A workshop equipment inspection method and system

By calculating the product mean of the normalized state parameters and vibration frequency differences of workshop equipment, combined with similarity analysis, equipment abnormalities are identified, which solves the problem of low accuracy of inspection results in the existing technology and improves the accuracy of equipment inspections. stability and efficiency to ensure production stability and safety.

CN118468191BActive Publication Date: 2024-10-01SHAANXI XINNENG COAL PREPARATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410912903.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-09
Publication Date
2024-10-01
Estimated Expiration
2044-07-09

AI Technical Summary

Technical Problem

Existing workshop equipment inspection methods have low accuracy in determining conveyor belt abnormalities and are prone to false alarms, resulting in inaccurate inspection results.

Method used

By calculating the sum of the normalized load weight, operating speed and current data in the sampling period as the state parameter, a target window is constructed and the product mean of the state abnormality degree and the vibration frequency difference is calculated. Combined with similarity analysis, the vibration anomaly of the equipment is identified. value to improve the accuracy and efficiency of inspections.

Benefits of technology

It improves the accuracy and efficiency of equipment inspections, reduces unexpected downtime, ensures the continuity and stability of production, provides data support for preventive maintenance, and avoids work accidents and personal injuries caused by equipment failure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118468191B_ABST
    Figure CN118468191B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of data processing, and more specifically, to a method and system for workshop equipment inspection. The method comprises: taking the sum of the normalized load weight, the normalized running speed and the normalized current data at the sampling moment as the state parameter; calculating the state abnormality degree at the target moment, constructing a window according to a preset size, and taking the window containing the target moment as the target window; respectively calculating the difference between the state parameter at the target moment and the state parameter at the remaining sampling moments in the target window, and constructing a difference sequence; calculating the vibration abnormality value at the target moment to inspect the workshop equipment. Through the technical solution of the present invention, the accuracy of the inspection results can be improved, equipment abnormalities can be discovered in time, equipment reliability can be improved, and maintenance costs can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of data processing, and more specifically, to a workshop equipment inspection method and system. Background Art

[0002] Workshop equipment is the core of industrial production, and its stable operation is directly related to production efficiency and product quality. With the development of industrial automation and intelligence, workshop equipment is becoming increasingly complex, and it is particularly important to conduct regular inspections of equipment to prevent failures and accidents. Regular inspections of workshop equipment can help discover potential faults and problems, and take maintenance measures in a timely manner to prevent sudden equipment failures from causing production interruptions, which helps to reduce maintenance costs and production losses. Timely discovery and repair of equipment failures can improve equipment reliability and stability, reduce downtime caused by equipment failures, and improve production efficiency and capacity utilization. With the development of technologies such as the Internet of Things (IoT), big data, and artificial intelligence, modern inspection methods have begun to shift towards automation and intelligence. By installing sensors to collect equipment operation data and using data analysis to predict equipment status, fault diagnosis and predictive maintenance can be performed more accurately.

[0003] The existing Chinese patent application document with publication number CN110849617A discloses a conveyor belt fault detection method, device, computer equipment and storage medium. The method extracts features from the collected vibration data sequence to obtain a current data feature set, inputs it into a pre-trained target conveyor belt fault detection model, outputs the fault detection value of the current data sequence, and determines the current working state of the conveyor belt according to the fault detection value of the current data sequence.

[0004] However, when the conveyor belt is operating normally, there will be a certain degree of vibration. It is inaccurate to simply judge the abnormality of the conveyor belt based on the vibration, which will lead to low accuracy of the inspection results and false alarms. Summary of the invention

[0005] In order to solve the problem of low accuracy of inspection results, the present invention proposes a workshop equipment inspection method and system.

