A modeling method and system for safety-oriented railway interlocking system
Through the accident model and process of system theory, the railway interlocking system model is gradually constructed, which solves the problem that existing technology is difficult to deal with software interaction errors, and achieves the guarantee of the safety and reliability of the railway interlocking system.
Patent Information
- Application Number
- CN202410796198.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-20
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-06-20
AI Technical Summary
The existing technology is difficult to effectively deal with software interaction errors when conducting safety analysis of railway control systems, resulting in failure to detect potential hazards early in the early stages of system design.
Adopting the accident model and process of system theory, by constructing the initial, first increment and second increment railway interlocking system models, gradually introducing track sections and signals, updating the control structure and process model, focusing on system components unsafe interactions between them to ensure security constraints throughout the entire system life cycle.
Effectively discover dangerous situations in the system caused by component interaction failures, reduce the difficulty of system analysis, understand the causes of software dangers early, and ensure the safety and reliability of the system.
Smart Images

Figure CN118363368B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of system safety assessment, and in particular to a modeling method and system for a safety-oriented railway interlocking system. Background Art
[0002] In recent years, the railway sector has continued to flourish, gradually moving towards informatization and intelligence. Against the backdrop of this rapid development, railway safety has received much attention, as railway control systems are related to the safety of people's lives and property. Before they are officially put into use, it is essential to conduct a comprehensive safety analysis and inspection of railway control systems to ensure that all unacceptable risks are eliminated. To ensure system safety, adequate safety analysis should be conducted in the early stages of system design to detect and resolve potential hazards as early as possible.
[0003] In the field of control, traditional safety analysis techniques include fault tree analysis (FTA), hazard and operability analysis (HAZOP), and failure mode and effects analysis (FMEA). These methods can link component failures with system accidents and reduce system risks by reducing component failure rates. However, with the increasing density of software in control systems and the increasing attention paid to software interaction errors, the above analysis methods have shown limitations in dealing with software interaction errors. Summary of the invention
[0004] The main purpose of the present invention is to overcome the above-mentioned defects in the prior art and to propose a modeling method and system for a safety-oriented railway interlocking system. Based on the accident model and process of system theory, safety analysis is carried out, focusing on the unsafe interactions between system components, thereby helping to discover dangerous situations caused by the failure of component interactions in the system.
[0005] The present invention adopts the following technical solution:
[0006] A modeling method for a safety-oriented railway interlocking system, characterized by comprising the following steps:
[0007] Constructing the initial system theory accident model and process of the railway interlocking system, which includes the control structure and process model and safety constraints;
[0008] Construct the accident model and process of the first incremental system theory of railway interlocking system, introduce track sections and update the control structure and process model as well as safety constraints;
[0009] Construct the accident model and process of the second incremental system theory of railway interlocking system, decompose the track section into different types of entities and update the control structure and process model as well as safety constraints;
[0010] The accident model and process of the third incremental system theory of the railway interlocking system are constructed, the signal machine is introduced, and the control structure, process model and safety constraints are updated to obtain the final railway interlocking system.
[0011] The accident model and process of the initial system theory of the railway interlocking system are constructed, which includes a control structure, a process model and safety constraints. The control structure includes an automatic train monitoring system, an interlocking controller, a path controlled by the interlocking controller and a train; the process model includes a number of variables and their values; the safety constraints include not allowing two conflicting routes to be reserved at the same time, and the route refers to the path that a train passes through when running from a designated location to another designated location.
[0012] Furthermore, some of the variables include the mode of the current route, the mode of the current path, the state of the path and whether the path conflicts with other paths; the mode of the current route includes request mode, cancellation mode and idle mode; the mode of the current path includes idle mode and reserved mode; the state of the path includes idle state, occupied state and unoccupied state; whether the path conflicts with other paths includes conflict and non-conflict; the safety constraints are determined based on the dangers that may be caused when the control behavior is provided or not provided by some of the variables.
[0013] Furthermore, the automatic train monitoring system sends a route request message when the train approaches the network, or sends a route cancellation message to cancel the previously requested route; the interlocking controller is responsible for processing the route reservation and cancellation requests initiated by the automatic train monitoring system, and gradually releasing the track sections associated with the occupied route as the train moves along the track, and releasing the path after the track sections of the path are completely released.
