Production scheduling optimization method and system based on big data analysis drive

Through the production scheduling optimization method driven by big data analysis, real-time sensor data is used to adjust the production plan, which solves the problem in the existing technology that production scheduling optimization is difficult to respond quickly to changes, achieves efficient operation of production equipment and resource optimization, and reduces energy consumption. and failure costs.

CN118586562BActive Publication Date: 2024-10-11NANJING XIANWEI INFORMATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411068618.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-10-11
Estimated Expiration
2044-08-06

AI Technical Summary

Technical Problem

Existing production scheduling optimization methods are difficult to quickly respond to changes in the production process, resulting in production delays and resource waste, and the optimization results are difficult to achieve optimal solutions.

Method used

Based on the production scheduling optimization method driven by big data analysis, real-time data is collected through sensors to determine the status of production equipment and adjust the production planning plan to adapt to the actual working status of the equipment. Specific steps include determining the production planning plan based on the order to be produced, collecting production line sensor data for preprocessing, determining the status of the equipment, and adjusting the production plan based on abnormal causes.

Benefits of technology

It achieves the optimal operation of production line equipment, reduces downtime and improves the continuity of the production process, optimizes production planning and scheduling, reduces energy consumption and raw material waste, and reduces equipment failure and maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118586562B_ABST
    Figure CN118586562B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of production scheduling technology, and in particular to a production scheduling optimization method and system driven by big data analysis. The present invention proposes the following scheme, which integrates advanced data analysis technology and production management theory to achieve more efficient, flexible and intelligent production scheduling; the method includes determining a production planning scheme according to product demand, collecting and preprocessing real-time data in the production line, judging the working status of the equipment and adjusting the planning scheme in abnormal situations; the system consists of initial planning, data acquisition, data processing and equipment optimization modules, which can process a large amount of data in a complex production environment, optimize resource allocation, and improve production efficiency and product quality; this invention is applicable to various manufacturing industries, and helps manufacturers to improve operational efficiency and cost-effectiveness under dynamically changing market conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of production scheduling, and in particular to a production scheduling optimization method and system driven by big data analysis. Background Art

[0002] In today's highly competitive manufacturing market, production scheduling optimization is the key to improving production efficiency, reducing operating costs and improving product quality. Traditional production scheduling methods rely on manual experience and simple algorithms, which have limitations when dealing with complex and dynamically changing manufacturing environments. With the development of Industry 4.0 and smart manufacturing, the application of big data analysis technology has provided new opportunities for production scheduling optimization. Big data analysis involves extracting valuable information from massive amounts of data, which can come from multiple sources such as machine sensors, historical production records, quality control systems, etc. By analyzing this data, manufacturers can more accurately predict demand, identify production bottlenecks, optimize resource allocation, and improve product quality. However, to achieve these goals, a production scheduling optimization method driven by big data analysis is needed.

[0003] For example, the Chinese patent with the authorization announcement number CN108805325B involves an integrated optimization method for production planning and scheduling. At present, the main way to solve production planning and scheduling problems is the traditional optimization method. The optimization result is difficult to be the optimal solution, and it is very likely that it cannot be achieved in terms of process, which leads to the expected production goals cannot be achieved, and resource allocation cannot be issued. The steps of this invention are: obtaining specific data of the production planning layer and the scheduling layer; establishing a planning layer cost model and a scheduling layer cost model respectively according to the specific data; optimizing the planning and scheduling cost model using an improved collaborative optimization method, and finally obtaining the lowest cost production plan. This invention is aimed at some difficult problems in production planning and scheduling optimization, and proposes an optimization method with strong global optimization capabilities. This optimization method has the characteristics of openness, robustness, parallelism, global convergence, and no special requirements for the mathematical form of the problem.

[0004] The above patents all have the problem raised by this background technology: the production scheduling optimization method needs to be able to quickly respond to changes in the production process. If the production planning plan cannot be adjusted in time, production delays or waste of resources will occur. To solve the above problems, this application designs a production scheduling optimization method and system driven by big data analysis. Summary of the invention

[0005] The technical problem to be solved by the present invention is to address the deficiencies in the prior art and provide a production scheduling optimization method and system driven by big data analysis. First, the production planning scheme of the workshop is determined according to the product demand of the order to be produced. Secondly, real-time data is collected through sensors configured in the production line to determine whether the production equipment is in normal working condition. Finally, the abnormal cause of the production equipment is determined, and the production planning scheme is adjusted to adapt to the actual working condition of the production equipment.

[0006] To achieve the above object, the present invention provides the following technical solutions:

[0007] The production scheduling optimization method driven by big data analysis includes the following steps:

[0008] S1: Determine the production planning plan of the workshop according to the product requirements of the orders to be produced;

[0009] S2: The production workshop produces parts according to the production plan, collects real-time data through sensors configured in the production line, and pre-processes the real-time data;

[0010] S3: Determine whether the production equipment is in normal working condition based on the pre-processed real-time data;

[0011] S4: If the production equipment is not in normal working condition, determine the abnormal cause of the production equipment and adjust the production planning plan to adapt to the actual working condition of the production equipment.

