A material management system driven by digital intelligence
By designing a material management system based on digital intelligence, using wireless scanning technology and RFID electronic tags, combining big data and cloud computing technology, the problem of poor material management in traditional warehousing management systems in construction projects has been solved, the intensive and intelligent material management has been realized, and resource utilization and progress control have been improved.
Patent Information
- Application Number
- CN202410535145.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-30
- Publication Date
- 2025-02-28
- Estimated Expiration
- 2044-04-30
AI Technical Summary
The traditional warehousing management system has poor systemic material management in construction projects, resulting in unclear material stocks and cutting, unclear status and location of tools, and difficult to achieve resource scheduling optimization, resulting in waste of materials, idle personnel and tools, waste of resources, increased costs, and delayed progress.
A material management system based on digital intelligence is designed, including enterprise material management platform, mobile terminal, external terminal and internal terminal. Through wireless scanning technology and RFID electronic tags, dynamic tracking and management of material location is realized. Combined with big data and cloud computing technology, a historical database of material demand is established, a custom material optimization scheduling algorithm is used to generate a list of people, materials, and machines.
The intensive and intelligent material management has been achieved, the project material needs are accurately calculated, resource coordination is guided, material utilization is improved, personnel and tools are dynamically monitored, the use saturation is improved, resource waste is reduced, costs are reduced, and progress is ensured.
Smart Images

Figure CN118469438B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of enterprise-level material optimization management, and in particular to a material management system based on digital intelligence drive. Background Art
[0002] The traditional warehouse management system is only for a single construction project, and there is no targeted material demand indicator database. The material management system is poorly managed, the material inventory and unloading are not clear and reasonable, the work saturation of the work surface is unclear, and the working status and position of the tools are unclear. In addition, the construction site environment is complex and changeable, and it is difficult to support the scheduling optimization of personnel, materials, tools and tools between different work surfaces, resulting in material waste, idle personnel and tools, waste of resources, increased costs, and delayed progress. In addition, operators need to manually record the operation data and then return to the computer to enter the data into the system, which is time-delayed and prone to errors. It only has recording and preliminary statistical functions, which is inefficient and difficult to adapt to the needs of intelligent and green development in the construction industry. Summary of the invention
[0003] Based on this, the purpose of the present invention is a material management system based on digital intelligence drive to achieve intensive and intelligent material management.
[0004] To achieve the above-mentioned objectives, the present invention provides a material management system based on digital intelligence drive, including: an enterprise material management platform, a mobile terminal, an external terminal and an internal terminal; the enterprise material management platform is integrated in a cloud server; the enterprise material management platform is used to comprehensively manage materials; the mobile terminal is used to scan the warehousing and outbound delivery of tools, materials and equipment, and detect the position information of the working surface where the operators are located, and transmit the read material QR code information, RFID electronic tag information and storage location QR code information to the enterprise material management platform; the external terminal is used to access the enterprise material management platform to manage materials; the internal terminal is used to manage and maintain the enterprise material management platform.
[0005] According to the specific embodiments provided by the present invention, the present invention discloses the following technical effects:
[0006] The digital intelligence-driven material management system provided by the present invention includes an enterprise material management platform, a mobile terminal, an external terminal and an internal terminal. The mobile terminal integrates wireless scanning technology for warehousing and outbound management, and realizes dynamic tracking of material locations; the external terminal performs material management based on the enterprise material management platform, including form creation, data filling, statistical analysis, etc., and prints material QR code labels; the internal terminal is used for enterprise material management platform management, and is responsible for maintaining background data. The enterprise material management platform realizes comprehensive material management from the whole process of issuing material requirement plans, comprehensive material scheduling, inbound / outbound management, etc.; through the mutual cooperation of the above modules, accurate calculation of project material needs can be realized, and resource coordination can be guided; intelligent calculation of material model selection can be performed to improve material utilization; the status of personnel and tools can be dynamically monitored to improve the utilization saturation of personnel and tools, and realize intensive and intelligent material management of the whole process. BRIEF DESCRIPTION OF THE DRAWINGS
[0007] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0008] Figure 1 This is a structural diagram of the digital intelligence-driven material management system provided by the present invention;
[0009] Figure 2 Schematic diagram of material management tree;
[0010] Figure 3 It is the flow chart of the comprehensive material scheduling algorithm;
[0011] Figure 4 This is a flow chart of the material index calculation method;
[0012] Figure 5 Calculate the flow chart for material requirement planning. DETAILED DESCRIPTION
[0013] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0014] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0015] like Figure 1 As shown, the digital intelligence-driven material management system provided in this embodiment includes: an enterprise material management platform, a mobile terminal 5, an external terminal 6 and an internal terminal 4.
