Pre-charging system, control method, controller, vehicle, medium and program product
By designing a precharge system in new energy vehicles and using power battery packs and vehicle modules to form a precharge circuit, the system cost and the withstand voltage and current parameters of the vehicle module are reduced, and the complexity of the precharge system in the existing technology is solved. High cost issues improve system security and efficiency.
Patent Information
- Application Number
- CN202411003614.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-07-25
AI Technical Summary
The circuit structure of the existing new energy vehicle pre-charge system is complex, resulting in high costs, and the cost problem of setting up multiple positive contactors in the high-voltage system topology is still high.
Design a pre-charge system to form a pre-charge circuit through the power battery pack and the vehicle module, and use the pre-charge resistor and the motor module to pre-charge the vehicle unit. The controller is equipped with a multi-phase bridge arm and a pre-charge switch unit to realize multiple The conduction and disconnection of the pre-charge circuit reduces the withstand voltage and current parameters of the vehicle module, thereby reducing system costs.
It realizes the reduction of the cost of the pre-charge system in new energy vehicles, improves the system efficiency and safety, and avoids the damage caused by voltage fluctuations and excessive current of high-voltage accessories when powered on.
Smart Images

Figure CN118560306B_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the field of vehicle technology, and in particular, to a pre-charging system, a control method, a controller, a vehicle, a medium, and a program product. Background Art
[0002] With the development of vehicle technology, new energy vehicles have emerged. In related technologies, in order to provide sufficient power to the high-voltage accessories in new energy vehicles, ensure that they can start and work normally after power-on, and avoid voltage fluctuations or excessive current during startup to damage the high-voltage accessories, new energy vehicles generally need to pre-charge the high-voltage accessories through a pre-charging system when powered on to ensure the normal operation and safety of the vehicle. Summary of the invention
[0003] The purpose of the present disclosure is to provide a pre-charging system, a control method, a controller, a vehicle, a medium and a program product to solve the above-mentioned technical problems.
[0004] In order to achieve the above object, the present disclosure provides a pre-charging system in a first aspect, the pre-charging system comprising:
[0005] A power battery pack, comprising a first battery pack and a second battery pack connected in series;
[0006] The vehicle machine module includes a pre-charging resistor and a vehicle machine unit;
[0007] Wherein, a pre-charging circuit is formed at least according to the power battery pack and the vehicle machine module, so that one of the first battery pack and the second battery pack pre-charges the vehicle machine unit through the pre-charging resistor.
[0008] Optionally, the vehicle-machine unit includes a first vehicle-machine unit and a second vehicle-machine unit connected in series, the pre-charging system further includes a motor module, and the pre-charging circuit is formed at least according to the power battery pack and the vehicle-machine module, including:
[0009] A pre-charging circuit is formed according to the power battery pack, the vehicle machine module and the motor module, so that one of the first battery pack and the second battery pack pre-charges one of the first vehicle machine unit and the second vehicle machine unit through the pre-charging resistor and / or the motor module.
[0010] Optionally, the motor module includes a capacitor, a multi-phase bridge arm, and a multi-phase winding corresponding to the multi-phase bridge arm, and each phase winding is connected to the midpoint of the corresponding bridge arm. The pre-charging circuit formed by the power battery pack, the vehicle machine module and the motor module includes:
[0011] The positive electrode of the first battery pack is respectively connected to the first bus terminal of the multi-phase bridge arm, the first end of the capacitor and the first end of the first vehicle unit, and the negative electrode of the second battery pack is respectively connected to the second bus terminal of the multi-phase bridge arm, the second end of the capacitor and the first end of the second vehicle unit;
[0012] The second end of the first vehicle unit is connected to the second end of the second vehicle unit, and the second end of the first vehicle unit is connected to the first end of the pre-charging resistor, and the second end of the pre-charging resistor is respectively connected to the negative electrode of the first battery pack and the positive electrode of the second battery pack;
[0013] The neutral point of the multi-phase winding is respectively connected to the negative electrode of the first battery pack, the positive electrode of the second battery pack, the first bus terminal of the multi-phase bridge arm, the first terminal of the capacitor and the first terminal of the first vehicle unit.
[0014] Optionally, the pre-charging system further comprises: a controller and a pre-charging switch unit for controlling the pre-charging circuit to be turned on or off, the controller being connected to the multi-phase bridge arm and the pre-charging switch unit respectively;
[0015] The controller is configured to: control the multi-phase bridge arm and the pre-charging switch unit so that one of the first battery pack and the second battery pack pre-charges one of the first vehicle unit and the second vehicle unit through the pre-charging resistor and / or the motor module.
[0016] Optionally, the controller is configured to: when the power battery pack is in a first state, control the multi-phase bridge arm and the pre-charging switch unit so that the first battery group, the first vehicle-machine unit and the pre-charging resistor form a pre-charging circuit, the second battery group, the pre-charging resistor and the second vehicle-machine unit form a pre-charging circuit, and the second battery group and the motor module form a pre-charging circuit.
[0017] Optionally, the controller is configured to: in a first stage, the first battery pack, the first vehicle-machine unit and the pre-charging resistor form a pre-charging circuit to pre-charge half of the first vehicle-machine unit; in a second stage, the second battery pack, the pre-charging resistor and the second vehicle-machine unit form a pre-charging circuit to pre-charge half of the second vehicle-machine unit, and the second battery pack, the multi-phase winding and the lower bridge arm of the multi-phase bridge arm form a pre-charging circuit to charge the multi-phase winding; in a third stage, the second battery pack, the multi-phase winding, the upper bridge arm of the multi-phase bridge arm and the capacitor form a pre-charging circuit to boost pre-charging the capacitor.
[0018] Optionally, the controller is configured to: in a first stage, the second battery pack, the pre-charging resistor and the second vehicle-machine unit form a pre-charging circuit to pre-charge half of the second vehicle-machine unit, and the second battery pack, the multi-phase winding and the lower bridge arm of the multi-phase bridge arm form a pre-charging circuit to charge the multi-phase winding; in a second stage, the second battery pack, the multi-phase winding, the upper bridge arm of the multi-phase bridge arm and the capacitor form a pre-charging circuit to boost and pre-charge the capacitor; in a third stage, the first battery pack, the first vehicle-machine unit and the pre-charging resistor form a pre-charging circuit to pre-charge half of the first vehicle-machine unit.
[0019] Optionally, the controller is configured to: when the power battery pack is in a first state, control the multi-phase bridge arm and the pre-charging switch unit so that the second battery group, the pre-charging resistor and the second vehicle-machine unit form a pre-charging circuit, the first battery group, the first vehicle-machine unit and the pre-charging resistor form a pre-charging circuit, and the first battery group and the motor module form a pre-charging circuit.
[0020] Optionally, the controller is configured to: in a first stage, the first battery pack, the first vehicle-machine unit and the pre-charging resistor form a pre-charging circuit to pre-charge half of the first vehicle-machine unit, and the first battery pack, the upper bridge arm of the multi-phase bridge arm and the multi-phase winding form a pre-charging circuit to charge the multi-phase winding; in a second stage, the first battery pack, the capacitor, the lower bridge arm of the multi-phase bridge arm and the multi-phase winding form a pre-charging circuit to boost and pre-charge the capacitor; in a third stage, the second battery pack, the pre-charging resistor and the second vehicle-machine unit form a pre-charging circuit to pre-charge half of the second vehicle-machine unit.
[0021] Optionally, the controller is configured to: in a first stage, the second battery pack, the second vehicle-machine unit and the pre-charging resistor form a pre-charging circuit to pre-charge half of the second vehicle-machine unit; in a second stage, the first battery pack, the pre-charging resistor and the first vehicle-machine unit form a pre-charging circuit to pre-charge half of the first vehicle-machine unit, and the first battery pack, the multi-phase winding and the upper bridge arm of the multi-phase bridge arm form a pre-charging circuit to charge the multi-phase winding; in a third stage, the first battery pack, the multi-phase winding, the lower bridge arm of the multi-phase bridge arm and the capacitor form a pre-charging circuit to boost pre-charging the capacitor.
[0022] Optionally, the controller is configured to: when the power battery pack is in the second state, control the multi-phase bridge arm and the pre-charging switch unit so that the first battery group, the pre-charging resistor and the first vehicle-machine unit form a pre-charging circuit, the first battery group and the motor module form a pre-charging circuit, and the first battery group, the second vehicle-machine unit, the pre-charging resistor and the motor module form a pre-charging circuit.
[0023] Optionally, the controller is configured to: in a first stage, form a pre-charging circuit with the first battery pack, the first vehicle-machine unit and the pre-charging resistor to pre-charge half of the first vehicle-machine unit, and form a pre-charging circuit with the first battery pack, the capacitor, the lower bridge arm of the multi-phase bridge arm and the multi-phase winding to pre-charge half of the capacitor; in a second stage, form a pre-charging circuit with the first battery pack, the multi-phase winding, the lower bridge arm of the multi-phase bridge arm, the second vehicle-machine unit and the pre-charging resistor to pre-charge half of the second vehicle-machine unit.
[0024] Optionally, the controller is configured to: when the power battery pack is in a third state, control the multi-phase bridge arm and the pre-charging switch unit so that the second battery group, the pre-charging resistor and the second vehicle-machine unit form a pre-charging circuit, the second battery group and the motor module form a pre-charging circuit, and the second battery group, the first vehicle-machine unit, the pre-charging resistor and the motor module form a pre-charging circuit.
[0025] Optionally, the controller is configured to: in a first stage, form a pre-charging circuit with the second battery pack, the pre-charging resistor and the second vehicle-machine unit to pre-charge half of the second vehicle-machine unit, and form a pre-charging circuit with the second battery pack, the multi-phase winding, the upper bridge arm of the multi-phase bridge arm and the capacitor to pre-charge half of the capacitor; in a second stage, form a pre-charging circuit with the second battery pack, the pre-charging resistor, the first vehicle-machine unit, the multi-phase winding and the lower bridge arm of the multi-phase bridge arm to pre-charge half of the first vehicle-machine unit.
