Mobile block control method, device, storage medium and electronic device
By determining the fuzzy area of train operation information in the railway control system and closing the incoming signal when the minimum front end of the train crosses the fuzzy area, the misjudgment and section unlocking problems caused by the train rolling back or back are solved, and the train operation is improved security.
Patent Information
- Application Number
- CN202410541256.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-30
- Publication Date
- 2025-02-14
- Estimated Expiration
- 2044-04-30
AI Technical Summary
In railway control, the train may slip backward or regress due to problems such as the slope of the line near the incoming signal or the train position ahead of schedule, causing the corresponding section status of the incoming signal to switch from occupation to idle, and misjudgment of the train Drive away, unlock the section, and increase the risk of squeezing.
By obtaining the operation information of the train, determine the fuzzy area of the corresponding section of the incoming signal machine relative to the train. When the minimum front end of the train passes through the fuzzy area, control the incoming signal machine to close to ensure that the section is when the train is backward or backward. Stay locked.
It effectively prevents misjudgment and section unlocking caused by train slipping back or regression, ensures the exclusiveness of the section corresponding to the train entering the station signal, and improves the safety of train operation.
Smart Images

Figure CN118560550B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of computer technology, and in particular to a mobile block control method, device, storage medium and electronic device. Background Art
[0002] At present, during the operation of a train, when the state of the section corresponding to the station entry signal is idle, the radio block center will indicate that the train can enter the section corresponding to the station entry signal. When the minimum front end of the train passes the station entry signal by a certain distance, the radio block center generates the cross-pressure information of the station entry signal according to the position information of the train, and sends the cross-pressure information to the computer interlocking system. After the computer interlocking system receives the cross-pressure information of the train, it controls the station entry signal to close.
[0003] However, in actual railway control, after the radio block center sends the train's cross-pressure information to the computer interlocking system, the train may slip back or retreat due to problems such as the slope of the line near the station entry signal or the train's advanced position. When the train slips back or retreats, the train may exit the section corresponding to the station entry signal, thereby switching the status of the section corresponding to the station entry signal from occupied to idle. If there is a train that has not left the next section of the section corresponding to the station entry signal, the status of the next section is occupied. At this time, the computer interlocking system will misjudge this situation as the train leaving the section corresponding to the station entry signal and entering the next section. At this time, the section corresponding to the station entry signal will be unlocked, that is, the status of the section corresponding to the station entry signal will be set to idle. If there is a turnout in the section corresponding to the station entry signal, then after the section corresponding to the station entry signal is unlocked, the turnout on this section may also be unlocked. Since the train has not entered the next section at this time, the train will continue to run and will still enter the section corresponding to the station entry signal. At this time, the turnout is in an unlocked state, which will cause the risk of the train squeezing the turnout. Summary of the invention
[0004] In view of the above problems, the present application provides a moving block control method, device, storage medium and electronic device.
[0005] In order to solve the above technical problems, this application proposes the following solutions:
[0006] In the first aspect, the present application provides a mobile block control method, the method comprising: obtaining the operation information of the train, the operation information being used to indicate the operation information when the train rolls back or retreats; determining the fuzzy zone of the section corresponding to the station entry signal relative to the train based on the operation information; when the minimum front end of the train passes through the fuzzy zone, controlling the station entry signal to close.
[0007] In combination with the first aspect, in a possible implementation method, the insulating node corresponding to the station entrance signal is used as the starting point of the fuzzy zone; the length of the fuzzy zone is determined according to the undivided distance of the train, the maximum reverse slip distance of the train and the maximum retreat distance of the train, and the undivided distance is used to indicate the distance that the train is not detected by the track circuit corresponding to the section.
[0008] In combination with the first aspect, in another possible implementation, the operating information includes: a first reverse roll distance, the first reverse roll distance is used to indicate the distance the train rolls back from the beginning of the train rolling back to the stage where the train triggers emergency braking; the method also includes: determining the maximum reverse roll distance based on the first reverse roll distance, the second reverse roll distance and the third reverse roll distance, the second reverse roll distance is used to indicate the distance the train rolls back during emergency braking, and the third reverse roll distance is used to indicate the distance the train rolls back from the stage where the train stops emergency braking to the stage where it stops completely.
[0009] In combination with the first aspect, in another possible implementation, the operation information also includes: a first slope, a second time, and an emergency braking rate, the first slope is used to indicate the maximum slope of the track between the starting point and the end of the section, with the position being the length of the train outside the station entry signal as the starting point, the second time is used to indicate the time when the train applies emergency braking, and the emergency braking rate is used to indicate the deceleration that can be achieved after the train applies emergency braking; the method also includes: determining a first speed of the train based on the first reverse roll distance and the first slope, the first speed being used to indicate the speed of the train when emergency braking starts after the train reverses; determining the second reverse roll distance of the train based on the first speed, the second time and the emergency braking rate.
[0010] In combination with the first aspect, in another possible implementation, the second speed of the train is determined based on the first speed, the first slope and the second time, and the second speed is used to indicate the speed of the train when it stops applying emergency braking; the third reverse roll distance of the train is determined based on the second speed, the first slope and the emergency braking rate.
[0011] In combination with the first aspect, in another possible implementation, the operation information also includes: a first retreat distance, the first retreat distance is used to indicate the distance the train retreats from the start of retreat to the start of the traction cut-off stage; the method also includes: determining the maximum retreat distance based on the first retreat distance, the second retreat distance, the third retreat distance and the fourth retreat distance, the second retreat distance is used to indicate the retreat distance of the train during the traction cut-off period, and the third retreat distance is used to indicate the retreat distance of the train during the emergency braking period after the traction cut-off.
