A resource accounting method for Shunjian logistics model based on equivalent logistics volume

By adopting a resource accounting method based on equivalent material flow under the Shunjian logistics model and taking into account the differential impact of intermediate conversion variables and stocking units, the problem of inaccurate accounting results in the existing technology is solved, and higher theoretical interpretability and Accuracy helps companies optimize logistics resource management and planning.

CN118396569BActive Publication Date: 2024-10-25CHANGCHUN UNIV OF SCI & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410817136.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2024-10-25
Estimated Expiration
2044-06-24

AI Technical Summary

Technical Problem

The existing lean accounting method of logistics resources fails to accurately consider the differential impact of intermediate conversion variables and stocking units under the Shunjian logistics model, resulting in a lack of theoretical interpretability and accuracy in the accounting results.

Method used

Using the resource accounting method based on equivalent material flow, by dividing the five links in the Shunjian logistics model, including unloading and return, inspection and storage, outbound transfer, stock picking and online links, combined with intermediate conversion variables such as bicycle quotas and parts Packaging volume, build an accounting model to accurately calculate logistics resource consumption, and propose resource allocation strategies.

Benefits of technology

It improves the theoretical interpretability and accuracy of logistics resource accounting, helps enterprises better manage logistics resources, reduces operational complexity and differential impacts, and provides more accurate resource planning guidance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118396569B_ABST
    Figure CN118396569B_ABST
Patent Text Reader

Abstract

The present invention relates to a resource accounting method of a Shunjian logistics model based on equivalent logistics volume, that is, to measure the logistics resources in each operation process of the Shunjian logistics model, that is, to measure the logistics resources consumed by the unloading and emptying link, the acceptance and storage link, the outbound transfer link, the stock picking link, and the online link under the Shunjian logistics model, by decomposing the operation process of the Shunjian logistics model, finding the intermediate conversion variables in the logistics resource consumption, and considering the impact of the differentiated impact of the stocking units in the Shunjian secondary storage area on the equivalent logistics volume, constructing a logistics resource accounting model, and finally realizing the logistics resource accounting under the Shunjian model from each link. The advantages of the present invention: it is proposed to use equivalent physical quantities as the calculation basis of intermediate conversion variables, consider the accurate calculation of intermediate conversion variables and the calculation of equivalent logistics volume caused by the differentiated impact of stocking units caused by Shunjian secondary storage, so that the logistics resource accounting results enhance theoretical explanation and accuracy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of lean accounting of production logistics resources, and in particular relates to a Shunjian logistics model resource accounting method based on equivalent logistics volume under the Shunjian logistics model. Background Art

[0002] Shunjian Logistics Model is a logistics management model that is customer-oriented and based on information technology. It means that after the parts enter the factory, they are rearranged in the order of the production models of the production line, or the parts that are initially processed on the secondary line of the relevant project are brought to the main line in order. Its operation process covers all aspects from order receipt, warehouse management, inventory control, distribution planning to logistics tracking.

[0003] Therefore, the standard operations of each process and the logistics resources consumed (personnel, process vehicles and occupied area) are diverse in type, huge in quantity and high in related logistics costs. The existing lean accounting method for logistics resources is based on the total operation time and standard operation time, and does not consider the precise calculation of intermediate conversion variables and their impact on the accounting results, resulting in a lack of theoretical explanation and accuracy in the accounting results.

[0004] Problems with existing technologies:

[0005] 1. Its existing lean accounting method for logistics resources is based on the total operation time and standard operation time, and does not consider the precise calculation of intermediate conversion variables and their impact on the accounting results, resulting in a lack of theoretical explanation and accuracy in the accounting results.

[0006] Chang Xiaolong. Research on the optimization and simulation of production workshop facilities planning of Company A has been reported. Chengdu University of Technology (2016) proposed that the product of demand and handling coefficient can be used to obtain the monthly equivalent logistics volume between each operation unit as the basis for analyzing the logistics relationship of the operation unit. However, the impact of intermediate transfer variables related to demand on the equivalent logistics volume was not considered. The reported "Logistics distribution system for product production links and logistics cost accounting method thereof", patent publication number CN109993483A, considers using GPS positioning terminals, RFID electronic tags attached to products, and mobile smart terminals used by different personnel, and using collection equipment to collect the costs of various departments in the process of product production and transportation and the cost information of vehicles during transportation in real time. Various costs are broken down into various links, such as management labor costs, warehousing labor costs, picking labor costs, etc., but the resource consumption details corresponding to the costs are not given. In the calculation of equivalent logistics volume, the role of intermediate transfer variables, that is, the impact of intermediate transfer variables on logistics resource consumption, and their application in the accounting of logistics resources are not considered.

[0007] 2. The existing logistics resource accounting method based on equivalent logistics volume does not take into account the impact of the differentiation of stocking units caused by different storage methods on the equivalent logistics volume.

[0008] Chang Jiang, reported. Lean logistics design for body parts welding enterprises based on Flexsim, Master's thesis of Shenyang University of Technology (2022), proposed that combining the two factors of material packaging and handling equipment to construct an equivalent logistics volume calculation model can better represent the logistics relationship between each operation unit. The total logistics volume between each pair of operation units can be calculated based on the equivalent logistics volume between the operation units. From the perspective of spatial layout, the workshop layout plan can be accurately adjusted to reduce logistics handling costs. The calculation of equivalent logistics volume without considering the impact of stocking unit differentiation and its impact on logistics resource accounting.

[0009] 3. Among the four existing production logistics models, the Shunjian logistics model has a good flow of operations. However, in the entire flow of operations, due to the existence of secondary storage problems and picking and preparing goods according to the production sequence, the Shunjian logistics model is dependent on the floor plan of the factory, with the most types of operations, the highest timeliness requirements, and the highest point-to-point accuracy requirements. This results in the Shunjian logistics model's information flow being very accurate and having the foundation for lean accounting.

[0010] The reported Wan Shiqi. Research on the Optimization of Cost Accounting of CH Logistics Company Based on Activity-Based Costing, Master's Thesis of Guangdong University of Technology (2022) Based on the activity-based costing method, the operation center is divided into: order management, cargo transportation, acceptance and storage operation links, warehousing management, cargo outbound and cargo distribution, and the specific resource consumption is calculated and aggregated. However, only the cost and allocation of logistics resources are considered, and the accounting of logistics resources consumed under the Shunjian logistics model is not considered. The reported Wang Qianqian. Research on the Optimization of Logistics Cost Calculation and Distribution Method of FAW Car Assembly Line, Master's Thesis of Jilin University (2011) proposed that the cost calculation under the Shunjian logistics method is based on the specific process of the Shunjian logistics method, and the logistics cost calculation method based on the logistics cost project is used as the calculation method. With the project as the carrier, it is determined whether each project is within the calculation range and the algorithm of each project according to the specific process of the Shunjian logistics method. The Shunjian logistics model in the factory is disassembled into warehousing cost, loading and unloading cost, logistics information cost, logistics management cost, and capital occupation cost, without considering the detailed consideration of the operation process of the Shunjian logistics model and the consumption of various logistics resources. Summary of the invention

[0011] In view of the above problems, the purpose of the present invention is to provide a resource accounting method for a Shunjian logistics model based on equivalent logistics volume, which is used to consider the calculation of equivalent logistics volume that affects the differentiation of stocking units due to different storage methods, and through intermediate conversion variables, clarify the precise calculation and application of intermediate conversion variables such as single vehicle quotas and parts packaging volumes, and realize the lean accounting of logistics resources under the Shunjian logistics model. And, the proposed logistics resource accounting method can be in the Shunjian model, by using equivalent logistics volume, the logistics volume of different operations can be uniformly measured, reducing the impact of operational complexity and differences. Help enterprises better manage logistics resources, and provide guidance for subsequent logistics resource planning by comparing and analyzing with actual on-site operations.

