Deep foundation pit monitoring system and method for underground structure groups

By establishing a foundation pit system model and using monitoring equipment for real-time monitoring, the problem of inaccurate monitoring of foundation pit projects has been solved, accurate monitoring and early warning of the surrounding environment of deep foundation pit systems of underground structures has been achieved, and monitoring efficiency and continuity have been improved. .

CN118531849BActive Publication Date: 2024-10-08SHANDONG UNIV +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410993891.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-10-08
Estimated Expiration
2044-07-24

AI Technical Summary

Technical Problem

The monitoring of existing foundation pit projects is inaccurate and cannot effectively monitor the deformation and displacement patterns of deep foundation pits for underground structures on surrounding buildings and the environment. After the monitoring scope is determined, the impact of future foundation pit excavation on existing structures cannot be continuously monitored.

Method used

Using deep foundation pit monitoring systems and methods for underground structure groups, the monitoring range is initially determined by establishing a foundation pit system model, monitoring equipment is used to conduct real-time monitoring and early warning of sensitive structures, and the three-dimensional space corresponding to the critical deformation value of the most sensitive structure is determined as the monitoring range. , including specific monitoring projects for buildings, underground corridors, stations, bridges, subway tunnels and underground pipelines.

Benefits of technology

It achieves accurate monitoring of the deformation and displacement patterns of the surrounding environment of the deep foundation pit system of the underground structure group, improves monitoring efficiency, shortens the construction period, and can continuously monitor changes in the original structure during future foundation pit excavation, avoiding redesign and Arrange monitoring points.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118531849B_ABST
    Figure CN118531849B_ABST
Patent Text Reader

Abstract

The present invention provides a monitoring system and method for a deep foundation pit of an underground structure group, including a deep foundation pit system model of an underground structure group, a deep foundation pit system of an underground structure group, and monitoring equipment. The deep foundation pit system model of an underground structure group is established based on the deep foundation pit system of an underground structure group. The deep foundation pit system model of an underground structure group is used to preliminarily determine the scope of the deep foundation pit system of an underground structure group. After the scope is determined, the monitoring equipment monitors the monitoring objects within the scope, and the most sensitive underground structure is determined based on the monitoring of the monitoring equipment. The three-dimensional space around the foundation pit corresponding to the critical deformation value of the most sensitive underground structure is truly used as the scope of the deep foundation pit system of the underground structure group. The monitoring equipment monitors the monitoring objects within the new scope and issues an early warning. The monitoring scope determined by the monitoring system can realize accurate monitoring of the deep foundation pit system of an underground structure group, reflect the changing laws of the surrounding environment, and can also reflect the changing laws of all existing structures and underground facilities contained therein.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of foundation pit monitoring, and in particular to a deep foundation pit monitoring system and method for underground structure groups. Background Art

[0002] Foundation pit engineering is a general term for support, foundation pit soil reinforcement, groundwater control, excavation and other projects taken to protect the safety of foundation pit construction, underground structures and the surrounding environment from damage, including survey, design, construction, monitoring, testing, etc. Foundation pit monitoring is an important part of foundation pit engineering. The scope of foundation pit engineering monitoring should be determined comprehensively based on the foundation pit design depth, geological conditions, surrounding environmental conditions, support structure type, construction method, etc., while considering the impact of construction precipitation and blasting excavation.

[0003] At present, in actual projects, the scope is limited to 3 times the depth of the foundation pit excavation, and existing buildings within the scope are monitored. The determination of the monitoring scope is mainly based on engineering experience, and the monitoring of foundation pit projects is inaccurate, and it is unable to reflect the deformation and displacement of surrounding existing buildings caused by the excavation of the deep foundation pit system of the underground structure group. In addition, most of the foundation pit project monitoring at this stage is temporary monitoring, and monitoring will no longer be carried out after the construction is completed. In the future, when there is foundation pit excavation in the vicinity, the scope determined by the new foundation pit cannot monitor the changes of existing structures and underground facilities.

[0004] Therefore, we propose a deep foundation pit monitoring system and method for underground structure groups. Summary of the invention

[0005] In view of the above problems, the present invention provides a deep foundation pit monitoring system and method for underground structure groups to solve the problems raised in the above background technology.

