A building seepage detection device

By introducing structures such as anti-fouling tubes, water filters, measuring rods, and scrapers into the building seepage detection device, the problem of reduced accuracy and structural damage caused by the accumulation of impurities and sediment is solved, and higher detection accuracy and equipment are achieved. stability.

CN118362479BActive Publication Date: 2024-10-11HEBEI CONSTR GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410790267.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-19
Publication Date
2024-10-11
Estimated Expiration
2044-06-19

AI Technical Summary

Technical Problem

Existing building seepage detection devices are prone to decrease in measurement accuracy and structural damage due to accumulation of impurities and sediment during the detection process, affecting the normal operation of the device.

Method used

A device is designed that includes an anti-fouling tube, a water filter, a measuring rod, a float ball, a scraper and a floating block. The scraper is driven by paddles and bevel gears to clean the sand, ensuring that the measuring rod always remains vertical, and uses Weight rings and balance plates keep the unit balanced and prevent tipping.

Benefits of technology

It effectively reduces sediment accumulation, improves detection accuracy, reduces measurement errors, prevents the device from tilting, and extends the service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118362479B_ABST
    Figure CN118362479B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of seepage detection, and discloses a building seepage detection device, comprising a water channel, a weir plate installed in the water channel, an anti-fouling cylinder installed in the water channel, a cover plate installed on the anti-fouling cylinder, a measuring rod arranged on the cover plate, one end of the measuring rod inserted into the anti-fouling cylinder and slidably installed with a float, a signal rod installed on the water channel, a solar charging device installed on the top of the signal rod, the seepage detection device uses a second float block to drive a blade to move up and down, so that only the lower part of the blade is always located in the water, and the blade is driven to rotate by the water flow at the outlet of the water collecting funnel, and then the turbine is driven to rotate by the first bevel gear and the second bevel gear as well as the transmission rod and the worm rod, when the connecting plate on the turbine drives the sliding rod to perform a circular motion, it will drive the limit rod to swing back and forth, and make the scraper repeatedly scrape the mud and sand at the bottom of the device, thereby reducing the accumulation of mud and sand at the bottom of the device and improving the detection accuracy of the seepage detection device.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of seepage detection, in particular to a building seepage detection device. Background Art

[0002] The building seepage detection device is a device system specially used to monitor the seepage conditions inside or outside the building. At present, a water weir meter is usually used to detect the seepage of the building. Its working principle is based on the water level change caused by the water flow passing through the weir plate of a specific shape. When the building seeps, the water will pass through the weir plate and cause the water level to change. This change can be recorded by the water weir meter. By measuring and analyzing these water level change data, the seepage condition of the building can be evaluated.

[0003] In actual use, the water measuring weir meter is usually fixed on the wall of the canal and located upstream of the weir plate. After the water seepage from the building is collected in the canal, it usually carries some impurities and silt. These impurities and silt flow with the water to the weir plate. When passing through the water measuring weir meter, some of the impurities and silt are prone to accumulate on one side of the bottom of the water measuring weir meter, and may block the sensor or affect the normal operation of the measuring equipment. This deposition phenomenon may have an adverse effect on the measurement accuracy and performance of the water measuring weir meter. When these impurities and silt continue to accumulate at the bottom of the water measuring weir meter, it may change its original support balance state and cause the water measuring weir meter to tilt. This tilt will not only affect the measurement accuracy of the water measuring weir meter, but may also damage its structure and even affect its normal operation. For this reason, we propose a building seepage detection device. Summary of the invention

[0004] The object of the present invention is to provide a building seepage detection device to solve the problems raised in the above background technology.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a building seepage detection device, comprising a water channel, a weir plate fixedly installed in the water channel, an anti-fouling cylinder fixedly installed in the water channel through a plurality of fixing hoops, a plurality of water filter tanks arranged on the anti-fouling cylinder, a cover plate fixedly installed on the anti-fouling cylinder, a measuring rod arranged on the cover plate, one end of the measuring rod inserted into the anti-fouling cylinder and slidably installed with a floating ball, a clamping ring fixedly installed at the lower end of the measuring rod, a signal rod for transmitting the measuring rod signal fixedly installed on the water channel, and a solar charging device for providing power fixedly installed on the top of the signal rod;

[0006] The transmission gear is a gear that is fixedly provided with a toothed wheel, and the toothed wheel is provided with a toothed wheel which is connected with the toothed wheel to the gearbox and the toothed wheel can be connected with the toothed wheel to the gearbox so as to prevent the toothed wheel from being lost.