[0012] In combination with the first aspect, in another possible implementation, the operating information also includes: a first time and a third speed, the first time is used to indicate the time required for the train to cut off traction, and the third speed is used to indicate the speed of the train when retreating; the method also includes: determining the second retreat distance and the fourth speed based on the first time, the first slope, and the third speed, the fourth speed is used to indicate the maximum speed that the train can reach due to the first slope during the traction cut-off period.
[0013] In combination with the first aspect, in another possible implementation, the operating information also includes: a third time, the third time is used to indicate the time when emergency braking is applied after the train traction is cut off; the method also includes: determining a fifth speed and a third retreat distance based on the fourth speed, the third time and the first slope, the fifth speed is used to indicate the maximum speed that the train can reach in the emergency braking stage due to the first slope after traction is cut off; determining the fourth retreat distance based on the fifth speed, the emergency braking rate and the first slope.
[0014] In combination with the first aspect, in another possible implementation, the distance between the smallest front end of the train and the second axle of the train is used as the undivided distance.
[0015] In a second aspect, the present application provides a mobile blocking control device, the mobile blocking control device comprising:
[0016] An acquisition module is used to acquire the running information of the train, and the running information is used to indicate the running information when the train rolls back or retreats;
[0017] A determination module, used to determine the fuzzy area of the section corresponding to the station entry signal relative to the train according to the operation information;
[0018] The control module is used to control the station approach signal to close when the smallest front end of the train passes through the fuzzy zone.
[0019] In combination with the second aspect, in a possible implementation method, the determination module is specifically used to take the insulating node corresponding to the station entry signal as the starting point of the fuzzy zone; determine the length of the fuzzy zone according to the undivided distance of the train, the maximum reverse slip distance of the train and the maximum retreat distance of the train, and the undivided distance is used to indicate the distance that the train is not detected by the track circuit corresponding to the section.
[0020] In combination with the second aspect, in another possible implementation method, the operation information includes: a first reverse roll distance, the first reverse roll distance is used to indicate the distance the train rolls back from the beginning of the train rolling back to the stage where the train triggers the emergency braking; a determination module, specifically used to determine the maximum reverse roll distance based on the first reverse roll distance, the second reverse roll distance and the third reverse roll distance, the second reverse roll distance is used to indicate the reverse roll distance of the train during emergency braking, and the third reverse roll distance is used to indicate the distance the train rolls back from the stage where the emergency braking stops to the stage where the train stops completely.
[0021] In combination with the second aspect, in another possible implementation method, the operation information also includes: a first slope, a second time, and an emergency braking rate. The first slope is used to indicate the maximum slope of the track between the starting point and the end of the section, with the position being the length of the train outside the station entry signal as the starting point. The second time is used to indicate the time when the train applies emergency braking. The emergency braking rate is used to indicate the deceleration that can be achieved after the train applies emergency braking. A determination module is specifically used to determine a first speed of the train based on the first reverse roll distance and the first slope. The first speed is used to indicate the speed of the train when emergency braking starts after the train reverses. Determine the second reverse roll distance of the train based on the first speed, the second time, and the emergency braking rate.
[0022] In combination with the second aspect, in another possible implementation, the determination module is specifically used to determine the second speed of the train based on the first speed, the first slope and the second time, the second speed being used to indicate the speed of the train when it stops applying emergency braking; and determine the third reverse roll distance of the train based on the second speed, the first slope and the emergency braking rate.
[0023] In combination with the second aspect, in another possible implementation, the operation information also includes: a first retreat distance, the first retreat distance is used to indicate the distance the train retreats from the start of retreat to the start of the traction cut-off stage; a determination module, specifically used to determine the maximum retreat distance based on the first retreat distance, the second retreat distance, the third retreat distance and the fourth retreat distance, the second retreat distance is used to indicate the retreat distance of the train during the traction cut-off period, and the third retreat distance is used to indicate the retreat distance of the train during the emergency braking period after the traction cut-off.
[0024] In combination with the second aspect, in another possible implementation method, the operating information also includes: a first time and a third speed, the first time is used to indicate the time required for the train to cut off traction, and the third speed is used to indicate the speed of the train when retreating; a determination module, specifically used to determine the second retreat distance and the fourth speed based on the first time, the first slope, and the third speed, and the fourth speed is used to indicate the maximum speed that the train can reach due to the first slope during the traction cut-off period.
[0025] In combination with the second aspect, in another possible implementation, the operating information also includes: a third time, the third time is used to indicate the time when emergency braking is applied after the train traction is cut off; a determination module, specifically used to determine the fifth speed and the third retreat distance based on the fourth speed, the third time and the first slope, the fifth speed is used to indicate the maximum speed that the train can reach in the emergency braking stage due to the first slope after traction is cut off; determine the fourth retreat distance based on the fifth speed, the emergency braking rate and the first slope.
[0026] In combination with the second aspect, in another possible implementation, the determination module is specifically configured to use the distance between the smallest front end of the train and the second axle of the train as the undivided distance.
[0027] In order to achieve the above-mentioned purpose, according to the third aspect of the present application, a storage medium is provided, wherein the storage medium includes a stored program, wherein when the program is running, the device where the storage medium is located is controlled to execute the mobile block control method of the above-mentioned first aspect.
[0028] In order to achieve the above-mentioned purpose, according to the fourth aspect of the present application, an electronic device is provided, which includes at least one processor, and at least one memory and a bus connected to the processor; wherein the processor and the memory communicate with each other through the bus; the processor is used to call the program instructions in the memory to execute the mobile block control method of the first aspect mentioned above.