[0014] Furthermore, track segments are introduced and the control structure is updated, wherein the path in the control structure includes a plurality of track segments. If a train is detected on a track segment, the track segment is in an occupied state, otherwise it is in an idle state; the track segment can be reserved, canceled or released.
[0015] Furthermore, track segments are introduced and the process model and safety constraints are updated. The status of the path is refined to indicate whether the track segment in the path is occupied, including unoccupied and occupied; whether the path conflicts with other paths is changed to whether the track segment of the path is reserved by other paths; a new variable is introduced: whether the track segment can be fully reserved by the path, including whether all can be reserved and not all can be reserved; a new variable is introduced: the mode of the track segment, including a reserved mode and an idle mode; a new variable is introduced: the status of the track segment, including an idle state, an occupied state and an unoccupied state; the updated safety constraint is: it is not allowed to reserve two routes with track segment conflicts at the same time.
[0016] Furthermore, the track segments are decomposed into entities of different types. Specifically, the track segments in the updated control structure are decomposed into linear segments and switches. A path includes multiple linear segments. When a train is detected on a linear segment, the linear segment is in an occupied state, otherwise it is in an idle state. The switch is a device on the track segment, which is used to change the direction of the train.
[0017] Furthermore, the track section is decomposed into different types of entities and the process model and safety constraints are updated. Specifically, new variables are introduced: whether all the switches in the path are in a locked state, including whether all the switches are locked and not all the switches are locked; new variables are introduced: whether all the switches in the path are correctly aligned to the specified position, including whether all are correctly aligned and not all are aligned; new variables are introduced: whether a specific switch is correctly aligned to the specified position, including whether the specific switch is correctly aligned and the specific switch is not aligned; the updated safety constraints increase: when there are switches in the wrong position in the path, the control behavior of the reserved path cannot be provided.
[0018] Furthermore, a signal is introduced to convey various signals and instructions to the train driver, and a green signal control behavior is set to indicate that the route is ready to receive the upcoming train; if the reserved route is to be cancelled, the red signal control behavior is used to change the signal to red, indicating that the route is no longer open; after the train enters the route, the red signal control behavior is used to change the signal to red, indicating that the route is occupied; the process model introduces a new variable signal state, whose values include red and green; the updated safety constraint is increased: when the signal is green, switch switching is not allowed.
[0019] A modeling system for a safety-oriented railway interlocking system, comprising:
[0020] Initial building block, constructing the initial system theory accident model and process of the railway interlocking system, which includes the control structure and process model as well as safety constraints;
[0021] The first incremental system module builds the accident model and process of the first incremental system theory of the railway interlocking system, introduces track sections and updates the control structure and process model as well as safety constraints;
[0022] The second incremental system module builds the accident model and process of the second incremental system theory of the railway interlocking system, decomposes the track section into different types of entities and updates the control structure and process model as well as safety constraints;
[0023] The third incremental system module constructs the accident model and process of the third incremental system theory of the railway interlocking system, introduces signal machines and updates the control structure, process model and safety constraints to obtain the final railway interlocking system.
[0024] It can be seen from the above description of the present invention that, compared with the prior art, the present invention has the following beneficial effects:
[0025] 1. The method of the present invention is based on the accident model and process of system theory to conduct safety analysis, focusing on the unsafe interactions between system components, thereby helping to discover dangerous situations caused by the failure of component interactions in the system.
[0026] 2. The method of the present invention adopts incremental development technology, which not only effectively reduces the difficulty of system analysis and avoids possible omissions when analyzing complex systems, but also enables early understanding of the dangerous causes of software and taking them into consideration so as to formulate corresponding improvement measures.
