A project incubation operation management system and method with risk prediction function

By introducing data collection, processing and prediction modules into the project incubation operation management system, the risk prediction model is adjusted according to the change of project characteristic parameters and risk characteristics, the stability and accuracy problems caused by inaccurate model updates are solved, and the system is improved operational stability and accuracy.

CN118261422BActive Publication Date: 2024-11-19SHENZHEN FUYONG YUNCHUANG INCUBATOR CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202410406966.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-07
Publication Date
2024-11-19
Estimated Expiration
2044-04-07

AI Technical Summary

Technical Problem

The existing project incubation operation management system has inaccurate model presets due to inaccurate model updates, resulting in a decrease in the stability and accuracy of project incubation, affecting the stability and accuracy of system operation.

Method used

Design a project incubation operation management system with risk prediction function, including data acquisition module, data processing module, risk prediction module and control module, and adjust the risk prediction model based on the variance of the change amount of the project characteristic parameters and the change amount of the risk characteristics. The minimum update reference feature data volume is used to redetermine the project incubation service type and classification granularity, and ensure the accuracy and stability of model updates.

Benefits of technology

It effectively reduces the reduction in system operation accuracy and stability caused by inaccurate model updates, improves the stability and accuracy of the system, and ensures the stability and service effect of project incubation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118261422B_ABST
    Figure CN118261422B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of data processing technology, and in particular to a project incubation operation management system and method with a risk prediction function, the system comprising: a data acquisition module for respectively collecting project incubation data and primary incubation project characteristic data in an incubation project; a data processing module connected to the data acquisition module for calculating the primary incubation project characteristic data to output secondary incubation project characteristic data; a risk prediction module connected to the data processing module for simulating and outputting the risk of project incubation; a project incubation module connected to the risk prediction module, comprising a number of service units for providing project incubation services; and a control module for determining the minimum update reference characteristic data amount of a risk prediction model according to the variance of the change amount of the project characteristic parameters. The present invention achieves an improvement in the stability and accuracy of system operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of data processing, and in particular to a project incubation operation management system and method with risk prediction function. Background Art

[0002] In the existing technology, project incubation refers to the process of helping early-stage entrepreneurial projects to develop and grow by providing resources, support and guidance. In the process of operational management of project incubation, problems such as data quality, feature selection, model overfitting, model updating and adaptability often occur, resulting in a decrease in the ability to predict project risks, which may eventually affect the operational stability of project incubation.

[0003] Chinese Patent Publication No.: CN110826869A discloses a management system for an enterprise science and technology enterprise incubator based on the Internet of Things, including: a project registration module, an enterprise information collection module, a central control module, an Internet of Things communication module, a property management module, an information release module, a talent management module, a financial management module, an enterprise valuation module, a risk assessment module, and a display module; the project registration module is connected to the central control module and is used to register a new enterprise project through a registration procedure; the enterprise information collection module is connected to the central control module and is used to collect data information such as operation, investment, and finance of science and technology enterprises; the central control module is connected to the project registration module, the enterprise information collection module, the Internet of Things communication module, the property management module, the information release module, the talent management module, the financial management module, the enterprise valuation module, the risk assessment module, and the display module and is used to control the normal operation of each module through a host; the Internet of Things communication module is connected to the central control module and is used to connect to the Internet of Things through a wireless transmitter for Internet of Things communication; the property management module is connected to the central control module and is used to manage the water, electricity, equipment, environmental sanitation, and security of the incubation base; the information release module is connected to the central control module and is used to release information on science and technology enterprises. It can be seen that the enterprise technology business incubator management system based on the Internet of Things has the problem that the inaccurate model update leads to inaccurate model preset and there are risk points after the prediction is completed, resulting in insufficient stability of project incubation and a decrease in the stability and accuracy of system operation. Summary of the invention

[0004] To this end, the present invention provides a project incubation operation management system and method with a risk prediction function, so as to overcome the problems in the prior art of inaccurate model presets due to inaccurate model updates and the existence of risk points after the prediction is completed, resulting in insufficient stability of project incubation and reduced stability and accuracy of system operation.

