Intelligent power operation and maintenance system and method for distribution network based on safety monitoring
By constructing an equipment abnormality assessment model and an environmental change-load neural network model in the smart power operation and maintenance of the distribution network, the problem of low equipment abnormality prediction accuracy and efficiency in the existing technology is solved, and a comprehensive analysis of equipment operation abnormality is achieved. Analysis and maintenance assessment improve forecast accuracy and efficiency.
Patent Information
- Application Number
- CN202411014001.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-07-26
AI Technical Summary
The existing technology cannot conduct a comprehensive analysis of equipment operation abnormalities in the next operation and maintenance cycle based on the equipment operation data and environmental conditions of the historical operation and maintenance cycle in the smart power operation and maintenance of the distribution network, resulting in the accuracy and prediction of abnormal equipment operation. Less efficient.
By setting the operation and maintenance cycle, obtain equipment operation data and environmental data, build equipment abnormality assessment models and environmental change-load neural network models, conduct equipment operation abnormality assessment and load prediction, obtain equipment operation abnormal changes, and make maintenance evaluation judgments. , and issue maintenance instructions based on the results.
It improves the accuracy and efficiency of abnormal equipment operation prediction and ensures timely maintenance and stable operation of distribution network equipment.
Smart Images

Figure CN118539440B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of data analysis, and more specifically relates to an intelligent power operation and maintenance system and method for a distribution network based on safety monitoring. Background Art
[0002] Intelligent power operation and maintenance of distribution network based on security monitoring refers to the use of modern information technology and automation equipment to monitor and analyze the operating status of distribution network in real time to ensure the safe, efficient and reliable operation of power system. This operation and maintenance mode usually includes the following key components: sensors and monitoring equipment; communication network; data processing and analysis platform; monitoring center; early warning and emergency response system; predictive maintenance; automated control and repair and user service and support;
[0003] Intelligent power operation and maintenance of distribution networks based on security monitoring not only improves the safety and reliability of distribution networks, but also reduces operating costs and improves operational efficiency, while also providing power users with more stable and high-quality power services;
[0004] The prior art cannot comprehensively analyze the abnormal operation of equipment in the next operation and maintenance cycle based on the equipment operation data and environmental conditions of the historical operation and maintenance cycle during the intelligent power operation and maintenance of the distribution network, resulting in low accuracy and prediction efficiency of abnormal operation prediction of equipment. The above problems exist in the prior art (for example, in the invention patents with authorization publication numbers CN115933508B and CN111384778B);
[0005] In order to solve these problems, the present application designs a distribution network intelligent power operation and maintenance system and method based on security monitoring. Summary of the invention
[0006] In view of the deficiencies in the prior art, the present invention proposes an intelligent power operation and maintenance system and method for a distribution network based on security monitoring. The present invention sets an operation and maintenance cycle, obtains equipment operation data and environmental data during the operation of distribution network equipment during the operation and maintenance cycle through a data monitoring component, imports the obtained equipment operation data at the beginning and end of the operation and maintenance cycle into a constructed equipment abnormality assessment model to conduct equipment operation abnormality assessment, obtains equipment operation abnormality changes at the beginning and end of the operation and maintenance cycle, constructs an environmental change-load neural network model through environmental change data and load data of historical operation and maintenance cycles to estimate the load of the next operation and maintenance cycle, obtains equipment operation abnormality change data, load data and estimated load of the next operation and maintenance cycle at the beginning and end of the previous operation and maintenance cycle to estimate the equipment operation abnormality changes in the next operation and maintenance cycle, performs maintenance assessment and judgment based on the estimated equipment operation abnormality changes in the next operation and maintenance cycle, issues maintenance instructions based on the maintenance assessment and judgment results, and comprehensively analyzes the equipment operation abnormality of the next operation and maintenance cycle, thereby improving the accuracy and efficiency of the prediction of equipment abnormal operation.
[0007] To achieve the above object, the present invention provides the following technical solution: a distribution network intelligent power operation and maintenance method based on security monitoring, which includes the following specific steps:
[0008] Set the operation and maintenance cycle, and obtain the equipment operation data and environmental data of the distribution network equipment during the operation and maintenance period through the data monitoring component;
[0009] Import the acquired equipment operation data at the beginning and end of the operation and maintenance cycle into the constructed equipment anomaly assessment model to conduct equipment operation anomaly assessment, and obtain equipment operation anomaly changes at the beginning and end of the operation and maintenance cycle;
[0010] The environmental change-load neural network model is constructed through the environmental change data and load data of the historical operation and maintenance cycle to estimate the load of the next operation and maintenance cycle;
[0011] Obtain the equipment operation abnormal change data, load data and estimated load of the next operation and maintenance cycle at the beginning and end of the previous operation and maintenance cycle to estimate the equipment operation abnormal change of the next operation and maintenance cycle;
[0012] Perform maintenance assessment and judgment based on the estimated abnormal changes in equipment operation in the next operation and maintenance cycle;
[0013] Maintenance instructions are issued based on the maintenance assessment results.