[0027] 3. The method of the present invention combines the accident model and process of system theory with incremental development technology, which not only continuously ensures that safety constraints run through the entire life cycle of the system, but also can promptly discover problems in the early stages of system development, thereby further ensuring the safety and reliability of the system. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 is a flow chart of the method of the present invention;
[0029] Figure 2 It is a railway track network topology diagram;
[0030] Figure 3 This is the initial control structure diagram of the railway interlocking system;
[0031] Figure 4 This is the control structure diagram for the first increment of the railway interlocking system;
[0032] Figure 5 This is the control structure diagram for the second increment of the railway interlocking system;
[0033] Figure 6 This is the control structure diagram for the third increment of the railway interlocking system.
[0034] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. DETAILED DESCRIPTION
[0035] The present invention is further described below through specific implementation modes.
[0036] The mission of the underground railway (abbreviated as "subway") signal system is to ensure driving safety, coordinate train operation, and improve transportation efficiency. In railway or subway stations and depots, there are many track sections that are interconnected to form different routes, and each route is only allowed to be used by one train. Whether a train can enter a specific route and whether there may be a route conflict are all coordinated by the interlocking system. The interlocking system is a key control system used in transportation systems such as railways, subways, and trams. Its main goal is to ensure the safe operation of trains in the railway network and prevent situations that may cause accidents or collisions. The interlocking system ensures that trains comply with specific driving rules and safety regulations during operation by monitoring signals, switches and other equipment on the railway tracks. The core functions of the interlocking system include the following aspects: Signal control: The interlocking system transmits various information to the train driver by controlling the status of the signal machine, such as instructions to stop, slow down, and accelerate. Switch control: The interlocking system manages the switches on the railway track to ensure that the train can pass safely when the switches are switched to avoid collisions or derailment. Route control: The interlocking system ensures that the train runs along a safe path during travel according to the train's direction and path planning, avoiding conflicts with other trains. Track section detection: The vehicle detection equipment monitors the train's position and running status to determine whether the train occupies the track section. On-board equipment interaction: The interlocking system exchanges information with the on-board equipment on the train, such as the automatic train monitoring system, to achieve automatic control and monitoring of the train.
[0037] For the sake of convenience, consider a simplified track network topology with 11 track sections, 1 turnout, and two signal machines, where the track section is represented by the letter "B", the turnout is represented by the letter "P", and the signal is represented by the letter "SG", as shown in Figure 2 shown.
[0038] Among them, the route refers to the running path that a railway train passes through from a certain designated location to another designated location. The route is determined by the positions of all the switch openings on its path (the route is usually a logical concept, usually with a signal at the starting point of the route, and the path is composed of the corresponding track segment entities). For example: the running path of route R1 is composed of track segments B2, B3 and B8, then the corresponding path of route R1 is B2->B3->B8. The automatic train monitoring system requests the interlocking system to reserve route R1. After the route R1 is successfully reserved, the signal SG1 related to route R1 will light up green (the signal is initially red), indicating that the train can pass through the current route R1. Before the train enters route R1, the automatic train monitoring system can cancel the reserved route R1 to the interlocking system. After the train enters route R1, the entry signal SG1 turns red, indicating that the route is no longer allowed to pass. The train occupies track segments B2, B3 and B8 in sequence. The train will release the corresponding track section after leaving. Before releasing track section B3, the relevant switch P1 will be unlocked after the train passes and leaves track section B3. When the train passes track section B8, all track sections in the route are released, and route R1 is released, allowing other trains to apply for use.
[0039] System-Theoretic Accident Model and Processes (STAMP), STAMP regards the safety analysis of complex systems as a control problem, and believes that safety is an emergent characteristic of complex systems. Accidents often originate from external disturbances, component failures (including software and hardware), or interaction failures of system components that are not effectively controlled. The theory focuses on analyzing the inadequate execution of safety constraints in system design, development, and operation. The core of STAMP is the control structure. By checking each link in the control loop, the causes of failure of the control object can be analyzed, and then the system safety constraints can be derived. Compared with traditional safety analysis methods, STAMP can more comprehensively analyze the factors that endanger the system, thereby obtaining more comprehensive safety requirements.
[0040] Based on the above analysis, the present invention proposes a modeling method for a safety-oriented railway interlocking system, including the following:
[0041] 1) Construct the initial system theory accident model and process of the railway interlocking system, which includes the control structure and process model as well as safety constraints.
