A coating thickness monitoring system for evaporation coating machine
By monitoring the coating thickness of multiple monitoring points in real time on the evaporation coating machine and generating correction instructions, combined with wear analysis, the problem of unstable coating thickness monitoring is solved, the controllability and stability of the coating process are improved, and resource utilization is optimized.
Patent Information
- Application Number
- CN202410863102.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-29
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-06-29
AI Technical Summary
The coating thickness monitoring of existing evaporation coating machines is unstable, resulting in insufficient coating thickness accuracy and stability, affecting product quality and performance.
A coating thickness monitoring system including a server, thickness monitoring module and early warning control module was designed. By monitoring the coating thickness of multiple monitoring points on the evaporation coating machine in real time, coating correction instructions are generated, and wear analysis is carried out to generate early warning strategies to ensure that Accuracy and stability of coating thickness.
Real-time monitoring and accurate early warning of coating thickness are achieved, controllability and stability of coating process are improved, the utilization of maintenance resources is optimized, and unnecessary shutdown and maintenance are avoided.
Smart Images

Figure CN118407015B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coating monitoring, and in particular to a coating thickness monitoring system for an evaporation coating machine. Background Art
[0002] The evaporation coating machine consists of a vacuum chamber, a heating system, a material container, etc. Its main purpose is to heat the material to the evaporation temperature, evaporate it, and deposit it on the surface to be tested to form a thin film or coating. Coatings of different thicknesses can achieve different functions, such as anti-reflection, anti-reflection, anti-corrosion, etc., to meet the product's requirements for functional performance. Therefore, in order to ensure the accuracy of the product's coating performance, it is particularly important to monitor the coating thickness of the evaporation coating machine;
[0003] At present, the coating thickness monitoring instrument of the evaporation coating machine usually needs to run for a long time. Long-term operation will cause wear and deformation of the evaporation coating machine, resulting in instability of the formation and thickness distribution of the film during the coating process, causing the coating thickness accuracy and stability of the evaporation coating machine to be not high enough, and unable to meet the product's precise requirements for coating thickness, thereby affecting the quality and performance of the product. Summary of the invention
[0004] The object of the present invention is to provide a coating thickness monitoring system for an evaporation coating machine to solve the problems mentioned in the above background technology.
[0005] The object of the present invention can be achieved by the following technical solution: A coating thickness monitoring system for an evaporation coating machine, comprising: a server, a thickness monitoring module and an early warning control module;
[0006] The server communicates with various sensors distributed in the evaporation coating machine to obtain and save coating information; the coating information includes the evaporation source contour map, the pressure thickness monitoring module of each stress point in the substrate table, and the pressure and thickness monitoring module of each stress point in the substrate table.
[0007] The thickness monitoring module monitors the coating thickness corresponding to several monitoring points on the evaporation coating machine in real time, and based on this, monitors the process requirements to judge the coating quality and generate coating correction instructions, and sends the coating correction instructions to the early warning control module; specifically:
[0008] 101: Obtain the coating thickness corresponding to each monitoring point and record it as Hij, where i = 1, 2, 3 ... I, I is a positive integer, I represents the total number of monitoring points on the coating machine, and i represents the serial number of any one of the monitoring points; j = 1, 2, 3 ... J, J is a positive integer, J represents the total number of acquisition moments, and j represents the serial number of any one of the acquisition moments; set a standard process thickness and record it as BH, through the set formula Calculate and obtain the thickness distribution value Pij corresponding to each monitoring point at each acquisition time, where α is the set correction coefficient and e is a natural constant;
[0009] 102: randomly selecting thickness distribution values corresponding to each monitoring point at a collection time, and performing discrete comparative analysis on the values to obtain coating evaluation indexes corresponding to each collection time;
[0010] 103: plotting a curve relationship diagram of the coating evaluation index changing with time with time as the horizontal axis and the coating evaluation index as the vertical axis, and analyzing the change trend of the coating evaluation index to obtain a correction index based on the curve relationship diagram; when the correction index is greater than a set correction threshold, generating a coating correction instruction and sending it to the early warning control module;
[0011] When the early warning control module receives a coating correction instruction, it performs a wear analysis on the evaporation source and substrate stage of the evaporation coating machine based on the coating information to measure the impact on the coating work of the evaporation coating machine, and generates a corresponding early warning strategy accordingly.