[0016] The enterprise material management platform is integrated in the cloud server; the cloud server includes: a data server 1, an application server 2 and a data backup server 3. The data server 1 is used to store material-related data, and a backup data server is set to ensure data security; the application server 2 is used to carry the enterprise material management platform and read the material-related data in the data server 1; the data backup server 3 is used to back up the material-related data.
[0017] The mobile terminal 5 is used to scan the incoming work tools, materials, and equipment, where the work tools and materials use QR code technology, and the equipment uses RFID technology. The mobile terminal reads the material QR code information, RFID electronic tag information, and storage location QR code information, and transmits them to the enterprise material management platform using wireless signals. The enterprise material management platform automatically builds a material virtual warehouse based on the scanned information and generates virtual material information, realizing the management of incoming and outgoing warehouses and the dynamic tracking of material locations. In addition, RFID technology is used to identify on-site workers, and the mobile terminal automatically detects the working surface location of the workers to realize the dynamic tracking of the personnel location.
[0018] The external terminal 6 is used to access the enterprise material management platform (the material administrator account can log in), manage the materials, including form creation, data filling, statistical analysis, etc., and print material QR code labels.
[0019] The internal terminal 4 is used for the management of the enterprise material management platform. Only the material administrator can log in to maintain the background data of the enterprise material management platform. The enterprise material management platform can be run by supporting a WebGL browser.
[0020] The internal terminal 4 and the external terminal 6 can be mobile phones, based on which the enterprise material management platform can be accessed, thereby improving the flexibility and convenience of material management.
[0021] Furthermore, a firewall 7 is provided between the cloud server and the mobile terminal 5 and the external terminal 6 to ensure the security and reliability of the material information.
[0022] Furthermore, the enterprise material management platform includes: project management module, personnel management module, material management module, supplier management module, capital management module, cost management module, risk management module, quality management module, material coding module, statistical analysis module and other functional modules. Comprehensive material management is achieved from the whole process of issuing material demand plan, comprehensive material dispatch, inbound / outbound management, etc.
[0023] (1) Project management module.
[0024] The project management module establishes company-level, project-level, and warehouse-level material management trees based on the enterprise material management platform. It inputs information such as project name, project number, warehouse name, warehouse number, etc. It has functions such as adding, deleting, and modifying to achieve coordinated management of materials for all projects under construction. Figure 2 At the same time, a project structure tree is created based on the enterprise material management platform, and the BIM model is uploaded according to this structure tree, which is convenient for reference in the material requirement plan based on the construction progress.
[0025] (2) Personnel management module.
[0026] The personnel management module registers project participants based on the enterprise material management platform, identifies the personnel's organization, position, type of work, number, on-the-job status, work location, and work surface, and conducts comprehensive scheduling of personnel.
[0027] The personnel scheduling method is: based on the BIM model progress and personnel demand indicators, dynamically calculate the number of personnel requirements, combine the work surface progress plan, form a "work surface-number of personnel" comprehensive scheduling form, dynamically adjust personnel arrangements, and maximize labor utilization.
[0028] (3)Material management module.