[0029] By means of the above technical solution, the technical solution provided by this application has at least the following advantages:
[0030] Since the present application determines the fuzzy zone of the section corresponding to the station entry signal relative to the train according to the operation information when the train reverses or reverses, when the minimum front end of the train crosses the fuzzy zone, the radio block center sends the cross-pressure information to the computer interlocking system, so that the computer interlocking system controls the closing of the station entry signal according to the cross-pressure information. The fuzzy zone of the present application is determined according to the operation information when the train reverses or reverses, so it can be ensured that when the train reverses or reverses, the section corresponding to the station entry signal is still in a locked state, thereby ensuring the exclusivity of the train entering the section corresponding to the station entry signal, and the section corresponding to the station entry signal will not be unlocked by the interlocking error, thereby ensuring the safety of the train operation.
[0031] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present application. Also, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:
[0033] Figure 1 A schematic diagram of the structure of a mobile block control system provided by an embodiment of the present application is shown;
[0034] Figure 2 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application is shown;
[0035] Figure 3 A schematic flow chart of a moving block control method provided in an embodiment of the present application is shown;
[0036] Figure 4 A schematic diagram of a fuzzy area provided in an embodiment of the present application is shown;
[0037] Figure 5 A schematic diagram of a maximum rollback distance provided by an embodiment of the present application is shown;
[0038] Figure 6 A schematic diagram showing a maximum retreat distance provided by an embodiment of the present application is shown;
[0039] Figure 7 A schematic structural diagram of a mobile blocking control device provided in an embodiment of the present application is shown. DETAILED DESCRIPTION
[0040] The exemplary embodiments of the present application will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present application are shown in the accompanying drawings, it should be understood that the present application can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present application and to fully convey the scope of the present application to those skilled in the art.
[0041] In the embodiments of the present application, the terms "first" and "second" do not have a logical or temporal dependency, nor do they limit the quantity and execution order. It should also be understood that although the following description uses the terms first, second, etc. to describe various elements, these elements should not be limited by the terms. These terms are only used to distinguish one element from another element.
[0042] In the embodiments of the present application, the term "at least one" means one or more, and the term "plurality" means two or more.
[0043] It should also be understood that the term "if" may be interpreted as "when" or "upon" or "in response to determining" or "in response to detecting." Similarly, the phrase "if it is determined that ..." or "if [a stated condition or event] is detected" may be interpreted as "upon determining that ..." or "in response to determining that ..." or "upon detecting [a stated condition or event]" or "in response to detecting [a stated condition or event]," depending on the context.
[0044] The implementation of the embodiments of the present application will be described in detail below with reference to the accompanying drawings.
[0045] For example, see Figure 1 , Figure 1 The schematic diagram of a mobile block control system to which the technical solution provided by the present application is applicable is shown. The mobile block control system 100 may include a dispatching device 110, an interlocking device 120 and an on-board device 130. The dispatching device 110, the interlocking device 120 and the on-board device 130 are connected through network communication.
[0046] The dispatching device 110 may be a Radio Block Center (RBC), which is one of the core parts of the train ground equipment. The RBC supervises and controls the operation of trains within its jurisdiction, can communicate with trains running within its jurisdiction, and can also communicate with a computer interlocking system (CI).
[0047] In an embodiment of the present application, the dispatching device 110 is used to communicate with the interlocking device 120 and the on-board device 130. Specifically, the dispatching device 110 receives the position information sent in real time by the on-board device 130. When it is determined based on the position information reported by the train that the train enters the preset range outside the station entry signal, the dispatching device 110 sends a control instruction to the interlocking device 120, and the control instruction is used to control the interlocking device 120 to check the state of the section corresponding to the station entry signal. When the state of the section corresponding to the station entry signal is idle, it indicates that the vehicle access route can be processed. At this time, the train can enter the section corresponding to the station entry signal. When the minimum front end of the train crosses the fuzzy area of the station entry signal, the dispatching device 110 generates the cross-pressure information of the station entry signal based on the position information of the train.
[0048] The interlocking device 120 may be a computer interlocking system. The computer interlocking system refers to a mutual restriction relationship established by technical means between signals, switches and routes in order to ensure the safety of train operation and shunting operations at railway stations.
[0049] In the embodiment of the present application, the interlocking device 120 controls the station entrance signal to close after receiving the cross-pressure information of the train sent by the dispatching device 110.
[0050] Figure 2 The hardware structure of an electronic device provided in this application can be the above-mentioned dispatching device 110, interlocking device 120 and vehicle-mounted device 130.
[0051] like Figure 2 As shown, the electronic device 200 includes a processor 210 , a communication line 220 and a communication interface 230 .
[0052] Optionally, the electronic device 200 may further include a memory 240 . The processor 210 , the memory 240 and the communication interface 230 may be connected via a communication line 220 .
[0053] The processor 210 may be a central processing unit (CPU), a general-purpose processor, a network processor (NP), a digital signal processor (DSP), a microprocessor, a microcontroller, a programmable logic device (PLD), or any combination thereof. The processor 210 may also be any other device having a processing function, such as a circuit, a device, or a software module, without limitation.
[0054] In one example, the processor 210 may include one or more CPUs, such as Figure 2 CPU0 and CPU2 in.
[0055] As an optional implementation, the electronic device 200 includes multiple processors, for example, in addition to the processor 210, it may also include a processor 270. The communication line 220 is used to transmit information between the components included in the electronic device 200.
[0056] The communication interface 230 is used to communicate with other devices or other communication networks. The other communication networks may be Ethernet, Radio Access Network (RAN), Wireless Local Area Networks (WLAN), etc. The communication interface 230 may be a module, a circuit, a transceiver or any device capable of achieving communication.
[0057] The memory 240 is used to store instructions, where the instructions may be computer programs.
[0058] Among them, the memory 240 can be a read-only memory (ROM) or other types of static storage devices that can store static information and / or instructions, or a random access memory (RAM) or other types of dynamic storage devices that can store information and / or instructions, or an electrically erasable programmable read-only memory (EEPROM), a compact disc read-only memory (CD-ROM) or other optical disc storage, optical disc storage (including compressed optical disc, laser disc, optical disc, digital versatile disc, Blu-ray disc, etc.), magnetic disk storage medium or other magnetic storage devices, etc., without limitation.