[0006] To achieve the above object, the present invention adopts the following technical solutions:

[0007] In the first aspect, the present invention provides a deep foundation pit monitoring system for an underground structure group, comprising a deep foundation pit system model of an underground structure group, a deep foundation pit system of an underground structure group and a monitoring device, wherein the deep foundation pit system model of the underground structure group is established based on the deep foundation pit system of the underground structure group, and the deep foundation pit system model of the underground structure group is used to preliminarily determine the scope of the deep foundation pit system of the underground structure group. After the scope of the deep foundation pit system of the underground structure group is determined, the monitoring device monitors the monitoring objects within the preliminarily determined scope of the deep foundation pit system of the underground structure group, and determines the most sensitive underground structure within the scope of the deep foundation pit system of the underground structure group based on the monitoring of the monitoring device, the most sensitive underground structure is the monitoring object whose monitoring deformation value reaches the control index value the fastest, and the three-dimensional space around the foundation pit corresponding to the critical deformation value of the most sensitive underground structure is truly used as the scope of the deep foundation pit system of the underground structure group, and the monitoring device monitors and warns the monitoring objects within the second determined scope of the deep foundation pit system of the underground structure group.

[0008] Furthermore, the monitoring objects within the scope of the deep foundation pit system of the underground structure group include at least one of buildings, underground pipe galleries and stations, bridges, subway tunnels and underground pipelines.

[0009] Furthermore, the monitoring items of the building are horizontal displacement monitoring and vertical displacement monitoring. Based on the monitoring items of the building, a horizontal displacement monitoring instrument is used to monitor the horizontal displacement of the building, and a vertical displacement monitoring instrument is used to monitor the vertical displacement of the building.

[0010] Furthermore, the monitoring project of the underground pipeline gallery and the station is cross-sectional deformation monitoring. Based on the monitoring project of the underground pipeline gallery and the station, a cross-sectional deformation monitoring instrument is used to monitor the cross-sectional deformation of the underground pipeline gallery and the station.

[0011] Furthermore, the monitoring items of the bridge are pier vertical displacement monitoring, pier differential settlement monitoring and pier column inclination monitoring. Based on the monitoring items of the bridge, a vertical displacement monitoring instrument is used to monitor the vertical displacement and differential settlement of the piers of the bridge, and an angle monitoring instrument is used to monitor the inclination of the pier columns of the bridge.

[0012] Furthermore, the monitoring items of the subway tunnel are horizontal displacement monitoring and vertical displacement monitoring. Based on the monitoring items of the subway tunnel, a horizontal displacement monitoring instrument is used to monitor the horizontal displacement of the subway tunnel, and a vertical displacement monitoring instrument is used to monitor the vertical displacement of the subway tunnel.

[0013] Furthermore, the monitoring items of the underground pipeline are vertical displacement monitoring and differential settlement monitoring. Based on the monitoring items of the underground pipeline, a vertical displacement monitoring instrument is used to monitor the vertical displacement and differential settlement of the underground pipeline.

[0014] In a second aspect, the present invention provides a method for monitoring a deep foundation pit of an underground structure group, comprising the following steps:

[0015] Based on the model parameters of the underground structure group deep foundation pit system, a deep foundation pit system model of the underground structure group is established, and the deformation cloud map of the surrounding surface soil is obtained through the deep foundation pit system model of the underground structure group;

[0016] Based on the information of the surrounding surface soil deformation cloud map, the scope of the deep foundation pit system of the underground structure group is preliminarily determined by selecting the predetermined boundary of the surrounding surface soil settlement value according to the construction requirements;

[0017] Determine monitoring items based on monitoring objects within the deep foundation pit of the underground structure group, and determine monitoring equipment and control index values ​​based on the determined monitoring items;

[0018] Based on the determined monitoring equipment, monitoring deformation values ​​are collected, and the most sensitive underground structure is determined based on the collected monitoring deformation values ​​and control index values, and the three-dimensional space around the foundation pit corresponding to the critical deformation value of the most sensitive underground structure is truly used as the scope of the deep foundation pit system of the underground structure group;

[0019] The monitoring equipment monitors the monitoring objects within the scope of the deep foundation pit system of the underground structure group determined for the second time;

[0020] The monitoring equipment monitors the data of each monitored object in real time and issues early warning.

[0021] Furthermore, the model parameters of the deep foundation pit system of the underground structure group are obtained by at least one of experiments, experience and inverse analysis.