[0012] Preferably, the specific process of discrete comparative analysis is:
[0013] Compare and analyze the thickness distribution value with the set distribution interval to divide the thickness distribution value into high deviation, medium deviation and low deviation, and count the cumulative number of high deviation, medium deviation and low deviation respectively, and record them as C1, C2, C3 respectively; sum the thickness distribution values corresponding to the high deviation, medium deviation and low deviation respectively to obtain the total value of high deviation, the total value of medium deviation and the total value of low deviation, and record them as C4, C5, C6 respectively;
[0014] Substitute the cumulative number of height deviations C1, the cumulative number of medium deviations C2, the cumulative number of low deviations C3, the total value of height deviations C4, the total value of medium deviations C5, the total value of low deviations C6 and the thickness distribution value Pij into the set formula The coating evaluation index CPj corresponding to the acquisition moment is calculated, where a1, a2, and a3 are respectively the set proportional coefficients, and a1>a2>a3>0. is the mean coating thickness corresponding to each monitoring point.
[0015] Preferably, the specific process of analyzing the change trend of the coating evaluation index according to the coating evaluation index versus time curve relationship diagram is as follows:
[0016] 301: Draw a tangent line of the curve at each evaluation point, obtain a tangent line expression by data fitting, and perform a derivative operation on the tangent line expression to obtain an evaluation derivative corresponding to each evaluation point; sum the evaluation derivatives greater than zero to obtain a monotonic decrease in quality, and sum the evaluation exponents less than zero and take the absolute value to obtain a monotonic increase in quality;
[0017] 302: Recording the evaluation derivative equal to zero as a stable derivative, and taking the evaluation index of the evaluation point corresponding to the stable derivative as the stable index of the stable derivative, thereby obtaining the stable index corresponding to each stable derivative, and evaluating the maintenance level of the coating evaluation index based on the stable index to obtain a maintenance value;
[0018] 303: The quality monotonically decreases F1, the quality monotonically increases F2, the maintenance value Wb and the coating evaluation index CPj are set by the formula The correction index FW is calculated, where b4, b5, and b6 are the set proportional coefficients, and e is a natural constant. is the mean value of the coating evaluation index at each acquisition moment.
[0019] Preferably, the specific process of evaluating the maintenance level of the coating evaluation index is:
[0020] The stability index corresponding to each stability derivative is compared with the set index interval to divide the stability index into highly poor quality maintenance, moderately poor quality maintenance and low poor quality maintenance, and the cumulative coefficients of highly poor quality maintenance, moderately poor quality maintenance and low poor quality maintenance are counted respectively and recorded as W1, W2 and W3 respectively; the stability index corresponding to each stability derivative is averaged to obtain the stable mean value recorded as W4;
[0021] Substitute the cumulative coefficient W1 for high-quality maintenance, the cumulative coefficient W2 for medium-quality maintenance, the cumulative coefficient W3 for low-quality maintenance and the stable mean W4 into the set formula The maintenance value Wb is obtained by calculation, wherein b1, b2, and b3 are respectively set proportional coefficients, and b1>b2>b3>0.
[0022] Preferably, the specific process of performing wear analysis on the evaporation source and substrate stage of the evaporation coating machine based on the coating information is as follows:
[0023] 501: randomly select an evaporation source contour map corresponding to a collection time, and overlap and compare it with the initial contour map to obtain the wear position and the wear area corresponding to each wear position, sum the wear areas of each wear position to obtain the total wear area, record it as S1, count the number of wear positions, record it as S2, calculate the wear degree Sd corresponding to the collection time by the set formula Sd=d1×S1+d2×S2, where d1 and d2 are respectively the set proportional coefficients; thus, the wear degree corresponding to each collection time can be obtained, record it as Sdj;
[0024] 502: retrieve the pressure of each force-bearing point in the substrate table corresponding to each acquisition moment and record it as Ykj, where k = 1, 2, 3 ... K, K is a positive integer, K represents the total number of force-bearing points in the substrate table, and k represents the sequence number of any force-bearing point; use the set formula Calculate and obtain the discrete force value Ydj corresponding to each acquisition moment, where is the mean pressure of each stress point;
[0025] 503: The wear degree Sdj and Ydj of the evaporation source corresponding to each acquisition moment are calculated by the set formula SYj=d3×Sdj+d4×Ydj to obtain the wear index SYj, wherein d3 and d4 are respectively set proportional coefficients; a curve relationship diagram of the wear index changing with time is drawn with time as the horizontal axis and the wear index as the vertical axis, and the wear change trend analysis is performed based on this to generate a corresponding early warning strategy.