[0059] It should be noted that the memory 240 may exist independently of the processor 210 or may be integrated with the processor 210. The memory 240 may be used to store instructions or program codes or some data, etc. The memory 240 may be located inside the electronic device 200 or outside the electronic device 200, without limitation.
[0060] The processor 210 is used to execute the instructions stored in the memory 240 to implement the communication method provided in the following embodiments of the present application. For example, when the electronic device 200 is a terminal or a chip in a terminal, the processor 210 can execute the instructions stored in the memory 240 to implement the steps performed by the transmitting end in the following embodiments of the present application.
[0061] As an optional implementation, the electronic device 200 further includes an output device 250 and an input device 260. The output device 250 may be a device such as a display, a speaker, etc. that can output data of the electronic device 200 to a user. The input device 260 may be a device such as a keyboard, a mouse, a microphone, or a joystick that can input data to the electronic device 200.
[0062] It should be pointed out that Figure 2 The structure shown in the figure does not constitute a limitation on the electronic device, except Figure 2 In addition to the components shown, the electronic device may include more or fewer components than shown, or combine certain components, or arrange the components differently.
[0063] The mobile block control device and application scenarios described in the embodiments of the present application are intended to more clearly illustrate the technical solutions of the embodiments of the present application, and do not constitute a limitation on the technical solutions provided in the embodiments of the present application. Ordinary technicians in this field can know that with the evolution of mobile block control devices and the emergence of new business scenarios, the technical solutions provided in the embodiments of the present application are also applicable to similar technical problems.
[0064] Next, the moving block control method is described in detail with reference to the accompanying drawings. Figure 3 A flow chart of a moving block control method provided in this application. The method is applied to Figure 1 The mobile block control system of the hardware structure shown in the figure specifically includes the following steps:
[0065] Step 310: Obtain train operation information.
[0066] The radio block center is one of the core parts of the train ground equipment. It monitors and controls the operation of trains within its jurisdiction, can communicate with trains running in its jurisdiction, and can also communicate with the computer interlocking system (CI). The computer interlocking system refers to the mutual restriction relationship established by technical means between signal machines, turnouts and routes in order to ensure the safety of railway station operation and shunting operations. The equipment that realizes this relationship is called interlocking equipment.
[0067] During the operation of the train, the train that communicates with the radio block center on the line will report its position information to the radio block center. When the radio block center determines that the train enters the preset range outside the station entry signal according to the position information reported by the train, the radio block center sends a control instruction to the computer interlocking system, which is used to control the computer interlocking system to check the status of the section corresponding to the station entry signal. When the status of the section corresponding to the station entry signal is idle, it indicates that the train can be received. At this time, the train can enter the section corresponding to the station entry signal. When the minimum front end of the train passes the station entry signal by a certain distance, the radio block center generates the cross-pressure information of the station entry signal according to the position information of the train, and sends the cross-pressure information to the computer interlocking system. The cross-pressure information is used as the condition for the computer interlocking to identify the train entering the route. The computer interlocking system controls the opening and closing of the signal according to this command. After the computer interlocking system receives the cross-pressure information of the train, it controls the station entry signal to close.
[0068] However, in actual railway control, after the radio block center sends the train's cross-pressure information to the computer interlocking system, the train may slip back or retreat due to problems such as the slope of the line near the station entry signal or the train's advanced position. When the train slips back or retreats, the train may exit the section corresponding to the station entry signal, thereby switching the status of the section corresponding to the station entry signal from occupied to idle. If there is a train that has not left the next section of the section corresponding to the station entry signal, the status of the next section is occupied. At this time, the computer interlocking system will misjudge this situation as the train leaving the section corresponding to the station entry signal and entering the next section. At this time, the section corresponding to the station entry signal will be unlocked, that is, the status of the section corresponding to the station entry signal will be set to idle. If there is a turnout in the section corresponding to the station entry signal, then after the section corresponding to the station entry signal is unlocked, the turnout on this section may also be unlocked. Since the train has not entered the next section at this time, the train will continue to run and will still enter the section corresponding to the station entry signal. At this time, the turnout is in an unlocked state, which will cause the risk of the train squeezing the turnout.
[0069] Based on the above reasons, the present application sets a fuzzy zone behind the station entry signal to prevent the train's smallest front end from rolling back or retreating after entering the section corresponding to the station entry signal, thereby causing the computer interlocking system to make an incorrect judgment. Based on this, the present application needs to obtain the pre-configured running information of the train when rolling back or retreating in addition to receiving the train's position information at the radio block center.
[0070] In one embodiment, the operation information related to the train rolling back includes: a first rolling back distance, a first slope, a second time, and an emergency braking rate. The first rolling back distance is used to indicate the distance of the train rolling back from the beginning of the train rolling back to the stage when the train triggers the emergency braking. The first slope is used to indicate the maximum slope of the track between the starting point and the end of the section, taking the position of the train length outside the station entry signal as the starting point. The second time is used to indicate the time to apply the emergency brake when the train rolls back. The emergency braking rate is used to indicate the deceleration that can be achieved after the train applies the emergency brake.
[0071] In another embodiment, the operation information related to the train retreat includes: a first retreat distance, a first time, a first slope, a third speed, and a third time. The first retreat distance is used to indicate the distance the train retreats from the beginning of the retreat to the beginning of the traction cutting stage. The first time is used to indicate the time required for the train to cut off the traction. It should be noted that when the train retreats, traction is required to pull the train to retreat, and when the train stops retreating, the traction needs to be cut off. The third speed is used to indicate the speed of the train when it retreats. The third time is used to indicate the time to apply emergency braking after the traction of the train is cut off. When the train retreats, the definition of the first slope is the same as the definition of the first slope when the train rolls back, and will not be repeated here.
