Adaptive optimization method and system for transmission curve of wind-solar-storage integrated base

By generating an adaptive power transmission curve based on wind and light power generation predicted power, energy storage power and power waste power, the power transmission instability problem caused by a single multi-stage power transmission curve is solved, and more stable power supply and lower power waste are achieved. Electricity rate.

CN118554530BActive Publication Date: 2024-11-26POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411027920.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-26
Estimated Expiration
2044-07-30

AI Technical Summary

Technical Problem

The existing single multi-stage power transmission curve is difficult to adapt to the random power generation characteristics of wind, light and storage integrated bases, resulting in unstable power transmission and prone to insufficient power supply or excessive power abandonment rate.

Method used

By obtaining the predicted power of the wind and light power generation of the wind and light storage integrated base in the future target period, determining the energy storage power and power waste power, and generating an adaptive power transmission curve based on these parameters, limiting the maximum number of power changes and minimum duration to optimize Power supply curve.

Benefits of technology

It improves the stability of power transmission, avoids the problem of insufficient power supply or excessive power waste rate, and reduces the frequent power switching of the power transmission curve in a short time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118554530B_ABST
    Figure CN118554530B_ABST
Patent Text Reader

Abstract

The present disclosure relates to the technical field of planning, design and operation and scheduling of new energy bases, and discloses a method and system for adaptively optimizing the transmission curve of a wind, solar and storage integrated base. The method includes obtaining the predicted wind and solar power generation power of the wind, solar and storage integrated base in each sub-period in the future target period, the maximum number of power changes allowed when the wind, solar and storage integrated base transmits power to the power grid in the target period, and the minimum power duration for the transmission power to remain unchanged; taking the maximum number of power changes and the minimum power duration as the first constraint conditions, taking the maximum amount of electricity transmitted to the power grid as the target, and determining the energy storage power and abandoned power of the wind, solar and storage integrated base in each sub-period according to the predicted wind and solar power generation power; generating the transmission curve of the wind, solar and storage integrated base in the target period based on the predicted wind and solar power generation power, energy storage power and abandoned power in each sub-period. The stability of power transmission can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the technical field of planning, design and operation scheduling of new energy bases, and in particular to a method and system for adaptively optimizing a power transmission curve of a wind, solar and storage integrated base. Background Art

[0002] The construction of large-scale wind, solar and storage integrated bases has become an important development direction for promoting the green and low-carbon transformation of energy. At present, when wind, solar and storage integrated bases transmit electricity to the power grid, they usually transmit electricity according to a single multi-stage transmission curve formulated monthly. This single multi-stage transmission curve is difficult to adapt to the random characteristics of power generation in wind, solar and storage integrated bases, which will cause unstable power transmission. Summary of the invention

[0003] In view of this, the embodiments of the present disclosure provide a method for adaptively optimizing a power transmission curve of a wind, solar and storage integrated base, a system for adaptively optimizing a power transmission curve, an electronic device and a computer-readable storage medium, which can improve the stability of power transmission.

[0004] On one hand, the present disclosure provides a method for adaptively optimizing a power transmission curve of a wind-solar-storage integrated base, the method comprising:

[0005] Obtain the predicted wind and solar power generation power of the wind, solar and storage integrated base in each sub-period in the future target period, as well as the maximum power change allowed when transmitting power to the power grid in the target period and the minimum power duration for which the transmission power remains unchanged;

[0006] Taking the maximum number of power changes and the minimum power duration as the first constraint condition, taking the maximum amount of power delivered to the power grid as the goal, and determining the energy storage power and power abandonment power of the wind-solar-storage integrated base in each of the sub-periods according to the predicted wind-solar power generation power;

[0007] Based on the predicted wind and solar power generation power, energy storage power and abandoned power in each of the sub-periods, a power transmission curve of the wind, solar and energy storage integrated base in the target period is generated.

[0008] Another aspect of the present disclosure provides a transmission curve adaptive optimization system for a wind-solar-storage integrated base, the system comprising:

[0009] A data acquisition module is used to obtain the predicted wind and solar power generation power of the wind, solar and storage integrated base in each sub-period within the future target period, as well as the maximum power change allowed when transmitting power to the power grid within the target period and the minimum power duration for which the transmission power remains unchanged;

[0010] A power calculation module is used to take the maximum number of power changes and the minimum power duration as the first constraint condition, take the maximum amount of electricity delivered to the power grid as the goal, and determine the energy storage power and abandoned power of the wind-solar-storage integrated base in each of the sub-periods according to the predicted wind-solar power generation power;

[0011] The curve generation module is used to generate the power transmission curve of the wind-solar-storage integrated base in the target period based on the predicted wind-solar power generation power, energy storage power and abandoned power in each of the sub-periods.

[0012] Another aspect of the present disclosure further provides a computer-readable storage medium, wherein the computer-readable storage medium is used to store a computer program, and when the computer program is executed by a processor, the method described above is implemented.

[0013] Another aspect of the present disclosure provides an electronic device, which includes a processor and a memory, wherein the memory is used to store a computer program, and when the computer program is executed by the processor, the method described above is implemented.