[0014] It should be specifically explained here that the setting of the operation and maintenance cycle and obtaining the equipment operation data and the environmental data of the equipment operation process during the operation and maintenance cycle of the distribution network equipment through the data monitoring component include the following specific steps:
[0015] S11, the maintenance personnel sets the operation and maintenance cycle, and obtains the equipment operation data in the previous operation and maintenance cycle through the equipment data monitoring component, wherein the equipment operation data includes the equipment operation current, operation voltage and temperature data, and is stored in the first storage component;
[0016] S12. Collect historical environmental data during the operation of the equipment through the environmental data monitoring component, where the environmental data includes temperature, humidity, and precipitation and snowfall data, and store them in the second storage component.
[0017] It should be specifically noted that the device abnormality assessment model includes the following specific contents:
[0018] S21, obtaining equipment operation data for a set time period from the beginning to the end of the previous operation and maintenance cycle;
[0019] S22, extracting the equipment operation data of the starting set time period of the previous operation and maintenance cycle and substituting it into the calculation formula of the equipment abnormal value of the starting time period to calculate the equipment abnormal value of the starting time period, wherein the calculation formula of the equipment abnormal value of the starting time period is: , where n is the number of device operation data, To set the duration of the time period, is the proportion coefficient of the i-th device operation data, is the specific value of the operation data of the i-th device at time t, is the median value of the data safety range of the ith device. It is the maximum value of the equipment operation data safety range. The minimum value of the device operation data security range;
[0020] S23, extract the calculated equipment abnormal value of the starting time period and the equipment operation data of the set time at the end time end and import them into the abnormal change value calculation formula to calculate the abnormal change value of the previous operation and maintenance cycle, where the abnormal change value calculation formula is: ,in, is the end time of the end time period;
[0021] It should be specifically explained here that the construction of an environment change-load neural network model based on the environment change data and load data of the historical operation and maintenance cycle to estimate the load of the next operation and maintenance cycle includes the following specific steps:
[0022] S31, obtaining the distribution network load data of the historical operation and maintenance cycle and the environmental change data of the historical operation and maintenance cycle, and constructing a convolutional neural network model whose input is the environmental change data of the operation and maintenance cycle and whose output is the distribution network load data of the operation and maintenance cycle;
[0023] S32, dividing the extracted distribution network load data of the historical operation and maintenance cycle and the environmental change data of the historical operation and maintenance cycle into 70% parameter training sets and 30% parameter test sets; inputting 70% parameter training sets into the convolutional neural network model for training to obtain an initial convolutional neural network model; using 30% parameter test sets to test the initial convolutional neural network model, and outputting the optimal initial convolutional neural network model that meets the judgment accuracy of the distribution network load data of the preset historical operation and maintenance cycle as the convolutional neural network model, wherein the output strategy formula of the specific neurons in the convolutional neural network model is: ,in is the output of n+1 layer s-term neurons, is the connection weight between the nth layer neuron j and the n+1th layer s-item neuron, represents the output of neuron j in layer n, represents the bias of the linear relationship between the nth layer neuron j and the n+1th layer s-term neuron, Represents the Sigmoid activation function;
[0024] S33. Import the acquired environmental change data for the next operation and maintenance cycle into the convolutional neural network model, and output the predicted load for the next operation and maintenance cycle.
[0025] It should be specifically explained here that the acquisition of the equipment operation abnormal change data, load data and the estimated load of the next operation and maintenance cycle at the beginning and end of the previous operation and maintenance cycle to estimate the equipment operation abnormal change of the next operation and maintenance cycle includes the following specific steps:
[0026] S41, obtaining equipment operation abnormal change data and load data at the beginning and end of the previous operation and maintenance cycle and the estimated load of the next operation and maintenance cycle;
[0027] S42, substituting the acquired equipment operation abnormal change data, load data and estimated load of the next operation and maintenance cycle at the beginning and end of the previous operation and maintenance cycle into the equipment operation abnormal change value calculation formula of the next operation and maintenance cycle to calculate the equipment operation abnormal change value of the next operation and maintenance cycle, wherein the equipment operation abnormal change value calculation formula of the next operation and maintenance cycle is: ,in, is the load of the next operation and maintenance cycle, The load at the beginning and end of the previous operation and maintenance cycle.
