Assembled ancient building threshold wall and processing method

By designing slots and slots on the back of the facing bricks, and using fixings and limiting plates, the problem of cumbersome construction of prefabricated sill walls and difficult control of brick joints has been solved, thereby improving construction efficiency and ensuring the quality of brick joints.

CN118309202BActive Publication Date: 2024-10-18BEIJING REAL ESTATE GRP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202410394966.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-02
Publication Date
2024-10-18
Estimated Expiration
2044-04-02

AI Technical Summary

Technical Problem

In the construction of prefabricated sill walls, the pattern on the front of the sill wall bricks makes the construction cumbersome, and the cement mortar joints and concrete pouring can easily cause the surface brick layers to be misaligned, which increases the difficulty of construction and the need for later repairs.

Method used

Design slots and slots on the back of the tiles, and use fixings and limit plates to ensure accurate arrangement of tiles. Sponge strips are used to control brick joints, and trapezoidal slotting and rod-structured fixings are used to reduce trial arrangement steps. And perform grouting operation after the initial setting of cement mortar to avoid changes in brick joints and the impact of concrete vibration.

Benefits of technology

It simplifies the construction process, reduces construction time, ensures the quality of brick joints, avoids the need for later repairs, and improves the integrity and appearance quality of the sill wall.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118309202B_ABST
    Figure CN118309202B_ABST
Patent Text Reader

Abstract

The present invention discloses an assembled ancient building sill wall and a processing method, comprising the following steps: Step 1: face brick design: determine the face brick of corresponding size according to the modeling of the face layer of the sill wall, open a slot set along the length direction of the sill wall on the back of the face brick, and open a slot perpendicular to the slot at an eccentric position on the back of each face brick; design and manufacture corresponding fixings for passing through the slot, and a notch is provided on the fixings at a position corresponding to the slot; Step 2: brick arrangement: arrange the face bricks of the sill wall in a mold of fixed size, with the brick surface reversed on the mold, and in the process of arranging the face bricks, insert a sponge strip into the brick joints between adjacent face bricks, insert the corresponding fixing into the slot, connect each row of face bricks, and embed a limit plate in the slot, and the limit plate is stuck in the corresponding notch; Step 3: caulking; Step 4: pouring concrete. The present application can save the processing time of the sill wall and ensure the prefabrication quality of the sill wall.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of ancient building construction, and in particular to an assembled ancient building sill wall and a processing method thereof. Background Art

[0002] Chinese traditional architecture has been created and developed along with the origin of Chinese civilization. It has a long history and outstanding achievements. Its unique architectural structure and construction style are an indispensable and important part of the world's architectural art. For cities with a profound ancient architectural heritage, the reconstruction of ancient buildings is an inevitable part of the old city renewal process.

[0003] The sill wall is the wall under the wooden slats at the front or back eaves of the building, and the inner and outer skins at both ends are built into eight-shaped pillar doors. Traditional sill walls are generally built with blue bricks, which have low construction efficiency and will cause environmental pollution during the construction process, which does not meet the development goals of green buildings. In recent years, the construction and repair of ancient architectural cultural relics have closely focused on the goal of high-quality development, deeply implemented the innovation-driven development strategy, and continuously promoted scientific and technological innovation and the optimization and upgrading of the industrial structure. As an emerging construction method, prefabricated buildings have many advantages that traditional buildings cannot match.

[0004] At present, the construction of prefabricated sill walls generally involves first placing the wall tiles on the front for trial arrangement. After the positions of the tiles are accurate, they can be reversed and arranged in the mold. Then, cement mortar joints are added and concrete is poured on the back of the tiles. The above process has the following problems:

[0005] 1. Due to the presence of patterns and shapes on the front of the sill wall tiles, it is necessary to first test-arrange the tiles face-on to determine the position of each tile, and then reverse the arrangement. The construction is cumbersome and time-consuming;

[0006] 2. When cement mortar is used for grouting and concrete is poured and vibrated, it is easy to cause the surface brick layer to be misaligned, which will affect the brick joints of the surface bricks and require manual repair later. This greatly increases the difficulty of promoting and applying prefabricated buildings in ancient building construction. Summary of the invention

[0007] The invention provides an assembled ancient building sill wall and a processing method thereof, which has a simple construction process and can ensure the quality of the brick joints of the facing bricks.