[0012] To achieve the above object, the present invention adopts the following technical solution:

[0013] A resource accounting method for a Shunjian logistics model based on equivalent logistics volume specifically comprises the following steps:

[0014] S1: Analysis of Shunjian logistics model operation process and logistics resources,

[0015] In the Shunjian logistics model operation, there are five main links, namely, unloading and returning, acceptance and storage, outbound transfer, stock preparation and picking, and online. By disassembling the operation process of each link, the flow direction of parts in each link and the consumed logistics resources are determined;

[0016] S2: Data collection and compilation,

[0017] Obtain automobile production plans and parts original unit information through data collection, and establish Shunjian parts information database;

[0018] S3: Construction of accounting model considering the differentiated impact of stocking units in Shunjian secondary storage,

[0019] According to the activity-based costing method, by calculating the operation time T and the planned working time T s Calculate and get the planning value of various logistics resources. Since workers cannot work at full capacity, divide it by the specified operating load rate λ to get the logistics resource accounting value. The various process vehicles required during the operation can be determined according to the number of operators, and then build a logistics mode accounting model.

[0020] S4: Calculate the logistics resources of each link in the construction.

[0021] Shunjian Logistics Resource Calculation includes the following five links: unloading and returning, acceptance and storage, outbound transfer, stock preparation and picking, and online launch;

[0022] S5: Shunjian Logistics Resource Allocation Strategy is proposed.

[0023] Since automobile production plans will change over time, while the configuration of operators in each link of the site is fixed, this will lead to different workloads for operators, that is, the operating load rate is not consistent. By measuring the logistics resources of each link, the logistics resources required for each link under a certain operating load rate can be accurately determined, which can be used to propose logistics resource allocation strategies. Based on the analysis of Shunjian’s logistics resource accounting value and the actual number of employees, a personnel structural configuration optimization strategy can be formulated.

[0024] As a preferred embodiment of the present invention, in the Shunjian logistics mode of step S1, the operation areas of the logistics resources consumed in each link are as follows:

[0025] By disassembling the operation process of the five links, the flow direction of the parts in the five links and the consumed logistics resources are determined. Among them, the operation areas of the logistics resources consumed in each link are as follows:

[0026] The unloading and empty return process involves three areas: the unloading port parking area, the acceptance area, and the empty container sorting area. The forklift at the unloading port parking area places the delivered parts in the acceptance area, and the forklift at the empty container sorting area returns the empty containers in the empty container sorting area to the parts manufacturer, and unloads the empty containers brought by the tractor from the Shunjian yard in the empty container sorting area;

[0027] The acceptance and warehousing process involves the acceptance area, the loading port of the large three-dimensional warehouse, and the stacking area. The acceptance personnel need to inspect the parts sent by the manufacturer. After the acceptance is completed, the forklift will deliver the parts to a specific storage area, namely the loading port and stacking area of ​​the large three-dimensional warehouse; the outbound transportation process involves the unloading port of the three-dimensional warehouse, the stacking area, the temporary storage area to be shipped, the Shunjian stocking area, and the empty box sorting area. After receiving the parts, the forklift will take them off the shelf from the three-dimensional warehouse and transport them to the temporary storage area to be shipped. The parts in the stacking area are waiting for the tractor to transfer them and do not need to be transported to the temporary storage area to be shipped. After the forklift places the parts on the tractor's equipment car, the tractor will send them to the secondary storage area. In the Shunjian logistics model, the secondary storage area is the Shunjian yard. After the tractor delivers the parts to the secondary storage area, the tractor will transport the empty boxes to the empty box sorting area and carry out the next parts transportation;

[0028] The stock picking process involves the information points, empty equipment storage area, picking area, and waiting area within the Shunjian yard, and is mainly carried out by picking personnel;

[0029] The online process involves the waiting area and line-side storage area of ​​the Shunjian yard. The tractor mounts the towing equipment vehicle in the waiting area of ​​the Shunjian yard, transports the parts to the line-side storage area, and transports the empty equipment vehicle in the line-side storage area back to the Shunjian yard.

[0030] As a preferred embodiment of the present invention, in step S2, the following steps are also included:

[0031] A1: Data collection,

[0032] According to the logistics execution system and manufacturing operation management system of the automobile manufacturer, the automobile production plan and original unit information of the parts of the enterprise are obtained, wherein the automobile models and the production volume of each model are extracted from the automobile production plan, the part number, the size of the part packaging box (L: length, W: width, H: height), the number of parts accommodated U, the storage method, the supply method are extracted from the original unit information library of the parts, and the part number and the number of equipment vehicles accommodated C are extracted from the MOM system; the single vehicle usage q of various parts required;

[0033] A2: Establish Shunjian parts information database,

[0034] By collecting the original unit information of parts and automobile production information, we screen out the parts required for the production of each model of automobile according to the automobile model. Then, based on the supply method, we screen out the parts required for operations under the Shunjian logistics model, obtain the information of the required parts, and establish a Shunjian parts information database.

[0035] As a preferred embodiment of the present invention, in step S3, the logistics mode calculation model is as follows:

[0036]

[0037] C1: Calculation of operation duration,

[0038] When calculating the operation time T, it is regarded as the product of the operation time and the equivalent logistics volume. The operation time is regarded as the unit operation time and the parts transportation time T. y The transportation time is calculated by the operation distance and operation speed. The operation distance is determined according to the operation area of ​​each link under the Shunjian logistics model. The operation speed includes: forklift speed v c , tractor speed v q , personnel movement speed v r ,

[0039] The unit operation time is calculated by the MTM time measurement method. By decomposing and summarizing the operation process of each link, the standard value of each unit operation time is determined. The unit standard operation time is divided into the following time according to the operator:

[0040] The acceptance personnel are involved in the scanning operation unit time T during acceptance sm , refers to the unit operation time of the acceptance personnel to scan the code for acceptance, and the unit time of appearance inspection is T cd It refers to the unit time for the acceptance personnel to check whether the parts packaging box is intact, and the unit time for confirming the arrival quantity T dh , refers to the unit operation time for acceptance personnel to confirm the arrival quantity;

[0041] The unit time T of forklift operation involved in forklift operation when the forklift driver is performing the operationC , refers to the unit operation time required for a forklift to pick up and put down goods;

[0042] The tractor time involves the unit operation time T of the mounted equipment during operation. GZ , refers to the unit operation time required for the tractor to untie and connect the new pallet truck during an empty-full exchange of equipment; the unit operation time of the equipment T TQJ , refers to the unit operation time required to put the equipment vehicle into the line-side storage area;

[0043] The picking personnel are involved in printing instruction tickets during the operation. DY , refers to the unit operation time of the picking personnel logging into the system to print the instruction ticket; the unit operation time of picking parts T FJ , refers to the unit time required for a picker to pick a part from a part packaging box and place it in the tool cart;