[0028] It should be specifically explained here that the specific steps of performing maintenance assessment and judgment based on the estimated abnormal changes in equipment operation in the next operation and maintenance cycle are as follows:
[0029] The obtained equipment operation abnormal change value for the next operation and maintenance cycle is compared with the set equipment operation abnormal change threshold. If the obtained equipment operation abnormal change value for the next operation and maintenance cycle is greater than or equal to the set equipment operation abnormal change threshold, a maintenance warning is issued; if the obtained equipment operation abnormal change value for the next operation and maintenance cycle is less than the set equipment operation abnormal change threshold, no maintenance warning is issued.
[0030] It should be noted here that the proportion coefficient of the i-th equipment operation data and the threshold value of the abnormal change in equipment operation are determined as follows: obtain at least five thousand sets of equipment operation data and environmental data during the historical operation of the finished product equipment, extract and judge whether the equipment will fail in the next cycle, substitute the equipment operation data during the historical operation and the environmental data during the equipment operation into the calculation formula for the abnormal change value of the equipment operation in the next operation and maintenance cycle, calculate the abnormal change value of the equipment operation in the next operation and maintenance cycle, import the calculated abnormal change value of the equipment operation in the next operation and maintenance cycle and the fault judgment result into the fitting software, and output the proportion coefficient of the i-th equipment operation data and the threshold value of the abnormal change in the equipment operation that meet the highest judgment accuracy.
[0031] The intelligent power operation and maintenance system for distribution network based on security monitoring is implemented based on the above-mentioned intelligent power operation and maintenance method for distribution network based on security monitoring, and specifically includes:
[0032] The data acquisition module is used to set the operation and maintenance cycle and obtain the equipment operation data and environmental data of the equipment during the operation and maintenance period through the data monitoring component;
[0033] An equipment anomaly assessment module is used to import the acquired equipment operation data at the beginning and end of the operation and maintenance cycle into the constructed equipment anomaly assessment model to perform equipment operation anomaly assessment and obtain equipment operation anomaly changes at the beginning and end of the operation and maintenance cycle;
[0034] The load estimation module is used to build an environment change-load neural network model based on the environment change data and load data of the historical operation and maintenance cycle to estimate the load of the next operation and maintenance cycle;
[0035] The next cycle operation prediction module is used to obtain the equipment operation abnormal change data, load data and the estimated load of the next operation and maintenance cycle at the beginning and end of the previous operation and maintenance cycle to predict the equipment operation abnormal change in the next operation and maintenance cycle;
[0036] The maintenance assessment module is used to make maintenance assessment judgments based on the estimated abnormal changes in equipment operation in the next operation and maintenance cycle;
[0037] An instruction issuing module is used to issue maintenance instructions according to the maintenance evaluation judgment results;
[0038] The control module is used to control the operation of the data acquisition module, the equipment abnormality assessment module, the load estimation module, the next cycle operation estimation module, the maintenance assessment module and the instruction issuance module.
[0039] An electronic device comprises: a processor and a memory, wherein the memory stores a computer program that can be called by the processor;
[0040] The processor executes the above-mentioned intelligent power operation and maintenance method of the distribution network based on security monitoring by calling the computer program stored in the memory.
[0041] A computer-readable storage medium stores instructions, which, when executed on a computer, enable the computer to execute the above-mentioned intelligent power operation and maintenance method for a distribution network based on security monitoring.
[0042] Compared with the prior art, the present invention has the following beneficial effects:
[0043] The present invention sets an operation and maintenance cycle, obtains equipment operation data and environmental data during the operation of distribution network equipment during the operation and maintenance cycle through a data monitoring component, imports the obtained equipment operation data at the beginning and end of the operation and maintenance cycle into a constructed equipment abnormality assessment model to perform equipment operation abnormality assessment, obtains equipment operation abnormality changes at the beginning and end of the operation and maintenance cycle, constructs an environmental change-load neural network model through environmental change data and load data of historical operation and maintenance cycles to estimate the load of the next operation and maintenance cycle, obtains equipment operation abnormality change data, load data and the estimated load of the next operation and maintenance cycle at the beginning and end of the previous operation and maintenance cycle to estimate the equipment operation abnormality change of the next operation and maintenance cycle, performs maintenance assessment and judgment based on the estimated equipment operation abnormality change of the next operation and maintenance cycle, issues maintenance instructions based on the maintenance assessment and judgment results, comprehensively analyzes the equipment operation abnormality of the next operation and maintenance cycle, and improves the accuracy and efficiency of the prediction of equipment abnormal operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying any creative work.
