Equipment maintenance management system based on data analysis

Through the equipment maintenance management system based on data analysis, the problems of chaotic maintenance management of enterprise production equipment and high operation and maintenance costs are solved, and efficient management of the equipment life cycle and operation efficiency are achieved.

CN118261575BActive Publication Date: 2024-11-22无锡芯享信息科技有限公司
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202211671357.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-26
Publication Date
2024-11-22
Estimated Expiration
2042-12-26

AI Technical Summary

Technical Problem

Existing enterprises lack scientific management systems in the maintenance and management of production equipment, resulting in idle and waste of equipment and increased operation and maintenance costs, and it is impossible to build an integrated maintenance model.

Method used

The equipment maintenance management system based on data analysis is adopted to build an integrated maintenance model of production equipment through status monitoring, optimization analysis, intelligent matching, maintenance plan setting and work order management to achieve efficient management of the equipment life cycle.

Benefits of technology

It improves the operation efficiency of enterprise production equipment, reduces equipment failures and operation and maintenance costs, and ensures efficient management and service life of equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118261575B_ABST
    Figure CN118261575B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of equipment maintenance, and is used to solve the problem that the existing enterprises have a relatively chaotic way of maintaining and managing production equipment, cannot build an integrated maintenance model for enterprise production equipment, and increase the burden of enterprise operation and maintenance costs. In particular, an equipment maintenance management system based on data analysis is disclosed, including a server, a data acquisition unit, an equipment operation analysis unit, an equipment demand qualitative unit, a matching model construction unit, a workstation performance positioning unit, a maintenance two-way matching unit and a maintenance plan setting unit; the present invention, through status monitoring, optimization analysis, intelligent matching, maintenance plan setting, maintenance work order generation and work order overdue management, builds an integrated maintenance of production equipment, realizes efficient management of enterprise equipment and maintenance of equipment life cycle, ensures the operation of enterprise production equipment, and improves the comprehensive productivity of the enterprise.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of equipment maintenance, and in particular to an equipment maintenance management system based on data analysis. Background Art

[0002] Production equipment is the basic guarantee for enterprise production. If an enterprise can perform efficient maintenance on production equipment, it can not only increase the service life of production equipment, but also effectively reduce the economic pressure brought to the enterprise by replacing production equipment, reduce the waste of enterprise resources, and reduce the occurrence of production equipment failures.

[0003] However, in the existing enterprises' way of maintaining and managing production equipment, it is usually the staff on the enterprise's production line who perform irregular maintenance on the production equipment based on their work experience. There is no scientific management system in place, which leads to idle waste of some equipment and chaos in the maintenance work of production equipment. It is impossible to build an integrated maintenance model for the enterprise's production equipment, which greatly increases the burden of the enterprise's operation and maintenance costs.

[0004] In order to solve the above defects, a technical solution is now provided. Summary of the invention

[0005] The purpose of the present invention is to solve the problem that the existing enterprises have relatively chaotic methods of maintenance and management of production equipment, are unable to build an integrated maintenance model for enterprise production equipment, and increase the burden of enterprise operation and maintenance costs. Through status monitoring, optimization analysis, intelligent matching, maintenance plan setting, maintenance work order generation and work order overdue management, an integrated maintenance of production equipment is built, efficient management of enterprise equipment and maintenance of equipment life cycle are achieved, the operation of enterprise production equipment is guaranteed, and the operation efficiency of the enterprise is improved. An equipment maintenance management system based on data analysis is proposed.

[0006] The purpose of the present invention can be achieved through the following technical solutions:

[0007] The equipment maintenance management system based on data analysis includes a server, which is communicatively connected with a data acquisition unit, an equipment operation analysis unit, an equipment demand qualitative unit, a matching model building unit, a workstation performance positioning unit, a maintenance two-way matching unit and a maintenance plan setting unit;

[0008] The data acquisition unit is used to obtain the operating values ​​of each maintenance item of the enterprise's production equipment, the working performance parameters of each maintenance workstation, and the number of on-duty personnel at each maintenance workstation per unit time period, and send various types of information to the equipment operation analysis unit, the workstation performance positioning unit, and the maintenance plan setting unit in sequence;

[0009] The equipment operation analysis unit is used to receive the operation values ​​of each maintenance item of the enterprise's production equipment, and perform maintenance status pre-determination analysis and processing, thereby obtaining the planned maintenance type of each maintenance item of the production equipment, and sending it to the equipment demand qualitative unit;

[0010] The equipment demand qualitative unit is used to receive the planned maintenance type of each maintenance item of the production equipment, and perform maintenance demand state determination and analysis processing, thereby obtaining a high maintenance demand signal, a medium maintenance demand signal and a low maintenance demand signal, and sending them to the maintenance bidirectional matching unit;

[0011] The matching model building unit is used to build a two-way matching model between the equipment and the maintenance workstation, and obtain the equipment group (production equipment) → maintenance workstation, and send it to the maintenance two-way matching unit;

[0012] The workstation performance positioning unit is used to obtain the working performance parameters of the maintenance workstation of the enterprise, and perform operation performance positioning analysis and processing, thereby obtaining the operation status corresponding to the maintenance workstation, and sending the operation status corresponding to the maintenance workstation to the maintenance two-way matching unit;

[0013] The maintenance two-way matching unit is used to optimize the matching process between the equipment and the maintenance workstation, obtain the planned maintenance work order of each production equipment, and send it to the maintenance plan setting unit;

[0014] The maintenance plan setting unit performs equipment maintenance plan setting analysis and processing based on the received planned maintenance work orders generated by each production equipment, and generates a final maintenance execution work order.

