Dynamic design proofreading optimization method, system and storage medium for highway construction projects
By obtaining coordinate distribution maps and performing dynamic design proofreading in highway construction projects, the problem of inconsistency between design drawings and construction conditions is solved, and accurate revision of design drawings and support for subsequent operation and maintenance are achieved.
Patent Information
- Application Number
- CN202410853505.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-06-28
AI Technical Summary
In highway construction projects, the design drawings are inconsistent with the actual construction conditions, resulting in inconvenience in subsequent operation, maintenance and design.
By obtaining the coordinate distribution map of the construction area, the original design drawing is constructed and continuously revised according to the actual construction conditions until the design drawing is consistent with the completed situation. Data acquisition, change and integration modules are used for dynamic design proofreading.
The consistency between the design drawings and the actual construction conditions was achieved, ensuring the correction effect of the design drawings, and providing an accurate reference for subsequent operation, maintenance and construction design.
Smart Images

Figure CN118395580B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of engineering management, and in particular to a method, system and storage medium for dynamic design proofreading optimization of a highway construction project. Background Art
[0002] In the early stage of highway construction, the route design of the construction area needs to be carried out according to the construction needs. However, since the construction situation in the highway construction area is affected by external factors such as the geology, hydrology, and environment in the highway construction area, it is necessary to change the route and design structure. In addition, during the highway construction process, the selection of materials and the optimization of construction technology have an important impact on the quality and cost of the project. Therefore, according to the actual situation, choose the appropriate materials and construction technology to ensure that the project quality meets the requirements while reducing the cost as much as possible.
[0003] If there are any problems with the design drawings in the early stage of highway construction, they need to be optimized. It may be necessary to add detailed information, correct errors, and improve the design plan to ensure that the design drawings are accurate and complete. At the same time, the completion drawings need to be updated and revised according to the actual situation. This includes updates to route adjustments, structural modifications, sign and line settings, etc., to ensure that the completion drawings reflect the actual situation. However, since the completion drawings need to be constantly modified before they are finally completed during the entire highway construction project, the actual construction status is constantly changing and correcting, which ultimately leads to the actual completion being different from the design drawings, making it inconvenient for the operation and maintenance of subsequent highway construction and subsequent construction design. Summary of the invention
[0004] The purpose of the present invention is to solve the shortcomings of the prior art that the actual completion is inconsistent with the design drawings, and to propose a dynamic design proofreading optimization method, system and storage medium for highway construction projects.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] The first aspect of the present invention provides a method for dynamic design proofreading and optimization of a highway construction project, comprising:
[0007] Obtain location information of the construction area and construct a coordinate distribution map of the construction area;
[0008] Obtain design information of the construction area, and construct an original design map of the construction area based on the coordinate distribution map of the construction area;
[0009] According to the coordinate distribution map of the construction area, the original design map of the construction area is divided into sections to obtain original design information of at least two sections in the construction area;
[0010] Extracting pre-construction characteristic information of the construction area according to the design information of the construction area and / or the original design information of the section of the construction area;
[0011] Obtain the actual operation situation of the construction area, match it with the pre-construction characteristic information of the construction area, and obtain the design revision information of the construction area;
[0012] According to the design revision information of the construction area, the original design information of the section of the construction area is revised to obtain a revised design drawing of the construction area;
[0013] According to the actual operation situation of the construction area, the revised design drawing of the construction area is continuously revised to obtain the completed design drawing of the construction area.
[0014] Some possible solutions include:
[0015] Obtaining a practical operation period of the construction area, dividing and obtaining at least one correction period of the construction area;
[0016] According to the revision period of the construction area and in combination with the original design drawing of the construction area, the pre-construction characteristic information of the construction area is extracted respectively;
[0017] According to the revision period of the construction area, the pre-construction characteristic information of the construction area is matched with the actual operation situation of the construction area to obtain the design revision information of each revision period in the construction area;
[0018] According to the revision cycle of the construction area and in combination with the design revision information of each revision cycle in the construction area, the original design drawing of the construction area and / or the revised design drawing of the construction area are revised to obtain the completed design drawing of the construction area.
[0019] In some feasible solutions, the method for obtaining original design information of at least two sections in the construction area includes:
[0020] According to the coordinate distribution map of the construction area, determine the design direction of the original design drawing of the construction area;
[0021] According to the design direction of the original design drawing of the construction area, the original design drawing of the construction area is structurally divided to obtain the original design structure distribution information of the construction area;
[0022] According to the original design structure distribution information of the construction area and in combination with the coordinate distribution map of the construction area, the original design map of the construction area is divided into intervals to obtain the original design information of at least two sections in the construction area.
