Ultra-high purity helium purification system and purification method
By analyzing and optimizing the status and temperature control data of the helium purification equipment in real time in the helium purification system, the problem of the inability to effectively supervise and regulate the existing equipment is solved, the helium purification efficiency and impurity removal efficiency are improved, and the helium purification efficiency is ensured. Stability and safety of the purification process.
Patent Information
- Application Number
- CN202410804343.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-21
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-06-21
AI Technical Summary
Existing helium purification equipment cannot be effectively supervised and regulated, resulting in low purification efficiency, unstable equipment, and inability to respond to emergency situations during operation in a timely manner, affecting the high-purity demand for helium.
Design an ultra-high purity helium purification system, including a purification supervision platform, information storage unit, operation supervision unit, conversion processing unit, processing self-test unit and fusion analysis unit. Through real-time collection and analysis of status risk data and temperature control data, Generate operation and management instructions, conduct safety supervision feedback analysis and heating conversion safety supervision analysis, optimize equipment operation and impurity removal efficiency, and conduct risk assessment and control based on historical information and curve charts.
It improves the helium purification efficiency and impurity removal efficiency, ensures the stability and safety of the helium purification process, provides timely early warning feedback management, and enhances the stability and emergency management capabilities of the equipment.
Smart Images

Figure CN118373390B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of helium purification, and in particular to an ultra-high purity helium purification system and a purification method. Background Art
[0002] With the development of science and technology, the demand for high-purity gases in the electronics and chemical industries is increasing. Taking the semiconductor industry as an example, it has made great progress in highly integrated high-quality products, and high integration requires materials with high purity, including high-purity gases. Gas purity is an important factor that directly affects the quality of devices;
[0003] High-purity gas is the most important basic material for industries such as integrated circuits, photovoltaics, optical fibers, and light-emitting diodes. As production requirements for high-purity gas (electronic gas) become higher and higher, the sensitivity of impurity analysis in electronic gas will be required to be at the ppb level. Harmful impurities in electronic gas are mainly oxygen and carbon compounds, such as water, oxygen, carbon monoxide, carbon dioxide, methane, etc. Therefore, it is necessary to maximize the purity of helium through technical means. However, in the existing technology, it is impossible to supervise and analyze the purification equipment, and thus it is impossible to ensure the stable operation and high-efficiency purification rate of the purification equipment, thereby reducing the working efficiency of the purification equipment, and it is impossible to supervise the heating and conversion of the raw gas during the working process, thereby affecting the subsequent impurity removal efficiency, resulting in reduced purification efficiency, which is not conducive to the stable purification treatment of the equipment, and it is impossible to regulate the supervision of the purification equipment, thereby reducing the timeliness of emergency management during the operation of the equipment;
[0004] In view of the above technical defects, a solution is now proposed. Summary of the invention
[0005] The purpose of the present invention is to provide an ultra-high purity helium purification system and purification method to solve the above-mentioned technical defects. The present invention analyzes from two perspectives, the front end and the main body, to ensure the safety of the entire helium purification process, and at the same time helps to improve the helium purification efficiency, and helps to make early warning feedback management in a timely manner to ensure the stable progress of the helium purification process. Under the premise that the raw gas heating conversion is normal, the processing data is subjected to purification processing supervision evaluation analysis for timely early warning feedback management, and the purification equipment is adjusted according to the information feedback situation, on the one hand, the purification efficiency of the purification equipment is improved, and on the other hand, the impurity removal efficiency of the purification equipment is improved, and in-depth analysis is performed through information feedback to perform information fusion risk assessment analysis, and at the same time, historical information and curves are combined for analysis, so as to adjust the supervision intensity of the purification equipment according to the information feedback situation to ensure the stable operation of the purification equipment and the stability of the purification efficiency.
[0006] The purpose of the present invention can be achieved by the following technical solutions: an ultra-high purity helium purification system, including a purification supervision platform, an information storage unit, an operation supervision unit, a conversion processing unit, a processing self-checking unit, a fusion analysis unit and an execution management unit. When the purification supervision platform generates an operation management instruction, the operation management instruction is sent to the information storage unit. After receiving the operation management instruction, the information storage unit immediately collects the state risk data and temperature control data of the helium purification, the state risk data includes a supply risk value and a parameter risk value, and the temperature control data includes a potential impact value and an operation interference value, and the state risk data and the temperature control data are sent to the operation supervision unit and the conversion processing unit respectively;
[0007] After receiving the state risk data, the operation supervision unit immediately performs operation pre-processing safety supervision feedback analysis on the state risk data, sends the obtained normal signal to the conversion processing unit, and sends the obtained risk signal to the execution management unit;
[0008] After receiving the temperature control data and the normal signal, the conversion processing unit immediately performs a heating conversion safety supervision analysis on the temperature control data, sends the obtained feedback signal to the processing self-checking unit, and sends the obtained abnormal signal to the execution management unit through the processing self-checking unit;
[0009] After receiving the feedback signal, the processing self-checking unit immediately collects the processing data of the purification equipment, including the efficiency risk value and the impurity interference value, and performs purification processing supervision evaluation analysis on the processing data, and sends the obtained optimization signal or control signal to the execution management unit, and sends the obtained stable signal to the fusion analysis unit;
[0010] After receiving the stable signal, the fusion analysis unit immediately conducts information fusion risk assessment analysis and sends the obtained policy signal to the execution management unit.