[0005] To achieve the above-mentioned purpose, the present invention provides a project incubation operation management system with a risk prediction function, comprising: a data acquisition module, used to respectively collect project incubation data and primary incubation project characteristic data in an incubation project; a data processing module, which is connected to the data acquisition module, used to calculate the primary incubation project characteristic data to output secondary incubation project characteristic data; a risk prediction module, which is connected to the data processing module, used to simulate and output the risk of project incubation, including a classification unit for classifying the project incubation data, a modeling unit connected to the classification unit for constructing a risk prediction model according to the project incubation data, and an updating unit connected to the modeling unit for updating the risk prediction model; A project incubation module, which is connected to the risk prediction module and includes a number of service units for providing project incubation services; a control module, which is respectively connected to the data acquisition module, the data processing module, the risk prediction module and the project incubation module, and is used to determine the minimum update reference feature data amount of the risk prediction model according to the variance of the change amount of the project characteristic parameters, or to determine the number of service types for project incubation according to the variance of the change amount of the project characteristic parameters and the change amount of the risk characteristics, and to re-determine the minimum update reference feature data amount of the risk prediction model according to the matching number of project incubation services, and to determine the classification granularity of the service types for project incubation according to the matching number of the project incubation services and the proportion of the number of identical service characteristics.

[0006] Further, the first-level incubation project characteristic data includes project characteristic indicator parameters of several test projects, risk characteristics of several projects, matching numbers of project incubation services, and numbers of identical service characteristics of several service types;

[0007] The secondary incubation project characteristic data includes the variance of the change in project characteristic parameters, the change in risk characteristics, and the proportion of the number of identical service characteristics.

[0008] Furthermore, the control module obtains the variance of the variation of the project characteristic parameter.

[0009] If the variance of the change in the project characteristic parameter is greater than a preset second variance, the control module determines a minimum update reference characteristic data amount for the risk prediction model.

[0010] Furthermore, the minimum update reference feature data amount of the risk prediction model is determined by the difference between the variance of the change amount of the project feature parameter and a preset second variance.

[0011] Furthermore, if the variance of the change amount of the project characteristic parameter is greater than the preset first variance and less than or equal to the preset second variance, the control module obtains the change amount of the risk characteristic,

[0012] If the change in the risk characteristic is greater than a preset change, the control module determines the number of service types for project incubation.

[0013] Furthermore, the number of service types incubated by the project is determined by the difference between the change in risk characteristics and a preset change.

[0014] Further, the control module obtains the matching quantity of the project incubation service when completing the initial determination of the minimum update reference feature data amount for the risk prediction model.

[0015] If the matching quantity of the project incubation service is greater than a preset first quantity and less than or equal to a preset second quantity, the control module redetermines the minimum update reference feature data amount of the risk prediction model.

[0016] Furthermore, the minimum update reference feature data amount of the risk prediction model is re-determined by the difference between the matching quantity of the project incubation service and the preset first quantity.

[0017] Furthermore, if the matching number of the project incubation service is greater than the preset second number, the control module obtains the number ratio of the same service features,

[0018] If the proportion of the number of the same service features is greater than the preset proportion, the control module determines the classification granularity of the service type for project incubation;

[0019] The classification granularity of the service types for project incubation is determined by the difference between the proportion of the number of identical service features and a preset proportion.

[0020] The present invention also provides a project incubation operation management method with risk prediction function, comprising the following steps:

[0021] Collecting project incubation data and primary incubation project characteristic data in the incubation project, and calculating the primary incubation project characteristic data to output secondary incubation project characteristic data;

[0022] Constructing a risk prediction model based on the project incubation data and some secondary incubation project characteristic data;

[0023] Based on the results of the risk prediction model, potential risks are evaluated and ranked, corresponding risk management strategies are formulated, and monitoring and tracking are performed;

[0024] Determine the minimum update reference characteristic data amount of the risk prediction model based on the variance of the change amount of the project characteristic parameters of several test projects, or obtain the change amount of the risk characteristics of several projects;

[0025] Determining the number of service types to be incubated by the project based on the amount of change in the risk characteristics;

[0026] Acquiring the matching quantity of the project incubation service when the initial determination of the minimum update reference feature data amount for the risk prediction model is completed;

[0027] Redetermine the minimum update reference feature data amount of the risk prediction model based on the matching number of the project incubation services, or obtain the quantity ratio of the same service features of several service types;

[0028] The classification granularity of the service types incubated by the project is determined based on the proportion of the quantity of the same service features.

