A transformer static mixing casting method and system

The static mixing and casting method solves the problems of high consumption and solidification in dynamic mixing during transformer production, achieving a high-precision and flexible casting process, and ensuring casting quality and effective equipment operation.

CN118456741BActive Publication Date: 2024-11-15GUANGDONG KEYUAN ELECTRIC
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410939099.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-11-15
Estimated Expiration
2044-07-15

AI Technical Summary

Technical Problem

In existing transformer manufacturing processes, dynamic mixing technology suffers from problems such as high power consumption, high failure rate, high maintenance costs, low casting efficiency, and poor penetration due to easy solidification of the mixed materials.

Method used

A static mixing and casting method is adopted. By acquiring user process parameters and historical pressure curves, vacuuming, material preparation, sampling and testing, and heating operations are carried out. The casting pressure is monitored in real time to ensure the accuracy of the proportions, and a cleaning operation is performed after completion.

Benefits of technology

It achieves a highly flexible mixing process, avoids curing or gel aging of the mixture, improves wettability, and ensures the effective life of the mixture pipeline and the quality of casting.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118456741B_ABST
    Figure CN118456741B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of transformer production and processing, and discloses a transformer static mixing and pouring method and system, the method comprising: obtaining process parameters and a historical pressure curve, and confirming the pressure parameters according to the historical pressure curve; respectively performing vacuum treatment on an epoxy resin material tank, a curing agent material tank and a pouring tank, and respectively performing material preparation treatment on the epoxy resin and the curing agent; respectively performing sampling and detection on the epoxy resin material tank, the curing agent material tank and the static mixer; after passing the sampling and detection, controlling the static mixer to perform a heating operation, and after reaching a preset heating temperature, performing a pouring operation according to a preset total number of valve pouring times and a preset number of valve pouring times per time, and monitoring the pouring pressure in real time; after completing the pouring operation, performing a cleaning operation on the pouring tank; the method disclosed in the present application can realize static mixing, and in the production process, material mixing can be realized at any time, and has the advantages of high working flexibility and high proportioning accuracy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of transformer production and processing, and in particular to a transformer static mixing casting method and system. Background Art

[0002] Since the 1980s, epoxy resin materials have been used more and more widely in my country's electrical products. In addition to being used as adhesives and prepreg insulating materials, they are now widely used as the main insulating material in transformers, mutual inductors, insulators and other fields. The voltage level range has also developed from 10kV and below to 35kV, and the main processing method is casting.

[0003] In order to improve the quality of product casting, all manufacturers have continuously carried out technical transformation of casting equipment, from normal pressure casting, semi-vacuum casting to full vacuum casting and full vacuum automatic pressure gel casting of insulators (AFG process for short). The so-called full vacuum means that from the batching and mixing of epoxy resin to the subsequent casting, the entire process is carried out under a vacuum degree of less than 0.1kPa; the advantage of full vacuum casting is that the entire batching process is in a vacuum state, which can effectively extract the air in the epoxy resin mixture and reduce the bubbles in the batching; in the full vacuum casting process, as much air as possible in the epoxy resin casting mold is extracted, thereby reducing the bubbles in the cast product, improving the electrical insulation strength and mechanical properties of the product, and effectively reducing the amount of partial discharge inside the product.

[0004] The existing transformer production and processing technology generally adopts dynamic mixing technology, and the dynamic mixing casting adopts gravity casting. Due to the large structural disk, multi-layer system design and multiple device structures, there are problems such as high power consumption, high failure rate and high repair and maintenance costs. Furthermore, dynamic mixing adopts batch mixing method, which has the problems of low casting efficiency and long waiting time. If the material mixing begins to react during the waiting process, the material viscosity will increase, which may easily cause poor product penetration.

[0005] It can be seen that the existing technology still needs to be improved and enhanced. Summary of the invention

[0006] In view of the above-mentioned deficiencies in the prior art, the object of the present invention is to provide a static mixing and casting method for a transformer, which can realize static mixing and can mix materials at any time during the production process, and has the advantages of high working flexibility and high proportioning accuracy.

[0007] In order to achieve the above object, the present invention adopts the following technical solutions:

[0008] A transformer static mixing casting method comprises the following steps:

[0009] Obtain the process parameters and historical pressure curves set by the user, and confirm the pressure parameters based on the historical pressure curves;

[0010] Vacuum the epoxy resin tank, curing agent tank and pouring tank respectively;

[0011] The epoxy resin and the curing agent are respectively subjected to material preparation treatment, wherein the material preparation treatment includes degassing treatment, heating treatment and circulation treatment;

[0012] Take samples and test the epoxy resin tank, curing agent tank and static mixer respectively;

[0013] After passing the sampling test, the static mixer is controlled to perform the heating operation. When the preset heating temperature is reached, the pouring operation is performed according to the preset total number of valve pouring times and the preset number of valve pouring times per time, and the pouring pressure is monitored in real time;

[0014] When the pouring operation is completed, the pouring tank is cleaned.

