A method for forecasting and managing oilfield power load based on multi-energy complementarity

Through the multi-energy complementary oil field power load prediction management method, using data preprocessing and integral value calculation, the problem of low prediction accuracy of oil field power load in the existing technology is solved, and the accuracy evaluation and parameter adjustment of the prediction results are achieved. Ensures long-term stability of prediction accuracy.

CN118551188BActive Publication Date: 2024-11-05广州信诚信息科技有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410994345.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-11-05
Estimated Expiration
2044-07-24

AI Technical Summary

Technical Problem

The prior art cannot ensure the accuracy of oil field power load prediction for a long time, resulting in inaccurate prediction results and inability to adjust parameters in a timely manner.

Method used

The performance of the prediction model is monitored and updated or retrained in time to ensure prediction accuracy through data preprocessing, historical data analysis, integral value calculation and parameter adjustment.

Benefits of technology

By calculating the integral value of the expected function and the actual load, the accuracy of the prediction results is evaluated, and the data acquisition period and number of features are adjusted based on the integral value and other indicators, the prediction accuracy is improved and the prediction accuracy and accuracy are ensured for a long time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118551188B_ABST
    Figure CN118551188B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of oilfield power load prediction, and in particular to a method for oilfield power load prediction management based on multi-energy complementarity. It includes: data screening and preprocessing; selecting the optimal prediction model; making predictions, and judging whether the operation of the prediction unit meets the preset standard based on the integral value of the area formed by the prediction function and the actual function within the preset time after the start of the prediction; if it is judged that the preset standard is not met, the reason for not meeting the preset standard is determined according to the integral value; when it is judged that the preset standard is met, the operating parameters are maintained. The beneficial effect of the present invention is that the present invention evaluates the accuracy of the prediction results within the preset time period by calculating the integral of the time load function of the expected function and the actual load within the preset time, so that when it is judged that the operation of the prediction unit does not meet the preset standard, the corresponding operating parameters are adjusted in time to ensure the prediction accuracy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of oilfield power load forecasting, and in particular to an oilfield power load forecasting management method based on multi-energy complementarity. Background Art

[0002] Chinese Patent Publication No.: CN114169631A discloses an oilfield power load management and control system based on data analysis, including: To achieve the above-mentioned purpose, the present invention provides an oilfield power load forecasting and management method based on multi-energy complementarity. The invention comprises: a data acquisition unit, an abnormality identification unit, a repair modeling unit, a data rating unit, an early warning feedback unit and a display terminal; the data acquisition unit is used to collect the grid data information in the oilfield power load in a unit time period and send it to the abnormality identification unit; the abnormality identification unit performs box plot parameter analysis and processing on the received grid data information in the unit time period, and generates a signal with large abnormal data interference, a signal with basically no abnormal data interference and a signal with small abnormal data interference, and sends the signal with large abnormal data interference and the signal with small abnormal data interference to the repair modeling unit; the repair modeling unit is used to receive the signal with large abnormal data interference and the signal with small abnormal data interference; the early warning feedback unit is used to perform early warning feedback analysis and processing on the received more accurate prediction signal, generally accurate prediction signal and fuzzy prediction signal, and generates a high-level prediction signal, a medium-level prediction signal and a low-level prediction signal, and sends it to the display terminal of the oilfield control equipment for analysis. It can be seen from this that the oilfield power load control system based on data analysis has the following problems: it is impossible to verify whether the prediction result is accurate and adjust the corresponding parameters in time, so that after a long time of operation, it is easy to have inaccurate prediction results, so that the prediction accuracy cannot be guaranteed for a long time. Summary of the invention

[0003] To this end, the present invention provides an oilfield power load forecasting management method based on multi-energy complementarity to overcome the problem in the prior art that the forecasting accuracy cannot be guaranteed for a long time.