[0015] Furthermore, the specific operation steps of the maintenance status pre-determination analysis and processing are as follows:

[0016] Obtain the operating values ​​of each maintenance item of each production equipment in the enterprise in real time;

[0017] Compare and analyze the operating values ​​of each maintenance item of each production equipment with the corresponding preset maintenance comparison thresholds;

[0018] When the operating value of the maintenance item of the production equipment is less than the corresponding preset maintenance comparison threshold, the corresponding maintenance item of the corresponding production equipment is marked as a first-level maintenance plan item;

[0019] When the operating value of the maintenance item of the production equipment is equal to the corresponding preset maintenance comparison threshold, the corresponding maintenance item of the corresponding production equipment is marked as a secondary maintenance plan item;

[0020] When the operating value of the maintenance item of the production equipment is greater than the corresponding preset maintenance comparison threshold, the corresponding maintenance item of the corresponding production equipment is calibrated as a third-level maintenance plan item.

[0021] Furthermore, the specific operation steps of the maintenance requirement status determination analysis process are as follows:

[0022] The sum of the number of maintenance items of each production equipment that are calibrated as a first-level maintenance plan item, a second-level maintenance plan item, and a third-level maintenance plan item is counted and recorded as sum1, sum2, and sum3, respectively, and the sum of the number of each maintenance plan type of each production equipment is sorted in descending order to obtain a descending sequence A;

[0023] If sum1 is at the first place in the descending sequence A, that is, A = {sum1, sum2, sum3} or A = {sum1, sum3, sum2}, a high maintenance signal is generated;

[0024] If sum3 is ranked first in the descending sequence A, and sum2 is ranked second first in the descending sequence A, that is, A = {sum3, sum2, sum1} or A = {sum3, sum1, sum2}, a low maintenance signal is generated;

[0025] In other cases, a maintenance signal is generated.

[0026] Furthermore, the specific steps for constructing a two-way matching model between equipment and maintenance workstations are as follows:

[0027] The enterprise includes several equipment groups, which represent the collection of production equipment with the same structural maintenance attribute in the enterprise, and each equipment group contains at least one maintenance workstation;

[0028] Match each production equipment with its corresponding maintenance workstation to obtain the equipment group (production equipment) → maintenance workstation, which is symbolically represented as sbzid (scid) → byzid.

[0029] Furthermore, the specific operation steps of running performance positioning analysis and processing are as follows:

[0030] Obtain the number of equipment under maintenance, equipment overdue for maintenance, and equipment with custom maintenance settings in the working performance parameters of each maintenance workstation in real time, and calibrate them as ncm k 、ocm k and scm k , and conduct a formal analysis based on the set formula Get the capacity coefficient ynx of each maintenance workstation k ; The custom setting of equipment maintenance quantity is specifically the equipment maintenance quantity within seven days;

[0031] Substituting the transport capacity coefficient of each maintenance workstation into a preset maintenance workstation grade form for positioning analysis, wherein the maintenance workstation grade form includes a first-class determination grade, a second-class determination grade, a third-class determination grade and a fourth-class determination grade;

[0032] When the capacity coefficient of a maintenance workstation corresponds to a first-class determination level in a preset maintenance workstation grade form, the operating status of the corresponding maintenance workstation will be calibrated as an excellent operating status; when the capacity coefficient of a maintenance workstation corresponds to a second-class determination level in a preset maintenance workstation grade form, the operating status of the corresponding maintenance workstation will be calibrated as a sub-optimal operating status; when the capacity coefficient of a maintenance workstation corresponds to a third-class determination level in a preset maintenance workstation grade form, the operating status of the corresponding maintenance workstation will be calibrated as an intermediate operating status; when the capacity coefficient of a maintenance workstation corresponds to a fourth-class determination level in a preset maintenance workstation grade form, the operating status of the corresponding maintenance workstation will be calibrated as a poor operating status.