[0045] Figure 1 It is a schematic diagram of the overall process of the intelligent power operation and maintenance method of the distribution network based on security monitoring of the present invention;
[0046] Figure 2It is a schematic flow chart of the steps of the equipment abnormality assessment model in the intelligent power operation and maintenance method of the distribution network based on security monitoring of the present invention;
[0047] Figure 3 It is a schematic diagram of the overall framework of the intelligent power operation and maintenance system of the distribution network based on security monitoring of the present invention. DETAILED DESCRIPTION
[0048] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0049] In the following description, many specific details are set forth to facilitate a full understanding of the present application, but the present application may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present application. Therefore, the present application is not limited to the specific embodiments disclosed below.
[0050] Example 1
[0051] See also Figure 1-Figure 2 , an embodiment provided by the present invention: the technical problem solved by this embodiment is: the prior art cannot comprehensively analyze the abnormal operation of equipment in the next operation and maintenance cycle according to the equipment operation data and environmental conditions of the historical operation and maintenance cycle during the intelligent power operation and maintenance of the distribution network, resulting in low accuracy and prediction efficiency of abnormal operation prediction of equipment;
[0052] The intelligent power operation and maintenance method of distribution network based on security monitoring includes the following specific steps:
[0053] Set the operation and maintenance cycle, and obtain the equipment operation data and environmental data of the distribution network equipment during the operation and maintenance period through the data monitoring component;
[0054] Import the acquired equipment operation data at the beginning and end of the operation and maintenance cycle into the constructed equipment anomaly assessment model to conduct equipment operation anomaly assessment, and obtain equipment operation anomaly changes at the beginning and end of the operation and maintenance cycle;
[0055] The environmental change-load neural network model is constructed through the environmental change data and load data of the historical operation and maintenance cycle to estimate the load of the next operation and maintenance cycle;
[0056] Obtain the equipment operation abnormal change data, load data and estimated load of the next operation and maintenance cycle at the beginning and end of the previous operation and maintenance cycle to estimate the equipment operation abnormal change of the next operation and maintenance cycle;
[0057] Perform maintenance assessment and judgment based on the estimated abnormal changes in equipment operation in the next operation and maintenance cycle;
[0058] Issue maintenance instructions based on maintenance assessment results;
[0059] In this embodiment, it should be specifically explained that setting the operation and maintenance cycle and obtaining the equipment operation data and the environmental data of the equipment operation process during the operation and maintenance period through the data monitoring component include the following specific steps:
[0060] S11. The maintenance personnel sets the operation and maintenance cycle, and obtains the equipment operation data in the previous operation and maintenance cycle through the equipment data monitoring component, wherein the equipment operation data includes the equipment operation current, operation voltage and temperature data, and is stored in the first storage component. It should be noted that the operation and maintenance cycle here is set according to the actual needs of operation and maintenance;
[0061] The length of the distribution network operation and maintenance cycle depends on many factors, including the type, scale, complexity, environment, equipment status and operation and maintenance policy of the distribution network. Generally, the distribution network operation and maintenance cycle can be divided into the following levels:
[0062] 1. Daily operation and maintenance: This includes regular inspections and routine maintenance of the distribution network, such as equipment inspections, defect handling, equipment cleaning, insulator replacement, etc. Daily operation and maintenance is usually carried out continuously to ensure the normal operation of the distribution network;
[0063] 2. Periodic O&M: This involves regular comprehensive inspection and maintenance of distribution network equipment, such as insulation testing of cables, preventive testing of equipment, and channel cleaning of lines. Periodic O&M is usually carried out at certain time intervals, such as monthly, quarterly, or annually.
[0064] S12, collecting historical environmental data during the operation of the equipment through the environmental data monitoring component, wherein the environmental data includes temperature, humidity and precipitation and snowfall data, and storing it in the second storage component;
[0065] There is a close relationship between load and weather, especially in the operation of distribution networks; weather changes will directly affect the load of the power system, so weather factors must be considered in the planning, operation and dispatch of the power system:
[0066] 1. Temperature impact: Temperature is one of the main factors that affect power load. Generally speaking, when the temperature rises, people will increase the frequency and duration of using air conditioners, resulting in an increase in power demand. Conversely, when the temperature drops, power demand may decrease. Therefore, temperature changes in summer and winter have a significant impact on load;
[0067] 2. Seasonal changes: Seasonal changes also have an impact on power load. For example, summer and winter are usually seasons with higher power demand because people use air conditioning or heating to adjust the indoor temperature, while spring and autumn seasons have relatively lower power demand;
[0068] 3. Rainfall: Rainfall can affect the normal operation of the power system, especially in extreme weather conditions such as heavy rain and typhoons. Waterlogging may cause the collapse of transmission towers or damage to power equipment, thus affecting the supply and demand of loads.