[0072] Step 320: Determine the fuzzy area of the section corresponding to the station entry signal relative to the train according to the operation information.
[0073] After the radio block center obtains the running information of the train, the fuzzy area of the section corresponding to the station entry signal relative to the train is determined according to the running information.
[0074] In one embodiment, Figure 4 As shown, the insulating section corresponding to the station entry signal is taken as the starting point of the fuzzy zone. The undivided distance of the train, the maximum reverse slip distance of the train and the maximum retreat distance of the train are determined according to the train operation information. The length of the fuzzy zone is determined according to the undivided distance of the train, the maximum reverse slip distance of the train and the maximum retreat distance of the train, and then the range of the fuzzy zone of the section corresponding to the station entry signal relative to the train is obtained.
[0075] For example, the undivided distance of the train is D1, the maximum reverse distance of the train is D2, and the maximum retreat distance of the train is D3, then the length of the fuzzy zone D=D1+max(D2,D3).
[0076] Since the entire track system network is divided into many block sections at appropriate distances, each block section is separated by track insulation joints to form an independent track circuit, and a signal is installed at the starting point of each block section. This independent track circuit is composed of rail lines and rail insulation. It can automatically and continuously detect whether this section of the line is occupied by a train, and can also control the signal device (signal) to ensure the driving safety of the train.
[0077] When a train enters a block section, the track circuit responds immediately and transmits the information to the signal that a train has already passed through the block section and other trains are prohibited from entering. At this time, the signal at the entrance of the block section immediately displays the information that the train is prohibited from entering (i.e. the signal is closed).
[0078] For the track circuit, the train is considered to have entered the block section only when the axle of the train presses on the track of the track circuit corresponding to the block section, causing the track circuit to short-circuit. However, in order to ensure the safety of train operation, the moment when the smallest front end of the train enters the block section should be considered as the moment when the train enters the block section, rather than the moment when the axle of the train presses on the track of the track circuit corresponding to the block section. Based on this, the present application takes into account the undivided distance when determining the range of the fuzzy zone of the section corresponding to the station entry signal relative to the train, that is, the distance at which the train is not detected by the track circuit corresponding to the section.
[0079] In a railway system, the track circuit often fails to detect the first axle of the train. Therefore, in an embodiment of the present application, the distance between the smallest front end of the train and the second axle of the train is taken as the undivided distance.
[0080] On the one hand, if Figure 5 As shown, when the train rolls backward, the train will first roll backward for a preset distance (i.e., the first rollback distance). After the train rolls backward for the first rollback distance, the train control system will apply emergency braking to stop the train. However, during the emergency braking stage of the train, after the speed of the train reaches a certain level (i.e., reaches the second speed), the emergency braking will no longer be applied to the train. At this time, the train can gradually reduce its speed according to the emergency braking previously applied until the train speed reaches 0, at which time the train stops running.
[0081] Based on this, the maximum reverse roll distance of the present application consists of three parts, namely the first reverse roll distance (the distance the train rolls back from the start of the reverse roll to the stage when the train triggers the emergency braking), the second reverse roll distance (the distance the train rolls back during emergency braking) and the third reverse roll distance (the distance the train rolls back from the stage when the train stops emergency braking to the stage when it stops completely).
[0082] In one embodiment, since the first reverse roll distance of the train is known, the position of the train length outside the station signal is taken as the starting point, and the maximum slope of the track between the starting point and the end of the section is also known, the maximum speed (first speed) that the train can reach in the reverse roll stage can be determined according to the first reverse roll distance and the first slope. In the emergency braking stage, the train performs emergency braking based on the first speed according to the second time and the emergency braking rate. Therefore, the second reverse roll distance of the train can be determined according to the first speed, the second time and the emergency braking rate. In the case of the known speed of the train when the emergency braking starts (i.e., the maximum speed that the train can reach in the reverse roll stage), the first slope and the time when the train applies emergency braking, the speed of the train when the emergency braking stops (the second speed) can be determined according to the first speed, the first slope and the second time. Since after the emergency braking stops, the train decelerates to 0 based on the second speed, the first slope and the emergency braking rate, the third reverse roll distance of the train is determined according to the second speed, the first slope and the emergency braking rate.
[0083] For example, the first reverse rolling distance of the train is D4, the first slope is a, the second time is t2, and the emergency braking rate is a.
[0084] The first speed of the train Where g is the acceleration due to gravity.
[0085] The second reverse slip distance of the train D5 = S1*t2+0.5*a*t2 2 .
[0086] The second speed of the train S2=S1+a*g*t2.
[0087] The third reverse distance of the train
[0088] After calculating the second reverse roll distance D5 and the third reverse roll distance D6 of the train according to the above formula, the maximum reverse roll distance of the train can be obtained, that is, D=D4+D5+D6.
[0089] On the other hand, Figure 6As shown, in some scenarios, the train needs to retreat after the minimum front end passes the signal for a certain distance, for example, the train stops ahead of the signal. In this case, the train begins to retreat under the action of traction. After the train retreats a preset distance (the first retreat distance), the traction will be cut off and emergency braking will be applied to stop the train. Before the train traction is completely cut off, the train will retreat for a distance (the second retreat distance) due to the residual traction. After the train traction is completely cut off, the train starts emergency braking. In the emergency braking stage, the train retreats the third retreat distance according to the preset time and emergency braking rate. Similar to the train rollback, in the emergency braking stage of the train, after the speed of the train reaches a certain level, the emergency braking will no longer be applied to the train. At this time, the train can gradually reduce the speed according to the emergency braking previously applied until the train speed is 0, at which time the train stops running. In this stage, the train retreats the fourth retreat distance.