[0006] In a first aspect, the present invention discloses a workshop equipment inspection method, comprising: taking the sum of the normalized load weight, the normalized running speed and the normalized current data at the sampling moment as a state parameter; taking any sampling moment in the sampling period as the target moment, calculating the state abnormality degree at the target moment, constructing a window according to a preset size, and taking the window containing the target moment as the target window; respectively calculating the difference between the state parameters at the target moment and the state parameters at the remaining sampling moments in the target window, constructing a difference sequence, calculating the similarity between the current sampling period and the difference sequence of the marked period in the target window, wherein the marked period is a historical sampling period adjacent to the current sampling period; calculating the mean of the product of the first difference and the second difference at the same sampling moment in the target window between the current sampling period and the marked period, wherein the first difference is the difference in the state abnormality degree at the same sampling moment, and the second difference is the difference in the vibration frequency obtained at the same sampling moment; taking the sum of the similarity and the mean as the vibration abnormality value at the target moment to inspect the workshop equipment.

[0007] By using the concepts of target time and target window, the slight changes in the equipment status are effectively captured by calculating the difference sequence similarity between the current sampling period and the adjacent historical sampling period in the target window. In addition, by calculating the product mean of the difference in the state abnormality degree and the difference in vibration frequency between the two sampling periods at the same sampling time, the ability to identify abnormal vibration of the equipment is further enhanced. Not only does it improve the accuracy and efficiency of equipment inspections, but it also provides strong data support for preventive maintenance through quantitative vibration abnormalities, which helps to timely identify and deal with potential equipment problems, reduce unexpected downtime, and ensure the stability and continuity of the production process.

[0008] Preferably, the target window is a window constructed with the target time as the center and a preset size as the length.

[0009] The symmetrical window ensures balanced observation of state changes before and after the target moment, reduces analysis deviations that may be caused by time bias, helps identify long-term trends and periodic changes in equipment status, and provides a basis for long-term performance evaluation and prediction of equipment. The data within the window can reveal abnormal fluctuations near the target moment, which helps to promptly detect potential equipment failures or performance degradation.

[0010] Preferably, the target window further comprises: a window constructed with a target moment as a sampling moment of the window endpoint and a preset size as a length, wherein the target moment is the left endpoint of the window or the right endpoint of the window.

[0011] Preferably, the calculation of the state abnormality degree at the target moment includes: constructing the state parameter at each sampling moment in the sampling period into a state parameter curve.

[0012] ,in, Indicates The degree of abnormality of the state at each sampling moment; Indicates the target window of the current sampling period and the adjacent future window. The state parameter difference at each sampling moment; Indicates the first The slope of the tangent line at the sampling moment, Indicates the first The slope of the tangent line at the sampling moment; Indicates the window size, which includes the target window and the adjacent future window; represents the normalization function; in the state abnormality degree relationship, The sampling moment is the target moment.

[0013] By taking the mean of the difference between the target window of the current sampling period and the adjacent future window, we can gain a deep insight into the change in the growth rate of the conveyor belt state parameters over time. It not only reveals the performance fluctuations of the conveyor belt in the short term, but also smoothes the random noise and short-term fluctuations through the calculation of the mean, highlighting the long-term trend and systematic changes.

[0014] Preferably, the calculation of the state abnormality degree at the target moment further comprises: constructing the state parameter at each sampling moment in the sampling period into a state parameter curve.

[0015] ,in, Indicates The degree of abnormality of the state at each sampling moment; Indicates the target window of the current sampling period and the adjacent future window. The state parameter difference at each sampling moment; Indicates the target window of the current sampling period and the adjacent historical window. The state parameter difference at each sampling moment; Indicates the first The slope of the tangent line at the sampling moment, Indicates the first The slope of the tangent line at the sampling moment; Indicates the first The slope of the tangent line at the sampling moment; Indicates the window size, which includes the target window, the adjacent future window, and the adjacent history window; represents the normalization function; in the state abnormality degree relationship, The sampling moment is the target moment.

[0016] Not only does it focus on the difference between the target window and the adjacent future window to ensure that the immediate changes and potential trends of the device status can be captured, but it also carefully considers the difference between the target window and the adjacent historical window, thereby expanding the time range of detection and lengthening the detection period. This not only helps to smooth short-term random fluctuations and reduce false alarms, but also enhances the insight into the long-term performance changes of the device, thereby significantly improving the accuracy and reliability of the calculation results of the state abnormality degree.

