A quality monitoring method during concrete foundation pouring construction
By combining mixing and transportation information to determine the quality of concrete casting and confirming the number of casting layers, the problems of insufficient vibration quality monitoring and insufficient control parameter indicators in the existing technology are solved, and the controllability and overall structure of casting quality are improved. security.
Patent Information
- Application Number
- CN202411045227.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-08-01
AI Technical Summary
The vibration quality monitoring intensity during the pouring construction of existing concrete foundations is insufficient, and the comprehensive judgment cannot be made in combination with the traceability information of the stirring and transportation process, resulting in insufficient effectiveness and reliability of vibration quality control, and insufficient vibration control parameter indicators. Influences the overall strength and stability of concrete.
A method for quality monitoring during concrete foundation pouring construction is proposed. By introducing casting setting indicators, identifying traceability information, monitoring casting status, setting quality correction factors, and making casting quality judgment based on mixing and transportation information, confirming the number of casting layers to ensure that The accuracy and rationality of the number of cast layers.
Improve the effectiveness and reliability of vibration quality control, enhance the guarantee of casting quality, reduce the impact of insufficient or excessive casting layers on the overall strength and stability of concrete, and improve the safety and reliability of the overall structure. sex.
Smart Images

Figure CN118571357B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of concrete pouring quality monitoring and relates to a quality monitoring method in a concrete foundation pouring construction process. Background Art
[0002] Concrete foundation pouring is a very important part of construction engineering, and its quality is directly related to the safety and stability of the entire building. Therefore, during the construction process, quality monitoring is required to ensure that the quality of the concrete foundation meets the design requirements.
[0003] At present, the quality monitoring during the concrete foundation pouring construction process mainly monitors the vibration quality during the pouring process, so as to ensure the vibration effect and construction effect.
[0004] Prior art, such as a Chinese invention patent application with application publication number CN114964154B, discloses a bored pile casting process monitoring system, which sets three sensor units at different heights. During the process of pulling out the casting conduit, a specific pressure difference is calculated. When the second sensor unit is located at the concrete liquid surface, the pressure difference reaches a maximum value. At the same time, the height of the second sensor is the same as the height of the casting. Based on this specific pressure difference, it can be determined when to stop pulling out the casting conduit, and the height of the casting at this time can also be calculated collaboratively.
[0005] Another example of the prior art is a real-time monitoring method for concrete vibration quality based on laser three-dimensional positioning disclosed in a Chinese invention patent application with application publication number CN106323170B, which includes: arranging the measuring points of the laser detector, determining the initial value of the vertical position, and obtaining the plane position of the vibrating rod working point and the vertical displacement, and then drawing the distribution of the plane and vertical points of the vibrating rod, and based on this, according to the data acquisition frequency and processing speed, a vibration construction quality analysis diagram can be generated in real time or later. Based on this, the measuring point distribution and depth distribution diagram during the entire construction process can be drawn to reduce the workload of construction supervision and reduce the difficulty of adjustment.
[0006] Obviously, with regard to the above technical solutions, the current vibration quality monitoring still has the following deficiencies: 1. Insufficient monitoring intensity: Currently, the vibration quality is judged only based on the performance of the currently vibrated concrete, without combining the traceability information of its mixing process and transportation process for comprehensive judgment, which is accidental. At the same time, only monitoring the vibration quality through the vibrated state cannot guarantee the timeliness of vibration regulation, and thus cannot improve the effectiveness and reliability of vibration quality control.
[0007] 2. Insufficient vibration control parameter indicators: Currently, only the vibration frequency, vibration depth and other parameter indicators are controlled according to the concrete state, ignoring the influence of the thickness of the casting layer on the vibration. As a result, the rationality and pertinence of the vibration process control cannot be further improved, and the guarantee of the vibration quality corresponding to the vibration process cannot be further enhanced. In addition, if the number of casting layers is insufficient or excessive, it may affect the overall strength and stability of the concrete. Summary of the invention
[0008] In view of this, in order to solve the problems raised in the above background technology, a quality monitoring method during the concrete foundation pouring construction process is now proposed.
[0009] The purpose of the present invention can be achieved through the following technical solutions: The present invention provides a quality monitoring method during the concrete foundation pouring construction process, the method comprising: S1, concrete pouring information import: importing the pouring setting indicators of the current batch of concrete to be poured, including the set number of pouring layers and pouring size.
[0010] S2. Concrete traceability information identification: Identify the traceability label of the current batch of concrete to be poured, and obtain mixing information and transportation information.