[0014] In the technical solutions of some embodiments of the present application, on the one hand, based on the predicted wind and solar power generation power of the wind, solar and storage integrated base in each sub-period in the future target period, the energy storage power and abandoned power of the wind, solar and storage integrated base in each sub-period are obtained, and then based on the predicted wind and solar power generation power, energy storage power and abandoned power in each sub-period, the power transmission curve of the wind, solar and storage integrated base in the target period is generated. In this way, the power transmission curve can be adaptively adjusted according to the predicted wind and solar power generation power to prevent problems such as insufficient power supply or excessive abandonment rate, thereby improving the stability of power transmission. On the other hand, in the process of determining the energy storage power and the abandoned power, the maximum number of power changes and the minimum power duration are used as the first constraint conditions, and the number of power changes and the duration of the unchanged transmission power of the power transmission curve can be constrained. In this way, when the wind, solar and storage integrated base transmits electric energy to the power grid, it can avoid frequent power switching in a short period of time, thereby improving the stability of power transmission. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The features and advantages of the present disclosure will be more clearly understood by referring to the accompanying drawings, which are schematic and should not be construed as limiting the present disclosure in any way. In the accompanying drawings:

[0016] Figure 1 A schematic diagram showing a single multi-segment power transmission curve in some technologies;

[0017] Figure 2 It shows the energy distribution diagram of wind, solar and storage integrated bases in some technologies on a day with low energy generation;

[0018] Figure 3It shows the energy distribution diagram of wind, solar and storage integrated base in some technologies;

[0019] Figure 4 It shows the energy distribution diagram of wind, solar and storage integrated bases in some technologies on the energy-intensive day;

[0020] Figure 5 A schematic diagram of a flow chart of a method for adaptively optimizing a power transmission curve provided by an embodiment of the present application is shown;

[0021] Figure 6 A schematic diagram of energy distribution of a wind-solar-storage integrated base on a day with low energy generation is shown in one embodiment of the present application;

[0022] Figure 7 A schematic diagram of a power transmission curve of a wind-solar-storage integrated base on a day with low energy generation is shown in one embodiment of the present application;

[0023] Figure 8 A schematic diagram of energy distribution of a wind-solar-storage integrated base provided by an embodiment of the present application is shown;

[0024] Fig. 9 A schematic diagram of a power transmission curve of a wind-solar-storage integrated base provided by an embodiment of the present application during energy generation is shown;

[0025] Fig.10 A schematic diagram of energy distribution of a wind-solar-storage integrated base on a high energy production day provided by an embodiment of the present application is shown;

[0026] Fig.11 A schematic diagram of a power transmission curve of a wind-solar-storage integrated base on a high-energy production day provided by an embodiment of the present application is shown;

[0027] Fig.12 A schematic diagram of modules of a power transmission curve adaptive optimization system provided by an embodiment of the present application is shown;

[0028] Fig.13 A schematic diagram of an electronic device provided by an embodiment of the present application is shown. DETAILED DESCRIPTION

[0029] In order to make the purpose, technical solutions and advantages of the embodiments of the present disclosure clearer, the technical solutions in the embodiments of the present disclosure will be clearly and completely described below in conjunction with the drawings in the embodiments of the present disclosure. Obviously, the described embodiments are part of the embodiments of the present disclosure, not all of the embodiments. Based on the embodiments of the present disclosure, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present disclosure.

[0030] In the wind, solar and energy storage integrated base, wind power generation equipment, photovoltaic power generation equipment and energy storage equipment may be included. Among them, when the wind power generation equipment is working, wind energy can be converted into electrical energy, and this process is called wind power generation; when the photovoltaic power generation equipment is working, solar energy can be converted into electrical energy, and this process is called photovoltaic power generation. In this application, wind power generation and photovoltaic power generation are collectively referred to as wind and solar power generation.

[0031] The electricity generated by wind and solar power generation can be transmitted to the power grid to supply electricity to each user in the power grid. Generally speaking, if the electricity generated by wind and solar power generation is still surplus after meeting the electricity demand of the power grid users, the surplus electricity can be stored in the energy storage device; if the electricity generated by wind and solar power generation cannot meet the electricity demand of the power grid users, the electricity stored in the energy storage device can be transmitted to the power grid to supplement the shortage of wind power generation and photovoltaic power generation.

[0032] In order to make efficient use of electric energy and ensure the safe and stable operation of the power grid, the power consumption of power grid users and the performance of the power grid's transmission channels can be analyzed to formulate a power transmission curve. The power transmission curve refers to the curve of the power transmitted from the wind, solar and storage integrated base to the power grid over time. The wind, solar and storage integrated base can transmit electric energy to the power grid according to the power transmission curve.