[0026] Preferably, the specific process of analyzing the wear change trend according to the wear index versus time curve is as follows:
[0027] Draw a tangent to the curve at the wear point, calculate the slope of the tangent to get the trend slope corresponding to each wear point; sum up the trend slopes greater than zero to get the wear aggravation value recorded as M1, and sum up the trend slopes less than zero and take the absolute value to get the wear reduction value recorded as M2;
[0028] Substitute the wear aggravation value M1, wear reduction value M2 and wear index SYj into the set formula The warning value Md is calculated, where d5 and d6 are respectively the set proportional coefficients. When the warning value is greater than the maximum value in the set warning interval, a shutdown maintenance instruction is generated, and the evaporation coating machine is controlled to shut down, and the shutdown maintenance instruction is sent to the corresponding engineer to repair the evaporation coating machine; when the warning value is within the set warning interval, a wear maintenance instruction is generated and sent to the corresponding engineer to maintain the evaporation coating machine; when the warning value is less than the minimum value in the set warning interval, the thickness monitoring instruction is resent to the thickness monitoring module until a shutdown maintenance instruction or a wear maintenance instruction is generated.
[0029] Beneficial effects of the present invention:
[0030] 1. By real-time monitoring of the coating thickness at several monitoring points on the evaporation coating machine, the coating evaluation index is obtained according to the set standard process thickness analysis, and then a curve chart of the coating evaluation index changing over time is constructed to help the staff intuitively understand the coating quality change trend; at the same time, the evaluation derivative and stability index are used to conduct a more detailed analysis of the coating quality change trend, help discover the instability of the coating quality and the change trend to obtain the correction index, and generate the coating correction instruction accordingly, which can timely discover the quality problems of the coating thickness and provide technical support for the implementation of the early warning control strategy of the evaporation coating machine;
[0031] 2. By analyzing the coating information, the wear of the evaporation coating machine can be evaluated in real time, and then according to the severity of the wear, maintenance resources can be reasonably allocated to avoid unnecessary downtime for maintenance, thereby optimizing resource utilization; real-time monitoring and accurate early warning of the coating thickness evaporated by the evaporation coating machine can be achieved to improve the controllability and stability of the coating process, while optimizing the utilization of maintenance resources, which has a positive impact on the management and maintenance of the production process. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] The present invention will be further described below in conjunction with the accompanying drawings.
[0033] Figure 1 It is a schematic diagram of system module connection of the present invention. DETAILED DESCRIPTION
[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0035] It should be noted that, in the description of the present invention, terms such as "up", "down", "left", "right", "inside" and "outside" indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings. This is merely for the convenience of description and does not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it should not be understood as a limitation on the present invention.
[0036] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.
[0037] See also Figure 1 As shown, the present invention is a coating thickness monitoring system for an evaporation coating machine, comprising: a server 111, a thickness monitoring module 112 and an early warning control module 113;
[0038] The server 111 communicates with various sensors distributed in the evaporation coating machine to obtain and store coating information; wherein the coating information includes an evaporation source contour map and pressures of various stress points in the substrate table; specifically, the evaporation source contour map is obtained by photographing the evaporation source with a high-definition camera to obtain an evaporation source image, and extracting the contour map of the evaporation source image using a contour extraction technology to obtain the contour map of the evaporation source; the pressure of the substrate table is obtained by using pressure sensors distributed at various stress points in the substrate table to obtain the pressures borne by various stress points on the substrate table;
[0039] The thickness monitoring module 112 monitors the coating thickness of the evaporation coating machine according to the process requirements to determine whether the coating state meets the process requirements, and generates a coating correction instruction accordingly, specifically:
[0040] A number of monitoring points are set on the coating machine, and the coating thickness corresponding to each monitoring point at each sampling time is obtained and recorded as Hij, where i = 1, 2, 3 ... I, I is a positive integer, I represents the total number of monitoring points on the coating machine, and i represents the serial number of any one of the monitoring points; j = 1, 2, 3 ... J, J is a positive integer, J represents the total number of sampling times, and j represents the serial number of any one of the sampling times; a standard process thickness is set and recorded as BH. It should be noted that the standard process thickness is usually determined according to specific process requirements and product functional requirements. It is a target thickness set to achieve product design specifications or functional requirements; using the set formula The thickness distribution value Pij corresponding to each monitoring point at each acquisition time is calculated, where α is the set correction coefficient and e is the natural constant. It can be seen from the formula that the closer the coating thickness at the monitoring point is to the standard process thickness (i.e. The closer it is to zero), the larger the distribution value corresponding to the monitoring point is, indicating that the coating thickness at the monitoring point is more in line with the standard process requirements; randomly select the thickness distribution value Pij of each monitoring point at a certain acquisition time, compare and analyze the thickness distribution value with the set distribution interval, when the thickness distribution value is less than the minimum value in the set distribution interval, a high deviation is accumulated; when the thickness distribution value is within the set distribution interval, a medium deviation is accumulated; when the thickness distribution value is greater than the maximum value in the set distribution interval, a low deviation is accumulated; the cumulative number of high deviation, medium deviation and low deviation is counted respectively, and they are recorded as C1, C2, C3 respectively; the thickness distribution values corresponding to the high deviation, medium deviation and low deviation are summed up to obtain the total value of the high deviation, the total value of the medium deviation and the total value of the low deviation, and they are recorded as C4, C5, C6 respectively; using the set formula The coating evaluation index CPj corresponding to the acquisition moment is calculated, where a1, a2, and a3 are respectively the set proportional coefficients, and a1>a2>a3>0. is the mean value of the coating thickness corresponding to each monitoring point; from the formula, it can be known that the coating evaluation index is a measure of the difference between the coating formation and coating thickness at each acquisition moment and the standard process thickness; when the accumulated number of height deviations is greater and the total value of height deviations is greater, it means that the difference between the thickness of each monitoring point and the standard process thickness at the acquisition moment is greater, and the coating evaluation index is greater; when the difference in coating thickness between each monitoring point at the acquisition moment is greater, it means that the uneven thickness distribution of the coating at the acquisition moment is more serious, and the coating evaluation index is greater; thus, the coating evaluation index corresponding to each acquisition moment can be obtained;
[0041] A two-dimensional rectangular coordinate system is constructed with time as the horizontal coordinate and the coating evaluation index CPj as the vertical coordinate. The coating evaluation index is input into the coordinate system according to its corresponding collection time, and the position of the coating evaluation index in the coordinate system is recorded as the evaluation point. A smooth curve is used to connect each evaluation point in turn to obtain a curve relationship diagram of the coating evaluation index changing with time, and it is displayed to intuitively show the changing trend of the coating quality and help the staff to more clearly understand the degree of change in the coating quality; a tangent line is drawn for each evaluation point, and a tangent expression is obtained by data fitting, and the tangent expression is derived to obtain each evaluation point Corresponding evaluation derivative; It should be noted that the evaluation derivative represents the changing trend of the coating evaluation index at each evaluation point. When the evaluation derivative is greater than zero, it means that the coating evaluation index at the evaluation point corresponding to the evaluation derivative shows an upward trend, which means that the coating quality is declining; when the evaluation derivative is less than zero, it means that the coating evaluation index at the evaluation point corresponding to the evaluation derivative shows a downward trend, which means that the coating quality is improving; when the evaluation derivative is equal to zero, it means that the coating evaluation index at the evaluation point corresponding to the evaluation derivative shows a stable trend; The evaluation derivatives greater than zero are summed to obtain the monotonic decrease in quality, recorded as F1, and the evaluation derivatives less than zero are recorded as F2. The evaluation indexes are summed and the absolute values are taken to calculate the monotonic increase of the quality, which is recorded as F2; the evaluation derivative equal to zero is recorded as the stable derivative, and the evaluation index of the evaluation point corresponding to the stable derivative is taken as the stable index of the stable derivative, thereby the stable index corresponding to each stable derivative can be obtained. It should be noted that the larger the stable derivative corresponding