[0011] S3. Concrete pouring status monitoring: After the first floor concrete pouring and vibration are completed, monitor the status information of the first floor concrete after vibration.
[0012] S4, concrete pouring quality determination: set the concrete pouring quality correction factor, and make a pouring quality status determination. When the determination result is that the pouring quality is unqualified, execute step S5, otherwise proceed to pour the next layer of concrete, and repeat steps S3 to S4 until all the set number of pouring layers are completed.
[0013] S5. Feedback on the change in the number of concrete pouring layers: confirm the change in the number of concrete pouring layers, and then replace the set number of pouring layers, and return to step S3.
[0014] Compared with the prior art, the beneficial effects of the present invention are as follows: (1) The present invention determines the pouring quality status according to the mixing information, transportation information and status information of the first layer of concrete after vibration, and when the judgment result is that the pouring quality is unqualified, confirms the change in the number of concrete pouring layers and makes corrections, which effectively solves the problem of insufficient monitoring of vibration quality. It not only considers the performance of the vibrated concrete, but also combines the traceability information of the mixing process and the transportation process, thereby realizing a comprehensive judgment of the pouring quality status, avoiding the randomness of the current judgment method, and thus ensuring the timeliness of vibration quality monitoring, thereby improving the effectiveness and reliability of vibration quality control.
[0015] (2) The present invention effectively compensates for the problem of insufficient current vibration control parameter indicators by confirming the changed number of concrete pouring layers, fully considers the influence of the pouring layer thickness on the vibration, and realizes the precise control of the number of pouring layers, thereby further improving the rationality and pertinence of the vibration process control, and further enhancing the guarantee of the vibration quality corresponding to the vibration process, reducing the influence of insufficient or excessive number of pouring layers on the overall strength and overall stability of concrete, and at the same time expanding the coverage of vibration quality control.
[0016] (3) The present invention can better grasp the quality changes of concrete during production and transportation by statistically analyzing the consistency between the mixing state and the transportation state. At the same time, by setting the correction factor, the pouring quality can be corrected according to the specific mixing and transportation state, thereby improving the credibility and accuracy of the pouring quality state judgment result.
[0017] (4) The present invention confirms the change in the number of concrete pouring layers by setting a pouring change compensation factor, thereby improving the accuracy and pertinence of setting the number of pouring layers, thereby improving the controllability of the pouring quality, and at the same time better ensuring the performance of the concrete structure under stress, reducing cracks and other structural problems, and improving the safety and reliability of the overall structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0019] Figure 1 The present invention is a schematic flow chart of the steps for implementing the method. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0021] See also Figure 1 As shown, the present invention provides a quality monitoring method during the concrete foundation pouring construction process, including: S1, concrete pouring information import: importing the pouring setting indicators of the current batch of concrete to be poured, including the set number of pouring layers and pouring size.
[0022] S2. Concrete traceability information identification: Identify the traceability label of the current batch of concrete to be poured, and obtain mixing information and transportation information.
[0023] S3. Concrete pouring status monitoring: After the first floor concrete pouring and vibration are completed, monitor the status information of the first floor concrete after vibration.
[0024] S4, concrete pouring quality determination: set the concrete pouring quality correction factor, and make a pouring quality status determination. When the determination result is that the pouring quality is unqualified, execute step S5, otherwise proceed to pour the next layer of concrete, and repeat steps S3 to S4 until all the set number of pouring layers are completed.
[0025] S5. Feedback on the change in the number of concrete pouring layers: confirm the change in the number of concrete pouring layers, and then replace the set number of pouring layers, and return to step S3.
[0026] In a specific embodiment, concrete is usually poured layer by layer and waited to harden. After each layer is poured, the concrete will begin to gradually harden and increase its strength. This layer-by-layer pouring method helps to ensure the quality and stability of each layer of concrete, and can effectively control the deformation and shrinkage of the concrete. Therefore, although it is important to adjust vibration parameters such as frequency and depth, if the number of pouring layers is not appropriate, even if the vibration effect of the vibrating rod is good, the expected concrete density cannot be achieved. During the vibration process, an inappropriate number of pouring layers may cause voids or bubbles inside the concrete, affecting its quality. If it is not adjusted according to the number of pouring layers, even if the vibrating rod works well, it will increase the processing and repair work in the subsequent construction, reducing the construction efficiency. Therefore, the present invention selects the change of the number of vibration layers as a means of controlling the pouring quality.