[0033] In some current technologies, the power transmission curve for the wind, solar and storage integrated base is a single multi-stage power transmission curve drawn up on a monthly basis. The so-called single multi-stage power transmission curve means that the power transmission curve is the same every day in a month, and the power transmission curve of a day can be divided into multiple sections according to the power consumption pattern. For example, during the peak power consumption periods from 11:00 to 14:00 and 19:00 to 21:00, power is transmitted to the power grid at a power of 50 kilowatts; during the low power consumption periods from 0:00 to 11:00, 14:00 to 19:00 and 21:00 to 24:00, power is transmitted to the power grid at a power of 30 kilowatts. However, since the wind, solar and storage integrated base mainly relies on wind and solar energy for power generation, and wind and solar energy have random characteristics, the power generated by the wind, solar and storage integrated base every day is not fixed. If power is transmitted to the power grid according to this single multi-stage power transmission curve, it is easy to cause problems such as insufficient power supply or excessive power abandonment rate, affecting the stability of power transmission.

[0034] For easier understanding, please refer to Figures 1 to 4 . Figure 1 Schematic diagram of a single multi-segment power transmission curve in some technologies. Figure 2 Schematic diagram of energy distribution of wind, solar and storage integrated bases in some technologies on a day with low energy production. Figure 3 Schematic diagram of energy distribution of wind, solar and storage integrated bases in energy development using some technologies. Figure 4 The following is a schematic diagram of the energy distribution of some wind, solar and storage integrated bases in the energy boom day. Figure 2It can be seen that on days with low energy production, due to the low wind and solar energy, the wind, solar and storage integrated base generates relatively little electricity. Figure 1 The transmission curve shown in the figure will transmit electricity to the grid, and there will be a large power gap. In this case, it is easy to cause the problem of insufficient power supply. Figure 4 It can be seen that on energy boom days, due to the abundance of wind and solar energy, the wind, solar and storage integrated bases generate more electricity. Figure 1 The transmission curve shown in the figure delivers power to the grid and discards excess power. Figure 3 It can be seen that in the energy development day, due to the moderate wind and solar energy, the electricity generated by the wind, solar and storage integrated base is also moderate. Figure 1 The transmission curve shown in the figure transmits electric energy to the grid without causing a large power gap and without discarding excessive electric energy.

[0035] It can be seen that this single multi-stage power transmission curve is not suitable for wind, solar and storage integrated bases. In addition, this single multi-stage power transmission curve does not limit the duration between two power changes, so that the power transmission curve will change continuously. If the wind, solar and storage integrated base transmits electricity to the grid according to this power transmission curve, multiple power switches may be performed in a short period of time. For example, between 9:10 and 9:15, electricity is transmitted to the grid at a power of 50 kilowatts, between 9:15 and 9:20, electricity is transmitted to the grid at a power of 45 kilowatts, and between 9:20 and 9:30, electricity is transmitted to the grid at a power of 30 kilowatts. This frequent power switching also affects the stability of power transmission.

[0036] In view of this, the present application provides a method for adaptively optimizing the transmission curve of a wind, solar and storage integrated base, which can solve the above problems. The method for adaptively optimizing the transmission curve can be applied to a curve generation model, or to an electronic device that runs the curve generation model. Electronic devices include but are not limited to tablet computers, laptop computers, desktop computers, servers, etc. In conjunction with reference 5, a flow chart of a method for adaptively optimizing the transmission curve is provided for an embodiment of the present application. Figure 5 In the present invention, the adaptive optimization method of power transmission curve includes the following steps:

[0037] Step S51, obtaining the predicted wind and solar power generation power of the wind, solar and storage integrated base in each sub-period within the future target period, as well as the maximum power change allowed when transmitting power to the power grid within the target period and the minimum power duration for the transmission power to remain unchanged.

[0038] The target period refers to the period spanned by a complete power transmission curve.

[0039] In this embodiment, the target time period is divided into days. The future target time period can be a certain day in the future, such as the first day in the future, the second day in the future, or the third day in the future. In short, the method of the present application is used to formulate a power transmission curve for a certain day in the future.

[0040] The target period can be divided into a plurality of sub-periods. In this embodiment, the sub-periods are divided in units of hours. Since a day includes 24 hours, a target period can be divided into 24 sub-periods.

[0041] It should be noted that, during the implementation of the specific plan, the target period and sub-periods can be divided according to actual needs, and this application does not limit this. For example, if the target period is divided into weeks and the sub-periods are divided into days, then the target period can be a certain week in the future, and one target period can be divided into 7 sub-periods.

[0042] The wind-solar power forecast can be a general term for the wind power forecast and photovoltaic power forecast of the wind-solar-storage integrated base. Based on time series prediction and other methods, the wind-solar power forecast of the wind-solar-storage integrated base in each sub-period in the future target period can be predicted. The wind-solar power forecast can be manually input into the curve generation model.

[0043] The maximum number of power changes and the minimum power duration can be determined according to actual needs and manually input into the curve generation model. The maximum number of power changes is used to limit the number of power transmission curve segments within the target period. For example, when the maximum number of power changes is 2, it means that the power transmission curve within the target period is a three-segment power transmission curve. The minimum power duration is used to limit the duration of a single-segment curve, that is, the duration for which the transmission power remains unchanged.

[0044] Step S52, taking the maximum number of power changes and the minimum power duration as the first constraint conditions, taking the maximum amount of electricity delivered to the power grid as the goal, and determining the storage power and abandoned power of the wind, solar and storage integrated base in each sub-period based on the predicted power of wind and solar power generation.