[0090] Based on this, the maximum retreat distance of the present application consists of four parts: the first retreat distance (the distance the train retreats from the start of retreat to the start of the train cutting off traction phase), the second retreat distance (the distance the train retreats during the train cutting off traction phase), the third retreat distance (the distance the train retreats during the emergency braking phase after the train traction is cut off), and the fourth retreat distance (the distance the train retreats from the emergency braking phase to the complete stop phase).
[0091] In one embodiment, during the traction removal stage of the train, the time required for the train to remove traction (first time) is known, the first slope is known, and the speed of the train when retreating is known, so the second retreat distance can be determined based on the first time, the first slope, and the third speed. On this basis, the maximum speed (fourth speed) that the train can reach during the traction removal period due to the first slope can also be determined. When calculating the retreat distance of the train in the emergency braking stage, the third retreat distance can be determined when the speed of the train when emergency braking starts (fourth speed), the time when the train applies emergency braking after traction removal (third time) and the first slope are known. On this basis, the maximum speed that the train can reach during the emergency braking stage due to the first slope after traction removal can also be obtained. Similar to the train rollback, since after the emergency braking stops, the train decelerates to 0 based on the fifth speed, the first slope, and the emergency braking rate, the fourth retreat distance is determined based on the fifth speed, the emergency braking rate, and the first slope.
[0092] For example, the first retreat distance of the train is D7, the first slope is a, the first time is t1, the third time is t3, the third speed is S3, and the emergency braking rate is a.
[0093] Second retreat distance of the train
[0094] The fourth speed of the train S4=S3+a*g*t1.
[0095] The fifth speed of the train S5=S4+a*g*t3.
[0096] The third retreat distance of the train
[0097] The fourth retreat distance of the train
[0098] After the second retreat distance D8, the third retreat distance D9 and the fourth retreat distance D10 of the train are calculated according to the above formula, the maximum retreat distance of the train can be obtained, that is, D=D7+D8+D9+D10.
[0099] The first slope is 2, the first time is 0.2 seconds, the second time is 0.3 seconds, the third time is 0.1 seconds, and the emergency braking rate is -0.8m / s 2 , the first reverse distance is 2 meters, the first retreat distance is 2 meters, the third speed is 5km / h, and the undivided distance is 5 meters. According to the above train reverse formula, the maximum reverse distance of the train can be calculated to be 7.19 meters, and the maximum retreat distance of the train can be calculated to be 7.72 meters according to the above train retreat formula. In summary, the length of the fuzzy zone of the section corresponding to the station signal relative to the train is D = D1 + max (D2, D3) = 5 + 7.72 = 12.72 meters.
[0100] Step 330: When the smallest front end of the train passes through the fuzzy area, the station entry signal is controlled to be closed.
[0101] When the radio block center finds that the minimum front end of the train has passed the fuzzy area of the section corresponding to the station entry signal relative to the train based on the position information sent by the train in real time, the radio block center sends the cross-pressure information to the computer interlocking system. After receiving the cross-pressure information of the train, the computer interlocking system controls the station entry signal to close.
[0102] In summary, since the present application determines the fuzzy zone of the section corresponding to the station entry signal relative to the train based on the operation information when the train reverses or reverses, when the minimum front end of the train crosses the fuzzy zone, the radio block center sends the cross-pressure information to the computer interlocking system, so that the computer interlocking system controls the closing of the station entry signal based on the cross-pressure information. The fuzzy zone of the present application is determined based on the operation information when the train reverses or reverses, so it can be ensured that when the train reverses or reverses, the section corresponding to the station entry signal is still in a locked state, thereby ensuring the exclusivity of the train entering the section corresponding to the station entry signal, and the section corresponding to the station entry signal will not be unlocked by the interlocking error, thereby ensuring the safety of the train operation.
[0103] It is understandable that in order to implement the functions in the above embodiments, the computer device includes hardware structures and / or software modules corresponding to the execution of each function. Those skilled in the art should easily realize that, in combination with the units and method steps of each example described in the embodiments disclosed in this application, the present application can be implemented in the form of hardware or a combination of hardware and computer software. Whether a function is executed in the form of hardware or computer software driving hardware depends on the specific application scenario and design constraints of the technical solution.
[0104] Furthermore, as a response to the above Figure 3 The implementation of the method embodiment shown in the figure, the embodiment of the present application provides a mobile block control device. The embodiment of the device corresponds to the aforementioned method embodiment. For ease of reading, this embodiment will not repeat the details of the aforementioned method embodiment one by one, but it should be clear that the device in this embodiment can correspond to all the contents of the aforementioned method embodiment. Figure 7 As shown, the mobile block control device 700 includes:
[0105] An acquisition module 710 is used to acquire the running information of the train, where the running information is used to indicate the running information when the train rolls back or retreats;
[0106] A determination module 720, for determining the fuzzy area of the section corresponding to the station entry signal relative to the train according to the operation information;
[0107] The control module 730 is used to control the station entry signal to close when the smallest front end of the train passes through the fuzzy area.
[0108] Further, such as Figure 7 As shown, the determination module 720 is specifically used to take the insulating node corresponding to the station entry signal as the starting point of the fuzzy zone; determine the length of the fuzzy zone according to the undivided distance of the train, the maximum reverse slip distance of the train and the maximum retreat distance of the train, and the undivided distance is used to indicate the distance that the train is not detected by the track circuit corresponding to the section.
[0109] Further, such as Figure 7 As shown, the operation information includes: a first rollback distance, the first rollback distance is used to indicate the distance the train rolls back from the start of the train rolling back to the stage where the train triggers the emergency braking; a determination module 720, specifically used to determine the maximum rollback distance according to the first rollback distance, the second rollback distance and the third rollback distance, the second rollback distance is used to indicate the rollback distance of the train during emergency braking, and the third rollback distance is used to indicate the distance the train rolls back from the stage where the train stops emergency braking to the stage where it stops completely.