[0007] Preferably, an elastic pad is fixedly installed on the cover plate, a balancing chamber is provided in the cover plate, a balancing plate is provided in the balancing chamber, a counterweight chamber is provided at the lower end of the cover plate, a counterweight ring is provided in the counterweight chamber, a plurality of connecting ropes are fixedly connected between the counterweight ring and the balancing plate, two elastic first threaded sleeves are fixedly installed on the measuring rod, and a rigid second threaded sleeve is fixedly installed, and threaded strips are fixedly installed on the inner ring wall of the cover plate and the inner ring wall of the balancing plate.

[0008] Preferably, a plurality of springs are fixedly mounted on the outer ring of the counterweight ring, a slider is fixedly mounted on one end of each of the springs, an annular plate is fixedly mounted on the inner wall of the counterweight bin, a plurality of guide grooves for limiting the slider are arranged on the inner wall of the annular plate, and the guide grooves correspond one-to-one to the sliders.

[0009] Preferably, a plurality of balls are movably mounted on the lower end of the balancing plate, a telescopic column is fixedly mounted on the lower end of each of the balls, and the lower end of each of the telescopic columns is fixedly connected to the inner wall of the balancing bin.

[0010] Preferably, the threads on the inner wall of the cover plate cooperate with the first threaded sleeve, and the threads on the inner wall of the balance plate cooperate with the second threaded sleeve.

[0011] Preferably, a water collecting funnel is fixedly mounted on the second floating block, the water collecting funnel is located upstream of the blade, and a first floating block providing buoyancy for the water collecting funnel is fixedly mounted thereon.

[0012] Preferably, a filter is fixedly installed at the water inlet of the water collecting funnel, and the filter is configured to be wedge-shaped.

[0013] Preferably, the scraper is provided with a plurality of water filtering holes for reducing its resistance in water, and the lower end of the scraper is configured to be wedge-shaped for reducing friction between it and mud and sand impurities.

[0014] Preferably, two elastic sealing strips are fixedly mounted on the device bin, and a sealing ring cooperating with the sealing strips is rotatably mounted on the rotating rod.

[0015] Preferably, the inner wall of the annular plate is arranged to be arc-shaped.

[0016] Compared with the prior art, the present invention has the following beneficial effects:

[0017] The present invention utilizes the second floating block to drive the blade to move up and down, so that only the lower part of the blade is always located in the water, and the water flow at the outlet of the water collecting funnel drives the blade to rotate, and then drives the turbine to rotate through the first bevel gear and the second bevel gear and the transmission rod and the worm rod. When the connecting plate on the turbine drives the sliding rod to perform a circular motion, it will drive the limit rod to swing back and forth, and the scraper will repeatedly scrape off the mud and sand at the bottom of the device, thereby reducing the accumulation of mud and sand at the bottom of the device and improving the detection accuracy of the seepage detection device.

[0018] The present invention utilizes the counterweight ring to drive the balance plate to always maintain a horizontal state under the action of gravity, and through the connection between the balance plate and the second threaded sleeve on the measuring rod, the measuring rod is also always kept in a vertical state. When the device as a whole tilts, the elastic first threaded sleeve will be squeezed and deformed, and the measuring rod can still be fixed on the cover plate when the first threaded sleeve is deformed, so that the measuring rod can always maintain a vertical state for detection, thereby reducing the detection error of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0020] Figure 2 This is a schematic diagram of the weir plate structure of the present invention;

[0021] Figure 3 This is a schematic diagram of the water collecting funnel structure of the present invention;

[0022] Figure 4 This is a schematic diagram of the structure of the device bin of the present invention;

[0023] Figure 5 It is a schematic diagram of the rotating rod structure of the present invention;

[0024] Figure 6 It is a schematic diagram of the turbine structure of the present invention;

[0025] Figure 7 This is a schematic diagram of the scraper structure of the present invention;

[0026] Figure 8This is a schematic diagram of the internal structure of the anti-fouling cylinder of the present invention;

[0027] Fig. 9 This is a schematic diagram of the internal structure of the cover plate of the present invention;

[0028] Fig.10 This is a schematic diagram of the internal structure of the balance bin of the present invention;

[0029] Fig.11 It is a schematic diagram of the internal structure of the counterweight bin of the present invention.