[0015] In the transformer static mixing casting method, the process parameters and the historical pressure curve set by the user are obtained, and the pressure parameters are confirmed according to the historical pressure curve, which specifically includes:

[0016] Obtain the user's login information and verify the user's permissions based on the login information;

[0017] When the permission check is passed, the permission check result is obtained, and the process parameters set by the user are obtained;

[0018] Confirm the validity of the acquired process parameters according to the authority verification result, and store the valid process parameters in the parameter library, wherein the process parameters include vacuum parameters, heating parameters, degassing preparation parameters and metering pump parameters;

[0019] Obtain a historical pressure curve, select any value from the middle and low valleys in the historical pressure curve as the lower pressure limit, select any value from the middle cap in the historical pressure curve as the upper pressure limit, and integrate the lower pressure limit and the upper pressure limit to obtain the pressure parameter.

[0020] In the transformer static mixing and pouring method, the epoxy resin tank, the curing agent tank and the pouring tank are vacuumized respectively, which specifically includes:

[0021] When the epoxy resin tank and the curing agent tank are subjected to vacuum treatment, the common vacuum pump connected to the epoxy resin tank and the curing agent tank is first controlled to be turned on, and when the opening time thereof is consistent with the preset first preheating time, the resin vacuum valve connected to the epoxy resin tank is controlled to be opened, and the curing agent vacuum valve connected to the curing agent tank is controlled to be opened, so as to perform vacuum treatment on the epoxy resin tank and the curing agent tank;

[0022] When the pouring tank is vacuumed, the pouring vacuum pump connected to the pouring tank is first controlled to open. When its opening time is consistent with the preset pouring preheating time, the pouring vacuum valve connected to the pouring tank is controlled to open to vacuum the pouring tank.

[0023] In the transformer static mixing and casting method, the epoxy resin and the curing agent are prepared separately, and the preparation process includes degassing, heating and circulation, which specifically includes:

[0024] Control the resin stirring motor, resin water pump, resin water heater and resin evacuation valve connected to the epoxy resin tank to start working, perform degassing treatment according to the preset resin preparation time and resin preparation vacuum degree, perform heating treatment according to the preset resin heating temperature, and perform circulation treatment according to the preset resin stirring time;

[0025] The curing stirring motor, curing water pump, curing water heater and curing agent vacuum valve connected to the curing agent tank are controlled to start working, degassing treatment is performed according to the preset curing preparation time and curing preparation vacuum degree, heating treatment is performed according to the preset curing heating temperature, and circulation treatment is performed according to the preset curing stirring time.

[0026] In the transformer static mixing and pouring method, the epoxy resin tank, the curing agent tank and the static mixer are sampled and tested respectively, specifically including:

[0027] Control the resin sampling valve connected to the epoxy resin tank to open three times according to the preset resin sampling time, obtain the resin metering results of the three samplings fed back by the resin metering pump, and determine whether the three resin metering results are all within the preset resin ratio range;

[0028] Control the curing agent sampling valve connected to the curing agent tank to open three times according to the preset curing sampling time, obtain the curing metering results of the three samplings fed back by the curing agent metering pump, and judge whether the three curing metering results are all within the preset curing ratio range;

[0029] Controlling the mixing sampling valve connected to the static mixer to open three times according to the preset mixing sampling time, obtaining the mixing metering results of the three samplings fed back by the metering pump, and judging whether the three mixing metering results are all within the preset mixing output range;

[0030] After completing the sampling and testing of the epoxy resin tank, curing agent tank and static mixer, close the resin sampling valve, curing agent sampling valve and mixing sampling valve.

[0031] In the transformer static mixing casting method, after the sampling test, the static mixer is controlled to perform a heating operation, and when the preset heating temperature is reached, the casting operation is performed according to the preset total number of valve castings and the preset number of valve castings per time, which specifically includes:

[0032] After passing the sampling test, controlling the static mixer to perform a heating operation, wherein the heating temperature of the heating operation is greater than a preset pouring temperature;

[0033] Acquire valve opening information, wherein the valve opening information includes the number of pouring valves to be opened and the serial numbers of the pouring valves to be opened;

[0034] According to the valve opening information, the preset total number of valve pouring and the preset number of valve pouring each time corresponding to the pouring valve number to be opened are obtained;

[0035] First, the pouring valve with the smallest number to be opened is controlled to be opened, and then the pouring operation is performed according to the number sequence of the pouring valves to be opened and the preset total number of pouring times of the valves corresponding to the numbers and the preset number of pouring times of each valve;

[0036] During the pouring operation, the filling operation is performed according to the preset filling times and filling methods corresponding to the numbers of the pouring valves to be opened.

[0037] In the transformer static mixing casting method, the pouring pressure is monitored in real time, specifically including:

[0038] Acquire the real-time pouring pressure fed back by the metering pump, wherein the real-time pouring pressure includes the real-time resin transmission pressure and the real-time curing agent transmission pressure;

[0039] Calculate the pressure difference between the real-time resin transmission pressure and the real-time curing agent transmission pressure, and determine whether the pressure difference is within a preset allowable pressure difference range;

[0040] If not, the pouring operation is stopped.