[0008] The technical problem to be solved is that the joints of assembled sill wall tiles are difficult to control and the construction is complicated.

[0009] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0010] The present invention provides a method for processing an assembled ancient building threshold wall, comprising the following steps:

[0011] Step 1: Design of facing bricks: Determine the facing bricks of corresponding sizes according to the shape of the sill wall surface layer, open a slot on the back of the facing bricks that runs through the length direction of the sill wall, and open a slot perpendicular to the slot at an eccentric position on the back of each facing brick; design and make corresponding fixings for passing through the slots, and set a notch on the fixings at the position corresponding to the slot;

[0012] Step 2: Brick arrangement: Arrange the sill wall tiles in a mold of fixed size, with the brick surface turned upside down on the mold. During the brick arrangement process, insert the sponge strip into the brick joints between adjacent tiles, insert the corresponding fixings into the slots to connect each row of tiles, and embed the limit plate into the slot, and the limit plate is inserted into the corresponding notch;

[0013] Step 3: Caulking: Use cement mortar to fill the brick joints between the tiles. After the cement mortar is initially set, remove the limit plate and fixing parts, and use cement mortar to caulk the grooves.

[0014] Step 4: pouring concrete: after the cement mortar in the groove has initially set, apply interface agent on the face brick layer, lay the first layer of steel bars and set the upper and lower layers of steel bar tie embedded parts, pour the outer leaf wall concrete, lay the insulation layer, lay the second layer of steel bars and connect them to the first layer of steel bars, pour the lightweight aggregate inner leaf wall, and maintain the sill wall.

[0015] The present invention provides a processing method for an assembled ancient building sill wall, and further, the cross-sectional shape of the groove is a trapezoid.

[0016] The present invention provides a processing method for an assembled ancient building sill wall. Further, the fixing member is a rod structure, and its cross section matches the shape of the slotted cross section.

[0017] The present invention provides a processing method for an assembled ancient building sill wall. Further, when arranging the face bricks, horse-tooth-shaped interfaces are reserved on the face brick layer at both ends of the sill wall.

[0018] The present invention provides a processing method for an assembled ancient building sill wall. Further, a hole for a fixing piece to pass through is provided on the side wall of the mold, and the hole is sealed with a sealing plug after the fixing piece is taken out.

[0019] The present invention provides a processing method for an assembled ancient building sill wall. Furthermore, the horse-tooth-shaped joint is filled with insulation blocks when pouring concrete and is removed when installing the sill wall.

[0020] The present invention provides a processing method for an assembled ancient building sill wall, and further, the sponge strip is filled at the bottom of the brick joint.

[0021] The invention discloses a processing method for a prefabricated ancient building sill wall. Further, after the sill wall is prefabricated, the sponge strip is taken out to perform caulking treatment.

[0022] The present invention discloses an assembled ancient building sill wall, comprising a face brick layer, an outer leaf wall, an insulation layer and an inner leaf wall, wherein a groove extending through the face brick layer along the length direction of the sill wall is provided on the back of the face brick layer, a slot extending through the groove perpendicularly is provided at an eccentric position on the back of each face brick of the face brick layer, and cement mortar is filled in the brick joints and the groove of the face brick layer;

[0023] The outer leaf wall comprises a first layer of steel bars laid on the face brick layer and concrete poured on the face brick layer;

[0024] The inner leaf wall comprises two layers of steel bars laid on the thermal insulation layer, tie-in embedded parts connecting the first layer of steel bars and the second layer of steel bars, and concrete poured on the thermal insulation layer.