[0033] Furthermore, the specific operation steps for optimizing the matching of equipment and maintenance workstations are as follows:

[0034] According to the two-way matching model constructed between production equipment and maintenance workstations, the maintenance requirement status of each production equipment and the corresponding operation status of each maintenance workstation are obtained, and the maintenance workstation with the corresponding operation status is preferentially matched according to the maintenance requirement status of the production equipment;

[0035] Among them, the maintenance demand status of the production equipment is sorted according to the demand quantity as high maintenance demand signal, medium maintenance demand signal and low maintenance demand signal, and the operation status of the maintenance workstation is sorted according to the priority as optimal operation status, suboptimal operation status, medium operation status and poor operation status;

[0036] After completing the matching of production equipment and maintenance workstation, obtain the maintenance process type of the corresponding production equipment, and the maintenance process type includes ordered and unordered. After marking the maintenance process type of the production equipment, generate a planned maintenance work order for the corresponding production equipment.

[0037] Furthermore, the specific operation steps for setting up the analysis and processing of the equipment maintenance plan are as follows:

[0038] According to the planned maintenance work order generated by each production equipment, the number of personnel on duty at the corresponding maintenance workstation in the unit time period is retrieved, and compared and analyzed with the preset maintenance supply reference values ​​RV1 and RV2, where the maintenance supply reference value RV1 is less than the maintenance supply reference value RV2;

[0039] When the number of personnel on duty at the corresponding maintenance workstation in the unit time period is less than the preset maintenance supply reference value RV1, a maintenance personnel supply shortage signal is generated; when the number of personnel on duty at the corresponding maintenance workstation in the unit time period is between the preset maintenance supply reference values ​​RV1 and RV2, a maintenance personnel supply sufficient signal is generated; when the number of personnel on duty at the corresponding maintenance workstation in the unit time period is greater than the preset maintenance supply reference value RV2, a maintenance personnel supply excess signal is generated;

[0040] When a maintenance personnel supply shortage signal is generated, the maintenance time period of the corresponding production equipment is set to the t1 maintenance time period, and the t1 maintenance time period set for the production equipment is included in the corresponding planned maintenance work order, and a final maintenance execution work order is generated;

[0041] When a maintenance personnel supply sufficient signal is generated, the maintenance time period of the corresponding production equipment is set as the t2 maintenance time period, and the t2 maintenance time period set for the production equipment is included in the corresponding planned maintenance work order, and a final maintenance execution work order is generated;

[0042] When a maintenance personnel oversupply signal is generated, the maintenance time period of the corresponding production equipment is set to the t3 maintenance time period, and the t3 maintenance time period set for the production equipment is included in the corresponding planned maintenance work order, and a final maintenance execution work order is generated, wherein t1>t2>t3.

[0043] Furthermore, the specific operation steps of equipment maintenance operation status analysis and processing are as follows:

[0044] Obtain the maintenance date of each production equipment maintenance execution work order in real time, set the first upper limit date date1 and the second upper limit date date2, and compare and analyze the maintenance date of each production equipment maintenance execution work order with the set first upper limit date date1 and the second upper limit date date2;

[0045] When the maintenance date of the production equipment maintenance execution work order is before the set first upper limit date1, the first maintenance reminder operation is triggered, that is, when the production equipment is started, and the interval with the last reminder is greater than or equal to the custom time interval, a maintenance reminder is given. At this time, the production equipment can operate normally. If the production equipment maintenance execution order is started, the message will not be displayed; the custom time interval is specifically 2 hours;

[0046] When the maintenance date of the production equipment maintenance execution work order is between the set first upper limit date1 and the second upper limit date2, the secondary maintenance reminder operation is triggered, that is, when the production equipment is started, and the interval with the last reminder is greater than or equal to 1 hour, a maintenance reminder is given. At this time, the production equipment can operate normally. If the production equipment maintenance execution order is started, the message will not be displayed;

[0047] When the maintenance date of the production equipment maintenance execution work order reaches the second upper limit date2, the maintenance overdue lock operation is triggered. That is, when the production equipment is started, a maintenance overdue reminder is given. At this time, the production equipment cannot start the operation and can be unlocked after the overdue maintenance execution work order is started.

[0048] Compared with the prior art, the present invention has the following beneficial effects:

[0049] The present invention realizes a clear qualitative analysis of the maintenance demand status of enterprise production equipment by means of data comparison, statistical summation and sequence positioning, and constructs a two-way matching model between equipment and maintenance workstations by means of data definition;

[0050] Through symbol calibration, formula analysis and form-level positioning analysis, it not only realizes the real-time positioning analysis of the operating performance of the enterprise's maintenance workstation, but also lays the foundation for the optimization management of the maintenance of the enterprise's production equipment.

