Lifting machinery for port logistics management
The lifting machinery addresses the cumbersome replacement of worn or cracked hooks by enabling quick switching between single and double hooks through a movable pulley system with a spring mechanism, ensuring secure attachment and efficient cargo handling.
Patent Information
- Application Number
- CN202410880127.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-02
- Publication Date
- 2024-12-31
- Estimated Expiration
- 2044-07-02
AI Technical Summary
Existing lifting machinery for port logistics faces challenges with cumbersome and time-consuming disassembly and replacement of worn or cracked lifting hooks, and limited flexibility in hook types, which can disrupt cargo shipping operations.
A lifting machinery design featuring a movable pulley system with interchangeable single and double hooks, utilizing a movable locking sleeve and elastic limiting clamp for quick hook switching and secure attachment, facilitated by a spring mechanism for easy height adjustment and manual operation.
Enables quick and secure replacement of lifting hooks, ensuring uninterrupted cargo handling by allowing easy switching between hook types and reducing manual intervention, thus enhancing operational efficiency.
Smart Images

Figure CN118579655B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of lifting machinery, and in particular to lifting machinery for port logistics management. Background Art
[0002] Port logistics refers to the central port city utilizing its own port advantages, relying on advanced hardware and software environment, strengthening its radiation capacity to the logistics activities around the port, highlighting the port's specialties in cargo collection, storage, and distribution, based on port-related industries, with the goal of optimizing port resource integration, and developing a comprehensive port service system with characteristics covering all links in the logistics industry chain; in the process of port logistics, the transportation of large and overweight goods requires the use of lifting machinery to assist in lifting operations.
[0003] For example, the Chinese patent "CN109733986B A crane hook assembly" has a hook body, an anti-slip device is arranged on the hook body, the top end of the hook body passes through the hook crossbeam and is connected with a hook nut, the hook body is rotatably connected to the hook crossbeam, the front and rear sides of the hook body on the hook crossbeam are respectively connected with a hanging plate A, the left and right ends of the hanging plate A are respectively connected with a hanging fork through a rotating shaft A, the top end of the hanging fork is rotatably connected with a rotating shaft B, the left and right sides of the hanging fork on the rotating shaft B are respectively connected with a hanging plate B, the front and rear ends of the hanging plate B are respectively connected with a pulley shaft, and the pulley shaft is respectively provided with a pulley block; the overall force of the hook assembly is relatively uniform, the movable pulley block is symmetrically lifted, the structure is ingenious, safe and reliable, and can be disassembled for use as separate components, and its structural design is reasonable, safety is high, and the bearing capacity is strong.
[0004] In the application of existing port logistics lifting machinery, the lifting hooks are usually connected and fixed with bolts to ensure safety. When the hooks are severely worn or cracked, disassembly and replacement are cumbersome and time-consuming, which can easily affect the progress of cargo shipping. In addition, the lifting machinery is equipped with mostly one type of hook, either a single hook or a double hook, and the later type replacement is relatively cumbersome and time-consuming. Summary of the invention
[0005] The present invention relates to a lifting machinery for port logistics management, which solves the problem that in the application process of existing lifting machinery for port logistics, the lifting hooks used for lifting are usually connected and fixed with bolts to ensure the safety of use. When the hooks are severely worn or cracked, the disassembly and replacement are cumbersome and time-consuming, which can easily affect the progress of cargo shipment. In addition, the lifting hooks equipped on the lifting machinery are mostly of one kind, either a single hook or a double hook, and the replacement of the types at a later stage is relatively cumbersome and time-consuming.
[0006] In a first aspect of the present disclosure, a lifting machinery for port logistics management is provided, which specifically includes: a main fishing body; a movable pulley is installed on the top of the main fishing body, and the movable pulley is connected to the crane through a steel wire rope; a movable connecting piece is installed on the bottom of the main fishing body, and movable pull rings are installed at both ends of the movable connecting piece, and a tension spring is connected to the outside of the movable pull ring; a force-bearing vertical connecting shaft is connected to the bottom of the movable connecting piece, the force-bearing vertical connecting shaft is rotatably connected to the movable connecting piece, and a lifting hook is connected to the bottom of the force-bearing vertical connecting shaft; a movable locking sleeve is sleeved on the outside of the force-bearing vertical connecting shaft, and the movable locking sleeve is connected to the lifting hook; an elastic limiting clamp is connected to the outside of the force-bearing vertical connecting shaft, and the elastic limiting clamp is connected to the movable locking sleeve.