[0004] To achieve the above objectives, the present invention provides an oilfield power load forecasting and management method based on multi-energy complementarity. It includes:

[0005] Step S1, the preprocessing unit screens all the data measured by the data acquisition unit according to the data keywords preset in the data analysis unit and then preprocesses them;

[0006] Step S2, the data analysis unit controls the prediction unit to perform training according to the preprocessed data to select the optimal prediction model based on the historical data;

[0007] Step S3, the data analysis unit controls the prediction unit to predict future data according to the optimal prediction model, and determines whether the operation of the prediction unit meets the preset standard according to the integral value of the area formed by the prediction function and the actual function within a preset time after the start of prediction;

[0008] Step S4, if the data analysis unit determines that the operation of the prediction unit does not meet the preset standard, the data analysis unit determines the reason why the preset standard is not met according to the integral value;

[0009] Step S5: When the data analysis unit determines that the operation of the prediction unit meets the preset standard, the data analysis unit maintains the operation parameters to predict the future load conditions.

[0010] Furthermore, in the step S3, the data analysis unit determines whether the operation of the prediction unit meets the preset standard according to the integral value of the area formed by the function curve of the actual power load and the function image of the load curve predicted by the prediction unit in the determination time period preset in the data analysis unit;

[0011] If the data analysis unit preliminarily determines that the operation of the prediction unit does not meet the preset standard, the data analysis unit determines the reason why the operation of the prediction unit does not meet the preset standard based on the distribution of the data;

[0012] If the data analysis unit determines that the operation of the prediction unit does not meet the preset standard, the data analysis unit determines the reason why the operation of the prediction unit does not meet the preset standard according to the integral value.

[0013] Furthermore, the integral value is calculated as follows:

[0014] S31, establishing a plane rectangular coordinate system with the ordinate being load and the abscissa being time;

[0015] S32, in a plane rectangular coordinate system, plotting a predicted load function and an actual load function after a preset time period from the time node at which prediction is started;

[0016] S33. The data analysis unit integrates the area formed by the predicted load function and the actual load function within a preset time period to obtain the integral value.

[0017] Furthermore, when the data analysis unit determines that the operation of the prediction unit meets the preset standards, the difference between the first-level preset integral value and the integral value is recorded as the integral difference and a number of adjustment methods for the update period of the model parameters preset in the data analysis unit are set according to the integral difference, and the adjustment range of each adjustment method for the update period is different.

[0018] Furthermore, when the data analysis unit preliminarily determines that the operation of the prediction unit does not meet the preset standard, the data analysis unit sets a time marking point in the time interval formed by the time node of the real-time data to the time node of the earliest data, records the data generated between the marking point and the time node when the real-time data is generated as recent data, records the proportion of recent data in all selected data as the recent proportion, and determines the reason why the operation of the prediction unit does not meet the preset standard based on the recent proportion, including: there is a problem with the prediction function selected by the pre-detection unit, or the data collection cycle of the data collection unit is higher than the preset standard, or the number of data features when screening data in the preprocessing unit is lower than the preset standard.

[0019] Furthermore, when the data analysis unit determines that the reason why the operation of the prediction unit does not meet the preset standard is that the data collection cycle of the data collection unit is higher than the preset standard, the difference between the recent proportion and the first-level preset recent proportion is recorded as a first proportion difference, and a period adjustment method for the data collection cycle of the data collection unit is set according to the first proportion difference, and the adjustment range of each period adjustment method for the data collection cycle of the data collection unit is different.

[0020] Furthermore, when the data analysis unit determines that the reason why the operation of the prediction unit does not meet the preset standard is that the number of data features when the data is screened out in the preprocessing unit is lower than the preset standard, the difference between the recent proportion and the secondary preset recent proportion is recorded as the second proportion difference and a quantity adjustment method for the data features when the data is screened out in the preprocessing unit is set according to the second proportion difference, and the adjustment range of each quantity adjustment method for the number of data features when the data is screened out in the preprocessing unit is different.

[0021] Furthermore, when the data analysis unit determines that the operation of the prediction unit does not meet the preset standard, the difference between the integral value and the secondary preset integral value is recorded as a standard deviation value and the reason why the operation of the prediction unit does not meet the preset standard is determined according to the standard deviation value, including: there is new energy consumption in the oilfield power system, the data analysis unit determines whether the load is a normal load according to the load stability of the system at the oilfield point, there is a fault in the data acquisition unit, and the energy supply at the new energy power supply end of the oilfield power system is unstable, and the data analysis unit adjusts the energy supply ratio of the new energy to the corresponding value according to the standard deviation value.