[0012] The specific steps of S1 are as follows:

[0013] S1.1: According to the design drawings of the orders to be produced, determine the parts requirements of the orders to be produced, encode the parts according to the number of processing steps, and convert them into the initial parts population;

[0014] S1.2: Set the number of iterations, perform chromosome decoding on the initial part population according to the categories of parts, and obtain an initial scheduling plan. The categories of parts include key parts and common parts;

[0015] S1.3: Calculate the fitness of each part in the initial part population according to the initial scheduling plan, iteratively optimize the fitness of the parts until the number of iterations is reached, and output the production planning plan. The calculation formula for the fitness of the parts is:

[0016] ,

[0017] in, represents the part fitness of the current part, Indicates the total processing time of the part, TN indicates the processing time of the current part, The weighted coefficient representing the sum of the difference between the completion time of key parts and the latest installation point, represents the latest time of loading, x represents a single key part, S represents the total number of key parts, represents the processing time of the xth key part, Indicates the degree of simultaneity of parts assembly.

[0018] The chromosome decoding of the initial part population according to the part category includes setting part priority, key part scheduling and general part scheduling. The specific steps of the key part scheduling are as follows:

[0019] S1.21: Obtain the installation point of each key part and calculate the start time of the key parts based on the installation point;

[0020] S1.22: Obtain the processing procedures of the key parts with the highest priority that have not been scheduled in the current part chromosome, calculate the completion time of the key parts with the highest priority, and obtain the processing time sequence of the key parts with the highest priority;

[0021] S1.23: Adjust the processing time sequence of the key parts with the highest current priority according to the working status of the processing equipment to obtain the latest completion time;

[0022] S1.24: Determine whether the latest completion time of the key part with the highest current priority is greater than the latest time of the loading point. If it is greater than the latest time of the loading point, clear the processing time sequence of the key part with the highest current priority, remove it from the key parts list, and add it to the general parts list;

[0023] S1.25: Repeat S1.22 to S1.24 until all key parts are scheduled.

[0024] The calculation formula for the completion time of the key part with the highest current priority is:

[0025] ;

[0026] in, Indicates the completion time of the current highest priority critical part, represents the start time of the key part with the highest current priority, j represents the jth processing step of the key part with the highest current priority, M represents the total number of processing steps of the key part with the highest current priority, k represents the processing equipment of a single workshop, and N represents the total number of processing equipment in the workshop. It represents the time required for the jth processing step of the key part with the highest current priority to be processed on the kth processing equipment. represents the discriminant function. If the jth processing step of the key part with the highest current priority does not need to be processed in the kth processing equipment, then ,on the contrary .

[0027] The real-time data includes the real-time temperature of the working equipment, the real-time energy consumption, the equipment parts image and the bearing acceleration signal. The preprocessing of the real-time data includes data cleaning, image preprocessing and signal preprocessing. The data cleaning includes temperature data cleaning and energy consumption data cleaning. The image preprocessing includes image denoising, image segmentation and edge detection. The signal preprocessing includes signal normalization and signal denoising. The signal denoising includes sensor signal noise denoising, signal transmission noise denoising and environmental signal noise denoising.

[0028] S3 includes temperature status analysis, energy consumption status analysis, parts loss analysis and signal status analysis of production equipment;

[0029] The temperature state analysis includes monitoring the temperature data of key components of the equipment according to the temperature sensors installed on the production equipment, drawing a frequency distribution histogram of the temperature data, and outputting the temperature state analysis results of the key components of the equipment according to the frequency distribution histogram;

[0030] The energy consumption status analysis includes establishing an energy consumption baseline model based on the energy consumption data of the monitoring equipment installed on the production equipment, comparing the energy consumption data of the equipment with the energy consumption baseline model, and outputting the energy consumption analysis results of the production equipment based on the deviation value.

[0031] The specific steps of the parts loss analysis are as follows:

[0032] S3.1: Perform Gaussian difference on the preprocessed equipment part image, extract key points of the equipment part image, and calculate the dielectric strength of the key points;

[0033] S3.2: Compare the dielectric strength of the key point with the feature threshold. If it is greater than or equal to the feature threshold, mark the key point as a feature point, and use the BRIEF descriptor and MLP network to process the feature point to generate a loss feature vector.

[0034] S3.3: The loss feature vector is converted into a center loss feature through edge projection, a part loss recognition network is constructed, the center loss feature is trained through the part loss recognition network, and the loss category and loss rate of the production equipment parts are output.