[0045] Specifically, in the curve generation model, the objective function shown in expression (1) can be pre-set:

[0046] (1)

[0047] In expression (1), T represents the number of sub-periods within the target period (e.g., 24); F represents the amount of electricity transmitted to the grid by the wind-solar-storage integrated base within the target period; It represents the power that the wind-solar-storage integrated base can transmit to the grid in the mth sub-period; Indicates the duration of a single sub-period.

[0048] Furthermore, , represents the wind power generation of the wind-solar-storage integrated base in the mth sub-period, represents the photovoltaic power generation of the wind-solar-storage integrated base in the mth sub-period, represents the charging and discharging power of the energy storage equipment in the wind-solar-storage integrated base in the mth sub-period, It represents the abandoned power of the wind-solar-storage integrated base in the mth sub-period.

[0049] Since the predicted wind and solar power generation power of the wind, solar and storage integrated base in each sub-period has been obtained in step S51, the predicted wind and solar power generation power obtained in step S51 can be substituted into expression (1), and then the maximum number of power changes and the minimum power duration are used as the first constraint conditions, and the maximum value of F is used as the goal. The objective function is solved to determine the energy storage power and abandoned power of the wind, solar and storage integrated base in each sub-period. Among them, the value of the energy storage power obtained by the solution can be positive or negative. When the value of the energy storage power is negative, it means that the energy storage device stores electrical energy; when the value of the energy storage power is positive, it means that the energy storage device discharges.

[0050] Furthermore, in the process of solving the objective function, combined with the actual conditions of the transmission channel and the energy storage device, one or more of the following conditions can be used as the second constraint condition to ensure the accuracy and rationality of the solution result:

[0051] 1) ,in, represents the minimum transmission capacity of the transmission channel, Indicates the maximum transmission capacity of the transmission channel;

[0052] 2) ,in, Indicates the maximum charging power supported by the energy storage device. Indicates the maximum discharge power supported by the energy storage device, and, is a negative value, is a positive value;

[0053] 3) and , represents the energy storage capacity of the energy storage device in the mth sub-period, Indicates the rated energy storage capacity of the energy storage device. represents the full power of the energy storage device, and h represents the full utilization hours of the energy storage device;

[0054] 4) , where η represents the energy storage efficiency coefficient of the energy storage device, Represents the energy storage capacity of the energy storage device in the m-1th sub-period.

[0055] Step S53, based on the predicted wind and solar power generation power, energy storage power and power abandonment power in each sub-period, generate a power transmission curve for the wind, solar and energy storage integrated base in the target period.

[0056] Specifically, the predicted wind and solar power generation power, energy storage power, and abandoned power in the kth sub-period can be added together, and the result of the addition is the power that the wind, solar, and storage integrated base can transmit to the power grid in the kth sub-period. Based on the power that the wind, solar, and storage integrated base can transmit to the power grid in each sub-period, the power that can be transmitted to the power grid in each sub-period can be marked in a coordinate system with time as the X-axis and power as the Y-axis. Connect the marked powers, and the resulting curve edge is the power transmission curve of the wind, solar, and storage integrated base in the target period.

[0057] In summary, in the technical solutions of some embodiments of the present application, on the one hand, based on the predicted wind and solar power generation power of the wind, solar and storage integrated base in each sub-period in the future target period, the energy storage power and abandoned power of the wind, solar and storage integrated base in each sub-period are obtained, and then based on the predicted wind and solar power generation power, energy storage power and abandoned power in each sub-period, the power transmission curve of the wind, solar and storage integrated base in the target period is generated. In this way, the power transmission curve can be adaptively adjusted according to the predicted wind and solar power generation power to prevent problems such as insufficient power supply or excessive abandonment rate, thereby improving the stability of power transmission. On the other hand, in the process of determining the energy storage power and the abandoned power, the maximum number of power changes and the minimum power duration are used as the first constraint conditions, and the number of power changes and the duration between two power changes of the power transmission curve can be constrained. In this way, when the wind, solar and storage integrated base transmits electric energy to the power grid, it can avoid frequent power switching in a short period of time, thereby improving the stability of power transmission.

[0058] The scheme of the present application is further described below.

[0059] In some embodiments, taking the maximum number of power changes and the minimum power duration as the first constraint condition may include:

[0060] According to the preset constraint matrix, the number of changes in the power transmission of the wind, solar and storage integrated base within the target period is less than or equal to the maximum number of power changes, and the duration for which the transmission power remains unchanged is greater than or equal to the minimum power duration. The constraint matrix is ​​set based on the change in the power transmission of the wind, solar and storage integrated base in two adjacent sub-periods.

[0061] Specifically, the constraint matrix can be pre-set in the curve generation model. When determining the energy storage power and abandoned power of the wind-solar-storage integrated base in each sub-period, the curve generation model can make the number of power changes of the wind-solar-storage integrated base in the target period less than or equal to the maximum number of power changes, and make the duration of the transmission power remain unchanged greater than or equal to the minimum power duration, based on the constraint matrix.