[0022] Furthermore, when the data analysis unit determines that there is new energy consumption in the oilfield power system, the data analysis unit determines whether the load is normal according to the variance value of the voltage of the oilfield power system in a preset determination time period. If the data analysis unit determines that the load is normal, the prediction model is re-established according to the current parameters.

[0023] If the data analysis unit determines that the load is an abnormal load, an abnormality notification is issued.

[0024] Furthermore, when the data analysis unit determines that the reason why the operation of the prediction unit does not meet the preset standards is that the energy supply of the new energy power supply end of the oilfield power system is unstable, a proportional adjustment method for energy supply for the new energy is set according to the average frequency of the oilfield power system within a preset judgment time period measured by the data acquisition unit, and the adjustment range of the energy supply ratio of each proportional adjustment method is different.

[0025] Compared with the prior art, the beneficial effect of the present invention is that, in practical applications, it is very necessary to establish a monitoring system for a prediction model, which can regularly monitor the prediction performance and error of the model. If it is found that the model performs poorly in certain circumstances, the model is updated or retrained in a timely manner. The present invention calculates the integral of the expected function and the time load function of the actual load within a preset time, thereby evaluating the accuracy of the prediction results within a preset time period, so that when it is determined that the operation of the prediction unit does not meet the preset standards, the corresponding operating parameters are adjusted in a timely manner to ensure the prediction accuracy.

[0026] Furthermore, in practical applications, if you want to evaluate the performance of the currently used prediction model, you usually use methods such as root mean square error (RMSE) and mean absolute percentage error (MAPE) to compare the difference between the prediction results and the actual observed data and calculate the evaluation index to reflect the accuracy and degree of deviation of the prediction model. The present invention calculates the degree of deviation more precisely by calculating the integral value, so that the comparison result is more accurate, thereby further ensuring the prediction accuracy.

[0027] Furthermore, in the actual operation of the prediction model, if the amount of training data is small or the data is not timely, it may cause underfitting or overfitting of the model, thereby affecting the prediction accuracy. In particular, the impact of recent data on the accuracy of the prediction results is particularly prominent. The present invention calculates the proportion of recent data and compares it with the preset standard, thereby quickly making a secondary judgment on whether the operation of the prediction unit meets the preset standard, and thus making corresponding adjustments in time according to the judgment result. The present invention further ensures the prediction accuracy by passing the present invention.

[0028] Furthermore, the accuracy of the prediction results is also affected by whether the currently used feature set fully reflects the characteristics and influencing factors of the power load. By performing feature engineering, adding or deleting some features, the prediction accuracy will also be affected. The present invention adjusts the number of data features to ensure the accuracy of the prediction results, thereby further ensuring the prediction accuracy.

[0029] Furthermore, a good power system should be able to maintain a suitable voltage and frequency range. If the voltage or frequency fluctuates greatly, it indicates that there is an abnormal load. The present invention monitors the frequency to monitor whether there is an abnormal load, and handles the abnormal load in time, thereby further ensuring the prediction accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 This is a flowchart of the steps of the oilfield power load forecasting management method based on multi-energy complementarity according to the present invention;

[0031] Figure 2 It is a determination flow chart of the determination method of the present invention;

[0032] Figure 3 is a flow chart of the steps of the integral value calculation method of the present invention;

[0033] Figure 4 This is a flow chart for determining the adjustment method of the present invention. DETAILED DESCRIPTION

[0034] In order to make the objects and advantages of the present invention more clearly understood, the present invention is further described below in conjunction with embodiments; it should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0035] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.

[0036] It should be noted that, in the description of the present invention, terms such as "up", "down", "left", "right", "inside" and "outside" indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings. This is merely for the convenience of description and does not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present invention.

[0037] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0038] In order to make the objects and advantages of the present invention more clearly understood, the present invention is further described below in conjunction with embodiments; it should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0039] It should be pointed out that the data in this embodiment are obtained by comprehensive analysis and evaluation of the historical detection data and the corresponding historical detection results of the year before this detection by the method described in the present invention. Before this detection, the system described in the present invention comprehensively determines the values ​​of the various preset parameter standards for this detection based on the various operating data of the oilfield power system detected in the previous year and the integral value calculated by integrating the allowable error in the present invention within the judgment time period. It can be understood by those skilled in the art that the determination method of the system described in the present invention for a single parameter mentioned above can be to select the value with the highest proportion as the preset standard parameter according to the data distribution, use weighted summation to use the obtained value as the preset standard parameter, substitute each historical data into a specific formula and use the value obtained by the formula as the preset standard parameter or other selection methods, as long as the system described in the present invention can clearly define different specific situations in the single judgment process through the obtained values.