[0027] The embodiment of the present invention determines the pouring quality status according to the mixing information, transportation information of the composite concrete and the status information of the first layer of concrete after vibration, and when the judgment result is that the pouring quality is unqualified, confirms the change in the number of pouring layers of concrete and makes corrections, thereby effectively solving the problem of insufficient monitoring of the current vibration quality. It not only takes into account the performance of the vibrated concrete, but also combines the traceability information of the mixing process and the transportation process, thereby realizing a comprehensive judgment of the pouring quality status, avoiding the randomness of the current judgment method, and further ensuring the timeliness of vibration quality monitoring, thereby improving the effectiveness and reliability of vibration quality control.
[0028] Specifically, the setting of the concrete pouring quality correction factor in step S4 includes: E1, extracting the measured value, reference value interval and marked evaluation attribute of each mixing evaluation index from the mixing information, wherein the marked evaluation attribute is one of a positive attribute and a negative attribute, and calculating the mixing state consistency. .
[0029] It should be added that the stirring evaluation index includes multiple indicators such as stirring uniformity, bubble distribution, sedimentation velocity and chromaticity difference. For example, the marked evaluation attribute of stirring uniformity is a positive attribute, and the marked evaluation attributes corresponding to bubble distribution, sedimentation velocity and chromaticity difference are negative attributes. For the stirring evaluation index with positive attributes, the corresponding measured value is within the reference value interval, and the closer it is to the upper limit of the reference value interval, the better; for the stirring evaluation index with negative attributes, when the actual measured value is within the reference value interval, the closer it is to the lower limit of the reference value interval, the better.
[0030] E2. Extract the planned transportation time, actual transportation time and the monitored temperature value during transportation from the transportation information, record the number of stirring times, the number of water addition times and the time point of each water addition, and calculate the degree of consistency of the transportation status .
[0031] It should be added that the monitored temperature value refers to the average monitored temperature value during the transportation process.
[0032] E3. Based on the preset reference stirring consistency interval, extract the lower limit value of the reference stirring consistency interval and upper limit .
[0033] E4. Based on the preset reference transport state consistency interval, extract the lower limit value of the reference transport state consistency interval and upper limit .
[0034] E5. and and Compare them separately and and and Compare them respectively and set the matching deviation interference weight, which is recorded as .
[0035] E6. Set the concrete pouring quality correction factor , , and are the evaluation weights of the set mixing state and transportation state, is a natural constant, The reference stirring consistency and the reference transportation state consistency are set respectively.
[0036] In a specific embodiment, The specific value of is within the reference stirring consistency range. Specifically, for the convenience of analysis, , The specific value of is within the reference transport state consistency interval. Specifically, for the convenience of analysis, .
[0037] It should be added that the mixing state directly determines the subsequent use effect and pouring quality of concrete, and the transportation process will also interfere with the pouring quality of concrete. Therefore, the two information dimensions of mixing information and transportation information are used for traceability. At the same time, according to the direct relationship between the mixing state and the transportation state on the pouring quality, the evaluation weight of the mixing state is set to be greater than the evaluation weight corresponding to the transportation state, that is, , illustratively, The value can be 0.6. The value can be 0.4.
[0038] The embodiment of the present invention can better grasp the quality change of concrete during production and transportation by statistically analyzing the consistency of the mixing state and the transportation state. At the same time, by setting the correction factor, the pouring quality can be corrected according to the specific mixing and transportation state, thereby improving the credibility and accuracy of the pouring quality state judgment result.
[0039] Furthermore, the statistical mixing state consistency in step E1 includes: E11, recording the mixing evaluation indicators with marked evaluation attributes as positive attributes and negative attributes as positive indicators and negative indicators respectively, thereby dividing each mixing evaluation indicator into each positive indicator and each negative indicator.
[0040] E12. Compare the measured values of each positive indicator with the reference value interval. If the measured value of a positive indicator is within the reference value interval, mark the positive indicator as a Class I positive indicator and count the number of Class I positive indicators. .
[0041] E13. The measured value of the Class I positive indicator and the corresponding lower and upper limits of the reference value interval are recorded as as well as and ,like , mark the positive indicators of type I as positive indicators of type II, and count the number of positive indicators of type II .
[0042] E14. and The ratio of is recorded as the type II positive ratio ,Will The ratio of the number of positive indicators is recorded as the type I positive ratio. .