[0051] By combining the maintenance demand status of the company's production equipment with the operating status of the corresponding maintenance workstation, a two-way optimized matching operation between the production equipment and the maintenance workstation is achieved. By analyzing the on-the-job personnel supply capacity of the maintenance workstation per unit time, the maintenance plan cycle of the production equipment is clearly set. This not only realizes the integrated maintenance of the company's production equipment, but also ensures the operation of the company's production equipment and enhances the company's operating efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] In order to facilitate understanding by those skilled in the art, the present invention is further described below in conjunction with the accompanying drawings;

[0053] Figure 1 This is the overall system block diagram of the present invention. DETAILED DESCRIPTION

[0054] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0055] like Figure 1 As shown, the equipment maintenance management system based on data analysis includes a server, and the server is communicatively connected with a data acquisition unit, an equipment operation analysis unit, an equipment demand qualitative unit, a matching model building unit, a workstation performance positioning unit, a maintenance two-way matching unit and a maintenance plan setting unit;

[0056] The data collection unit obtains the operating values ​​of each maintenance item of the enterprise's production equipment, the working performance parameters of each maintenance workstation, and the number of on-duty personnel at each maintenance workstation per unit time period, and sends various types of information to the equipment operation analysis unit, the workstation performance positioning unit, and the maintenance plan setting unit in sequence;

[0057] When the equipment operation analysis unit receives the operation values ​​of each maintenance item of the enterprise's production equipment, it performs maintenance status pre-judgment analysis and processing based on the values. The specific operation process is as follows:

[0058] Obtain the operating values ​​of each maintenance item of each production equipment in the enterprise in real time and calibrate it into muk ij , where i and j are both positive integers greater than 1, and i represents each production equipment, and j represents a number of maintenance items corresponding to each production equipment;

[0059] Compare the operating values ​​of each maintenance item of each production equipment with the corresponding preset maintenance threshold TH ij For comparative analysis, it should be noted that the operating value of each maintenance item of the production equipment corresponds to a preset maintenance comparison threshold, and each production equipment contains a corresponding number of maintenance items;

[0060] When the operating value of the maintenance item of the production equipment is muk ij Less than the corresponding preset maintenance comparison threshold TH ij When the corresponding maintenance item of the generated equipment is marked as a first-level maintenance plan item;

[0061] When the operating value of the maintenance item of the production equipment is muk ij Equal to the corresponding preset maintenance comparison threshold TH ij When the corresponding maintenance item of the generated equipment is marked as a secondary maintenance plan item;

[0062] When the operating value of the maintenance item of the production equipment is muk ij Greater than the corresponding preset maintenance comparison threshold TH ij When the corresponding maintenance item of the generated equipment is marked as a third-level maintenance plan item;

[0063] The obtained planned maintenance type of each maintenance item of the production equipment is sent to the equipment demand qualitative unit, wherein the planned maintenance type includes a primary maintenance plan item, a secondary maintenance plan item, and a tertiary maintenance plan item. It should also be pointed out that the primary maintenance plan item is used to indicate that the corresponding maintenance item of the production equipment has a relatively strong maintenance plan, while the secondary maintenance plan item is used to indicate a maintenance plan that is slightly weaker than the primary maintenance plan item, and the tertiary maintenance plan item indicates a maintenance plan that is slightly weaker than the secondary maintenance plan item;

[0064] When the equipment demand qualitative unit receives the planned maintenance type of each maintenance item of the production equipment, it performs maintenance demand status determination and analysis based on the type. The specific operation process is as follows:

[0065] The sum of the number of maintenance items of each production equipment that are calibrated as a first-level maintenance plan item, a second-level maintenance plan item, and a third-level maintenance plan item is counted and recorded as sum1, sum2, and sum3, respectively, and the sum of the number of each maintenance plan type of each production equipment is sorted in descending order to obtain a descending sequence A;

[0066] If sum1 is at the first place in the descending sequence A, that is, A = {sum1, sum2, sum3} or A = {sum1, sum3, sum2}, a high maintenance signal is generated;

[0067] If sum3 is ranked first in the descending sequence A, and sum2 is ranked second first in the descending sequence A, that is, A = {sum3, sum2, sum1} or A = {sum3, sum1, sum2}, a low maintenance signal is generated;

[0068] In other cases, a maintenance signal is generated, where the other cases mean that sum2 is at the first place in the descending sequence A, that is, A = {sum2, sum3, sum1} or A = {sum2, sum1, sum3};

[0069] and sending the obtained high maintenance need signal, medium maintenance need signal and low maintenance need signal to the maintenance bidirectional matching unit;

[0070] The matching model building unit is used to build a two-way matching model between the equipment and the maintenance workstation. The specific operation process is as follows:

[0071] The enterprise includes several equipment groups, which represent the collection of production equipment with the same structural maintenance attribute in the enterprise, and each equipment group contains at least one maintenance workstation;

[0072] It should be pointed out that when the maintenance structures required by two production devices are both of the key switch data attribute type, the two production devices are identified as generation devices of the same structural maintenance attribute;

[0073] Match each production equipment with its corresponding maintenance workstation to obtain the equipment group (production equipment) → maintenance workstation, which is symbolically represented as sbzid (scid) → byzid;

[0074] For example, an enterprise contains 5 device groups, and the IDs of the 5 device groups are 01, 02, 03, 04, and 05 respectively;