[0026] Optionally, the controller is configured to: when the power battery pack is in the fourth state, control the multi-phase bridge arm and the pre-charging switch unit so that the power battery pack cannot form a pre-charging circuit with the motor module and / or the vehicle module, and / or generate an alarm message, wherein the alarm message is used to indicate a fault in the power battery pack.
[0027] Optionally, the pre-charging system further includes a power supply switch unit for controlling the power battery pack, the vehicle machine module and the motor module to form a power supply circuit, and the power supply switch unit is connected to the controller;
[0028] Correspondingly, the controller is also configured to: control the multi-phase bridge arm and the power supply switch unit so that the first battery pack and the first vehicle unit form a power supply circuit and / or the second battery pack and the second vehicle unit form a power supply circuit.
[0029] Optionally, the first vehicle machine unit includes a heater and a compressor, and the second vehicle machine unit includes an on-board charger and a DCDC transformer.
[0030] A second aspect of the present disclosure provides a pre-charging control method, the pre-charging control method comprising:
[0031] Determining a target pre-charging mode according to status information of a power battery pack, wherein the power battery pack includes a first battery pack and a second battery pack connected in series, and the pre-charging mode includes a pre-charging mode based on the first battery pack or the second battery pack;
[0032] According to the target pre-charging method, the vehicle machine module and the motor module connected to the power battery pack are pre-charged.
[0033] A third aspect of the present disclosure provides a controller, the controller comprising:
[0034] processor;
[0035] a memory for storing processor-executable instructions;
[0036] Wherein, the processor is configured to: execute the steps of the method described in the second aspect.
[0037] A fourth aspect of the present disclosure provides a vehicle, comprising the pre-charging system described in the first aspect or the controller described in the third aspect.
[0038] A fifth aspect of the present disclosure provides a non-temporary computer-readable storage medium having a computer program stored thereon, which implements the steps of the method described in the second aspect when executed by a processor.
[0039] A sixth aspect of the present disclosure provides a computer program product, comprising a computer program, which implements the steps of the method described in the second aspect when executed by a processor.
[0040] Through the above technical solution, at least one pre-charging circuit can be formed inside the pre-charging system, and by controlling the conduction of at least one pre-charging circuit, the power battery pack can pre-charge the vehicle-machine module. At the same time, because the power battery pack pre-charges the vehicle-machine module based on one of the first battery pack and the second battery pack when pre-charging the vehicle-machine module, the vehicle-machine module can be pre-charged half of the pack, that is, the pre-charging voltage of the vehicle-machine module is half of the power battery pack voltage, thereby reducing the performance parameters such as the withstand voltage and / or withstand current of the vehicle-machine module. At the same time, since the performance parameters such as withstand voltage / current are proportional to the price, the cost of the pre-charging system can be reduced.
[0041] Other features and advantages of the present disclosure will be described in detail in the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] The accompanying drawings are used to provide a further understanding of the present disclosure and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the present disclosure but do not constitute a limitation of the present disclosure. In the accompanying drawings:
[0043] Figure 1 It is a schematic diagram of a pre-charging circuit in the related art;
[0044] Figure 2 is a schematic diagram of a pre-charging system provided by an embodiment of the present disclosure;
[0045] Figure 3 is a schematic diagram of another pre-charging system provided by an embodiment of the present disclosure;
[0046] Figure 4 is a schematic diagram of another pre-charging system provided by an embodiment of the present disclosure;
[0047] Figure 5 is a schematic diagram of another pre-charging system provided by an embodiment of the present disclosure;
[0048] Figure 6 is a schematic diagram of current direction when a pre-charging system according to an embodiment of the present disclosure performs pre-charging;
[0049] Figure 7 is a schematic diagram of current direction during pre-charging of another pre-charging system provided by an embodiment of the present disclosure;
[0050] Figure 8 is a schematic diagram of current direction during pre-charging of another pre-charging system provided by an embodiment of the present disclosure;
[0051] Fig. 9 is a schematic diagram of current direction during pre-charging of another pre-charging system provided by an embodiment of the present disclosure;
[0052] Fig.10 is a schematic diagram of current direction during pre-charging of another pre-charging system provided by an embodiment of the present disclosure;
[0053] Fig.11 is a schematic diagram of current direction during pre-charging of another pre-charging system provided by an embodiment of the present disclosure;
[0054] Fig.12 is a schematic diagram of current direction during pre-charging of another pre-charging system provided by an embodiment of the present disclosure;
[0055] Fig.13 is a schematic diagram of current direction during charging of another battery control system provided by an embodiment of the present disclosure;
[0056] Fig.14 is a schematic diagram of current direction during charging of another battery control system provided by an embodiment of the present disclosure;
[0057] Fig.15 is a schematic diagram of current direction during charging of another battery control system provided by an embodiment of the present disclosure;
[0058] Fig.16 is a schematic diagram of current direction during pre-charging of another pre-charging system provided by an embodiment of the present disclosure;
[0059] Fig.17 is a schematic diagram of current direction during pre-charging of another pre-charging system provided by an embodiment of the present disclosure;
[0060] Fig.18 is a schematic diagram of current direction during pre-charging of another pre-charging system provided by an embodiment of the present disclosure;
[0061] Fig.19 is a schematic diagram of current direction during charging of another battery control system provided by an embodiment of the present disclosure;
[0062] Fig. 20 is a schematic diagram of current direction during charging of another battery control system provided by an embodiment of the present disclosure;
[0063] Fig.21 is a schematic diagram of current direction during charging of another battery control system provided by an embodiment of the present disclosure;
[0064] Fig. 22 is a schematic diagram of a pre-charging system provided by an embodiment of the present disclosure when a vehicle-mounted module is working;
[0065] Fig.23 is a schematic diagram of another pre-charging system provided by an embodiment of the present disclosure when a vehicle-mounted module is working;
[0066] Fig.24 is a schematic diagram of another pre-charging system provided by an embodiment of the present disclosure when a vehicle-mounted module is working;
[0067] Fig.25 is a flow chart of a pre-charging control method provided by an embodiment of the present disclosure;
[0068] Fig.26 is a flow chart for selecting a target pre-charging method provided by an embodiment of the present disclosure;
[0069] Fig. 27 is a block diagram of a pre-charging control system provided by an embodiment of the present disclosure;
[0070] Fig.28 It is a schematic diagram of a functional block diagram of a vehicle provided in an embodiment of the present disclosure.
[0071] Description of Reference Numerals
[0072] 1. First battery pack; 2. Second battery pack; 3. Pre-charging resistor; 4. First vehicle machine unit; 5. Second vehicle machine unit; 6. Capacitor; 7. Multi-phase bridge arm; 8. Multi-phase winding. DETAILED DESCRIPTION
[0073] The specific implementation of the present disclosure is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described herein is only used to illustrate and explain the present disclosure, and is not used to limit the present disclosure.
[0074] As mentioned in the background technology, with the development of vehicle technology, new energy vehicles have emerged. In the related technology, in order to provide sufficient power to the high-voltage accessories (such as relays, capacitors, compressors, etc.) in new energy vehicles, ensure that they can start and work normally after power-on, and avoid voltage fluctuations or excessive current during startup to damage the high-voltage accessories, when new energy vehicles are powered on, they generally need to pre-charge the high-voltage accessories through a pre-charging system to ensure the normal operation and safety of the vehicle.
[0075] However, the circuit structure of the pre-charging system in the related art is complicated, thereby increasing the cost of the pre-charging system.
[0076] For example, in the utility model patent with publication number: CN215971122U, a pre-charging circuit, a high-voltage power distribution device and an electric vehicle are proposed, such as Figure 1 As shown. Since the pre-charging circuit reuses the pre-charging resistor, it solves the technical problems of the related art that the pre-charging resistor is too much, occupies a large space, and has high cost. However, since multiple positive contactors are set in the high-voltage system topology, there is still a high cost problem.
[0077] In view of this, the present disclosure provides a pre-charging system, a control method, a controller, a vehicle, a medium and a program product to solve the above-mentioned technical problems.
[0078] The embodiments of the present disclosure are further explained below with reference to the accompanying drawings.
[0079] Figure 2 is a schematic diagram of a pre-charging system provided in an embodiment of the present disclosure, referring to Figure 2 , the pre-charging system may include:
[0080] The power battery pack includes a first battery group 1 and a second battery group 2 connected in series.
[0081] The vehicle computer module includes a pre-charging resistor 3 and a vehicle computer unit.
[0082] A pre-charging circuit is formed at least according to the power battery pack and the vehicle machine module, so that one of the first battery pack 1 and the second battery pack 2 pre-charges the vehicle machine unit through the pre-charging resistor 3 .
[0083] In this embodiment, each battery pack may be composed of a plurality of battery cells (or battery sections) connected in series, the first battery pack 1 and the second battery pack 2 may include the same number of battery cells, and the battery cells of the entire power battery pack may be an even number.
[0084] In this embodiment, the vehicle machine module may include one vehicle machine unit, or may include multiple vehicle machine units. When the vehicle machine module includes multiple vehicle machine units, the multiple vehicle machine units may be connected in parallel and / or in series.
[0085] For example, Figure 2 As shown, the vehicle module includes a vehicle unit, wherein the second end of the vehicle unit is respectively connected to the first end of the pre-charging resistor 3 and the positive electrode of the first battery pack 1, the second end of the pre-charging resistor 3 is respectively connected to the negative electrode of the first battery pack 1 and the positive electrode of the second battery pack 2, and the negative electrode of the second battery pack 2 is connected to the first end of the vehicle unit. Thus, the second battery pack 2 can pre-charge the vehicle unit.
[0086] For example, Figure 3 As shown, the vehicle machine module includes a first vehicle machine unit 4 and a second vehicle machine unit 5 connected in parallel, wherein the first end of the parallel connection is connected to the positive electrode of the first battery pack 1, the second end of the parallel connection is respectively connected to the negative electrode of the second battery pack 2 and the first end of the pre-charging resistor 3, and the second end of the pre-charging resistor 3 is respectively connected to the negative electrode of the first battery pack 1 and the positive electrode of the second battery pack 2. Thus, the first battery pack 1 can pre-charge the first vehicle machine unit 4 and the second vehicle machine unit 5 at the same time.