[0041] In the transformer static mixing casting method, after the casting operation is completed, the casting tank is cleaned, which specifically includes:

[0042] When the pouring operation is completed, the pouring valve with the smallest number is controlled to open, and the other pouring valves are controlled to close;

[0043] According to the preset cleaning times, the epoxy resin tank is controlled to deliver epoxy resin to the static mixer and the smallest numbered pouring valve for resin cleaning;

[0044] When the resin cleaning is completed, the compressed air valve connected to the static mixer is controlled to open;

[0045] The preset pouring and cleaning time corresponding to the pouring valve number is obtained, and based on the obtained preset pouring and cleaning time, the pouring pipelines are cleaned one by one with compressed air according to the pouring valve number.

[0046] In the transformer static mixing casting method, after the resin cleaning is completed, the compressed air valve connected to the static mixer is controlled to open, and then the following steps are included:

[0047] The refrigeration equipment is controlled to start working to cool the metering pump, static mixer and the pipelines between the two.

[0048] The present application also correspondingly provides a transformer static mixing casting system, wherein the transformer static mixing casting system adopts any of the above-mentioned transformer static mixing casting methods to realize working control.

[0049] Beneficial effects: The present invention provides a transformer static mixing and pouring method, which can realize static mixing, that is, in the production process, materials can be taken and mixed at any time, and has the advantages of high working flexibility and high proportioning accuracy, and can effectively avoid the problems of solidification or gel aging of the mixture, and improve the wettability of the mixture; further, after the pouring is completed, a cleaning operation is performed, which can effectively avoid the sedimentation of the filler and ensure the effective life of the rubber in the mixture pipeline, that is, ensure that the mixture will not have a solidification problem. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] Figure 1 A first logic flow chart of the transformer static material mixing casting method provided by the present invention;

[0051] Figure 2 A second logic flow chart of the transformer static material mixing casting method provided by the present invention;

[0052] Figure 3 A third logic flow chart of the transformer static material mixing casting method provided by the present invention;

[0053] Figure 4 A fourth logic flow chart of the transformer static material mixing casting method provided by the present invention;

[0054] Figure 5 A fifth logic flow chart of the transformer static material mixing casting method provided by the present invention;

[0055] Figure 6 A sixth logic flow chart of the transformer static material mixing casting method provided by the present invention;

[0056] Figure 7 A seventh logic flow chart of the transformer static material mixing casting method provided by the present invention;

[0057] Figure 8 This is a system structure diagram of the transformer static mixing casting system provided by the present invention.

[0058] Explanation of main component symbols: 1-epoxy resin tank, 11-resin evacuation valve, 12-resin metering pump, 13-resin sampling valve, 2-curing agent tank, 21-curing agent evacuation valve, 22-curing agent metering pump, 23-curing agent sampling valve, 3-static mixer, 31-compressed air valve, 32-mixing sampling valve, 4-pouring tank, 41-pouring valve, 42-pouring vacuum pump, 43-pouring evacuation valve, 44-pouring Roots pump, 51-common Roots pump, 52-common vacuum pump, 6-refrigeration equipment. DETAILED DESCRIPTION

[0059] The present invention provides a transformer static mixing casting method and system. To make the purpose, technical solution and effect of the present invention clearer and more specific, the present invention is further described in detail below with reference to the accompanying drawings and examples.

[0060] In the description of the present invention, it should be understood that the terms "installation", "connection" and the like should be understood in a broad sense, and a person skilled in the art can understand the specific meanings of the above terms in the present invention according to specific circumstances.

[0061] See also Figure 1 The present invention provides a transformer static mixing casting method, comprising the steps of:

[0062] 101. Obtain the process parameters and historical pressure curve set by the user, and confirm the pressure parameters according to the historical pressure curve;

[0063] In this embodiment, the historical pressure curve is the pressure curve when the mixing and pouring process was last performed. The horizontal axis of the pressure curve is the time axis, and the vertical axis is the pressure value range. The pressure parameter is an important parameter, and an incorrect setting may cause equipment or pouring failure.

[0064] 102. Perform vacuum treatment on the epoxy resin material tank 1, the curing agent material tank 2 and the pouring tank 4 respectively;

[0065] In this embodiment, the epoxy resin used is CY225, and the curing agent used is HY227; before pouring, each material tank and the pouring tank 4 are evacuated to ensure that the pouring process is carried out in a full vacuum environment to ensure the product pouring effect.

[0066] 103. Perform material preparation processing on the epoxy resin and the curing agent respectively, wherein the material preparation processing includes degassing processing, heating processing and circulation processing;

[0067] In this embodiment, the epoxy resin in the epoxy resin tank 1 and the curing agent in the curing agent tank 2 are prepared separately, wherein the degassing process is a very important process, the quality of degassing will determine the amount of bubbles during pouring, the fewer bubbles, the higher the pouring quality, and by coordinating the circulation process, the materials can be mixed evenly and the bubbles can be further removed to further improve the pouring quality.