[0075] If the equipment group sbz04 contains three production equipment, and the IDs of the three production equipment are 1101, 1102, and 1103 respectively;

[0076] If the enterprise contains 6 maintenance workstations, and the IDs of the 6 maintenance workstations are 101, 102, 103, 104, 105 and 106 respectively;

[0077] If the 1103 production equipment in the 01 equipment group corresponds to the 105 maintenance workstation, the symbol is sbz01(sc1103)→byz105;

[0078] And send the obtained equipment group (production equipment) → maintenance workstation to the maintenance two-way matching unit;

[0079] When the workstation performance positioning unit receives the working performance parameters of the enterprise's maintenance workstation, it performs operation performance positioning analysis and processing based on the parameters. The specific operation process is as follows:

[0080] Obtain the working performance parameters of each maintenance workstation in real time, including the number of equipment under maintenance, the number of equipment overdue for maintenance, and the number of equipment maintained within seven days, and calibrate them as ncm k 、ocm k and scm k , and conduct a formal analysis based on the set formula Get the capacity coefficient ynx of each maintenance workstation k , where k is a positive integer and k represents each maintenance workstation;

[0081] Substitute the transport capacity coefficient of each maintenance workstation into the preset maintenance workstation grade form for positioning analysis, wherein the maintenance workstation grade form includes the first-class determination grade, the second-class determination grade, the third-class determination grade and the fourth-class determination grade, and the performance of the first-class determination grade, the second-class determination grade, the third-class determination grade and the fourth-class determination grade increases gradually;

[0082] It should also be noted that the capacity factor of each maintenance workstation corresponds to a type determination level in the maintenance workstation level table;

[0083] When the capacity coefficient of the maintenance workstation corresponds to a first-class determination level in the preset maintenance workstation grade form, the operation state of the corresponding maintenance workstation is calibrated as an excellent operation state; when the capacity coefficient of the maintenance workstation corresponds to a second-class determination level in the preset maintenance workstation grade form, the operation state of the corresponding maintenance workstation is calibrated as a sub-optimal operation state; when the capacity coefficient of the maintenance workstation corresponds to a third-class determination level in the preset maintenance workstation grade form, the operation state of the corresponding maintenance workstation is calibrated as an intermediate operation state; when the capacity coefficient of the maintenance workstation corresponds to a fourth-class determination level in the preset maintenance workstation grade form, the operation state of the corresponding maintenance workstation is calibrated as a poor operation state;

[0084] The obtained operation status corresponding to the maintenance workstation is sent to the maintenance two-way matching unit, wherein the operation status includes an optimal operation status, a suboptimal operation status, a medium operation status and a poor operation status;

[0085] The maintenance bidirectional matching unit is used to optimize the matching between the equipment and the maintenance workstation according to the bidirectional matching model between the equipment and the maintenance workstation, and the maintenance demand status of the received production equipment and the operating status of the corresponding maintenance workstation. The specific operation process is as follows:

[0086] According to the two-way matching model constructed between production equipment and maintenance workstations, the maintenance requirement status of each production equipment and the corresponding operation status of each maintenance workstation are obtained, and the maintenance workstation with the corresponding operation status is preferentially matched according to the maintenance requirement status of the production equipment;

[0087] Among them, the maintenance demand status of the production equipment is sorted according to the demand quantity as high maintenance demand signal, medium maintenance demand signal and low maintenance demand signal, and the operation status of the maintenance workstation is sorted according to the priority as optimal operation status, suboptimal operation status, medium operation status and poor operation status;

[0088] For example, each production equipment corresponds to at least one maintenance workstation. If the production equipment 1101 corresponds to 4 maintenance workstations, namely, maintenance workstation 101, maintenance workstation 102, maintenance workstation 103, and maintenance workstation 104, and the operation status of maintenance workstation 101 is a medium operation status, the operation status of maintenance workstation 102 is a suboptimal operation status, the operation status of maintenance workstation 103 is an excellent operation status, and the operation status of maintenance workstation 104 is a poor operation status, then the production equipment 1101 matches the corresponding maintenance workstation 103;

[0089] For example, if production equipment 1101, production equipment 1102, and production equipment 1103 correspond to two maintenance workstations at the same time, they are maintenance workstation 101 and maintenance workstation 102 respectively;

[0090] If the maintenance requirement status of the equipment generated at 1101 is a low maintenance requirement signal, the maintenance requirement status of the production equipment at 1102 is a high maintenance requirement signal, and the maintenance requirement status of the production equipment at 1103 is a medium maintenance requirement signal;

[0091] If the operation status of the 101 maintenance workstation is the superior operation status and the 102 maintenance workstation is the intermediate operation status, then the 1102 production equipment matches the corresponding 102 maintenance workstation, and both the 1102 production equipment and the 1103 production equipment match the corresponding 101 maintenance workstation;