[0030] In the figure: 1-channel; 2-weir plate; 3-signal rod; 4-solar charging device; 5-measuring rod; 6-cover plate; 7-anti-fouling cylinder; 8-device compartment; 9-filter tank; 10-fixing hoop; 11-filter screen; 12-water collecting funnel; 13-first floating block; 14-paddle; 15-second floating block; 16-rotating rod; 17-sealing strip; 18-sealing ring; 19-first bevel gear; 20-second bevel gear; 21-transmission rod; 22-guide rod; 23-vortex rod; 24-turbine; 2 5-connecting plate; 26-slide rod; 27-ring; 28-limiting rod; 29-connecting rod; 30-scraper; 31-water filter hole; 32-floating ball; 33-clamping ring; 34-elastic pad; 35-first threaded sleeve; 36-second threaded sleeve; 37-threaded strip; 38-balancing chamber; 39-counterweight chamber; 40-balancing plate; 41-ball; 42-telescopic column; 43-connecting rope; 44-counterweight ring; 45-slider; 46-spring; 47-annular plate; 48-guide groove. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] See also Figure 1-11The present invention provides a technical solution: a building seepage detection device, including a water channel 1, a weir plate 2 fixedly installed in the water channel 1, the weir plate 2 hinders the water flow in the water channel 1, so that the liquid level on one side of the weir plate 2 rises for easy detection, an anti-fouling cylinder 7 is fixedly installed in the water channel 1 through a plurality of fixing hoops 10, and a plurality of water filter tanks 9 are arranged on the anti-fouling cylinder 7, so that water can enter the anti-fouling cylinder 7 for easy detection, a cover plate 6 is fixedly installed on the anti-fouling cylinder 7, and a measuring rod 5 is arranged on the cover plate 6 (the measuring rod 5 is an existing known structure, so the present invention will not be described in detail), the measuring rod One end of the measuring rod 5 is inserted into the anti-fouling cylinder 7, and a floating ball 32 is slidably installed. The floating ball 32 slides up and down along the measuring rod 5 according to the height of the liquid level. The measuring rod 5 determines the amount of water seepage in the building by detecting the position of the floating ball 32. A clamp ring 33 is fixedly installed at the lower end of the measuring rod 5. A signal rod 3 for transmitting the signal of the measuring rod 5 is fixedly installed on the water channel 1. A solar charging device 4 for providing electricity is fixedly installed on the top of the signal rod 3. The information signal collected by the measuring rod 5 is transmitted through the signal rod 3, which is convenient for detecting the seepage situation of the building at any time, thereby improving the safety of the building.