[0023] In some feasible solutions, the method of extracting pre-construction feature information of the construction area includes:
[0024] Determine the original design structure consumables information of the construction area according to the original design structure distribution information of the construction area;
[0025] Classifying the original design structure consumables information of the construction area according to the original design structure distribution information of the construction area to obtain at least one set of original design structure consumables classification information of the construction area;
[0026] According to the original design drawings of the construction area and in combination with the classification information of the original design structural consumables of the construction area, determine the total amount of each type of consumables in the original design drawings of the construction area;
[0027] According to the design direction of the original design drawing of the construction area and the coordinate distribution map of the construction area, determine the direction information of each type of consumables in the original design drawing of the construction area;
[0028] The pre-construction characteristic information of the construction area is determined based on the total amount of each consumable and the direction information of each type of consumable in the original design drawing of the construction area.
[0029] In some feasible solutions, the original design structural consumables classification information of the construction area includes:
[0030] The overall structure of highway construction in the construction area, the infrastructure that forms the overall structure of highway construction, and one or more combinations of component structures in the infrastructure that constitutes the overall structure of highway construction.
[0031] In some feasible solutions, the method for obtaining the design revision information of the construction area includes:
[0032] According to the actual operation situation of the construction area, obtain the actual operation data information of the construction area;
[0033] According to the actual operation data information of the construction area, the actual total amount of consumables in the construction area is obtained;
[0034] According to the actual total amount of consumables in the construction area, determine the actual total amount of each type of consumables in the construction area;
[0035] Compare the actual total amount of each type of consumables in the construction area with the total amount of each type of consumables in the original design drawing of the construction area to obtain comparison difference information in the construction area;
[0036] According to the comparison difference information in the construction area and in combination with the coordinate distribution map of the construction area, the design correction information of the construction area is determined.
[0037] In some feasible solutions, the method for obtaining a revised design drawing of a construction area further includes:
[0038] According to the coordinate distribution map of the construction area and in combination with the classification information of the original design structural consumables of the construction area, the direction coordinate information of each type of consumables in the original design map of the construction area is determined;
[0039] According to the actual operation situation in the construction area, determine the actual trend information of each type of consumables in the construction area;
[0040] According to the actual trend information of each type of consumables in the construction area and combined with the design revision information of the construction area, the original design information of the section of the construction area is revised to obtain a revised design drawing of the construction area.
[0041] A second aspect of the present invention provides a highway construction project dynamic design proofreading optimization system, which adopts a highway construction project dynamic design proofreading optimization method described in any one of the first aspects.
[0042] In some feasible solutions, the optimization system further includes:
[0043] A data collection module, wherein the data collection module is used to collect actual operation data of the construction area;
[0044] A data modification module, wherein the data modification module is used to modify and revise the original design drawing of the construction area;
[0045] A data integration module is used to record data changes of the original design drawings of the construction area.
[0046] A third aspect of the present invention provides a computer-readable medium having a computer program stored thereon, wherein when the program is executed by a processor, a dynamic design proofreading and optimization method for a highway construction project as described in any one of the first aspects is implemented.
[0047] The beneficial effects of the present invention are:
[0048] The present invention obtains the coordinate distribution map of the construction area in advance, constructs the corresponding design map according to the design information of the construction area in the coordinate distribution map of the construction area, and then modifies the design map according to the actual construction situation in the construction area, so as to continuously modify the design map of the construction area, so as to make the final modified design map consistent with the actual completion situation, and ensure the modification effect of the design map, so as to provide reference for the subsequent operation and maintenance of highway construction and subsequent construction design. That is, it effectively solves the disadvantage of the inconsistency between the actual completion and the design map display in the prior art. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] Figure 1 It is a schematic diagram of the overall process of a dynamic design proofreading optimization method for a highway construction project provided in an embodiment of the present invention;
[0050] Figure 2 It is a schematic diagram of the first part of the process of a dynamic design proofreading optimization method for a highway construction project provided in an embodiment of the present invention;
[0051] Figure 3 It is a schematic diagram of the second part of the flow chart of a method for dynamic design, proofreading and optimizing a highway construction project provided in an embodiment of the present invention;
[0052] Figure 4 It is a schematic diagram of determining the final correction angle in a dynamic design proofreading optimization method for a highway construction project provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0053] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0054] It should be noted that all directional indications (such as up, down, left, right, front, back, etc.) in the embodiments of the present invention are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0055] In the present invention, unless otherwise clearly specified and limited, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "fixation" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0056] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or a scheme that satisfies both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in the field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0057] Reference Figures 1 to 4 In order to solve the shortcomings of the prior art that the actual completion is inconsistent with the design drawing, and to provide reference for the subsequent operation and maintenance of highway construction and subsequent construction design, the present invention provides a dynamic design proofreading optimization method for highway construction projects. The optimization method obtains the coordinate distribution map of the construction area in advance, constructs the corresponding design map according to the design information of the construction area in the coordinate distribution map of the construction area, and then corrects the design map according to the actual construction situation in the construction area, so as to continuously correct the design map of the construction area, so as to make the final corrected design map consistent with the actual completion situation, ensure the correction effect of the design map, and provide reference for the subsequent operation and maintenance of highway construction and subsequent construction design. That is, it effectively solves the shortcomings of the prior art that the actual completion is inconsistent with the design map.