[0062] Specifically, in some embodiments, a first array may be defined as ,in, It represents the change in the power transmission of the wind-solar-storage integrated base in the t-th sub-period and the t-1-th sub-period, and t is 2, 3, ..., T. T represents the number of sub-periods in the target period.

[0063] Based on the first array, the second array can be defined ,in, Indicates the total number of changes in the power transmission of the wind-solar-storage integrated base within the target period at the t-th sub-period. If the power transmission of the t-th sub-period is different from that of the t-1-th sub-period, The value is equal to The value of is added by 1; if the power transmission power in the t-th sub-period is the same as that in the t-1-th sub-period, The value is equal to Among them, for For example, if the power transmission in the first sub-period is the same as that in the second sub-period, then The value is 0. If the power transmission in the first sub-period is different from that in the second sub-period, The value is 1. For example, assuming that the power transmission in the first sub-period is different from that in the second sub-period, The value is 1; the power transmission power of the second sub-period is the same as that of the third sub-period, then The value continues to be 1; the power transmission power of the third sub-period and the fourth sub-period is different, then The value becomes 2 (i.e. ). And so on. It can be understood that, assuming that the value of T is 24, if there is a change in the power transmission between two adjacent sub-periods during the target period, then the accumulated back, The maximum value is 23.

[0064] Based on the above first array and second array, the number of power changes of the wind-solar-storage integrated base within the target period can be made less than or equal to the maximum power change number according to the first constraint matrix shown in expression (2):

[0065] (2)

[0066] Where, t=2, 3, ..., T;

[0067] N represents the maximum number of power changes obtained in step S51; It represents the change of power transmission of the wind-solar-storage integrated base in the t-th sub-period and the t-1-th sub-period; Indicates the total number of changes in the power transmission of the wind-solar-storage integrated base within the target period at the tth sub-period; Indicates the total number of changes in the power transmission of the wind-solar-storage integrated base within the target period by the t-1th sub-period; Indicates the total number of power transmission changes of the wind-solar-storage integrated base in the target period at the Tth sub-period; when the value of t is 2, The value of is 0.

[0068] In expression (2), , It means that if the power transmission in the t-th sub-period is the same as that in the t-1-th sub-period, The value is equal to The value of , It means that if the power transmission in the t-th sub-period is different from that in the t-1-th sub-period, The value is equal to The value of is increased by 1; It is the last variable in the second array. If the value of this variable is less than or equal to N, the number of changes in the power transmission of the wind-solar-storage integrated base within the target period can be made less than or equal to the maximum number of changes in power.

[0069] Furthermore, in some embodiments, the curve generation model may include a mathematical solver. The mathematical solver solves the above objective function based on the constraint conditions to obtain the energy storage power and the power abandonment. However, since the mathematical solver can only recognize the conditional judgment of 01 variables (variables whose values ​​can only be 0 or 1) and cannot recognize the conditional judgment of continuous variables (variables whose values ​​can be any value), the mathematical solver cannot recognize the conditional judgment of expression (2). , and , ( is a continuous variable, and is a conditional judgment of a continuous variable), which will lead to the problem of solution failure.

[0070] In view of this, the first variable array can be defined and the second variable array , where the variables in the first variable array and the second variable array are 01 variables. Based on the first variable array and the second variable array, when the energy storage power and the power abandonment power are determined by a mathematical solver, the first constraint matrix shown in expression (2) can be converted into a second constraint matrix as shown in expression (3), and based on the second constraint matrix, the number of power transmission changes of the wind-solar-storage integrated base in the target period is less than or equal to the maximum power change number:

[0071] (3)

[0072] Where, t=2, 3, ..., T;

[0073] and represents a variable with a value of 0 or 1, and in the tth sub-period, and The value of is different, M is a positive number and the value of M can be greater than the maximum change of two adjacent power changes.

[0074] In expression (2), Indicated in and If one variable takes the value of 1, then the other variable takes the value of 0.

[0075] In expression (3), , and , It can correspond to the expression (2) , Specifically, in In the case of and can be converted to and ,Right now ,therefore, ;

[0076] In expression (3), , and , It can correspond to the expression (2) , Specifically, in In the case of and can be converted to and ,Right now ,therefore, .

[0077] In this way, expression (2) is converted to expression (3). Since the conditional judgment in expression (3) and , are all conditional judgments of 01 variables, so the math solver can recognize them normally. In this way, when solving with the math solver, the problem of solution failure can be avoided.

[0078] So far, we have explained how to make the number of power changes of the wind-solar-storage integrated base within the target period less than or equal to the maximum number of power changes based on the constraint matrix. The following explains how to make the duration of the transmission power remaining unchanged greater than or equal to the minimum power duration based on the constraint matrix.

[0079] In some embodiments, the minimum power duration is the sum of the durations of the H sub-periods. In the non-first and last H sub-periods of the target period, the duration for which the power transmission power remains constant can be greater than or equal to the minimum power duration according to the third constraint matrix shown in expression (4):

[0080] (4)

[0081] Where, i=2, 3, ..., T-(H-1);

[0082] express and difference, Indicates the total number of changes in the power transmission of the wind-solar-storage integrated base within the target period when the i-th sub-period is reached; Indicates the total number of power transmission changes of the wind-solar-storage integrated base in the target period when the i-1th sub-period is reached; when i=2, .