[0035] The specific steps of the signal status analysis are as follows:

[0036] S3.4: Obtain working signals of the bearings of the production equipment under normal working conditions, use the signals as training sets of the state assessment model, and obtain optimal parameters of the state assessment model through the training sets;

[0037] S3.5: Divide the Fourier spectrum of the signal into frequency domain boundaries according to the scale space transformation, and divide the Fourier spectrum of the signal into frequency bands with different center frequencies, each frequency band corresponds to an intrinsic mode function;

[0038] S3.6: Iterate each eigenmode function to calculate the optimal solution that satisfies the minimum sum of bandwidths of each modal component, calculate the power spectrum according to the optimal solution of each modal component, and select the component with the largest energy in the power spectrum as the bearing working eigenvector;

[0039] S3.7: The bearing working characteristic vector is used as the input parameter of the state assessment model, and the input parameter is classified according to the optimal parameter and the penalty factor. The classification result is used as the prediction result of the operation state of the production equipment. The calculation formula of the classification result is:

[0040] ,

[0041] Among them, C represents the classification result, B represents the bearing working feature vector, represents the optimal kernel parameter, represents the penalty factor, s represents the unit length of the bearing working characteristic vector, represents the bearing working characteristic vector of the sth unit length, K represents the total length of the bearing working characteristic vector, represents the working characteristic vector of the bearing under normal operation of the sth unit length, a represents the Lagrange multiplier, and b represent the parameters of the optimal classification hyperplane, represents the slack variable.

[0042] A production scheduling optimization system driven by big data analysis, the system comprising an initial planning module, a data acquisition module, a data processing module and an equipment optimization module;

[0043] The initial planning module is used to determine the production planning scheme of the workshop according to the product requirements of the orders to be produced;

[0044] The data acquisition module is used to collect real-time data through sensors configured in the production line;

[0045] The data processing module is used to pre-process the real-time data and determine whether the production equipment is in a normal working state according to the pre-processed real-time data;

[0046] The equipment optimization module is used to adjust the production planning scheme to adapt to the actual working status of the production equipment;

[0047] The initial planning module includes:

[0048] The order analysis unit is used to receive and analyze the orders to be produced, and extract product requirements and design drawing information;

[0049] A parts coding unit is used to determine parts requirements and perform chromosome coding to form an initial parts population according to design drawings;

[0050] The scheduling plan generation unit is used to set the number of iterations, perform chromosome decoding on the initial part population, obtain the initial scheduling plan, calculate the part fitness, and generate the final production planning plan through iterative optimization;

[0051] The data acquisition module comprises:

[0052] The sensor data acquisition unit is used to collect real-time data of equipment operation through sensors such as temperature, energy consumption, image and signal configured in the production line;

[0053] A data synchronization unit, used to ensure that the data collected from different sensors are synchronized for subsequent processing;

[0054] The data processing module comprises:

[0055] Data cleaning unit, used to clean the collected temperature and energy consumption data to remove noise and abnormal values;

[0056] An image preprocessing unit, used for denoising, segmentation and edge detection of equipment part images;

[0057] A signal preprocessing unit, used for normalizing and denoising the bearing signal;

[0058] The status analysis unit includes temperature status analysis, energy consumption status analysis, parts loss analysis and signal status analysis to determine the working status of the production equipment.

[0059] Compared with the prior art, the present invention has the following beneficial effects:

[0060] 1. The present invention ensures that production line equipment operates in the optimal state through precise initial planning and real-time data monitoring, reduces downtime and improves the continuity of the production process;

[0061] 2. The present invention optimizes production planning and scheduling, reduces energy consumption and raw material waste, and reduces equipment failures and repair costs through predictive maintenance. BRIEF DESCRIPTION OF THE DRAWINGS

[0062] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:

[0063] Figure 1This is a flow chart of a production scheduling optimization method driven by big data analysis according to Embodiment 1 of the present invention;

[0064] Figure 2 This is a flow chart of the genetic algorithm of Example 1 of the present invention;

[0065] Figure 3 This is a module diagram of a production scheduling optimization system driven by big data analysis according to Example 2 of the present invention. DETAILED DESCRIPTION

[0066] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0067] Example 1

[0068] See also Figure 1 , an embodiment provided by the present invention: a production scheduling optimization method driven by big data analysis, comprising the following steps:

[0069] S1: Determine the production planning plan of the workshop according to the product requirements of the orders to be produced;

[0070] S2: The production workshop produces parts according to the production plan, collects real-time data through sensors configured in the production line, and pre-processes the real-time data;

[0071] S3: Determine whether the production equipment is in normal working condition based on the pre-processed real-time data;

[0072] S4: If the production equipment is not in normal working condition, determine the abnormal cause of the production equipment according to the fault diagnosis strategy, and adjust the production planning plan to adapt to the actual working condition of the production equipment.