[0017] Preferably, the size of the adjacent history window is consistent with the size of the target window, and the leftmost sampling moment in the target window and the rightmost sampling moment in the adjacent history window are continuous in time sequence.

[0018] The continuity of analysis is ensured, and analysis errors that may be caused by time breakpoints are avoided. By connecting the current and historical windows, the evolution trend of device status over time can be tracked more accurately.

[0019] Preferably, the size of the adjacent future window is consistent with the size of the target window, and the rightmost sampling moment in the target window and the leftmost sampling moment in the adjacent future window are continuous in time sequence.

[0020] In a second aspect, the present invention discloses a workshop equipment inspection system, comprising: a processor; and a memory, wherein the memory stores computer instructions, and when the computer instructions are executed by the processor, the device executes the above-mentioned workshop equipment inspection method.

[0021] Beneficial effects of the present invention:

[0022] 1. Through preventive maintenance, work accidents caused by equipment failure can be avoided, personnel safety can be guaranteed, and injuries can be avoided, thus creating a safer and more efficient production environment for the enterprise.

[0023] 2. By integrating the normalized load weight, operating speed and current data into one state parameter, the comprehensive state of the equipment under different working conditions can be effectively reflected. By calculating the difference between the state parameters at the target time and other times and constructing a difference sequence, the slight changes and abnormal trends in the operation of the equipment can be captured more accurately. In addition, by constructing a window including the target time and calculating the degree of abnormality, potential equipment failures can be discovered in a timely manner, thereby improving the inspection efficiency and accuracy of workshop equipment, reducing unexpected downtime, and ensuring the continuity and stability of production. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] By reading the following detailed description with reference to the accompanying drawings, the above and other objects, features and advantages of the exemplary embodiments of the present invention will become readily understood. In the accompanying drawings, several embodiments of the present invention are shown in an exemplary and non-limiting manner, and the same or corresponding reference numerals represent the same or corresponding parts, wherein:

[0025] Figure 1 The present invention is a flowchart of a workshop equipment inspection method according to an embodiment of the present invention.

[0026] Figure 2 It is a schematic diagram of a workshop equipment inspection system according to an embodiment of the present invention. DETAILED DESCRIPTION

[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0028] It should be understood that when the terms "first", "second", etc. are used in the claims, descriptions, and drawings of the present invention, they are only used to distinguish different objects, rather than to describe a specific order. The terms "include" and "comprise" used in the description and claims of the present invention indicate the presence of the described features, wholes, steps, operations, elements, and / or components, but do not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components, and / or their collections.

[0029] The present invention provides a workshop equipment inspection method. Figure 1 As shown, a workshop equipment inspection method includes steps S1 to S3, which are described in detail below.

[0030] S1, the sum of the normalized load weight, normalized running speed and normalized vibration frequency at the sampling time is taken as the state parameter.

[0031] In one embodiment, a sensor is installed on the conveyor belt to collect conveyor belt related data, including load weight, current data, running speed and vibration frequency, and collects load weight, current data, running speed and vibration frequency at any sampling time in a sampling period. For example, the sampling period can be set by those skilled in the art according to actual production, including but not limited to 24 hours, one working day and one week, etc. The present invention sets the sampling period to 24 hours. The sampling interval is set to 1 minute.

[0032] The load weight, running speed and current data are normalized respectively. Normalization is a prior art and will not be described in detail here. The state parameters are calculated and satisfy the relationship:

[0033] ,in, Indicates The state parameters at each sampling moment, Indicates Current data at each sampling moment; Indicates The load weight at each sampling moment; Indicates The running speed at each sampling moment; Represents the normalization function.