[0011] Preferably, the pre-processing safety supervision feedback analysis process of the operation supervision unit is as follows:
[0012] S1: Set a supervision cycle and mark the supervision cycle as a time threshold, and obtain the supply risk value of the entire purification equipment within the time threshold. The supply risk value represents the product of the fluctuation frequency of the power supply voltage of the front-end power supply and the number of power supply failures after data normalization, and then the product of the protection risk value after data normalization. The number of power supply failures includes the number of short circuits and leakages. The protection risk value represents the product of the number of overload operations of the cooling fan and the warning feedback duration after data normalization. The overload operation number represents the number of times the operating power exceeds the rated operating power and the ratio of the single operation duration exceeds the preset threshold. The warning feedback duration represents the time between the start time of the cooling failure warning feedback and the warning execution time.
[0013] S2: Obtain the parameter risk value of the entire purification equipment within the time threshold. The parameter risk value indicates the number of values corresponding to the operating parameters of the entire purification equipment that meet the preset range. The operating parameters include vibration frequency and abnormal sound decibel value. Compare and analyze the supply risk value and parameter risk value with the preset supply risk value threshold and preset parameter risk value threshold that are stored internally:
[0014] If the supply risk value is less than the preset supply risk value threshold, and the parameter risk value is equal to the preset parameter risk value threshold, a normal signal is generated;
[0015] If the supply risk value is greater than or equal to the preset supply risk value threshold, or the parameter risk value is not equal to the preset parameter risk value threshold, a risk signal is generated.
[0016] Preferably, the heating conversion safety supervision analysis process of the conversion processing unit is as follows:
[0017] T1: Get the potential impact value of the compressor within the time threshold. The potential impact value represents the product of the portion of the actual operating voltage of the compressor that deviates from the rated voltage and the portion of the time between the initial operating temperature and the maximum operating temperature that is lower than the preset threshold after data normalization.
[0018] T2: Obtain the operation interference value of the compressor within the time threshold. The operation interference value indicates the portion of the conversion rate of the raw gas carbon monoxide to carbon dioxide in the compressor that is lower than the preset threshold, and then the product value obtained by normalizing the data with the ratio between the overpressure operation time and the operation time. The overpressure operation time indicates the total operation time corresponding to the compressor operation voltage exceeding the rated operation voltage, and the operation time indicates the time from the time the compressor is put into use to the current time.
[0019] T3: Compare and analyze the potential impact value and the operation interference value with the preset potential impact value threshold and the preset operation interference value threshold that are stored internally:
[0020] If the potential impact value is less than the preset potential impact value threshold, and the operation interference value is less than the preset operation interference value threshold, a feedback signal is generated;
[0021] If the potential impact value is greater than or equal to a preset potential impact value threshold, or the operation interference value is greater than or equal to a preset operation interference value threshold, an abnormal signal is generated.
[0022] Preferably, the purification treatment supervision evaluation analysis process of the treatment self-checking unit is as follows:
[0023] SS1: Divide the time threshold into i sub-time periods, where i is a natural number greater than zero, and obtain the efficiency risk value of the purification equipment in each sub-time period. The efficiency risk value represents the length of the line segment of the purification work efficiency change curve of the purification equipment in the sub-time period that is below the preset purification work efficiency change curve;
[0024] SS2: Obtain the impurity interference value of the purification equipment in each sub-time period. The impurity interference value represents the product of the portion of the carbon dioxide impurity removal rate lower than the preset threshold and the number of separation rates corresponding to the liquefaction separation parameters lower than the preset threshold after data normalization. The liquefaction separation parameters include oxygen and nitrogen. The efficiency risk value and the impurity interference value are labeled XLi and ZAi respectively.
[0025] SS3: Obtain the optimized demand assessment coefficient Ri of each sub-time period according to the formula, establish a rectangular coordinate system with the number of sub-time periods as the X-axis and the optimized demand assessment coefficient Ri as the Y-axis, draw the optimized demand assessment coefficient curve by plotting points, and draw the preset optimized demand assessment coefficient curve in the coordinate system, obtain the minimum trough value of the optimized demand assessment coefficient curve from the coordinate system, and mark the minimum trough value of the optimized demand assessment coefficient curve obtained from the coordinate system as the optimized value, and perform discriminant analysis on the optimized value:
[0026] If the optimized value is below the preset optimization demand assessment coefficient curve, an optimization signal is generated;
[0027] If the optimized value is located above or on the preset optimization demand assessment coefficient curve, a resolution instruction is generated.
[0028] Preferably, when the processing self-checking unit generates a resolution instruction:
[0029] The length of the line segment connecting the two points is obtained from the optimization demand evaluation coefficient curve, and the length of the line segment connecting the two points obtained from the optimization demand evaluation coefficient curve is marked as the change line value, and the change line value is compared and analyzed with the internal preset change line value threshold, and the ratio of the number of line segments corresponding to the change line value greater than the preset change line value threshold to the total number of line segments is marked as the floating optimization coefficient, and the floating optimization coefficient is compared and analyzed with the preset floating optimization coefficient threshold entered and stored internally:
[0030] If the floating optimization coefficient is less than the preset floating optimization coefficient threshold, a stable signal is generated;
[0031] If the floating optimization coefficient is greater than or equal to the preset floating optimization coefficient threshold, a control signal is generated.