[0083] Expression (4) may include multiple inequalities. For example, assuming H is 3 and T is 7, then expression (4) may include:

[0084] ;

[0085] ;

[0086] ;

[0087] .

[0088] In combination with the above second array, it can be understood that when the power transmission power of two adjacent sub-periods changes, and The difference is 1, that is ; When the power transmission power in two adjacent sub-periods does not change, and The difference is 0, that is By limiting , indicating that in H sub-periods, the transmission power of the wind-solar-storage integrated base can only change once. In this way, the duration of the transmission power remaining unchanged can be greater than or equal to the minimum power duration.

[0089] Furthermore, for the first and last H sub-periods of the target period, the above expression (4) may not be able to fully guarantee that the duration for which the transmission power remains constant is greater than or equal to the minimum power duration. In the case of , it is possible that the power transmission power of the first sub-period and the second sub-period changes, while the power transmission power of the second sub-period and the third sub-period does not change. Then, between the first sub-period and the second sub-period, the duration of the power transmission remaining unchanged does not reach H sub-periods. To avoid this problem, within the first and last H sub-periods of the target period, the duration of the power transmission remaining unchanged can be made greater than or equal to the minimum power duration according to the fourth constraint matrix shown in expression (5):

[0090] (5)

[0091] Where n is an integer, and or , express and difference, Indicates the total number of power transmission changes of the wind-solar-storage integrated base in the target period when the nth sub-period is reached, Indicates the total number of power transmission changes of the wind-solar-storage integrated base in the target period when the n+1th sub-period is reached; when the value of n is 1, .

[0092] The meaning of expression (5) is that in the first H sub-periods and the last H sub-periods of the target period, the transmission power of two adjacent sub-periods does not change, so that in the first H sub-periods and the last H sub-periods, the duration for which the transmission power remains unchanged is greater than or equal to the minimum power duration.

[0093] Combined with reference Figures 6 to 11 . Figure 6 A schematic diagram of energy distribution of an integrated wind, solar and storage base on a day with low energy generation is provided for one embodiment of the present application. Figure 7 A schematic diagram of the power transmission curve of a wind, solar and storage integrated base on a day with low energy generation is provided for one embodiment of the present application. Figure 8 A schematic diagram of energy distribution of a wind, solar and storage integrated base in energy generation according to an embodiment of the present application. Fig. 9 A schematic diagram of the power transmission curve of a wind, solar and storage integrated base during energy generation on a given day is provided for one embodiment of the present application. Fig.10 A schematic diagram of energy distribution of a wind, solar and storage integrated base on a high energy production day provided for one embodiment of the present application. Fig.11 A schematic diagram of the power transmission curve of a wind, solar and storage integrated base on a high energy production day provided for one embodiment of the present application. Figures 6 to 11 It can be seen that the daily transmission curve of the wind-solar-storage integrated base is generated based on the predicted wind-solar power, energy storage power and power abandonment power of the day. The transmission curves are different on days with small energy generation, medium energy generation and large energy generation (that is, the transmission curve is an adaptive transmission curve), which avoids the problems of insufficient power supply or excessive power abandonment rate, and in a short period of time, there is no problem of frequent switching of transmission power. In this way, the stability of power transmission is effectively improved.

[0094] In a specific embodiment, the wind power installed capacity of the wind, solar and storage integrated base is 6 million kW; the photovoltaic installed capacity is 13 million kW; the pumped storage power station installed capacity is 3 million kW, the full power utilization hours are 6 hours, and the energy storage efficiency is 75%. The maximum transmission capacity of the DC transmission channel supporting the wind, solar and storage integrated base is 8 million kW, and the minimum channel utilization rate is 10%. Assume that the maximum number of power changes is 2 times (that is, the power transmission curve is a three-stage power transmission curve), and the minimum power duration is 4 hours. According to the single multi-stage curve in some technologies and the adaptive power transmission curve of this application, the online power, power shortage and power abandonment rate of the two can be shown in Table 1.

[0095] Table 1 Comparison of online power, power shortage and power abandonment rate

[0096]

[0097] It can be seen from the comparison in Table 1 that power transmission according to the adaptive multi-stage curve of the present application can effectively reduce the power abandonment rate, maximize the base grid-connected power, and eliminate power shortage.

[0098] This completes the entire description of this application.

[0099] Corresponding to the power transmission curve adaptive optimization method, the present application also provides a power transmission curve adaptive optimization system for a wind, solar and storage integrated base. Fig.12 , which is a module diagram of a power transmission curve adaptive optimization system provided in one embodiment of the present application. Fig.12 The transmission curve adaptive optimization system includes:

[0100] The data acquisition module is used to obtain the predicted wind and solar power generation power of the wind, solar and storage integrated base in each sub-period in the future target period, as well as the maximum power change allowed when transmitting power to the power grid in the target period and the minimum power duration for which the transmission power remains unchanged;

[0101] The power calculation module is used to take the maximum number of power changes and the minimum power duration as the first constraint condition, take the maximum amount of power delivered to the power grid as the goal, and determine the energy storage power and power abandonment power of the wind-solar-storage integrated base in each sub-period according to the predicted power of wind-solar power generation;

[0102] The curve generation module is used to generate the power transmission curve of the wind-solar-storage integrated base in the target period based on the predicted wind-solar power generation power, energy storage power and abandoned power in each sub-period.