[0058] Specifically, the first aspect of the present invention provides a dynamic design proofreading optimization method for a highway construction project, the optimization method comprising: obtaining and collecting the current position information of the construction area in advance, constructing a coordinate distribution map of the construction area according to the current position of the construction area, so that after obtaining the design information of the construction area, the coordinate distribution map of the construction area can be used to construct the original design drawing of the construction area; that is, according to the coordinate situation of the location of the construction area and in conjunction with the design situation of the construction area, the original design drawing in the construction area is constructed, so that the subsequent modification of the highway construction plan in the construction area is clearer and more intuitive, and it is also convenient for providing reference for the subsequent operation and maintenance of the highway construction and subsequent construction design. During the construction operation period in the construction area, a corresponding construction cycle arrangement is generally required. Here, in order to facilitate the subsequent modification of the original design drawings of the construction area, the original design drawings of the construction area can be divided into intervals according to the construction cycle according to the coordinate distribution map of the construction area, and then the original design information of at least two sections in the construction area is obtained; then the pre-construction feature information of the construction area is extracted according to the design information of the construction area and / or the original design information of the sections of the construction area; that is, according to the original design information of the corresponding interval sections in the construction area, the corresponding highway construction preparation and construction conditions in the original design drawings of the construction area (including the construction structure categories, length and area of the construction structures at each stage of highway construction, and the direction of the construction structures at each stage) are extracted. In order to achieve the subsequent acquisition of the actual operation conditions of the construction area, the pre-construction feature information of the construction area is matched with the pre-construction feature information of the construction area to obtain the design correction information of the construction area; that is, the original design construction conditions in the construction area are compared with the actual construction conditions, and the original design drawing correction information in the construction area is finally confirmed. Then, according to the design correction information of the construction area, the original design information of the sections of the construction area is corrected to obtain the corrected design drawings of the construction area. Since highway construction is carried out in sections, it is necessary to continuously revise the revised design drawings of the construction area based on the actual conditions of the construction area, so as to ensure that the completed design drawings of the construction area are consistent with the actual completion conditions.
[0059] In this embodiment, in order to reduce the number of corrections between the design drawing and the actual operation in the construction area, corrections can be made according to the construction period in the construction area, that is, the design drawing in the construction area can be corrected according to the actual operation of the construction area when the error between the design drawing and the actual operation in the construction area is large or the construction period is long. Specifically, the optimization method also includes: the construction period of the construction project in the construction area can be divided according to the previous construction practice experience to achieve the actual operation period of the construction area, and at least one correction period of the construction area can be obtained; in some embodiments, the overall project can be divided periodically according to the progress of the construction project, such as the division of the construction project of a certain section (including "bridge", "pavement", "roadbed", "culvert"), and the route comparison with the design drawing can be carried out after the "bridge" is completed in whole or in part, the route comparison with the design drawing can be carried out after the "pavement" is completed in whole or in part, the route comparison with the design drawing can be carried out after the "roadbed" is completed in whole or in part, and the route comparison with the design drawing can be carried out after the "culvert" is completed in whole or in part. That is, the overall project is divided into multiple correction period intervals according to the construction period, and then the actual operation situation and the design drawing situation are compared and corrected according to the correction period interval. Specifically, in order to facilitate the correction work, the optimization method also includes: according to the correction period of the pre-divided construction area, combined with the original design drawing of the construction area, the pre-construction feature information of the construction area (including: the construction route direction in the original design drawing in the current correction period and the length, span and other geometric data of the project) is extracted respectively; then, according to the correction period of the construction area, the pre-construction feature information of the construction area is matched with the actual operation situation of the construction area, and the design correction information of each correction period in the construction area is obtained; that is, the actual construction situation in the construction area is compared with the design situation, and the correction situation information of the current design drawing is determined. Then, according to the correction period of the construction area, and combined with the design correction information of each correction period in the construction area, the original design drawing of the construction area and / or the revised design drawing of the construction area are corrected to obtain the completed design drawing of the construction area. In this embodiment, the design drawings of the construction area can be divided into sections or revised and proofread according to the construction period to ensure that the design drawings in the construction area meet the design of the project after completion, so that the completed design drawings of the construction area are consistent with the actual completion status, which is convenient for subsequent maintenance and secondary design.