[0025] Compared with the prior art, the present invention has the following beneficial effects:

[0026] 1. The present application provides slots and eccentric slots on the back of the tiles to cooperate with the fixing parts and the limiting plates. After the tiles are arranged, when the fixing parts and the limiting plates can be inserted into the corresponding slots, the tiles are arranged accurately, so that the arrangement position of the tiles can be determined from the back of the tiles, avoiding the need to first conduct a trial arrangement of the tiles face-on, determine the position of each tile, and then reverse the arrangement; thus saving construction time;

[0027] 2. When the brick joints are filled, the fixing parts and the limiting plates are used to limit the facing bricks, so as to avoid changes in the brick joints during the filling process; and after the brick joints are filled, the slotted filling operation is performed, and the facing bricks are limited by the previous filling, so as to avoid the influence of the facing brick joints during the filling process;

[0028] 3. The grooves are then used for grouting, which can increase the integrity of the facing brick layer and avoid the impact of vibration on the brick joints during subsequent concrete pouring, which requires manual repair later.

[0029] The present invention will be further described below in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a front view of the assembled sill wall of the present invention;

[0031] Figure 2 It is a partial side view of the assembled sill wall of the present invention;

[0032] Figure 3 is a cross-sectional view of the face brick of the present invention;

[0033] Figure 4 It is a plan view of the facing brick of the present invention;

[0034] Figure 5 It is a schematic plan view of the fixing member of the present invention.

[0035] Reference numerals:

[0036] 1. Facing brick layer; 2. Outer leaf wall; 3. Insulation layer; 4. Inner leaf wall; 5. Grooving; 6. Slot; 7. Fixing piece; 8. Notch; 9. Horse tooth shaped joint. DETAILED DESCRIPTION

[0037] like Figure 1-Figure 5 As shown, the present invention discloses an assembled ancient building threshold wall and a processing method, the processing method comprising the following steps:

[0038] Step 1: Design of facing bricks: Determine the corresponding size of facing bricks according to the shape of the sill wall surface layer, open a slot on the back of the facing brick that runs through the length of the sill wall, and open a slot perpendicular to the slot at a position off the center of each facing brick. The cross-sectional shape of the slot is trapezoidal, with a larger bottom and a smaller top. Design and make corresponding fixings for passing through the slots. A notch is set on the fixings at the position corresponding to the slot. The fixings are rod structures, and their cross-sections match the cross-sectional shape of the slots.

[0039] Step 2: Brick arrangement: Arrange the sill wall tiles in a mold of fixed size, with the brick surface turned upside down on the mold. During the tile arrangement process, insert the sponge strip into the brick joints between adjacent tiles, insert the corresponding fixings into the slots to connect each row of tiles, and insert the limit plate into the slots. The limit plate is inserted into the corresponding notch. When the limit plate cannot be inserted into the notch, it means that the arrangement position of the tiles is wrong and the installation direction of the tiles needs to be adjusted. The mold includes a bottom mold and a side mold. The side wall of the mold is provided with holes for the fixings to pass through. The holes are sealed with sealing plugs after the fixings are removed; the sponge strip is filled at the bottom of the brick joint to control the size of the brick joint, and can also play a sealing role to prevent the front of the tiles from being contaminated by mortar. The fixings and limit plates can ensure the position of the tiles during the subsequent grouting, avoid changes in the brick joints, and affect the appearance quality of the sill wall; in addition, the slots are used for grouting, which can increase the integrity of the tile layer and avoid the impact of vibrating the concrete on the brick joints during the subsequent pouring of concrete, which requires manual repair later.

[0040] Step 3: caulking: Use cement mortar to fill the brick joints between the facing bricks first. After the cement mortar has initially set, remove the limiting plates and fixings, and use cement mortar to caulk the grooves. This application sets grooves, and when the brick joints are filled, the facing bricks are limited by fixings and limiting plates to avoid changes in the brick joints during the caulking process; and after the brick joints are filled, the caulking operation of the grooves is performed, and the previous caulking is used to limit the facing bricks, thereby avoiding the impact on the brick joints of the facing bricks during the caulking.