[0043] E15. Compare the measured value of each negative indicator with the reference value range, and confirm each Class I negative indicator in the same way as the Class I positive indicator.
[0044] E16. The measured value of the Class I negative indicator and the corresponding lower and upper limits of the reference value interval are recorded as as well as and ,like , then the Class I negative indicators will be marked as Class II negative indicators.
[0045] E17, according to and The confirmation method is similar to confirming the type II negative ratio and type I negative ratio ,right , , and Normalization processing was performed respectively, and the consistency of the stirring state was obtained through statistical model statistics.
[0046] In a specific embodiment, , , and The specific normalization process for normalization is as follows: Subtract the difference from the set reference Class I positive ratio, compare the difference with the reference Class I positive ratio, and record the ratio as the Class I positive excess.
[0047] According to the normalization method of Class I positive excess, Class II positive excess, Class I negative excess and Class II negative excess are normalized in turn, and Class I positive excess, Class II positive excess, Class I negative excess and Class II negative excess are taken as , , and The normalized processing result.
[0048] It should be added that the reference Class I forward ratio is mainly confirmed based on the number of positive indicators. For example, if there are 20 positive indicators, usually at least 18 positive indicators have measured values within the reference value range, and only then can it be determined that the mixing state meets the standard, that is, the reference Class I forward ratio can be taken as 0.9.
[0049] It should also be added that, in a specific embodiment, the statistical model can use a linear regression model and an exponential regression model for statistics. The specific model is not limited here. Specifically, for the convenience of analysis, a linear regression model can be adopted as the statistical model for the statistics of the mixing state consistency.
[0050] Furthermore, the statistical transportation status consistency in step E2 includes: E21, taking the difference between the planned transportation time and the actual transportation time as the transportation time difference .
[0051] E22. Compare the time point of the first water addition with the time point of the last water addition to obtain the water addition time, and take the ratio of the number of water additions to the water addition time as the water addition frequency. .
[0052] E23. Based on the monitored temperature value and the actual transportation duration during the transportation process, locate the reference mixing times and the reference water adding frequency of the monitored temperature value under the actual transportation duration from the preset concrete transportation reference table, recorded as and .
[0053] E24, record the stirring times as , statistical transport status consistency , , is the reference transportation time difference set, and The reference stirring times and stirring frequencies are set respectively.
[0054] In a specific embodiment, The specific value of is mainly set according to the planned transportation time. For example, if the planned transportation time is 30 minutes, The value can be set to 5 minutes. and The specific value of is similarly set according to the reference stirring times and the reference water adding frequency. For example, if the reference stirring times is 20 times, The specific value can be 2, and the reference water adding frequency is every 6 minutes. The specific value is 2 minutes each time.
[0055] Furthermore, in step E5, setting the matching deviation interference weight includes: As scenario 1, As scenario 2, As scene 3.
[0056] Will As scenario 4, As scenario 5, As scene 6.
[0057] If scenario 1 and scenario 4 are both true, 0 is used as the matching deviation interference weight.
[0058] If scenario 1 and scenario 5 are both true, As the fit deviation interference weight.
[0059] If scenario 1 and scenario 6 are both true, As the fit deviation interference weight.
[0060] If scenario 2 and scenario 4 are both true, As the fit deviation interference weight.
[0061] If scenario 2 and scenario 5 are both true, As the fit deviation interference weight.
[0062] If scenario 2 and scenario 6 are both true, As the fit deviation interference weight.
[0063] If scenario 3 and scenario 4 are both true, As the fit deviation interference weight.
[0064] If scenario 3 and scenario 5 are both true, As the fit deviation interference weight.
[0065] If scenario 3 and scenario 6 are both true, As the matching deviation interference weight, the matching deviation interference weight is obtained , The value is 0 or or or or or or or or ,and .
[0066] In a specific embodiment, The value range of is from 0 to 1. For example, , , , , , , and The possible values are 0.1, 0.2, 0.25, 0.3, 0.4, 0.6, 0.7 and 0.85 respectively.
[0067] Specifically, the pouring quality status is determined in step S4, including: N1, extracting vibration status information and solidification status information from the status information of the first layer of concrete after vibration.
[0068] It should be added that the vibration state information refers to the state information after the vibration is completed but before solidification, and the solidification state information refers to the state information during the solidification process.
[0069] N2. Extract the vibration volume deviation, the number of bubbles and the porosity of each monitoring area from the vibration state information, and calculate the vibration state difference .