[0087] For example, Figure 4As shown, the vehicle machine module includes a first vehicle machine unit 4 and a second vehicle machine unit 5 connected in series, wherein the first end of the first vehicle machine unit 4 is connected to the positive electrode of the first battery pack 1, the second end of the first vehicle machine unit 4 is connected to the second end of the second vehicle machine unit 5 and the first end of the pre-charging resistor 3, the second end of the pre-charging resistor 3 is respectively connected to the negative electrode of the first battery pack 1 and the positive electrode of the second battery pack 2, and the first end of the second vehicle machine unit 5 is connected to the negative electrode of the second battery pack 2. Thus, the first battery pack 1 can pre-charge the first vehicle machine unit 4, and the second battery pack 2 can pre-charge the second vehicle machine unit 5.
[0088] In this embodiment, the vehicle unit may include one or more high voltage accessories. Figure 3 or Figure 4 As shown, when the vehicle machine module includes a first vehicle machine unit 4 and a second vehicle machine unit 5, the first vehicle machine unit 4 may include a heater (Positive Temperature Coefficient, PTC) and a compressor (AC). The second vehicle machine unit 5 may include an on-board charger (OBC) and a DCDC transformer.
[0089] In this embodiment, the resistance value of the pre-charging resistor 3 can be set according to actual conditions, and the embodiment of the present disclosure does not impose any limitation on this.
[0090] Through the connection structure of the above-mentioned pre-charging system, at least one pre-charging circuit can be formed inside the pre-charging system. By controlling the conduction of at least one pre-charging circuit, the power battery pack can pre-charge the vehicle-machine module. At the same time, because the power battery pack pre-charges the vehicle-machine module based on one of the first battery pack and the second battery pack when pre-charging the vehicle-machine module, the vehicle-machine module is half-pre-charged, that is, the pre-charging voltage of the vehicle-machine module is half of the voltage of the power battery pack, thereby reducing the performance parameters such as the withstand voltage and / or withstand current of the vehicle-machine module. At the same time, since the performance parameters such as withstand voltage / current are proportional to the price, the cost of the pre-charging system can be reduced.
[0091] It should be understood that the high-voltage accessories in the vehicle may generally include a motor module in addition to the vehicle module. Therefore, in a possible manner, the pre-charging system may also include a motor module, and the motor module is connected to the power battery pack and the vehicle module respectively, so that the motor module, the power battery pack and the vehicle module form a pre-charging loop, so that one of the first battery pack 1 and the second battery pack 2 pre-charges the vehicle module through the pre-charging resistor 3 and / or the motor module.
[0092] In a possible manner, the vehicle unit may include a first vehicle unit 4 and a second vehicle unit 5 connected in series, and the pre-charging system further includes a motor module. Accordingly, a pre-charging circuit is formed at least according to the power battery pack and the vehicle module, which may include:
[0093] A pre-charging circuit is formed according to the power battery pack, the vehicle machine module and the motor module, so that one of the first battery pack 1 and the second battery pack 2 pre-charges one of the first vehicle machine unit 4 and the second vehicle machine unit 5 through the pre-charging resistor 3 and / or the motor module.
[0094] For example, the first battery pack 1 may be used to pre-charge the first vehicle unit through the pre-charging resistor 3 , and the second battery pack 2 may be used to pre-charge the second vehicle unit through the pre-charging resistor 3 .
[0095] For example, the first battery pack 1 can pre-charge the first vehicle unit through the pre-charging resistor 3 , and the first battery pack 1 can pre-charge the second vehicle unit through the pre-charging resistor 3 and the motor module.
[0096] For example, the second battery pack 2 can pre-charge the second vehicle unit through the pre-charging resistor 3 , and the second battery pack 2 can pre-charge the first vehicle unit through the pre-charging resistor 3 and the motor module.
[0097] In a possible manner, the motor module may include a capacitor 6, a multi-phase bridge arm 7, and a multi-phase winding 8 corresponding to the multi-phase bridge arm 7, and each phase winding is connected to the midpoint of the corresponding bridge arm. Accordingly, a pre-charging circuit is formed according to the power battery pack, the vehicle module, and the motor module. Figure 5 As shown, including:
[0098] The positive electrode of the first battery pack 1 is respectively connected to the first bus terminal of the multi-phase bridge arm 7, the first end of the capacitor 6 and the first end of the first vehicle unit 4, and the negative electrode of the second battery pack is respectively connected to the second bus terminal of the multi-phase bridge arm 7, the second end of the capacitor 6 and the first end of the second vehicle unit 5; the second end of the first vehicle unit 4 is connected to the second end of the second vehicle unit 5, and the second end of the first vehicle unit 4 is connected to the first end of the pre-charging resistor 3, and the second end of the pre-charging resistor 3 is respectively connected to the negative electrode of the first battery pack 1 and the positive electrode of the second battery pack 2; the neutral point of the multi-phase winding 8 is respectively connected to the negative electrode of the first battery pack 1, the positive electrode of the second battery pack 2, the first bus terminal of the multi-phase bridge arm 7, the first end of the capacitor 6 and the first end of the first vehicle unit 4.
[0099] Through the connection structure in this embodiment, multiple pre-charging circuits can be formed inside the pre-charging system, and by controlling the conduction of the multiple pre-charging circuits, the power battery pack can pre-charge the vehicle module and the motor module.
[0100] In a possible manner, the pre-charging system may further include: a controller and a pre-charging switch unit for controlling the pre-charging circuit to be turned on or off, the controller being connected to the multi-phase bridge arm 7 and the pre-charging switch unit respectively;
[0101] The controller is configured to: control the multi-phase bridge arm 7 and the pre-charging switch unit so that one of the first battery pack 1 and the second battery pack 2 pre-charges one of the first vehicle unit 4 and the second vehicle unit 5 through the pre-charging resistor 3 and / or the motor module.
[0102] For example, Figure 5 As shown, the pre-charging switch unit may include a first switch unit K5, a second switch unit K6, a third switch unit K8, a fourth switch unit K4 and a fifth switch unit K1. Among them, the first end of the first switch unit K5 is connected to the positive electrode of the first battery pack 1, and the second end of the first switch unit K5 is respectively connected to the first bus terminal of the multi-phase bridge arm 7, the first end of the capacitor 6 and the first end of the first vehicle unit 4. The first end of the second switch unit K6 is connected to the negative electrode of the second battery pack, and the second end of the second switch unit K6 is respectively connected to the second bus terminal of the multi-phase bridge arm 7, the second end of the capacitor 6 and the first end of the second vehicle unit 5. The first end of the third switch unit K8 is connected to the second end of the first vehicle unit 4, and the second end of the third switch unit K8 is connected to the first end of the pre-charging resistor 3. The first end of the fourth switch unit K4 is respectively connected to the negative electrode of the first battery pack 1 and the positive electrode of the second battery pack 2, and the second end of the fourth switch unit K4 is connected to the neutral point of the multi-phase winding 8. The first end of the fifth switch unit K1 is connected to the neutral point of the multi-phase winding 8 , and the second end of the fifth switch unit K1 is respectively connected to the first bus terminal of the multi-phase bridge arm 7 , the first end of the capacitor 6 , and the first end of the first vehicle unit 4 .
[0103] Therefore, by controlling the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the fifth switch unit K1, the first battery group 1 can pre-charge the first vehicle unit through the pre-charging resistor 3, the second battery group 2 can pre-charge the second vehicle unit through the pre-charging resistor 3, the first battery group 1 can pre-charge the first vehicle unit through the pre-charging resistor 3, the first battery group 1 can pre-charge the second vehicle unit through the pre-charging resistor 3 and the motor module, the second battery group 2 can pre-charge the second vehicle unit through the pre-charging resistor 3, or the second battery group 2 can pre-charge the first vehicle unit through the pre-charging resistor 3 and the motor module.
[0104] In a possible implementation, the controller can be configured to: when the power battery pack is in a first state, control the multi-phase bridge arm 7 and the pre-charging switch unit so that the first battery group 1, the first vehicle unit 4 and the pre-charging resistor 3 form a pre-charging circuit, the second battery group 2, the pre-charging resistor 3 and the second vehicle unit 5 form a pre-charging circuit, and the second battery group 2 and the motor module form a pre-charging circuit.
[0105] The first state can be used to indicate that the first battery pack 1 and the second battery pack 2 in the power battery pack can pre-charge the motor module and / or the vehicle module. For example, when the first battery pack 1 passes the fault self-check and determines that the first battery pack 1 has no fault or the fault level is lower than the preset fault level, and the second battery pack 2 passes the fault self-check and determines that the second battery pack 2 has no fault or the fault level is lower than the preset fault level, the power battery pack is determined to be in the first state.
[0106] It should be understood that, of the above three pre-charging circuits, when the direction of electric energy flow does not conflict, only one of the pre-charging circuits can be turned on at the same time, and when the pre-charging is successful or fails, the next pre-charging circuit is turned on. It is also possible to turn on multiple pre-charging circuits at the same time to pre-charge multiple high-voltage accessories at the same time and increase the pre-charging speed. When multiple pre-charging circuits are turned on, if one of the pre-charging circuits completes pre-charging, the pre-charging circuit can be disconnected by the corresponding switch unit, or after the remaining pre-charging circuits complete pre-charging, the multiple pre-charging circuits can be disconnected at the same time by the corresponding switch unit, and the embodiments of the present disclosure do not impose any restrictions on this.
[0107] Among them, the basis for judging the success and failure of pre-charging can be determined according to the actual situation, and the embodiments of the present disclosure do not impose any restrictions on this. In a possible way, the basis for judging the success and failure of pre-charging can be: if within the pre-charging time threshold, the difference between the voltage at the power output terminal and the voltage of the pre-charging accessory is greater than the first preset value, and the preset time is maintained, then the pre-charging is determined to be successful, otherwise it is determined to be a pre-charging failure. Among them, the pre-charging time threshold, the first preset value and the preset time can be determined according to the actual situation, and the embodiments of the present disclosure do not impose any restrictions on this. For example, the pre-charging time threshold can be set to 1 second, the first preset value can be set to 30 volts, and the preset time can be set to 200ms.