[0022] Furthermore, the setting method of the early warning is: when the monitored deformation value is less than 60% of the control index value, the structure is safe and external operations continue; when the monitored deformation value is greater than 60% and less than or equal to 80% of the control index value, the monitoring equipment alarms and increases the monitoring frequency; when the monitored deformation value is greater than 80% and less than or equal to 100% of the control index value, external operations are suspended and a safety assessment of the structure is performed.

[0023] Compared with the existing technology, the present invention has the following technical effects:

[0024] The present invention provides a monitoring system and method for deep foundation pits of underground structure groups. The monitoring system is modeled through model parameters of the deep foundation pit system of the underground structure group, and the range of the deep foundation pit system of the underground structure group is preliminarily determined by using the model. The monitoring equipment is used to monitor the monitoring objects within the range, and the most sensitive underground structure is determined. The three-dimensional space around the foundation pit corresponding to the critical deformation value of the most sensitive underground structure is truly used as the range of the deep foundation pit system of the underground structure group. The monitoring equipment is used to monitor the monitoring objects within the range of the deep foundation pit system of the underground structure group determined for the second time in real time and to give an early warning. The system is based on the concept of deformation control, and through the monitoring of the deep foundation pit system model and monitoring equipment of the underground structure group, the most sensitive underground structure is determined, and the three-dimensional space around the foundation pit corresponding to the critical deformation value of the most sensitive underground structure is truly used as the monitoring range of the deep foundation pit system of the underground structure group, which can accurately reflect the deformation and displacement deformation law of the surrounding environment of the deep foundation pit system of the underground structure group.

[0025] Moreover, when there is foundation pit excavation near the future deep foundation pit system of the underground structure group, the new foundation pit and the original deep foundation pit system of the underground structure group form a new deep foundation pit system of the underground structure group. The monitoring system determines the monitoring range for the new deep foundation pit system of the underground structure group, and the determined range includes the original deep foundation pit system of the underground structure group. The permanent monitoring points arranged in the original deep foundation pit system of the underground structure group can be used directly without redesign and arrangement, thereby improving the monitoring efficiency and shortening the construction period. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 A schematic diagram of a deep foundation pit system of an underground structure group according to an embodiment of the present invention;

[0027] Figure 2 A schematic diagram of the monitoring range of a deep foundation pit of an underground structure group according to an embodiment of the present invention;

[0028] Figure 3 A schematic diagram of the layout of monitoring points in a subway tunnel according to an embodiment of the present invention;

[0029] Figure 4 A schematic diagram of the layout of monitoring points of an underground pipe gallery according to an embodiment of the present invention;

[0030] Figure 5 A schematic diagram of the layout of monitoring points in a station according to an embodiment of the present invention;

[0031] Figure 6 The present invention is a flowchart of a method for monitoring a deep foundation pit of an underground structure group according to an embodiment of the present invention. DETAILED DESCRIPTION

[0032] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0033] It should be noted that the following detailed descriptions are exemplary and are intended to provide further explanation of the present application. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present application belongs.

[0034] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0035] Embodiment 1

[0036] See also Figure 1 to Figure 2 This embodiment provides a deep foundation pit monitoring system for underground structure groups, including a deep foundation pit system model for underground structure groups, a deep foundation pit system for underground structure groups, and monitoring equipment. The deep foundation pit system model for underground structure groups is established based on model parameters of the deep foundation pit system for underground structure groups, and the model parameters come from at least one of empirical values, experimental values, and actual monitoring values. The deep foundation pit system model for underground structure groups is used to preliminarily determine the scope of the deep foundation pit system for underground structure groups. After the scope of the deep foundation pit system for underground structure groups is determined, the monitoring equipment monitors the monitoring objects within the preliminarily determined scope of the deep foundation pit system for underground structure groups, and the monitoring objects include at least one of buildings, underground pipe galleries and stations, bridges, subway tunnels, and underground pipelines.

[0037] Based on the monitoring of the monitoring equipment, the most sensitive underground structure within the scope of the deep foundation pit system of the underground structure group is determined. The most sensitive underground structure is the monitoring object whose monitored deformation value reaches the control index value the fastest. The three-dimensional space around the foundation pit corresponding to the critical deformation value of the most sensitive underground structure is truly regarded as the scope of the deep foundation pit system of the underground structure group. The monitoring equipment monitors and issues early warnings for the monitoring objects within the scope of the deep foundation pit system of the underground structure group determined for the second time.