[0103] Combined with reference Fig.13 , is a schematic diagram of an electronic device provided by an embodiment of the present application. The electronic device includes a processor and a memory, the memory is used to store a computer program, and when the computer program is executed by the processor, the above method is implemented.

[0104] The processor may be a central processing unit (CPU). The processor may also be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, or a combination of the above chips.

[0105] As a non-transitory computer-readable storage medium, the memory can be used to store non-transitory software programs, non-transitory computer executable programs and modules, such as program instructions / modules corresponding to the method in the embodiment of the present disclosure. The processor executes various functional applications and data processing of the processor by running the non-transitory software programs, instructions and modules stored in the memory, that is, implementing the method in the above method embodiment.

[0106] The memory may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created by the processor, etc. In addition, the memory may include a high-speed random access memory, and may also include a non-transitory memory, such as at least one disk storage device, a flash memory device, or other non-transitory solid-state storage device. In some embodiments, the memory may optionally include a memory remotely disposed relative to the processor, and these remote memories may be connected to the processor via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0107] One embodiment of the present application further provides a computer-readable storage medium, which is used to store a computer program. When the computer program is executed by a processor, the above method is implemented.

[0108] Although the embodiments of the present disclosure have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present disclosure, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A method for adaptively optimizing the transmission curve of a wind-solar-storage integrated base, characterized in that: The method comprises: Obtain the predicted wind and solar power generation power of the wind, solar and storage integrated base in each sub-period within the future target period, as well as the maximum number of power changes allowed when transmitting power to the power grid within the target period and the minimum power duration for which the transmission power remains unchanged; Taking the maximum number of power changes and the minimum power duration as the first constraint condition, taking the maximum amount of power delivered to the power grid as the goal, the following objective function is solved to obtain the energy storage power and abandoned power of the wind-solar-storage integrated base in each sub-period: In the objective function, is the duration of a single sub-period, F represents the amount of electricity delivered to the power grid, T represents the number of sub-periods within the target period, represents the power transmitted by the wind-solar-storage integrated base to the power grid in the mth sub-period, where: , represents the wind power generation power of the wind-solar-storage integrated base in the mth sub-period, represents the photovoltaic power generation power of the wind-solar-storage integrated base in the mth sub-period, represents the charging and discharging power of the energy storage equipment of the wind-solar-storage integrated base in the mth sub-period, represents the abandoned power of the wind-solar-storage integrated base in the mth sub-period; Based on the predicted wind and solar power generation power, energy storage power and power abandonment power in each of the sub-periods, a power transmission curve of the wind, solar and energy storage integrated base in the target period is generated; The taking the maximum number of power changes and the minimum power duration as the first constraint condition includes: According to a preset constraint matrix, the number of changes in the power transmission of the wind-solar-storage integrated base within the target period is less than or equal to the maximum number of changes in power, and the duration for which the power transmission remains unchanged is greater than or equal to the minimum duration of power, wherein the constraint matrix is ​​set based on the change in the power transmission of the wind-solar-storage integrated base in two adjacent sub-periods; And, according to a preset constraint matrix, the number of power transmission changes of the wind-solar-storage integrated base within the target period is less than or equal to the maximum power change number, including: According to the following first constraint matrix, the number of changes in the power transmission of the wind-solar-storage integrated base within the target period is made less than or equal to the maximum number of changes in power: Where, t=2, 3, ..., T; T represents the number of sub-periods within the target period, and N represents the maximum number of power changes; Indicates the change in power transmission of the wind-solar-storage integrated base in the t-th sub-period and the t-1-th sub-period; Indicates the total number of changes in the power transmission of the wind-solar-storage integrated base within the target period at the tth sub-period; Indicates the total number of changes in the power transmission of the wind-solar-storage integrated base within the target period at the t-1th sub-period; Indicates the total number of changes in the power transmission of the wind-solar-storage integrated base in the target period at the Tth sub-period; when the value of t is 2, The value of is 0.

2. The method according to claim 1, characterized in that When the energy storage power and the abandoned power are determined by a mathematical solver, according to the first constraint matrix, the number of changes in the power transmission of the wind-solar-storage integrated base within the target period is less than or equal to the maximum number of changes in power, including: The first constraint matrix is ​​converted into the following second constraint matrix, and according to the second constraint matrix, the number of changes in the power transmission of the wind-solar-storage integrated base within the target period is made less than or equal to the maximum number of changes in power: Where, t=2, 3, ..., T; and represents a variable with a value of 0 or 1, and in the tth sub-period, and The values ​​of are different, M is a positive number and the value of M is greater than the maximum change of two adjacent power changes.