to the stable derivative, the more stable the coating evaluation index is at a relatively large level, indicating that the coating quality is stable at a relatively poor state; on the contrary, the smaller the stable derivative corresponding to the stable derivative is, the more stable the coating evaluation index is at a relatively small level, indicating that the coating quality is stable at a relatively good state. Next; compare and analyze the stability index corresponding to each stability derivative with the set index interval. When the stability index is greater than the maximum value in the set index interval, a high-quality maintenance is accumulated; when the stability index is within the set index interval, a moderate-quality maintenance is accumulated; when the stability index is less than the minimum value in the set index interval, a low-quality maintenance is accumulated; the cumulative coefficients of high-quality maintenance, moderate-quality maintenance and low-quality maintenance are calculated respectively, and they are recorded as W1, W2, and W3 respectively; the stability index corresponding to each stability derivative is averaged to obtain a stable mean value recorded as W4; using the set formula The maintenance value Wb is calculated, where b1, b2, and b3 are respectively the set proportional coefficients, and b1>b2>b3>0; it can be seen from the formula that when the stability index corresponding to the stability derivative is larger, it means that the coating quality is stable in a relatively poor state, and the maintenance value is larger;
[0042] The quality monotonically decreasing degree F1, the quality monotonically increasing degree F2, the maintenance value Wb and the coating evaluation index CPj are set by the formula The correction index FW is calculated, where b4, b5, and b6 are respectively set proportional coefficients, e is a natural constant, and CP is the average value of the coating evaluation index at each acquisition moment; when the correction index is greater than the set correction threshold, it means that the coating thickness has a very high risk of not meeting the standard process requirements, and a coating correction instruction is generated and sent to the early warning control module;
[0043] By real-time monitoring of the coating thickness at several monitoring points on the evaporation coating machine, the coating evaluation index is obtained according to the set standard process thickness analysis, and then a curve chart of the coating evaluation index changing with time is constructed to help staff intuitively understand the coating quality change trend; at the same time, the evaluation derivative and stability index are used to conduct a more detailed analysis of the coating quality change trend, help discover the instability of the coating quality and the change trend to obtain the correction index, and generate coating correction instructions accordingly, which can timely discover quality problems in the coating thickness and provide technical support for the implementation of the early warning control strategy of the evaporation coating machine.
[0044] When receiving the coating correction instruction, the early warning control module 113 performs wear analysis on the coating information to measure the degree of influence on the coating work of the evaporation coating machine, and generates a corresponding early warning strategy accordingly to ensure that the coating thickness meets the process requirements, so as to achieve real-time monitoring and accurate early warning of the coating thickness evaporated by the evaporation coating machine, so as to improve the controllability and stability of the coating process; specifically:
[0045] Step 1: Obtain the coating information corresponding to each acquisition moment, and perform coating interference analysis based on the information to obtain the wear index; wherein the coating information includes the evaporation source contour map and the pressure of each force point in the substrate table;
[0046] Take any evaporation source contour map corresponding to a collection moment, and overlap and compare it with the initial contour map (the initial contour map refers to the contour of the evaporation source in the initial state when it is just put into use) to obtain the wear position and the wear area corresponding to each wear position. The wear area of each wear part is summed up to obtain the total wear area, which is recorded as S1. The number of wear positions is counted and recorded as S2. The wear degree Sd corresponding to the collection moment is calculated using the set formula Sd=d1×S1+d2×S2, where d1 and d2 are the set proportional coefficients respectively; thus, the wear degree corresponding to each collection moment is recorded as Sdj;
[0047] Step 2: retrieve the pressure of each force-bearing point in the substrate table corresponding to each acquisition moment and record it as Ykj, where k = 1, 2, 3 ... K, K is a positive integer, K represents the total number of force-bearing points in the substrate table, and k represents the sequence number of any force-bearing point; use the set formula Calculate and obtain the discrete force value Ydj corresponding to each acquisition moment, where is the average pressure of each force point. As can be seen from the formula, the more uneven the pressure of each force point in the substrate table is, the greater the discrete value of the force will be, which will lead to increased wear of the substrate table and affect the deposition uniformity of the thin film.