[0034] It should be noted that, under normal circumstances, the load of the conveyor belt is balanced. Therefore, when the current remains unchanged, the running speed of the conveyor belt is also uniform. Therefore, there is a correlation between the state of the conveyor belt and the changes of the three. The load weight, running speed and current data are normalized separately to eliminate the dimensions of the three indicators, and the overall summation result is normalized to map the value range of the state parameter between 0-1, which is convenient for subsequent use and can more intuitively reflect the running status of the conveyor belt.

[0035] S2, calculate the abnormality degree of the state at the target moment.

[0036] In one embodiment, the state parameters of each sampling moment in the sampling period are constructed as a state parameter curve. Any sampling moment in the sampling period is taken as the target moment, a window is constructed according to a preset size, and the window containing the target moment is taken as the target window. Exemplarily, the present invention takes the target moment as the center of the window and the preset size as the length, thereby obtaining the target window. The window size can be set by those skilled in the art.

[0037] The sampling moments that do not meet the window size are discarded, that is, the data at both ends of a sampling cycle that do not meet the construction window are not considered, because when the conveyor belt starts or ends running, the state of the conveyor belt is unstable relative to the state of running for a period of time, and the state parameters will also fluctuate.

[0038] Construct an adjacent future window and an adjacent history window. The size of the adjacent history window is consistent with the size of the target window, and the leftmost sampling moment in the target window is continuous with the rightmost sampling moment in the adjacent history window in time sequence; the size of the adjacent future window is consistent with the size of the target window, and the rightmost sampling moment in the target window is continuous with the leftmost sampling moment in the adjacent future window in time sequence.

[0039] Exemplarily, the window size is set to 5, and the sampling moments included in the target window are: (98, 99, 100, 101, 102), then the sampling moments included in the adjacent future window are: (103, 104, 105, 106, 107), and the sampling moments included in the adjacent historical window are: (93, 94, 95, 96, 97).

[0040] Calculate the abnormality of the state at the target moment. The abnormality of the state satisfies the relationship:

[0041] ,in, Indicates The degree of abnormality of the state at each sampling moment; Indicates the target window of the current sampling period and the adjacent future window. The state parameter difference at each sampling moment; Indicates the target window of the current sampling period and the adjacent historical window. The state parameter difference at each sampling moment; Indicates the first The slope of the tangent line at the sampling moment, Indicates the first The slope of the tangent line at the sampling moment; Indicates the first The slope of the tangent line at the sampling moment; Indicates the window size, which includes the target window, the adjacent future window, and the adjacent history window; represents the normalization function; in the state abnormality degree relationship, The sampling moment is the target moment.

[0042] For example, Indicates the target window of the current sampling period and the adjacent future window. The state parameter difference at each sampling moment is calculated, that is, the difference between the state parameters at the 98th sampling moment and the state parameters at the 103rd sampling moment is calculated. By analogy, the difference between the state parameters at the 99th sampling moment and the state parameters at the 104th sampling moment, the difference between the state parameters at the 100th sampling moment and the state parameters at the 105th sampling moment, the difference between the state parameters at the 101st sampling moment and the state parameters at the 106th sampling moment, the difference between the state parameters at the 102nd sampling moment and the state parameters at the 107th sampling moment are calculated in the same way. , that is, the target window of the current sampling period and the adjacent historical window, The state parameter difference at each sampling moment.

[0043] By averaging the difference between the state parameters of the target window created with the target moment as the center and the sampling moments of the same position in the two adjacent windows, the stability of the target moment within a period of time can be reflected. Similarly, the tangent slope of the target point can be obtained from the state parameter curve to obtain the difference between the state parameters of the target moment within a period of time and the state parameters of the remaining sampling moments in a period of time.

[0044] It should be noted that since the target window is a window that includes the target time, the target window in the formula can reflect the concept of the target time. The sampling moment is the target moment, and is a variable, which represents the first The sampling time, A sampling moment is also a sampling moment in the target window, so there will be situation, so .