[0060] In this embodiment, in order to facilitate understanding of how to obtain the original design information of at least two sections in the construction area, the following explanation is given here. Specifically, the method for obtaining the original design information of at least two sections in the construction area includes: determining the design direction of the original design drawing of the construction area according to the coordinate distribution map of the construction area; that is, attaching coordinates to the construction area in advance, and then formulating the design direction of the original design drawing of the construction area according to the design plan in the construction area. That is, three-dimensional coordinates can be constructed according to the geographical coordinates of the construction area in three-dimensional software (such as: 3ds max, Maya, Cinema4D, Zbrush, etc.), so as to facilitate integration with previous construction data, to form a complete set of technical information, and to facilitate subsequent maintenance of construction projects. Then, in the three-dimensional coordinates, the original design drawing of the construction area is constructed according to the original design information of the construction area to determine the direction of the overall structure. Then, according to the design direction of the original design drawing of the construction area, the original design drawing of the construction area is structurally divided to obtain the original design structure distribution information of the construction area; that is, the original design drawing in the construction area can be divided according to the structure, such as in some implementation methods, the engineering structure content is divided into "bridge", "pavement", "roadbed", and "culvert" according to the engineering construction projects of a certain interval (including "bridge", "pavement", "roadbed", and "culvert"). It is also possible to divide the structures of "bridge", "pavement", "roadbed" and "culvert" respectively, such as dividing "bridge" into bridge foundation-bridge column construction, etc., dividing "pavement" into the first pavement construction area-the second pavement construction area, etc., dividing "roadbed" into the first roadbed construction area-the second roadbed construction area, etc., dividing "culvert" into the first culvert construction area-the second culvert construction area, etc. That is, according to the above example, the original design structure distribution information of the construction area can be combined with the coordinate distribution map of the construction area to divide the original design map of the construction area into intervals, and obtain the original design information of at least two sections in the construction area.
[0061] In this embodiment, in order to facilitate understanding of how to extract pre-construction feature information of a construction area, the following explanation is given here. Specifically, the method for extracting pre-construction feature information of a construction area includes: determining the original design structure consumables information of the construction area based on the original design structure distribution information of the construction area; that is, determining the consumables constituting the original structure based on the overall project in the original design drawing in the construction area and the original structure composition in the construction area. Then, according to the original design structure distribution information of the construction area, the original design structure consumables information of the construction area is classified to obtain at least one group of original design structure consumables classification information of the construction area; in some embodiments, the overall construction structure can be divided into multiple construction interval structures, such as a bridge can be divided into a first box girder segment group, a second box girder segment group, a third box girder segment group, and ... the Nth box girder segment group; such as a pavement can be divided into a first pavement construction interval, a second pavement construction interval... the Nth pavement construction interval; such as a roadbed can be divided into a first roadbed construction interval, a second roadbed construction interval... the Nth roadbed construction interval; such as a culvert can be divided into a first culvert construction interval, a second culvert construction interval... the Nth culvert construction interval; then, according to the original design drawing of the construction area and combined with the original design structure consumables classification information of the construction area, the total amount of each type of consumables in the original design drawing of the construction area is determined; that is, according to the project structure main body of the construction area, the original design structure can be classified according to the consumables that constitute the original structure. In some feasible implementations, the categories can be determined according to the types of structures that constitute the original structure, such as "bridges" can be divided into box beam segment groups, bridge pile foundation groups, bridge cap towers, etc. When the "bridge" structure is subsequently modified, one or more structural combinations in the box beam segment group, bridge pile foundation group, and bridge cap tower can be directly added or deleted. That is, the geometric length of the "bridge" is modified here. That is, the overall structure of the project in the construction area is partially modified. In addition, it is also necessary to determine the direction information of each type of consumables in the original design drawing of the construction area according to the design direction of the original design drawing of the construction area and the coordinate distribution map of the construction area; that is, according to the three-dimensional coordinates of the construction area, according to the original design drawing of the construction area, determine the direction of the overall structure of the project in the construction area, and / or the direction of the original structure that constitutes the overall structure in the construction area, and / or the direction of the construction interval structure that constitutes the original structure, etc., and hereby determine the direction and orientation of the design structure of the construction area. That is, according to the total amount of each consumable and the direction information of each type of consumable in the original design drawing of the construction area, determine the pre-construction feature information (including: design length and design direction) of the construction area. In some feasible schemes, the original design structural consumables classification information of the construction area includes: the overall structure of highway construction in the construction area, the infrastructure forming the overall structure of highway construction, and the length and overall length of one or more of the component structures in the infrastructure constituting the overall structure of highway construction.As an example, the overall structure of the highway construction in the above-mentioned construction area can be "the overall structure of a certain highway construction project", such as "bridge + road surface + roadbed + culvert +..... etc." to form a set of overall structures of highway construction in the construction area; at this time, the basic structure forming the overall structure of the highway construction can be "bridge", "road surface", "roadbed", "culvert"... etc. The component structure in the basic structure that constitutes the overall structure of the highway construction can be "bridge-pile foundation-foundation steel bar", that is, multiple project details can be set according to the list of engineering projects in the construction area. Here, in order to make it easier to understand the composition of the classification information of the original design structure consumables of the construction area, the following example is given here: the component structure in the basic structure that constitutes the overall structure of the highway construction can be subdivided into: the overall structure of the highway construction is "1"; the basic structure that forms the overall structure of the highway construction is "101", "102", ...., "10N"; the component structure in the basic structure that constitutes the overall structure of the highway construction can be "101-1-.....", "102-1-.....", ...., "10N-1-.....". To further facilitate understanding of the classification information of the original design structural consumables of the construction area, a bridge is used as an example. Suppose the entire bridge is "101", then the item numbered "101-1" is the "foundation steel bar" that constitutes the entire bridge, and is also equipped with corresponding units of "KG" and length (m); the item numbered "101-1-a" is a further subdivision of the "foundation steel bar" that constitutes the entire bridge, which is "plain round steel bar", and is also equipped with corresponding units of "KG" and length (m); the item numbered "101-1-b" is a further subdivision of the "foundation steel bar" that constitutes the entire bridge, which is "ribbed steel bar", and is also equipped with corresponding units of "KG" and length (m)... until the item numbered "101-1-n", the corresponding units are "KG" and length (m).