[0042] In this step, an initial system-theoretical accident model and process are constructed, which includes three basic elements, namely, control structure and process model and safety constraints.
[0043] Control Structure: The control structure in STAMP is a representation of the hierarchical organization of control elements (controllers) and the control loops that interact with the physical process and each other. It includes information flows, feedback mechanisms, and relationships between different control levels. This structure is critical to identifying potential failure points in the system or unsafe interactions between components.
[0044] Process Model: A process model describes how the system operates under control actions, representing control information and feedback information between components. Process models are essential for understanding the dynamic behavior of the system and identifying how insufficient control can lead to dangerous conditions.
[0045] Safety Constraints: Safety constraints are explicit conditions derived from the control structure and process model that must be maintained to ensure safety. These constraints prevent or mitigate hazardous conditions and ensure that the system operates within safety limits. Safety constraints are the cornerstone of STAMP. Safety constraints provide clear goals for safety analysis and define safety criteria for system design and evaluation.
[0046] The initial STAMP is a relatively abstract model and process. In the initial STAMP, only the automatic train monitoring system, train and interlocking controllers, and the paths controlled by the interlocking controllers are considered. The remaining components will be considered in subsequent steps. The initial control structure diagram outlines the interactions between the various components and control elements. This is a key blueprint that guides all subsequent development and analysis activities. Figure 3 As shown, the solid line represents the control behavior and the dotted line represents the feedback behavior.
[0047] Specifically, the key components of the initial control structure include the automatic train monitoring system, the interlocking controller, the paths controlled by the interlocking controller, and the trains. The roles and responsibilities of each entity can be summarized as follows: Automatic train monitoring system: The automatic train monitoring system is responsible for sending route request messages to the computer interlocking system when the train approaches the network. If necessary, it can also issue a route cancellation message to cancel the previously requested route. Interlocking controller: The interlocking controller is responsible for processing route reservation and cancellation requests initiated by the automatic train monitoring system. In order to meet these requests, the interlocking controller performs control actions of reserving paths and canceling reserved paths accordingly. In addition, as the train moves along the track, the interlocking controller releases the paths associated with the idle routes. Trains: Trains are authorized to enter the paths of the reserved routes specifically assigned to them. They move along the paths of their respective reserved routes and eventually leave the paths.
[0048] Path: A path is a physical entity consisting of a series of interconnected track sections in a network topology. In order to correctly establish a path, all switches along the path must be converted and locked to the required position to allow the train to pass through the predetermined path. After constructing the control structure diagram, it is also necessary to construct the process model variables in the control structure. Table 1 details the process model in the initial computer interlocking system, including the relevant variables and their values.
[0049] Table 1: Variables and values of the initial process model of the subway interlocking system:
[0050]
[0051] When the automatic train monitoring system sends a route reservation request to the interlocking controller, the variable Route Mode, i.e., the mode of the current route, is set to "Request", "Cancel" when the automatic train monitoring system requests to cancel the reserved route, and "Free" when the interlocking controller does not receive any request, where Request represents the request mode, Cancel represents the cancel mode, and Free represents the free mode. For the Path Mode variable, the value "Free" means that the path has not been reserved by the interlocking controller, while "Reserve" means that the path has been reserved, Free represents the free mode, and Reserve represents the reserved mode. The variable Path State, i.e., the state of the path, is marked as "Free" before the train passes through the path, marked as "Occupy" when the train is on the path, and marked as "Unoccupy" once the train leaves the path, where FREE represents the free state, Occupy represents the occupied state, and Unoccupy represents the unoccupied state. For the variable No Conflicting Paths Res Others, that is, whether the path conflicts with other paths, if there is no conflict between the requested path and the reserved path, the value is assigned to "Yes", and if there is a conflict, the value is assigned to "No". After obtaining the process model variables, these variables will be analyzed one by one in the control behavior (such as Figure 3 The solid line part in the figure shows the possible dangers that may be caused by providing or not providing the reserved paths. For example, if the variable "NoConflicting Paths Res Others" provides the control behavior of the reserved paths when the value is "No", this will cause conflicts between the two reserved paths, thus creating a danger. Therefore, the safety constraint is: it is not allowed to reserve two conflicting paths at the same time.