[0007] Furthermore, the lifting hook is divided into two types: a single hook and a double hook. A slot is provided on the top of the lifting hook, and the bottom end of the load-bearing vertical connecting shaft is inserted into the slot.
[0008] Furthermore, the outside of the lifting hook is provided with three stress-bearing grooves in a surrounding shape, the stress-bearing grooves are L-shaped, the stress-bearing grooves are connected with the slots, and the bottom end of the stress-bearing vertical connecting shaft is provided with three stress-bearing blocks in a surrounding shape, the stress-bearing blocks are connected to the stress-bearing grooves, and the lifting hook is connected to the stress-bearing vertical connecting shaft by snap-fitting. The lifting hook can be replaced according to the actual needs of logistics lifting, so as to achieve a quick switching effect between single hook and double hook, thereby better meeting the needs of logistics lifting.
[0009] Furthermore, the movable locking sleeve is slidably connected to the outside of the stressed vertical connecting shaft, the bottom of the movable locking sleeve is in contact with the top of the lifting hook, three guide blocks are arranged in a surrounding shape on the outside of the stressed vertical connecting shaft, and three sliding holes are arranged in a surrounding shape on the outside of the movable locking sleeve. The guide blocks are slidably connected to the sliding holes, and the sliding holes and the guide blocks slide together to guide the movement of the movable locking sleeve.
[0010] Furthermore, three plug-in blocks are arranged in a surrounding shape at the bottom of the movable locking sleeve, and the plug-in blocks are inserted into the top of the force-bearing groove provided on the lifting hook.
[0011] Furthermore, a spring is mounted on the outside of the stressed vertical connecting shaft, the bottom end of the spring contacts the top of the movable locking sleeve, and the top end of the spring contacts the stressed vertical connecting shaft. The spring has the effect of resetting the movable locking sleeve. When the lifting hook and the stressed vertical connecting shaft are clamped together, the stress block moves to the innermost end of the stress groove, and the movable locking sleeve moves downward under the influence of the spring thrust, so that the plug block is inserted into the stress groove. The cooperation between the plug block and the stress groove has the effect of limiting the lifting hook.
[0012] Furthermore, the outer side of the load-bearing vertical connecting shaft is symmetrically provided with an inner connecting groove, and the outer side of the movable locking sleeve is symmetrically provided with an outer connecting hole, the outer connecting hole is connected to the inner connecting groove, and the elastic limiting clip is connected to the outer connecting hole and the inner connecting groove in a connected state. When the movable locking sleeve moves downward to the bottom, the outer connecting hole and the inner connecting groove are in a connected state, and the elastic limiting clip is connected to the outer connecting hole and the inner connecting groove, so that the movable locking sleeve is locked and fixed by the elastic limiting clip.
[0013] Furthermore, movable holes are arranged on both sides of the main fishing body, two ends of the movable connecting piece are slidably connected in the movable holes, and the movable pull ring is rotatably connected to the end of the movable connecting piece.
[0014] Furthermore, a movable hole is provided on the outside of the movable pull ring, and a fixed pull hole is provided on the outside of the main fishing body. One end of the tension spring is connected to the movable hole, and the other end of the tension spring is connected to the fixed pull hole. When the lifting hook falls to a height slightly higher than the required height, there is no need to communicate with the crane operator through an intercom, and the lifting hook can be directly pulled down manually. The tension spring is stretched under force, and the lifting hook moves downward, thereby lowering the height of the lifting hook so that the lifting hook can be connected to the steel wire rope for lifting logistics goods.