[0044] C2: Calculation of equivalent logistics volume considering the differentiated impact of stocking units in Shunjian secondary storage,

[0045] (1) Calculation of equivalent material flow rate stored once,

[0046] Since one-time storage does not involve unpacking and picking operations, the parts transfer method is full box transfer. Therefore, when converting the equivalent logistics volume, the number of parts stacks is used as the equivalent logistics volume. The operation involves unloading and returning, acceptance and storage operations, and outbound transfer. When calculating the number of parts stacks, the model production ratio, part single vehicle quota, part packaging volume, and the number of equipment vehicles are used for calculation, and converted into standard stacks as the equivalent logistics volume, which is helpful for the subsequent calculation of the operation time required for parts operation, that is, the operation time of forklift and tractor logistics resources;

[0047] Calculation of model production ratio: According to the production plan, calculate the model production ratio of each model c =

[0048] [c 1 ,c 2 ,…,c n ] T , where k i is the quantity of each model scheduled for production in the production plan. The calculation formula for the production proportion of each model is:

[0049]

[0050] Calculation of single vehicle quota: based on the number of parts of each model used in different models,

[0051]

[0052] and the proportion of vehicle models in production, and calculate the average number of each type of parts used in the production of a car, that is, the single vehicle quota d = [d 1 ,d 2 ,…,d m ] T :

[0053] d=qc formula (3-4)

[0054] Calculation of parts packaging volume: Based on the volume of various parts packaging boxes and the number of parts contained, the approximate volume of each part is calculated, that is, V = [V 1 ,V 2 ,…,V m ] T is the volume of the parts packaging, L = [l 1 ,l 2 ,…,l m ] T ,W=[w 1 ,w 2 ,…,w m ] T ,H=[h 1 ,h 2 ,…,h m ] T , is the length, width and height of the parts packaging box, U=[u 1 ,u 2 ,…,u m ] T The number of parts contained in the packaging box, that is, the number of parts contained, is used to obtain the parts packaging volume. The calculation formula is as follows:

[0055] V=L⊙W⊙H / U Formula (3-5)

[0056] Calculation of the number of parts stacks: According to the single vehicle quota and the parts packaging volume, as well as the vehicle model production plan, the number of parts stacks required for transfer is calculated from D = [D 1 ,D 2 ,…,D m ] T , a standard stack is set to be one cubic meter, where n c Represents the total amount of automobile production, and the calculation formula for the number of pallets of each part is as follows:

[0057] D=n c d⊙V formula (3-6)

[0058] (2) Calculation of equivalent material flow rate of secondary storage,

[0059] Calculation of the number of equipment carts: Shunjian logistics model requires that different parts be delivered to the production line side within the specified time through the stock picking process in the order of serial numbers. Therefore, in the stock sorting and on-line process, the parts need to be unpacked and picked, and different parts need to be distinguished and placed on special equipment carts. In these two links, the required number of equipment carts is used as the equivalent logistics volume. The number of equipment carts Z = [Z 1 ,Z 2 ,…,Z m ] T The calculation requires the single vehicle quota, vehicle output and the number of equipment vehicles C = [C 1 ,C 2 ,…,C m ] T , the calculation formula is as follows:

[0060] Z=n c d / C Formula (3-7)

[0061] C3: Planned working hours refer to the working hours stipulated by the enterprise for workers.

[0062] C4: The work load rate refers to the fact that employees cannot work at full capacity during the operation. Therefore, it is necessary to calculate the work load rate to balance the work load of employees and give full play to their work capacity. When calculating logistics resources, the standard operation time and the range of work load are specified for calculation. Let the work load rate be λ.

[0063] As a preferred embodiment of the present invention, in step S4,

[0064] D1: Unloading and returning to empty space.

[0065] In this link logistics calculation, the path distance S from the unloading parking area to the acceptance area is TY And the path distance S from the empty container area to the unloading parking space KT , forklift unit operation time T C And the forklift speed v c Calculate the required operation time, and then convert the required number of workers and forklifts based on the operation time. The operation logistics resources are forklift drivers and forklifts. The calculation formula is as follows:

[0066]

[0067] D2: Check and store the goods.

[0068] When calculating logistics resources in the acceptance phase, it is necessary to calculate the unit time T for appearance inspection. cd , Arrival quantity confirmation unit time T dh , Scanning operation unit time T smCalculate the number of acceptance personnel based on the number of parts stacks that need to be accepted and the employee's workload rate.

[0069]

[0070] Due to the size of the packaging boxes, some parts are stored in the large stereoscopic warehouse, and the rest are stored in the stacking area. Therefore, when calculating the logistics resources in the warehousing link, the operating distance is the path distance S from the acceptance area to the stereoscopic warehouse. YLK And the path distance S from the acceptance area to the stacking area YDD , suppose there are k kinds of parts in the storage stereoscopic warehouse, h kinds of parts in the stacking area, k+h=m, and the number of stacks of different parts is D i and D j , the operation logistics resources are forklift drivers and forklifts. The calculation formula is as follows:

[0071]

[0072] D3: Outbound transfer:

[0073] The outbound link involves the problem of parts storage location. The outbound of parts from the stacking area is completed by the forklift that places the parts in the stacking area. Therefore, the logistics resources calculated in this link refer specifically to the forklift and forklift driver responsible for the outbound of parts from the large stereoscopic warehouse. The types of parts involved are the same as those stored in the stereoscopic warehouse in the inbound link, which is k. Suppose the path distance from the unloading port of the large stereoscopic warehouse to the temporary storage area to be shipped is S. XD , the calculation formula is as follows:

[0074]

[0075] In the Shunjian logistics model, the operation process of the tractor performing the outbound transfer scene is considered to be a round trip from the Shunjian yard to the empty equipment storage area. In the Shunjian stocking area, according to the type of parts, they are transferred to different storage areas of the Shunjian yard. During this period, the tractor needs to unload empty boxes in the empty equipment storage area, load parts in the waiting area or stacking area, and exchange empty and full pallet trucks in the Shunjian stocking area. During this period, the number of pallet trucks mounted on the tractor p is involved. The distance of a cycle operation path from the empty equipment storage area to the Shunjian stocking area is S = [S 1 ,S 2 ,…,S m ], the unit time of loading pallet truck is T GZ , the calculation formula is as follows:

[0076]

[0077] D4: Stock picking process,

[0078] The stock picking process involves the calculation of picking personnel. Since unpacking and picking are required, the equivalent logistics volume is the number of equipment vehicles, which mainly involves the path distance S from the information point in the construction site to the empty equipment area. XK , the path distance S from the empty equipment area to the sorting area KF , the path distance S from the sorting area to the waiting area FD And the sorting area distance S FJ The unit operation time involved is the unit time T of printing instruction ticket. DY , Single sorting parts time T FJ , the walking speed of the person is v r After the parts are sorted, the equipment cart needs to be pushed to the waiting area. The calculation formula is as follows:

[0079]

[0080] D5: Online stage,

[0081] In the on-line link, the operation process of the tractor is considered to be based on the type of parts, from each line of the Shunjian stocking area to the corresponding production line side storage area. Therefore, the number of parts required to go online is calculated based on the number of equipment carts mounted on the tractor. The mounted equipment is generally picked up and placed by the staff in the stocking area. Therefore, it is assumed that the mounted equipment trolleys are connected. During this period, the distance from the line side storage area of ​​each production line to the Shunjian stocking area is S = [S 1 ,S 2 ,…,S m ], the unit time of mounting equipment is T GZ , the unit operation time T of placing equipment vehicles in the online storage area TQJ , the calculation formula is as follows:

[0082]

[0083] By measuring the above links, the logistics resource accounting under the Shunjian logistics model based on equivalent logistics volume was completed, in which intermediate transfer variables were used as the basis for accounting, which is conducive to expanding to other logistics models and enhancing the theoretical explanatory power and accuracy of the logistics resource accounting results.