[0038] This monitoring system is modeled through the model parameters of the deep foundation pit system of the underground structure group, and the scope of the deep foundation pit system of the underground structure group is preliminarily determined by using the model. The monitoring equipment is used to monitor the monitoring objects within the scope, and the most sensitive underground structure is determined. The three-dimensional space around the foundation pit corresponding to the critical deformation value of the most sensitive underground structure is truly used as the scope of the deep foundation pit system of the underground structure group. The monitoring equipment is used to monitor the monitoring objects within the scope of the deep foundation pit system of the underground structure group determined for the second time in real time and issue early warnings. Based on the concept of deformation control, this system uses the model of the deep foundation pit system of the underground structure group and monitoring equipment to determine the most sensitive underground structure, and the three-dimensional space around the foundation pit corresponding to the critical deformation value of the most sensitive underground structure is truly used as the monitoring scope of the deep foundation pit system of the underground structure group. It can accurately reflect the deformation and displacement deformation laws of the surrounding environment of the deep foundation pit system of the underground structure group.

[0039] Moreover, when there is foundation pit excavation near the future deep foundation pit system of the underground structure group, the new foundation pit and the original deep foundation pit system of the underground structure group form a new deep foundation pit system of the underground structure group. The monitoring system determines the monitoring range for the new deep foundation pit system of the underground structure group, and the determined range includes the original deep foundation pit system of the underground structure group. The permanent monitoring points arranged in the original deep foundation pit system of the underground structure group can be used directly without redesign and arrangement, thereby improving the monitoring efficiency and shortening the construction period.

[0040] Specifically, the monitoring items of the building are horizontal displacement monitoring and vertical displacement monitoring. Based on the monitoring items of the building, an electronic level is used to monitor the horizontal displacement and vertical displacement of the building.

[0041] Specifically, the monitoring project of underground pipeline corridors and stations is cross-sectional deformation monitoring. Based on the monitoring project of underground pipeline corridors and stations, electronic levels are used to monitor the cross-sectional deformation of underground pipeline corridors and stations.

[0042] Specifically, the monitoring items of the bridge are pier vertical displacement monitoring, pier differential settlement monitoring and pier column inclination monitoring. Based on the bridge monitoring items, an electronic level is used to monitor the vertical displacement and differential settlement of the bridge piers, and an inclinometer is used to monitor the inclination of the bridge piers.

[0043] Specifically, the monitoring projects of the subway tunnel are horizontal displacement monitoring and vertical displacement monitoring. Based on the monitoring projects of the subway tunnel, an electronic level is used to monitor the horizontal displacement and vertical displacement of the subway tunnel.

[0044] Specifically, the monitoring projects of underground pipelines are vertical displacement monitoring and differential settlement monitoring. Based on the monitoring projects of underground pipelines, electronic levels are used to monitor the vertical displacement and differential settlement of underground pipelines.

[0045] Embodiment 2

[0046] See also Figures 3 to 6 This embodiment provides a method for monitoring a deep foundation pit of an underground structure group, using the deep foundation pit monitoring system of an underground structure group as described in the first embodiment, including the following steps:

[0047] Step 1: Using the three-dimensional overall design method, through the finite element software, based on the model parameters of the deep foundation pit system of the underground structure group, with the excavated foundation pit as the center, a deep foundation pit system model of the underground structure group is established, and the excavation, dewatering, support and other processes of the deep foundation pit system of the underground structure group are simulated to obtain the deformation cloud map of the surrounding surface soil.

[0048] Specifically, the model parameters of the deep foundation pit system of the underground structure group are obtained by at least one of experiments, experience and back analysis method.

[0049] Step 2: Based on the information of the deformation cloud map of the surrounding surface soil, the boundary of the surrounding surface soil settlement of 10mm is selected as the plane range of the deep foundation pit system of the underground structure group, and the depth of the soil uplift of 10mm at the bottom of the pit is determined as the vertical range of the deep foundation pit system of the underground structure group.

[0050] Specifically, different foundation pit projects have their own systems. When the distance between foundation pits is short, the foundation pit systems overlap with each other, eventually forming a deep foundation pit system for underground structure groups. By determining the scope of the deep foundation pit system for underground structure groups, the monitoring objects within the scope can be linked together, and each monitoring object within the scope can be placed under a unified monitoring standard.