[0073] The S1 also includes analyzing orders, evaluating workshop resources, matching production capacity and formulating production plans. The analyzing orders includes analyzing the product type, quantity, delivery period and parts assembly plan of the orders to be produced in detail, and evaluating the product size, raw material specifications and process complexity. The evaluating workshop resources includes evaluating the current resource status of the workshop, including machine equipment capabilities, raw material inventory and human resources. The matching production capacity includes matching the order requirements with the workshop resource status to determine whether there is sufficient production capacity to meet the order requirements. If the production capacity is insufficient, some orders are cancelled or outsourcing planning is carried out. The formulating production plan includes customizing a detailed production plan based on the order requirements and resource evaluation results. The production plan includes the production sequence of each product, the start and end time, the required materials and staffing.

[0074] The specific steps of S1 are as follows:

[0075] S1.1: According to the design drawings of the orders to be produced, determine the parts requirements of the orders to be produced, divide the parts into key parts and common parts, perform chromosome encoding on the initial parts population according to the number of processing steps of key parts and common parts, and convert them into the initial parts population;

[0076] S1.2: Set the number of iterations, perform chromosome decoding on the initial part population according to part classification, and obtain the initial scheduling plan;

[0077] S1.3: Calculate the fitness of each part in the initial part population according to the initial scheduling plan, iteratively optimize the fitness of the parts until the number of iterations is reached, and output the production planning plan. The calculation formula for the fitness of the parts is:

[0078] ,

[0079] in, represents the part fitness of the current part, Indicates the total processing time of the part, TN indicates the processing time of the current part, The weighted coefficient representing the sum of the difference between the completion time of key parts and the latest installation point, represents the latest time of loading, x represents a single key part, S represents the total number of key parts, represents the processing time of the xth key part, Indicates the degree of simultaneous assembly of parts;

[0080] The part assembly concurrency refers to the sum of the differences between the latest completed part and the completion time of other parts assembled at the same assembly point. Its value is related to the amount of work-in-progress inventory. The smaller the value, the higher the assembly concurrency and the smaller the work-in-progress inventory.

[0081] See also Figure 2 , a flow chart of a genetic algorithm according to an embodiment of the present invention, wherein the genetic algorithm includes chromosome encoding, initializing a population, chromosome decoding, calculating an initial fitness, and iterative optimization;

[0082] The chromosome encoding includes encoding the part chromosome according to the processing steps of the part, as shown in Table 1, including 5 part chromosomes, each of which has three processes. If the chromosome number 1 appears for the first time, its process number is recorded as 1-1, and when it appears for the second time, its process number is recorded as 1-2, and the part chromosomes are encoded in sequence;

[0083] Table 1 Part chromosome coding table

[0084]

[0085] Initializing the population includes setting the population size, the number of iterations, the initial crossover probability and the initial mutation probability;

[0086] The chromosome decoding includes priority sorting, key parts scheduling and general parts scheduling;

[0087] The priority sorting is used to sort the priorities of parts according to the classification of parts. The priority of the key parts appearing for the first time is recorded as 1-1, and the priority of the key parts is recorded in sequence. The priority of the general parts appearing for the first time is recorded as 2-1, and the priority of the general parts is recorded in sequence. Assuming that the part chromosomes 2 and 3 in Table 1 are key parts, and the remaining part chromosomes are general parts, the priorities corresponding to each process re-obtained from the chromosomes in Table 1 are shown in Table 2:

[0088] Table 2 Priority of each process of part chromosome

[0089]

[0090] The key parts scheduling is used to adjust the priority of key parts. The specific steps of key parts scheduling are as follows:

[0091] S1.21: Obtain the installation point of each key part according to the parts assembly plan, and calculate the start time of the key parts according to the installation point ,in, represents the start time of the i-th key component, represents the time of the installation point of the i-th key component;

[0092] S1.22: Obtain the processing procedures of the key parts with the highest priority that are not scheduled in the current part chromosome, calculate the completion time of the key parts with the highest priority, and obtain the processing time sequence of the key parts with the highest priority. The calculation formula of the completion time is:

[0093] ;

[0094] in, Indicates the completion time of the current highest priority critical part, represents the start time of the key part with the highest current priority, j represents the jth processing step of the key part with the highest current priority, M represents the total number of processing steps of the key part with the highest current priority, k represents the processing equipment of a single workshop, and N represents the total number of processing equipment in the workshop. It represents the time required for the jth processing step of the key part with the highest current priority to be processed on the kth processing equipment. represents the discriminant function. If the jth processing step of the key part with the highest current priority does not need to be processed in the kth processing equipment, then ,on the contrary ;

[0095] S1.23: Obtain the working status of the processing equipment in the corresponding time period in the processing time sequence of the current highest priority key part. If the working status of the processing equipment shows that it is occupied, adjust the start time of the current highest priority key part on the processing equipment according to the occupied time, calculate the completion time of the current highest priority key part according to the adjusted time difference, repeat S1.23 until all processing procedures of the current highest priority key part are adjusted, and obtain the latest completion time;

[0096] S1.24: Determine whether the latest completion time of the key part with the highest current priority is greater than the latest time of the loading point. If it is greater than the latest time of the loading point, clear the processing time sequence of the key part with the highest current priority, remove it from the key parts list, and add it to the general parts list;