[0084] As a preferred embodiment of the present invention, in step S5, the following steps are also included:

[0085] E1: Balanced workload,

[0086] When optimizing the structural configuration of logistics resources, the calculated values ​​of logistics resources in each link are used as a reference. When there is a certain gap between the calculated logistics resources in a certain link and the actual on-site operators, the personnel with low workload rates are assigned additional tasks through planning and design.

[0087] E2: Process Reengineering and Allocation,

[0088] Since each operation process is linked to each other, some of them have a sequence. The three links of unloading, acceptance and warehousing have a sequence, which also causes some waiting time. Based on the logistics resource accounting value and the actual number of operators, the operation process can be analyzed and optimized, and the diversity of operators' operations can be considered;

[0089] E3: Optimization of personnel structure,

[0090] Based on the logistics resource accounting results of each link and the actual number of operators, the operators are reallocated to other links. This requires comprehensive training of employees to meet the needs of dynamic allocation of employees, so that they can be competent for the operating processes of other links and realize dynamic structural adjustments of operators in each link. At the same time, this requires planners to make accurate scheduling of personnel and allocation of work tasks and eliminate workers' discomfort with job transfers.

[0091] The advantages and positive effects of the present invention are:

[0092] 1. The present invention proposes to use equivalent physical quantities as the calculation basis of intermediate conversion variables, consider the accurate calculation of intermediate conversion variables and the calculation of equivalent logistics volume that takes into account the differentiated impact of stocking units caused by secondary storage, so as to enhance the theoretical explanatory power and accuracy of logistics resource accounting results.

[0093] 2. The present invention realizes lean accounting of logistics resources under the through-flow of Shunjian logistics model by clarifying the calculation principles and application scenarios of intermediate conversion variables such as equivalent number of stacks, single vehicle quota, and parts packaging volume, which has guiding significance for logistics resource accounting of other logistics models. BRIEF DESCRIPTION OF THE DRAWINGS

[0094] Figure 1 It is the operation flow chart of Shunjian logistics mode and its logistics resource analysis flow chart of the present invention;

[0095] Figure 2 It is a data collection and arrangement flow chart of the present invention;

[0096] Figure 3 It is a flow chart of the calculation model construction considering the differentiated impact of the stocking units of Shunjian secondary storage of the present invention;

[0097] Figure 4 It is a flow chart of logistics resource accounting for each link of Shunjian of the present invention;

[0098] Figure 5 This is the Shunjian logistics resource allocation strategy flow chart of the present invention DETAILED DESCRIPTION

[0099] The following is combined with Figure 1-5 , describe in detail the technical solution and key points of the invention.

[0100] This embodiment takes the logistics resource accounting based on equivalent logistics volume under the Shunjian mode as the research object. According to the operation process under the Shunjian logistics mode. It is mainly divided into unloading and returning links, acceptance and storage links, outbound transportation links, preparation and picking links, and online links. A resource accounting method based on equivalent logistics volume is proposed for the logistics resources such as personnel and forklifts consumed in each link.

[0101] This embodiment is based on the logistics resource accounting method of equivalent logistics volume. By calculating the logistics resources of each logistics resource in different operation processes, that is, calculating the logistics resources consumed in the unloading and emptying link, the acceptance and storage operation link, the outbound transfer scene link, the preparation and picking link, and the online link under the logistics Shunjian mode (logistics resources mainly include: forklifts, forklift drivers, tractors, tractor drivers, acceptance personnel and picking personnel, etc.), by decomposing the operation process of the Shunjian logistics model, finding the intermediate conversion variables in the logistics resource consumption, that is, the single vehicle quota, the parts packaging volume, and considering the differentiated impact of the stocking unit in the Shunjian secondary storage area on the equivalent logistics volume, a logistics resource accounting model is constructed, and finally the logistics resource accounting under the Shunjian mode is realized from all links.

[0102] This method specifically includes the following five steps:

[0103] S1: Analysis of Shunjian logistics model operation process and logistics resources,

[0104] In the Shunjian logistics model operation, there are five main links, namely, unloading and returning, acceptance and storage, outbound transfer, stock preparation and picking, and online. By disassembling the operation process of each link, the flow direction of parts in each link and the consumed logistics resources are determined;

[0105] The operating areas of logistics resources consumed in each link are as follows:

[0106] The unloading and returning process involves three areas: the unloading port parking area, the acceptance area, and the empty container sorting area. The forklift at the unloading port parking area places the delivered parts in the acceptance area, and the forklift at the empty container sorting area returns the empty containers in the empty container sorting area to the parts manufacturer and unloads the empty containers brought by the tractor from the Shunjian yard.

[0107] The acceptance and warehousing operation involves the acceptance area, the loading port of the large three-dimensional warehouse, and the stacking area. The acceptance personnel need to inspect the parts sent by the manufacturer. After the acceptance is completed, the forklift will deliver the parts to a specific storage area, namely the loading port and stacking area of ​​the large three-dimensional warehouse; the outbound transportation scene involves the unloading port of the three-dimensional warehouse, the stacking area, the temporary storage area to be shipped, the Shunjian stocking area, and the empty box sorting area. After receiving the parts, the forklift will take them off the shelf from the three-dimensional warehouse and transport them to the temporary storage area to be shipped. The parts in the stacking area are waiting for the tractor and do not need to be transported to the temporary storage area to be shipped. After the forklift places the parts on the tractor's equipment car, the tractor will send them to the secondary storage area. In the Shunjian logistics model, the secondary storage area is the Shunjian yard. After the tractor delivers the parts to the secondary storage area, the tractor will transport the empty boxes to the empty box sorting area and carry out the next parts transportation;

[0108] The stock picking process involves the information points, empty equipment storage area, picking area, and waiting area within the Shunjian yard, and is mainly carried out by picking personnel;

[0109] The online process involves the waiting area and line-side storage area of ​​the Shunjian yard. The tractor mounts the towing equipment vehicle in the waiting area of ​​the Shunjian yard, transports the parts to the line-side storage area, and transports the empty equipment vehicle in the line-side storage area back to the Shunjian yard.

[0110] The above-mentioned specific storage area refers to: the parts operated in the Shunjian logistics model refer to the parts that are generally stored in the large three-dimensional warehouse and the stacking area during one storage. These parts have the characteristics of large size, heavy weight, many types or colors, and are closely related to vehicle models. Therefore, specific storage areas are required to ensure their safe and effective storage. Among them, the problem of parts storage area is involved in the unloading and emptying link, the warehousing inspection link, and the outbound transportation scene link.