[0029] The material management module is used to manage equipment, materials and tools, as well as to implement standardized material management processes, calculate and provide material requirement plans.
[0030] The material management module is the core module of the enterprise material management platform, which includes the equipment management sub-module, material management sub-module, tool management sub-module, material standardization management process sub-module and material requirement planning sub-module.
[0031] 3.1) Equipment management submodule.
[0032] The equipment management submodule registers and identifies the name, specification, model, etc. of the equipment based on the enterprise material management platform, and identifies the status based on the mobile terminal scanning of the equipment RFID electronic information tag. The identification information includes "in warehouse", "out of warehouse", and "installation completed", dynamically monitoring the location and installation status of the equipment.
[0033] 3.2) Material management submodule.
[0034] The material management submodule registers and identifies the name, specification, model, etc. of the materials based on the enterprise material management platform, uses wireless scanning technology to dynamically monitor their location information, and conducts comprehensive scheduling of materials.
[0035] like Figure 3 As shown in the figure, the material scheduling algorithm is as follows: based on the BIM model, the enterprise material management platform integrates the engineering quantity statistics function, combines the working face, automatically generates the working face material list, takes the same specification full-length pipeline as a statistical unit, and all types of full-length pipelines form a queue to perform pipeline virtual piping. For a single pipeline, first determine whether the length of the single pipeline is greater than the maximum modulus. If it is greater, the maximum modulus pipeline is used for piping. When the maximum modulus pipeline is difficult to meet the requirements, determine whether other modulus pipelines meet the requirements from large to small. When the minimum modulus pipeline cannot meet the requirements, only the missing pipeline length is statistically analyzed to establish a surplus material database. A comprehensive statistical analysis is performed on the surplus material database, and the surplus material is statistically analyzed with the modulus as the object. If the relevant modulus can realize the surplus material combination, the relevant modulus is used for batching. If not, the optimal modulus is selected for batching based on the material utilization rate. Try to use one pipe section to achieve the expected division, reduce the generation of surplus material, and improve the material utilization rate.
[0036] The material utilization rate is calculated as follows:
[0037]
[0038] In the formula, η is the material utilization rate; r is the length of the surplus material; i represents the number of surplus materials; m is the sum of the number of surplus materials to be combined; L is the length of the material; j represents the number of pipes with different modules.
[0039] The enterprise material management platform combines material utilization indicators and automatically performs multi-scheme virtual piping calculation and analysis based on the modular database to maximize material utilization.
[0040] 3.3) Tool management submodule.
[0041] The tool management submodule registers and identifies the name, specification, model, etc. of tools based on the enterprise material management platform, uses wireless scanning technology to dynamically monitor their location information, and conducts comprehensive scheduling of tools.
[0042] The tool scheduling method is to combine the construction progress of the BIM model and the tool demand indicators. The enterprise material management platform automatically calculates the tool demand list, optimizes the mobilization and dynamic management of tools between different projects and different work surfaces; at the same time, it monitors the operating status of tools based on chips, analyzes the utilization rate of tools, provides data support for the optimization of tool demand indicators, and continuously corrects the scheduling plan.
[0043] 3.4) Material standardization management process sub-module.
[0044] The material standardization management process submodule is used to execute the material standardization management process, which is as follows:
[0045] 3.4.1) Identify materials.
[0046] The coding function module of the enterprise material management platform is called through the external terminal 6 to automatically encode the tools, materials and equipment. The name, specification, model, unit price, status and other related information of the tools, materials and equipment are input through the external terminal 6. After the input is completed, the external terminal 6 sends a coding request instruction to the enterprise material management platform. The enterprise material management platform automatically encodes the materials, tools and equipment based on the automatic coding algorithm, and sends instructions to the external terminal. The external terminal 6 is connected in series with the printer to print the coding information of the tools and materials in the form of a QR code and post it on the tools and materials. In addition, for the equipment, its coding information is stored in an RFID tag and fixed on the surface of the equipment to achieve the uniqueness of the material information pointing.