[0097] S1.25: Repeat S1.22 to S1.24 until all key parts are scheduled;

[0098] The general parts scheduling performs processing scheduling on the general parts after the key parts scheduling is completed. First, the priority of the general parts is adjusted, and the priority of the newly added key parts is preferentially scheduled according to the original order, and the priority of the general parts process is updated. Then, the process of the general parts with the current highest priority in the general parts process is obtained. According to the scheduling plan of the key parts, the processing arrangement of the general parts with the current highest priority is performed during the idle time of the corresponding processing equipment. The processing arrangement work is repeated until the scheduling of all general parts is completed, and an initial scheduling plan is generated;

[0099] The chromosome fitness value is an important basis for subsequent genetic operations. The fitness reflects the adaptability of the chromosome. By mapping the optimization target, calculating the fitness of all parts, and calibrating the fitness of the parts through the linear calibration method, the emergence of super individuals can be prevented.

[0100] The iterative optimization includes selection operation, crossover operation and mutation operation. The selection operation retains excellent individuals or passes them on after genetic operation, and eliminates inferior individuals. The crossover operation replaces and reconstructs part of the genes of two parent chromosomes to generate two new daughter chromosomes. The mutation operation generates new individuals by changing part of the genes of chromosomes.

[0101] The real-time data includes the real-time temperature of the working equipment, the real-time energy consumption, the equipment parts image and the bearing acceleration signal;

[0102] The preprocessing of real-time data includes data cleaning, image preprocessing and signal preprocessing. The data cleaning includes temperature data cleaning and energy consumption data cleaning. The specific steps of image preprocessing are as follows:

[0103] S2.1: De-noising the equipment parts image. The equipment parts image noise includes AD quantization noise, dark current noise and parts reflection noise;

[0104] S2.2: Perform histogram statistics on the grayscale values ​​of the denoised equipment part image, take the peak-to-valley grayscale value between the two peaks as the segmentation threshold 1, calculate the segmentation threshold 2 according to the probability density function of the equipment part image, obtain the optimal segmentation threshold by weighted summing the segmentation threshold 1 and the segmentation threshold 2, compare the pixel point of the equipment part image with the optimal segmentation threshold, if it is greater than or equal to the optimal segmentation threshold, mark the pixel point as the target area, if it is less than the optimal segmentation threshold, mark the pixel point as the background area;

[0105] S2.3: Connecting the pixel points marked as the target area to obtain the target area image, and smoothing the target area image by edge detection, wherein the edge detection includes image Gaussian filtering, calculating the gradient amplitude and direction by differential method, non-maximum suppression of the gradient amplitude, and double threshold edge connection;

[0106] The signal preprocessing includes signal normalization and signal denoising, and the signal denoising includes sensor signal noise denoising, signal transmission noise denoising and environment signal noise denoising;

[0107] S3 includes temperature status analysis, energy consumption status analysis, parts loss analysis and signal status analysis of production equipment;

[0108] The temperature state analysis includes monitoring the temperature data of key components of the equipment according to the temperature sensors installed on the production equipment, drawing a frequency distribution histogram of the temperature data, judging whether there is abnormal fluctuation or deviation from the preset temperature range according to the frequency distribution histogram, and outputting the temperature state analysis results of the key components of the equipment, wherein the temperature state analysis results include normal temperature state, high temperature state and low temperature state;

[0109] The energy consumption status analysis includes monitoring the energy consumption data of the equipment according to the energy consumption monitoring equipment installed on the production equipment, the energy consumption data including current, voltage, power factor, active power and reactive power, establishing an energy consumption baseline model according to the historical energy consumption data and the operating characteristics of the production equipment, comparing the energy consumption data of the equipment with the energy consumption baseline model, and outputting the energy consumption analysis results of the production equipment according to the deviation value, the energy consumption analysis results including total energy consumption anomaly, peak energy consumption anomaly, valley energy consumption anomaly and energy consumption fluctuation anomaly;

[0110] The specific steps of the parts loss analysis are as follows:

[0111] S3.1: Perform Gaussian difference on the preprocessed equipment part image, extract the key points of the equipment part image, calculate the monomer medium strength of the key points, divide the target area image into four components of red, green, blue and depth for pixel decomposition, calculate the decomposed medium strength of the four components, and calculate the medium strength of the key points based on the monomer medium strength and the decomposed medium strength;

[0112] S3.2: Compare the medium strength of the key point with the feature threshold. If it is greater than or equal to the feature threshold, mark the key point as a feature point, use the BRIEF descriptor to describe the feature point, calculate the feature point descriptor of the feature point, use the MLP network to convert the feature point into high-dimensional data, and add it to the feature point descriptor, so that the feature point and the feature descriptor are added to form a feature vector. Each feature point is combined with its coordinates and confidence. The feature point is embedded in the high-dimensional vector using a multi-layer perceptron. First, the feature point is converted into 256-dimensional data using a five-layer fully connected perceptron. The number of channels of the five-layer perceptron is 3, 32, 64, 128 and 256 respectively, and a loss feature vector is generated;