[0040] See also Figure 1 As shown, it is a flowchart of the steps of the oil field power load forecasting management method based on multi-energy complementarity according to the present invention, including:

[0041] Step S1, the preprocessing unit screens all the data measured by the data acquisition unit according to the data keywords preset in the data analysis unit and then preprocesses them;

[0042] Step S2, the data analysis unit controls the prediction unit to perform training according to the preprocessed data to select the optimal prediction model based on the historical data;

[0043] Step S3, the data analysis unit controls the prediction unit to predict future data according to the optimal prediction model, and determines whether the operation of the prediction unit meets the preset standard according to the integral value of the area formed by the prediction function and the actual function within a preset time after the start of prediction;

[0044] Step S4, if the data analysis unit determines that the operation of the prediction unit does not meet the preset standard, the data analysis unit determines the reason why the preset standard is not met according to the integral value;

[0045] Step S5: When the data analysis unit determines that the operation of the prediction unit meets the preset standard, the data analysis unit maintains the operation parameters to predict the future load conditions.

[0046] See also Figure 2As shown, it is a determination flow chart of the determination method of the present invention. In the step S3, the data analysis unit determines whether the operation of the prediction unit meets the preset standard according to the integral value of the area formed by the function curve of the actual power load and the function image of the load curve predicted by the prediction unit within the determination time period (the value in the embodiment of the present invention is: 3h), and determines according to the integral value.

[0047] The first determination method is that the data analysis unit determines that the operation of the prediction unit meets the preset standard; the first determination method satisfies that the integral value is less than the first-level preset integral value preset in the data analysis unit; the first-level preset integral value in the embodiment of the present invention is set to 1500;

[0048] The second determination method is that the data analysis unit preliminarily determines that the operation of the prediction unit does not meet the preset standard, and the data analysis unit determines the reason why the operation of the prediction unit does not meet the preset standard according to the distribution of the data; the second determination method satisfies that the integral value is greater than or equal to the first-level preset integral value and less than or equal to the second-level preset integral value preset in the data analysis unit; the second-level preset integral value in the embodiment of the present invention is set to 3000;

[0049] The third judgment method is that the data analysis unit determines that the operation of the prediction unit does not meet the preset standard, and the data analysis unit determines the reason why the operation of the prediction unit does not meet the preset standard based on the integral value; the third judgment method satisfies that the integral value is greater than the secondary preset integral value.

[0050] See also Figure 3 As shown, it is a flow chart of the steps of the integral value calculation method of the present invention, and the integral value calculation method is:

[0051] S31, establishing a plane rectangular coordinate system with the ordinate being load (in kW) and the abscissa being time (in min);

[0052] S32, in the coordinate system between the planes, plotting the predicted load function and the actual load function after the time node at which prediction is started;

[0053] S33. The data analysis unit integrates the area formed by the predicted load function and the actual load function within a preset determination time after the time node at which prediction starts, thereby obtaining the integral value.

[0054] See also Figure 4As shown, it is a determination flow chart of the adjustment method of the present invention. Under the first determination method, the data analysis unit records the difference between the first-level preset integral value and the integral value as the integral difference and determines the adjustment method for the update period of the model parameter preset in the data analysis unit according to the integral difference, wherein:

[0055] The first adjustment method is that the data analysis unit uses the first adjustment coefficient α1 to adjust the update period to a corresponding value; the first adjustment coefficient α1 in the embodiment of the present invention is set to 1.40;

[0056] The second adjustment method is that the data analysis unit uses the second adjustment coefficient α2 to adjust the update period to a corresponding value; the second adjustment coefficient α2 in the embodiment of the present invention is set to 1.75;

[0057] The third adjustment method is that the data analysis unit uses the third adjustment coefficient α3 to adjust the update period to a corresponding value; the third adjustment coefficient α3 in the embodiment of the present invention is set to 2.0.