[0068] 104. Sample and test the epoxy resin tank 1, the curing agent tank 2 and the static mixer 3 respectively;

[0069] In this embodiment, sampling and testing are performed before pouring to ensure that the resin metering pump 12 is working properly, the curing agent metering pump 22 is working properly, and the mixture sampling is normal, so as to ensure normal material transportation and normal proportioning, ensure the accuracy of the generated mixture, and improve the pouring quality.

[0070] 105. After the sampling test is passed, the static mixer 3 is controlled to perform a heating operation. When the preset heating temperature is reached, a pouring operation is performed according to a preset total number of valve pouring times and a preset number of valve pouring times per time, and the pouring pressure is monitored in real time.

[0071] In this embodiment, the transformer static mixing pouring system includes 18 pouring valves 41. Some of the pouring valves 41 can be opened according to actual production needs, and the numbers of the pouring valves 41 that need to be opened can be obtained.

[0072] 106. After the pouring operation is completed, the pouring tank 4 is cleaned.

[0073] The present application discloses a transformer static mixing and pouring method, which can realize static mixing, that is, in the production process, materials can be taken and mixed at any time, and has the advantages of high working flexibility and high proportioning accuracy, and can effectively avoid the problems of solidification or gel aging of the mixture, and improve the wettability of the mixture; further, after the pouring is completed, a cleaning operation is performed, which can effectively avoid the sedimentation of the filler and ensure the effective life of the rubber in the mixture pipeline, that is, ensure that the mixture will not have a solidification problem.

[0074] For further information, see Figure 2 The obtaining of the process parameters and the historical pressure curve set by the user and the confirmation of the pressure parameters according to the historical pressure curve specifically include:

[0075] 201. Obtain the user's login information and perform permission verification on the user according to the login information;

[0076] In this embodiment, the user's login information includes a user account and a user password, and the login information can be checked for permissions through a preset user permission table; the user permission table records registered user accounts and their corresponding operation permissions.

[0077] 202. When the authority verification is passed, the authority verification result is obtained, and the process parameters set by the user are obtained;

[0078] 203. Confirm the validity of the acquired process parameters according to the authority verification result, and store the valid process parameters in a parameter library, wherein the process parameters include vacuum parameters, heating parameters, degassing material preparation parameters, and metering pump parameters;

[0079] In this embodiment, whether the corresponding process parameters can be modified is confirmed according to the user's authority; wherein, the vacuum parameters: the lower limit value is to close the vacuum valve and the Roots pump when the vacuum is evacuated to this value, and the upper limit value is to open the vacuum valve again when the vacuum value returns to this value after closing the vacuum valve; degassing preparation time: after the material is loaded and sucked, the resin material and the curing agent material are required to be vacuumed and degassed, and the degassed material can be poured. After the degassing is completed, the stirring motor will work intermittently according to the set running time and pause time; heating parameters: need to be set according to the requirements of the process materials; metering pump parameters: the speed and ratio of pouring can be set here. When different ratios need to be adjusted, they can be adjusted by modifying the percentage of the curing agent.

[0080] 204. Obtain a historical pressure curve, select any value from the middle and low valleys in the historical pressure curve as the lower pressure limit, select any value from the middle peak in the historical pressure curve as the upper pressure limit, and integrate the lower pressure limit and the upper pressure limit to obtain a pressure parameter;

[0081] In this embodiment, the transformer static mixing pouring system includes 18 pouring valves 41, and the lower pressure limit includes two, one of which is used as the lower pressure limit of the pouring valves numbered 1-9, and the other is used as the lower pressure limit of the pouring valves numbered 10-18. The two lower pressure limits are selected by the staff from the middle and low valleys in the historical pressure curve according to project requirements.

[0082] For further information, see Figure 3 The epoxy resin material tank 1, the curing agent material tank 2 and the pouring tank 4 are respectively vacuumed, specifically including:

[0083] 301. When the epoxy resin tank 1 and the curing agent tank 2 are subjected to vacuum treatment, the common vacuum pump 52 connected to the epoxy resin tank 1 and the curing agent tank 2 is first controlled to be turned on. When the opening time thereof is consistent with the preset first preheating time, the resin vacuum valve 11 connected to the epoxy resin tank 1 is controlled to be turned on, and the curing agent vacuum valve 21 connected to the curing agent tank 2 is controlled to be turned on, so as to perform vacuum treatment on the epoxy resin tank 1 and the curing agent tank 2.

[0084] In this example, see Figure 8The transformer static mixing and pouring system includes an epoxy resin tank 1, a curing agent tank 2 and a pouring tank 4. The output end of the epoxy resin tank 1 and the output end of the curing agent tank 2 are connected to the input end of the static mixer 3. The output end of the static mixer 3 is connected to the input end of the pouring tank 4 through 18 pouring valves 41. The epoxy resin tank 1 is connected to a common vacuum pump 52 through a resin evacuation valve 11 and a common Roots pump 51. The curing agent tank 2 is connected to a common vacuum pump 52 through a curing agent evacuation valve 21 and a common Roots pump 51, that is, the epoxy resin tank 1 and the curing agent tank 2 share a Roots pump and a vacuum pump.