[0052] 2) Construct the accident model and process of the first incremental system theory of the railway interlocking system, introduce track sections and update the control structure and process model as well as safety constraints.
[0053] Among them, during the first increment, the control structure has undergone changes to accommodate the addition of component track segments. Therefore, the modification of the control structure requires adjusting the roles and responsibilities of the controller to make them consistent with the newly introduced functions. The control structure diagram of the first increment is shown in the figure below: Figure 4 As shown in the figure, the key components of the first incremental control structure are the track segments. The roles and responsibilities of each entity can be summarized as follows:
[0054] Automatic Train Monitoring System: The Automatic Train Monitoring System is responsible for sending route request messages to the computer interlocking system when a train approaches the network. If necessary, it can also issue a route cancellation message to revoke a previously requested route. Interlocking Controller: The interlocking controller is responsible for processing route reservation and cancellation requests initiated by the Automatic Train Monitoring System. In order to meet these requests, the interlocking controller performs control actions to reserve paths and cancel reserved paths accordingly. In addition, as the train moves along the track, the interlocking controller will gradually release the track sections associated with the occupied route, and release the path after the track sections of the path are completely released. Train: Trains are authorized to enter the paths of the reserved routes specifically assigned to them. They move along the paths of their respective reserved routes and eventually leave the paths.
[0055] Track segment: A route consists of multiple track segments, each of which contains a track segment detection device. If a train is detected on the track segment, it is in occupied state, otherwise it is in idle state. Track segments can be reserved, cancelled and released.
[0056] The process model of the control structure has been modified to integrate new functions, optimize existing functions and introduce track blocks. The existing variable Path State has been refined to None of Track Blocks Are Occupied. If the value of Path State is "Occupy", i.e. the track blocks that make up the path are occupied, the variable None of Track Blocks Are Occupied is set to "No"; otherwise, the value is "Yes". In addition, the variable No Conflicting Paths Are Res Others has been changed to the variable None of Track Blocks Are Reserved Others, i.e. a conflict between paths is considered if a track block is reserved by another path. The newly introduced variable AllBlocks Are Res Oneself is "Yes" if each track block that makes up the path can be reserved; otherwise, the value is "No". In addition, the newly added Track Block Mode variable is set to "Reserve" when the track block is reserved; otherwise, the value is "Free". In addition, the new variable Track Block State is assigned the value "Free" when the train has not yet passed the track block; the value "Occupy" when the track block is currently occupied by a train; and the value "Unoccupy" when the train passes and no longer occupies the track block. A detailed explanation of the updated process model variables and their corresponding values can be found in Table 2. Table 2 provides a comprehensive overview of these variables, clearly showing their values.
[0057] Table 2: Process variables and values of the first increment of the subway interlocking system:
[0058]
[0059] After obtaining the process model variables, the variables will be analyzed one by one to provide control behavior ( Figure 4For example, if the variable "None of Track Blocks Are Reserved Others" (whether the track block of this path is reserved by other paths) is set to No, the control behavior of the reserved path is provided, which will cause the track block between the two reserved routes to conflict, thus creating a hazard. Therefore, the safety constraint is: it is not allowed to reserve two routes with conflicting track blocks at the same time.
[0060] 3) Construct the accident model and process of the second incremental system theory of railway interlocking system, decompose the track section into different types of entities and update the control structure and process model as well as safety constraints.