[0047] 3.4.2) In / out warehouse management.
[0048] Warehouse management: When entering the warehouse, the enterprise material management platform is accessed based on the mobile terminal 5 to formulate a material entry form. Subsequently, the mobile terminal 5 is used to scan the QR code or RFDI electronic tag of the material and the QR code of the warehouse to be entered. At this time, the material information and entry information are transmitted to the enterprise material management platform, forming a virtual warehouse on the platform side to achieve dynamic visual display. At the same time, the enterprise material management platform provides a manual entry method. Based on the material demand plan, the actual material procurement situation is modified to formulate a material entry statistical table and a material acceptance form. The platform automatically generates a unique QR code for the material acceptance form.
[0049] Return management: Standard modular materials are returned using the warehouse entry management method; for leftover materials, they need to be re-labeled using the external terminal 6, and the specifications, dimensions and other parameters of the leftover materials are registered, and they are marked as leftover materials, and they are re-entered into the warehouse according to the warehouse entry management method; for tools and equipment, they are re-entered into the warehouse according to the warehouse entry management method.
[0050] 3.4.3) Outbound delivery management.
[0051] Issue order: After selecting the receiving unit, project, and issuing warehouse, enter the material number to add the material, enter the quantity, and generate the material pick list according to the generated order.
[0052] Outbound management: Use a handheld mobile terminal 5 to scan the QR code or RFID electronic tag of the material and mark it as outbound status. The mobile terminal 5 automatically transmits the information to the enterprise material management platform, and the enterprise material management platform automatically adjusts the status of the material to outbound.
[0053] 3.4.4) Installation management.
[0054] After the materials are moved to the designated area, the mobile terminal 5 is used to scan the QR code or RFID electronic tag on the materials, and the material status is adjusted to entered; after the materials are installed, the mobile terminal 5 is continued to be used to scan the QR code or RFID electronic tag on the materials, and the material status is adjusted to installed. The mobile terminal 5 automatically transmits the "installed" status information of the materials to the enterprise material management platform, matches the material information with the BIM model, and dynamically adjusts the progress information of the BIM model. The enterprise material management platform dynamically forms a list of labor, tools and equipment requirements based on relevant indicators, and uniformly dispatches and manages personnel, tools and equipment based on this. Based on the unfinished project volume, the manpower, material and machine plan is reversed to achieve dynamic tracking of manpower, material and machine.
[0055] 3.5) Material requirement planning submodule.
[0056] The material requirement plan submodule is used to calculate and provide material requirement plans. The specific methods for calculating and providing material requirement plans are as follows: establish a mainline indicator database based on historical data of similar projects and similar work surfaces; establish an auxiliary indicator database based on actual data of similar work surfaces in the same project; based on the mainline indicator database and the auxiliary indicator database, use data analysis technology to dynamically calculate indicators; the indicators include: tool indicators, personnel indicators and material indicators; determine the material requirement quantity based on the indicators; determine the allocation list; the allocation list includes material and component allocation lists and tool and personnel allocation lists; determine the material requirement plan based on the allocation list and the material requirement quantity.
[0057] 3.5.1) If Figure 4As shown in the figure, based on the historical data of enterprise projects, a database of main indicators for personnel, tools, and materials is built; in view of the fact that the indicators for the required materials of project construction are related to multiple factors such as project type, regional location, and working environment, it is necessary to feature the existing data, and the feature identification includes different project types, different geographical regions, different types of working surfaces, floor clear height, pipeline density, and other characteristics, forming an enterprise-level database of personnel, materials, and machines. Based on the main indicator database, a material demand indicator system is formulated, including unit area indicators, unit volume indicators, etc.; at the same time, combined with the actual data of the same type of working surface of the same project, the data on the use of personnel, tools, and materials is dynamically collected and transmitted to the enterprise material management platform in real time, an auxiliary indicator database is established, and data is collected to continuously iterate and update the indicators; based on the main indicator database and the auxiliary indicator database, the material data used in the project with similar feature identification to the working surface under construction is extracted, and the required indicators of tools, personnel, and materials are dynamically calculated using data analysis technology, laying the foundation for determining the quantity of material demand.