[0085] In this embodiment, the common vacuum pump 52 needs to be opened first. When the first preheating time of the common vacuum pump 52 is reached, the resin vacuum valve 11 and the curing agent vacuum valve 21 are controlled to open to ensure that the vacuum operation is carried out stably. The first preheating time can be pre-set according to the design parameters of the material tank and the production requirements. After opening the resin vacuum valve 11 and the curing agent vacuum valve 21, if the pressure in the material tank meets the preset pressure condition, the common Roots pump 51 is controlled to open.

[0086] 302. When the pouring tank 4 is subjected to vacuum treatment, the pouring vacuum pump 42 connected to the pouring tank 4 is first controlled to be turned on. When the opening time thereof is consistent with the preset pouring preheating time, the pouring vacuum valve 43 connected to the pouring tank 4 is controlled to be opened to perform vacuum treatment on the pouring tank 4.

[0087] In this example, see Figure 8 The transformer static mixing pouring system also includes two pouring vacuum pumps 42, a pouring evacuation valve 43 and a pouring Roots pump 44. The two pouring vacuum pumps 42 are connected to the pouring tank 4 through the pouring evacuation valve 43 respectively, and the pouring Roots pump 44 is arranged on the connecting pipeline between the pouring evacuation valve 43 and the pouring vacuum pump 42; the pouring preheating time can be pre-set according to the design parameters of the pouring tank 4 and the production requirements; when the pouring evacuation valve 43 is opened, if the pressure in the pouring tank 4 meets the preset pressure condition, the pouring Roots pump 44 is controlled to open.

[0088] For further information, see Figure 4 The epoxy resin and the curing agent are respectively subjected to material preparation treatment, and the material preparation treatment includes degassing treatment, heating treatment and circulation treatment, specifically including:

[0089] 401. Control the resin stirring motor, resin water pump, resin water heater and resin evacuation valve 11 connected to the epoxy resin material tank 1 to start working, perform degassing treatment according to the preset resin preparation time and resin preparation vacuum degree, perform heating treatment according to the preset resin heating temperature, and perform circulation treatment according to the preset resin stirring time;

[0090] In this embodiment, air is extracted through the resin evacuation valve 11 to degas the epoxy resin; the resin stirring motor is arranged in the epoxy resin tank 1, and the resin water pump and the resin water heater cooperate to transport a heat source to the epoxy resin tank 1 to achieve heating of the epoxy resin during the preparation process; the resin stirring motor drives the epoxy resin to be stirred from the bottom of the tank to the top of the tank, and then from the top of the tank to the bottom of the tank, so as to achieve a circulation treatment of the epoxy resin; the degassing treatment, heating treatment and stirring treatment are carried out simultaneously, and the preparation treatment is carried out according to a preset resin preparation time. When the preset resin preparation time is reached, the epoxy resin preparation treatment is stopped.

[0091] 402, controlling the curing stirring motor, curing water pump, curing water heater and curing agent evacuation valve 21 connected to the curing agent tank 2 to start working, performing degassing treatment according to the preset curing preparation time and curing preparation vacuum degree, performing heating treatment according to the preset curing heating temperature, and performing circulation treatment according to the preset curing stirring time;

[0092] In this embodiment, air is extracted through the curing agent evacuation valve 21 to degas the curing agent; the curing agent stirring motor is arranged in the curing agent tank 2, and the curing agent water pump and the curing agent water heater cooperate to transport a heat source to the curing agent tank 2 to achieve heating of the curing agent during the preparation process; the curing agent is driven by the curing agent stirring motor to stir the curing agent from the bottom of the tank to the top of the tank, and then from the top of the tank to the bottom of the tank to achieve a circulation treatment of the curing agent; the degassing treatment, heating treatment and stirring treatment are carried out simultaneously, and the preparation treatment is carried out according to a preset curing agent preparation time. When the preset curing agent preparation time is reached, the curing agent preparation treatment is stopped.

[0093] For further information, see Figure 5 The sampling and testing of the epoxy resin tank 1, the curing agent tank 2 and the static mixer 3 respectively specifically includes:

[0094] 501. Control the resin sampling valve 13 connected to the epoxy resin material tank 1 to open three times according to the preset resin sampling time, obtain the resin metering results of the three samplings fed back by the resin metering pump 12, and determine whether the three resin metering results are all within the preset resin ratio range;

[0095] In this example, see Figure 8A resin metering pump 12 is provided at the output end of the epoxy resin material tank 1, and the output end of the resin metering pump 12 is respectively connected to a resin sampling valve 13 and an input end of a static mixer 3; the epoxy resin is sampled once at a certain interval, and a total of three samples are taken to obtain a resin metering result, which is the resin sampling weight; when the three resin metering results all fall within the preset resin ratio range, it indicates that the resin metering pump 12 is working normally.