[0051] Step 3: Determine the monitoring items based on the monitoring objects within the deep foundation pit of the underground structure group, and determine the monitoring equipment and control index values ​​based on the determined monitoring items.

[0052] Specifically, the monitoring objects within the deep foundation pit system of the underground structure group include at least one of buildings, underground pipe galleries and stations, bridges, subway tunnels and underground pipelines.

[0053] Specifically, the monitoring items for buildings (structures) are horizontal displacement monitoring and vertical displacement monitoring. For adjacent buildings (structures), an electronic level is used for vertical displacement monitoring. The vertical displacement monitoring points are arranged on the outer wall or load-bearing columns. The monitoring points are spaced 15m apart along the outer wall, or one monitoring point is arranged on every two load-bearing columns. An electronic level is used for horizontal displacement monitoring. The horizontal displacement monitoring points should be arranged on the outer wall, load-bearing columns, both sides of the deformation joints and other representative locations of the buildings (structures) on one side of the excavation of the deep foundation pit system or tunnel of the adjacent underground structure group. They can also be arranged at the same location as the vertical displacement monitoring points of the buildings (structures).

[0054] Specifically, the monitoring project for underground pipe corridors and stations is cross-sectional deformation monitoring. For underground pipe corridors, electronic levels are used to monitor cross-sectional deformation. The layout of underground pipe corridor monitoring points is as follows: Figure 4 As shown, Figure 4 Schematic diagram of the monitoring point layout of the underground pipeline corridor. Figure 4 The figure shows the monitoring surface diagram of the comprehensive double-warehouse underground corridor. A monitoring surface is arranged every 10m along the entire length of the corridor. Monitoring points are arranged at four positions on the monitoring surface. The monitoring points are all located in the underground corridor. Monitoring points S6 and S9 are arranged on the top of the left warehouse corridor, and monitoring points S7 and S8 are arranged on the bottom. Monitoring points S10 and S13 are arranged on the top of the right warehouse corridor, and monitoring points S11 and S12 are arranged on the bottom. For prefabricated corridors, steel bars are reserved at specified locations during production to determine the locations of the monitoring points. For cast-in-place reinforced concrete corridors, steel bars are reserved at specified locations when the steel mesh is tied to determine the locations of the monitoring points. Each monitoring surface of the underground corridor is arranged in accordance with Figure 4 The monitoring points are arranged, and a coordinate system is established with the center of each monitoring surface as the origin, the up-down direction of the monitoring surface as the y-axis direction, and the left-right direction of the monitoring surface as the x-axis direction. The horizontal and vertical positions of each monitoring point are quantified, and then the coordinate points are connected in sequence to obtain the initial monitoring section graph, and the initial coordinates are recorded. When the subsequent structure is deformed, the coordinate changes of the monitoring points are recorded, and the cross-sectional deformation can be directly observed through the graphic changes. For underground pipe corridors, pre-buried screws are pre-buried on the main structure of the main monitoring points and weak monitoring points as permanent monitoring points. During monitoring, the forced centering disk is installed through the pre-buried screws, and the electronic level is installed to a position where it can be aimed at the forced centering disk, so as to monitor the permanent monitoring point.

[0055] For stations, electronic levels are used to monitor cross-section deformation. The layout of station monitoring points is as follows: Figure 5 As shown, Figure 5 Schematic diagram of the monitoring point layout of the station. Figure 5 The monitoring surface diagram of the station is shown in the figure. The monitoring surface is arranged along the entire length of the station, and the monitoring points are arranged in the station. The station includes two underground floors. Monitoring points S16, S21, and S17 are arranged at the top of the first underground floor, and monitoring points S15, S20, and S18 are arranged at the top of the second underground floor. Monitoring points S14 and S19 are arranged at the bottom of the second underground floor. For the station, pre-embedded screws are pre-buried on the main structure of the main monitoring points and weak monitoring points as permanent monitoring points. During monitoring, the forced centering disk is installed through the pre-embedded screws, and the electronic level is installed to a position where it can be aimed at the forced centering disk, so as to monitor the permanent monitoring point. Each monitoring surface of the station is arranged in accordance with Figure 5The monitoring points are arranged, and a coordinate system is established with the center of each monitoring surface as the origin, the up and down direction of the monitoring surface as the y-axis direction, and the left and right direction of the monitoring surface as the x-axis direction. The horizontal and vertical positions of each monitoring point are quantified, and then the coordinate points are connected in sequence to obtain the initial monitoring section graph, and the initial coordinates are recorded. When the subsequent structure is deformed, the changes in the coordinates of the monitoring points are recorded, and the cross-sectional deformation can be directly observed through the changes in the graph.