[0111] The above-mentioned secondary storage means that these parts will be stored in Shunjian's stocking area, namely the PC area, through the Shunjian logistics model. Unpacking and picking are carried out in the Shunjian stocking area, and the parts are sent to the line-side storage area in the order of vehicle assembly within the specified time through instruction tickets. This ensures that these parts can be quickly and accurately extracted and used during the production process. Among them, the unloading and emptying link, the outbound transfer scene link, the stocking picking link and the online link involve the secondary storage of parts.

[0112] S2: Data collection and compilation,

[0113] Obtain automobile production plans and parts original unit information through data collection, and establish Shunjian parts information database;

[0114] A1: Data collection,

[0115] According to the automobile manufacturer's logistics execution system (LES) and manufacturing operations management system (MOM), the company's automobile production plan and parts original unit information are obtained, among which the scheduled automobile models and the scheduled production volume of each model are extracted from the automobile production plan, and the part number, part packaging box size (L: length, W: width, H: height), part storage number U, storage method (primary storage: large object stereoscopic warehouse, stacking area; secondary storage: sequential building preparation area), supply method (L1: sequential; L2: batch; L3: sequential building; L4: SPS) are extracted from the parts original unit information library, and the part number, equipment vehicle storage number C; the single vehicle usage q of various parts required are extracted from the MOM system.

[0116] A2: Establish Shunjian parts information database,

[0117] By collecting the original unit information of parts and automobile production information, the parts required for the production of each model of automobile are screened out according to the automobile model. Then, according to the supply method (L3), the parts required for operations under the Shunjian logistics model are screened out, and the information of the required parts, such as the number of parts to be accommodated, the size of the packaging box, etc., are obtained to establish a Shunjian parts information database.

[0118] S3: Construction of accounting model considering the differentiated impact of stocking units in Shunjian secondary storage,

[0119] According to the activity-based costing method, by calculating the operation time T (the time required to complete an operation process multiplied by the equivalent logistics volume, the operation time required for the production plan’s automobile output) and the planned working time T s Calculate and get the planning value of various logistics resources. Since workers cannot work at full capacity, divide it by the specified operating load rate λ to get the logistics resource accounting value. The various process vehicles required during the operation can be determined according to the number of operators, and then build a logistics mode accounting model.

[0120] The logistics mode accounting model is as follows:

[0121]

[0122] C1: Calculation of operation duration,

[0123] When calculating the operation time T, it can be regarded as the product of the time to complete one operation and the equivalent logistics volume. The time to complete one operation can be regarded as the unit operation time and the parts transportation time T. y The transportation time is calculated by the operation distance and operation speed. The operation distance is determined according to the operation area of ​​each link under the Shunjian logistics model. The operation speed includes: forklift speed v c , tractor speed v q , personnel movement speed v r ,

[0124] The unit operation time can be calculated by the MTM time measurement method. By decomposing and summarizing the operation process of each link, the standard value of each unit operation time is determined. The unit standard operation time can be divided into the following time according to the operator:

[0125] The acceptance personnel are involved in the scanning operation unit time T during acceptance sm , refers to the unit operation time of the acceptance personnel to scan the code for acceptance, and the unit time of appearance inspection is T cd It refers to the unit time for the acceptance personnel to check whether the parts packaging box is intact, and the unit time for confirming the arrival quantity T dh , refers to the unit operation time for acceptance personnel to confirm the arrival quantity;

[0126] The unit time T of forklift operation involved in forklift operation when the forklift driver is performing the operation C , refers to the unit operation time required for a forklift to pick up and put down goods;

[0127] The tractor time involves the unit operation time T of the mounted equipment during operation. GZ , refers to the unit operation time required for the tractor to untie and connect the new pallet truck during an empty-full exchange of equipment; the unit operation time of the equipment T TQJ , refers to the unit operation time required to put the equipment vehicle into the line-side storage area;

[0128] The picking personnel are involved in printing instruction tickets during the operation. DY , refers to the unit operation time of the picking personnel logging into the system to print the instruction ticket; the unit operation time of picking parts T FJ , refers to the unit time required for a picker to pick a part from a part packaging box and place it in the tool cart;

[0129] C2: Calculation of equivalent logistics volume considering the differentiated impact of stocking units in Shunjian secondary storage,

[0130] (1) Calculation of equivalent material flow rate stored once,

[0131] Since one-time storage does not involve unpacking and picking operations, and the parts transfer method is full-box transfer, the number of parts stacks can be used as the equivalent logistics volume when converting the equivalent logistics volume. The links involved in the operation include unloading and returning, acceptance and storage operations, and outbound transfer scenarios. When calculating the number of parts stacks, the model production ratio, the parts single vehicle quota, the parts packaging volume, and the number of equipment vehicles can be used for calculation, and converted into standard stacks as the equivalent logistics volume, which is helpful for the subsequent calculation of the operating time required for parts operations, that is, the operating time of forklift and tractor logistics resources;

[0132] Calculation of model production ratio: According to the production plan, calculate the model production ratio of each model c =

[0133] [c 1 ,c 2 ,…,c n ] T , where k i is the quantity of each model scheduled for production in the production plan. The calculation formula for the production proportion of each model is:

[0134]

[0135] Calculation of single vehicle quota: based on the number of parts of each model used in different models,

[0136]

[0137] and the proportion of vehicle models in production, and calculate the average number of each type of parts used in the production of a car, that is, the single vehicle quota d = [d 1 ,d 2 ,…,d m ] T :

[0138] d=qc formula (3-4)

[0139] Calculation of parts packaging volume: Based on the volume of various parts packaging boxes and the number of parts contained, the approximate volume of each part is calculated, that is, V = [V 1 ,V 2 ,…,V m ] T is the volume of the parts packaging, L = [l 1 ,l 2 ,…,l m ] T ,W=[w 1 ,w 2 ,…,w m ] T ,H=[h 1 ,h 2 ,…,h m ] T , is the length, width and height of the parts packaging box, U=[u 1 ,u 2 ,…,u m ] T The number of parts contained in the packaging box, that is, the number of parts contained, is used to obtain the parts packaging volume. The calculation formula is as follows:

[0140] V=L⊙W⊙H / U Formula (3-5)

[0141] Calculation of the number of parts stacks: Based on the single vehicle quota and the parts packaging volume, as well as the vehicle model production plan, the number of parts stacks required for transfer can be calculated from D = [D 1 ,D 2 ,…,D m ] T , a standard stack is set to be one cubic meter, where n c Represents the total amount of automobile production, and the calculation formula for the number of pallets of each part is as follows:

[0142] D=n c d⊙V formula (3-6)

[0143] (2) Calculation of equivalent material flow rate of secondary storage,

[0144] Calculation of the number of equipment carts: Shunjian Logistics Model requires that different parts be delivered to the production line side within the specified time by picking up the stock in the order of serial numbers. Therefore, in the stock sorting and on-line links, it is necessary to unpack and pick the parts, distinguish different parts (the same model parts may have differences in color, etc.), and place them on special equipment carts. In these two links, the number of equipment carts required Z = [Z 1 ,Z 2 ,…,Z m ] T As the equivalent logistics volume, the calculation of the number of equipment vehicles requires the single vehicle quota, automobile displacement and the number of equipment vehicles accommodated C = [C 1 ,C 2 ,…,C m ] T , the calculation formula is as follows:

[0145] Z=n c d / C Formula (3-7)

[0146] C3: Planned working hours refer to the working hours stipulated by the enterprise for workers.