[0058] Specifically, under the second determination mode, the data analysis unit sets a time mark point in the time interval formed by the time node of the real-time data to the time node of the earliest data. The time mark point in the present invention is comprehensively determined based on the actual data generation situation of each oil field and other conditions. The data generated between the mark point and the time node of the real-time data generation is recorded as recent data, and the proportion of recent data in all selected data is recorded as the recent proportion. The reason for the operation of the prediction unit not meeting the preset standard is determined according to the recent proportion, wherein:

[0059] The first reason judgment method is that the reason why the operation of the prediction unit does not meet the preset standard is that there is a problem with the prediction function selected by the prediction unit; the first reason judgment method satisfies that the recent proportion is less than the first-level preset recent proportion preset in the data analysis unit; the first-level preset recent proportion in the embodiment of the present invention is set to 30%;

[0060] The second reason judgment method is that the reason why the operation of the prediction unit does not meet the preset standard is that the data collection cycle of the data collection unit is higher than the preset standard; the second reason judgment method satisfies that the recent data proportion is greater than or equal to the first-level preset recent proportion and is less than or equal to the second-level preset recent proportion preset in the data analysis unit; the second-level preset recent proportion in the embodiment of the present invention is set to 45%;

[0061] The third reason judgment method is that the data analysis unit determines that the reason why the operation of the prediction unit meets the preset standard is that the number of data features when the data is screened in the preprocessing unit is lower than the preset standard; the third reason judgment method satisfies that the recent proportion is greater than the secondary preset recent proportion.

[0062] Specifically, under the second cause determination method, the data analysis unit records the difference between the recent proportion and the first-level preset recent proportion as the first proportion difference and determines the period adjustment method for the data collection period of the data collection unit according to the first proportion difference, wherein:

[0063] The first cycle adjustment method is that the data analysis unit selects the first cycle adjustment coefficient z1 to adjust the data collection cycle of the data collection unit to a corresponding value; the first cycle adjustment coefficient z1 in the embodiment of the present invention is set to 0.85;

[0064] The second cycle adjustment method is that the data analysis unit selects the second cycle adjustment coefficient z2 to adjust the data collection cycle of the data collection unit to a corresponding value; the first cycle adjustment coefficient z1 in the embodiment of the present invention is set to 0.80;

[0065] The third period adjustment method is that the data analysis unit selects the third period adjustment coefficient z3 to adjust the data collection period of the data collection unit to a corresponding value; the third period adjustment coefficient z3 in the embodiment of the present invention is set to 0.75.

[0066] Specifically, under the third cause determination method, the data analysis unit records the difference between the recent proportion and the secondary preset recent proportion as a second proportion difference and determines the quantity adjustment method for the data features when screening the data in the preprocessing unit according to the second proportion difference, wherein:

[0067] The first quantity adjustment method is that the data analysis unit selects the first quantity adjustment coefficient s1 to adjust the number of data features when the data is screened in the preprocessing unit to a corresponding value; the first quantity adjustment method satisfies that the second proportion difference is greater than the first-level preset second proportion difference preset in the data analysis unit; the first period adjustment coefficient s1 in the embodiment of the present invention is set to 3.0, and the first-level preset second proportion difference is 20%;

[0068] The second quantity adjustment method is that the data analysis unit selects the second quantity adjustment coefficient s2 to adjust the number of data features when the data is screened in the preprocessing unit to a corresponding value; the second quantity adjustment method satisfies that the second proportion difference is less than or equal to the first-level preset second proportion difference and is greater than or equal to the second-level preset second proportion difference preset in the data analysis unit; the second period adjustment coefficient z1 in the embodiment of the present invention is set to 2.0, and the second-level preset second proportion difference is 10%;

[0069] The third quantity adjustment method is that the data analysis unit selects the third quantity adjustment coefficient s3 to adjust the number of data features when the data is screened in the preprocessing unit to a corresponding value; the third quantity adjustment method satisfies that the second proportion difference is less than the secondary preset second proportion difference; the second period adjustment coefficient z3 in the embodiment of the present invention is set to 1.5.

[0070] If decimals appear during the adjustment process, the number of adjusted data features will be rounded up.