[0110] Further, such as Figure 7As shown, the operation information also includes: a first slope, a second time, and an emergency braking rate. The first slope is used to indicate the maximum slope of the track between the starting point and the end of the section, with the position of the length of the train outside the station entry signal as the starting point. The second time is used to indicate the time when the train applies emergency braking. The emergency braking rate is used to indicate the deceleration that can be achieved after the train applies emergency braking. The determination module 720 is specifically used to determine the first speed of the train according to the first reverse roll distance and the first slope. The first speed is used to indicate the speed of the train when emergency braking starts after the train reverses; determine the second reverse roll distance of the train according to the first speed, the second time and the emergency braking rate.
[0111] Further, such as Figure 7 As shown, the determination module 720 is specifically used to determine the second speed of the train based on the first speed, the first slope and the second time, the second speed being used to indicate the speed of the train when it stops applying emergency braking; and determine the third reverse roll distance of the train based on the second speed, the first slope and the emergency braking rate.
[0112] Further, such as Figure 7 As shown, the operation information also includes: a first retreat distance, the first retreat distance is used to indicate the distance the train retreats from the start of the train retreat to the start of the traction cut-off stage; a determination module 720, specifically used to determine the maximum retreat distance based on the first retreat distance, the second retreat distance, the third retreat distance and the fourth retreat distance, the second retreat distance is used to indicate the retreat distance of the train during the traction cut-off period, and the third retreat distance is used to indicate the retreat distance of the train during the emergency braking period after the traction cut-off.
[0113] Further, such as Figure 7 As shown, the operation information also includes: a first time and a third speed, the first time is used to indicate the time required for the train to cut off traction, and the third speed is used to indicate the speed of the train when retreating; a determination module 720 is specifically used to determine the second retreat distance and the fourth speed according to the first time, the first slope, and the third speed, and the fourth speed is used to indicate the maximum speed that the train can reach due to the first slope during the traction cut-off period.
[0114] Further, such as Figure 7 As shown, the operation information also includes: a third time, the third time is used to indicate the time when emergency braking is applied after the train traction is cut off; a determination module 720, specifically used to determine a fifth speed and a third retreat distance according to the fourth speed, the third time and the first slope, the fifth speed is used to indicate the maximum speed that the train can reach in the emergency braking stage due to the first slope after the traction is cut off; determine the fourth retreat distance according to the fifth speed, the emergency braking rate and the first slope.
[0115] Further, such as Figure 7As shown, the determination module 720 is specifically configured to use the distance between the smallest front end of the train and the second axle of the train as the undivided distance.
[0116] An embodiment of the present application provides a storage medium on which a program is stored. When the program is executed by a processor, the moving block control method is implemented.
[0117] An embodiment of the present application provides a processor, which is used to run a program, wherein the moving block control method is executed when the program is run.
[0118] The present application also provides a computer program product, which, when executed on a data processing device, is suitable for executing an initialization program having the following method steps: obtaining the operation information of the train, the operation information being used to indicate the operation information when the train rolls back or retreats; determining the fuzzy zone of the section corresponding to the station entry signal relative to the train based on the operation information; and controlling the station entry signal to close when the minimum front end of the train passes through the fuzzy zone.
[0119] Furthermore, the insulating node corresponding to the station entry signal is taken as the starting point of the fuzzy zone; the length of the fuzzy zone is determined according to the undivided distance of the train, the maximum reverse slip distance of the train and the maximum retreat distance of the train. The undivided distance is used to indicate the distance that the train is not detected by the track circuit corresponding to the section.
[0120] Furthermore, the operation information includes: a first reverse roll distance, the first reverse roll distance is used to indicate the distance the train rolls back from the start of the train rolling back to the stage where the train triggers the emergency braking; the method also includes: determining the maximum reverse roll distance based on the first reverse roll distance, the second reverse roll distance and the third reverse roll distance, the second reverse roll distance is used to indicate the distance the train rolls back during emergency braking, and the third reverse roll distance is used to indicate the distance the train rolls back from the stage where the train stops emergency braking to the stage where it stops completely.
[0121] Furthermore, the operation information also includes: a first slope, a second time, and an emergency braking rate, the first slope is used to indicate the maximum slope of the track between the starting point and the end of the section, with the position being the length of the train outside the station entry signal as the starting point, the second time is used to indicate the time when the train applies emergency braking, and the emergency braking rate is used to indicate the deceleration that can be achieved after the train applies emergency braking; the method also includes: determining a first speed of the train based on the first reverse roll distance and the first slope, the first speed is used to indicate the speed of the train when emergency braking begins after the train reverses; determining the second reverse roll distance of the train based on the first speed, the second time and the emergency braking rate.
[0122] Furthermore, the second speed of the train is determined according to the first speed, the first slope and the second time, and the second speed is used to indicate the speed of the train when the emergency brake is stopped; the third reverse roll distance of the train is determined according to the second speed, the first slope and the emergency braking rate.
[0123] Furthermore, the operation information also includes: a first retreat distance, the first retreat distance is used to indicate the distance the train retreats from the start of retreat to the start of the traction cut-off stage; the method also includes: determining the maximum retreat distance based on the first retreat distance, the second retreat distance, the third retreat distance and the fourth retreat distance, the second retreat distance is used to indicate the retreat distance of the train during the traction cut-off period, and the third retreat distance is used to indicate the retreat distance of the train during the emergency braking period after the traction cut-off.
[0124] Furthermore, the operation information also includes: a first time and a third speed, the first time is used to indicate the time required for the train to cut off traction, and the third speed is used to indicate the speed of the train when retreating; the method also includes: determining the second retreat distance and the fourth speed based on the first time, the first slope, and the third speed, and the fourth speed is used to indicate the maximum speed that the train can reach due to the first slope during the traction cut-off period.