[0032] Preferably, the information fusion risk assessment analysis process of the fusion analysis unit is as follows:
[0033] Obtain the optimization value corresponding to the stable signal within the time threshold, obtain the potential impact value and operation interference value corresponding to the feedback signal within the time threshold, obtain the supply risk value and parameter risk value corresponding to the normal signal within the time threshold, and label the optimization value, potential impact value, operation interference value, supply risk value and parameter risk value as YZ, QY, YG, GG, CF respectively;
[0034] According to the formula The purification risk assessment coefficient is obtained, where f1, f2, f3, f4 and f5 are preset weight factor coefficients of optimization value, potential impact value, operation interference value, supply risk value and parameter risk value, respectively. f1, f2, f3, f4 and f5 are all positive numbers greater than zero. f6 is a preset fault tolerance factor coefficient, and the value of f6 is 2.914. P is the purification risk assessment coefficient. The purification risk assessment coefficients of m historical normal purification equipment are obtained, and m is a natural number greater than zero. A rectangular coordinate system is established with the number of purification risk assessment coefficients as the X-axis and the purification risk assessment coefficient as the Y-axis. The purification risk assessment coefficient curve is drawn by plotting points, and then all rising lines are obtained from the purification risk assessment coefficient curve. The length value of the segment is obtained, and the length values of all rising line segments obtained from the purification risk assessment coefficient curve are marked as potential values, and the potential value is compared and analyzed with the preset potential value threshold stored internally, and the ratio of the number of rising line segments corresponding to the potential value greater than the preset potential value threshold to the total number of rising line segments is marked as an excessive risk value, and at the same time, the ratio of the number of rising line segments to the total number of line segments in the purification risk assessment coefficient curve is obtained, and the ratio of the obtained number of rising line segments to the total number of line segments in the purification risk assessment coefficient curve is marked as a trend ratio, and the product value obtained after data normalization of the excessive risk value and the trend ratio is marked as a control demand value, and the control demand value is compared and analyzed with the preset control demand value threshold stored internally:
[0035] If the control demand value is less than the preset control demand value threshold, no signal is generated;
[0036] If the control demand value is greater than or equal to the preset control demand value threshold, a control signal is generated.
[0037] The beneficial effects of the present invention are as follows:
[0038] (1) The present invention ensures the safety of the entire helium purification process by analyzing from two perspectives: the front end and the main body. It also helps to improve the helium purification efficiency and to make early warning feedback management in a timely manner to ensure the stable progress of the helium purification process. From the front end perspective, the state risk data is analyzed for operation preprocessing safety supervision feedback to understand the risk situation of the entire purification equipment operation factors, so as to optimize the purification equipment with operation risks to ensure the purification safety and stability of the purification equipment. Under the premise that the front end power supply is normal, the temperature control data of the main body is analyzed for heating conversion safety supervision to determine whether the raw gas is safely and normally converted after being heated by the compressor, so as to ensure the carbon dioxide conversion efficiency and reduce the risk of affecting the subsequent helium purification efficiency.
[0039] (2) Under the premise that the heating and conversion of the raw gas is normal, the present invention conducts purification processing supervision evaluation and analysis on the processing data to determine whether the purification equipment is working normally, so as to provide timely early warning feedback management, and at the same time adjust the purification equipment according to the information feedback, so as to improve the purification efficiency of the purification equipment on the one hand and the impurity removal efficiency of the purification equipment on the other hand, and conducts in-depth analysis and information fusion risk evaluation and analysis through information feedback to determine whether the purification risk of the entire purification equipment is too high, and at the same time conducts analysis in combination with historical information and curve charts, so as to adjust the supervision intensity of the purification equipment according to the information feedback, so as to ensure the stable operation of the purification equipment and the stability of the purification efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] The present invention will be further described below in conjunction with the accompanying drawings;
[0041] Figure 1 It is a flowchart of the system of the present invention;
[0042] Figure 2 It is a reference diagram of the method of the present invention. DETAILED DESCRIPTION
[0043] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0044] Embodiment 1:
[0045] See also Figure 1 to Figure 2As shown, the present invention is an ultra-high purity helium purification system, including a purification supervision platform, an information storage unit, an operation supervision unit, a conversion processing unit, a processing self-checking unit, a fusion analysis unit and an execution management unit, the purification supervision platform is connected to the information storage unit in a one-way communication, the information storage unit is connected to the operation supervision unit and the conversion processing unit in a one-way communication, the operation supervision unit is connected to the conversion processing unit and the execution management unit in a one-way communication, the conversion processing unit is connected to the processing self-checking unit in a one-way communication, the processing self-checking unit is connected to the fusion analysis unit and the execution management unit in a one-way communication, and the fusion analysis unit is connected to the execution management unit in a one-way communication;
