on the end plate (1), the end plate bolt holes (3) are arranged at an azimuth angle of 60°, an end plate stiffening rib (4) is provided between every two end plate bolt holes (3), and the end plate stiffening rib (4) is fixedly connected to the end plate (1) and the lead screw (2); S2, inserting the barrel nut 5 onto the lead screw (2), setting a rotating handle (7) on the barrel nut (5), and then inserting the washer (8) onto the lead screw (2); S3. A top flange bolt hole (9) is provided on the top flange (11). The arrangement of the top flange bolt hole (9) is consistent with that of the end plate (1). The top flange (11) and the bottom flange (12) are welded by an inner steel pipe (16) and an outer steel pipe (14). The inner steel pipe (16) and the outer steel pipe (14) are coaxial. A plurality of flange stiffening ribs (15) are evenly arranged on the top flange (11), the outer steel pipe (14) and the bottom flange (12). A bottom flange bolt hole (13) is arranged between every two flange stiffening ribs (15). The arrangement of the bottom flange bolt holes (13) is consistent with that of the adopted steel support flange. S4. Assemble the lead screw (2) with the barrel nut (5) and the gasket (8). Pass the high foot bolt (6) through the end plate bolt hole (3) and the top flange bolt hole (9). Tighten the small nut. Pass the lead screw 2 into the fixed base so that the entire active node is in the shortest state. S5. The assembled flexible node is transported to the site for connection with the short-connected section of the steel support. The connected steel support is hoisted into the foundation pit, and both ends are placed on the pre-embedded tray of the ground-connected wall. The flexible node end plate (1) is welded to the pre-embedded steel plate of the ground-connected wall.
9. The installation method of the high-bolt-active joint for assembled internal support according to claim 8, characterized in that: Two jack trays are welded on the bottom flange (12) of the fixed base. The two trays are placed symmetrically. A hydraulic jack is placed inside the tray to apply preload. The hydraulic jack applies axial preload in three stages. The barrel nut (5) and the high foot bolt (6) are tightened at each stage to ensure that the contact surface of the barrel nut (5) and the fixed base fits. After the preload axial force requirement is met, the oil gauge pressure is maintained. At this time, the barrel nut (5) is rotated by rotating the handle (7) to move the barrel nut (5) toward the fixed base until the gasket (8) is in close contact with the top flange (11) and the barrel nut (5) cannot be retracted. The small nut on the high foot bolt (6) is further tightened to lock the top lead screw and the fixed base. At this time, the flexible joint is erected.