[0045] In one embodiment, the abnormality degree of the state at the target moment is calculated, and the abnormality degree of the state satisfies the relationship:

[0046] ,in, Indicates The degree of abnormality of the state at each sampling moment; Indicates the target window of the current sampling period and the adjacent future window. The state parameter difference at each sampling moment; Indicates the first The slope of the tangent line at the sampling moment, Indicates the first The slope of the tangent line at the sampling moment; Indicates the window size, which includes the target window and the adjacent future window; represents the normalization function; in the state abnormality degree relationship, The sampling moment is the target moment.

[0047] In one embodiment, the target time is used as the sampling time of the window endpoint, and the preset size is a window constructed with a length, wherein the target time is the left endpoint of the window or the right endpoint of the window.

[0048] S3, calculating the vibration abnormality value at the target time to perform inspection of the workshop equipment.

[0049] It should be noted that, because the workshop conveyor belt performs the same work every day during the production of a single batch of goods, the mechanical parts of the conveyor belt may become fatigued, resulting in differences in state parameters as the usage time increases. In adjacent days, the states of the conveyor belts at the same time node are similar. The differences between adjacent days can be used to determine whether there is any abnormality in the conveyor belt.

[0050] In one embodiment, the differences between the state parameters at the target moment and the state parameters at the remaining sampling moments in the target window are calculated respectively, a difference sequence is constructed, and the similarity between the current sampling period and the marked period in the difference sequence in the target window is calculated, wherein the marked period is a historical sampling period adjacent to the current sampling period.

[0051] Exemplarily, according to the sampling moments included in the target window shown as an example in step S2, it is necessary to calculate the difference between the state parameters at the 100th sampling moment and the state parameters at the 98th sampling moment, the difference between the state parameters at the 100th sampling moment and the state parameters at the 99th sampling moment, the difference between the state parameters at the 100th sampling moment and the state parameters at the 101st sampling moment, and the difference between the state parameters at the 100th sampling moment and the state parameters at the 102nd sampling moment, and construct these four differences into a difference sequence.

[0052] Calculate the vibration abnormal value at the target time, and the vibration abnormal value satisfies the relationship:

[0053] ,in, Indicates Vibration abnormal value at each sampling moment; Indicates The first difference of the sampling moments; Indicates The second difference of the sampling moments; Indicates the similarity of the difference sequence between the current sampling period and the marking period in the target window; Indicates the window size; represents the normalized function; in the vibration abnormal value relationship, The sampling moment is the target moment.

[0054] Exemplarily, the similarity may be cosine similarity, Euclidean distance, Manhattan distance, etc., and the present invention adopts cosine similarity.

[0055] Compare the vibration abnormality value with the preset vibration abnormality threshold: When the vibration abnormality value is less than or equal to the preset vibration abnormality threshold, the conveyor belt is abnormal, and an alarm signal is generated and sent to remind the staff to perform maintenance. When the vibration abnormality value is greater than the preset vibration abnormality threshold, the conveyor belt is in good condition and the inspection result is qualified.

[0056] The embodiment of the present invention also discloses a workshop equipment inspection system, referring to Figure 2 , including a processor and a memory, the memory stores computer program instructions, and when the computer program instructions are executed by the processor, a workshop equipment inspection method according to the present invention is implemented.

[0057] The above system also includes other components well known to those skilled in the art, such as a communication bus and a communication interface, and their configuration and functions are known in the art, so they will not be described in detail here.

[0058] In the present invention, the aforementioned memory may be any tangible medium containing or storing a program, which may be used by or in combination with an instruction execution system, apparatus or device. For example, a computer-readable storage medium may be any appropriate magnetic storage medium or magneto-optical storage medium, such as a resistive random access memory RRAM (Resistive Random Access Memory), a dynamic random access memory DRAM (Dynamic Random Access Memory), a static random access memory SRAM (Static Random-Access Memory), an enhanced dynamic random access memory EDRAM (Enhanced Dynamic Random Access Memory), a high-bandwidth memory HBM (High-Bandwidth Memory), a hybrid memory cube HMC (Hybrid Memory Cube), etc., or any other medium that can be used to store the required information and can be accessed by an application, a module or both. Any such computer storage medium may be part of a device or accessible or connectable to a device.