[0046] When the purification supervision platform generates an operation and management instruction, the operation and management instruction is sent to the information storage unit. After receiving the operation and management instruction, the information storage unit immediately collects the state risk data and temperature control data of helium purification, and performs safety supervision on the helium purification process through the state risk data and temperature control data to ensure the safety of the entire helium purification process, while helping to improve the efficiency of helium purification and to make early warning feedback management in a timely manner to ensure the stability of the helium purification process. Among them, the state risk data includes the supply risk value and the parameter risk value, and the temperature control data includes the potential impact value and the operation interference value. The state risk data and the temperature control data are sent to the operation supervision unit and the conversion processing unit respectively. The helium purification process is as follows: the raw gas is heated after passing through a compressor, so that the carbon monoxide and oxygen in the raw gas react completely and are all converted into carbon dioxide, and then the raw gas is cooled and enters the adsorber to remove carbon dioxide impurities in the raw gas, and then the raw gas is cooled and then enters the gas-liquid separator to separate the partially liquefied oxygen, nitrogen and argon, and then the raw gas passes through the absorption tower from bottom to top, and passes through the absorption tower from top to bottom with high-purity liquid nitrogen as an absorbent, and the raw gas coming out of the top of the tower is heat exchanged with negative pressure liquid nitrogen for cooling, and the raw gas is cooled and separated from the gas and liquid again, and the gas is further condensed to separate the nitrogen, and then the raw gas enters the low-temperature adsorber to remove the nitrogen in the raw gas by adsorption;
[0047] After receiving the status risk data, the operation supervision unit immediately conducts operation pre-processing safety supervision feedback analysis on the status risk data to understand the operation risk of the entire purification equipment, so as to optimize the purification equipment with operation risks to ensure the purification safety and stability of the purification equipment, and at the same time help the normal operation of the purification equipment to ensure the purification efficiency of helium. The specific pre-processing safety supervision feedback analysis process is as follows:
[0048] A supervision cycle is set, and the supervision cycle is marked as a time threshold, and the supply risk value of the entire purification equipment within the time threshold is obtained. The supply risk value represents the product of the fluctuation frequency of the power supply voltage of the front-end power supply and the number of power supply failures after data normalization, and then the product of the protection risk value after data normalization. The number of power supply failures includes the number of short circuits, the number of leakages, etc. The protection risk value represents the product of the number of overload operations of the cooling fan and the warning feedback duration after data normalization. The number of overload operations represents the number of times the operating power exceeds the rated operating power and the ratio of the single operation duration exceeds the preset threshold. The warning feedback duration represents the time between the start time of the cooling failure warning feedback and the warning execution time. It should be noted that the supply risk value is an influencing parameter reflecting the risk of the front-end power supply of the entire purification equipment. The larger the value of the supply risk value, the greater the operating risk of the entire purification equipment.
[0049] The parameter risk value of the entire purification equipment within the time threshold is obtained. The parameter risk value indicates the number of values corresponding to the operating parameters of the entire purification equipment that meet the preset range. The operating parameters include vibration frequency, abnormal sound decibel value, etc. It should be noted that the larger the value of the parameter risk value, the greater the operating risk of the entire purification equipment;
[0050] Compare and analyze the supply risk value and parameter risk value with the preset supply risk value threshold and preset parameter risk value threshold that are stored internally:
[0051] If the supply risk value is less than the preset supply risk value threshold, and the parameter risk value is equal to the preset parameter risk value threshold, a normal signal is generated and sent to the conversion processing unit;
[0052] If the supply risk value is greater than or equal to the preset supply risk value threshold, or the parameter risk value is not equal to the preset parameter risk value threshold, a risk signal is generated and sent to the execution management unit. After receiving the risk signal, the execution management unit immediately performs the preset early warning operation corresponding to the risk signal, so as to timely perform operation management and parameter adjustment of the entire purification equipment to ensure the stability of power supply and the safety of operation;
[0053] After receiving the temperature control data and normal signals, the conversion processing unit immediately performs heating conversion safety supervision analysis on the temperature control data to determine whether the raw gas is safely converted after being heated by the compressor to ensure the subsequent helium purification efficiency. The specific heating conversion safety supervision analysis process is as follows:
[0054] The potential impact value of the compressor within the time threshold is obtained. The potential impact value represents the product of the portion of the actual operating voltage of the compressor that deviates from the rated voltage and the portion of the time between the initial operating temperature and the maximum operating temperature that is lower than the preset threshold after data normalization. It should be noted that the larger the value of the potential impact value, the greater the risk of the compressor affecting the heating of the raw gas, and the greater the risk of the helium purification process;
[0055] The operation interference value of the compressor within the time threshold is obtained. The operation interference value indicates the portion of the conversion rate of the raw gas carbon monoxide to carbon dioxide in the compressor that is lower than the preset threshold, and then the product value is obtained after data normalization processing with the ratio between the overpressure operation time and the operation time. The overpressure operation time indicates the total operation time corresponding to the compressor operation voltage exceeding the rated operation voltage. The operation time indicates the time between the time when the compressor is put into use and the current time. It should be noted that the larger the value of the operation interference value, the greater the risk of the compressor affecting the heating of the raw gas, the greater the risk of the helium purification process, and the greater the risk of impurity removal damage;
[0056] Compare and analyze the potential impact value and the operation interference value with the preset potential impact value threshold and the preset operation interference value threshold that are stored internally:
[0057] If the potential impact value is less than the preset potential impact value threshold, and the operation interference value is less than the preset operation interference value threshold, a feedback signal is generated and sent to the processing self-check unit;
[0058] If the potential impact value is greater than or equal to the preset potential impact value threshold, or the operating interference value is greater than or equal to the preset operating interference value threshold, an abnormal signal is generated, and the abnormal signal is sent to the execution management unit through the processing self-check unit. After receiving the abnormal signal, the execution management unit immediately performs the preset early warning operation corresponding to the abnormal signal, so as to manage the compressor in time to reduce the impact of the compressor on helium purification, thereby helping to improve the helium purification efficiency.