[0029] Compared with the prior art, the beneficial effect of the present invention lies in that the system of the present invention, by setting a data acquisition module, a data processing module, a risk prediction module, a project incubation module and a control module, adjusts the minimum update reference feature data amount of the risk prediction model according to the variance of the change amount of the project feature parameters, thereby reducing the influence of the inaccurate prediction of the model due to the inaccuracy of the model update, which causes the accuracy of the system operation to decrease. By adjusting the number of service types for project incubation according to the change amount of the risk characteristics, the influence of the stability of the system operation to decrease due to the lack of stability of the project incubation caused by the existence of risk points after the prediction is completed is reduced. By performing a secondary adjustment on the minimum update reference feature data amount of the risk prediction model according to the number of matches of the project incubation service, the influence of the accuracy of the system operation to decrease due to the decrease in the comprehensiveness caused by the small details of the model update, thereby reducing the influence of the decrease in the number of matches of the subsequent incubation service. By adjusting the classification granularity of the service types for project incubation according to the proportion of the number of the same service characteristics, the influence of the stability of the system operation to decrease due to the irregular update of the model in the later stage, which causes the unsatisfactory effect of the incubation service due to the inaccurate classification, is reduced, thereby achieving the improvement of the stability and accuracy of the system operation.

[0030] Furthermore, the system of the present invention adjusts the minimum update reference feature data amount of the risk prediction model by setting the difference between the variance of the change in the project characteristic parameters and a preset second variance, thereby reducing the impact of the inaccurate prediction of the model due to the inaccurate model update, which causes the accuracy of the system operation to decrease, and further improves the stability and accuracy of the system operation.

[0031] Furthermore, the system of the present invention adjusts the number of service types for project incubation by setting the difference between the change in risk characteristics and the preset change, thereby reducing the impact of the stability of system operation caused by insufficient stability in project incubation due to risk points after the prediction is completed, thereby further improving the stability and accuracy of system operation.

[0032] Furthermore, the system of the present invention performs secondary adjustment on the minimum update reference feature data volume of the risk prediction model by setting the difference between the matching number of project incubation services and a preset first number, thereby reducing the impact of a decrease in the accuracy of system operation caused by a decrease in the number of matches for subsequent incubation services due to the small details of the model update, thereby further improving the stability and accuracy of the system operation.

[0033] Furthermore, the system of the present invention adjusts the classification granularity of the service types for project incubation by setting the difference between the proportion of the number of identical service features and a preset proportion, thereby reducing the impact of unsatisfactory incubation service results due to inaccurate classification, resulting in irregular subsequent model updates and reduced stability in system operation, thereby further improving the stability and accuracy of system operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 It is an overall structural block diagram of a project incubation operation management system with risk prediction function according to an embodiment of the present invention;

[0035] Figure 2 It is an overall flow chart of the project incubation operation management method with risk prediction function according to an embodiment of the present invention;

[0036] Figure 3 A specific structural block diagram of a risk prediction module of a project incubation operation management system with a risk prediction function according to an embodiment of the present invention;

[0037] Figure 4 The present invention is a block diagram of a connection structure in which a risk prediction module and a control module are connected in a project incubation operation management system with a risk prediction function according to an embodiment of the present invention. DETAILED DESCRIPTION

[0038] In order to make the objects and advantages of the present invention more clearly understood, the present invention is further described below in conjunction with embodiments; it should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0039] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.

[0040] It should be noted that, in the description of the present invention, terms such as "up", "down", "left", "right", "inside" and "outside" indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings. This is merely for the convenience of description and does not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present invention.

[0041] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0042] See also Figure 1 , Figure 2 , Figure 3 as well as Figure 4 As shown, they are respectively an overall structural block diagram of a project incubation operation management system and method with a risk prediction function according to an embodiment of the present invention, an overall flow chart, a specific structural block diagram of a risk prediction module, and a connection structural block diagram of the risk prediction module and the control module. A project incubation operation management system with a risk prediction function according to the present invention comprises:

[0043] A data collection module is used to collect project incubation data and first-level incubation project feature data in the incubation projects respectively;

[0044] A data processing module, connected to the data acquisition module, for calculating the primary incubation project characteristic data to output secondary incubation project characteristic data;

[0045] A risk prediction module, which is connected to the data processing module and is used to simulate and output the risks of project incubation, including a classification unit for classifying the project incubation data, a modeling unit connected to the classification unit for building a risk prediction model according to the project incubation data, and an updating unit connected to the modeling unit for updating the risk prediction model;

[0046] A project incubation module, which is connected to the risk prediction module and includes a number of service units for providing project incubation services;

[0047] A control module, which is respectively connected to the data acquisition module, the data processing module, the risk prediction module and the project incubation module, and is used to determine the minimum update reference feature data amount of the risk prediction model according to the variance of the change amount of the project feature parameters, or to determine the number of service types for project incubation according to the variance of the change amount of the project feature parameters and the change amount of the risk feature, and to redetermine the minimum update reference feature data amount of the risk prediction model according to the matching number of project incubation services, and to determine the classification granularity of the service types for project incubation according to the matching number of the project incubation services and the proportion of the number of identical service features.