[0125] Furthermore, the operating information also includes: a third time, the third time is used to indicate the time when emergency braking is applied after the train traction is cut off; the method also includes: determining a fifth speed and a third retreat distance based on the fourth speed, the third time and the first slope, the fifth speed is used to indicate the maximum speed that the train can reach in the emergency braking stage due to the first slope after traction is cut off; determining the fourth retreat distance based on the fifth speed, the emergency braking rate and the first slope.
[0126] Further, the distance between the smallest front end of the train and the second axle of the train is taken as the undivided distance.
[0127] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0128] In a typical configuration, the device includes one or more processors (CPU), memory and bus. The device may also include input / output interface, network interface and the like.
[0129] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip. The memory is an example of a computer-readable medium.
[0130] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0131] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0132] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.
[0133] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.
Claims
1. A moving block control method, characterized in that: The method comprises: Acquiring running information of a train, wherein the running information is used to indicate running information when the train rolls back or retreats; Determining the fuzzy zone of the section corresponding to the station entry signal relative to the train according to the operation information, including: taking the insulating joint corresponding to the station entry signal as the starting point of the fuzzy zone; determining the length of the fuzzy zone according to the undivided distance of the train, the maximum reverse slip distance of the train and the maximum retreat distance of the train, wherein the undivided distance is used to indicate the distance that the train is not detected by the track circuit corresponding to the section; When the smallest front end of the train passes through the fuzzy zone, the station entry signal is controlled to be closed.
2. The method according to claim 1, characterized in that The operation information includes: a first reverse rolling distance, the first reverse rolling distance being used to indicate the reverse rolling distance of the train from the start of the reverse rolling to the stage of triggering the emergency braking of the train; The method further comprises: The maximum rollback distance is determined according to the first rollback distance, the second rollback distance and the third rollback distance, wherein the second rollback distance is used to indicate the rollback distance of the train during emergency braking, and the third rollback distance is used to indicate the rollback distance of the train from emergency braking to complete stop.
3. The method according to claim 2, characterized in that The operation information further includes: a first slope, a second time, and an emergency braking rate, wherein the first slope is used to indicate the maximum slope of the track between the starting point and the end point of the section, with the position of the train length outside the station entry signal as the starting point, the second time is used to indicate the time when the train applies emergency braking, and the emergency braking rate is used to indicate the deceleration that can be achieved after the train applies emergency braking; The method further comprises: Determine a first speed of the train according to the first rollback distance and the first slope, wherein the first speed is used to indicate the speed of the train when emergency braking begins after the train rolls back; The second rollback distance of the train is determined according to the first speed, the second time, and the emergency braking rate.
4. The method according to claim 3, characterized in that The method further comprises: determining a second speed of the train according to the first speed, the first slope and the second time, the second speed being used to indicate the speed of the train when the emergency brake is stopped; The third rollback distance of the train is determined according to the second speed, the first slope and the emergency braking rate.
5. The method according to claim 1, characterized in that The operation information further includes: a first retreat distance, the first retreat distance being used to indicate the distance the train retreats from the start of retreat to the start of the traction removal phase of the train; The method further comprises: The maximum retreat distance is determined based on the first retreat distance, the second retreat distance, the third retreat distance and the fourth retreat distance, the second retreat distance is used to indicate the retreat distance of the train during traction cut-off, and the third retreat distance is used to indicate the retreat distance of the train during emergency braking after traction cut-off.
6. The method according to claim 5, characterized in that The operation information further includes: a first time and a third speed, wherein the first time is used to indicate the time required for the train to cut off traction, and the third speed is used to indicate the speed of the train when retreating; The method further comprises: The second retreat distance and the fourth speed are determined according to the first time, the first slope, and the third speed, wherein the fourth speed is used to indicate the maximum speed that the train can reach due to the first slope during traction removal.
7. The method according to claim 6, characterized in that The operation information also includes: a third time, the third time is used to indicate the time when the emergency brake is applied after the traction of the train is cut off; The method further comprises: determining a fifth speed and the third retreat distance according to the fourth speed, the third time and the first slope, wherein the fifth speed is used to indicate a maximum speed that the train can reach in an emergency braking stage due to the first slope after traction removal; The fourth retreat distance is determined according to the fifth speed, the emergency braking rate, and the first slope.
8. The method according to claim 1, characterized in that The method further comprises: The undivided distance is taken as the distance between the smallest front end of the train and the second axle of the train.
9. A mobile block control device, characterized in that: The device comprises: An acquisition module, used for acquiring operation information of a train, wherein the operation information is used for indicating the operation information when the train rolls back or retreats; a determination module, used to determine the fuzzy zone of the section corresponding to the station entry signal relative to the train according to the operation information, including: taking the insulating joint corresponding to the station entry signal as the starting point of the fuzzy zone; determining the length of the fuzzy zone according to the undivided distance of the train, the maximum reverse slip distance of the train and the maximum retreat distance of the train, wherein the undivided distance is used to indicate the distance that the train is not detected by the track circuit corresponding to the section; A control module is used to control the station entry signal to close when the smallest front end of the train passes through the fuzzy area.
10. A storage medium, characterized in that: The storage medium includes a stored program, wherein when the program is executed, the device where the storage medium is located is controlled to execute the moving block control method according to any one of claims 1 to 8.
11. An electronic device, characterized in that: The device includes at least one processor, and at least one memory and a bus connected to the processor; wherein the processor and the memory communicate with each other through the bus; the processor is used to call the program instructions in the memory to execute the mobile block control method as described in any one of claims 1-8.
Citation Information
Patent Citations
Train retreating protection system and method
CN115848448A