[0059] After receiving the feedback signal, the processing self-check unit immediately collects the processing data of the purification equipment, including the efficiency risk value and the impurity interference value, and performs purification processing supervision evaluation and analysis on the processing data to determine whether the purification equipment works normally under the premise that the raw gas heating conversion is normal, so as to provide timely early warning feedback management. At the same time, the purification equipment is adjusted according to the information feedback to improve the purification efficiency and impurity removal efficiency of the purification equipment. The specific purification processing supervision evaluation and analysis process is as follows:
[0060] The time threshold is divided into i sub-time periods, where i is a natural number greater than zero, and the efficiency risk value of the purification equipment in each sub-time period is obtained. The efficiency risk value represents the length of the line segment of the purification work efficiency change curve of the purification equipment in the sub-time period that is below the preset purification work efficiency change curve. It should be noted that the larger the value of the efficiency risk value, the greater the control demand of the purification equipment;
[0061] The impurity interference value of the purification equipment in each sub-time period is obtained. The impurity interference value represents the product of the portion of the carbon dioxide impurity removal rate lower than the preset threshold and the number of separation rates corresponding to the liquefaction separation parameters lower than the preset threshold after data normalization. The liquefaction separation parameters include oxygen, nitrogen, etc. It should be noted that the larger the value of the impurity interference value, the greater the control demand of the purification equipment. The efficiency risk value and the impurity interference value are labeled as XLi and ZAi respectively;
[0062] According to the formula The optimization demand assessment coefficient of each sub-time period is obtained, where a1 and a2 are preset proportional factor coefficients for the efficiency risk value and the impurity interference value, respectively. The proportional factor coefficient is used to correct the deviation of various parameters in the formula calculation process, so as to make the calculation result more accurate. Both a1 and a2 are positive numbers greater than zero, a3 is the preset correction factor coefficient, and its value is 2.018. Ri is the optimization demand assessment coefficient of each sub-time period. A rectangular coordinate system is established with the number of sub-time periods as the X-axis and the optimization demand assessment coefficient Ri as the Y-axis. The optimization demand assessment coefficient curve is drawn by plotting points, and the preset optimization demand assessment coefficient curve is drawn in the coordinate system at the same time. The minimum trough value of the optimization demand assessment coefficient curve is obtained from the coordinate system, and the minimum trough value of the optimization demand assessment coefficient curve obtained from the coordinate system is marked as the optimization value, and the optimization value is discriminated and analyzed:
[0063] If the optimization value is below the preset optimization demand assessment coefficient curve, an optimization signal is generated and sent to the execution management unit. After receiving the optimization signal, the execution management unit immediately performs a preset early warning operation corresponding to the optimization signal and optimizes the purification equipment according to the information feedback to improve the purification efficiency of the purification equipment.
[0064] If the optimization value is above or above the preset optimization demand evaluation coefficient curve, a resolution instruction is generated. When the resolution instruction is generated, the length of the line segment connecting the two points is obtained from the optimization demand evaluation coefficient curve, and the length of the line segment connecting the two points obtained from the optimization demand evaluation coefficient curve is marked as the change line value, and the change line value is compared and analyzed with the internal preset change line value threshold, and the ratio of the number of line segments corresponding to the change line value greater than the preset change line value threshold to the total number of line segments is marked as a floating optimization coefficient, and the floating optimization coefficient is compared and analyzed with the preset floating optimization coefficient threshold stored internally:
[0065] If the floating optimization coefficient is less than the preset floating optimization coefficient threshold, a stable signal is generated and sent to the fusion analysis unit;
[0066] If the floating optimization coefficient is greater than or equal to the preset floating optimization coefficient threshold, a control signal is generated and sent to the execution management unit. After receiving the control signal, the execution management unit immediately performs a preset early warning operation corresponding to the control signal and controls the purification equipment according to the information feedback to improve the working stability and purification stability of the purification equipment;
[0067] After receiving the stable signal, the fusion analysis unit immediately performs information fusion risk assessment analysis to determine whether the purification risk of the entire purification equipment is too high, so as to provide timely information feedback and adjust the control of the purification equipment to improve the operating stability of the purification equipment. The specific information fusion risk assessment analysis process is as follows:
[0068] Obtain the optimization value corresponding to the stable signal within the time threshold, obtain the potential impact value and operation interference value corresponding to the feedback signal within the time threshold, obtain the supply risk value and parameter risk value corresponding to the normal signal within the time threshold, and label the optimization value, potential impact value, operation interference value, supply risk value and parameter risk value as YZ, QY, YG, GG, CF respectively;