[0062] In this embodiment, in order to facilitate understanding of how to determine the design revision information of the construction area (about the structural geometry information in the design drawing), the following description is given here. Specifically, the method for obtaining the design revision information of the construction area includes: obtaining the actual operation situation of the construction area by wired or wireless means, and then obtaining the actual operation data information of the construction area according to the actual operation situation of the construction area; in some feasible implementations, the optimization method can be carried in a data supplement platform (such as a construction log of a construction management platform), and the actual operation data information of the construction area is obtained by collecting data in the construction log. Then, according to the actual operation data information of the construction area, the actual total amount of consumables in the construction area is obtained; then, according to the actual total amount of consumables in the construction area, the actual total amount of each type of consumables in the construction area is determined; then, the actual total amount of each type of consumables in the construction area is compared with the total amount of each type of consumables in the original design drawing of the construction area to obtain the comparison difference information in the construction area; according to the comparison difference information in the construction area, combined with the coordinate distribution map of the construction area, the design revision information of the construction area is determined.
[0063] In this embodiment, in order to more specifically understand the above-mentioned comparison of the actual total amount of each type of consumables in the construction area with the total amount of each type of consumables in the original design drawing of the construction area to determine the comparison difference information in the construction area, the following description is made here:
[0064] Assume that the geometric data value (including length, width, area, etc.) of the total amount of each consumable in the original design drawing of the construction area is:
[0065] but: ,
[0066] In the formula, To manipulate geometric data, is the design ratio. That is, the design geometric value of the actual operation data can be determined by inputting the actual operation data into the three-dimensional coordinates and combining the scaling ratio in the three-dimensional coordinate model.
[0067] In this embodiment, in order to facilitate understanding of how to determine the design revision information of the construction area (about the structural direction information in the design drawing), the following explanation is given here. Specifically, the method for obtaining the revised design drawing of the construction area also includes: first, according to the coordinate distribution map of the construction area, combined with the original design structure consumables classification information of the construction area, determine the direction coordinate information of each type of consumables in the original design drawing of the construction area; that is, the model formed by the original design drawing of the construction area is constructed in the three-dimensional coordinate space, and then according to the model structure of the original design drawing, determine the design direction of each component structure in the model structure of the original design drawing. Then, according to the actual operation of the construction area, determine the actual direction information of each type of consumables in the construction area; then, according to the actual direction information of each type of consumables in the construction area, and combined with the design revision information of the construction area, revise the original design information of the section of the construction area to obtain the revised design drawing of the construction area.
[0068] In this embodiment, in order to more specifically understand the above-mentioned modification of the original design information of the section of the construction area according to the actual trend information of each type of consumables in the construction area and in combination with the design modification information of the construction area, the following description is made here:
[0069] Assume that in the original design drawing of the construction area or the revised design drawing after one revision, there is an original design structure of the construction area forming a line AB between two interval endpoints, A (x1, y1, z1), B (x2, y2, z2), among which, since the two interval endpoints of a highway construction project are rarely too high, the direction of the design drawing can be regarded as a two-dimensional plane design drawing, so z1 in A can be 0, and z2 in B can be 0, that is, the z-axis coordinate can be ignored. Thus, a one- or two-dimensional plane coordinate base point can be arbitrarily selected in the construction area, and / or the overall structure of the project in the construction area, and / or the original structure constituting the overall structure in the construction area, and / or the construction interval structure constituting the original structure, and a line can be randomly selected in the two-dimensional plane coordinate using the two-dimensional plane coordinate base point as the starting point as the design direction reference line of the original design drawing. According to the design direction reference line of the original design drawing, one or more original design direction connection lines in the original design of the overall structure of the project in the construction area and / or the original structure constituting the overall structure in the construction area are determined, and then the actual direction of the original design structure in the construction area is determined through practical operation data (such as the geographic coordinates of the two end points of the interval during actual construction), that is, the geographic coordinates of the two end points of the interval formed by actual construction can be combined with the coordinate distribution map of the construction area to determine the actual direction line of the original design structure in the actual construction area, and then the design direction reference line of the original design drawing is compared with the original design direction connection line of the overall structure of the project in the construction area and / or the original structure constituting the overall structure in the construction area, so as to obtain adjustment information. That is, when the original design structure needs to be corrected, the actual construction direction line in the construction area is determined based on the geographic coordinates of the two end points in the interval of the actual construction situation in the construction area, combined with the coordinate distribution map of the construction area, and then the final correction angle is determined based on the original design direction line (that is, the two-dimensional design direction) and the design direction reference line of the original design drawing.