[0015] The present invention provides a lifting machine for port logistics management, which has the following beneficial effects:
[0016] When the lifting hook is in use, the lifting hook is connected to the stressed vertical connecting shaft by a clamping connection, and the lifting hook can be replaced according to the actual logistics lifting use requirements, so that the single hook and double hook quick switching effect is achieved, and the logistics lifting use requirements are better met. When the lifting hook is severely worn or cracked, it can be quickly replaced to avoid affecting the progress of cargo shipping; the sliding hole and the guide block are slidably matched to play a guiding effect on the movement of the active locking sleeve, and the active locking sleeve is prevented from rotating; the spring plays a moving and resetting effect on the active locking sleeve; when the lifting hook is clamped together with the stressed vertical connecting shaft, the stress block moves to the innermost end of the stress groove, and the active locking sleeve moves downward under the influence of the spring thrust, so that the plug block is plugged into the stress groove, and the plug block cooperates with the stress groove to play a limiting effect on the lifting hook, prevent the lifting hook from rotating, and ensure the firmness of the connection between the lifting hook and the stressed vertical connecting shaft.
[0017] In addition, when the movable locking sleeve moves downward to the bottom, the outer connecting hole and the inner connecting groove are in a connected state, and the elastic limiting clamp is connected to the outer connecting hole and the inner connecting groove. The elastic limiting clamp is used to lock and fix the movable locking sleeve, further ensuring the firmness of the connection between the lifting hook and the stressed vertical connecting shaft; when the lifting hook needs to be replaced, first separate the elastic limiting clamp from the outer connecting hole and the inner connecting groove, and then move the movable locking sleeve upward to separate the plug from the stressed groove, and then rotate the lifting hook. The lifting hook is separated from the stressed vertical connecting shaft by itself under the influence of gravity, and the lifting hook replacement operation can be completed. The operation is simple and quick.
[0018] In addition, when the lifting hook falls to a height slightly higher than the required height, there is no need to communicate with the crane operator through the intercom. The lifting hook can be directly pulled down manually, and the tension spring is stretched, so that the lifting hook moves downward, lowering the height of the lifting hook and connecting it to the wire rope for lifting logistics goods, better meeting the actual needs of cargo shipping.
[0019] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the technical solution of the embodiment of the present invention, the drawings of the embodiment are briefly introduced below.
[0021] The drawings described below are only related to some embodiments of the present invention, but are not intended to limit the present invention.
[0022] In the attached picture:
[0023] Figure 1 The overall axial side structure schematic diagram of the lifting machinery for port logistics management of the present application is shown;
[0024] Figure 2 It shows a schematic structural diagram of the lifting hook of the lifting machinery for port logistics management of the present application in a disassembled state;
[0025] Figure 3 A schematic diagram of the main body axial side structure of the lifting machinery for port logistics management of the present application is shown;
[0026] Figure 4 A schematic diagram of the connection structure between the load-bearing vertical connecting shaft and the lifting hook of the lifting machinery for port logistics management of the present application is shown;
[0027] Figure 5 A schematic diagram of the split structure of the movable connecting piece and the movable pull ring of the lifting machinery for port logistics management of the present application is shown;
[0028] Figure 6A schematic diagram of the split structure of the load-bearing vertical connecting shaft and the lifting hook of the lifting machinery for port logistics management of the present application is shown;
[0029] Figure 7 A schematic diagram of the side structure of the load-bearing vertical connecting shaft of the hoisting machinery for port logistics management of the present application is shown;
[0030] Figure 8 A schematic diagram of the shaft side structure of a movable locking sleeve of a lifting machinery for port logistics management of the present application is shown.