[0056] Specifically, the monitoring items for bridges are pier vertical displacement monitoring, pier differential settlement monitoring, and pier column inclination monitoring. For bridges, an electronic level is used to monitor the vertical displacement of the pier, and the monitoring points are arranged at the bottom of the pier and around the abutment. At the same time, the differential settlement of the pier can be obtained based on the monitoring data of the vertical displacement of the pier. An inclinometer is used to monitor the inclination of the pier column. The monitoring points should be arranged in groups along the top and bottom of the pier column, and there should be no less than one group of monitoring points for each pier column, and no less than one monitoring point for each group. For bridges, screws are pre-buried at the monitoring points as permanent monitoring points. During monitoring, the forced centering disk is installed through the pre-buried screws, and the electronic level is installed to a position where it can be aimed at the forced centering disk, so as to monitor the permanent monitoring point.

[0057] Specifically, the monitoring items of subway tunnels are horizontal displacement monitoring and vertical displacement monitoring. For subway tunnels, electronic levels are used to monitor vertical displacement and horizontal displacement. The layout of monitoring points is as follows: Figure 3 As shown, Figure 3 Schematic diagram of the layout of monitoring points in subway tunnels. Figure 3 The figure shows the monitoring surface of the subway tunnel. The monitoring surface is set up every 10 segments along the entire length of the subway tunnel, and each monitoring surface is Figure 3Deploy monitoring points. A segment ring is composed of 6 shield tunnel segments, and the 6 shield tunnel segments are connected by bolts. The segment structure of the segment ring is circular in cross section, and the segment structure of the segment ring includes: an arch bottom arc segment located at the arch bottom of the section, an arch top arc segment located at the arch top of the section, two arch waist upper arc segments located at the arch waist positions on both sides of the section, and two arch waist lower arc segments, among which, the arch bottom arc segment located at the arch bottom of the section is the A2 segment, the arch top arc segment located at the arch top of the section is the K segment, the arch waist lower arc segment located at the left side of the section is the A3 segment, the arch waist upper arc segment located at the left side of the section is the B1 segment, the arch waist lower arc segment located at the right side of the section is the A1 segment, and the arch waist upper arc segment located at the right side of the section is the B2 segment. The monitoring points are arranged on the shield tunnel segments. There are 5 monitoring points arranged on one monitoring section, namely S1 monitoring point, S2 monitoring point, S3 monitoring point, S4 monitoring point and S5 monitoring point. Among them, S1 monitoring point is set on the inner side of A3 segment, S2 monitoring point is set on the inner side of B1 segment, S3 monitoring point is set on the inner side of K segment, S4 monitoring point is set on the inner side of B2 segment, and S5 monitoring point is set on the inner side of A1 segment. For prefabricated segments, steel bars are reserved at specified positions during production to determine the layout of monitoring points. For cast-in-place segments, steel bars are reserved at specified positions when steel mesh is tied to determine the layout of monitoring points. For subway tunnels, a forced centering plate is fixed by bolts at a specific position on the segment to form a permanent monitoring point. During monitoring, the electronic level is installed to a position where the forced centering plate can be aimed at, so as to monitor the permanent monitoring point.

[0058] Specifically, the monitoring items of underground pipelines are vertical displacement monitoring and differential settlement monitoring. For underground pipelines, an electronic level is used to monitor vertical displacement at a predetermined frequency. Monitoring points are arranged in groups every 10m along the direction of the pipeline, and are arranged at pipeline nodes, corners, and locations where displacement changes are sensitive or where deformation is predicted to be large. For pipelines with inspection wells, monitoring points are directly arranged on the pipeline or on the carrier of the pipeline. For pipelines without inspection wells but with excavation conditions, monitoring points are directly arranged on the pipeline. For pipelines without inspection wells and excavation conditions, corresponding points on the surface can be used instead. When underground pipelines are dense and of various types, important pipelines with poor deformation resistance and easy leakage or damage should be monitored. For underground pipelines, screws are pre-buried at the monitoring points as permanent monitoring points. During monitoring, the forced centering disk is installed through the pre-buried screws, and the electronic level is installed to a position where the forced centering disk can be aimed, so as to monitor the permanent monitoring point.