[0070] Reference Figure 4 In this embodiment, in order to more specifically understand the above-mentioned determination of the final correction angle based on the original design trend connection line (i.e., the two-dimensional design trend) and the design trend reference line of the original design drawing, the following description is made here:
[0071] Suppose a line is selected in the construction area as the design direction reference line of the original design drawing in the construction area (refer to Figure 4 a in the figure), wherein the design direction reference line of the original design drawing is parallel to the y-axis; according to the design direction of the original design drawing in the construction area, combined with the construction route in the construction area at this time (reference Figure 4 b) to determine the original design trend line of the original design drawing in the construction area (refer to Figure 4c); According to the actual operation data in the construction area, combined with the geographical coordinate information of the construction area, determine the actual construction route in the construction area (refer to Figure 4 At this time, according to the design direction reference line of the original design drawing in the construction area, one end of the original design direction connection line of the original design drawing in the construction area is extended to intersect with the design direction reference line of the original design drawing in the construction area, and the other end of the original design direction connection line of the original design drawing in the construction area is vertically connected to the design direction reference line of the original design drawing in the construction area to obtain the design direction triangular image of the original design drawing in the construction area, and the angle of intersection of one end of the original design direction connection line of the original design drawing in the construction area with the design direction reference line of the original design drawing in the construction area is determined according to the trigonometric function (refer to Figure 4 Similarly, according to the design direction reference line of the original design drawing in the construction area, one end of the actual construction route in the construction area is extended to intersect with the design direction reference line of the original design drawing in the construction area, and the other end of the actual construction route in the construction area is vertically connected to the design direction reference line of the original design drawing in the construction area to obtain the triangular image of the actual construction route in the construction area. According to the trigonometric function, the angle of intersection of one end of the actual construction route in the construction area with the design direction reference line of the original design drawing in the construction area is determined (refer to Figure 4 m in the figure). That is, the method to determine the final correction angle at this time is to extend one end of the actual construction route in the construction area to the intersection angle with the design direction reference line of the original design drawing in the construction area (refer to Figure 4 m) and one end of the line connecting the original design direction of the original design drawing in the construction area is extended to the intersection angle with the design direction reference line of the original design drawing in the construction area (reference Figure 4 The final correction angle of the original design trend line in the construction area can be determined by comparing the original design trend line in the construction area. It should be noted that in this embodiment, the design trend reference line (reference Figure 4 a in the figure), and can also be parallel to the x-axis. That is, different parallel directions can be selected according to actual conditions. In addition, the method for determining the final correction angle in the above-mentioned method can also be applied to the correction operation in the correction design drawing of the construction area.
[0072] In this embodiment, it should be noted that the coordinate distribution diagram of the construction area may be a three-dimensional coordinate space or a two-dimensional coordinate plane constructed by three-dimensional modeling software.
[0073] The second aspect of the present invention provides a highway construction project dynamic design proofreading optimization system, which adopts a highway construction project dynamic design proofreading optimization method described in any one of the first aspects. The optimization system also includes: a data acquisition module, which is used to collect practical data of the construction area; a data change module, which is used to change and modify the original design drawing of the construction area; and a data integration module, which is used to record the data changes of the original design drawing of the construction area. By obtaining the coordinate distribution map of the construction area in advance, the corresponding design drawing is constructed according to the design information of the construction area in the coordinate distribution map of the construction area, and then the design drawing is corrected according to the actual construction situation in the construction area, so as to achieve the consistency of the final corrected design drawing with the actual completion situation through continuous correction of the design drawing of the construction area, and ensure the correction effect of the design drawing, so as to provide reference for the subsequent operation and maintenance of highway construction and subsequent construction design. That is, it effectively solves the shortcomings of the prior art that the actual completion is inconsistent with the design drawing display.
[0074] In some embodiments, the optimization system can communicate using any currently known or future developed network protocol such as HTTP (Hyper Text Transfer Protocol), and can be interconnected with any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include a local area network ("LAN"), a wide area network ("WAN"), an internet (e.g., the Internet), and a peer-to-peer network (e.g., an ad hoc peer-to-peer network), as well as any currently known or future developed network.