[0061] In the second increment, the track segments in the updated control structure are decomposed into two types of entities: linear segments and turnouts. Therefore, the modification of the control structure requires adjusting the roles and responsibilities of the components to make them consistent with the newly introduced functions. The control structure diagram of the second increment is shown in the figure below: Figure 5 As shown, the roles and responsibilities of the various entities can be summarized as follows:
[0062] Automatic Train Monitoring System: The Automatic Train Monitoring System is responsible for sending route request messages to the computer interlocking system when the train approaches the network. If necessary, it can also issue a route cancellation message to cancel the previously requested route. Interlocking Controller: The interlocking controller is responsible for processing route reservation and cancellation requests initiated by the Automatic Train Monitoring System. In order to meet these requests, the interlocking controller performs control actions to reserve paths and cancel reserved paths accordingly. In addition, as the train moves along the track, the interlocking controller will gradually release the switches and track sections associated with the occupied routes. After the track sections and switches of the path are fully released, the path is released. Train: Trains are authorized to enter the path of the reserved routes specially assigned to them. They move along the paths of their respective reserved routes and eventually leave the path. Linear Segment: A path consists of multiple track segments. There are no switches on the linear track segments. Each track segment contains a track segment detection device. If a train is detected on the track segment, it is in the occupied state, otherwise it is in the idle state. Switch: A switch is a device on the track segment used to change the direction of train travel. The turnout includes a switch and a locking device. The switch is used to control the opening and closing direction of the turnout to ensure that the train can pass through the switch area smoothly and travel along the specified route or direction. In addition, the turnout is equipped with a locking device, and the locked turnout cannot change its position. The process model of the control structure has been modified to integrate new functions, optimize existing functions and introduce turnouts. When reserving a path, you need to reserve a track section first. If the track section contains a turnout, you need to switch the turnout to the position required by the route and lock it. When canceling a reserved path, the process now involves three control behaviors. First, you need to execute the control behavior of unlocking the turnout. Next, execute the control behavior of canceling the section. Finally, it is determined that all track sections in the path are canceled and all turns are unlocked before the control behavior of canceling the path can be executed.
[0063] The control action Path Release has been split into three separate steps. The control action Release Segment now manages the orderly release of individual track segments, which are released when the train leaves the segment. If the track segment contains switches, the control action Unlock Switches needs to be executed first. Finally, once the entire path has been confirmed to have been released, the Path Release control action is executed.
[0064] The process model of STAMP has been revised again, which includes the introduction of several new variables. One of the newly added variables is All Points Are Aligned Correctly, which is set to "Yes" when all the switches that make up the path are in the required position; otherwise, it is set to "No". In addition, the variable All Points Are Locked is set to "Yes" when all the switches on the initial path are locked, and to "No" if there are switches on the initial path that are not locked. The variable PointPosition takes the value "Aligned" when the switch is correctly aligned to the required position of the route; otherwise, it is considered "Unaligned". Similarly, the Point Mode variable is marked as "Lock" when the switch is in the locked state; conversely, if the switch is not locked, its value is "Unlock". To have a more detailed understanding of these revisions, an in-depth description of the new process model variables and their specific values can be found in Table 3. This table presents these variables in a clear and orderly manner, helping to better grasp their respective values and their meanings in the updated STAMP.
[0065] Table 3: Process variables and values of the second increment of the subway interlocking system:
[0066]
[0067] After obtaining the process model variables, the variables will be analyzed one by one to provide control behavior ( Figure 5 The danger caused by not providing control behavior is that if the variable "All Points Are AlignedCorrectly" (whether all turnouts in the path are correctly aligned to the specified position) is set to No, the control behavior of the reserved path is provided, which causes the train to enter the route with the wrong turnout position. Therefore, the safety constraint is: when there is a turnout in the wrong position in the path, the control behavior of the reserved path cannot be provided.
[0068] 4) Construct the accident model and process of the third incremental system theory of the railway interlocking system, introduce the signal machine and update the control structure, process model and safety constraints to obtain the final railway interlocking system.
[0069] The signal machine is introduced in the final STAMP. Therefore, the modification of the control structure requires adjusting the roles and responsibilities of the components to make them consistent with the newly introduced functions. The control structure diagram of the final model is as follows: Figure 6 .