[0113] S3.3: Convert the loss feature vector into a center loss feature through edge projection, construct a part loss recognition network, use the center loss feature as an input parameter of the part loss recognition network, train the part loss recognition network, and output the loss category and loss rate of the production equipment parts;

[0114] The specific steps of converting the loss feature vector into the center loss feature by edge projection are as follows:

[0115] S3.31: randomly select edge pixels from the edge pixel set of the loss feature vector and project them into the parameter space accumulator, and delete the selected edge pixels;

[0116] S3.32: Determine whether the extreme value in the parameter space accumulator is greater than the accumulation threshold. If it is less than or equal to the accumulation threshold, put the edge pixel back into the edge pixel set and repeat steps S3.31 to S3.32;

[0117] S3.33: If it is greater than the accumulation threshold, find the largest curve segment that is continuous or whose gap is not greater than the gap threshold in the peak set formed by the extreme value in the parameter space accumulator, and compare the largest curve segment with the limited length. If it is greater than or equal to the limited length, project the remaining edge pixels in the edge pixel set as the center loss feature. If it is less than the limited length, repeat steps S3.31 to S3.32;

[0118] The parts loss identification network includes:

[0119] An input layer, which establishes a feature sequence according to input parameters and calculates the fitting value of the feature sequence;

[0120] A hidden layer converts the fitting value of the feature sequence of the input layer into a high-dimensional space, and calculates the output value of the hidden layer in the high-dimensional space;

[0121] The output layer is used to output the loss category and loss rate of the production equipment parts.

[0122] The input parameters are trained by the part loss recognition network, and the loss categories of the output equipment parts include:

[0123] Initializing the part wear identification network according to the number of nodes in the input layer, the number of nodes in the hidden layer, and the number of nodes in the output layer of the part wear identification network, and determining the connection weights and node thresholds of the input layer and the hidden layer;

[0124] The input parameters are biased by the connection weights of the input layer and the hidden layer to obtain the output of the hidden layer, and the output of the hidden layer is updated by the node threshold to obtain the output layer input;

[0125] Calculating the error of the output layer input according to the error function of the output layer, determining whether the error of the output layer input meets the convergence requirement of the output layer, and if not, updating the connection weight and the node threshold;

[0126] If the convergence requirement is met, the loss category and loss rate of the transfer equipment parts are output, wherein the loss category of the equipment parts includes wear loss, corrosion loss, deformation loss and mixed loss;

[0127] The loss rate is calculated as follows:

[0128] ,

[0129] in, Indicates the loss rate of equipment parts. represents the learning rate, u represents a single node in the hidden layer, U represents the total number of nodes in the hidden layer, v represents a single node in the output layer, and V represents the total number of nodes in the output layer. represents the output of the u-th node in the hidden layer, represents the connection weights between the hidden layer and the output layer nodes, represents the node threshold of the output layer, and E represents the error of the output layer input;

[0130] Specifically, the part loss identification network is provided with an input layer, a hidden layer and an output layer. The input layer is used to establish a feature sequence according to the input parameters of the part loss identification network, accumulate the feature sequence, establish a grey differential equation, calculate the least squares parameter of the grey differential equation, and calculate the fitting value of the feature sequence by discretizing the least squares parameter solution. The hidden layer is used to transform the feature sequence fitting value of the input layer into a high-dimensional space by mapping according to the connection weights between the input layer and the hidden layer, sum the feature sequence fitting value in the high-dimensional space after nonlinear weighting, and calculate the output value of the hidden layer by bias. The output layer is used to obtain the output layer input, calculate the average error of the input value of the output layer, and determine whether the average error meets the convergence condition. If it does not meet the convergence requirement, the connection weight and node threshold are updated. If it meets the convergence requirement, the loss category and loss rate of the part are output;

[0131] The specific steps of the signal status analysis are as follows:

[0132] S3.4: Obtain working signals of the bearings of the production equipment under normal working conditions, use the signals as training sets of the state assessment model, and obtain optimal parameters of the state assessment model through the training sets;

[0133] The step of obtaining the optimal parameters of the state assessment model through training includes: optimizing the kernel parameters and penalty factors of the state assessment model through a moth optimization algorithm according to the training set to obtain the optimal kernel parameters and penalty factors, wherein the moth optimization algorithm is a population-based heuristic intelligent optimization algorithm;

[0134] S3.5: Divide the Fourier spectrum of the signal into frequency domain boundaries according to the scale space transformation, and divide the Fourier spectrum of the signal into frequency bands with different center frequencies, each frequency band corresponds to an intrinsic mode function;

[0135] S3.6: Iterate each eigenmode function to calculate the optimal solution that satisfies the minimum sum of bandwidths of each modal component, calculate the power spectrum according to the optimal solution of each modal component, and select the component with the largest energy in the power spectrum as the bearing working eigenvector;