[0070] It should be added that the vibration volume deviation refers to the deviation between the actual volume of concrete after vibration and the designed volume, which can be collected by a high-definition camera. The number of bubbles can also be collected by a high-definition camera, and the porosity can be obtained by scanning with an X-ray scanner.
[0071] N3. Extract the monitoring temperature of each solidification monitoring point at each monitoring time point in each monitoring depth layer from the solidification state information, and calculate the solidification state difference .
[0072] It should be supplemented that the monitored temperature is obtained by monitoring via an embedded temperature sensor.
[0073] N4. Statistical analysis of the difference in pouring quality of the first floor concrete , , and They are respectively expressed as the vibration state difference and solidification state difference of the set reference, The floor symbol.
[0074] It should be added that and The value of is mainly set according to the critical state of the vibration state difference and the solidification state difference. For example, if the critical state value of the vibration state difference is 0, then The reference value is 0. Specifically, for the convenience of analysis, The value can be 0.1. The value and The principle of value selection is the same, and no value selection examples are given here.
[0075] N5. If , the unqualified pouring quality is regarded as the pouring quality status judgment result, on the contrary, the qualified pouring quality is regarded as the pouring quality status judgment result, To set the reference pouring quality difference.
[0076] It should be added that is based on The critical value of is set accordingly. When the casting quality difference is in a critical state, and ,Right now The value is , you can As The specific value of .
[0077] Furthermore, in step N2, the vibration state difference is counted, including: N21, recording the vibration volume deviation as .
[0078] N22. Extract the length and width of the casting surface from the casting size, multiply the two to get the casting surface area, and take the ratio of the number of bubbles to the casting surface area as the bubble density. .
[0079] N23. Calculate the average porosity of each monitoring area to obtain the average vibration porosity .
[0080] N24, based on the pre-set permitted vibration volume deviation, bubble density and vibration porosity, , and Standardization treatments were performed separately, and the results after treatment were recorded as vibration volume deviation, vibration bubble deviation and vibration pore deviation respectively.
[0081] It should be added that , and The specific process of standardization is as follows: The difference is subtracted from the preset permissible vibration volume deviation, the difference is compared with the preset permissible vibration volume deviation, and the ratio is used as the vibration volume deviation degree.
[0082] Will The difference is made from the pre-set allowable bubble density, the difference is compared with the pre-set allowable bubble density, and the ratio is recorded as the vibration bubble deviation.
[0083] Will The difference is made from the pre-set allowable vibration porosity, and the difference is compared with the pre-set allowable vibration porosity, and the ratio is recorded as the vibration porosity deviation.
[0084] N25. Set the weights of vibration volume, vibration bubbles and vibration porosity, perform weighted sum calculation on the vibration volume deviation, vibration bubble deviation and vibration porosity deviation, and use the calculation result as the vibration state difference.
[0085] In a specific embodiment, the vibration volume directly affects the density and uniformity of concrete. If the vibration volume is insufficient, it may lead to too many voids inside the concrete, affecting the strength and durability. Therefore, the weight of the vibration volume is set to be the largest. For example, the weight of the vibration volume can be set to 0.4, while too many bubbles will reduce the density and strength of the concrete. For example, the weight of the vibration bubbles can be set to 0.3. The vibration porosity refers to the porosity inside the concrete after vibration. If the porosity is too high, it will seriously affect the strength and durability of the concrete, and it will also increase water absorption, leading to freeze-thaw damage and other problems. For example, the weight of the porosity can be set to 0.3.
[0086] Furthermore, in step N3, the difference in curing state is statistically analyzed, including: N31, using the time point as the horizontal coordinate and the temperature as the vertical coordinate, constructing a temperature change curve in each depth layer for each curing monitoring point, and extracting the slope, amplitude and maximum monitoring temperature of the curve.
[0087] N32. Calculate the variance of the slope, amplitude and maximum temperature of the same solidification monitoring point in each depth layer, and record the calculation results as slope difference, amplitude difference and temperature difference, respectively.
[0088] N33. The slope, amplitude and temperature are used as evaluation items, and the slope difference, amplitude difference and temperature difference are used as evaluation values of each evaluation item.
[0089] N34. Based on the evaluation value of each solidification monitoring point corresponding to each evaluation item, each solidification monitoring point is classified into one of Class A, Class B and Class C.
[0090] It should be added that the classification of each solidification monitoring point includes: traversing the evaluation value of each evaluation item corresponding to each solidification monitoring point and the preset reference value corresponding to each evaluation item, and counting the number of evaluation items whose corresponding evaluation value of each solidification monitoring point is greater than its reference value as the number of abnormal evaluation items.