[0069] In summary, weather factors have an important impact on load;
[0070] It should be specifically explained in this embodiment that the device abnormality assessment model includes the following specific contents:
[0071] S21, obtaining equipment operation data for a set time period from the beginning to the end of the previous operation and maintenance cycle;
[0072] S22, extracting the equipment operation data of the starting set time period of the previous operation and maintenance cycle and substituting it into the calculation formula of the equipment abnormal value of the starting time period to calculate the equipment abnormal value of the starting time period, wherein the calculation formula of the equipment abnormal value of the starting time period is: , where n is the number of device operation data, To set the duration of the time period, is the proportion coefficient of the i-th device operation data, is the specific value of the operation data of the i-th device at time t, is the median value of the data safety range of the ith device. It is the maximum value of the equipment operation data safety range. The minimum value of the device operation data security range;
[0073] S23, extract the calculated equipment abnormal value of the starting time period and the equipment operation data of the set time at the end time end and import them into the abnormal change value calculation formula to calculate the abnormal change value of the previous operation and maintenance cycle, where the abnormal change value calculation formula is: ,in, is the end time of the end time period;
[0074] In this embodiment, it should be specifically explained that the environmental change-load neural network model is constructed by using the environmental change data and load data of the historical operation and maintenance cycle to estimate the load of the next operation and maintenance cycle, which includes the following specific steps:
[0075] S31, obtaining the distribution network load data of the historical operation and maintenance cycle and the environmental change data of the historical operation and maintenance cycle, and constructing a convolutional neural network model whose input is the environmental change data of the operation and maintenance cycle and whose output is the distribution network load data of the operation and maintenance cycle;
[0076] The following is an example code for using Python and Keras library to build a simple convolutional neural network (CNN) model to predict distribution network load data. In this example, the environmental change data of the historical operation and maintenance period is used as input, and the distribution network load data of the historical operation and maintenance period is used as output, and the CNN model is used for training and prediction.
[0077] Python
[0078] import numpy as np
[0079] from sklearn.model_selection import train_test_split
[0080] from keras.models import Sequential
[0081] from keras.layers import Conv1D, MaxPooling1D, Flatten, Dense
[0082] # Assume that the numpy array data of distribution network load data and environmental change data of the historical operation and maintenance cycle have been prepared
[0083] # Assume that load_data contains the distribution network load data of the historical operation and maintenance period
[0084] # Assume that environment_data contains the environmental change data of the historical operation and maintenance cycle
[0085] # Data preprocessing
[0086] X = environment_data.reshape(environment_data.shape[0], environment_data.shape[1], 1)
[0087] y = load_data
[0088] # Data split into training set and test set
[0089] X_train, X_test, y_train, y_test = train_test_split(X, y, test_size=0.3, random_state=42)
[0090] # Build CNN model
[0091] model = Sequential()
[0092] model.add(Conv1D(64, 3, activation='relu', input_shape=(X.shape[1],X.shape[2])))
[0093] model.add(MaxPooling1D(2))
[0094] model.add(Flatten())
[0095] model.add(Dense(64, activation='relu'))
[0096] model.add(Dense(1))
[0097] # Compile the model
[0098] model.compile(optimizer='adam', loss='mean_squared_error')
[0099] # Train the model
[0100] model.fit(X_train, y_train, epochs=10, batch_size=32, validation_data=(X_test, y_test))
[0101] # Model evaluation
[0102] loss = model.evaluate(X_test, y_test)
[0103] print('Test Loss:', loss)
[0104] # Use the model to make predictions
[0105] predictions = model.predict(X_test)
[0106] This is just a simple example. In actual situations, more complex adjustments and optimizations may be required to the model based on the characteristics of the dataset and actual needs.
[0107] S32, dividing the extracted distribution network load data of the historical operation and maintenance cycle and the environmental change data of the historical operation and maintenance cycle into 70% parameter training sets and 30% parameter test sets; inputting 70% parameter training sets into the convolutional neural network model for training to obtain an initial convolutional neural network model; using 30% parameter test sets to test the initial convolutional neural network model, and outputting the optimal initial convolutional neural network model that meets the judgment accuracy of the distribution network load data of the preset historical operation and maintenance cycle as the convolutional neural network model, wherein the output strategy formula of the specific neurons in the convolutional neural network model is: ,in is the output of n+1 layer s-term neurons, is the connection weight between the nth layer neuron j and the n+1th layer s-item neuron, represents the output of neuron j in layer n, represents the bias of the linear relationship between the nth layer neuron j and the n+1th layer s-term neuron, Represents the Sigmoid activation function;
[0108] S33. Import the acquired environmental change data for the next operation and maintenance cycle into the convolutional neural network model, and output the predicted load for the next operation and maintenance cycle.