[0058] 3.5.2) The enterprise material management platform is interconnected with the BIM model through the interface between the BIM model and the data, automatically extracts the functional characteristics of the BIM model working surface (functional characteristics, floor clear height, pipeline density), conducts a comprehensive analysis of the functional characteristics, and automatically outputs the optimal indicators of material demand for similar working surfaces. For example, for building mechanical and electrical systems, first, the enterprise material management platform exports the mechanical and electrical system engineering quantity of the working surface based on BIM, including the types and quantities of components, specifications and lengths of pipelines, etc.; secondly, the platform uses material scheduling algorithms to perform virtual piping, and determines the module and quantity of pipelines based on the principle of optimal material utilization to form a material allocation list; at the same time, for the allocation of tools and personnel, the platform has an indicator optimization function, and proposes a dual indicator system of similar working surface indicators for the same project and similar working surface indicators for similar projects. The system automatically or manually defines their respective weights. Based on engineering experience, the proportion of similar working surface indicators for similar projects should be 30%, and the weight of similar working surface indicators for the same project should be 70%, thereby obtaining weighted indicators for material requirements, using the optimized indicators and combining them with the working area or volume to analyze and calculate the types and quantities of tools and personnel on the working surface to form a tool and personnel allocation list; based on the above process, data support is ultimately provided for material collection. The specific process is as follows: Figure 5 shown.
[0059] 3.5.3) The material requirement plan is presented in the form of a statistical table, including material number, material name, specification model, material, unit, planned quantity, tender unit price, tender quantity, tender amount, etc. The material requirement plan form includes submission time, document number, preparation date, preparer, profession, approval status, approval opinion, approval date, etc.
[0060] (4)Supplier management module.
[0061] The supplier management module establishes a supplier database based on the enterprise material management platform to clarify the supplier's supply type, supply quantity, unit price and other information.
[0062] (5) Fund management module.
[0063] (6)Cost management module.
[0064] (7)Risk management module.
[0065] The capital / cost / risk management module uses an external terminal 6 to operate the enterprise material management platform, input material prices, and form a price database; based on the material quantity and price database, it performs cost calculations, forms cost statistics reports and related indicators, analyzes related indicators in a timely manner, promptly finds process management loopholes, and improves the transparency of project cost management, capital control, and risk prevention.
[0066] (8)Quality management module.
[0067] The quality management module includes three dimensions: summary by construction team, summary by material, and summary by supplier. It enables analysis of material supply situations from different dimensions and realizes material quality traceability and comprehensive management.
[0068] (9)Material coding module.
[0069] The coding management module is used to automatically code tools, materials, and equipment. The specific coding methods are as follows:
[0070] 9.1) Establish a unified warehouse number at the enterprise level, number different warehouses, and formulate warehouse labels, including project name, warehouse type, and warehouse number. The project name uses 4-digit Arabic numerals (the enterprise level is used to number the project in sequence), the warehouse type is represented by M, E, and T (M is for materials, E is for equipment, and T is for tools), and the warehouse number uses 2-digit Arabic numerals (the project level is used to number the warehouse in sequence), for example, "0001-M-01", which means the 01 material warehouse of the 0001 project. For specific warehouses, formulate storage location labels, including area code, row number, column number, layer number, etc., where the area code is represented by uppercase English letters, and the row number, column number, and layer number are all 2-digit Arabic numerals separated by "-", for example, "A-01-02-03", which means area A, row 1, column 2, and layer 3.
[0071] 9.2) Develop material and equipment coding labels, including name, specification, pressure, and material; develop three states for materials and equipment, namely, stored, shipped, and installed. The stored code is 00, the shipped code is 01, and the installed code is 02.