[0136] S3.7: The bearing working characteristic vector is used as the input parameter of the state assessment model, and the input parameter is classified according to the optimal parameter and the penalty factor. The classification result is used as the prediction result of the operation state of the production equipment. The calculation formula of the classification result is:

[0137] ,

[0138] Among them, C represents the classification result, B represents the bearing working feature vector, represents the optimal kernel parameter, represents the penalty factor, s represents the unit length of the bearing working characteristic vector, represents the bearing working characteristic vector of the sth unit length, K represents the total length of the bearing working characteristic vector, represents the working characteristic vector of the bearing under normal operation of the sth unit length, a represents the Lagrange multiplier, and b represent the parameters of the optimal classification hyperplane, represents the slack variable;

[0139] The operating status of the production equipment includes a normal state, an outer ring fault state, an inner ring fault state and a rolling element fault state;

[0140] The adjusting of the production planning scheme to adapt to the actual working state of the production equipment includes:

[0141] Adjustments to energy consumption analysis results:

[0142] Abnormal total energy consumption: optimize production processes and equipment scheduling, reduce production activities during non-peak hours, inspect and maintain energy-intensive equipment to ensure its efficient operation, and replace old or inefficient equipment;

[0143] Peak energy consumption anomalies: Identify the causes of peaks, such as equipment overload or unreasonable operating hours, adjust production plans to avoid heavy load operations during periods of high energy costs, and introduce demand response technologies to reduce peak demand on the power grid;

[0144] Abnormal valley energy consumption: Analyze whether there is energy waste, such as equipment idling or overcooling, adjust equipment operation strategies, and improve equipment utilization during valley periods;

[0145] Abnormal energy consumption fluctuations: Check for instabilities in the production process, such as frequent starts and stops of equipment or changes in production speed, and implement energy management systems to smooth energy consumption and reduce fluctuations.

[0146] Adjustments to temperature status analysis results:

[0147] Normal temperature status: Maintain existing temperature control measures and monitor regularly to ensure continued stability;

[0148] High temperature state: Increase cooling capacity or improve cooling system to prevent equipment from overheating, adjust working cycle, and avoid overheating caused by long-term continuous operation;

[0149] Low temperature condition: Check whether the heating system is working properly, ensure that the equipment reaches the appropriate operating temperature, and adjust the environmental control, such as increasing the workshop temperature or using insulation materials;

[0150] Adjustment for equipment parts wear and tear:

[0151] Wear and tear: Regularly check the easily worn parts and replace them in time to maintain equipment performance; use more wear-resistant materials or coatings to reduce the wear rate;

[0152] Corrosion loss: Improve the working environment, reduce contact with corrosive substances, apply anti-corrosion materials or coatings, and perform anti-rust treatment regularly;

[0153] Deformation loss: Ensure that the equipment operates under the correct load and speed, avoid excessive load, use high-strength materials, and enhance the equipment's ability to resist deformation;

[0154] Mixed losses: For situations where multiple types of losses coexist, apply the above strategies in combination, conduct regular comprehensive loss analysis, and formulate corresponding maintenance plans;

[0155] Adjustments for production equipment failure status:

[0156] Normal status: Continue to implement the preventive maintenance plan to keep the equipment in good condition;

[0157] Outer ring fault status: Check the outer ring of the bearing and its installation, replace or adjust it if necessary, strengthen bearing lubrication, and reduce friction and heat generation;

[0158] Inner ring failure status: Check the fit between the inner ring of the bearing and the shaft to ensure proper tightening and alignment, evaluate the bearing load, and avoid failures caused by uneven loads;

[0159] Rolling element failure status: Check whether the rolling element is damaged or worn, optimize the load distribution of the rolling element, and reduce local overload.

[0160] Example 2

[0161] See also Figure 3 , the present invention provides an embodiment: a production scheduling optimization system driven by big data analysis, the system comprising an initial planning module, a data acquisition module, a data processing module and an equipment optimization module;

[0162] The initial planning module is used to determine the production planning scheme of the workshop according to the product requirements of the orders to be produced;

[0163] The data acquisition module is used to collect real-time data through sensors configured in the production line;

[0164] The data processing module is used to pre-process the real-time data and determine whether the production equipment is in a normal working state according to the pre-processed real-time data;

[0165] The equipment optimization module is used to adjust the production planning scheme to adapt to the actual working status of the production equipment;

[0166] The initial planning module includes:

[0167] The order analysis unit is used to receive and analyze the orders to be produced, and extract product requirements and design drawing information;

[0168] A parts coding unit is used to determine parts requirements and perform chromosome coding to form an initial parts population according to design drawings;

[0169] The scheduling plan generation unit is used to set the number of iterations, perform chromosome decoding on the initial part population, obtain the initial scheduling plan, calculate the part fitness, and generate the final production planning plan through iterative optimization;

[0170] The data acquisition module comprises:

[0171] The sensor data acquisition unit is used to collect real-time data of equipment operation through sensors such as temperature, energy consumption, image and signal configured in the production line;

[0172] A data synchronization unit, used to ensure that the data collected from different sensors are synchronized for subsequent processing;

[0173] The data processing module comprises:

[0174] Data cleaning unit, used to clean the collected temperature and energy consumption data to remove noise and abnormal values;

[0175] An image preprocessing unit, used for denoising, segmentation and edge detection of equipment part images;

[0176] A signal preprocessing unit, used for normalizing and denoising the bearing signal;

[0177] The status analysis unit includes temperature status analysis, energy consumption status analysis, parts loss analysis and signal status analysis to determine the working status of the production equipment.