[0096] 502. Control the curing agent sampling valve 23 connected to the curing agent tank 2 to open three times according to the preset curing sampling time, obtain the curing metering results of the three samplings fed back by the curing agent metering pump 22, and determine whether the three curing metering results are all within the preset curing ratio range;

[0097] In this example, see Figure 8 A curing agent metering pump 22 is provided at the output end of the curing agent tank 2, and the output end of the curing agent metering pump 22 is respectively connected to the curing agent sampling valve 23 and the input end of the static mixer 3; the curing agent is sampled once at a certain interval, and the sampling is performed three times in total to obtain the curing agent metering result, and the curing agent metering result is the curing agent sampling weight; when the three curing agent metering results all fall within the preset curing agent ratio range, it indicates that the curing agent metering pump 22 is working normally.

[0098] 503. Control the mixing sampling valve 32 connected to the static mixer 3 to open three times according to the preset mixing sampling time, obtain the mixing metering results of the three samplings fed back by the metering pump, and determine whether the three mixing metering results are all within the preset mixing output range;

[0099] In this example, see Figure 8 The output end of the static mixer 3 is connected to the input end of the mixing sampling valve 32 and each pouring valve 41 respectively; the mixed material is sampled once at a certain interval and measured by an external metering pump, and the sampling is performed three times in total to obtain the mixing measurement result, and the mixing measurement result is the mixing sampling weight; when the three mixing measurement results all fall within the preset mixing output range, it indicates that the mixing sampling is normal, that is, the ratio during pouring is normal.

[0100] 504. After completing the sampling and testing of the epoxy resin tank 1, the curing agent tank 2 and the static mixer 3, close the resin sampling valve 13, the curing agent sampling valve 23 and the mixed sampling valve 32 to allow the residual resin material or curing agent material to be sucked back into the pipeline during sampling to improve material utilization.

[0101] For further information, see Figure 6, after the sampling test, the static mixer 3 is controlled to perform a heating operation, and when the preset heating temperature is reached, a pouring operation is performed according to a preset total number of valve pouring times and a preset number of valve pouring times each time, specifically including:

[0102] 601. After passing the sampling test, the static mixer 3 is controlled to perform a heating operation, wherein the heating temperature of the heating operation is greater than a preset pouring temperature;

[0103] 602. Acquire valve opening information, where the valve opening information includes the number of pouring valves 41 to be opened and the serial numbers of the pouring valves 41 to be opened;

[0104] 603. Obtaining, according to the valve opening information, a preset total number of valve pouring times and a preset number of valve pouring times each time corresponding to the number of the pouring valve 41 to be opened;

[0105] In this embodiment, the number of the pouring valves 41 to be opened, the serial numbers of the pouring valves 41 to be opened, the total number of pouring times of the valves and the number of pouring times of each valve are preset by production personnel according to production requirements.

[0106] 604, first control the pouring valve 41 with the smallest number to be opened to be opened, and then perform the pouring operation according to the number sequence of the pouring valves 41 to be opened and the preset total number of pouring times of the valves corresponding to the numbers and the preset number of pouring times of each valve;

[0107] In this embodiment, each of the 18 pouring valves 41 can perform an independent pouring operation, because there is more than one coil in the pouring tank 4 each time pouring. For example, this pouring operation needs to use pouring valves numbered 1-3, among which pouring valve No. 1, pouring valve No. 2, and pouring valve No. 3 all need to be poured 50 times, and the number of pouring times of pouring valves No. 1, 2, and 3 is set to 2. The pouring process is: pouring valve No. 1 pours twice before pouring valve No. 2, pouring valve No. 2 pours twice before pouring valve No. 3, pouring valve No. 3 pours twice before pouring valve No. 1, and the pouring cycle is repeated to allow the mixture poured into the mold first to immerse in the coil until the pouring valves numbered 1-3 have completed pouring, that is, the three pouring valves have performed 50 pouring operations.

[0108] 605. During the pouring operation, the filling operation is performed according to the preset filling times and filling methods corresponding to the numbers of the pouring valves 41 to be opened;

[0109] In this embodiment, the feeding method includes full-stroke feeding and half-stroke feeding; specifically, the pouring valves numbered 1-18 are connected to the pouring ports numbered 1-18 in a one-to-one correspondence. During the pouring process, or when the pouring number of any pouring port is reached, the feeding operation can be performed according to the pouring situation. It is only necessary to add the "set total number of pourings" of the pouring port to the required number of feedings, and the system will automatically pour and feed. For example: the total number of pourings of pouring port No. 2 connected to pouring valve No. 2 is 48, and one feeding is required. Then the "set total number of pourings" of pouring port No. 2 is 49. When the system pours to pouring port No. 2, it will automatically pour for feeding according to the selected feeding method.

[0110] For further information, see Figure 6 , and real-time monitoring of pouring pressure, specifically including:

[0111] 606. Acquire the real-time pouring pressure fed back by the metering pump, where the real-time pouring pressure includes the real-time resin transmission pressure and the real-time curing agent transmission pressure;

[0112] In this embodiment, the real-time resin transmission pressure is obtained by the resin metering pump 12 , and the real-time curing agent transmission pressure is obtained by the curing agent metering pump 22 .