[0092] After completing the matching of the production equipment and the maintenance workstation, the maintenance process type of the corresponding production equipment is obtained, and the maintenance process type includes ordered and unordered. After marking the maintenance process type of the production equipment, a planned maintenance work order for the corresponding production equipment is generated;

[0093] It should be noted that if the maintenance process type of the production equipment is ordered, when performing maintenance operations on the production equipment, it can only be performed in the maintenance order from top to bottom set for the production equipment. A process can only be executed after all maintenance items of the current process have been completed;

[0094] If the maintenance process type of the production equipment is disordered, you can choose any one;

[0095] and sending the obtained planned maintenance work orders of each production equipment to the maintenance plan setting unit;

[0096] When the maintenance plan setting unit receives the planned maintenance work order generated by each production equipment, it performs equipment maintenance plan setting analysis and processing accordingly. The specific operation process is as follows:

[0097] According to the planned maintenance work order generated by each production equipment, the number of personnel on duty at the corresponding maintenance workstation in the unit time period is retrieved, and compared with the preset maintenance supply reference values ​​RV1 and RV2, wherein the maintenance supply reference value RV1 < the maintenance supply reference value RV2. It should be pointed out that the specific setting of the unit time period is made by technical personnel in this field according to the production equipment conditions of the enterprise, and the unit time period can be expressed as a week, 10 days or half a month;

[0098] When the number of personnel on duty at the corresponding maintenance workstation in the unit time period is less than the preset maintenance supply reference value RV1, a maintenance personnel supply shortage signal is generated; when the number of personnel on duty at the corresponding maintenance workstation in the unit time period is between the preset maintenance supply reference values ​​RV1 and RV2, a maintenance personnel supply sufficient signal is generated; when the number of personnel on duty at the corresponding maintenance workstation in the unit time period is greater than the preset maintenance supply reference value RV2, a maintenance personnel supply excess signal is generated;

[0099] When a maintenance personnel supply shortage signal is generated, the maintenance time period of the corresponding production equipment is set to the t1 maintenance time period, and the t1 maintenance time period set for the production equipment is included in the corresponding planned maintenance work order, and a final maintenance execution work order is generated;

[0100] When a maintenance personnel supply sufficient signal is generated, the maintenance time period of the corresponding production equipment is set as the t2 maintenance time period, and the t2 maintenance time period set for the production equipment is included in the corresponding planned maintenance work order, and a final maintenance execution work order is generated;

[0101] When a maintenance personnel oversupply signal is generated, the maintenance time period of the corresponding production equipment is set to the t3 maintenance time period, and the t3 maintenance time period set for the production equipment is included in the corresponding planned maintenance work order, and a final maintenance execution work order is generated, wherein t1>t2>t3;

[0102] According to the maintenance work order finally generated by the equipment, analyze and process the equipment maintenance operation status, specifically:

[0103] Obtain the maintenance date of each production equipment maintenance execution work order in real time, set the first upper limit date date1 and the second upper limit date date2, and compare and analyze the maintenance date of each production equipment maintenance execution work order with the set first upper limit date date1 and the second upper limit date date2;

[0104] When the maintenance date of the production equipment maintenance execution work order is before the set first upper limit date1, the first maintenance reminder operation is triggered, that is, when the production equipment is started, and the interval with the last reminder is greater than or equal to 2 hours, a maintenance reminder is given. At this time, the production equipment can operate normally. If the production equipment maintenance execution order is started, the message will not be displayed;

[0105] When the maintenance date of the production equipment maintenance execution work order is between the set first upper limit date1 and the second upper limit date2, the secondary maintenance reminder operation is triggered, that is, when the production equipment is started, and the interval with the last reminder is greater than or equal to 1 hour, a maintenance reminder is given. At this time, the production equipment can operate normally. If the production equipment maintenance execution order is started, the message will not be displayed;

[0106] When the maintenance date of the production equipment maintenance execution work order reaches the second upper limit date2, the maintenance overdue lock operation is triggered. That is, when the production equipment is started, a maintenance overdue reminder is given. At this time, the production equipment cannot start the operation and can be unlocked after the overdue maintenance execution work order is started.

[0107] When the present invention is used, by capturing the operating values ​​of various maintenance items of the enterprise's production equipment, the method of data comparison, statistical summation and sequence positioning is adopted to realize a clear qualitative analysis of the maintenance demand status of the enterprise's production equipment;

[0108] Through data definition, a two-way matching model between equipment and maintenance workstations was constructed. By obtaining the working performance parameters of the enterprise's maintenance workstations, symbol calibration, formula analysis and form-level positioning analysis were used to achieve real-time positioning analysis of the operating performance of the enterprise's maintenance workstations, laying the foundation for optimizing the maintenance management of the enterprise's production equipment.

[0109] By combining the maintenance demand status of the company's production equipment with the operating status of the corresponding maintenance workstation, a two-way optimized matching operation between the production equipment and the maintenance workstation is achieved. By analyzing the on-the-job personnel supply capacity of the maintenance workstation per unit time, the maintenance plan cycle of the production equipment is clearly set. This not only realizes the integrated maintenance of the company's production equipment, but also ensures the operation of the company's production equipment and enhances the company's operating efficiency.