[0091] The category of the solidification monitoring point with the number of abnormal evaluation items of 1 is recorded as Class A, the category of the solidification monitoring point with the number of abnormal evaluation items of 2 is recorded as Class B, and the category of the solidification monitoring point with the number of abnormal evaluation items of 3 is recorded as Class C, so as to classify each solidification monitoring point.
[0092] N35. Count the number of solidification monitoring points of categories A, B and C respectively, and compare them with the number of solidification monitoring points respectively. The ratios are recorded as Category A monitoring ratio, Category B monitoring ratio and Category C monitoring ratio respectively.
[0093] N36. Set the weights of the Class A monitoring ratio, Class B monitoring ratio, and Class C monitoring ratio, and calculate the degree of difference in solidification status through weighted summation.
[0094] It should be added that during the concrete curing process, the temperature gradient will cause inconsistent shrinkage rates between layers of different depths, forming internal stress. If the temperature changes unevenly, these internal stresses may cause cracks in the concrete, thus affecting the overall strength and durability of the structure. By increasing the number of pouring layers, the thickness of each layer of concrete can be reduced, thereby reducing the temperature gradient and reducing the generation of internal stress, which in turn makes the temperature between layers more uniform, the curing speed more consistent, and improves the overall performance and quality of the concrete. Therefore, the pouring quality is judged from the dimension of temperature gradient changes, and the number of subsequent pouring layers is confirmed.
[0095] In a specific embodiment, the weights of Class A monitoring ratio, Class B monitoring ratio and Class C monitoring ratio are set mainly according to the difficulty of achieving them, wherein the difficulty of achieving Class C>the difficulty of achieving Class B>the difficulty of achieving Class A, therefore, the weight of Class C monitoring ratio is set>the weight of Class B monitoring ratio>the weight of Class A monitoring ratio. Exemplarily, the weights of Class A monitoring ratio, Class B monitoring ratio and Class C monitoring ratio can be 0.2, 0.3 and 0.5 respectively.
[0096] In another specific embodiment, the step S5 of confirming the change in the number of concrete pouring layers includes: if , taking vibration deviation as the quality difference factor, if Abnormal temperature change is taken as the cause of quality difference.
[0097] The number of pouring layers set is recorded as , and set the pouring change compensation factor ,Will As the number of concrete pouring layers is changed, Indicates the round-up symbol. To set the reference rated number of pouring layers.
[0098] It should be added that the specific setting process of the reference rated number of pouring layers is: extract the pouring depth from the pouring size, extract the single suitable minimum pouring thickness corresponding to the pouring depth from the pouring technology table, compare the pouring depth with the single suitable minimum pouring thickness of the pouring depth, and use the ratio as the setting reference rated number of pouring layers.
[0099] The embodiment of the present invention effectively compensates for the problem of insufficient current vibration control parameter indicators by confirming the changed number of pouring layers of concrete, fully considers the influence of the thickness of the pouring layer on the vibration, and realizes the precise control of the number of pouring layers, thereby further improving the rationality and pertinence of the vibration process control, and further enhancing the guarantee of the vibration quality corresponding to the vibration process, reducing the influence of insufficient or excessive number of pouring layers on the overall strength and overall stability of concrete, and at the same time expanding the coverage of vibration quality control.
[0100] Furthermore, the pouring change compensation factor is set, including: if the quality difference factor is vibration deviation, As a compensation factor for casting changes .
[0101] If the cause of quality difference is abnormal temperature change, As a compensation factor for casting changes .
[0102] If the quality difference causes are vibration deviation and temperature change abnormality, As a compensation factor for casting changes , and thus the casting change compensation factor is obtained , The value is or or .
[0103] The embodiment of the present invention confirms the changed pouring number of concrete layers by setting the pouring change compensation factor, thereby improving the accuracy and pertinence of setting the number of pouring layers, thereby improving the controllability of the pouring quality, and at the same time better ensuring the performance of the concrete structure under stress, reducing cracks and other structural problems, and improving the safety and reliability of the overall structure.
[0104] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the present invention, they shall all fall within the protection scope of the present invention.