[0041] Step 4: Pour concrete: After the cement mortar in the groove has initially set, apply interface agent on the face brick layer, lay the first layer of steel bars and set the upper and lower layers of steel bar tie embedded parts, pour the outer leaf wall concrete, lay the insulation layer, lay the second layer of steel bars and connect them to the first layer of steel bars, pour the lightweight aggregate inner leaf wall, and perform sill wall maintenance.

[0042] In addition, when arranging the facing bricks, tooth-shaped joints are reserved on the facing brick layer at both ends of the sill wall. The tooth-shaped joints are filled with insulation blocks when pouring concrete and are removed when the sill wall is installed. The tooth-shaped joints are used for post-masonry construction between the building structure during the subsequent installation of the sill wall.

[0043] After the sill wall is prefabricated, take out the sponge strips and perform caulking.

[0044] Another embodiment of the present application also discloses an assembled ancient building sill wall, including a facing brick layer, an outer leaf wall, an insulation layer and an inner leaf wall. A groove is provided on the back of the facing brick layer along the length direction of the sill wall. A slot is provided at an eccentric position on the back of each facing brick of the facing brick layer, which is perpendicular to the groove. The brick joints and the grooves of the facing brick layer are filled with cement mortar.

[0045] The outer leaf wall includes a first layer of steel bars laid on a facing brick layer and concrete poured on the facing brick layer.

[0046] The inner leaf wall includes a second layer of steel bars laid on the thermal insulation layer, anchor embedded parts connecting the first layer of steel bars and the second layer of steel bars, and concrete poured on the thermal insulation layer.

[0047] The embodiments described above are merely descriptions of preferred implementation modes of the present invention and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.

Claims

1. A method for processing an assembled ancient building sill wall, characterized in that: The following steps are involved: Step 1: Design of facing bricks: Determine the facing bricks of corresponding sizes according to the shape of the sill wall surface layer, open a slot on the back of the facing brick that runs through the length direction of the sill wall, and the cross-sectional shape of the slot is a trapezoid; and open a slot that runs perpendicularly through the slot at an eccentric position on the back of each facing brick; design and manufacture corresponding fixings for passing through the slots, and the fixings are rod structures, and their cross-sections match the cross-sectional shapes of the slots; and a notch is provided on the fixings at the position corresponding to the slot; Step 2: Brick arrangement: Arrange the sill wall tiles in a mold of fixed size, with the brick surface turned upside down on the mold, and during the brick arrangement process, insert the sponge strip into the brick joints between adjacent bricks, and the sponge strip is filled at the bottom of the brick joints; insert the corresponding fixing parts into the slots to connect each row of bricks, and embed the limiting plate in the slot, and the limiting plate is inserted into the corresponding notch; Step 3: Caulking: Use cement mortar to fill the brick joints between the tiles. After the cement mortar is initially set, remove the limit plate and fixing parts, and use cement mortar to caulk the grooves. Step 4: pouring concrete: after the cement mortar in the slot is initially set, apply the interface agent on the face brick layer, lay the first layer of steel bars and set the upper and lower layers of steel bar tie embedded parts, pour the outer leaf wall concrete, lay the insulation layer, lay the second layer of steel bars and connect them to the first layer of steel bars, pour the lightweight aggregate inner leaf wall, and maintain the sill wall; After the sill wall is prefabricated, take out the sponge strips and perform caulking.

2. The processing method of the assembled ancient building sill wall according to claim 1 is characterized by: When arranging the facing bricks, reserve tooth-shaped joints on the facing brick layer at both ends of the sill wall.

3. The processing method of the assembled ancient building sill wall according to claim 1 is characterized by: The side wall of the mold is provided with a hole for the fixing piece to pass through, and the hole is sealed with a sealing plug after the fixing piece is taken out.

4. The processing method of the assembled ancient building sill wall according to claim 2 is characterized by: The tooth-shaped joint is filled with insulation blocks when pouring concrete and is removed when installing the sill wall.

Citation Information

Patent Citations

  • Ceramic face brick for reverse wall decoration surface and ceramic face brick reverse wall

    CN217379599U