[0108] For example, if the first vehicle unit 4 is within T1, it satisfies: U ptc ≥U1-30V and lasts for 200ms, it is determined that the first vehicle unit 4 is pre-charged successfully; if the second vehicle unit 5 is within T2, it satisfies: U dc ≥U2-30V, and lasts for 200ms, it is determined that the second vehicle unit 5 is pre-charged successfully; if the capacitor 6 is within T3, it satisfies: U c1≥U1-30V and lasts for 200ms, it is determined that the capacitor 6 is pre-charged successfully. Wherein, T1 represents the pre-charging time threshold of the first vehicle unit 4, U ptc represents the voltage of the first vehicle unit 4, U1 represents the voltage of the first battery pack 1, T2 represents the pre-charging time threshold of the second vehicle unit 5, U dc represents the voltage of the second vehicle unit 5, U2 represents the voltage of the second battery pack 2, T3 represents the pre-charging time threshold of the capacitor 6, U c1 represents the voltage of capacitor 6.
[0109] In a possible implementation, the controller can be configured as follows: in the first stage, the first battery group 1, the first vehicle unit 4 and the pre-charging resistor 3 form a pre-charging circuit to pre-charge half of the first vehicle unit 4; in the second stage, the second battery group 2, the pre-charging resistor 3 and the second vehicle unit 5 form a pre-charging circuit to pre-charge half of the second vehicle unit 5, and the second battery group 2, the multi-phase winding 8 and the lower arm of the multi-phase bridge arm 7 form a pre-charging circuit to charge the multi-phase winding 8; in the third stage, the second battery group 2, the multi-phase winding 8, the upper arm of the multi-phase bridge arm 7 and the capacitor 6 form a pre-charging circuit to pre-charge the capacitor 6 for boosting.
[0110] For example, in the first stage, if Figure 6 As shown, the controller controls the multi-phase bridge arm 7, the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the fifth switch unit K1, so that the first switch unit K5 and the third switch unit K8 are turned on, and the second switch unit K6, the fourth switch unit K4, the fifth switch unit K1, the upper bridge arm and the lower bridge arm in the multi-phase bridge arm 7 are disconnected, so that the electric energy output by the first battery pack 1 pre-charges the first vehicle unit 4 half of the pack. That is, the flow direction of the electric energy is: the positive electrode of the first battery pack 1 → the first switch unit K5 → the first vehicle unit 4 → the third switch unit K8 → the pre-charging resistor 3 → the negative electrode of the first battery pack 1.
[0111] In the second stage, if Figure 7As shown, the controller controls the multi-phase bridge arm 7, the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the fifth switch unit K1, so that the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the lower bridge arm in the multi-phase bridge arm 7 are turned on, and the first switch unit K5, the fifth switch unit K1 and the upper bridge arm in the multi-phase bridge arm 7 are turned off, so that the electric energy output by the second battery pack 2 pre-charges the second vehicle unit 5 half of the pack, and charges the multi-phase winding 8. That is, the flow direction of the electric energy includes a first flow direction and a second flow direction, wherein the first flow direction is: the positive electrode of the second battery pack 2 → the pre-charging resistor 3 → the third switch unit K8 → the second vehicle unit 5 → the second switch unit K6 → the negative electrode of the second battery pack 2. The second flow direction is: the positive electrode of the second battery pack 2 → the fourth switch unit K4 → the multi-phase winding 8 → the lower bridge arm in the multi-phase bridge arm 7 → the second switch unit K6 → the negative electrode of the second battery pack 2.
[0112] In the third stage, if Figure 8 As shown, the controller controls the multi-phase bridge arm 7, the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the fifth switch unit K1, so that the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the upper bridge arm in the multi-phase bridge arm 7 are turned on, and the first switch unit K5, the fifth switch unit K1 and the lower bridge arm in the multi-phase bridge arm 7 are turned off, so that the electric energy output by the second battery pack 2 performs half-pack pre-charging on the second vehicle unit 5, and the electric energy output by the multi-phase winding 8 and the electric energy output by the second battery pack 2 perform boost pre-charging on the capacitor 6. That is, the flow direction of the electric energy includes the third flow direction and the fourth flow direction, wherein the third flow direction is: the positive electrode of the second battery pack 2→the pre-charging resistor 3→the third switch unit K8→the second vehicle unit 5→the second switch unit K6→the negative electrode of the second battery pack 2. The fourth flow direction is: the positive electrode of the second battery group 2 → the fourth switch unit K4 → the multi-phase winding 8 → the upper bridge arm in the multi-phase bridge arm 7 → the capacitor 6 → the second switch unit K6 → the negative electrode of the second battery group 2 .
[0113] It should be understood that, since the present embodiment requires boost charging of the capacitor 6 , the second stage and the third stage need to be performed alternately.
[0114] In a possible implementation, the controller can be configured as follows: in the first stage, the second battery group 2, the pre-charging resistor 3 and the second vehicle unit 5 form a pre-charging circuit to pre-charge half of the second vehicle unit 5, and the second battery group 2, the multi-phase winding 8 and the lower bridge arm of the multi-phase bridge arm 7 form a pre-charging circuit to charge the multi-phase winding 8; in the second stage, the second battery group 2, the multi-phase winding 8, the upper bridge arm of the multi-phase bridge arm 7 and the capacitor 6 form a pre-charging circuit to boost and pre-charge the capacitor 6; in the third stage, the first battery group 1, the first vehicle unit 4 and the pre-charging resistor 3 form a pre-charging circuit to pre-charge half of the first vehicle unit 4.
[0115] For example, in the first stage, if Fig. 9 As shown, the controller controls the multi-phase bridge arm 7, the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the fifth switch unit K1, so that the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the lower bridge arm in the multi-phase bridge arm 7 are turned on, and the first switch unit K5, the fifth switch unit K1 and the upper bridge arm in the multi-phase bridge arm 7 are turned off, so that the electric energy output by the second battery pack 2 pre-charges the second vehicle unit 5 half of the pack, and charges the multi-phase winding 8. That is, the flow direction of the electric energy includes the fifth flow direction and the sixth flow direction, wherein the fifth flow direction is: the positive electrode of the second battery pack 2 → the pre-charging resistor 3 → the third switch unit K8 → the second vehicle unit 5 → the second switch unit K6 → the negative electrode of the second battery pack 2. The sixth flow direction is: the positive electrode of the second battery pack 2 → the fourth switch unit K4 → the multi-phase winding 8 → the lower bridge arm in the multi-phase bridge arm 7 → the second switch unit K6 → the negative electrode of the second battery pack 2.
[0116] In the second stage, if Fig.10 As shown, the controller controls the multi-phase bridge arm 7, the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the fifth switch unit K1, so that the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the upper bridge arm in the multi-phase bridge arm 7 are turned on, and the first switch unit K5, the fifth switch unit K1 and the lower bridge arm in the multi-phase bridge arm 7 are turned off, so that the electric energy output by the second battery pack 2 performs half-pack pre-charging on the second vehicle unit 5, and the electric energy output by the multi-phase winding 8 and the electric energy output by the second battery pack 2 perform boost pre-charging on the capacitor 6. That is, the flow direction of the electric energy includes the seventh flow direction and the eighth flow direction, wherein the seventh flow direction is: the positive electrode of the second battery pack 2→the pre-charging resistor 3→the third switch unit K8→the second vehicle unit 5→the second switch unit K6→the negative electrode of the second battery pack 2. The eighth flow direction is: the positive electrode of the second battery group 2 → the fourth switch unit K4 → the multi-phase winding 8 → the upper bridge arm in the multi-phase bridge arm 7 → the capacitor 6 → the second switch unit K6 → the negative electrode of the second battery group 2 .
[0117] In the third stage, if Fig.11 As shown, the controller controls the multi-phase bridge arm 7, the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the fifth switch unit K1, so that the first switch unit K5 and the third switch unit K8 are turned on, and the second switch unit K6, the fourth switch unit K4, the fifth switch unit K1, the upper bridge arm and the lower bridge arm in the multi-phase bridge arm 7 are disconnected, so that the electric energy output by the first battery pack 1 pre-charges the first vehicle unit 4 half of the pack. That is, the flow direction of the electric energy is: the positive electrode of the first battery pack 1 → the first switch unit K5 → the first vehicle unit 4 → the third switch unit K8 → the pre-charging resistor 3 → the negative electrode of the first battery pack 1.
[0118] In a possible implementation, the controller can also be configured to: when the power battery pack is in the first state, control the multi-phase bridge arm 7 and the pre-charging switch unit so that the second battery group 2, the pre-charging resistor 3 and the second vehicle unit 5 form a pre-charging circuit, the first battery group 1, the first vehicle unit 4 and the pre-charging resistor 3 form a pre-charging circuit, and the first battery group 1 and the motor module form a pre-charging circuit.
[0119] Similarly, of the three pre-charging circuits mentioned above, when there is no conflict in the direction of electric energy flow, only one of the pre-charging circuits can be turned on at the same time, and when the pre-charging is successful or fails, the next pre-charging circuit is turned on. It is also possible to turn on multiple pre-charging circuits at the same time to pre-charge the vehicle module and the motor module at the same time to increase the pre-charging speed. When multiple pre-charging circuits are turned on, if one of the pre-charging circuits completes pre-charging, the pre-charging circuit can be disconnected by the switch unit, or after the remaining pre-charging circuits complete pre-charging, the multiple pre-charging circuits can be disconnected at the same time by the switch unit. The embodiments of the present disclosure do not impose any restrictions on this.