[0110] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. An equipment maintenance management system based on data analysis includes a server, which is communicatively connected to a data acquisition unit and an equipment operation analysis unit. The data acquisition unit is used to obtain the operation values ​​of various maintenance items of the enterprise's production equipment, the working performance parameters of each maintenance workstation, and the number of on-the-job personnel of each maintenance workstation per unit time period, and sends various types of information to the equipment operation analysis unit, the workstation performance positioning unit, and the maintenance plan setting unit in sequence, characterized in that: The server also communicates with: The equipment operation analysis unit is used to receive the operation values ​​of each maintenance item of the enterprise's production equipment, and perform pre-judgment analysis and processing of the maintenance status, thereby obtaining the planned maintenance type of each maintenance item of the production equipment, and sending it to the equipment demand qualitative unit; The equipment demand qualitative unit is used to receive the planned maintenance type of each maintenance item of the production equipment, and perform maintenance demand status determination and analysis processing, thereby obtaining a high maintenance demand signal, a medium maintenance demand signal and a low maintenance demand signal, and sending them to the maintenance bidirectional matching unit; A matching model building unit is used to build a two-way matching model between equipment and maintenance workstations, and obtain the equipment group_production equipment→maintenance workstation, and send it to the maintenance two-way matching unit; The workstation performance positioning unit is used to obtain the working performance parameters of the enterprise's maintenance workstation and perform operation performance positioning analysis and processing, thereby obtaining the corresponding operation status of the maintenance workstation and sending the corresponding operation status of the maintenance workstation to the maintenance two-way matching unit; The maintenance two-way matching unit is used to optimize the matching between equipment and maintenance workstations, obtain the planned maintenance work orders of each production equipment, and send them to the maintenance plan setting unit; The maintenance plan setting unit performs equipment maintenance plan setting analysis and processing based on the planned maintenance work orders generated by each production equipment, and generates the final maintenance execution work order.

2. The equipment maintenance management system based on data analysis according to claim 1 is characterized in that: The specific steps for pre-determination and analysis of maintenance status are as follows: Obtain the operating values ​​of each maintenance item of each production equipment in the enterprise in real time and calibrate it into muk ij , where i and j are both positive integers greater than 1; The operating value muk of each maintenance item of each production equipment ij Respectively compare with the corresponding preset maintenance threshold TH ij Conduct comparative analysis; When Muk ij <TH ij When the corresponding maintenance item of the generated equipment is marked as a first-level maintenance plan item; When Muk ij =TH ij When the corresponding maintenance item of the generated equipment is marked as a secondary maintenance plan item; When Muk ij >TH ij When the corresponding maintenance item of the generated equipment is marked as a third-level maintenance plan item.

3. The equipment maintenance management system based on data analysis according to claim 1, characterized in that: The specific steps for determining and analyzing the maintenance requirement status are as follows: The sum of the number of maintenance items of each production equipment that are calibrated as a first-level maintenance plan item, a second-level maintenance plan item, and a third-level maintenance plan item is counted and recorded as sum1, sum2, and sum3, respectively, and the sum of the number of each maintenance plan type of each production equipment is sorted in descending order to obtain a descending sequence A; If sum1 is at the first place in the descending sequence A, that is, A = {sum1, sum2, sum3} or A = {sum1, sum3, sum2}, a high maintenance signal is generated; If sum3 is ranked first in the descending sequence A, and sum2 is ranked second first in the descending sequence A, that is, A = {sum3, sum2, sum1} or A = {sum3, sum1, sum2}, a low maintenance signal is generated; In other cases, a maintenance signal is generated.

4. The equipment maintenance management system based on data analysis according to claim 1, characterized in that: The specific steps for building a two-way matching model between equipment and maintenance workstations are as follows: The enterprise includes several equipment groups, which represent the collection of production equipment with the same structural maintenance attribute in the enterprise, and each equipment group contains at least one maintenance workstation; Match each production equipment with its corresponding maintenance workstation to obtain the equipment group_production equipment→maintenance workstation, which is represented by sbzid_scid→byzid.