[0033] An elastic pad 34 is fixedly installed on the cover plate 6, a balancing chamber 38 is arranged inside the cover plate 6, a balancing plate 40 is arranged inside the balancing chamber 38, a plurality of balls 41 are movably installed at the lower end of the balancing plate 40, a telescopic column 42 is fixedly installed at the lower end of each ball 41, and the lower end of each telescopic column 42 is fixedly connected to the inner wall of the balancing chamber 38. When the balancing plate 40 deflects in the balancing chamber 38, different telescopic columns 42 are compressed or stretched to different degrees by the balls 41. At the same time, the balancing plate 40 is limited by the balls 41, so that the balancing plate 40 will not rotate horizontally, but only deflect longitudinally. A counterweight chamber 39 is arranged at the lower end of the cover plate 6, a counterweight ring 44 is arranged inside the counterweight chamber 39, and a plurality of elastic Spring 46, one end of each spring 46 is fixedly installed with a slider 45, an annular plate 47 is fixedly installed on the inner wall of the counterweight bin 39, the inner wall of the annular plate 47 is arranged in an arc shape, and a plurality of guide grooves 48 for limiting the slider 45 are arranged on the inner wall of the annular plate 47, and the guide grooves 48 correspond to the slider 45 one by one, and the slider 45 and the spring 46 play a certain limiting role on the counterweight ring 44 to prevent the counterweight ring 44 from shaking violently during the installation process and causing the measuring rod 5 to be skewed. When the counterweight ring 44 deflects in the counterweight bin 39, the slider 45 is limited by the guide groove 48, and the counterweight ring 44 will drive the spring 46 and the slider 45 thereon to deflect longitudinally, but will not rotate laterally. Since the inner wall of the annular plate 47 is an arc The spring 46 is shaped, and will not be compressed or stretched during the rotation process, which helps the counterweight ring 44 to maintain a balanced state. A number of connecting ropes 43 are fixedly connected between the counterweight ring 44 and the balance plate 40. Through the connection of the connecting ropes 43, the counterweight ring 44 is kept in a horizontal state by gravity and the balance plate 40 is also driven to maintain a horizontal state. When the device as a whole tilts, the counterweight ring 44 will deflect in the counterweight bin 39 and drive the balance plate 40 to deflect in the balance bin 38. Two elastic first threaded sleeves 35 are fixedly installed on the measuring rod 5, and a rigid second threaded sleeve 36 is fixedly installed. Threaded strips 37 are fixedly installed on the inner ring wall of the cover plate 6 and the inner ring wall of the balance plate 40. The thread strips 37 of the balance plate 40 cooperate with the first threaded sleeve 35, and the thread strips 37 on the inner wall of the balance plate 40 cooperate with the second threaded sleeve 36. When the device as a whole tilts, the counterweight ring 44 drives the balance plate 40 to maintain a horizontal state, and the thread strips 37 on the inner wall of the balance plate 40 are threadedly connected with the rigid second threaded sleeve 36 on the measuring rod 5. The balance plate 40 will drive the measuring rod 5 to maintain a vertical state, so that the measuring rod 5 deflects relative to the cover plate 6. Since the thread strips 37 on the inner wall of the cover plate 6 are threadedly connected with the elastic first threaded sleeve 35 on the measuring rod 5, when the measuring rod 5 deflects relative to the cover plate 6, the two first threaded sleeves 35 on the measuring rod 5 will be deformed, and the elastic pad 34 at the upper end of the cover plate 6 will also be squeezed and deformed.While the two first threaded sleeves 35 on the measuring rod 5 are deformed, the measuring rod 5 is still fixed on the cover plate 6, and the measuring rod 5 can always be kept in a vertical state for detection, thereby improving the accuracy of the device detection and reducing the detection error.