[0109] In this embodiment, it should be specifically explained that obtaining the equipment operation abnormal change data, load data and the estimated load of the next operation and maintenance cycle at the beginning and end of the previous operation and maintenance cycle to estimate the equipment operation abnormal change of the next operation and maintenance cycle includes the following specific steps:
[0110] S41, obtaining equipment operation abnormal change data and load data at the beginning and end of the previous operation and maintenance cycle and the estimated load of the next operation and maintenance cycle;
[0111] S42, substituting the acquired equipment operation abnormal change data, load data and estimated load of the next operation and maintenance cycle at the beginning and end of the previous operation and maintenance cycle into the equipment operation abnormal change value calculation formula of the next operation and maintenance cycle to calculate the equipment operation abnormal change value of the next operation and maintenance cycle, wherein the equipment operation abnormal change value calculation formula of the next operation and maintenance cycle is: ,in, is the load of the next operation and maintenance cycle, The load at the beginning and end of the previous operation and maintenance cycle.
[0112] In this embodiment, it should be specifically explained that the specific steps of performing maintenance assessment and judgment based on the estimated abnormal changes in equipment operation in the next operation and maintenance cycle are as follows:
[0113] The obtained equipment operation abnormal change value for the next operation and maintenance cycle is compared with the set equipment operation abnormal change threshold. If the obtained equipment operation abnormal change value for the next operation and maintenance cycle is greater than or equal to the set equipment operation abnormal change threshold, a maintenance warning is issued; if the obtained equipment operation abnormal change value for the next operation and maintenance cycle is less than the set equipment operation abnormal change threshold, no maintenance warning is issued.
[0114] It should be noted in this embodiment that the proportion coefficient of the i-th equipment operation data and the value of the equipment operation abnormal change threshold are determined as follows: at least five thousand sets of equipment operation data and environmental data during the equipment operation process of the finished product are obtained, and whether the equipment in the next cycle fails is extracted and judged, and the equipment operation data in the historical operation process and the environmental data during the equipment operation process are substituted into the equipment operation abnormal change value calculation formula of the next operation and maintenance cycle to calculate the equipment operation abnormal change value of the next operation and maintenance cycle, and the calculated equipment operation abnormal change value and fault judgment result of the next operation and maintenance cycle are imported into the fitting software, and the proportion coefficient of the i-th equipment operation data and the value of the equipment operation abnormal change threshold that meet the highest judgment accuracy are output;
[0115] It should be noted here that the advantages of this embodiment over the prior art are as follows: an operation and maintenance cycle is set, and equipment operation data and environmental data of distribution network equipment during the operation and maintenance cycle are obtained through a data monitoring component; the equipment operation data obtained at the beginning and end of the operation and maintenance cycle are imported into the constructed equipment abnormality assessment model to perform equipment operation abnormality assessment; equipment operation abnormality changes at the beginning and end of the operation and maintenance cycle are obtained; an environmental change-load neural network model is constructed through environmental change data and load data of historical operation and maintenance cycles to estimate the load of the next operation and maintenance cycle; equipment operation abnormality change data, load data and the estimated load of the next operation and maintenance cycle at the beginning and end of the previous operation and maintenance cycle are obtained to estimate the equipment operation abnormality changes in the next operation and maintenance cycle; maintenance assessment and judgment are performed based on the estimated equipment operation abnormality changes in the next operation and maintenance cycle; maintenance instructions are issued based on the maintenance assessment and judgment results; a comprehensive analysis is performed on the equipment operation abnormality of the next operation and maintenance cycle, thereby improving the accuracy and efficiency of the prediction of equipment abnormal operation.
[0116] Example 2
[0117] like Figure 3 As shown, the intelligent power operation and maintenance system for distribution network based on security monitoring is implemented based on the above-mentioned intelligent power operation and maintenance method for distribution network based on security monitoring, which specifically includes: a data acquisition module, which is used to set the operation and maintenance cycle, and obtain the equipment operation data and environmental data of the equipment operation process during the operation and maintenance period of the distribution network equipment through the data monitoring component;
[0118] An equipment anomaly assessment module is used to import the acquired equipment operation data at the beginning and end of the operation and maintenance cycle into the constructed equipment anomaly assessment model to perform equipment operation anomaly assessment and obtain equipment operation anomaly changes at the beginning and end of the operation and maintenance cycle;
[0119] The load estimation module is used to build an environment change-load neural network model based on the environment change data and load data of the historical operation and maintenance cycle to estimate the load of the next operation and maintenance cycle;
[0120] The next cycle operation prediction module is used to obtain the equipment operation abnormal change data, load data and the estimated load of the next operation and maintenance cycle at the beginning and end of the previous operation and maintenance cycle to predict the equipment operation abnormal change in the next operation and maintenance cycle;
[0121] The maintenance assessment module is used to make maintenance assessment judgments based on the estimated abnormal changes in equipment operation in the next operation and maintenance cycle;
[0122] An instruction issuing module is used to issue maintenance instructions according to the maintenance evaluation judgment results;
[0123] The control module is used to control the operation of the data acquisition module, the equipment abnormality assessment module, the load estimation module, the next cycle operation estimation module, the maintenance assessment module and the instruction issuance module.