[0072] 9.3) Develop tool coding labels, including parameters such as type, name, number, location, and usage status. Tools of the same type are distinguished by numbers, using two-digit Arabic numerals, and are compiled in sequence starting from 00; location information includes warehoused and shipped, with warehoused code 00 for warehoused and 01 for shipped; usage status includes normal and faulty, with normal code 0 and faulty code 1.
[0073] 9.4) All relevant information is marked with a QR code.
[0074] Among them, the statistical analysis module includes material receipt summary, material collection summary, material return summary, consumption summary, real-time inventory query, material transfer query, etc.
[0075] (10)Statistical analysis module.
[0076] The statistical analysis module includes material receipt summary, material picking summary, material return summary, consumption summary, real-time inventory query, material transfer query, etc.
[0077] In order to solve the problems in the prior art, the present invention develops a material management system, builds a material demand history database, adopts big data and cloud computing technology to establish dynamic demand indicators for personnel, materials, and tools for different types of work surfaces; customizes a material optimization scheduling algorithm, automatically optimizes material selection and generates a list of personnel, materials, and machines based on material reserves; classifies and counts the status of personnel and tools and dynamically monitors them to improve the utilization saturation of personnel and tools; and finally, realizes intensive and intelligent material management.
[0078] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0079] This article uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only used to help understand the method and core ideas of the present invention. At the same time, for those skilled in the art, according to the ideas of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.
Claims
1. A digital intelligence-driven material management system, characterized in that: include: Enterprise material management platform, mobile terminal, external terminal and internal terminal; The enterprise material management platform is integrated into the cloud server; The enterprise material management platform is used to manage materials in an integrated manner; the mobile terminal is used to scan the entry and exit of tools, materials, and equipment, and detect the location information of the working surface where the operator is located, and transmit the read material QR code information, RFID electronic tag information, and storage location QR code information to the enterprise material management platform; the external terminal is used to access the enterprise material management platform to manage materials; the internal terminal is used to manage and maintain the enterprise material management platform; The enterprise material management platform includes a material management module, which includes: a material requirement plan submodule, which is used to calculate and provide a material requirement plan, specifically including: establishing a mainline indicator database based on historical data of similar projects and similar work surfaces; establishing an auxiliary indicator database based on actual data of similar work surfaces in the same project; dynamically calculating indicators using data analysis technology based on the mainline indicator database and the auxiliary indicator database; the indicators include: tool indicators, personnel indicators and material indicators; determining the material demand quantity based on the indicators; determining the allocation list; the allocation list includes a material and component allocation list and a tool and personnel allocation list; determining a material demand plan based on the allocation list and the material demand quantity; The material demand indicators for project construction are related to the project type, regional location and working environment. The existing data are characterized to form an enterprise-level human, material and machine indicator database, and the main line indicator database is obtained. The characteristic identification includes different project types, different geographical regions, different working surface types, floor clear height and pipeline density. Based on the main line indicator database, a material demand indicator system is formulated, including unit area indicators and unit volume indicators; Combined with the actual data of the same project and similar work surface, dynamically collect the data of personnel, tools and materials usage, and transmit it to the enterprise material management platform in real time, establish an auxiliary indicator database, and collect data to continuously iterate and update the indicators; Based on the main indicator database and the auxiliary indicator database, the material data used in the project that is similar to the characteristic identification of the construction surface is extracted, and the required indicators of tools, personnel and materials are dynamically calculated using data analysis technology.
2. The digital intelligence-driven material management system according to claim 1 is characterized in that: The cloud server includes: a data server, an application server and a data backup server; the data server is used to store material-related data and set up the data backup server; the application server is used to carry the enterprise material management platform and read the material-related data in the data server; the data backup server is used to back up the material-related data.
3. The digital intelligence-driven material management system according to claim 1 is characterized in that: A firewall is provided between the cloud server and the mobile terminal and between the cloud server and the external terminal.