[0113] 607. Calculate the pressure difference between the real-time resin transmission pressure and the real-time curing agent transmission pressure, and determine whether the pressure difference is within a preset allowable pressure difference range;

[0114] 608. If not, the pouring operation is stopped;

[0115] In this embodiment, when the calculated pressure difference is not within the preset allowable pressure difference range, it indicates that there is a pressure imbalance problem, and pouring needs to be stopped immediately to check the cause and eliminate the fault. The pouring operation can be continued only after the system is normal.

[0116] For further information, see Figure 7 After the pouring operation is completed, the pouring tank 4 is cleaned, which specifically includes:

[0117] 701. After the pouring operation is completed, the pouring valve 41 with the smallest number is controlled to be opened, and the other pouring valves 41 are controlled to be closed;

[0118] 702. According to the preset cleaning times, the epoxy resin tank 1 is controlled to deliver epoxy resin to the static mixer 3 and the pouring valve 41 with the smallest number, so as to perform resin cleaning;

[0119] In this embodiment, the pouring valve 41 with the smallest number is pouring valve No. 1; the epoxy resin tank 1 outputs the single-component resin, and then the mixed material in the static mixer 3 and the pipeline is pumped out through pouring valve No. 1.

[0120] 703. After the resin cleaning is completed, the compressed air valve 31 connected to the static mixer 3 is controlled to open;

[0121] 704. Obtain a preset pouring and cleaning time corresponding to the number of the pouring valve 41, and based on the obtained preset pouring and cleaning time, use compressed air to clean the pouring pipelines one by one according to the number of the pouring valve 41;

[0122] In this embodiment, the preset pouring and cleaning time can be 5 minutes, and the pouring valves numbered 1-18 will be opened one by one in order of numbering from small to large. The pouring and cleaning time of each pouring valve 41 is 5 minutes, that is, the compressed air cleaning step lasts for 1 and a half hours. Under the action of compressed air, the remaining material will flow out of the pouring valve 41 to empty the resin material in the pipeline and complete the cleaning operation of the system.

[0123] For further information, see Figure 7 After the resin cleaning is completed, the compressed air valve 31 connected to the static mixer 3 is controlled to be opened, and then the steps are also included:

[0124] 705. Control the refrigeration equipment 6 to start working, so as to cool the metering pump, the static mixer 3 and the pipeline therebetween;

[0125] In this embodiment, when the compressed air refrigeration step is performed, the refrigeration device 6 is turned on to cool the metering pump and the pipeline to prevent the resin from being solidified in the pipeline due to excessively high temperature, thereby ensuring the pipeline cleaning effect.

[0126] The present application also correspondingly provides a transformer static mixing casting system, wherein the transformer static mixing casting system adopts any of the above-mentioned transformer static mixing casting methods to realize working control.

[0127] It is understandable that those skilled in the art can make equivalent substitutions or changes based on the technical solution and inventive concept of the present invention, and all these changes or substitutions should fall within the protection scope of the present invention.

Claims

1. A static mixing casting method for transformers, It is characterized in that Includes steps: Obtain the process parameters and historical pressure curves set by the user, and confirm the pressure parameters based on the historical pressure curves; Vacuum the epoxy resin tank, curing agent tank and pouring tank respectively; The epoxy resin and the curing agent are respectively subjected to material preparation treatment, wherein the material preparation treatment includes degassing treatment, heating treatment and circulation treatment; Take samples and test the epoxy resin tank, curing agent tank and static mixer respectively; After passing the sampling test, the static mixer is controlled to perform a heating operation, and when the preset heating temperature is reached, a pouring operation is performed according to a preset total number of valve pouring times and a preset number of valve pouring times per time; Specifically, after the sampling test is passed, the static mixer is controlled to perform a heating operation, and the heating temperature of the heating operation is greater than a preset pouring temperature; Acquire valve opening information, wherein the valve opening information includes the number of pouring valves to be opened and the serial numbers of the pouring valves to be opened; According to the valve opening information, the preset total number of valve pouring and the preset number of valve pouring each time corresponding to the pouring valve number to be opened are obtained; First, the pouring valve with the smallest number to be opened is controlled to be opened, and then the pouring operation is performed according to the number sequence of the pouring valves to be opened and the preset total number of pouring times of the valves corresponding to the numbers and the preset number of pouring times of each valve; During the pouring operation, the filling operation is performed according to the preset filling times and filling methods corresponding to the numbers of the pouring valves to be opened; and the pouring pressure is monitored in real time; After the pouring operation is completed, the pouring tank is cleaned; Specifically, when the pouring operation is completed, the pouring valve with the smallest number is controlled to be opened, and the other pouring valves are controlled to be closed; According to the preset cleaning times, the epoxy resin tank is controlled to deliver epoxy resin to the static mixer and the smallest numbered pouring valve for resin cleaning; When the resin cleaning is completed, the compressed air valve connected to the static mixer is controlled to open; Control the refrigeration equipment to start working to cool the metering pump, static mixer and the pipelines between them; The preset pouring and cleaning time corresponding to the pouring valve number is obtained, and based on the obtained preset pouring and cleaning time, the pouring pipelines are cleaned one by one with compressed air according to the pouring valve number.