[0147] C4: The work load rate refers to the fact that employees cannot work at full capacity during the operation. Therefore, it is necessary to calculate the work load rate to balance the work load of employees and give full play to their work capacity. When calculating logistics resources, the standard operation time and the range of work load can be specified for calculation. Let the work load rate be λ.

[0148] S4: Calculate the logistics resources of each link in the construction.

[0149] The scenario logistics resources are calculated in the following five links: unloading and returning, acceptance and storage, outbound transfer, stock preparation and picking, and online.

[0150] D1: Unloading and returning to empty space.

[0151] In this link logistics calculation, the path distance S from the unloading parking area to the acceptance area is TY And the path distance S from the empty container area to the unloading parking space KT , forklift unit operation time T C And the forklift speed v c Calculate the required operation time, and then convert the required number of workers and forklifts based on the operation time. The operation logistics resources are forklift drivers and forklifts. The calculation formula is as follows:

[0152]

[0153]

[0154]

[0155] D2: Check and store the goods.

[0156] When calculating logistics resources in the acceptance phase, it is necessary to calculate the unit time T for appearance inspection. cd , Arrival quantity confirmation unit time T dh , Scanning operation unit time T sm Calculate the number of acceptance personnel based on the number of parts stacks that need to be accepted and the employee's workload rate.

[0157]

[0158] Due to the size of the packaging box, some parts can be stored in the large stereoscopic warehouse, and the rest can be stored in the stacking area. Generally, they are special-sized parts. Therefore, when calculating the logistics resources in the warehousing link, the operating distance is the path distance S from the acceptance area to the stereoscopic warehouse. YLK And the path distance S from the acceptance area to the stacking area YDD , suppose there are k kinds of parts in the storage stereoscopic warehouse, h kinds in the stacking area (k+h=m), and the number of stacks of different parts is D i and D j , the operation logistics resources are forklift drivers and forklifts. The calculation formula is as follows:

[0159]

[0160] D3: Outbound transfer:

[0161] The outbound link involves the problem of parts storage location. The outbound of parts from the stacking area is completed by the forklift that places the parts in the stacking area. Therefore, the logistics resources calculated in this link refer specifically to the forklift and forklift driver responsible for the outbound of parts from the large three-dimensional warehouse. The types of parts involved are the same as those stored in the three-dimensional warehouse during the inbound link, which is k. Suppose the path distance from the unloading port of the large three-dimensional warehouse to the temporary storage area is S XD , the calculation formula is as follows:

[0162]

[0163] In the Shunjian logistics model, the operation process of the tractor performing the outbound transfer scene can be regarded as a round trip from the Shunjian yard to the empty equipment storage area. In the Shunjian stocking area, according to the type of parts, they are transferred to different storage areas of the Shunjian yard. During this period, the tractor needs to unload empty boxes in the empty equipment storage area, load parts in the waiting area or stacking area, and exchange empty and full pallet trucks in the Shunjian stocking area. During this period, the number of pallet trucks mounted on the tractor p is involved. The distance of a cycle operation path from the empty equipment storage area to the Shunjian stocking area is S = [S 1 ,S 2 ,…,S m ], the unit time of loading pallet truck is T GZ , the calculation formula is as follows:

[0164]

[0165] D4: Stock picking process,

[0166] The stock picking process involves the calculation of picking personnel. Since unpacking and picking are required, the equivalent logistics volume is the number of equipment vehicles, which mainly involves the path distance S from the information point in the construction site to the empty equipment area. XK , the path distance S from the empty equipment area to the sorting area KF , the path distance S from the sorting area to the waiting area FD And the sorting area distance S FJ The unit operation time involved is the unit time T of printing instruction ticket. DY , Single sorting parts time T FJ , the walking speed of the person is v r After the parts are sorted, the equipment cart needs to be pushed to the waiting area. The calculation formula is as follows:

[0167]

[0168] D5: Online stage,

[0169] In the on-line link, the operation process of the tractor can be regarded as transferring parts from each line in the Shunjian stocking area to the corresponding production line side storage area according to the type of parts. Therefore, the number of parts on-line required is calculated based on the number of equipment carts mounted on the tractor. The mounted equipment is generally picked up and placed by the staff in the stocking area. Therefore, it is assumed that the mounted equipment trolleys are connected. During this period, the distance S between the line side storage area of ​​each production line and the Shunjian stocking area is involved = [S 1 ,S 2 ,…,S m], the unit time of mounting equipment (mainly refers to unloading the pallet truck, pushing the pallet truck to the designated location, and mounting the empty pallet truck) is T GZ , the unit operation time T of placing equipment vehicles in the online storage area TQJ , the calculation formula is as follows:

[0170]

[0171]

[0172] By measuring the above links, the logistics resource accounting under the Shunjian logistics model based on equivalent logistics volume was completed, in which intermediate transfer variables were used as the basis for accounting, which is conducive to expanding to other logistics models and enhancing the theoretical explanatory power and accuracy of the logistics resource accounting results.

[0173] S5: Shunjian Logistics Resource Allocation Strategy is proposed.

[0174] Since the automobile production schedule will change over time, while the configuration of operators in each link of the site is fixed, this will lead to different workloads of operators, that is, the workload rate is not consistent (some operators have a higher workload rate, while others have a lower workload rate). By measuring the logistics resources in each link, the logistics resources required for each link under a certain workload rate can be accurately determined, which is helpful for proposing logistics resource allocation strategies. According to the analysis of Shunjian’s logistics resource accounting value and the actual number of employees, a personnel structural configuration optimization strategy can be formulated.

[0175] E1: Balanced workload,

[0176] When optimizing the structural configuration of logistics resources, the calculated values ​​of logistics resources in each link can be used as a reference. When there is a certain gap between the calculated logistics resources in a certain link and the actual on-site operators, the personnel with low workload rate can be assigned additional tasks through planning and design. For example, due to different production schedules, the amount of parts to be operated is also different, and when the types of parts operated by operators are relatively fixed, this will cause some operators to have a larger workload, while some will have a smaller workload. For example, for forklift operators in the outbound transfer scene, the required workload of the parts can be analyzed based on the calculated values ​​of different parts stacks, and the workload of these parts can be divided and redistributed to achieve the operation scheduling of forklifts and tractors according to the changes in the production schedule to ensure balanced workload.

[0177] E2: Process Reengineering and Allocation,

[0178] Since each operation process is interconnected, some of them have a sequence, such as unloading, acceptance and warehousing. This also causes some waiting time. The operation process can be analyzed based on the logistics resource accounting value and the actual number of operators for reference, and optimization can be carried out, and the diversity of operators' operations can be considered. For example, when waiting for parts unloading and acceptance, the work of some forklift drivers responsible for warehousing can be allocated to other operation links (without affecting the warehousing operation tasks), such as sorting and returning empty boxes, to reduce waiting time and reduce workload. This requires logistics planners to plan the operations of operators in detail and consider the workload of employees to achieve accurate task allocation.