[0124] Example 3
[0125] This embodiment provides an electronic device, including: a processor and a memory, wherein the memory stores a computer program that can be called by the processor;
[0126] The processor executes the above-mentioned intelligent power operation and maintenance method of the distribution network based on security monitoring by calling the computer program stored in the memory.
[0127] The electronic device may have relatively large differences due to different configurations or performances, and may include one or more processors (Central Processing Units, CPU) and one or more memories, wherein the memory stores at least one computer program, which is loaded and executed by the processor to implement the intelligent power operation and maintenance method for distribution network based on security monitoring provided by the above method embodiment.
[0128] Example 4
[0129] This embodiment provides a computer-readable storage medium having a rewritable computer program stored thereon;
[0130] When the computer program runs on a computer device, the computer device executes the above-mentioned intelligent power operation and maintenance method for distribution network based on security monitoring.
[0131] For example, the computer readable storage medium can be a read-only memory (ROM), a random access memory (RAM), a compact disc (CD-ROM), a magnetic tape, a floppy disk, an optical data storage device, etc.
Claims
1. Intelligent power operation and maintenance method of distribution network based on security monitoring, It is characterized in that It includes the following specific steps: Set the operation and maintenance cycle, and obtain the equipment operation data and environmental data of the distribution network equipment during the operation and maintenance period through the data monitoring component; Import the acquired equipment operation data at the beginning and end of the operation and maintenance cycle into the constructed equipment anomaly assessment model to conduct equipment operation anomaly assessment, and obtain the equipment operation anomaly changes at the beginning and end of the operation and maintenance cycle; The environmental change-load neural network model is constructed through the environmental change data and load data of the historical operation and maintenance cycle to estimate the load of the next operation and maintenance cycle; Obtain the equipment operation abnormal change data, load data and estimated load of the next operation and maintenance cycle at the beginning and end of the previous operation and maintenance cycle to estimate the equipment operation abnormal change of the next operation and maintenance cycle; Perform maintenance assessment and judgment based on the estimated abnormal changes in equipment operation in the next operation and maintenance cycle; Issue maintenance instructions based on maintenance assessment results; The equipment anomaly assessment model includes the following specific contents: S21, obtaining equipment operation data for a set time period from the beginning to the end of the previous operation and maintenance cycle; S22, extracting the equipment operation data of the starting set time period of the previous operation and maintenance cycle and substituting it into the equipment abnormal value calculation formula of the starting time period to calculate the equipment abnormal value of the starting time period, wherein the equipment abnormal value calculation formula of the starting time period is: , where n is the number of device operation data, To set the duration of the time period, is the proportion coefficient of the i-th device operation data, is the specific value of the operation data of the i-th device at time t, is the median value of the data safety range of the ith device. It is the maximum value of the equipment operation data safety range. The minimum value of the device operation data security range; S23, extract the calculated equipment abnormal value of the starting time period and the equipment operation data of the set time at the end time end and import them into the abnormal change value calculation formula to calculate the abnormal change value of the previous operation and maintenance cycle, where the abnormal change value calculation formula is: ,in, The end time of the end time period.
2. The intelligent power operation and maintenance method for distribution network based on security monitoring according to claim 1, It is characterized in that The setting of the operation and maintenance cycle and obtaining the equipment operation data and the environmental data of the equipment operation process during the operation and maintenance cycle through the data monitoring component include the following specific steps: S11, the maintenance personnel sets the operation and maintenance cycle, obtains the equipment operation data in the previous operation and maintenance cycle through the equipment data monitoring component, and stores it in the first storage component; S12. Collect historical environmental data during the operation of the equipment through the environmental data monitoring component and store it in the second storage component.