2. A transformer static mixing casting method according to claim 1, It is characterized in that The obtaining of the process parameters and the historical pressure curve set by the user, and confirming the pressure parameters according to the historical pressure curve specifically includes: Obtain the user's login information and verify the user's permissions based on the login information; When the permission check is passed, the permission check result is obtained, and the process parameters set by the user are obtained; Confirm the validity of the acquired process parameters according to the authority verification result, and store the valid process parameters in the parameter library, wherein the process parameters include vacuum parameters, heating parameters, degassing preparation parameters and metering pump parameters; Obtain a historical pressure curve, select any value from the middle and low valleys in the historical pressure curve as the lower pressure limit, select any value from the middle cap in the historical pressure curve as the upper pressure limit, and integrate the lower pressure limit and the upper pressure limit to obtain the pressure parameter.

3. A transformer static mixing casting method according to claim 1, It is characterized in that The vacuum treatment of the epoxy resin material tank, the curing agent material tank and the pouring tank respectively specifically includes: When the epoxy resin tank and the curing agent tank are subjected to vacuum treatment, the common vacuum pump connected to the epoxy resin tank and the curing agent tank is first controlled to be turned on, and when the opening time thereof is consistent with the preset first preheating time, the resin vacuum valve connected to the epoxy resin tank is controlled to be opened, and the curing agent vacuum valve connected to the curing agent tank is controlled to be opened, so as to perform vacuum treatment on the epoxy resin tank and the curing agent tank; When the pouring tank is vacuumed, the pouring vacuum pump connected to the pouring tank is first controlled to open. When its opening time is consistent with the preset pouring preheating time, the pouring vacuum valve connected to the pouring tank is controlled to open to vacuum the pouring tank.

4. A transformer static mixing casting method according to claim 1, It is characterized in that The epoxy resin and the curing agent are respectively subjected to material preparation treatment, wherein the material preparation treatment includes degassing treatment, heating treatment and circulation treatment, and specifically includes: Control the resin stirring motor, resin water pump, resin water heater and resin evacuation valve connected to the epoxy resin tank to start working, perform degassing treatment according to the preset resin preparation time and resin preparation vacuum degree, perform heating treatment according to the preset resin heating temperature, and perform circulation treatment according to the preset resin stirring time; The curing stirring motor, curing water pump, curing water heater and curing agent vacuum valve connected to the curing agent tank are controlled to start working, degassing treatment is performed according to the preset curing preparation time and curing preparation vacuum degree, heating treatment is performed according to the preset curing heating temperature, and circulation treatment is performed according to the preset curing stirring time.

5. A transformer static mixing casting method according to claim 1, It is characterized in that The sampling and testing of the epoxy resin tank, the curing agent tank and the static mixer respectively specifically includes: Control the resin sampling valve connected to the epoxy resin tank to open three times according to the preset resin sampling time, obtain the resin metering results of the three samplings fed back by the resin metering pump, and determine whether the three resin metering results are all within the preset resin ratio range; Control the curing agent sampling valve connected to the curing agent tank to open three times according to the preset curing sampling time, obtain the curing metering results of the three samplings fed back by the curing agent metering pump, and judge whether the three curing metering results are all within the preset curing ratio range; Controlling the mixing sampling valve connected to the static mixer to open three times according to the preset mixing sampling time, obtaining the mixing metering results of the three samplings fed back by the metering pump, and judging whether the three mixing metering results are all within the preset mixing output range; After completing the sampling and testing of the epoxy resin tank, curing agent tank and static mixer, close the resin sampling valve, curing agent sampling valve and mixing sampling valve.

6. A transformer static mixing casting method according to claim 1, It is characterized in that The real-time monitoring of pouring pressure specifically includes: Acquire the real-time pouring pressure fed back by the metering pump, wherein the real-time pouring pressure includes the real-time resin transmission pressure and the real-time curing agent transmission pressure; Calculate the pressure difference between the real-time resin transmission pressure and the real-time curing agent transmission pressure, and determine whether the pressure difference is within a preset allowable pressure difference range; If not, the pouring operation is stopped.

7. A static mixing and pouring system for transformers. It is characterized in that The transformer static mixing and pouring system adopts the transformer static mixing and pouring method as described in any one of claims 1 to 6 to realize working control.

Citation Information

Patent Citations

  • Casting assembly line and method for mutual inductors

    CN106273138A

  • Pressure-stabilizing injection APG pouring process for epoxy resin casing pipe with metal insert

    CN116476293A

  • Dry-type transformer resin vacuum pouring process

    CN118136406A

  • Resin pressurization casting device and pressurization casting method

    JP2013248770A