[0069] According to the formula The purification risk assessment coefficient is obtained, where f1, f2, f3, f4 and f5 are preset weight factor coefficients of optimization value, potential impact value, operation interference value, supply risk value and parameter risk value, respectively; f1, f2, f3, f4 and f5 are all positive numbers greater than zero; f6 is a preset fault tolerance factor coefficient, and the value of f6 is 2.914; P is the purification risk assessment coefficient; the purification risk assessment coefficients of m historical normal purification equipment are obtained, and m is a natural number greater than zero. A rectangular coordinate system is established with the number of purification risk assessment coefficients as the X-axis and the purification risk assessment coefficient as the Y-axis; a purification risk assessment coefficient curve is drawn by plotting points, and then all rising points are obtained from the purification risk assessment coefficient curve. The length value of the line segment, and the length values of all rising line segments obtained from the purification risk assessment coefficient curve are marked as potential values, the potential value is compared and analyzed with the preset potential value threshold stored internally, and the ratio of the number of rising line segments corresponding to the potential value greater than the preset potential value threshold to the total number of rising line segments is marked as an excessive risk value, and at the same time, the ratio of the number of rising line segments to the total number of line segments in the purification risk assessment coefficient curve is obtained, and the ratio of the obtained number of rising line segments to the total number of line segments in the purification risk assessment coefficient curve is marked as a trend ratio, and the product value obtained after data normalization of the excessive risk value and the trend ratio is marked as a control demand value, and the control demand value is compared and analyzed with the preset control demand value threshold stored internally:
[0070] If the control demand value is less than the preset control demand value threshold, no signal is generated;
[0071] If the control demand value is greater than or equal to the preset control demand value threshold, a control signal is generated and sent to the execution management unit. After receiving the control signal, the execution management unit immediately performs the preset warning operation corresponding to the control signal, and adjusts the supervision intensity of the purification equipment according to the information feedback to ensure the stable operation of the purification equipment and the stability of the purification efficiency.
[0072] Embodiment 2:
[0073] A method for purifying ultra-high purity helium comprises the following steps:
[0074] Step 1: Collect the status risk data and temperature control data of helium purification, and send them to step 2 and step 3 respectively;
[0075] Step 2: Conduct operation pre-processing safety supervision feedback analysis on the status risk data to understand the operation risk of the entire purification equipment, so as to optimize the purification equipment with operation risks according to the information feedback;
[0076] Step 3: Conduct heating conversion safety supervision analysis on the temperature control data to determine whether the raw gas is safely converted after being heated by the compressor, and perform corresponding information transmission processing based on the feedback signal and abnormal signal obtained;
[0077] Step 4: Under the premise that the heating and conversion of the raw gas is normal, the processing data is purified and evaluated to determine whether the purification equipment is working normally, and the obtained optimization value is discriminated and analyzed. If an optimization signal is obtained, early warning feedback management is performed, and if a discrimination instruction is obtained, step 5 is entered;
[0078] Step 5: Conduct in-depth analysis through information feedback, and perform discriminant analysis on the obtained floating optimization coefficient. If a stable signal is obtained, proceed to step 6. If a control signal is obtained, early warning feedback management is performed;
[0079] Step 6: Analyze the purification risk of the entire purification equipment, that is, conduct information fusion risk assessment analysis, combine historical information and curve charts for analysis, and perform discriminant analysis on the obtained control demand value. If a control signal is obtained, early warning feedback management is performed;
[0080] In summary, the present invention ensures the safety of the entire helium purification process by analyzing from two perspectives, the front end and the main body, and helps to improve the helium purification efficiency, and helps to make early warning feedback management in a timely manner to ensure the stable progress of the helium purification process. From the front-end perspective, the state risk data is subjected to operation preprocessing safety supervision feedback analysis to understand the risk situation of the operating elements of the entire purification equipment, so as to optimize the purification equipment with operation risks to ensure the purification safety and stability of the purification equipment. Under the premise of normal power supply at the front end, the temperature control data of the main body is subjected to heating conversion safety supervision analysis to determine whether the raw gas is safely and normally converted after being heated by the compressor to ensure the carbon dioxide conversion efficiency. At the same time, the risk of affecting the subsequent helium purification efficiency is reduced. Under the premise that the heating and conversion of the raw gas is normal, the processing data is subjected to purification processing supervision evaluation and analysis to determine whether the purification equipment is working normally, so as to provide timely early warning feedback management. At the same time, the purification equipment is adjusted according to the information feedback. On the one hand, the purification efficiency of the purification equipment is improved, and on the other hand, the impurity removal efficiency of the purification equipment is improved. In-depth analysis is carried out through information feedback to perform information fusion risk assessment and analysis to determine whether the purification risk of the entire purification equipment is too high. At the same time, historical information and curve charts are combined for analysis to adjust the supervision of the purification equipment according to the information feedback to ensure the stable operation of the purification equipment and the stability of the purification efficiency.