[0071] Specifically, the data analysis unit records the difference between the integral value and the secondary preset integral value as a standard deviation value under the third determination mode and determines the reason determination mode for the operation of the prediction unit not meeting the preset standard according to the standard deviation value, including:

[0072] The first reason determination method is that the data analysis unit determines that the reason why the operation of the prediction unit does not meet the preset standard is that there is new energy consumption in the oilfield power system, and the data analysis unit determines whether the load is a normal load according to the load stability of the oilfield power system;

[0073] The second cause determination method is that the data analysis unit determines that the reason why the operation of the prediction unit does not meet the preset standard is that the data acquisition unit has a fault;

[0074] The third cause determination method is that the data analysis unit determines that the reason why the operation of the prediction unit does not meet the preset standard is that the energy supply of the new energy power supply end of the oilfield power system is unstable, and the data analysis unit adjusts the energy supply ratio of the new energy to the corresponding value according to the standard deviation value.

[0075] Specifically, the data analysis unit determines a load determination method for determining whether the load is normal according to a voltage variance value of the oilfield power system in a preset detection time period under the first cause determination method, wherein:

[0076] The first load determination method is that the data analysis unit determines that the load is a normal load, and re-establishes the prediction model according to the current parameters; the first load determination method satisfies that the variance value is greater than the preset variance value preset in the data analysis unit; the preset variance value in the embodiment of the present invention is set to 1500;

[0077] The second load determination method is that the data analysis unit determines that the load is an abnormal load and issues an abnormal notification; the second load determination method satisfies that the variance value is less than or equal to the preset variance value.

[0078] Specifically, the data analysis unit determines the proportional adjustment mode for energy supply for the new energy according to the average frequency of the oilfield power system measured by the data acquisition unit within the determination time period under the third cause determination mode, wherein:

[0079] The first proportional adjustment mode is that the data analysis unit uses the first proportional adjustment coefficient b1 to adjust the proportion of energy supply of the new energy to a corresponding value; the first proportional adjustment mode satisfies that the average frequency is greater than the first-level preset average frequency preset in the data analysis unit; the first proportional adjustment coefficient b1 in the embodiment of the present invention is set to 0.75, and the first-level preset average frequency is 60Hz;

[0080] The second proportional adjustment mode is that the data analysis unit uses the second proportional adjustment coefficient b2 to adjust the proportion of energy supply of the new energy to the corresponding value; the second proportional adjustment mode satisfies that the average frequency is less than or equal to the first-level preset average frequency and is greater than or equal to the second-level preset average frequency preset in the data analysis unit; the second proportional adjustment coefficient b2 in the embodiment of the present invention is set to 0.85, and the second-level preset average frequency is 50Hz;

[0081] The third proportional adjustment method is that the data analysis unit uses the third proportional adjustment coefficient b3 to adjust the proportion of energy supply by the new energy to a corresponding value; the third proportional adjustment method satisfies that the average frequency is less than the secondary preset average frequency; the third proportional adjustment coefficient b3 in the embodiment of the present invention is set to 0.95.

[0082] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.