[0059] Although this specification has shown and described a number of embodiments of the present invention, it will be apparent to those skilled in the art that such embodiments are provided by way of example only. Those skilled in the art will conceive of many modifications, changes and alternatives without departing from the ideas and spirit of the present invention. It should be understood that in the practice of the present invention, various alternatives to the embodiments of the present invention described herein may be employed.

[0060] The above are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore, any equivalent changes made based on the structure, shape, and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A workshop equipment inspection method, characterized in that: include: The sum of the normalized load weight, the normalized running speed and the normalized current data at the sampling time is taken as the state parameter; Any sampling moment in the sampling period is taken as the target moment, and the abnormality degree of the state at the target moment is calculated. The abnormality degree of the state at the target moment is calculated, and the abnormality degree of the state at the target moment is calculated. The calculation includes: Constructing the state parameters at each sampling moment in the sampling period into a state parameter curve; ,in, Indicates The degree of abnormality of the state at each sampling moment; Indicates the target window of the current sampling period and the adjacent future window. The state parameter difference at each sampling moment; Indicates the first The slope of the tangent line at the sampling moment, Indicates the first The slope of the tangent line at the sampling moment; Indicates the window size, which includes the target window and the adjacent future window; represents the normalization function; in the state abnormality degree relationship, The sampling moment is the target moment; Build a window according to the preset size and use the window containing the target time as the target window; Calculate the difference between the state parameters at the target time and the state parameters at the other sampling times in the target window, construct a difference sequence, and calculate the similarity between the current sampling period and the marked period in the target window, where the marked period is a historical sampling period adjacent to the current sampling period; Calculate the average of the product of the first difference and the second difference at the same sampling moment in the target window between the current sampling period and the marking period, wherein the first difference is the difference in the abnormality degree of the state at the same sampling moment, and the second difference is the difference in the vibration frequency obtained at the same sampling moment; The sum of the similarity and the mean is taken as the vibration anomaly value at the target moment to conduct inspection of workshop equipment.

2. A workshop equipment inspection method according to claim 1, characterized in that: The target window is a window constructed with the target time as the center and a preset size as the length.

3. A workshop equipment inspection method according to claim 1, characterized in that: The target window also includes: The target time is used as the sampling time of the window endpoint, and the preset size is a window constructed with a length, wherein the window endpoint includes the left end point of the window and the right end point of the window.

4. A workshop equipment inspection method according to claim 1, characterized in that: The calculation of the abnormality degree of the state at the target time also includes: Constructing the state parameters at each sampling moment in the sampling period into a state parameter curve; ,in, Indicates The degree of abnormality of the state at each sampling moment; Indicates the target window of the current sampling period and the adjacent future window. The state parameter difference at each sampling moment; Indicates the target window of the current sampling period and the adjacent historical window. The state parameter difference at each sampling moment; Indicates the first The slope of the tangent line at the sampling moment, Indicates the first The slope of the tangent line at the sampling moment; Indicates the number of adjacent history windows. The slope of the tangent line at the sampling moment; Indicates the window size, which includes the target window, the adjacent future window, and the adjacent history window; represents the normalization function; in the state abnormality degree relationship, The sampling moment is the target moment.

5. A workshop equipment inspection method according to claim 4, characterized in that: The adjacent history window has the same size as the target window, and the leftmost sampling moment in the target window and the rightmost sampling moment in the adjacent history window are continuous in time sequence.

6. A workshop equipment inspection method according to claim 1 or 5, characterized in that: The adjacent future window has a size consistent with that of the target window, and the rightmost sampling moment in the target window and the leftmost sampling moment in the adjacent future window are continuous in time sequence.

7. A workshop equipment inspection system, characterized in that: include: Processor; and A memory storing computer instructions, wherein when the computer instructions are executed by a processor, the device executes a workshop equipment inspection method according to any one of claims 1 to 6.