[0031] Reference numerals list
[0032] 1. Main fishing body; 101. Movable hole; 102. Fixed pulling hole;
[0033] 2. Movable pulley;
[0034] 3. Active connector;
[0035] 4. Moving pull ring; 401. Moving trash hole;
[0036] 5. Extension spring;
[0037] 6. Force-bearing vertical connecting shaft; 601. Force-bearing block; 602. Guide block; 603. Internal connecting groove;
[0038] 7. Lifting hook; 701. Slot; 702. Stress groove;
[0039] 8. Movable locking sleeve; 801. Sliding hole; 802. Insert block; 803. External connection hole;
[0040] 9. Spring;
[0041] 10. Elastic limit clamp. DETAILED DESCRIPTION
[0042] In order to make the purpose, technical solution and advantages of the embodiment of the present invention clearer, the technical solution of the embodiment of the present invention will be clearly and completely described below in conjunction with the accompanying drawings of the embodiment of the present invention. Obviously, the described embodiment is a part of the embodiment of the present invention, not all of the embodiments. Based on the described embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0043] Example 1: Please refer to Figures 1 to 8 :
[0044] The present invention proposes a lifting machinery for port logistics management, comprising: a main fishing body 1; a movable pulley 2 is installed on the top of the main fishing body 1, and the movable pulley 2 is connected to the crane through a wire rope; a movable connecting piece 3 is installed on the bottom of the main fishing body 1, and movable pull rings 4 are installed on both ends of the movable connecting piece 3, and a tension spring 5 is connected to the outside of the movable pull ring 4; a force-bearing vertical connecting shaft 6 is connected to the bottom of the movable connecting piece 3, and the force-bearing vertical connecting shaft 6 is rotatably connected to the movable connecting piece 3, and a lifting hook 7 is connected to the bottom of the force-bearing vertical connecting shaft 6; a movable locking sleeve 8 is sleeved on the outside of the force-bearing vertical connecting shaft 6, and the movable locking sleeve 8 is connected to the lifting hook 7; an elastic limiting clip 10 is connected to the outside of the force-bearing vertical connecting shaft 6, and the elastic limiting clip 10 is connected to the movable locking sleeve 8; the lifting hook 7 is divided into a single hook and There are two types of double hooks. A slot 701 is provided on the top of the lifting hook 7, and the bottom end of the load-bearing vertical connecting shaft 6 is inserted into the slot 701; three load-bearing grooves 702 are arranged in a surrounding shape on the outside of the lifting hook 7, and the load-bearing groove 702 is L-shaped. The load-bearing groove 702 is communicated with the slot 701, and three load-bearing blocks 601 are arranged in a surrounding shape on the bottom end of the load-bearing vertical connecting shaft 6. The load-bearing blocks 601 are connected to the load-bearing grooves 702. The lifting hook 7 is connected to the load-bearing vertical connecting shaft 6 by snapping. The lifting hook 7 can be replaced according to the actual needs of logistics lifting use, so as to achieve a quick switching effect between a single hook and a double hook, and better meet the needs of logistics lifting use. When the lifting hook 7 is severely worn or cracked, it can be quickly replaced to avoid affecting the progress of cargo shipping.
[0045] In the embodiment of the present disclosure, the movable locking sleeve 8 is slidably connected to the outside of the stressed vertical connecting shaft 6, the bottom of the movable locking sleeve 8 is in contact with the top of the lifting hook 7, the outside of the stressed vertical connecting shaft 6 is provided with three guide blocks 602 in a surrounding shape, the outside of the movable locking sleeve 8 is provided with three sliding holes 801 in a surrounding shape, the guide blocks 602 are slidably connected in the sliding holes 801, the bottom of the movable locking sleeve 8 is provided with three plug blocks 802 in a surrounding shape, the plug blocks 802 are plugged into the top of the stress groove 702 provided on the lifting hook 7, the outside of the stressed vertical connecting shaft 6 is sleeved with a spring 9, the bottom end of the spring 9 is in contact with the top of the movable locking sleeve 8, and the top end of the spring 9 is in contact with the stressed vertical connecting shaft 6; adopting The above technical scheme, through the sliding cooperation between the sliding hole 801 and the guide block 602, has the effect of guiding the movement of the movable locking sleeve 8, preventing the movable locking sleeve 8 from rotating, and has the effect of resetting the movement of the movable locking sleeve 8 through the spring 9. When the lifting hook 7 and the stressed vertical connecting shaft 6 are clamped together, the stress block 601 moves to the innermost end of the stress groove 702, and the movable locking sleeve 8 moves downward under the thrust of the spring 9, so that the plug block 802 is inserted into the stress groove 702. Through the cooperation between the plug block 802 and the stress groove 702, the lifting hook 7 is limited, the lifting hook 7 is prevented from rotating, and the firmness of the connection between the lifting hook 7 and the stressed vertical connecting shaft 6 is ensured.