3. The method according to claim 2, characterized in that The minimum power duration is the sum of the durations of H sub-periods; According to the preset constraint matrix, the duration for which the power transmission power remains unchanged is greater than or equal to the minimum power duration, including: In the non-first and last H sub-periods of the target period, according to the following third constraint matrix, the duration for which the power transmission power remains unchanged is greater than or equal to the minimum power duration: Where, i=2, 3, ..., T-(H-1); express and difference, Indicates the total number of changes in the power transmission of the wind-solar-storage integrated base within the target period when the i-th sub-period is reached; Indicates the total number of changes in the power transmission of the wind-solar-storage integrated base in the target period when the i-1th sub-period is reached; when i=2, .

4. The method according to claim 1, characterized in that The minimum power duration is the sum of the durations of H sub-periods; According to the preset constraint matrix, the duration for which the power transmission power remains unchanged is greater than or equal to the minimum power duration, including: In the first and last H sub-periods of the target period, according to the following fourth constraint matrix, the duration for which the power transmission power remains unchanged is greater than or equal to the minimum power duration: Where n is an integer, and or , express and difference, Indicates the total number of changes in the power transmission of the wind-solar-storage integrated base during the target period when the nth sub-period is reached, Indicates the total number of changes in the power transmission of the wind-solar-storage integrated base in the target period when the n+1th sub-period is reached; when the value of n is 1, .

5. The method according to claim 1, characterized in that In the process of solving the objective function, one or more of the following conditions are used as the second constraint conditions: ,in, represents the minimum transmission capacity of the transmission channel, Indicates the maximum transmission capacity of the transmission channel; ,in, Indicates the maximum charging power supported by the energy storage device, represents the maximum discharge power supported by the energy storage device, and is a negative value, is a positive value; and ,in, represents the energy storage capacity of the energy storage device in the mth sub-period, represents the rated energy storage capacity of the energy storage device, represents the full power of the energy storage device, and h represents the full power utilization hours of the energy storage device; , where η represents the energy storage efficiency coefficient of the energy storage device, Represents the energy storage capacity of the energy storage device in the m-1th sub-period.

6. An adaptive optimization system for transmission curve of wind, solar and storage integrated base, characterized in that: The system comprises: A data acquisition module is used to obtain the predicted wind and solar power generation power of the wind, solar and storage integrated base in each sub-period in the future target period, as well as the maximum number of power changes allowed when transmitting power to the power grid in the target period and the minimum power duration for which the transmission power remains unchanged; The power calculation module is used to take the maximum number of power changes and the minimum power duration as the first constraint condition, take the maximum amount of power delivered to the power grid as the goal, and solve the following objective function to obtain the energy storage power and abandoned power of the wind-solar-storage integrated base in each sub-period: In the objective function, is the duration of a single sub-period, F represents the amount of electricity delivered to the power grid, T represents the number of sub-periods within the target period, represents the power transmitted by the wind-solar-storage integrated base to the power grid in the mth sub-period, where: , represents the wind power generation power of the wind-solar-storage integrated base in the mth sub-period, represents the photovoltaic power generation power of the wind-solar-storage integrated base in the mth sub-period, represents the charging and discharging power of the energy storage equipment of the wind-solar-storage integrated base in the mth sub-period, Represents the abandoned power of the wind-solar-storage integrated base in the mth sub-period; specifically, when the maximum number of power changes and the minimum power duration are used as the first constraint conditions, according to the preset constraint matrix, the number of changes in the power transmission of the wind-solar-storage integrated base in the target period is less than or equal to the maximum number of power changes, and the duration for which the transmission power remains unchanged is greater than or equal to the minimum power duration, wherein the constraint matrix is ​​set based on the change in the power transmission of the wind-solar-storage integrated base in two adjacent sub-periods; specifically, when the number of changes in the power transmission of the wind-solar-storage integrated base in the target period is less than or equal to the maximum number of power changes according to the preset constraint matrix, according to the following first constraint matrix, the number of changes in the power transmission of the wind-solar-storage integrated base in the target period is less than or equal to the maximum number of power changes: Where, t=2, 3, ..., T; T represents the number of sub-periods within the target period, and N represents the maximum number of power changes; Indicates the change in power transmission of the wind-solar-storage integrated base in the t-th sub-period and the t-1-th sub-period; Indicates the total number of changes in the power transmission of the wind-solar-storage integrated base within the target period at the tth sub-period; Indicates the total number of changes in the power transmission of the wind-solar-storage integrated base within the target period at the t-1th sub-period; Indicates the total number of changes in the power transmission of the wind-solar-storage integrated base in the target period at the Tth sub-period; when the value of t is 2, The value of is 0; The curve generation module is used to generate the power transmission curve of the wind-solar-storage integrated base in the target period based on the predicted wind-solar power generation power, energy storage power and abandoned power in each of the sub-periods.

7. A computer-readable storage medium, characterized in that: The computer-readable storage medium is used to store a computer program, and when the computer program is executed by a processor, the method according to any one of claims 1 to 5 is implemented.

8. An electronic device, characterized in that: The electronic device comprises a processor and a memory, wherein the memory is used to store a computer program, and when the computer program is executed by the processor, the method according to any one of claims 1 to 5 is implemented.