[0048] Step 3: Calculate the wear degree Sdj and Ydj of the evaporation source corresponding to each collection time by the set formula SYj=d3×Sdj+d4×Ydj to obtain the wear index SYj, where d3 and d4 are respectively the set proportional coefficients; construct a two-dimensional rectangular coordinate system with time as the horizontal coordinate and the wear index as the vertical coordinate, input the wear index into the coordinate system according to its corresponding collection time, and record the position of the wear index in the coordinate system as the wear point, use a smooth curve to connect the wear points in sequence to obtain a curve relationship diagram of the wear index changing with time; draw a curve at the wear point The tangent of the wear point is calculated by calculating the slope of the tangent to obtain the trend slope corresponding to each wear point. It should be noted that the trend slope represents the change trend of the wear index at the wear point. When the trend slope is greater than zero, it means that the wear index at the wear point shows an increasing trend, that is, the wear is aggravated; when the trend slope is less than zero, it means that the wear index at the wear point shows a decreasing trend, that is, the wear is slowed down; the trend slopes greater than zero are summed up to obtain the wear aggravation value, recorded as M1, and the trend slopes less than zero are summed up and the absolute value is taken to calculate the wear slowdown value, recorded as M2, and the set formula is used. Calculate and obtain the warning value Md, where d5 and d6 are respectively the set proportional coefficients; compare and analyze the warning value with the set warning interval. When the warning value is greater than the maximum value in the set warning interval, it means that the wear of the evaporation coating machine is very serious and needs to be shut down for overhaul. Then, a shutdown maintenance instruction is generated, and the evaporation coating machine is controlled to shut down, and the shutdown maintenance instruction is sent to the corresponding engineer to repair the evaporation coating machine; when the warning value is within the set warning interval, a wear maintenance instruction is generated and sent to the corresponding engineer to maintain the evaporation coating machine; when the warning value is less than the minimum value in the set warning interval, it means that the wear is very small and can be ignored; then resend the thickness monitoring instruction to the thickness monitoring module until a shutdown maintenance instruction or a wear maintenance instruction is generated;
[0049] By analyzing the coating information, the wear of the evaporation coating machine can be evaluated in real time, and then according to the severity of the wear, maintenance resources can be reasonably allocated to avoid unnecessary downtime for maintenance, thereby optimizing resource utilization; it effectively improves the efficiency, stability and controllability of the coating process, while optimizing the utilization of maintenance resources, which has a positive impact on the management and maintenance of the production process.
[0050] The above contents are merely examples and explanations of the structure of the present invention. The technicians in this technical field may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the structure of the invention or exceed the scope defined by the claims, they should all fall within the protection scope of the present invention.
Claims
1. A coating thickness monitoring system for an evaporation coating machine, characterized in that: Including thickness monitoring module and early warning control module; The thickness monitoring module monitors the coating thickness corresponding to several monitoring points on the evaporation coating machine in real time, and based on this, monitors the process requirements to judge the coating quality and generate coating correction instructions, and sends the coating correction instructions to the early warning control module; specifically: 101: Obtain the coating thickness corresponding to each monitoring point and record it as Hij, where i = 1, 2, 3 ... I, I is a positive integer, I represents the total number of monitoring points on the coating machine, i represents the serial number of any one of the monitoring points; j = 1, 2, 3 ... J, J represents the total number of acquisition moments, j represents the serial number of any one of the acquisition moments; set a standard process thickness and record it as BH, through the set formula Calculate and obtain the thickness distribution value Pij corresponding to each monitoring point at each acquisition time, where α is the set correction coefficient and e is a natural constant; 102: randomly selecting thickness distribution values corresponding to each monitoring point at a collection time, and performing discrete comparative analysis on the values to obtain coating evaluation indexes corresponding to each collection time; 103: plotting a curve relationship diagram of the coating evaluation index changing with time with time as the horizontal axis and the coating evaluation index as the vertical axis, and analyzing the change trend of the coating evaluation index to obtain a correction index based on the curve relationship diagram; when the correction index is greater than a set correction threshold, generating a coating correction instruction and sending it to the early warning control module; When the early warning control module receives the coating correction instruction, it performs wear analysis on the evaporation source and substrate table of the evaporation coating machine based on the coating information to measure the degree of influence on the coating work of the evaporation coating machine, and generates a corresponding early warning strategy accordingly; The specific process of discrete comparative analysis is as follows: Compare and analyze the thickness distribution value with the set distribution interval to divide the thickness distribution value into high deviation, medium deviation and low deviation, and count the cumulative number of high deviation, medium deviation and low deviation respectively, and record them as C1, C2, C3 respectively; sum the thickness distribution values corresponding to the high deviation, medium deviation and low deviation respectively to obtain the total value of high deviation, the total value of medium deviation and the total value of low deviation, and record them as C4, C5, C6 respectively; The cumulative number of height deviations C1, the cumulative number of medium deviations C2, the cumulative number of low deviations C3, the total value of height deviations C4, the total value of medium deviations C5, the total value of low deviations C6 and the thickness distribution value Pij are calculated by the set formula Calculate and obtain the coating evaluation index CPj corresponding to the acquisition moment, where a1, a2, and a3 are respectively the set proportional coefficients, and a1>a2>a3>0, and Pj is the average coating thickness corresponding to each monitoring point; The specific process of analyzing the change trend of the coating evaluation index based on the relationship diagram of the coating evaluation index changing with time is as follows: 301: Draw a tangent line of the curve at each evaluation point, obtain a tangent line expression by data fitting, and perform a derivative operation on the tangent line expression to obtain an evaluation derivative corresponding to each evaluation point; sum the evaluation derivatives greater than zero to obtain a monotonic decrease in quality, and sum the evaluation exponents less than zero and take the absolute value to obtain a monotonic increase in quality; 302: Recording the evaluation derivative equal to zero as a stable derivative, and taking the evaluation index of the evaluation point corresponding to the stable derivative as the stable index of the stable derivative, thereby obtaining the stable index corresponding to each stable derivative, and evaluating the maintenance level of the coating evaluation index based on the stable index to obtain a maintenance value; 303: The quality monotonically decreases F1, the quality monotonically increases F2, the maintenance value Wb and the coating evaluation index CPj are set by the formula The correction index FW is calculated, where b4, b5, and b6 are the set proportional coefficients, and e is a natural constant. is the mean value of the coating evaluation index at each acquisition moment.