[0075] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.
[0076] The present invention provides a computer-readable medium in a third aspect, on which a computer program is stored, wherein the program is executed by a processor to implement a method for dynamic design proofreading and optimization of a highway construction project as described in any one of the first aspects. The computer-readable medium in this embodiment can be written in one or more programming languages or a combination thereof to write computer program codes for performing the operations of some embodiments of the present disclosure, and the above-mentioned programming languages include object-oriented programming languages, such as Java, Smalltalk, C++, and also include conventional procedural programming languages, such as "C" language or similar programming languages. The program code can be executed completely on the user's computer, partially on the user's computer, as an independent software package, partially on the user's computer and partially on a remote computer, or completely on a remote computer or server. In the case of a remote computer, the remote computer can be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or can be connected to an external computer (for example, using an Internet service provider to connect through the Internet).
[0077] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present disclosure. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some implementations as replacements, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.
[0078] In particular, according to some embodiments of the present disclosure, the process described above with reference to the flowchart can be implemented as a computer software program. For example, some embodiments of the present disclosure include a computer program product, which includes a computer program carried on a computer readable medium, and the computer program includes a program code for executing the method shown in the flowchart.
[0079] In a fourth aspect, the present invention provides an electronic device, comprising: one or more processors; a storage device having one or more programs stored thereon; when the one or more programs are executed by the one or more processors, the one or more processors implement a method for dynamic design proofreading and optimization of highway construction projects as described in the first aspect. The computer-readable medium may be included in the electronic device; or it may exist separately, that is, it is not assembled into the electronic device. The computer-readable medium carries one or more programs, and when the one or more programs are executed by the electronic device, the electronic device can implement a method for finished product detection of packaging boxes based on image positioning as described in the first aspect.
[0080] A fifth aspect of the present invention provides a computer program product, comprising a computer program, which, when executed by a processor, implements a dynamic design proofreading and optimization method for a highway construction project as described in the first aspect.
[0081] The above descriptions are only some preferred embodiments of the present disclosure and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the embodiments of the present disclosure is not limited to the technical solutions formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the above inventive concept. For example, the above features are replaced with (but not limited to) technical features with similar functions disclosed in the embodiments of the present disclosure.
Claims
1. A dynamic design proofreading optimization method for highway construction projects, It is characterized in that include: Obtain location information of the construction area and construct a coordinate distribution map of the construction area; Obtain design information of the construction area, and construct an original design map of the construction area based on the coordinate distribution map of the construction area; According to the coordinate distribution map of the construction area, the original design map of the construction area is divided into sections to obtain original design information of at least two sections in the construction area; Extracting pre-construction characteristic information of the construction area according to the design information of the construction area and / or the original design information of the section of the construction area; Obtain the actual operation situation of the construction area, match it with the pre-construction characteristic information of the construction area, and obtain the design revision information of the construction area; According to the design revision information of the construction area, the original design information of the section of the construction area is revised to obtain a revised design drawing of the construction area; Wherein, the method for obtaining the design revision information of the construction area includes: According to the actual operation situation of the construction area, obtain the actual operation data information of the construction area; According to the actual operation data information of the construction area, the actual total amount of consumables in the construction area is obtained; According to the actual total amount of consumables in the construction area, determine the actual total amount of each type of consumables in the construction area; Compare the actual total amount of each type of consumables in the construction area with the total amount of each type of consumables in the original design drawing of the construction area to obtain comparison difference information in the construction area; According to the comparison difference information in the construction area and in combination with the coordinate distribution map of the construction area, the design correction information of the construction area is determined; In addition, the method for obtaining a revised design drawing of a construction area further comprises: According to the coordinate distribution map of the construction area and in combination with the classification information of the original design structural consumables of the construction area, the direction coordinate information of each type of consumables in the original design map of the construction area is determined; According to the actual operation situation in the construction area, determine the actual trend information of each type of consumables in the construction area; According to the actual trend information of each type of consumables in the construction area and combined with the design revision information of the construction area, the original design information of the section of the construction area is revised to obtain a revised design drawing of the construction area; According to the actual operation of the construction area, the revised design drawings of the construction area are continuously revised to obtain the completed design drawings of the construction area; Wherein, the method for obtaining the completion design drawing of the construction area includes: Suppose a line is selected in the construction area as a design direction reference line of the original design drawing in the construction area, wherein the design direction reference line of the original design drawing is parallel to the y-axis; According to the design direction of the original design drawing in the construction area and in combination with the coordinates of one end point of the constructed route in the construction area at this time, the original design direction connection line of the original design drawing in the construction area is determined; Determine the actual construction route in the construction area based on the actual operation data in the construction area and in combination with the geographic coordinate information of the construction area; According to the design direction reference line of the original design drawing in the construction area, one end of the original design direction connection line of the original design drawing in the construction area is extended to intersect with the design direction reference line of the original design drawing in the construction area, and the other end of the original design direction connection line of the original design drawing in the construction area is vertically connected to the design direction reference line of the original design drawing in the construction area to obtain a design direction triangular image of the original design drawing in the construction area, and the angle of intersection of one end of the original design direction connection line of the original design drawing in the construction area with the design direction reference line of the original design drawing in the construction area is determined according to a trigonometric function; According to the design direction reference line of the original design drawing in the construction area, one end of the actual construction route in the construction area is extended to intersect with the design direction reference line of the original design drawing in the construction area, and the other end of the actual construction route in the construction area is vertically connected to the design direction reference line of the original design drawing in the construction area to obtain a triangular image of the actual construction route in the construction area, and the angle of intersection of one end of the actual construction route in the construction area with the design direction reference line of the original design drawing in the construction area is determined according to trigonometric functions; At this time, one end of the actual construction route in the construction area is extended to the intersection angle with the design direction reference line of the original design drawing in the construction area, and one end of the original design direction line of the original design drawing in the construction area is extended to the intersection angle with the design direction reference line of the original design drawing in the construction area for comparison to determine the final correction angle of the original design direction line in the construction area.