[0034] The anti-fouling cylinder 7 is provided with a device bin 8, on which a rotating rod 16 is slidably installed, a paddle 14 is fixedly installed at one end of the rotating rod 16, and a first bevel gear 19 is fixedly installed at the other end. A second floating block 15 providing buoyancy for the rotating rod 16 is also rotatably installed, and a water collecting funnel 12 is fixedly installed on the second floating block 15. The water collecting funnel 12 is located upstream of the paddle 14, and a first floating block 13 providing buoyancy for the water collecting funnel is fixedly installed thereon, so that the water collecting funnel 12 can stably float in the water, can collect and discharge the water flow to the paddle 14, so that the paddle 14 is rotated by the impact force of enough water, and a filter screen 11 is fixedly installed at the water inlet of the water collecting funnel 12, and the filter screen 11 can reduce impurities in the water collecting funnel 12 to prevent the impurities from clogging the water collecting funnel 12 or The blade 14 is damaged, and the filter screen 11 is set in a wedge shape, which is convenient for impurities to flow away along the inclined surface of the filter screen 11, reducing the blockage of the filter screen 11. Two elastic sealing strips 17 are fixedly installed on the device bin 8, and a sealing ring 18 matching the sealing strip 17 is rotatably installed on the rotating rod 16, so that the device bin 8 always maintains a sealed state, reducing the influence of water on the internal equipment of the device bin 8. A transmission rod 21 is rotatably installed in the device bin 8, and a second bevel gear 20 matching the first bevel gear 19 is slidably installed on the transmission rod 21. A guide rod 22 for limiting the second bevel gear 20 is fixedly installed on the transmission rod 21, and a vortex rod 23 is fixedly installed at the lower end of the transmission rod 21. A turbine 24 matching the vortex rod 23 is rotatably installed on the inner wall of the device bin 8 A connecting plate 25 is fixedly installed on the turbine 24, a sliding rod 26 is slidably installed on one end of the connecting plate 25, a collar 27 is fixedly installed on one end of the sliding rod 26, a limit rod 28 is slidably installed on the collar 27, a connecting rod 29 is rotatably installed in the warehouse wall of the device warehouse 8, the limit rod 28 and the connecting rod 29 are fixedly connected by a connecting rod, and a scraper 30 for cleaning mud and sand impurities is also fixedly installed on the connecting rod 29, and a plurality of water filtering holes 31 for reducing its resistance in water are provided on the scraper 30, and the lower end of the scraper 30 is configured to be a wedge shape for reducing the friction between it and the mud and sand impurities. The second floating block 15 is always floating on the water surface due to the buoyancy of the water, and drives the rotating rod 16 and the blade 14 thereon and the first bevel gear 19 to move up and down, so that the blade 14 always only The lower half of the paddle 14 is located in the water. The rotating rod 16 will also drive the sealing ring 18 to slide up and down between the two sealing strips 17, so that the sealing ring 18 and the sealing strips 17 on both sides are always in a close fit state, so that the device compartment 8 can be sealed. The first bevel gear 19 also pushes the second bevel gear 20 to slide up and down along the transmission rod 21. The water collecting funnel 12 collects the water flow upstream of the paddle 14 and discharges it from its water outlet, so that the impact force of the water flow on the paddle 14 becomes larger, which is convenient for the paddle 14 to rotate. The paddle 14 will drive the rotating rod 16 and the first bevel gear 19 to rotate synchronously. Through the cooperation of the first bevel gear 19 and the second bevel gear 20, and the limiting of the second bevel gear 20 by the guide rod 22, the paddle 14 drives the transmission rod 21 to rotate.The transmission rod 21 will drive the vortex rod 23 at its lower end to rotate. Through the cooperation between the vortex rod 23 and the turbine 24, the turbine 24 drives the upper connecting plate 25 to rotate. The connecting plate 25 drives the upper slide bar 26 to perform circular motion. Through the cooperation between the collar 27 and the limit rod 28, and the limit 29 of the connecting rod by the warehouse wall of the device warehouse 8, the slide bar 26 performs circular motion and drives the limit rod 28 to swing back and forth, and drives the scraper 30 to swing back and forth, scraping off the mud and sand impurities at the bottom of the device, reducing the influence of mud and sand impurities on the measuring rod 5, and preventing the accumulation of mud and sand impurities and causing the device to tilt.