4. The digital intelligence-driven material management system according to claim 1 is characterized in that: The enterprise material management platform includes: Project management module, used to coordinate the management of materials for all projects under construction; The personnel management module is used to register project participants, identify the organization, position, number, on-the-job status and work location of the project participants, and conduct comprehensive scheduling of the project participants; The material management module is used to manage equipment, materials and tools, implement standardized material management processes, and calculate and provide material requirement plans; The supplier management module is used to establish a supplier database and clarify the supplier's supply type and supply quantity; Fund management module, used to manage the funds of the project; Cost management module, used to manage the cost of the project; Risk management module, used to pre-control project risks; The quality management module is used to analyze the material supply situation from different dimensions to achieve comprehensive management of material quality; the different dimensions include: construction team summary dimension, material summary dimension and supplier summary dimension; Material coding module, used to automatically code tools, materials and equipment; The statistical analysis module is used for material receipt summary, material picking summary, material return summary, consumption summary, real-time inventory query and material transfer query.
5. The digital intelligence-driven material management system according to claim 4 is characterized in that: The material management module includes: The equipment management sub-module is used to register and identify the name, specification and model of the equipment, and dynamically monitor the location information and installation status of the equipment; The material management submodule is used to register and identify the name, specification and model of the material, dynamically monitor the location information of the material, and conduct comprehensive scheduling of the material; The tool management submodule is used to register and identify the name, specification and model of the tool, dynamically monitor the location information of the tool, and conduct comprehensive scheduling of the tool; The material standardization management process submodule is used to execute the material standardization management process; the material standardization management process includes: material identification, in / out warehouse management, outbound management, and installation management; The material requirement planning submodule is used to calculate and provide material requirement plans.
6. The digital intelligence-driven material management system according to claim 5 is characterized in that: The comprehensive scheduling of materials specifically includes: For a single pipeline, determine whether the length of the single pipeline is greater than the maximum module. If so, use the largest module pipe for piping. If not, determine whether other module pipes meet the requirements in order from large to small. When the smallest module pipe cannot meet the requirements, collect data statistics on the missing pipeline lengths and establish a surplus material database. Optimize the surplus material combination of the pipelines in the surplus material database based on the module.
7. The digital intelligence-driven material management system according to claim 4 is characterized in that: The automatic coding of tools, materials and equipment specifically includes: Establish a unified warehouse number at the enterprise level, number different warehouses, and formulate warehouse labels, which include project name, warehouse type and warehouse number, where the project name is represented by 4-digit Arabic numerals, warehouse type is represented by M, E and T, M stands for materials, E stands for equipment, T stands for tools, and warehouse number is represented by 2-digit Arabic numerals; formulate storage location labels for specific warehouses, including area code, row number, column number and layer number, where the area code is represented by uppercase English letters, and the row number, column number and layer number are all 2-digit Arabic numerals; Formulate material and equipment coding labels, including name, specification, pressure and material; formulate three states of materials and equipment, namely, in-warehouse, out-warehouse and installed; Develop coding labels for tools and machinery, including type, name, number, location and usage status; tools and machinery of the same type are distinguished by numbers, using two-digit Arabic numerals, and compiled sequentially from 00; location information includes in-warehouse and out-warehouse, with in-warehouse coded as 00 and out-warehouse coded as 01; usage status includes normal and faulty, with normal coded as 0 and faulty coded as 1.
8. The mobile terminal according to claim 1, characterized in that: The tools and materials are also identified by using QR codes, and the personnel and equipment are identified by using RFID electronic tags.
Citation Information
Patent Citations
BIM-based on-site construction personnel intelligent management method
CN108053150A
BIM-based pipe excess material comprehensive utilization method
CN113011776A
BIM-based visual material management system
CN116823101A
All-dimensional intelligent large material supply chain management system for building construction enterprise
CN116933969A