[0070] Automatic train monitoring system: The automatic train monitoring system is responsible for sending route request messages to the computer interlocking system when the train approaches the route. If necessary, it can also issue a route cancellation message to cancel the previously requested route. Interlocking controller: The interlocking controller is responsible for processing route reservation and cancellation requests initiated by the automatic train monitoring system. In order to meet these requests, the interlocking controller performs control actions to reserve and cancel reserved paths accordingly. In addition, as the train moves along the track, the interlocking controller will gradually release the switches and track sections associated with the occupied route. After the track sections and switches of the path are fully released, the path is released. Train: Trains are authorized to enter the path of the reserved route specially assigned to them. They move along the path of their respective reserved routes and eventually leave the path. Linear section: A path consists of multiple track sections. There are no switches on the linear track section. Each track section contains a track section detection device. If a train is detected on the track section, it is in an occupied state, otherwise it is in an idle state. Switch: The track section contains switches, and the switch contains switches and locking devices. The switch is a device used to control the turnout and change its opening and closing direction. The switch enables the train to pass smoothly in the turnout area and allows the train to run along the specified route or direction. The turnout also contains a locking device, and the locked turnout cannot be moved.
[0071] Signal: used to convey various signals and instructions to the train driver to ensure the safe operation of the train on the railway. Green means that the route is passable, and red means that the route is not passable and the train needs to stop.
[0072] After confirming that the route reservation is successful, a green signal control behavior is introduced to indicate that the route is ready for the upcoming train. In addition, if the reserved route needs to be cancelled, a red signal control behavior will be used to turn the signal red, indicating that the route is no longer open. In addition, after the train enters the route, the signal will turn red again, indicating that the route is occupied. The process model of STAMP has been further updated to integrate the new Signal State variable. This variable is assigned "Green", indicating that the route path is clear and the train has been authorized to move forward; otherwise, the signal state is set to "Red". As shown in Table 4:
[0073] Table 4: Process variables and values of the third increment of the subway interlocking system:
[0074]
[0075] After obtaining the process model variables, the variables will be analyzed one by one to provide control behavior ( Figure 6Solid line part) or no control behavior is provided. For example, if the variable "Signal State" is set to Green, the control behavior of switching the turnout is provided, which will cause the train to enter the path where the turnout position is incorrect, thus creating a danger. Therefore, the safety constraint is: when the signal is green, switching the turnout is not allowed.
[0076] The present invention utilizes incremental development technology to gradually build STAMP, only considering some components in the initial stage, and gradually introducing more components as the analysis goes deeper, until finally building a complete STAMP model. This process effectively reduces the difficulty of software-intensive system analysis. By building the STAMP of the underground railway interlocking system, developers can find possible problems in the system and eliminate potential safety hazards to ensure that the system has a high degree of safety and reliability.
[0077] The above is only a specific implementation of the present invention, but the design concept of the present invention is not limited thereto. Any non-substantial changes to the present invention using this concept shall be deemed as an infringement of the protection scope of the present invention.
Claims
1. A modeling method for safety-oriented railway interlocking system, It is characterized in that These include: Constructing an accident model and process of the initial system theory of a railway interlocking system, which includes a control structure, a process model and safety constraints; the control structure includes an automatic train monitoring system, an interlocking controller, a path controlled by the interlocking controller and a train; the process model includes a number of variables and their values; the safety constraint includes not allowing two conflicting routes to be reserved at the same time, and the route refers to the path that a train passes through when it runs from a designated location to another designated location; the variables include the mode of the current route, the mode of the current path, the state of the path and whether the path conflicts with other paths; the mode of the current route includes a request mode, a cancel mode and an idle mode; the mode of the current path includes an idle mode and a reserved mode; the state of the path includes an idle state, an occupied state and an unoccupied state; whether the path conflicts with other paths includes whether there is a conflict and whether there is no conflict; the safety constraints are determined according to the dangers caused by the control behavior provided or not provided by the variables; Construct the accident model and process of the first incremental system theory of railway interlocking system, introduce track sections and update the control structure and process model as well as safety constraints; Construct the accident model and process of the second incremental system theory of railway interlocking system, decompose the track section into different types of entities and update the control structure and process model as well as safety constraints; The accident model and process of the third incremental system theory of the railway interlocking system are constructed, the signal machine is introduced, and the control structure, process model and safety constraints are updated to obtain the final railway interlocking system.
2. A modeling method for a safety-oriented railway interlocking system as claimed in claim 1, It is characterized in that The automatic train monitoring system sends a route request message when the train approaches the network, or sends a route cancellation message to cancel the previously requested route; the interlocking controller is responsible for processing the route reservation and cancellation requests initiated by the automatic train monitoring system, and gradually releasing the track sections associated with the occupied route as the train moves along the track, and releasing the route after the track sections of the path are completely released.