[0035] Specifically, water seeping from a building is collected in the water channel 1, and is blocked by the weir plate 2, so that the liquid level on one side thereof is raised for easy detection. The seeping water enters the anti-fouling cylinder 7 through the filter tank 9, and drives the float 32 to slide up and down along the measuring rod 5 according to the height of the liquid level. The measuring rod 5 determines the amount of water seepage from the building by detecting the position of the float 32. The information signal collected by the measuring rod 5 is transmitted through the signal rod 3, so as to detect the seepage condition of the building at any time. When the device as a whole tilts, the counterweight ring 44 will deflect in the counterweight bin 39, and drive the balance plate 40 to deflect in the balance bin 38. The slider 45 and the spring 46 play a certain limiting role on the counterweight ring 44 to prevent the counterweight ring 44 from violently moving during the installation process. The swaying causes the measuring rod 5 to be skewed. When the counterweight ring 44 deflects in the counterweight bin 39, the guide groove 48 limits the position of the slider 45, and the counterweight ring 44 will drive the spring 46 and the slider 45 thereon to deflect longitudinally without lateral rotation. Since the inner wall of the annular plate 47 is arc-shaped, the spring 46 will not be compressed or stretched during the rotation process, which helps the counterweight ring 44 to maintain a balanced state. Through the connection of the connecting rope 43, the counterweight ring 44 is kept in a horizontal state by gravity, and the balance plate 40 will also be driven to maintain a horizontal state. When the balance plate 40 deflects in the balance bin 38, the different telescopic columns 42 are compressed or stretched to different degrees through the ball 41. At the same time, the limit of the balance plate 40 by the ball 41 The balance plate 40 is positioned so that the balance plate 40 will not rotate laterally but will only deflect longitudinally. Since the counterweight ring 44 drives the balance plate 40 to maintain a horizontal state, and the threaded strip 37 on the inner wall of the balance plate 40 is threadedly connected with the rigid second threaded sleeve 36 on the measuring rod 5, the balance plate 40 will drive the measuring rod 5 to maintain a vertical state, so that the measuring rod 5 deflects relative to the cover plate 6. Since the threaded strip 37 on the inner wall of the cover plate 6 is threadedly connected with the elastic first threaded sleeve 35 on the measuring rod 5, when the measuring rod 5 deflects relative to the cover plate 6, the two first threaded sleeves 35 on the measuring rod 5 will be deformed, and the elastic pad 34 at the upper end of the cover plate 6 will also be squeezed and deformed. When the two first threaded sleeves 35 on the measuring rod 5 are deformed, the measuring rod 5 is still fixed to the cover plate 6. The second floating block 15 is always floated on the water surface by the buoyancy of the water, and drives the rotating rod 16 and the blade 14 and the first bevel gear 19 thereon to move up and down, so that only the lower half of the blade 14 is always in the water. The rotating rod 16 will also drive the sealing ring 18 to slide up and down between the two sealing strips 17, so that the sealing ring 18 and the sealing strips 17 on both sides are always in a tight fit, so that the device compartment 8 can be sealed. The first bevel gear 19 also pushes the second bevel gear 20 to slide up and down along the transmission rod 21. The water collecting funnel 12 collects the water flow upstream of the blade 14 and discharges it from its water outlet, so that the impact force of the water flow on the blade 14 becomes greater.To facilitate the rotation of the blade 14, the blade 14 will drive the rotating rod 16 and the first bevel gear 19 to rotate synchronously. Through the cooperation between the first bevel gear 19 and the second bevel gear 20, and the limiting of the second bevel gear 20 by the guide rod 22, the blade 14 drives the transmission rod 21 to rotate, and the transmission rod 21 will drive the vortex rod 23 at its lower end to rotate. Through the cooperation between the vortex rod 23 and the turbine 24, the turbine 24 drives the upper connecting plate 25 to rotate, and the connecting plate 25 drives the upper sliding rod 26 to perform circular motion. Through the cooperation between the collar 27 and the limiting rod 28, and the limiting 29 of the connecting rod by the warehouse wall of the device warehouse 8, the sliding rod 26 performs circular motion while driving the limiting rod 28 to swing back and forth, and drives the scraper 30 to swing back and forth to scrape the mud and impurities at the bottom of the device.