2. The coating thickness monitoring system of an evaporation coating machine according to claim 1, characterized in that: The specific process of evaluating the maintenance level of the coating evaluation index is as follows: Compare and analyze the stability index corresponding to each stability derivative with the set index interval to divide the stability index into highly poor quality maintenance, moderately poor quality maintenance and low poor quality maintenance, respectively count the cumulative coefficients of highly poor quality maintenance, moderately poor quality maintenance and low poor quality maintenance, and calculate the mean of the stability index corresponding to each stability derivative to obtain the stability mean; The maintenance value is obtained by formulating and analyzing the cumulative coefficient of high-quality maintenance, the cumulative coefficient of moderate-quality maintenance, the cumulative coefficient of low-quality maintenance and the stable mean.
3. The coating thickness monitoring system of an evaporation coating machine according to claim 1, characterized in that: The specific process of wear analysis of the evaporation source and substrate stage of the evaporation coating machine based on coating information is as follows: 501: randomly select an evaporation source contour map corresponding to a collection time, and overlap and compare it with the initial contour map to obtain the wear position and the wear area corresponding to each wear position, and numerically process and analyze the number of wear positions and the wear area to obtain the wear degree; thus, the wear degree corresponding to each collection time can be obtained and recorded as Sdj; 502: retrieve the pressure of each force-bearing point in the substrate table corresponding to each acquisition time and record it as Ykj, where k = 1, 2, 3 ... K, K represents the total number of force-bearing points in the substrate table, and k represents the sequence number of any force-bearing point; use the set formula Calculate and obtain the discrete force value Ydj corresponding to each acquisition moment, where Yj is the mean pressure value of each force point; 503: The wear degree of the evaporation source corresponding to each collection time is calculated and analyzed by formulating a wear index corresponding to each collection time, and a wear index versus time curve relationship diagram is drawn with time as the horizontal axis and the wear index as the vertical axis, and a wear change trend analysis is performed based on the wear index to generate a corresponding early warning strategy.
4. The coating thickness monitoring system of an evaporation coating machine according to claim 3, characterized in that: The specific process of analyzing the wear trend based on the wear index versus time curve is as follows: Draw a tangent to the curve at the wear point, calculate the slope of the tangent to get the trend slope corresponding to each wear point; sum up the trend slopes greater than zero to get the wear aggravation value, and sum up the trend slopes less than zero and take the absolute value to get the wear mitigation value; The wear aggravation value, wear reduction value and wear index are calculated and analyzed by formulating, and the warning value is obtained. When the warning value is greater than the maximum value in the set warning interval, a shutdown maintenance instruction is generated, and the evaporation coating machine is controlled to be shut down, and the shutdown maintenance instruction is sent to the corresponding engineer to repair the evaporation coating machine; when the warning value is within the set warning interval, a wear maintenance instruction is generated and sent to the corresponding engineer to maintain the evaporation coating machine; when the warning value is less than the minimum value in the set warning interval, the thickness monitoring instruction is resent to the thickness monitoring module until a shutdown maintenance instruction or a wear maintenance instruction is generated.