3. A modeling method for a safety-oriented railway interlocking system as claimed in claim 1, It is characterized in that Track segments are introduced and the control structure is updated. The path in the control structure includes multiple track segments. If a train is detected on a track segment, the track segment is in an occupied state, otherwise it is in an idle state. The track segment can be reserved, cancelled or released.
4. A modeling method for a safety-oriented railway interlocking system as claimed in claim 2, It is characterized in that Track segments are introduced and the process model and safety constraints are updated. The status of the path is refined to indicate whether the track segment in the path is occupied, including unoccupied and occupied. Whether the path conflicts with other paths is changed to whether the track segment of the path is reserved by other paths. A new variable is introduced: whether the track segment can be fully reserved by the path, including whether all can be reserved and not all can be reserved. A new variable is introduced: the mode of the track segment, including the reserved mode and the idle mode. A new variable is introduced: the status of the track segment, including the idle state, the occupied state and the unoccupied state. The updated safety constraint is: it is not allowed to reserve two routes with track segment conflicts at the same time.
5. A modeling method for a safety-oriented railway interlocking system as claimed in claim 1, It is characterized in that The track segments are decomposed into entities of different types. Specifically, the track segments in the updated control structure are decomposed into linear segments and switches. A path includes multiple linear segments. When a train is detected on a linear segment, the linear segment is in an occupied state, otherwise it is in an idle state. The switch is a device on the track segment, which is used to change the direction of the train.
6. A modeling method for a safety-oriented railway interlocking system as claimed in claim 1, It is characterized in that The track section is decomposed into different types of entities and the process model and safety constraints are updated. Specifically, a new variable is introduced: whether all the switches in the path are in a locked state, including all the switches are locked and not all the switches are locked; a new variable is introduced: whether all the switches in the path are correctly aligned to the specified position, including all correctly aligned and not all aligned; a new variable is introduced: whether a specific switch is correctly aligned to the specified position, including the specific switch is correctly aligned and the specific switch is not aligned; the updated safety constraint increases: when there are switches in the wrong position in the path, the control behavior of the reserved path cannot be provided.
7. A modeling method for a safety-oriented railway interlocking system as claimed in claim 5, It is characterized in that The signal is introduced to convey various signals and instructions to the train driver, and the green signal control behavior is set to indicate that the route is ready to receive the upcoming train; if the reserved route is to be cancelled, the red signal control behavior is used to turn the signal to red, indicating that the route is no longer open; after the train enters the route, the red signal control behavior is used to turn the signal to red, indicating that the route is occupied; the process model introduces a new variable signal state, whose values include red and green; the updated safety constraint is increased: when the signal is green, the switch is not allowed to be switched.
8. A modeling system for safety-oriented railway interlocking systems, It is characterized in that A modeling method for a safety-oriented railway interlocking system according to any one of claims 1 to 7, comprising: Initial building block, constructing the initial system theory accident model and process of the railway interlocking system, which includes the control structure and process model as well as safety constraints; The first incremental system module builds the accident model and process of the first incremental system theory of the railway interlocking system, introduces track sections and updates the control structure and process model as well as safety constraints; The second incremental system module builds the accident model and process of the second incremental system theory of the railway interlocking system, decomposes the track section into different types of entities and updates the control structure and process model as well as safety constraints; The third incremental system module constructs the accident model and process of the third incremental system theory of the railway interlocking system, introduces signal machines and updates the control structure, process model and safety constraints to obtain the final railway interlocking system.
Citation Information
Patent Citations
Rail transit train control system danger analysis method and equipment based on communication
CN115729210A
Rail transit interlocking system safety analysis and development method and device
CN116187104A
High-speed railway interlocking system safety analysis method, system, equipment and medium
CN117670630A
Method for checking safety requirements of SSI-based data used in an interlocking control system
EP3395643A1
Dispatch control over train motion at its approach to occupied track section and system to this end
RU2511742C1