[0120] In a possible implementation, the controller can be configured as follows: in a first stage, the first battery group 1, the first vehicle unit 4 and the pre-charging resistor 3 form a pre-charging circuit to pre-charge half of the first vehicle unit 4, and the first battery group 1, the upper bridge arm of the multi-phase bridge arm 7 and the multi-phase winding 8 form a pre-charging circuit to charge the multi-phase winding 8; in a second stage, the first battery group 1, the capacitor 6, the lower bridge arm of the multi-phase bridge arm 7 and the multi-phase winding 8 form a pre-charging circuit to boost and pre-charge the capacitor 6; in a third stage, the second battery group 2, the pre-charging resistor 3 and the second vehicle unit 5 form a pre-charging circuit to pre-charge half of the second vehicle unit 5.
[0121] For example, in the first stage, if Fig.12As shown, the controller controls the multi-phase bridge arm 7, the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the fifth switch unit K1, so that the first switch unit K5, the third switch unit K8, the fourth switch unit K4 and the upper bridge arm in the multi-phase bridge arm 7 are turned on, and the second switch unit K6, the fifth switch unit K1 and the lower bridge arm in the multi-phase bridge arm 7 are turned off, so that the electric energy output by the first battery pack 1 pre-charges the first vehicle unit 4 half of the pack, and charges the multi-phase winding 8. That is, the flow direction of the electric energy includes the ninth flow direction and the tenth flow direction, wherein the ninth flow direction is: the positive electrode of the first battery pack 1→the first switch unit K5→the first vehicle unit 4→the third switch unit K8→the pre-charging resistor 3→the negative electrode of the first battery pack 1. The tenth flow direction is: the positive electrode of the first battery pack 1→the first switch unit K5→the upper bridge arm in the multi-phase bridge arm 7→the multi-phase winding 8→the fourth switch unit K4→the negative electrode of the first battery pack 1.
[0122] In the second stage, if Fig.13 As shown, the controller controls the multi-phase bridge arm 7, the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the fifth switch unit K1, so that the first switch unit K5, the third switch unit K8, the fourth switch unit K4 and the lower bridge arm in the multi-phase bridge arm 7 are turned on, and the second switch unit K6, the fifth switch unit K1 and the upper bridge arm in the multi-phase bridge arm 7 are turned off, so that the electric energy output by the first battery pack 1 performs half-pack pre-charging on the first vehicle unit 4, and the electric energy output by the multi-phase winding 8 and the electric energy output by the first battery pack 1 perform boost pre-charging on the capacitor 6. That is, the flow direction of the electric energy includes the eleventh flow direction and the twelfth flow direction, wherein the eleventh flow direction is: the positive electrode of the first battery pack 1→the first switch unit K5→the first vehicle unit 4→the third switch unit K8→the pre-charging resistor 3→the negative electrode of the first battery pack 1. The twelfth flow direction is: the positive electrode of the first battery group 1 → the first switch unit K5 → the capacitor 6 → the lower bridge arm in the multi-phase bridge arm 7 → the multi-phase winding 8 → the fourth switch unit K4 → the negative electrode of the first battery group 1 .
[0123] In the third stage, if Fig.14 As shown, the controller controls the multi-phase bridge arm 7, the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the fifth switch unit K1, so that the second switch unit K6 and the third switch unit K8 are turned on, and the first switch unit K5, the fourth switch unit K4, the fifth switch unit K1, the upper bridge arm and the lower bridge arm in the multi-phase bridge arm 7 are disconnected, so that the electric energy output by the second battery pack 2 pre-charges the second vehicle unit 5 half of the pack. That is, the flow direction of the electric energy is: the positive electrode of the second battery pack 2 → the pre-charging resistor 3 → the third switch unit K8 → the second vehicle unit 5 → the second switch unit K6 → the negative electrode of the second battery pack 2.
[0124] In a possible implementation, the controller can be configured as follows: in the first stage, the second battery group 2, the second vehicle unit 5 and the pre-charging resistor 3 form a pre-charging circuit to pre-charge half of the second vehicle unit 5; in the second stage, the first battery group 1, the pre-charging resistor 3 and the first vehicle unit 4 form a pre-charging circuit to pre-charge half of the first vehicle unit 4, and the first battery group 1, the multi-phase winding 8 and the upper arm of the multi-phase bridge arm 7 form a pre-charging circuit to charge the multi-phase winding 8; in the third stage, the first battery group 1, the multi-phase winding 8, the lower arm of the multi-phase bridge arm 7 and the capacitor 6 form a pre-charging circuit to pre-charge the capacitor 6 for boosting.
[0125] For example, in the first stage, if Fig.15 As shown, the controller controls the multi-phase bridge arm 7, the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the fifth switch unit K1, so that the second switch unit K6 and the third switch unit K8 are turned on, and the first switch unit K5, the fourth switch unit K4, the fifth switch unit K1, the upper bridge arm and the lower bridge arm in the multi-phase bridge arm 7 are disconnected, so that the electric energy output by the second battery pack 2 pre-charges the second vehicle unit 5 half of the pack. That is, the flow direction of the electric energy is: the positive electrode of the second battery pack 2 → the pre-charging resistor 3 → the third switch unit K8 → the second vehicle unit 5 → the second switch unit K6 → the negative electrode of the second battery pack 2.
[0126] In the second stage, if Fig.16 As shown, the controller controls the multi-phase bridge arm 7, the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the fifth switch unit K1, so that the first switch unit K5, the third switch unit K8, the fourth switch unit K4 and the upper bridge arm in the multi-phase bridge arm 7 are turned on, and the second switch unit K6, the fifth switch unit K1 and the lower bridge arm in the multi-phase bridge arm 7 are turned off, so that the electric energy output by the first battery pack 1 pre-charges the first vehicle unit 4 half of the pack, and charges the multi-phase winding 8. That is, the flow direction of the electric energy includes the thirteenth flow direction and the fourteenth flow direction, wherein the thirteenth flow direction is: the positive electrode of the first battery pack 1→the first switch unit K5→the first vehicle unit 4→the third switch unit K8→the pre-charging resistor 3→the negative electrode of the first battery pack 1. The fourteenth flow direction is: the positive electrode of the first battery group 1 → the first switch unit K5 → the upper bridge arm in the multi-phase bridge arm 7 → the multi-phase winding 8 → the fourth switch unit K4 → the negative electrode of the first battery group 1 .
[0127] In the third stage, if Fig.17As shown, the controller controls the multi-phase bridge arm 7, the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the fifth switch unit K1, so that the first switch unit K5, the third switch unit K8, the fourth switch unit K4 and the lower bridge arm in the multi-phase bridge arm 7 are turned on, and the second switch unit K6, the fifth switch unit K1 and the upper bridge arm in the multi-phase bridge arm 7 are turned off, so that the electric energy output by the first battery pack 1 performs half-pack pre-charging on the first vehicle unit 4, and the electric energy output by the multi-phase winding 8 and the electric energy output by the first battery pack 1 perform boost pre-charging on the capacitor 6. That is, the flow direction of the electric energy includes the fifteenth flow direction and the sixteenth flow direction, wherein the fifteenth flow direction is: the positive electrode of the first battery pack 1→the first switch unit K5→the first vehicle unit 4→the third switch unit K8→the pre-charging resistor 3→the negative electrode of the first battery pack 1. The sixteenth flow direction is: the positive electrode of the first battery group 1 → the first switch unit K5 → the capacitor 6 → the lower bridge arm in the multi-phase bridge arm 7 → the multi-phase winding 8 → the fourth switch unit K4 → the negative electrode of the first battery group 1 .
[0128] In a possible embodiment, the controller is configured to: when the power battery pack is in the second state, control the multi-phase bridge arm 7, the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the fifth switch unit K1, so that: the first battery group 1, the pre-charging resistor 3 and the first vehicle unit 4 form a pre-charging circuit, the first battery group 1 and the motor module form a pre-charging circuit, and the first battery group 1, the second vehicle unit 5, the pre-charging resistor 3 and the motor module form a pre-charging circuit.
[0129] The second state can be used to indicate that only the first battery pack 1 in the power battery pack can pre-charge the motor module and the vehicle module. For example, when the first battery pack 1 passes the fault self-check and determines that the first battery pack 1 has no fault or the fault level is lower than the preset fault level, and the second battery pack 2 passes the fault self-check and determines that the second battery pack 2 has a fault or the fault level is higher than or equal to the preset fault level, the power battery pack is determined to be in the second state.
[0130] Similarly, when the directions of the electric energy flows do not conflict, only one of the two pre-charging circuits can be turned on at the same time, and when the pre-charging succeeds or fails, the next pre-charging circuit can be turned on. It is also possible to turn on multiple pre-charging circuits at the same time to pre-charge multiple high-voltage accessories at the same time and increase the pre-charging speed. When multiple pre-charging circuits are turned on, if one of the pre-charging circuits completes pre-charging, the pre-charging circuit can be disconnected by the switch unit, or after the remaining pre-charging circuits complete pre-charging, multiple pre-charging circuits can be disconnected at the same time by the switch unit. The embodiments of the present disclosure do not impose any restrictions on this.
[0131] In a possible implementation, the controller can be configured as follows: in a first stage, the first battery group 1, the first vehicle unit 4 and the pre-charging resistor 3 form a pre-charging circuit to pre-charge half of the first vehicle unit 4, and the first battery group 1, the capacitor 6, the lower arm of the multi-phase bridge arm 7 and the multi-phase winding 8 form a pre-charging circuit to pre-charge half of the capacitor 6; in a second stage, the first battery group 1, the multi-phase winding 8, the lower arm of the multi-phase bridge arm 7, the second vehicle unit 5 and the pre-charging resistor 3 form a pre-charging circuit to pre-charge half of the second vehicle unit 5.