[0036] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0037] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A building seepage detection device, comprising a water channel (1) and a weir plate (2) fixedly installed in the water channel (1), characterized in that: An anti-fouling cylinder (7) is fixedly installed in the water channel (1) via a plurality of fixing hoops (10), a plurality of water filter grooves (9) are arranged on the anti-fouling cylinder (7), a cover plate (6) is fixedly installed on the anti-fouling cylinder (7), a measuring rod (5) is arranged on the cover plate (6), one end of the measuring rod (5) is inserted into the anti-fouling cylinder (7) and a floating ball (32) is slidably installed, a clamping ring (33) is fixedly installed at the lower end of the measuring rod (5), a signal rod (3) for transmitting a signal of the measuring rod (5) is fixedly installed on the water channel (1), and a solar charging device (4) for providing electricity is fixedly installed at the top of the signal rod (3); The anti-fouling cylinder (7) is provided with a device bin (8), a rotating rod (16) is slidably mounted on the device bin (8), a paddle (14) is fixedly mounted on one end of the rotating rod (16), and a first bevel gear (19) is fixedly mounted on the other end, a second floating block (15) for providing buoyancy is also rotatably mounted on the rotating rod (16), a transmission rod (21) is rotatably mounted in the device bin (8), a second bevel gear (20) matching the first bevel gear (19) is slidably mounted on the transmission rod (21), a guide rod (22) for limiting the position of the second bevel gear (20) is fixedly mounted on the transmission rod (21), and the transmission rod (21) A vortex rod (23) is fixedly mounted on the lower end, a turbine (24) matched with the vortex rod (23) is rotatably mounted on the inner wall of the device bin (8), a connecting plate (25) is fixedly mounted on the turbine (24), a sliding rod (26) is slidably mounted on one end of the connecting plate (25), a collar (27) is fixedly mounted on one end of the sliding rod (26), a limit rod (28) is slidably mounted on the collar (27), a connecting rod (29) is rotatably mounted in the bin wall of the device bin (8), the limit rod (28) and the connecting rod (29) are fixedly connected via a connecting rod, and a scraper (30) for cleaning mud and sand impurities is also fixedly mounted on the connecting rod (29).

2. A building seepage detection device according to claim 1, characterized in that: An elastic pad (34) is fixedly mounted on the cover plate (6), a balancing chamber (38) is arranged inside the cover plate (6), a balancing plate (40) is arranged inside the balancing chamber (38), a counterweight chamber (39) is arranged at the lower end of the cover plate (6), a counterweight ring (44) is arranged inside the counterweight chamber (39), a plurality of connecting ropes (43) are fixedly connected between the counterweight ring (44) and the balancing plate (40), two elastic first threaded sleeves (35) are fixedly mounted on the measuring rod (5), and a rigid second threaded sleeve (36) is fixedly mounted, and threaded strips (37) are fixedly mounted on the inner ring wall of the cover plate (6) and the inner ring wall of the balancing plate (40).

3. A building seepage detection device according to claim 2, characterized in that: A plurality of springs (46) are fixedly mounted on the outer ring of the counterweight ring (44), and a slider (45) is fixedly mounted on one end of each of the springs (46). An annular plate (47) is fixedly mounted on the inner wall of the counterweight bin (39), and a plurality of guide grooves (48) for limiting the position of the slider (45) are arranged on the inner wall of the annular plate (47), and the guide grooves (48) correspond one to one with the sliders (45).

4. A building seepage detection device according to claim 2, characterized in that: A plurality of balls (41) are movably mounted on the lower end of the balancing plate (40), a telescopic column (42) is fixedly mounted on the lower end of each of the balls (41), and the lower end of each of the telescopic columns (42) is fixedly connected to the inner wall of the balancing chamber (38).

5. A building seepage detection device according to claim 4, characterized in that: The thread strips (37) on the inner wall of the cover plate (6) are matched with the first threaded sleeve (35), and the thread strips (37) on the inner wall of the balance plate (40) are matched with the second threaded sleeve (36).

6. A building seepage detection device according to claim 1, characterized in that: A water collecting funnel (12) is fixedly mounted on the second floating block (15); the water collecting funnel (12) is located upstream of the blade (14), and a first floating block (13) is fixedly mounted on the water collecting funnel to provide buoyancy for the funnel.

7. A building seepage detection device according to claim 6, characterized in that: A filter screen (11) is fixedly installed at the water inlet of the water collecting funnel (12), and the filter screen (11) is arranged in a wedge shape.

8. A building seepage detection device according to claim 1, characterized in that: The scraper (30) is provided with a plurality of water filtering holes (31) for reducing its resistance in water, and the lower end of the scraper (30) is configured in a wedge shape for reducing friction between it and mud and sand impurities.

9. A building seepage detection device according to claim 1, characterized in that: Two elastic sealing strips (17) are fixedly mounted on the device bin (8), and a sealing ring (18) matching the sealing strips (17) is rotatably mounted on the rotating rod (16).

10. A building seepage detection device according to claim 3, characterized in that: The inner wall of the annular plate (47) is arranged to be arc-shaped.