[0046] In the embodiment of the present disclosure, the outer part of the force-bearing vertical connecting shaft 6 is symmetrically provided with an inner connecting groove 603, and the outer part of the movable locking sleeve 8 is symmetrically provided with an outer connecting hole 803, the outer connecting hole 803 is connected to the inner connecting groove 603, and the elastic limiting clip 10 is connected to the outer connecting hole 803 and the inner connecting groove 603 in a connected state; by adopting the above technical solution, when the movable locking sleeve 8 moves downward to the bottom end, the outer connecting hole 803 and the inner connecting groove 603 are in a connected state, and the elastic limiting clip 10 is connected to the outer connecting hole 803 and the inner connecting groove 603, and the elastic limiting clip 10 is connected to the outer connecting hole 803 and the inner connecting groove 603. The elastic limit clamp 10 has the effect of locking and fixing the movable locking sleeve 8, further ensuring the firmness of the connection between the lifting hook 7 and the stressed vertical connecting shaft 6; when the lifting hook 7 needs to be replaced, first separate the elastic limit clamp 10 from the outer connecting hole 803 and the inner connecting groove 603, then move the movable locking sleeve 8 upward to separate the plug block 802 from the stressed groove 702, and then rotate the lifting hook 7. The lifting hook 7 is separated from the stressed vertical connecting shaft 6 by itself under the influence of gravity, and the replacement operation of the lifting hook 7 can be completed, and the operation is simple and quick.
[0047] Embodiment 2, on the basis of embodiment 1, movable holes 101 are provided on both sides of the main fishing body 1, both ends of the movable connecting piece 3 are slidably connected in the movable holes 101, the movable pull ring 4 is rotatably connected to the end of the movable connecting piece 3, a movable hole 401 is provided on the outside of the movable pull ring 4, and a fixed pull hole 102 is provided on the outside of the main fishing body 1, one end of the tension spring 5 is connected in the movable hole 401, and the other end of the tension spring 5 is connected in the fixed pull hole 102; adopting the above technical scheme, when the falling height of the lifting hook 7 is slightly higher than the required height, there is no need to communicate with the crane operator through the intercom, and the lifting hook 7 can be directly pulled down manually, the tension spring 5 is stretched by force, the lifting hook 7 moves downward, and the height of the lifting hook 7 is reduced, so that the lifting hook 7 is connected to the wire rope for lifting logistics goods, which better meets the actual cargo shipping needs.
[0048] The working principle of this embodiment is as follows: first, according to the actual logistics lifting needs, the required type of lifting hook 7 is selected, and the bottom end of the stressed vertical connecting shaft 6 is inserted into the slot 701 provided on the lifting hook 7, and the stress block 601 is connected to the innermost end of the stress groove 702; next, the movable locking sleeve 8 moves downward under the thrust of the spring 9, so that the plug block 802 is inserted into the stress groove 702, and the plug block 802 cooperates with the stress groove 702 to limit the lifting hook 7, prevent the lifting hook 7 from rotating, and achieve the effect of connecting and fixing the lifting hook 7 to the stressed vertical connecting shaft 6; when the movable locking sleeve 8 moves downward to the bottom, the outer connecting hole 803 and the inner connecting groove 603 are in a connected state, and the elastic limiting clip 10 is connected to the outer connecting hole 803 and the inner connecting groove 603, and the movable locking sleeve 8 is locked by the elastic limiting clip 10 The lifting hook 7 is directly pulled down manually, and the tension spring 5 is stretched, and the lifting hook 7 moves downward, thereby lowering the height of the lifting hook 7, so that the lifting hook 7 can be connected to the wire rope for lifting the logistics goods; when the lifting hook 7 needs to be replaced, the elastic limiting clip 10 is first separated from the outer connecting hole 803 and the inner connecting groove 603, and then the movable locking sleeve 8 is moved upward to separate the plug block 802 from the force groove 702, and then the lifting hook 7 is rotated, and the lifting hook 7 is separated from the force-bearing vertical connecting shaft 6 by itself under the influence of gravity, and the replacement operation of the lifting hook 7 can be completed.