2. A method for dynamic design, proofreading and optimizing a highway construction project according to claim 1, It is characterized in that Also includes: Obtaining a practical operation period of the construction area, dividing and obtaining at least one correction period of the construction area; According to the revision period of the construction area and in combination with the original design drawing of the construction area, the pre-construction characteristic information of the construction area is extracted respectively; According to the revision period of the construction area, the pre-construction characteristic information of the construction area is matched with the actual operation situation of the construction area to obtain the design revision information of each revision period in the construction area; According to the revision cycle of the construction area and in combination with the design revision information of each revision cycle in the construction area, the original design drawing of the construction area and / or the revised design drawing of the construction area are revised to obtain the completed design drawing of the construction area.
3. A method for dynamic design, proofreading and optimizing a highway construction project according to claim 2, It is characterized in that The method for obtaining original design information of at least two sections in a construction area comprises: According to the coordinate distribution map of the construction area, determine the design direction of the original design drawing of the construction area; According to the design direction of the original design drawing of the construction area, the original design drawing of the construction area is structurally divided to obtain the original design structure distribution information of the construction area; According to the original design structure distribution information of the construction area and in combination with the coordinate distribution map of the construction area, the original design map of the construction area is divided into intervals to obtain the original design information of at least two sections in the construction area.
4. A method for dynamic design, proofreading and optimizing a highway construction project according to claim 3, It is characterized in that The method for extracting pre-construction feature information of a construction area comprises: Determine the original design structure consumables information of the construction area according to the original design structure distribution information of the construction area; Classifying the original design structure consumables information of the construction area according to the original design structure distribution information of the construction area to obtain at least one set of original design structure consumables classification information of the construction area; According to the original design drawings of the construction area and in combination with the classification information of the original design structural consumables of the construction area, determine the total amount of each type of consumables in the original design drawings of the construction area; According to the design direction of the original design drawing of the construction area and the coordinate distribution map of the construction area, determine the direction information of each type of consumables in the original design drawing of the construction area; The pre-construction characteristic information of the construction area is determined based on the total amount of each consumable and the direction information of each type of consumable in the original design drawing of the construction area.
5. A method for dynamic design, proofreading and optimizing a highway construction project according to claim 4, It is characterized in that The original design structural consumables classification information of the construction area includes: The overall structure of highway construction in the construction area, the infrastructure that forms the overall structure of highway construction, and one or more combinations of component structures in the infrastructure that constitutes the overall structure of highway construction.
6. A dynamic design proofreading and optimization system for highway construction projects, It is characterized in that A dynamic design proofreading and optimization method for a highway construction project as described in any one of claims 1 to 5 is adopted.
7. A highway construction project dynamic design proofreading optimization system according to claim 6, It is characterized in that The optimization system also includes: A data collection module, wherein the data collection module is used to collect actual operation data of the construction area; A data modification module, wherein the data modification module is used to modify and revise the original design drawing of the construction area; A data integration module is used to record data changes of the original design drawings of the construction area.
8. A computer readable medium, It is characterized in that A computer program is stored thereon, wherein when the program is executed by a processor, a dynamic design proofreading and optimization method for a highway construction project as claimed in any one of claims 1 to 5 is implemented.
Citation Information
Patent Citations
Outdoor automatic obstacle dodging AGV navigation method based on multiple sensors
CN106774313A
Pipeline completion drawing generation method, device and system
CN110390725A
BIM deepening method for rapid building of automobile factory building
CN115470552A
BIM-based curtain wall construction drawing one-key generation method
CN115795604A
Construction management system
JP2018119295A