[0179] E3: Optimization of personnel structure,

[0180] Based on the logistics resource accounting results of each link and the actual number of operators, the operators are reallocated to other links. This requires comprehensive training of employees to meet the needs of dynamic allocation of employees, so that they can be competent for the operating processes of other links and realize dynamic structural adjustments of operators in each link. At the same time, this requires planners to make accurate scheduling of personnel and allocation of work tasks and eliminate workers' discomfort with job transfers.

[0181] The above description is only a preferred example of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various changes and variations. Any modification, equivalent substitution, and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A resource accounting method for a Shunjian logistics model based on equivalent logistics volume, characterized in that: Follow these steps: S1: Analysis of Shunjian logistics model operation process and logistics resources, In the Shunjian logistics model operation, five links are divided, namely, unloading and returning, acceptance and storage, outbound transfer, preparation and picking, and online. By disassembling the operation process of the five links, the flow of parts in the five links and the consumed logistics resources are determined. Among them, the operation areas of logistics resources consumed in each link are as follows: The unloading and empty return process involves three areas: the unloading port parking area, the acceptance area, and the empty container sorting area. The forklift at the unloading port parking area places the delivered parts in the acceptance area, and the forklift at the empty container sorting area returns the empty containers in the empty container sorting area to the parts manufacturer, and unloads the empty containers brought by the tractor from the Shunjian yard in the empty container sorting area; The acceptance and warehousing process involves the acceptance area, the loading port of the large three-dimensional warehouse, and the stacking area. The acceptance personnel need to inspect the parts sent by the manufacturer. After the acceptance is completed, the forklift will deliver the parts to a specific storage area, namely the loading port and stacking area of ​​the large three-dimensional warehouse; the outbound transportation process involves the unloading port of the large three-dimensional warehouse, the stacking area, the temporary storage area to be shipped, the Shunjian stock preparation area, and the empty box sorting area. After receiving the parts, the forklift will take them off the shelf from the three-dimensional warehouse and transport them to the temporary storage area to be shipped. The parts in the stacking area are waiting for the tractor to transfer them and do not need to be transported to the temporary storage area to be shipped. After the forklift places the whole box of parts on the tractor's equipment car, the tractor will send them to the secondary storage area. In the Shunjian logistics model, the secondary storage area is the Shunjian yard. After the tractor delivers the parts to the secondary storage area, the tractor will transport the empty boxes to the empty box sorting area and carry out the next parts transportation; The stock picking process involves the information points, empty equipment storage area, picking area, and waiting area within the Shunjian yard, and is mainly carried out by picking personnel; The on-line process involves the waiting area and line-side storage area of ​​the Shunjian yard. The tractor mounts the towed equipment vehicle in the waiting area of ​​the Shunjian yard, transports the parts to the line-side storage area, and transports the empty equipment vehicle in the line-side storage area back to the Shunjian yard; S2: Data collection and compilation, Obtain automobile production plans and parts original unit information through data collection, and establish Shunjian parts information database; including the following steps: A1: Data collection, According to the logistics execution system and manufacturing operation management system of the automobile manufacturer, the automobile production plan and original unit information of the parts of the manufacturer are obtained. The automobile models and the production volume of each model are extracted from the automobile production plan, and the part number, the size of the part packaging box L: length, W: width, H: height, the number of parts accommodated U, the storage method, the supply method, and the part number and the number of equipment vehicles accommodated C are extracted from the manufacturing operation management system; the single vehicle usage q of various parts required, A2: Establish Shunjian parts information database, By collecting the original unit information of parts and the automobile production information, we can select the parts required for the production of each model of automobile according to the automobile model. Then, based on the supply method, we can select the parts required for the operation under the Shunjian logistics model, obtain the information of the required parts, and establish the Shunjian parts information database. S3: Construction of accounting model considering the differentiated impact of stocking units in Shunjian secondary storage, According to the activity-based costing method, by calculating the operation time T and the planned working time T s Calculate and get the planning value of various logistics resources. Since workers cannot work at full capacity, divide it by the specified operating load rate λ to get the logistics resource accounting value and get the Shunjian logistics mode accounting model. The Shunjian logistics model accounting model is as follows: C1: Calculation of operation duration, When calculating the operation time T, it is regarded as the product of the operation time and the equivalent logistics volume. The operation time is regarded as the unit operation time and the parts transportation time T. y The part transportation time is calculated by the operation distance and operation speed. The operation distance is determined according to the operation area of ​​each link under the Shunjian logistics model. The operation speed includes: forklift travel speed v c , tractor speed v q , personnel movement speed v r , The unit operation time is calculated by the MTM time measurement method. By decomposing and summarizing the operation process of each link, the standard value of each unit operation time is determined. The unit operation time is divided into the following durations according to the operator: The acceptance personnel are involved in the scanning operation unit time T during acceptance sm , refers to the unit operation time of the acceptance personnel to scan the code for acceptance, and the unit time of appearance inspection is T cd It refers to the unit time for the acceptance personnel to check whether the parts packaging box is intact, and the unit time for confirming the arrival quantity T dh , refers to the unit operation time for acceptance personnel to confirm the arrival quantity; The unit time T of forklift operation involved in forklift operation when the forklift driver is performing the operation C , refers to the unit operation time required for a forklift to pick up and put down goods; The tractor time involves the unit operation time T of the mounted equipment during operation. GZ , refers to the unit operation time required for the tractor to untie and connect the new pallet truck during an empty-full exchange of equipment; the unit operation time of the equipment T TQJ , refers to the unit operation time required to put the equipment vehicle into the line-side storage area; The picking personnel are involved in printing instruction tickets during the operation. DY , refers to the unit operation time of the picking personnel logging into the system to print the instruction ticket; the unit operation time of picking parts T FJ , refers to the unit time required for a picker to pick a part from a part packaging box and place it in the tool cart; C2: Calculation of equivalent logistics volume considering the differentiated impact of stocking units in Shunjian secondary storage, (1) Calculation of equivalent material flow rate stored once, Since one-time storage does not involve unpacking and picking operations, the parts transfer method is full box transfer. Therefore, when converting the equivalent logistics volume, the number of parts stacks is used as the equivalent logistics volume. The operation involves unloading and returning, acceptance and storage operations, and outbound transfer scenarios. When calculating the number of parts stacks, the vehicle type production ratio, parts single vehicle quota, parts packaging volume, and the number of equipment vehicles are used for calculation, and converted into standard stacks as the equivalent logistics volume, which is helpful for the subsequent calculation of the operation time required for parts operation, that is, the operation time of forklift and tractor logistics resources; Calculation of model production ratio: According to the production plan, calculate the model production ratio of each model c = [c1, c2, ..., c n ] T , where k i is the quantity of each model scheduled for production in the production plan. The calculation formula for the production proportion of each model is: Calculation of parts quota per vehicle: based on the number of parts of each model used in different models, The average number of parts used for each model in the production of a car is calculated based on the model production ratio, that is, the parts per car quota d = [d1, d2, ..., d m ] T : d=qc formula (3-4) Calculation of parts packaging volume: Based on the volume of various parts packaging boxes