5. The equipment maintenance management system based on data analysis according to claim 1, characterized in that: The specific steps for running performance positioning analysis and processing are as follows: Obtain the working performance parameters of each maintenance workstation in real time, including the number of equipment under maintenance, the number of equipment overdue for maintenance, and the number of equipment with custom maintenance settings, and perform formulaic analysis to obtain the capacity coefficient of each maintenance workstation; Substituting the transport capacity coefficient of each maintenance workstation into a preset maintenance workstation grade form for positioning analysis, wherein the maintenance workstation grade form includes a first-class determination grade, a second-class determination grade, a third-class determination grade and a fourth-class determination grade; When the capacity coefficient of the maintenance workstation corresponds to a determination level in the preset maintenance workstation level table, the operation state of the corresponding maintenance workstation is marked as an excellent operation state; When the capacity coefficient of the maintenance workstation corresponds to the second-class determination level in the preset maintenance workstation level table, the operation state of the corresponding maintenance workstation is calibrated as a suboptimal operation state; When the capacity coefficient of the maintenance workstation corresponds to the three determination levels in the preset maintenance workstation level table, the operation status of the corresponding maintenance workstation is calibrated as the intermediate operation status; When the capacity coefficient of a maintenance workstation corresponds to one of the four determination levels in the preset maintenance workstation level table, the operation state of the corresponding maintenance workstation is calibrated as a poor operation state.

6. The equipment maintenance management system based on data analysis according to claim 1, characterized in that: The specific steps for optimizing the matching of equipment and maintenance workstations are as follows: According to the two-way matching model constructed between production equipment and maintenance workstations, the maintenance requirement status of each production equipment and the corresponding operation status of each maintenance workstation are obtained, and the maintenance workstation with the corresponding operation status is preferentially matched according to the maintenance requirement status of the production equipment; After completing the matching of production equipment and maintenance workstation, obtain the maintenance process type of the corresponding production equipment, and the maintenance process type includes ordered and unordered. After marking the maintenance process type of the production equipment, generate a planned maintenance work order for the corresponding production equipment.

7. The equipment maintenance management system based on data analysis according to claim 1, characterized in that: The specific steps for equipment maintenance plan setting analysis and processing are as follows: According to the planned maintenance work order generated by each production equipment, the number of personnel on duty at the corresponding maintenance workstation in the unit time period is retrieved, and compared and analyzed with the preset maintenance supply reference values ​​RV1 and RV2, where the maintenance supply reference value RV1 is less than the maintenance supply reference value RV2; When the number of personnel on duty at the corresponding maintenance workstation in the unit time period is less than the preset maintenance supply reference value RV1, a maintenance personnel supply shortage signal is generated; when the number of personnel on duty at the corresponding maintenance workstation in the unit time period is between the preset maintenance supply reference values ​​RV1 and RV2, a maintenance personnel supply sufficient signal is generated; when the number of personnel on duty at the corresponding maintenance workstation in the unit time period is greater than the preset maintenance supply reference value RV2, a maintenance personnel supply excess signal is generated; When a maintenance personnel supply shortage signal is generated, the maintenance time period of the corresponding production equipment is set to the t1 maintenance time period, and the t1 maintenance time period set for the production equipment is included in the corresponding planned maintenance work order, and a final maintenance execution work order is generated; When a maintenance personnel supply sufficient signal is generated, the maintenance time period of the corresponding production equipment is set as the t2 maintenance time period, and the t2 maintenance time period set for the production equipment is included in the corresponding planned maintenance work order, and a final maintenance execution work order is generated; When a maintenance personnel oversupply signal is generated, the maintenance time period of the corresponding production equipment is set to the t3 maintenance time period, and the t3 maintenance time period set for the production equipment is included in the corresponding planned maintenance work order, and a final maintenance execution work order is generated, wherein t1>t2>t3.

8. The equipment maintenance management system based on data analysis according to claim 7 is characterized in that: The specific steps for analyzing and processing the equipment maintenance operation status are as follows: Obtain the maintenance date of each production equipment maintenance execution work order in real time, set the first upper limit date date1 and the second upper limit date date2, and compare and analyze the maintenance date of each production equipment maintenance execution work order with the set first upper limit date date1 and the second upper limit date date2; When the maintenance date of the production equipment maintenance execution work order is before the set first upper limit date1, the first maintenance reminder operation is triggered, that is, when the production equipment is started, and the interval with the last reminder is greater than the custom time interval, a maintenance reminder is given. At this time, the production equipment can operate normally. If the production equipment maintenance execution order is started, the message will not be displayed; When the maintenance date of the production equipment maintenance execution work order is between the set first upper limit date1 and the second upper limit date2, the secondary maintenance reminder operation is triggered, that is, when the production equipment is started, and the interval with the last reminder is greater than or equal to 1 hour, a maintenance reminder is given. At this time, the production equipment can operate normally. If the production equipment maintenance execution order is started, the message will not be displayed; When the maintenance date of the production equipment maintenance execution work order reaches the second upper limit date2, the maintenance overdue lock operation is triggered. That is, when the production equipment is started, a maintenance overdue reminder is given. At this time, the production equipment cannot start the operation and can be unlocked after the overdue maintenance execution work order is started.

Citation Information

Patent Citations

  • Elevator maintenance enterprise management system based on cloud platform

    CN107085746A

  • System and method for generating elevator dynamic maintenance plan

    CN107934710A

  • equipment maintenance operation management system and method based on the Internet technology

    CN109767015A

  • Intelligent online management system for maintainer

    CN112633758A