[0081] The threshold is set to facilitate comparison. The size of the threshold depends on the amount of sample data and the number of bases set by technicians in this field for each group of sample data; as long as it does not affect the proportional relationship between the parameter and the quantized value.
[0082] The above formulas are obtained by collecting a large amount of data for software simulation and selecting a formula that is close to the actual value. The coefficients in the formula are set by technical personnel in this field according to actual conditions. The above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited to this. Any technical personnel familiar with the technical field within the technical scope disclosed by the present invention, according to the technical solution and the inventive concept of the present invention, make equivalent replacement or change, which should be covered within the protection scope of the present invention.
Claims
1. An ultra-high purity helium purification system, characterized in that: It includes a purification supervision platform, an information storage unit, an operation supervision unit, a conversion processing unit, a processing self-checking unit, a fusion analysis unit and an execution management unit; When the purification supervision platform generates an operation and management instruction, the operation and management instruction is sent to the information storage unit. After receiving the operation and management instruction, the information storage unit immediately collects the state risk data and temperature control data of helium purification. The state risk data includes the supply risk value and the parameter risk value, and the temperature control data includes the potential impact value and the operation interference value. The state risk data and the temperature control data are sent to the operation supervision unit and the conversion processing unit respectively; After receiving the state risk data, the operation supervision unit immediately performs operation pre-processing safety supervision feedback analysis on the state risk data, sends the obtained normal signal to the conversion processing unit, and sends the obtained risk signal to the execution management unit; After receiving the temperature control data and the normal signal, the conversion processing unit immediately performs a heating conversion safety supervision analysis on the temperature control data, sends the obtained feedback signal to the processing self-checking unit, and sends the obtained abnormal signal to the execution management unit through the processing self-checking unit; After receiving the feedback signal, the processing self-checking unit immediately collects the processing data of the purification equipment, including the efficiency risk value and the impurity interference value, and performs purification processing supervision evaluation analysis on the processing data, and sends the obtained optimization signal or control signal to the execution management unit, and sends the obtained stable signal to the fusion analysis unit; After receiving the stable signal, the fusion analysis unit immediately conducts information fusion risk assessment and analysis, and sends the obtained policy signal to the execution management unit; The pre-processing safety supervision feedback analysis process of the operation supervision unit is as follows: S1: Set a supervision cycle and mark the supervision cycle as a time threshold, and obtain the supply risk value of the entire purification equipment within the time threshold. The supply risk value represents the product of the fluctuation frequency of the power supply voltage of the front-end power supply and the number of power supply failures after data normalization, and then the product of the protection risk value after data normalization. The number of power supply failures includes the number of short circuits and leakages. The protection risk value represents the product of the number of overload operations of the cooling fan and the warning feedback duration after data normalization. The overload operation number represents the number of times the operating power exceeds the rated operating power and the ratio of the single operation duration exceeds the preset threshold. The warning feedback duration represents the time between the start time of the cooling failure warning feedback and the warning execution time. S2: Obtain the parameter risk value of the entire purification equipment within the time threshold. The parameter risk value indicates the number of values corresponding to the operating parameters of the entire purification equipment that meet the preset range. The operating parameters include vibration frequency and abnormal sound decibel value. Compare and analyze the supply risk value and parameter risk value with the preset supply risk value threshold and preset parameter risk value threshold that are stored internally: If the supply risk value is less than the preset supply risk value threshold, and the parameter risk value is equal to the preset parameter risk value threshold, a normal signal is generated; If the supply risk value is greater than or equal to the preset supply risk value threshold, or the parameter risk value is not equal to the preset parameter risk value threshold, a risk signal is generated; The heating conversion safety supervision analysis process of the conversion processing unit is as follows: T1: Get the potential impact value of the compressor within the time threshold. The potential impact value represents the product of the portion of the actual operating voltage of the compressor that deviates from the rated voltage and the portion of the time between the initial operating temperature and the maximum operating temperature that is lower than the preset threshold after data normalization. T2: Obtain the operation interference value of the compressor within the time threshold. The operation interference value indicates the portion of the conversion rate of the raw gas carbon monoxide to carbon dioxide in the compressor that is lower than the preset threshold, and then the product value obtained by normalizing the data with the ratio between the overpressure operation time and the operation time. The overpressure operation time indicates the total operation time corresponding to the compressor operation voltage exceeding the rated operation voltage, and the operation time indicates the time from the time the compressor is put into use to the current time. T3: Compare and analyze the potential impact value and the operation interference value with the preset potential impact value threshold and the preset operation interference value threshold that are stored internally: If the potential impact value is less than the preset potential impact value threshold, and the operation interference value is less than the preset operation interference value threshold, a feedback signal is generated; If the potential impact value is greater than or equal to the preset potential impact value threshold, or the operation interference value is greater than or equal to the preset operation interference value threshold, an abnormal signal is generated; The purification process supervision assessment analysis process of the processing self-check unit is as follows: SS1: Divide the time threshold into i sub-time periods, where i is a natural number greater than zero, and