[0048] Specifically, the project incubation module includes:

[0049] Strategic consulting unit, which provides strategic planning and decision-making support for projects;

[0050] A business model unit, which is connected to the strategic consulting unit and is used to design and optimize the business model of the project;

[0051] A standardization unit, which is connected to the business module unit and is used to provide standardized guidance and support for the operation and management of the project;

[0052] The resource management unit is connected to the standardization unit and is used to coordinate and configure various resources of the project.

[0053] Specifically, the risk prediction module also includes:

[0054] A technical assessment unit to assess the technical feasibility of the project;

[0055] A business model evaluation unit, which is connected to the technical evaluation unit and is used to evaluate the business model of the project;

[0056] A standardization evaluation unit, which is connected to the business model evaluation unit and is used to evaluate the standardization degree of the project;

[0057] The financial analysis unit is connected to the standardized evaluation unit and is used to analyze and evaluate the financial situation of the project.

[0058] Specifically, project incubation data include the name of the incubation project, the growth number of the project's R&D products, and the service function information of the project incubation services.

[0059] Specifically, the process of building a risk prediction model is to classify and process the project incubation data, select the model corresponding to the prediction target according to the data characteristics in the project, evaluate the model after training, and further adjust the model according to the evaluation results to obtain a risk prediction model.

[0060] Specifically, the variance of the change in the project characteristic parameters is the variance of the change in the project characteristic parameters of several test items. The method for calculating the variance of the change in the project characteristic parameters is a conventional technical means well known to those skilled in the art, and therefore the calculation process of the variance of the change in the project characteristic parameters will not be repeated here.

[0061] Specifically, the change in the number of risk features means the difference in the number of risk features of the risk prediction model and the original risk features during the project incubation process after the project incubation module completes the prediction of the risk prediction model.

[0062] Specifically, the service types of project incubation include market promotion, policy consultation and resource matching.

[0063] Specifically, the matching number of the project incubation services means the number of project incubation services that perform corresponding processing and risk reduction on risk points in the project incubation module when the risk prediction module completes the risk prediction.

[0064] Specifically, the calculation formula for the proportion of the number of the same service features is:

[0065]

[0066] Among them, G is the proportion of the number of identical service features, K is the number of identical service features in incubation projects of several service types, and T is the total number of service types.

[0067] Specifically, the classification granularity of the service types for project incubation includes the number of overlapping characters in the service types, the standard processing time of the service types, and the service time of the project incubation cycle.

[0068] The system of the present invention is provided with a data acquisition module, a data processing module, a risk prediction module, a project incubation module and a control module, and adjusts the minimum update reference feature data amount of the risk prediction model according to the variance of the change amount of the project feature parameters, thereby reducing the influence of the inaccurate prediction of the model due to the inaccurate model update, which causes the accuracy of the system operation to decrease. By adjusting the number of service types for project incubation according to the change amount of the risk feature, the influence of the stability of the system operation to decrease due to the insufficient stability of the project incubation caused by the existence of risk points after the prediction is completed is reduced. By performing a secondary adjustment on the minimum update reference feature data amount of the risk prediction model according to the matching number of the project incubation service, the influence of the comprehensiveness decreased due to the small details of the model update, thereby reducing the matching number of the subsequent incubation service and causing the accuracy of the system operation to decrease. By adjusting the classification granularity of the service types for project incubation according to the proportion of the number of the same service features, the influence of the stability of the system operation to decrease due to the irregular model update in the later stage, which causes the unsatisfactory effect of the incubation service due to the inaccurate classification, is reduced, thereby achieving the improvement of the stability and accuracy of the system operation.

[0069] Please continue reading Figure 2 As shown, the first-level incubation project characteristic data includes project characteristic indicator parameters of several test projects, risk characteristics of several projects, matching quantity of project incubation services and quantity of same service characteristics of several service types,

[0070] The secondary incubation project characteristic data includes the variance of the change in project characteristic parameters, the change in risk characteristics, and the proportion of the number of identical service characteristics.