[0059] Specifically, the control index value is determined in the foundation pit project. For different monitoring items, a safety threshold is determined based on experience, theoretical calculations and actual engineering conditions. When the monitored deformation value approaches or exceeds this threshold, it means that there is a potential safety risk in the monitoring project and corresponding measures need to be taken to deal with it.

[0060] Step 4: Based on the determined monitoring equipment, the monitoring deformation values ​​are collected, and the most sensitive underground structure is determined based on the collected monitoring deformation values ​​and control index values. As an example, the most sensitive underground structure is the station, and the three-dimensional space around the foundation pit corresponding to the critical deformation value of the station is truly used as the scope of the deep foundation pit system of the underground structure group.

[0061] Step 5: The monitoring equipment monitors the monitoring objects within the deep foundation pit system of the underground structure group determined for the second time.

[0062] Specifically, the monitoring equipment used are all automated instruments, which monitor and warn the data to ensure the safety of the excavation process of the foundation pit group. The monitoring equipment and its lines are regularly inspected and repaired, and damaged or unusable equipment is replaced in a timely manner.

[0063] Specifically, monitoring points and permanent monitoring points should be permanently marked and protected. When there is another single foundation pit excavation nearby, the monitoring objects of the new underground structure group deep foundation pit system formed by the foundation pit and the existing underground structure group deep foundation pit system include the monitoring objects of the existing underground structure group deep foundation pit system, and the monitoring points and permanent monitoring points deployed in the existing underground structure group deep foundation pit system can continue to be used for monitoring. The monitoring points and permanent monitoring points should be regularly checked and maintained to ensure that they can be reused and used permanently, so as to ensure continuous monitoring throughout the life cycle of the underground structure group deep foundation pit system.

[0064] Step 6: The monitoring equipment monitors the data of each monitored object in real time and issues early warning. When there is a deep foundation pit system of an underground structure group excavated near each monitored object, the monitoring point can record the surface settlement, soil displacement, structural deformation and torsion data caused by the deep foundation pit system excavation of the underground structure group. By analyzing the data, the impact of the deep foundation pit system excavation of the underground structure group on the surrounding structures can be evaluated, providing a reference for subsequent engineering design and construction.

[0065] Specifically, the early warning setting method is: when the monitored deformation value is less than 60% of the control index value, the structure is safe and external operations continue; when the monitored deformation value is greater than 60% and less than or equal to 80% of the control index value, external operations can continue, but the monitoring system will alarm to remind construction personnel to increase the monitoring frequency and add monitoring points and monitoring points to relevant locations if necessary; when the monitored deformation value is greater than 80% and less than or equal to 100% of the control index value, external operations are suspended and construction personnel conduct further safety assessments on the deep foundation pit system of the underground structure group.

[0066] The above description is only a preferred embodiment of the present disclosure and is not intended to limit the present disclosure. For those skilled in the art, the present disclosure may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present disclosure shall be included in the protection scope of the present disclosure.

[0067] Although the above describes the specific implementation methods of the present disclosure in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present disclosure. Technical personnel in the relevant field should understand that on the basis of the technical solution of the present disclosure, various modifications or variations that can be made by those skilled in the art without creative work are still within the scope of protection of the present disclosure.

Claims

1. The deep foundation pit monitoring system for underground structure groups is characterized by: It includes a deep foundation pit system model of an underground structure group, a deep foundation pit system of an underground structure group and a monitoring device. The deep foundation pit system model of an underground structure group is established based on the deep foundation pit system of the underground structure group. The deep foundation pit system model of an underground structure group is used to preliminarily determine the scope of the deep foundation pit system of the underground structure group. After the scope of the deep foundation pit system of the underground structure group is determined, the monitoring device monitors the monitoring objects within the preliminarily determined scope of the deep foundation pit system of the underground structure group. Based on the monitoring of the monitoring device, the most sensitive underground structure within the scope of the deep foundation pit system of the underground structure group is determined. The most sensitive underground structure is the monitoring object whose monitoring deformation value reaches the control index value the fastest. The three-dimensional space around the foundation pit corresponding to the critical deformation value of the most sensitive underground structure is truly used as the scope of the deep foundation pit system of the underground structure group. The monitoring device monitors and warns the monitoring objects within the second determined scope of the deep foundation pit system of the underground structure group.