3. The intelligent power operation and maintenance method for distribution network based on security monitoring as claimed in claim 2, It is characterized in that The method of building an environment change-load neural network model based on the environment change data and load data of the historical operation and maintenance cycle to estimate the load of the next operation and maintenance cycle includes the following specific steps: S31, obtaining the distribution network load data of the historical operation and maintenance cycle and the environmental change data of the historical operation and maintenance cycle, and constructing a convolutional neural network model whose input is the environmental change data of the operation and maintenance cycle and whose output is the distribution network load data of the operation and maintenance cycle; S32, dividing the extracted distribution network load data of the historical operation and maintenance cycle and the environmental change data of the historical operation and maintenance cycle into 70% parameter training sets and 30% parameter test sets; inputting 70% parameter training sets into the convolutional neural network model for training to obtain an initial convolutional neural network model; using 30% parameter test sets to test the initial convolutional neural network model, and outputting the optimal initial convolutional neural network model that meets the judgment accuracy of the distribution network load data of the preset historical operation and maintenance cycle as the convolutional neural network model, wherein the output strategy formula of the specific neurons in the convolutional neural network model is: ,in is the output of n+1 layer s-term neurons, is the connection weight between the nth layer neuron j and the n+1th layer s-term neuron, represents the output of neuron j in layer n, represents the bias of the linear relationship between the nth layer neuron j and the n+1th layer s-term neuron, Represents the Sigmoid activation function; S33. Import the acquired environmental change data for the next operation and maintenance cycle into the convolutional neural network model, and output the predicted load for the next operation and maintenance cycle.
4. The intelligent power operation and maintenance method for distribution network based on security monitoring as claimed in claim 3, It is characterized in that The acquisition of the equipment operation abnormal change data, load data and the estimated load of the next operation and maintenance cycle at the beginning and end of the previous operation and maintenance cycle to estimate the equipment operation abnormal change in the next operation and maintenance cycle includes the following specific steps: S41, obtaining equipment operation abnormal change data and load data at the beginning and end of the previous operation and maintenance cycle and the estimated load of the next operation and maintenance cycle; S42, substituting the acquired equipment operation abnormal change data, load data and estimated load of the next operation and maintenance cycle at the beginning and end of the previous operation and maintenance cycle into the equipment operation abnormal change value calculation formula of the next operation and maintenance cycle to calculate the equipment operation abnormal change value of the next operation and maintenance cycle, wherein the equipment operation abnormal change value calculation formula of the next operation and maintenance cycle is: ,in, is the load of the next operation and maintenance cycle, The load at the beginning and end of the previous operation and maintenance cycle.
5. The intelligent power operation and maintenance method for distribution network based on security monitoring as claimed in claim 4, It is characterized in that The specific steps of performing maintenance assessment and judgment based on the estimated abnormal changes in equipment operation in the next operation and maintenance cycle are as follows: The obtained equipment operation abnormal change value for the next operation and maintenance cycle is compared with the set equipment operation abnormal change threshold. If the obtained equipment operation abnormal change value for the next operation and maintenance cycle is greater than or equal to the set equipment operation abnormal change threshold, a maintenance warning is issued; if the obtained equipment operation abnormal change value for the next operation and maintenance cycle is less than the set equipment operation abnormal change threshold, no maintenance warning is issued.
6. A distribution network intelligent power operation and maintenance system based on security monitoring, which is implemented based on the distribution network intelligent power operation and maintenance method based on security monitoring as claimed in any one of claims 1 to 5, It is characterized in that Specifically include: The data acquisition module is used to set the operation and maintenance cycle and obtain the equipment operation data and environmental data of the equipment during the operation and maintenance period through the data monitoring component; An equipment anomaly assessment module is used to import the acquired equipment operation data at the beginning and end of the operation and maintenance cycle into the constructed equipment anomaly assessment model to perform equipment operation anomaly assessment and obtain equipment operation anomaly changes at the beginning and end of the operation and maintenance cycle; The load estimation module is used to build an environment change-load neural network model based on the environment change data and load data of the historical operation and maintenance cycle to estimate the load of the next operation and maintenance cycle; The next cycle operation prediction module is used to obtain the equipment operation abnormal change data, load data and the estimated load of the next operation and maintenance cycle at the beginning and end of the previous operation and maintenance cycle to predict the equipment operation abnormal change in the next operation and maintenance cycle; The maintenance assessment module is used to make maintenance assessment judgments based on the estimated abnormal changes in equipment operation in the next operation and maintenance cycle; An instruction issuing module is used to issue maintenance instructions according to the maintenance evaluation judgment results; The control module is used to control the operation of the data acquisition module, the equipment abnormality assessment module, the load estimation module, the next cycle operation estimation module, the maintenance assessment module and the instruction issuance module.
7. An electronic device, include: A processor and a memory, wherein the memory stores a computer program that can be called by the processor; It is characterized in that the processor executes the intelligent power operation and maintenance method for distribution network based on security monitoring as described in any one of claims 1 to 5 by calling the computer program stored in the memory.
8. A computer-readable storage medium, It is characterized in that Instructions are stored, and when the instructions are executed on a computer, the computer executes the intelligent power operation and maintenance method for a distribution network based on security monitoring as described in any one of claims 1 to 5.