[0071] Please continue reading Figure 2 As shown, the control module obtains the variance of the change amount of the project characteristic parameter,

[0072] If the variance of the change in the project characteristic parameter is greater than a preset second variance, the control module determines a minimum update reference characteristic data amount for the risk prediction model.

[0073] Specifically, the project characteristic parameter is the duration used for project incubation.

[0074] Specifically, the variance of the change in the project characteristic parameter is recorded as Q, the preset first variance is recorded as Q1, and Q1=20h 2 , the preset second variance is recorded as Q2, set Q2 = 30h 2 The difference between the variance of the change in the project characteristic parameter and the preset second variance is recorded as △Q, and △Q=Q-Q2 is set.

[0075] The system of the present invention determines the stability of system operation by setting a preset first variance and a preset second variance, thereby reducing the impact of reduced accuracy of system operation due to inaccurate determination of the stability of system operation, and further improving the stability and accuracy of system operation.

[0076] Please continue reading Figure 2 As shown, the minimum update reference feature data amount of the risk prediction model is determined by the difference between the variance of the change amount of the project feature parameter and the preset second variance.

[0077] Specifically, the specific process of determining the minimum update reference feature data amount of the risk prediction model by the difference between the variance of the change amount of the project feature parameter and the preset second variance is:

[0078] The control module uses a preset second data amount adjustment coefficient to adjust the minimum update reference feature data amount of the risk prediction model to the first data amount under a preset first variance difference condition; the preset first variance difference condition is that the difference between the variance of the change amount of the project feature parameter and the preset second variance is less than or equal to the preset variance difference;

[0079] The control module uses a preset first data amount adjustment coefficient to adjust the minimum update reference feature data amount of the risk prediction model to a second data amount under a preset second variance difference condition; the preset second variance difference condition is that the difference between the variance of the change amount of the project feature parameter and the preset second variance is greater than the preset variance difference;

[0080] Among them, the first data volume adjustment coefficient is smaller than the preset second data volume adjustment coefficient.

[0081] Specifically, the preset variance difference is recorded as △Q0, and △Q0=2h 2 The preset first data volume adjustment coefficient is denoted as α1, and α1 is set to 0.8. The preset second data volume adjustment coefficient is denoted as α2, and α2 is set to 0.9. The minimum updated reference feature data volume of the risk prediction model is denoted as V, wherein 0<α1<α2<1. The minimum updated reference feature data volume of the risk prediction model after adjustment is denoted as V', and V'=V×(1+αi) / 2, wherein αi is the preset i-th data volume adjustment coefficient, and i is set to 1, 2.

[0082] The system of the present invention adjusts the minimum update reference feature data amount of the risk prediction model by setting the difference between the variance of the change amount of the project characteristic parameters and the preset second variance, thereby reducing the impact of the inaccurate prediction of the model due to the inaccurate model update, which causes the accuracy of the system operation to decrease, and further improves the stability and accuracy of the system operation.

[0083] Please continue reading Figure 2 As shown, if the variance of the change amount of the project characteristic parameter is greater than the preset first variance and less than or equal to the preset second variance, the control module obtains the change amount of the risk characteristic,

[0084] If the change in the risk characteristic is greater than a preset change, the control module determines the number of service types for project incubation.

[0085] Specifically, the preset change is recorded as P0, and P0=0.2 is set. The change of the risk characteristic is recorded as P. The difference between the change of the risk characteristic and the preset change is recorded as △P, and △P=P-P0 is set.

[0086] The system of the present invention performs a secondary judgment on the stability of project incubation by setting a preset change amount, thereby reducing the impact of decreased stability of system operation due to inaccurate secondary judgment on the stability of project incubation, and further improving the stability and accuracy of system operation.

[0087] Please continue reading Figure 2 As shown, the number of service types incubated by the project is determined by the difference between the change in risk characteristics and the preset change.

[0088] Specifically, the specific process of determining the number of service types incubated by the project through the difference between the change in risk characteristics and the preset change is:

[0089] The control module adjusts the number of service types incubated by the project to a first number using a preset first quantity adjustment coefficient under a preset first change difference condition; the preset first change difference condition is that the difference between the change amount of the risk feature and the preset change amount is less than or equal to the preset change difference;

[0090] The control module adjusts the number of service types incubated by the project to a second number using a preset second quantity adjustment coefficient under a preset second change difference condition; the preset second change difference condition is that the difference between the change of the risk feature and the preset change is greater than the preset change difference;

[0091] Wherein, the preset first quantity adjustment coefficient is smaller than the preset second quantity adjustment coefficient.