[0049] In this article, there are a few points to note:
[0050] 1. The drawings of the embodiments of the present disclosure only involve structures related to the embodiments of the present disclosure, and other structures may refer to general designs.
[0051] 2. In the absence of conflict, the embodiments of the present disclosure and the features therein may be combined with each other to obtain new embodiments.
[0052] The above are only specific embodiments of the present disclosure, but the protection scope of the present disclosure is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present disclosure, which should be included in the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure should be based on the protection scope of the claims.
Claims
1. Lifting machinery for port logistics management, including: A main fishing body (1); a movable pulley (2) is installed inside the top of the main fishing body (1), and the movable pulley (2) is connected to the crane through a wire rope; it is characterized in that a movable connecting piece (3) is installed inside the bottom of the main fishing body (1), and movable pull rings (4) are installed at both ends of the movable connecting piece (3), and the outside of the movable pull ring (4) is connected to a tension spring (5); the bottom of the movable connecting piece (3) is connected to a load-bearing vertical connecting shaft (6), the load-bearing vertical connecting shaft (6) is rotatably connected to the movable connecting piece (3), and the bottom of the load-bearing vertical connecting shaft (6) is connected to a lifting hook (7); the outside of the load-bearing vertical connecting shaft (6) is sleeved with a movable locking sleeve (8), and the movable locking sleeve (8) is connected to the lifting hook (7). The stressed vertical connecting shaft (6) is externally connected with an elastic limiting clamp (10), which is connected to a movable locking sleeve (8); the lifting hook (7) is divided into two types: a single hook and a double hook, the top of the lifting hook (7) is provided with a slot (701), and the bottom end of the stressed vertical connecting shaft (6) is inserted into the slot (701); the lifting hook (7) is externally provided with three stressed grooves (702) in a surrounding shape, the stressed grooves (702) are L-shaped, and the stressed grooves (702) are connected to the slots (701), and the bottom end of the stressed vertical connecting shaft (6) is provided with three stressed blocks (601) in a surrounding shape, and the stressed blocks (601) are connected to the stressed grooves (702); the movable The locking sleeve (8) is slidably connected to the outside of the stressed vertical connecting shaft (6), the bottom of the movable locking sleeve (8) is in contact with the top of the lifting hook (7), the outside of the stressed vertical connecting shaft (6) is provided with three guide blocks (602) in a surrounding shape, the outside of the movable locking sleeve (8) is provided with three sliding holes (801) in a surrounding shape, and the guide blocks (602) are slidably connected in the sliding holes (801); the bottom of the movable locking sleeve (8) is provided with three plug blocks (802) in a surrounding shape, and the plug blocks (802) are plugged into the top of the stressed groove (702) provided in the lifting hook (7); the outside of the stressed vertical connecting shaft (6) is symmetrically provided with inner connecting grooves (603), and the outside of the movable locking sleeve (8) is An external connection hole (803) is symmetrically arranged, the external connection hole (803) is connected to the internal connection groove (603), and the elastic limit clamp (10) is connected to the external connection hole (803) and the internal connection groove (603) in a connected state; movable holes (101) are arranged on both sides of the main fishing body (1), both ends of the movable connecting member (3) are slidably connected to the movable holes (101), and the movable pull ring (4) is rotatably connected to the end of the movable connecting member (3); a movable pull hole (401) is arranged outside the movable pull ring (4), and a fixed pull hole (102) is arranged outside the main fishing body (1); one end of the tension spring (5) is connected to the movable pull hole (401), and the other end of the tension spring (5) is connected to the fixed pull hole (102).
2. The hoisting machinery for port logistics management according to claim 1, characterized in that: A spring (9) is sleeved on the outside of the stressed vertical connecting shaft (6), the bottom end of the spring (9) contacts the top of the movable locking sleeve (8), and the top end of the spring (9) contacts the stressed vertical connecting shaft (6).