[0132] For example, in the first stage, if Fig.18 As shown, the controller controls the multi-phase bridge arm 7, the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the fifth switch unit K1, so that the first switch unit K5, the third switch unit K8, the fourth switch unit K4 and the lower bridge arm in the multi-phase bridge arm 7 are turned on, and the second switch unit K6, the fifth switch unit K1 and the upper bridge arm in the multi-phase bridge arm 7 are turned off, so that the electric energy output by the first battery pack 1 pre-charges the first vehicle unit 4 and the capacitor 6 half of the pack. That is, the flow direction of the electric energy includes the seventeenth flow direction and the eighteenth flow direction, wherein the seventeenth flow direction is: the positive electrode of the first battery pack 1→the first switch unit K5→the first vehicle unit 4→the third switch unit K8→the pre-charging resistor 3→the negative electrode of the first battery pack 1. The eighteenth flow direction is: the positive electrode of the first battery pack 1→the first switch unit K5→the capacitor 6→the lower bridge arm in the multi-phase bridge arm 7→the multi-phase winding 8→the fourth switch unit K4→the negative electrode of the first battery pack 1.
[0133] In the second stage, if Fig.19 As shown, the controller controls the multi-phase bridge arm 7, the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the fifth switch unit K1, so that the first switch unit K5, the third switch unit K8, the fifth switch unit K1 and the lower bridge arm in the multi-phase bridge arm 7 are turned on, and the second switch unit K6, the fourth switch unit K4 and the upper bridge arm in the multi-phase bridge arm 7 are turned off, so that the electric energy output by the first battery pack 1 pre-charges the second vehicle unit 5 half of the pack. That is, the flow direction of the electric energy is: the positive electrode of the first battery pack 1 → the first switch unit K5 → the fifth switch unit K1 → the multi-phase winding 8 → the lower bridge arm in the multi-phase bridge arm 7 → the second vehicle unit 5 → the third switch unit K8 → the pre-charging resistor 3 → the negative electrode of the first battery pack 1.
[0134] In a possible implementation, the controller can be configured to: when the power battery pack is in the third state, control the multi-phase bridge arm 7, the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the fifth switch unit K1, so that: the second battery group 2, the pre-charging resistor 3 and the second vehicle unit 5 form a pre-charging circuit, the second battery group 2 and the motor module form a pre-charging circuit, and the second battery group 2, the first vehicle unit 4, the pre-charging resistor 3 and the motor module form a pre-charging circuit.
[0135] Among them, the third state can be used to indicate that only the second battery pack 2 in the power battery pack can pre-charge the motor module and the vehicle module. For example, when the first battery pack 1 passes the fault self-test and determines that the first battery pack 1 has a fault or the fault level is higher than or equal to the preset fault level, and the second battery pack 2 passes the fault self-test and determines that the second battery pack 2 has no fault or the fault level is lower than the preset fault level, it is determined that the power battery pack is in the third state.
[0136] Similarly, when the directions of the electric energy flows do not conflict, only one of the two pre-charging circuits can be turned on at the same time, and when the pre-charging succeeds or fails, the next pre-charging circuit can be turned on. It is also possible to turn on multiple pre-charging circuits at the same time to pre-charge multiple high-voltage accessories at the same time and increase the pre-charging speed. When multiple pre-charging circuits are turned on, if one of the pre-charging circuits completes pre-charging, the pre-charging circuit can be disconnected by the switch unit, or after the remaining pre-charging circuits complete pre-charging, multiple pre-charging circuits can be disconnected at the same time by the switch unit. The embodiments of the present disclosure do not impose any restrictions on this.
[0137] In a possible implementation, the controller can be configured as follows: in a first stage, the second battery pack 2, the pre-charging resistor 3 and the second vehicle unit 5 form a pre-charging circuit to pre-charge half of the second vehicle unit 5, and the second battery pack 2, the multi-phase winding 8, the upper arm of the multi-phase bridge arm 7 and the capacitor 6 form a pre-charging circuit to pre-charge half of the capacitor 6; in a second stage, the second battery pack 2, the pre-charging resistor 3, the first vehicle unit 4, the multi-phase winding 8, and the lower arm of the multi-phase bridge arm 7 form a pre-charging circuit to pre-charge half of the first vehicle unit 4.
[0138] For example, in the first stage, if Fig. 20As shown, the controller controls the multi-phase bridge arm 7, the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the fifth switch unit K1, so that the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the upper bridge arm in the multi-phase bridge arm 7 are turned on, and the first switch unit K5, the fifth switch unit K1 and the lower bridge arm in the multi-phase bridge arm 7 are turned off, so that the electric energy output by the second battery pack 2 pre-charges the second vehicle unit 5 and the capacitor 6 half of the pack. That is, the flow direction of the electric energy includes the nineteenth flow direction and the twentieth flow direction, wherein the nineteenth flow direction is: the positive electrode of the second battery pack 2 → the pre-charging resistor 3 → the third switch unit K8 → the second vehicle unit 5 → the second switch unit K6 → the negative electrode of the second battery pack 2. The twentieth flow direction is: the positive electrode of the second battery pack 2 → the fourth switch unit K4 → the multi-phase winding 8 → the upper bridge arm in the multi-phase bridge arm 7 → the capacitor 6 → the second switch unit K6 → the negative electrode of the second battery pack 2.
[0139] In the second stage, if Fig.21 As shown, the controller controls the multi-phase bridge arm 7, the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the fifth switch unit K1, so that the second switch unit K6, the third switch unit K8, the fifth switch unit K1 and the lower bridge arm in the multi-phase bridge arm 7 are turned on, and the first switch unit K5, the fourth switch unit K4 and the upper bridge arm in the multi-phase bridge arm 7 are turned off, so that the electric energy output by the second battery pack 2 pre-charges the first vehicle unit 4 half of the pack. That is, the flow direction of the electric energy is: the positive electrode of the second battery pack 2 → the pre-charging resistor 3 → the third switch unit K8 → the first vehicle unit 4 → the fifth switch unit K1 → the multi-phase winding 8 → the lower bridge arm in the multi-phase bridge arm 7 → the second switch unit K6 → the negative electrode of the second battery pack 2.
[0140] In a possible implementation, the controller can be configured to: when the power battery pack is in the fourth state, control the multi-phase bridge arm 7, the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4 and the fifth switch unit K1, so that: the power battery pack cannot form a pre-charging circuit with the motor module and / or the vehicle module, and / or generate an alarm message, and the alarm message is used to indicate a power battery pack failure.
[0141] Among them, the fourth state can be used to indicate that only the first battery pack 1 and the second battery pack 2 in the power battery pack cannot pre-charge the motor module and the vehicle module. For example, when the first battery pack 1 passes the fault self-test and determines that the first battery pack 1 has a fault or the fault level is higher than or equal to the preset fault level, and the second battery pack 2 passes the fault self-test and determines that the second battery pack 2 has a fault or the fault level is higher than or equal to the preset fault level, it is determined that the power battery pack is in the fourth state.
[0142] In a possible implementation manner, the pre-charging system further includes a power supply switch unit for controlling the power battery pack, the vehicle machine module and the motor module to form a power supply circuit, and the power supply switch unit is connected to the controller;
[0143] Correspondingly, the controller is also configured to: control the multi-phase bridge arm 7 and the power supply switch unit so that the first battery pack 1 and the first vehicle unit 4 form a power supply circuit and / or the second battery pack 2 and the second vehicle unit 5 form a power supply circuit.
[0144] For example, Figure 5 As shown, the power switch unit can further include a sixth switch unit K7 on the basis of the pre-charging switch unit, and the first end of the sixth switch unit K7 is respectively connected to the second end of the first vehicle unit 4 and the second end of the second vehicle unit 5, and the second end of the sixth switch unit K7 is respectively connected to the negative electrode of the first battery pack 1 and the positive electrode of the second battery pack 2. Therefore, after the first vehicle unit 4, the second vehicle unit 5 and the capacitor 6 are pre-charged, the power switch unit can be controlled so that the power battery pack can supply half of the vehicle module with power.
[0145] For example, when the power battery pack is in the first state, the multi-phase bridge arm 7, the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4, the fifth switch unit K1 and the sixth switch unit K7 can be controlled by the controller to make the first switch unit K5, the second switch unit K6 and the sixth switch unit K7 turned on, and the upper bridge arm in the multi-phase bridge arm 7 of the third switch unit K8, the fourth switch unit K4 and the fifth switch unit K1 and the lower bridge arm in the multi-phase bridge arm 7 are disconnected, so that the electric energy output by the first battery pack 1 supplies half of the power to the first vehicle unit 4, and the electric energy output by the second battery pack 2 supplies half of the power to the second vehicle unit 5, as shown in FIG. Fig. 22 That is, the flow direction of electric energy is: the positive electrode of the first battery pack 1 → the first switch unit K5 → the first vehicle unit 4 → the sixth switch unit K7 → the negative electrode of the first battery pack 1. The positive electrode of the second battery pack 2 → the sixth switch unit K7 → the second vehicle unit 5 → the second switch unit K6 → the negative electrode of the second battery pack 2.
[0146] For example, when the power battery pack is in the second state, the multi-phase bridge arm 7, the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4, the fifth switch unit K1 and the sixth switch unit K7 can be controlled by the controller to turn on the first switch unit K5 and the sixth switch unit K7, and to turn on the second switch unit K6, the third switch unit K8, the fourth switch unit K4, the fifth switch unit K1, the upper bridge arm in the multi-phase bridge arm 7 and the lower bridge arm in the multi-phase bridge arm 7, so that the electric energy output by the first battery pack 1 supplies half of the power to the first vehicle unit 4, as shown in FIG. Fig.23 That is, the flow direction of electric energy is: the positive electrode of the first battery pack 1 → the first switch unit K5 → the first vehicle unit 4 → the sixth switch unit K7 → the negative electrode of the first battery pack 1 .
[0147] For example, when the power battery pack is in the second state, the multi-phase bridge arm 7, the first switch unit K5, the second switch unit K6, the third switch unit K8, the fourth switch unit K4, the fifth switch unit K1 and the sixth switch unit K7 can be controlled to make the second switch unit K6 and the sixth switch unit K7 turned on, and the first switch unit K5, the third switch unit K8, the fourth switch unit K4, the fifth switch unit K1, the upper bridge arm in the multi-phase bridge arm 7 and the lower bridge arm in the multi-phase bridge arm 7 are disconnected, so that the electric energy output by the second battery pack 2 supplies half of the power to the second vehicle unit 5, such as Fig.24 That is, the flow direction of electric energy is: the positive electrode of the second battery pack 2 → the sixth switch unit K7 → the second vehicle unit 5 → the second switch unit K6 → the negative electrode of the second battery pack 2 .