[0092] Specifically, the preset change difference is recorded as △P0, and △P0 is set to 0.1. The preset first quantity adjustment coefficient is recorded as β1, and β1 is set to 1.2. The preset second quantity adjustment coefficient is recorded as β2, and β2 is set to 1.4. The number of service types incubated by the project is recorded as H, where 1<β1<β2. The number of service types incubated by the project after adjustment is recorded as H', and H' is set to H×(1+2βj) / 3, where βj is the preset j-th quantity adjustment coefficient, and j is set to 1, 2.

[0093] The system of the present invention adjusts the number of service types for project incubation by setting the difference between the change amount of risk characteristics and the preset change amount, thereby reducing the impact of the stability of system operation caused by insufficient stability of project incubation due to risk points after the prediction is completed, and further improving the stability and accuracy of system operation.

[0094] Please continue reading Figure 3 As shown, the control module obtains the matching quantity of the project incubation service when completing the initial determination of the minimum update reference feature data amount for the risk prediction model.

[0095] If the matching quantity of the project incubation service is greater than a preset first quantity and less than or equal to a preset second quantity, the control module redetermines the minimum update reference feature data amount of the risk prediction model.

[0096] Specifically, the preset first quantity is recorded as Y1, and Y1=6 is set. The preset second quantity is recorded as Y2, and Y2=7 is set. The matching quantity of project incubation services is recorded as Y. The difference between the matching quantity of project incubation services and the preset first quantity is recorded as △Y, and △Y=Y-Y1 is set.

[0097] The system of the present invention determines the comprehensiveness of model prediction by setting a preset first number and a preset second number, thereby reducing the impact of decreased accuracy of system operation due to inaccurate judgment of the comprehensiveness of model prediction, and further improving the stability and accuracy of system operation.

[0098] Please continue reading Figure 3 As shown, the minimum update reference feature data amount of the risk prediction model is re-determined by the difference between the matching quantity of the project incubation service and the preset first quantity.

[0099] Specifically, the specific process of re-determining the minimum update reference feature data amount of the risk prediction model through the difference between the matching quantity of the project incubation service and the preset first quantity is:

[0100] The control module uses a preset third data volume secondary adjustment coefficient to secondary adjust the minimum update reference feature data volume of the risk prediction model to a third data volume under a preset first quantity difference condition; the preset first quantity difference condition is that the difference between the matching quantity of the project incubation service and the preset first quantity is less than or equal to the preset quantity difference;

[0101] The control module uses a preset fourth data amount secondary adjustment coefficient to secondary adjust the minimum update reference feature data amount of the risk prediction model to a fourth data amount under a preset second quantity difference condition; the preset second quantity difference condition is that the difference between the matching quantity of the project incubation service and the preset first quantity is greater than the preset quantity difference;

[0102] Among them, the preset third data volume secondary adjustment coefficient is smaller than the preset fourth data volume secondary adjustment coefficient.

[0103] Specifically, the preset quantity difference is recorded as △Y0, and △Y0 is set to 2. The preset third data volume quadratic adjustment coefficient is recorded as α3, and α3 is set to 1.1. The preset fourth data volume quadratic adjustment coefficient is recorded as α4, and α4 is set to 1.3, wherein 1<α3<α4. The minimum updated reference feature data volume of the adjusted risk prediction model is recorded as V”, and V” is set to V'×(1+αm) / 2, wherein αm is the preset mth data volume quadratic adjustment coefficient, and m is set to 3, 4.

[0104] The system of the present invention performs secondary adjustment on the minimum update reference feature data amount of the risk prediction model by setting the difference between the matching number of project incubation services and a preset first number, thereby reducing the impact of a decrease in the accuracy of system operation caused by a decrease in the number of matches for subsequent incubation services due to the small details of the model update, thereby further improving the stability and accuracy of the system operation.

[0105] Please continue reading Figure 4 As shown, if the matching number of the project incubation service is greater than the preset second number, the control module obtains the number ratio of the same service features,

[0106] If the proportion of the number of the same service features is greater than the preset proportion, the control module determines the classification granularity of the service types incubated by the project.

[0107] Specifically, the preset proportion is recorded as R0, and R0=0.6 is set. The quantity proportion of the same service feature is recorded as R. The difference between the quantity proportion of the same service feature and the preset proportion is recorded as △R, and △R=R-R0 is set.