2. The underground structure group deep foundation pit monitoring system according to claim 1 is characterized in that: The monitoring objects within the scope of the deep foundation pit system of the underground structure group include at least one of buildings, underground pipe galleries and stations, bridges, subway tunnels and underground pipelines.

3. The deep foundation pit monitoring system for underground structure groups according to claim 2 is characterized in that: The monitoring items of the building are horizontal displacement monitoring and vertical displacement monitoring. Based on the monitoring items of the building, a horizontal displacement monitoring instrument is used to monitor the horizontal displacement of the building, and a vertical displacement monitoring instrument is used to monitor the vertical displacement of the building.

4. The deep foundation pit monitoring system for underground structure groups according to claim 2 is characterized in that: The monitoring project of the underground pipeline gallery and the station is cross-sectional deformation monitoring. Based on the monitoring project of the underground pipeline gallery and the station, a cross-sectional deformation monitoring instrument is used to monitor the cross-sectional deformation of the underground pipeline gallery and the station.

5. The underground structure group deep foundation pit monitoring system according to claim 2 is characterized in that: The monitoring items of the bridge are pier vertical displacement monitoring, pier differential settlement monitoring and pier column inclination monitoring. Based on the monitoring items of the bridge, a vertical displacement monitoring instrument is used to monitor the vertical displacement and differential settlement of the piers of the bridge, and an angle monitoring instrument is used to monitor the inclination of the pier columns of the bridge.

6. The deep foundation pit monitoring system for underground structure groups according to claim 2 is characterized in that: The monitoring items of the subway tunnel are horizontal displacement monitoring and vertical displacement monitoring. Based on the monitoring items of the subway tunnel, a horizontal displacement monitoring instrument is used to monitor the horizontal displacement of the subway tunnel, and a vertical displacement monitoring instrument is used to monitor the vertical displacement of the subway tunnel.

7. The deep foundation pit monitoring system for underground structure groups according to claim 2 is characterized in that: The monitoring items of the underground pipeline are vertical displacement monitoring and differential settlement monitoring. Based on the monitoring items of the underground pipeline, a vertical displacement monitoring instrument is used to monitor the vertical displacement and differential settlement of the underground pipeline.

8. A method for monitoring deep foundation pits of underground structure groups, characterized in that: The following steps are involved: Based on the model parameters of the underground structure group deep foundation pit system, a deep foundation pit system model of the underground structure group is established, and the deformation cloud map of the surrounding surface soil is obtained through the deep foundation pit system model of the underground structure group; Based on the information of the surrounding surface soil deformation cloud map, the scope of the deep foundation pit system of the underground structure group is preliminarily determined by selecting the predetermined boundary of the surrounding surface soil settlement value according to the construction requirements; Determine monitoring items based on monitoring objects within the deep foundation pit of underground structure groups, and determine monitoring equipment and control index values ​​based on the determined monitoring items; Based on the determined monitoring equipment, monitoring deformation values ​​are collected, and the most sensitive underground structure is determined based on the collected monitoring deformation values ​​and control index values, and the three-dimensional space around the foundation pit corresponding to the critical deformation value of the most sensitive underground structure is truly used as the scope of the deep foundation pit system of the underground structure group; The monitoring equipment monitors the monitoring objects within the scope of the deep foundation pit system of the underground structure group determined for the second time; The monitoring equipment monitors the data of each monitored object in real time and issues early warning.

9. The method for monitoring deep foundation pits of underground structure groups according to claim 8, characterized in that: The model parameters of the deep foundation pit system of the underground structure group are obtained by at least one of experiments, experience and inverse analysis.

10. The method for monitoring deep foundation pits of underground structure groups according to claim 8, characterized in that: The method for setting the early warning is as follows: when the monitored deformation value is less than 60% of the control index value, the structure is safe and external operations continue; when the monitored deformation value is greater than 60% and less than or equal to 80% of the control index value, the monitoring equipment alarms and increases the monitoring frequency; when the monitored deformation value is greater than 80% and less than or equal to 100% of the control index value, external operations are suspended and a safety assessment of the structure is performed.