[0148] It is worth noting that if the pre-charging of the first vehicle unit 4 fails during the pre-charging process of the pre-charging system, in order to avoid damage to the first vehicle unit 4 after power-on, the first switch unit K5 can be controlled to be disconnected after the pre-charging system completes the pre-charging, so that the first battery pack 1 and the first vehicle unit 4 cannot form a power supply circuit. Similarly, if the pre-charging of the second vehicle unit 5 fails, the second switch unit K6 can be controlled to be disconnected after the pre-charging system completes the pre-charging, so that the second battery pack 2 and the second vehicle unit 5 cannot form a power supply circuit.
[0149] In this embodiment, by adding the sixth switch unit K7, after the pre-charging system completes pre-charging, the first vehicle unit 4 and / or the second vehicle unit 5 can operate based on the half pack voltage, that is, the operating voltage of the vehicle module is half of the power battery pack voltage. Since performance parameters such as withstand voltage / current are proportional to price, the cost of the vehicle module can be reduced, thereby reducing the cost of the vehicle.
[0150] Based on the same concept, the present disclosure also provides a pre-charging control method. Fig.25 As shown, the pre-charging control method may include:
[0151] S2501: Determine a target pre-charging method according to status information of a power battery pack, wherein the power battery pack includes a first battery pack 1 and a second battery pack 2 connected in series, and the pre-charging method includes a pre-charging method based on the first battery pack 1 or the second battery pack 2.
[0152] Among the possible methods, the target pre-charging method includes a full-pack pre-charging method, an upper half-pack pre-charging method and an upper half-pack pre-charging method. Among them, the full-pack pre-charging method is used to characterize the pre-charging of the vehicle module and the motor module using the first battery pack 1 and the second battery pack 2, the upper half-pack pre-charging method is used to characterize the pre-charging of the vehicle module and the motor module using the first battery pack 1, and the lower half-pack pre-charging method is used to characterize the pre-charging of the vehicle module and the motor module using the second battery pack 2.
[0153] The status information of the power battery pack can be used to indicate whether the first battery pack 1 and the second battery pack 2 in the power battery pack are faulty. Accordingly, according to the status information of the power battery pack, determining the target pre-charging method may include:
[0154] When the status information of the power battery pack indicates that the first battery pack 1 and the second battery pack 2 are not faulty, the target pre-charging method is determined to be the full-pack pre-charging method. When the status information of the power battery pack indicates that the first battery pack 1 is not faulty and the second battery pack 2 is faulty, the target pre-charging method is determined to be the upper half-pack pre-charging method. When the status information of the power battery pack indicates that the first battery pack 1 is faulty and the second battery pack 2 is not faulty, the target pre-charging method is determined to be the lower pack pre-charging method.
[0155] S2502: Pre-charge the vehicle machine module and the motor module connected to the power battery pack according to the target pre-charging method.
[0156] For example, the pre-charging control method may be executed by a controller in a vehicle, so that when the vehicle is powered on, it can be determined whether the first battery group 1 and the second battery group 2 are faulty through the fault self-detection function of the first battery group 1 and the second battery group 2. If the first battery group 1 and the second battery group 2 are working normally, that is, the first battery group 1 and the second battery group 2 are not faulty, the vehicle-machine module and the motor module are pre-charged based on the full-pack pre-charging method. If the first battery group 1 is working normally and the second battery group 2 is not working normally, that is, the first battery group 1 is not faulty and the second battery group 2 is faulty, the vehicle-machine module and the motor module are pre-charged based on the upper half-pack pre-charging method. If the second battery group 2 is working normally and the first battery group 1 is not working normally, that is, the first battery group 1 is faulty and the second battery group 2 is not faulty, the vehicle-machine module and the motor module are pre-charged based on the lower half-pack pre-charging method, such as Fig.26 shown.
[0157] Based on the same concept, the embodiment of the present disclosure also provides a pre-charging control system, such as Fig. 27 As shown, the pre-charging control system 2700 may include:
[0158] A determination module 2701 is used to determine a target pre-charging mode according to the status information of the power battery pack, wherein the power battery pack includes a first battery pack 1 and a second battery pack 2 connected in series, and the pre-charging mode includes a pre-charging mode based on the first battery pack 1 or the second battery pack 2;
[0159] The pre-charging module 2702 is used to pre-charge the vehicle machine module and the motor module connected to the power battery pack according to the target pre-charging method.
[0160] Based on the same concept, the embodiment of the present disclosure further provides a controller, the controller comprising:
[0161] processor;
[0162] a memory for storing processor-executable instructions;
[0163] Wherein, the processor is configured to: execute the steps of the above-mentioned pre-charging control method.
[0164] Based on the same concept, an embodiment of the present disclosure also provides a vehicle, comprising any of the above-mentioned pre-charging systems or the above-mentioned controller.
[0165] Based on the same concept, an embodiment of the present disclosure also provides a non-temporary computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the steps of the above-mentioned pre-charging control method are implemented.
[0166] Based on the same concept, an embodiment of the present disclosure also provides a computer program product, including a computer program, which implements the steps of the above-mentioned pre-charging control method when executed by a processor.
[0167] Please refer to Fig.28 , Fig.28 28 is a functional block diagram of a vehicle provided according to an embodiment of the present disclosure. Vehicle 2800 may include various subsystems, for example, an infotainment system 2810, a perception system 2820, a decision control system 2830, a drive system 2840, and a computing platform 2850. Among them, vehicle 2800 may also include more or fewer subsystems, and each subsystem may include multiple components. In addition, each subsystem and each component of vehicle 2800 may be interconnected by wire or wireless means.
[0168] In some embodiments, the infotainment system 2810 may include a communication system, an entertainment system, and a navigation system, etc.
[0169] The perception system 2820 may include several sensors for sensing information about the environment around the vehicle 2800. For example, the perception system 2820 may include a global positioning system (the global positioning system may be a GPS system, or a Beidou system or other positioning systems), an inertial measurement unit (IMU), a laser radar, a millimeter wave radar, an ultrasonic radar, and a camera.
[0170] The decision control system 2830 may include a computing system, a vehicle controller, a steering system, a throttle, and a braking system.
[0171] The drive system 2840 may include components that provide powered motion for the vehicle 2800. In one embodiment, the drive system 2840 may include an engine, an energy source, a transmission system, and wheels. The engine may be one or a combination of an internal combustion engine, an electric motor, and an air compression engine. The engine is capable of converting energy provided by the energy source into mechanical energy.
[0172] Some or all functions of the vehicle 2800 are controlled by a computing platform 2850. The computing platform 2850 may include at least one processor 2851 and a memory 2852, and the processor 2851 may execute instructions 2853 stored in the memory 2852.
[0173] The processor 2851 may be any conventional processor, such as a commercially available CPU. The processor may also include a graphics processor (Graphic Process Unit, GPU), a field programmable gate array (Field Programmable Gate Array, FPGA), a system on chip (System on Chip, SOC), an application specific integrated circuit (Application Specific Integrated Circuit, ASIC) or a combination thereof.
[0174] Memory 2852 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, magnetic disk or optical disk.
[0175] In addition to instructions 2853 , memory 2852 may also store data, such as road maps, route information, vehicle location, direction, speed, etc. The data stored in memory 2852 may be used by computing platform 2850 .
[0176] In the embodiment of the present disclosure, the processor 2851 may execute instruction 2853 to complete the steps of the above-mentioned pre-charging control method.
[0177] The preferred embodiments of the present disclosure are described in detail above in conjunction with the accompanying drawings; however, the present disclosure is not limited to the specific details in the above embodiments. Within the technical concept of the present disclosure, a variety of simple modifications can be made to the technical solution of the present disclosure, and these simple modifications all fall within the protection scope of the present disclosure.
[0178] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, the present disclosure will not further describe various possible combinations.
Claims
1. A pre-charging system, characterized in that: The pre-charging system comprises: A power battery pack comprises a first battery pack (1) and a second battery pack (2) connected in series; A vehicle machine module comprises a pre-charging resistor (3) and a vehicle machine unit, wherein the vehicle machine unit comprises a first vehicle machine unit (4) and a second vehicle machine unit (5) connected in series, and the first vehicle machine unit (4) and the second vehicle machine unit (5) comprise one or more high-voltage accessories; Motor module; A pre-charging circuit is formed according to the power battery pack, the vehicle machine module and the motor module, so that one of the first battery pack (1) and the second battery pack (2) pre-charges one of the first vehicle machine unit (4) and the second vehicle machine unit (5) through the pre-charging resistor (3), or one of the first battery pack (1) and the second battery pack (2) pre-charges one of the first vehicle machine unit (4) and the second vehicle machine unit (5) through the pre-charging resistor (3) and the motor module.
2. The pre-charging system according to claim 1, characterized in that: The motor module comprises a capacitor (6), a multi-phase bridge arm (7) and a multi-phase winding (8) corresponding to the multi-phase bridge arm (7) one by one, and each phase winding is connected to the midpoint of the corresponding bridge arm. The power battery pack, the vehicle machine module and the motor module form a pre-charging circuit, comprising: The positive electrode of the first battery group (1) is respectively connected to the first bus terminal of the multi-phase bridge arm (7), the first end of the capacitor (6) and the first end of the first vehicle unit (4), and the negative electrode of the second battery group (2) is respectively connected to the second bus terminal of the multi-phase bridge arm (7), the second end of the capacitor (6) and the first end of the second vehicle unit (5); The second end of the first vehicle unit (4) is connected to the second end of the second vehicle unit (5), and the second end of the first vehicle unit (4) is connected to the first end of the pre-charging resistor (3), and the second end of the pre-charging resistor (3) is respectively connected to the negative electrode of the first battery pack (1) and the positive electrode of the second battery pack (2); The neutral point of the multi-phase winding (8) is respectively connected to the negative electrode of the first battery pack (1), the positive electrode of the second battery pack (2), the first bus terminal of the multi-phase bridge arm (7), the first end of the capacitor (6) and the first end of the first vehicle unit (4).