[0108] The system of the present invention performs a secondary determination on the classification accuracy of the service type by setting a preset ratio, thereby reducing the impact of the decreased stability of the system operation due to inaccurate secondary determination on the classification accuracy of the service type, and further improving the stability and accuracy of the system operation.

[0109] Please continue reading Figure 4 As shown, the classification granularity of the service types for project incubation is determined by the difference between the quantity ratio of the same service features and the preset ratio.

[0110] Specifically, the specific process of determining the classification granularity of the service types for project incubation by the difference between the quantity ratio of the same service features and the preset ratio is as follows:

[0111] The control module adjusts the classification granularity of the service type for project incubation to the first granularity using a preset first granularity adjustment coefficient under a preset first proportion difference condition; the preset first proportion difference condition is that the difference between the quantity proportion of the same service features and the preset proportion is less than or equal to the preset proportion difference;

[0112] The control module adjusts the classification granularity of the service types for project incubation to a second granularity using a preset second granularity adjustment coefficient under a preset second proportion difference condition; the preset second proportion difference condition is that the difference between the quantity proportion of the same service features and the preset proportion is greater than the preset proportion difference;

[0113] Wherein, the preset first granularity adjustment coefficient is smaller than the preset second granularity adjustment coefficient.

[0114] Specifically, the preset proportion difference is recorded as △R0, and △R0 is set to 0.2. The preset first granularity adjustment coefficient is recorded as γ1, and γ1 is set to 1.15. The preset second granularity adjustment coefficient is recorded as γ2, and γ2 is set to 1.25. The classification granularity of the service type for project incubation is recorded as L, wherein 1<γ1<γ2. The adjusted classification granularity of the service type for project incubation is recorded as L', and L'=L×(1+3γw) / 4 is set, wherein γw is the preset wth granularity adjustment coefficient, and w is set to 1, 2.

[0115] The system described in the present invention adjusts the classification granularity of the service types for project incubation by setting the difference between the proportion of the number of identical service features and the preset proportion, thereby reducing the impact of unsatisfactory incubation service results due to inaccurate classification, resulting in irregular subsequent model updates and reduced stability in system operation, and further improving the stability and accuracy of system operation.

[0116] Please continue reading Figure 2 As shown, a project incubation operation management method with risk prediction function includes the following steps:

[0117] Collecting project incubation data and primary incubation project characteristic data in the incubation project, and calculating the primary incubation project characteristic data to output secondary incubation project characteristic data;

[0118] Constructing a risk prediction model based on the project incubation data and some secondary incubation project characteristic data;

[0119] Based on the results of the risk prediction model, potential risks are evaluated and ranked, corresponding risk management strategies are formulated, and monitoring and tracking are performed;

[0120] Determine the minimum update reference characteristic data amount of the risk prediction model based on the variance of the change amount of the project characteristic parameters of several test projects, or obtain the change amount of the risk characteristics of several projects;

[0121] Determining the number of service types to be incubated by the project based on the amount of change in the risk characteristics;

[0122] Acquiring the matching quantity of the project incubation service when the initial determination of the minimum update reference feature data amount for the risk prediction model is completed;

[0123] Redetermine the minimum update reference feature data amount of the risk prediction model based on the matching number of the project incubation services, or obtain the quantity ratio of the same service features of several service types;

[0124] The classification granularity of the service types incubated by the project is determined based on the proportion of the quantity of the same service features.

[0125] Example 1

[0126] The control module described in this embodiment 1 adjusts the minimum updated reference feature data of the risk prediction model according to the difference between the variance of the change amount of the project feature parameter and the preset second variance, wherein the preset variance difference is recorded as △Q0, the preset first data amount adjustment coefficient is recorded as α1, the preset second data amount adjustment coefficient is recorded as α2, and the minimum updated reference feature data amount of the risk prediction model is recorded as V, wherein 0<α1<α2<1, α1=0.8, α2=0.9, △Q0=2h 2 , V=4.

[0127] In this embodiment 1, ΔQ=3h is obtained 2 The control module determines that △Q>△Q0 and uses the preset first data amount adjustment coefficient to adjust the minimum update reference feature data amount of the risk prediction model to the second data amount, and calculates V'=4×(1+0.8) / 2=3.

[0128] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.