obtain the efficiency risk value of the purification equipment in each sub-time period. The efficiency risk value represents the length of the line segment of the purification work efficiency change curve of the purification equipment in the sub-time period that is below the preset purification work efficiency change curve; SS2: Obtain the impurity interference value of the purification equipment in each sub-time period. The impurity interference value represents the product of the portion of the carbon dioxide impurity removal rate lower than the preset threshold and the number of separation rates corresponding to the liquefaction separation parameters lower than the preset threshold after data normalization. The liquefaction separation parameters include oxygen and nitrogen. The efficiency risk value and the impurity interference value are labeled XLi and ZAi respectively. SS3: Obtain the optimized demand assessment coefficient Ri of each sub-time period according to the formula, establish a rectangular coordinate system with the number of sub-time periods as the X-axis and the optimized demand assessment coefficient Ri as the Y-axis, draw the optimized demand assessment coefficient curve by plotting points, and draw the preset optimized demand assessment coefficient curve in the coordinate system, obtain the minimum trough value of the optimized demand assessment coefficient curve from the coordinate system, mark it as the optimized value, and perform discriminant analysis on the optimized value: If the optimized value is below the preset optimization demand assessment coefficient curve, an optimization signal is generated; If the optimized value is above or on the preset optimization demand assessment coefficient curve, a resolution instruction is generated; When the processing self-checking unit generates a resolution instruction: The length of the line segment connecting the two points is obtained from the optimization demand evaluation coefficient curve, and it is marked as the change line value. The change line value is compared and analyzed with the internal preset change line value threshold. The ratio of the number of line segments corresponding to the change line value greater than the preset change line value threshold to the total number of line segments is marked as the floating optimization coefficient. The floating optimization coefficient is compared and analyzed with the preset floating optimization coefficient threshold entered and stored internally: If the floating optimization coefficient is less than the preset floating optimization coefficient threshold, a stable signal is generated; If the floating optimization coefficient is greater than or equal to the preset floating optimization coefficient threshold, a control signal is generated; The information fusion risk assessment analysis process of the fusion analysis unit is as follows: Obtain the optimization value corresponding to the stable signal within the time threshold, obtain the potential impact value and operation interference value corresponding to the feedback signal within the time threshold, obtain the supply risk value and parameter risk value corresponding to the normal signal within the time threshold, and label the optimization value, potential impact value, operation interference value, supply risk value and parameter risk value as YZ, QY, YG, GG, CF respectively; According to the formula The purification risk assessment coefficient is obtained, where f1, f2, f3, f4 and f5 are preset weight factor coefficients of optimization value, potential impact value, operation interference value, supply risk value and parameter risk value, respectively. f1, f2, f3, f4 and f5 are all positive numbers greater than zero. f6 is the preset fault tolerance factor coefficient, and the value of f6 is 2.
914. P is the purification risk assessment coefficient. The purification risk assessment coefficients of m historical normal purification equipment are obtained, and m is a natural number greater than zero. A rectangular coordinate system is established with the number of purification risk assessment coefficients as the X-axis and the purification risk assessment coefficients as the Y-axis. The purification risk assessment coefficient is plotted by plotting points. The purification risk assessment coefficient curve is obtained, and then the length values of all rising line segments are obtained from the purification risk assessment coefficient curve, and marked as potential values. The potential values are compared and analyzed with the preset potential value threshold stored internally, and the ratio of the number of rising line segments corresponding to the potential value greater than the preset potential value threshold to the total number of rising line segments is marked as an excessive risk value. At the same time, the ratio of the number of rising line segments to the total number of line segments in the purification risk assessment coefficient curve is obtained and marked as a trend ratio. The product value obtained after data normalization of the excessive risk value and the trend ratio is marked as a control demand value, and the control demand value is compared and analyzed with the preset control demand value threshold stored internally: If the control demand value is less than the preset control demand value threshold, no signal is generated; If the control demand value is greater than or equal to the preset control demand value threshold, a control signal is generated.
2. A method for purifying ultra-high purity helium, the method being applied to an ultra-high purity helium purification system according to claim 1, characterized in that: The specific steps include: Step 1: Collect the status risk data and temperature control data of helium purification, and send them to step 2 and step 3 respectively; Step 2: Conduct operation pre-processing safety supervision feedback analysis on the status risk data to understand the operation risk of the entire purification equipment, so as to optimize the purification equipment with operation risks according to the information feedback; Step 3: Conduct heating conversion safety supervision analysis on the temperature control data to determine whether the raw gas is safely converted after being heated by the compressor, and perform corresponding information transmission processing based on the feedback signal and abnormal signal obtained; Step 4: Under the premise that the heating and conversion of the raw gas is normal, the processing data is purified and evaluated to determine whether the purification equipment is working normally, and the obtained optimization value is discriminated and analyzed. If an optimization signal is obtained, early warning feedback management is performed, and if a discrimination instruction is obtained, step 5 is entered; Step 5: Conduct in-depth analysis through information feedback, and perform discriminant analysis on the obtained floating optimization coefficient. If a stable signal is obtained, proceed to step 6. If a control signal is obtained, early warning feedback management is performed; Step 6: Analyze the purification risk of the entire purification equipment, that is, conduct information fusion risk assessment analysis, and combine historical information and curve charts for analysis, and perform discriminant analysis on the obtained control demand value. If a control signal is obtained, early warning feedback management will be carried out.