3. The pre-charging system according to claim 2, characterized in that: The pre-charging system further comprises: a controller and a pre-charging switch unit for controlling the pre-charging circuit to be turned on or off, wherein the controller is respectively connected to the multi-phase bridge arm (7) and the pre-charging switch unit; The controller is configured to: control the multi-phase bridge arm (7) and the pre-charging switch unit so that one of the first battery group (1) and the second battery group (2) pre-charges one of the first vehicle machine unit (4) and the second vehicle machine unit (5) through the pre-charging resistor (3), or so that one of the first battery group (1) and the second battery group (2) pre-charges one of the first vehicle machine unit (4) and the second vehicle machine unit (5) through the pre-charging resistor (3) and the motor module.
4. The pre-charging system according to claim 3, characterized in that: The controller is configured to: when the power battery pack is in a first state, control the multi-phase bridge arm (7) and the pre-charging switch unit so that the first battery pack (1), the first vehicle unit (4) and the pre-charging resistor (3) form a pre-charging circuit, the second battery pack (2), the pre-charging resistor (3) and the second vehicle unit (5) form a pre-charging circuit, and the second battery pack (2) and the motor module form a pre-charging circuit.
5. The pre-charging system according to claim 4, characterized in that: The controller is configured to: in a first stage, the first battery pack (1), the first vehicle unit (4) and the pre-charging resistor (3) form a pre-charging circuit to pre-charge half of the first vehicle unit (4); in a second stage, the second battery pack (2), the pre-charging resistor (3) and the second vehicle unit (5) form a pre-charging circuit to pre-charge half of the second vehicle unit (5); and the second battery pack (2), the multi-phase winding (8) and the lower bridge arm of the multi-phase bridge arm (7) form a pre-charging circuit to charge the multi-phase winding (8); in a third stage, the second battery pack (2), the multi-phase winding (8), the upper bridge arm of the multi-phase bridge arm (7) and the capacitor (6) form a pre-charging circuit to pre-charge the capacitor (6) with a boost voltage.
6. The pre-charging system according to claim 4, characterized in that: The controller is configured to: in a first stage, the second battery pack (2), the pre-charging resistor (3) and the second vehicle-machine unit (5) form a pre-charging circuit to pre-charge half of the second vehicle-machine unit (5), and the second battery pack (2), the multi-phase winding (8) and the lower bridge arm of the multi-phase bridge arm (7) form a pre-charging circuit to charge the multi-phase winding (8); in a second stage, the second battery pack (2), the multi-phase winding (8), the upper bridge arm of the multi-phase bridge arm (7) and the capacitor (6) form a pre-charging circuit to pre-charge the capacitor (6); in a third stage, the first battery pack (1), the first vehicle-machine unit (4) and the pre-charging resistor (3) form a pre-charging circuit to pre-charge half of the first vehicle-machine unit (4).
7. The pre-charging system according to claim 3, characterized in that: The controller is configured to: when the power battery pack is in a first state, control the multi-phase bridge arm (7) and the pre-charging switch unit so that the second battery pack (2), the pre-charging resistor (3) and the second vehicle unit (5) form a pre-charging circuit, the first battery pack (1), the first vehicle unit (4) and the pre-charging resistor (3) form a pre-charging circuit, and the first battery pack (1) and the motor module form a pre-charging circuit.
8. The pre-charging system according to claim 7, characterized in that: The controller is configured to: in a first stage, the first battery pack (1), the first vehicle-machine unit (4) and the pre-charging resistor (3) form a pre-charging circuit to pre-charge half of the first vehicle-machine unit (4), and the first battery pack (1), the upper bridge arm of the multi-phase bridge arm (7) and the multi-phase winding (8) form a pre-charging circuit to charge the multi-phase winding (8); in a second stage, the first battery pack (1), the capacitor (6), the lower bridge arm of the multi-phase bridge arm (7) and the multi-phase winding (8) form a pre-charging circuit to boost the capacitor (6); in a third stage, the second battery pack (2), the pre-charging resistor (3) and the second vehicle-machine unit (5) form a pre-charging circuit to pre-charge half of the second vehicle-machine unit (5).
9. The pre-charging system according to claim 7, characterized in that: The controller is configured to: in a first stage, the second battery pack (2), the second vehicle unit (5) and the pre-charging resistor (3) form a pre-charging circuit to pre-charge half of the second vehicle unit (5); in a second stage, the first battery pack (1), the pre-charging resistor (3) and the first vehicle unit (4) form a pre-charging circuit to pre-charge half of the first vehicle unit (4); and the first battery pack (1), the multi-phase winding (8) and the upper bridge arm of the multi-phase bridge arm (7) form a pre-charging circuit to charge the multi-phase winding (8); in a third stage, the first battery pack (1), the multi-phase winding (8), the lower bridge arm of the multi-phase bridge arm (7) and the capacitor (6) form a pre-charging circuit to pre-charge the capacitor (6) with a boost voltage.
10. The pre-charging system according to claim 3, characterized in that: The controller is configured to: when the power battery pack is in the second state, control the multi-phase bridge arm (7) and the pre-charging switch unit so that the first battery pack (1), the pre-charging resistor (3) and the first vehicle unit (4) form a pre-charging circuit, the first battery pack (1) and the motor module form a pre-charging circuit, and the first battery pack (1), the second vehicle unit (5), the pre-charging resistor (3) and the motor module form a pre-charging circuit.
11. The pre-charging system according to claim 10, characterized in that: The controller is configured to: in a first stage, make the first battery pack (1), the first vehicle unit (4) and the pre-charging resistor (3) form a pre-charging circuit to pre-charge half of the first vehicle unit (4), and make the first battery pack (1), the capacitor (6), the lower bridge arm of the multi-phase bridge arm (7) and the multi-phase winding (8) form a pre-charging circuit to pre-charge half of the capacitor (6); in a second stage, make the first battery pack (1), the multi-phase winding (8), the lower bridge arm of the multi-phase bridge arm (7), the second vehicle unit (5) and the pre-charging resistor (3) form a pre-charging circuit to pre-charge half of the second vehicle unit (5).
12. The pre-charging system according to claim 3, characterized in that: The controller is configured to: when the power battery pack is in the third state, control the multi-phase bridge arm (7) and the pre-charging switch unit so that the second battery pack (2), the pre-charging resistor (3) and the second vehicle unit (5) form a pre-charging circuit, the second battery pack (2) and the motor module form a pre-charging circuit, and the second battery pack (2), the first vehicle unit (4), the pre-charging resistor (3) and the motor module form a pre-charging circuit.
13. The pre-charging system according to claim 12, characterized in that: The controller is configured to: in a first stage, form a pre-charging circuit with the second battery pack (2), the pre-charging resistor (3) and the second vehicle-machine unit (5) to pre-charge half of the second vehicle-machine unit (5), and form a pre-charging circuit with the second battery pack (2), the multi-phase winding (8), the upper bridge arm of the multi-phase bridge arm (7) and the capacitor (6) to pre-charge half of the capacitor (6); in a second stage, form a pre-charging circuit with the second battery pack (2), the pre-charging resistor (3), the first vehicle-machine unit (4), the multi-phase winding (8) and the lower bridge arm of the multi-phase bridge arm (7) to pre-charge half of the first vehicle-machine unit (4).
14. The pre-charging system according to claim 3, characterized in that: The controller is configured to: when the power battery pack is in the fourth state, control the multi-phase bridge arm (7) and the pre-charging switch unit so that the power battery pack cannot form a pre-charging circuit with the motor module and / or the vehicle machine module, and / or generate an alarm message, wherein the alarm message is used to indicate a fault in the power battery pack.
15. The pre-charging system according to any one of claims 3 to 14, characterized in that: The pre-charging system further includes a power supply switch unit for controlling the power battery pack, the vehicle machine module and the motor module to form a power supply circuit, and the power supply switch unit is connected to the controller; Correspondingly, the controller is also configured to: control the multi-phase bridge arm (7) and the power supply switch unit so that the first battery pack (1) and the first vehicle-machine unit (4) form a power supply circuit and / or the second battery pack (2) and the second vehicle-machine unit (5) form a power supply circuit.
16. The pre-charging system according to any one of claims 1 to 14, characterized in that: The first vehicle machine unit (4) comprises a heater and a compressor, and the second vehicle machine unit (5) comprises an on-board charger and a DCDC transformer.
17. A pre-charging control method, characterized in that: The pre-charge control method comprises: Determine a target pre-charging method according to status information of a power battery pack, wherein the power battery pack comprises a first battery pack (1) and a second battery pack (2) connected in series, and the target pre-charging method is that one of the first battery pack (1) and the second battery pack (2) pre-charges one of the first vehicle unit (4) and the second vehicle unit (5) in the pre-charging circuit through a pre-charging resistor (3) in the pre-charging circuit, and pre-charges a capacitor in a motor module through one of the first battery pack (1) and the second battery pack (2) through a motor module in the pre-charging circuit, wherein the pre-charging circuit is formed according to the power battery pack, the first vehicle unit (4), the second vehicle unit (5), the pre-charging resistor (3) and the motor module, and the first vehicle unit (4) and the second vehicle unit (5) comprise one or more high-voltage accessories; According to the target pre-charging method, one of the first vehicle machine unit (4) and the second vehicle machine unit (5) in the pre-charging loop and the motor module are pre-charged.
18. A controller, characterized in that: The controller comprises: processor; a memory for storing processor-executable instructions; Wherein, the processor is configured to: execute the steps of the method described in claim 17.
19. A vehicle, characterized in that: Includes the pre-charging system according to any one of claims 1-16 or the controller according to claim 18.
20. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to claim 17 are implemented.
21. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to claim 17 are implemented.
Citation Information
Patent Citations
Pre-charging circuit, high-voltage power distribution device and electric vehicle
CN215971122U
Charging voltage switching device, control method and automobile
CN111546944A
Power battery system, electric vehicle and control method
CN117021978A