and the number of parts contained, the approximate volume of each part is calculated, that is, V = [V1, V2, ..., V m ] T is the volume of the parts packaging, L=[l1,l2,…,l m ] T ,W=[w1,w2,…,w m ] T ,H=[h1,h2,…,h m ] T , is the length, width and height of the parts packaging box, U=[u1,u2,…,u m ] T The number of parts contained in the packaging box, that is, the number of parts contained, is used to obtain the parts packaging volume. The calculation formula is as follows: V=L⊙W⊙H / U Formula (3-5) Calculation of the number of parts stacks: According to the parts per vehicle quota and the parts packaging volume, as well as the vehicle model production plan, the number of parts stacks required for transfer is calculated from D = [D1, D2, ..., D m ] T , a standard stack is set to be one cubic meter, where n c Represents the total amount of automobile production, and the calculation formula for the number of pallets of each part is as follows: D=n c d⊙V formula (3-6) (2) Calculation of equivalent material flow rate of secondary storage, Calculation of the number of equipment carts: Shunjian logistics model requires that different parts be delivered to the production line side within the specified time through the stock picking process in the order of serial numbers. Therefore, in the stock sorting and on-line process, the parts need to be unpacked and picked, and different parts need to be distinguished and placed on special equipment carts. In these two links, the required number of equipment carts is used as the equivalent logistics volume. The number of equipment carts Z = [Z1, Z2, …, Z m ] T The calculation requires the parts per vehicle quota, the total number of vehicles scheduled for production, and the number of equipment vehicles accommodated C = [C1, C2, ..., C m ] T , the calculation formula is as follows: Z=n c d / C Formula (3-7) C3: Planned working time T s Refers to the working hours stipulated by the enterprise for workers. C4: Operation load rate refers to the fact that during the operation, employees cannot work at full capacity, so it is necessary to calculate the operation load rate to balance the employee's workload and give full play to their work capacity. When calculating logistics resources, the standard operation time and the range of operation load are specified for calculation. Let the operation load rate be λ; S4: Shunjian calculates logistics resources in all links, including the following five links: unloading and returning, acceptance and storage, outbound transfer, stock preparation and picking, and online launch; D1: Unloading and returning to empty space. In this link logistics calculation, the path distance S from the unloading parking area to the acceptance area is TY And the path distance S from the empty container area to the unloading parking space KT , forklift unit operation time T C And the forklift speed v c Calculate the required operation time, and then convert the required number of workers and forklifts based on the operation time. The operation logistics resources are forklift drivers and forklifts. The calculation formula is as follows: D2: Check and store the goods. When calculating logistics resources in the acceptance phase, it is necessary to calculate the unit time T for appearance inspection. cd , Arrival quantity confirmation unit time T dh , Scanning operation unit time T sm Calculate the number of acceptance personnel based on the number of parts stacks that need to be accepted and the employee's workload rate. Due to the size of the packaging boxes, some parts are stored in the large stereoscopic warehouse, and the rest are stored in the stacking area. Therefore, when calculating the logistics resources in the warehousing link, the operating distance is the path distance S from the acceptance area to the stereoscopic warehouse. YLK And the path distance S from the acceptance area to the stacking area YDD , suppose there are k kinds of parts in the storage stereoscopic warehouse, h kinds of parts in the stacking area, k+h=m, and the number of stacks of different parts is D i and D j , the operation logistics resources are forklift drivers and forklifts. The calculation formula is as follows: D3: Outbound transfer: The outbound link involves the problem of parts storage location. The outbound of parts from the stacking area is completed by the forklift that places the parts in the stacking area. Therefore, the logistics resources calculated in this link refer specifically to the forklift and forklift driver responsible for the outbound of parts from the large three-dimensional warehouse. The types of parts involved are the same as the types of parts stored in the three-dimensional warehouse in the inbound link, which is k. Suppose the path distance from the unloading port of the large three-dimensional warehouse to the temporary storage area to be shipped is S. XD , the calculation formula is as follows: In the Shunjian logistics model, the operation process of the tractor performing the outbound transfer scene is considered to be a round trip from the Shunjian yard to the empty equipment storage area. In the Shunjian stocking area, according to the type of parts, they are transferred to different storage areas of the Shunjian yard. During this period, the tractor needs to unload empty boxes in the empty equipment storage area, load parts in the waiting area or stacking area, and exchange empty and full pallet trucks in the Shunjian stocking area. During this period, the number of pallet trucks mounted on the tractor p is involved. The distance of a cycle operation path from the empty equipment storage area to the Shunjian stocking area is S = [S1, S2, …, S m ], the unit time of loading the pallet truck is T GZ , the calculation formula is as follows: D4: Stock picking process, The stock picking process involves the calculation of picking personnel. Since unpacking and picking are required, the equivalent logistics volume is the number of equipment vehicles Z, which mainly involves the path distance S from the information point in the construction site to the empty equipment area. XK , the path distance S from the empty equipment area to the sorting area KF , the path distance S from the sorting area to the waiting area FD And the internal distance S of the sorting area FJ The unit operation time involved is the unit time T of printing instruction ticket. DY , Single sorting parts time T FJ , and the walking speed of the person is v r ; After the parts are sorted, the equipment cart needs to be pushed to the waiting area. The calculation formula is as follows: D5: Online stage, In the on-line link, the operation process of the tractor is considered to be based on the type of parts, and is transferred from each line in the Shunjian stocking area to the corresponding production line side storage area. Therefore, the number of parts required to go online is calculated based on the number of equipment vehicles mounted on the tractor. The mounted equipment is generally picked up and placed by the staff in the stocking area. Therefore, it is assumed that the mounted equipment vehicles are connected. During this period, the distance from the line side storage area of ​​each production line to the Shunjian stocking area is S = [S1, S2, …, S m ], the unit time of mounting equipment is T GZ , the unit operation time T of placing equipment vehicles in the online storage area TQJ , the calculation formula is as follows: By measuring the above links, the logistics resource accounting under the Shunjian logistics model based on equivalent logistics volume was completed, in which the intermediate transfer variables were used as the basis for accounting, which is conducive to expanding to other logistics models and enhancing the theoretical explanation and accuracy of the logistics resource accounting results; S5: Shunjian Logistics Resource Allocation Strategy is proposed. Since the automobile production schedule will change over time, and the configuration of operators in each link of the site is fixed, this leads to different workloads of operators, that is, inconsistent workload rates. By calculating the logistics resources of each link, the logistics resources required by each link under a certain workload rate can be accurately determined to propose logistics resource allocation strategies. According to the analysis of Shunjian’s logistics resource accounting value and the actual number of employees, a personnel structural configuration optimization strategy can be formulated; E1: Balanced workload, When optimizing the structural configuration of logistics resources, the calculated values ​​of logistics resources in each link are used as a reference. When there is a certain gap between the calculated logistics resources in a certain link and the actual on-site operators, the personnel with low workload rates are assigned additional tasks through planning and design. E2: Process Reengineering and Allocation, Since each operation process is linked to each other, some of them have a sequence. The three links of unloading, acceptance and warehousing have a sequence, which also causes some waiting time. Based on the logistics resource accounting value and the actual number of operators, the operation process can be analyzed and optimized, and the diversity of operators' operations can be considered; E3: Optimization of personnel structure, Based on the logistics resource accounting results of each link and the actual number of operators, the operators are reallocated to other links. This requires comprehensive training of employees to meet the needs of dynamic allocation of employees, so that they can be competent for the operating processes of other links and realize dynamic structural adjustments of operators in each link. At the same time, this requires planners to make accurate scheduling of personnel and allocation of work tasks and eliminate workers' discomfort with job transfers.