[0083] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for predicting and managing oilfield power load based on multi-energy complementarity, characterized in that: include: Step S1, the preprocessing unit screens all the data measured by the data acquisition unit according to the data keywords preset in the data analysis unit and then preprocesses them; Step S2, the data analysis unit controls the prediction unit to perform training according to the preprocessed data to select the optimal prediction model based on the historical data; Step S3, the data analysis unit controls the prediction unit to predict future data according to the optimal prediction model, and determines whether the operation of the prediction unit meets the preset standard according to the integral value of the area formed by the prediction function and the actual function within a preset time after the start of prediction; Step S4, if the data analysis unit determines that the operation of the prediction unit does not meet the preset standard, the data analysis unit determines the reason why the preset standard is not met according to the integral value; Step S5, when the data analysis unit determines that the operation of the prediction unit meets the preset standard, the data analysis unit maintains the operation parameters to predict the future load conditions; In step S3, the data analysis unit determines whether the operation of the prediction unit meets the preset standard according to the integral value of the area formed by the function curve of the actual power load and the function image of the load curve predicted by the prediction unit in the determination time period preset in the data analysis unit; If the data analysis unit preliminarily determines that the operation of the prediction unit does not meet the preset standard, the data analysis unit determines the reason why the operation of the prediction unit does not meet the preset standard based on the distribution of the data; If the data analysis unit determines that the operation of the prediction unit does not meet the preset standard, the data analysis unit determines the reason why the operation of the prediction unit does not meet the preset standard based on the integral value; When the data analysis unit preliminarily determines that the operation of the prediction unit does not meet the preset standard, the data analysis unit sets a time mark point in the time interval formed by the time node of the real-time data to the time node of the earliest data, records the data generated between the mark point and the time node of the real-time data as recent data, records the proportion of recent data in all selected data as recent proportion, and determines the reason why the operation of the prediction unit does not meet the preset standard according to the recent proportion, including: there is a problem with the prediction function selected by the pre-detection unit, or the data collection cycle of the data collection unit is higher than the preset standard, or the number of data features when the data is screened in the pre-processing unit is lower than the preset standard; When the data analysis unit determines that the reason why the operation of the prediction unit does not meet the preset standard is that the data collection period of the data collection unit is higher than the preset standard, the difference between the recent proportion and the first-level preset recent proportion is recorded as a first proportion difference, and a period adjustment method for the data collection period of the data collection unit is set according to the first proportion difference, and the adjustment range of each period adjustment method for the data collection period of the data collection unit is different; When the data analysis unit determines that the reason why the operation of the prediction unit does not meet the preset standard is that the number of data features when the data is screened out in the preprocessing unit is lower than the preset standard, the difference between the recent proportion and the secondary preset recent proportion is recorded as the second proportion difference, and a quantity adjustment method for the data features when the data is screened out in the preprocessing unit is set according to the second proportion difference, and the adjustment range of each quantity adjustment method for the number of data features when the data is screened out in the preprocessing unit is different.

2. The oilfield power load forecasting management method based on multi-energy complementarity according to claim 1 is characterized in that: The integral value is calculated as follows: S31, establishing a plane rectangular coordinate system with the ordinate being load and the abscissa being time; S32, in a plane rectangular coordinate system, plotting a predicted load function and an actual load function after a preset time period from the time node at which prediction is started; S33. The data analysis unit integrates the area formed by the predicted load function and the actual load function within a preset time period to obtain the integral value.

3. The oilfield power load forecasting management method based on multi-energy complementarity according to claim 1 is characterized in that: When the data analysis unit determines that the operation of the prediction unit meets the preset standard, the difference between the first-level preset integral value and the integral value is recorded as the integral difference, and a number of adjustment methods for the update period of the model parameters preset in the data analysis unit are set according to the integral difference, and the adjustment range of each adjustment method for the update period is different.

4. The oilfield power load forecasting management method based on multi-energy complementarity according to claim 1 is characterized in that: When the data analysis unit determines that the operation of the prediction unit does not meet the preset standard, the difference between the integral value and the secondary preset integral value is recorded as the standard deviation value and the reason why the operation of the prediction unit does not meet the preset standard is determined according to the standard deviation value, including: there is new energy consumption in the oilfield power system, the data analysis unit determines whether the load is a normal load according to the load stability of the oilfield power system, there is a fault in the data acquisition unit, and the energy supply of the new energy power supply end of the oilfield power system is unstable, and the data analysis unit adjusts the energy supply ratio of the new energy to the corresponding value according to the standard deviation value.

5. The oilfield power load forecasting management method based on multi-energy complementarity according to claim 4 is characterized in that: When the data analysis unit determines that there is new energy consumption in the oilfield power system, the data analysis unit determines whether the load is normal according to the variance value of the voltage of the oilfield power system in a preset determination time period. If the data analysis unit determines that the load is normal, the prediction model is re-established according to the current parameters. If the data analysis unit determines that the load is an abnormal load, an abnormality notification is issued.

6. The oilfield power load forecasting management method based on multi-energy complementarity according to claim 4 is characterized in that: When the data analysis unit determines that the reason why the operation of the prediction unit does not meet the preset standards is that the energy supply of the new energy power supply end of the oilfield power system is unstable, a proportional adjustment method for energy supply for the new energy is set according to the average frequency of the oilfield power system within a preset determination time period measured by the data acquisition unit, and the adjustment range of the energy supply ratio of each proportional adjustment method is different.