Claims
1. A method for quality monitoring during the pouring construction of a concrete foundation, characterized in that: The method includes: S1. Importing concrete pouring information: importing the pouring setting indicators of the current batch of concrete to be poured, including the number of set pouring layers and pouring size; S2. Concrete traceability information identification: Identify the traceability label of the current batch of concrete to be poured, and obtain mixing information and transportation information; S3, concrete pouring status monitoring: after the first floor concrete pouring and vibration are completed, monitor the status information of the first floor concrete after vibration; S4, concrete pouring quality determination: set the concrete pouring quality correction factor, and perform pouring quality status determination. If the determination result is that the pouring quality is unqualified, execute step S5, otherwise, proceed to the next layer of concrete pouring, and repeat steps S3 to S4 until all the set number of pouring layers are completed; S5, feedback on the change of the number of concrete pouring layers: confirm the changed number of concrete pouring layers, thereby replacing the set number of pouring layers, and return to step S3; The casting quality status determination comprises: Extracting vibration state information and solidification state information from the state information of the first floor concrete after vibration; Extract the vibration volume deviation, the number of bubbles and the porosity of each monitoring area from the vibration state information, and calculate the vibration state difference ; The monitoring temperature of each solidification monitoring point at each monitoring time point in each monitoring depth layer is extracted from the solidification state information, and the solidification state difference is statistically analyzed. ; Statistics on the difference in pouring quality of the first floor concrete , , and They are respectively expressed as the vibration state difference and solidification state difference of the set reference, is the floor symbol, is the concrete pouring quality correction factor; The step of setting the concrete pouring quality correction factor includes: The measured value, reference value interval and marked evaluation attribute of each stirring evaluation index are extracted from the stirring information, wherein the marked evaluation attribute is one of a positive attribute and a negative attribute, and the stirring state consistency is calculated. ; The planned transportation time, the actual transportation time and the monitored temperature value during transportation are extracted from the transportation information, the stirring times, the water adding times and the water adding time points of each water adding are recorded, and the transportation status consistency is calculated. ; Based on the preset reference stirring consistency interval, the lower limit value of the reference stirring consistency interval is extracted and upper limit ; Based on the preset reference transport state consistency interval, the lower limit value of the reference transport state consistency interval is extracted and upper limit ; Will and and Compare them separately and and and Compare them respectively and set the matching deviation interference weight, which is recorded as ; Set the concrete pour quality correction factor , , and are the evaluation weights of the set mixing state and transportation state, is a natural constant, They are respectively used to set the reference mixing consistency and the reference transportation state consistency; like , the unqualified pouring quality is regarded as the pouring quality status judgment result, on the contrary, the qualified pouring quality is regarded as the pouring quality status judgment result, To set the reference pouring quality difference; The step of confirming the changed number of pouring layers of concrete includes: like , taking vibration deviation as the quality difference factor, if Taking temperature anomaly as the cause of quality difference; The number of pouring layers set is recorded as , and set the pouring change compensation factor ,Will As the number of concrete pouring layers is changed, Indicates the round-up symbol. To set the reference rated number of pouring layers; The setting of the pouring change compensation factor includes: If the quality difference cause is vibration deviation, As a compensation factor for casting changes ; If the cause of quality difference is abnormal temperature change, As a compensation factor for casting changes ; If the quality difference causes are vibration deviation and temperature change abnormality, As a compensation factor for casting changes , and thus the casting change compensation factor is obtained , The value is or or .
2. A method for monitoring quality during the pouring construction of a concrete foundation as claimed in claim 1, characterized in that: The statistical stirring state consistency includes: The stirring evaluation indicators with marked evaluation attributes as positive attributes and negative attributes are recorded as positive indicators and negative indicators respectively, so as to divide each stirring evaluation indicator into each positive indicator and each negative indicator; Compare the measured value of each positive indicator with the reference value interval. If the measured value of a positive indicator is within the reference value interval, mark the positive indicator as a Class I positive indicator and count the number of Class I positive indicators. ; The measured value of the Class I positive indicator and the corresponding lower and upper limits of the reference value interval are recorded as as well as and ,like , mark the positive indicators of type I as positive indicators of type II, and count the number of positive indicators of type II ; Will and The ratio of is recorded as the type II positive ratio ,Will The ratio of the number of positive indicators is recorded as the type I positive ratio. ; Compare the measured value of each negative indicator with the reference value interval, and confirm each Class I negative indicator in the same way as the confirmation method of Class I positive indicators; The measured value of the negative indicator of type I and the corresponding lower and upper limits of the reference value interval are recorded as as well as and ,like , then the Class I negative indicator is marked as a Class II negative indicator; according to and The confirmation method is similar to confirming the type II negative ratio and type I negative ratio ,right , , and Normalization processing was performed respectively, and the consistency of the stirring state was obtained through statistical model statistics.