Claims

1. A project incubation operation management system with risk prediction function, It is characterized in that include: A data collection module is used to collect project incubation data and first-level incubation project feature data in the incubation projects respectively; A data processing module, connected to the data acquisition module, for calculating the primary incubation project characteristic data to output secondary incubation project characteristic data; A risk prediction module, which is connected to the data processing module and is used to simulate and output the risks of project incubation, including a classification unit for classifying the project incubation data, a modeling unit connected to the classification unit for building a risk prediction model according to the project incubation data, and an updating unit connected to the modeling unit for updating the risk prediction model; A project incubation module, which is connected to the risk prediction module and includes a number of service units for providing project incubation services; A control module, which is respectively connected to the data acquisition module, the data processing module, the risk prediction module and the project incubation module, and is used to determine the minimum update reference feature data amount of the risk prediction model according to the variance of the change amount of the project feature parameters, or to determine the number of service types for project incubation according to the variance of the change amount of the project feature parameters and the change amount of the risk feature, and to re-determine the minimum update reference feature data amount of the risk prediction model according to the matching number of project incubation services, and to determine the classification granularity of the service types for project incubation according to the matching number of the project incubation services and the proportion of the number of identical service features; The first-level incubation project characteristic data includes project characteristic indicator parameters of several test projects, risk characteristics of several projects, matching quantity of project incubation services and quantity of same service characteristics of several service types; The secondary incubation project characteristic data includes the variance of the change in project characteristic parameters, the change in risk characteristics, and the proportion of the number of identical service characteristics; The control module obtains the variance of the change amount of the project characteristic parameter, If the variance of the change amount of the project characteristic parameter is greater than the preset second variance, the control module determines the minimum update reference characteristic data amount of the risk prediction model; The minimum update reference feature data amount of the risk prediction model is determined by the difference between the variance of the change amount of the project feature parameter and the preset second variance; If the variance of the change in the project characteristic parameter is greater than the preset first variance and less than or equal to the preset second variance, the control module obtains the change in the risk characteristic, If the change amount of the risk characteristic is greater than the preset change amount, the control module determines the number of service types for project incubation; The number of service types incubated by the project is determined by the difference between the change amount of the risk characteristics and the preset change amount; The control module obtains the matching quantity of the project incubation service when completing the initial determination of the minimum update reference feature data amount for the risk prediction model, If the matching number of the project incubation service is greater than the preset first number and less than or equal to the preset second number, the control module redetermines the minimum update reference feature data amount of the risk prediction model; The minimum update reference feature data amount of the risk prediction model is re-determined by the difference between the matching quantity of the project incubation service and the preset first quantity.

2. The project incubation operation management system with risk prediction function according to claim 1, It is characterized in that If the matching number of the project incubation service is greater than the preset second number, the control module obtains the ratio of the number of the same service features, If the proportion of the number of the same service features is greater than the preset proportion, the control module determines the classification granularity of the service type for project incubation; The classification granularity of the service types for project incubation is determined by the difference between the proportion of the number of identical service features and a preset proportion.

3. A management method for a project incubation operation management system with risk prediction function applied to any one of claims 1-2, It is characterized in that The following steps are involved: Collecting project incubation data and primary incubation project characteristic data in the incubation project, and calculating the primary incubation project characteristic data to output secondary incubation project characteristic data; Constructing a risk prediction model based on the project incubation data and some secondary incubation project characteristic data; Based on the results of the risk prediction model, potential risks are evaluated and ranked, corresponding risk management strategies are formulated, and monitoring and tracking are performed; Determining the minimum update reference characteristic data amount of the risk prediction model based on the variance of the change amount of the project characteristic parameters of several test items; Obtaining the amount of change in risk characteristics of several projects, and determining the number of service types to be incubated by the projects based on the amount of change in risk characteristics; Acquiring the matching quantity of the project incubation service when the initial determination of the minimum update reference feature data amount for the risk prediction model is completed; Re-determining the minimum update reference feature data amount of the risk prediction model based on the matching quantity of the project incubation service; The quantity ratio of the same service features of several service types is obtained, and the classification granularity of the service types incubated by the project is determined based on the quantity ratio of the same service features.

Citation Information

Patent Citations

  • Enterprise scientific and technological enterprise incubator management system based on Internet-of-things

    CN110826869A

  • Intelligent enterprise financial information management system and method for adaptive risk control

    CN116739811A

  • Intelligent production process management system

    CN116880400A

  • Hatching project risk assessment system based on Internet of Things and big data

    CN117422300A

  • E-commerce data operation management system

    CN117745322A