3. A method for quality monitoring during the pouring construction of a concrete foundation as claimed in claim 1, characterized in that: The statistical transport status consistency includes: The difference between the planned transportation time and the actual transportation time is taken as the transportation time difference ; Compare the time point of the first water addition with the time point of the last water addition to get the water addition time, and take the ratio of the number of water additions to the water addition time as the water addition frequency. ; Based on the monitored temperature value and the actual transportation time during the transportation process, the reference mixing times and the reference water adding frequency of the monitored temperature value under the actual transportation time are located from the preset concrete transportation reference table, and recorded as and ; Record the number of stirring times as , statistical transport status consistency , , is the reference transportation time difference set, and The reference stirring times and stirring frequencies are set respectively.
4. A method for monitoring quality during the pouring construction of a concrete foundation as claimed in claim 1, characterized in that: The setting of the matching deviation interference weight includes: Will As scenario 1, As scenario 2, As scene 3; Will As scenario 4, As scenario 5, As scene 6; If scenario 1 and scenario 4 are both true, 0 is used as the interference weight of the matching deviation; If scenario 1 and scenario 5 are both true, As the coincidence deviation interference weight; If scenario 1 and scenario 6 are both true, As the coincidence deviation interference weight; If scenario 2 and scenario 4 are both true, As the coincidence deviation interference weight; If scenario 2 and scenario 5 are both true, As the coincidence deviation interference weight; If scenario 2 and scenario 6 are both true, As the coincidence deviation interference weight; If scenario 3 and scenario 4 are both true, As the coincidence deviation interference weight; If scenario 3 and scenario 5 are both true, As the coincidence deviation interference weight; If scenario 3 and scenario 6 are both true, As the matching deviation interference weight, the matching deviation interference weight is obtained , The value is 0 or or or or or or or or ,and .
5. The method for quality monitoring during the concrete foundation pouring construction process as claimed in claim 1, characterized in that: The statistical vibration state difference degree includes: The vibration volume deviation is recorded as ; The length and width of the casting surface are extracted from the casting size, and the two are multiplied to obtain the casting surface area. The ratio of the number of bubbles to the casting surface area is used as the bubble density. ; The porosity of each monitoring area is averaged and the average vibration porosity is obtained. ; Based on the pre-set allowable vibration volume deviation, bubble density and vibration porosity, , and Standardization treatments were performed respectively, and the results after treatment were recorded as vibration volume deviation, vibration bubble deviation and vibration pore deviation in turn; The weights of vibration volume, vibration bubbles and vibration porosity are set, and the weighted sum of vibration volume deviation, vibration bubble deviation and vibration porosity deviation is calculated, and the calculation result is used as the vibration state difference.
6. A method for quality monitoring during the pouring construction of a concrete foundation as claimed in claim 1, characterized in that: The statistical curing state difference degree includes: With the time point as the abscissa and the temperature as the ordinate, a temperature variation curve is constructed in each depth layer for each solidification monitoring point, and the slope, amplitude and maximum monitoring temperature of the curve are extracted; The slope, amplitude and maximum temperature of the same solidification monitoring point in each depth layer are respectively calculated for variance, and the calculation results are recorded as slope difference, amplitude difference and temperature difference respectively; The slope, amplitude and temperature are used as evaluation items, and the slope difference, amplitude difference and temperature difference are used as evaluation values of each evaluation item; Based on the evaluation value of each evaluation item corresponding to each solidification monitoring point, each solidification monitoring point is classified into one of Class A, Class B and Class C; The number of solidification monitoring points of categories A, B and C are counted respectively, and compared with the number of solidification monitoring points respectively, and the ratios are recorded as category A monitoring ratio, category B monitoring ratio and category C monitoring ratio respectively; The weights of the Class A monitoring ratio, Class B monitoring ratio, and Class C monitoring ratio are set, and the degree of difference in solidification status is calculated by weighted summation.
Citation Information
Patent Citations
Real-time monitoring method for concrete vibration quality based on laser three-dimensional positioning
CN106323170B
A monitoring system for the casting process of cast-in-place piles
CN114964154B
A method for predicting concrete durability based on data mining and artificial intelligence algorithm
AU2020101854A4
Concrete pouring side station supervision method based on artificial intelligence
CN111582188A
Complete management method for digital concrete engineering construction
CN116011859A