[0178] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A production scheduling optimization method driven by big data analysis, characterized in that: The following steps are involved: S1: Determine the production planning plan of the workshop according to the product requirements of the orders to be produced; S2: The production workshop produces parts according to the production plan, collects real-time data through sensors configured in the production line, and pre-processes the real-time data; S3: Determine whether the production equipment is in normal working condition based on the pre-processed real-time data; S4: If the production equipment is not in normal working condition, determine the abnormal cause of the production equipment and adjust the production planning scheme to adapt to the actual working condition of the production equipment; The specific steps of S1 are as follows: S1.1: According to the design drawings of the orders to be produced, determine the parts requirements of the orders to be produced, encode the parts according to the number of processing steps, and convert them into the initial parts population; S1.2: Set the number of iterations, perform chromosome decoding on the initial part population according to the categories of parts, and obtain an initial scheduling plan. The categories of parts include key parts and common parts; S1.3: Calculate the fitness of each part in the initial part population according to the initial scheduling plan, iteratively optimize the fitness of the parts until the number of iterations is reached, and output the production planning plan. The calculation formula for the fitness of the parts is: , in, represents the part fitness of the current part, Indicates the total processing time of the part, TN indicates the processing time of the current part, The weighted coefficient representing the sum of the difference between the completion time of key parts and the latest installation point, represents the latest time of loading, x represents a single key part, S represents the total number of key parts, represents the processing time of the xth key part, Indicates the degree of simultaneous assembly of parts; The chromosome decoding of the initial part population according to the part category includes setting part priority, key part scheduling and general part scheduling. The specific steps of the key part scheduling are as follows: S1.21: Obtain the installation point of each key part and calculate the start time of the key parts based on the installation point; S1.22: Obtain the processing procedures of the key parts with the highest priority that have not been scheduled in the current part chromosome, calculate the completion time of the key parts with the highest priority, and obtain the processing time sequence of the key parts with the highest priority; S1.23: Adjust the processing time sequence of the key parts with the highest current priority according to the working status of the processing equipment to obtain the latest completion time; S1.24: Determine whether the latest completion time of the key part with the highest current priority is greater than the latest time of the loading point. If it is greater than the latest time of the loading point, clear the processing time sequence of the key part with the highest current priority, remove it from the key parts list, and add it to the general parts list; S1.25: Repeat S1.22 to S1.24 until all key parts are scheduled; The real-time data includes the real-time temperature of the working equipment, the real-time energy consumption, the equipment parts image and the bearing acceleration signal. The preprocessing of the real-time data includes data cleaning, image preprocessing and signal preprocessing. The data cleaning includes temperature data cleaning and energy consumption data cleaning. The image preprocessing includes image denoising, image segmentation and edge detection. The signal preprocessing includes signal normalization and signal denoising. The signal denoising includes sensor signal noise denoising, signal transmission noise denoising and environmental signal noise denoising.

2. The production scheduling optimization method based on big data analysis drive according to claim 1 is characterized in that: The calculation formula for the completion time of the key part with the highest current priority is: ; in, Indicates the completion time of the current highest priority critical part, represents the start time of the key part with the highest current priority, j represents the jth processing step of the key part with the highest current priority, M represents the total number of processing steps of the key part with the highest current priority, k represents the processing equipment of a single workshop, and N represents the total number of processing equipment in the workshop. It represents the time required for the jth processing step of the key part with the highest current priority to be processed on the kth processing equipment. represents the discriminant function. If the jth processing step of the key part with the highest current priority does not need to be processed in the kth processing equipment, then ,on the contrary .

3. The production scheduling optimization method based on big data analysis drive according to claim 1 is characterized in that: S3 includes temperature status analysis, energy consumption status analysis, parts loss analysis and signal status analysis of production equipment; The temperature state analysis includes monitoring the temperature data of key components of the equipment according to the temperature sensors installed on the production equipment, drawing a frequency distribution histogram of the temperature data, and outputting the temperature state analysis results of the key components of the equipment according to the frequency distribution histogram; The energy consumption status analysis includes establishing an energy consumption baseline model based on the energy consumption data of the monitoring equipment installed on the production equipment, comparing the energy consumption data of the equipment with the energy consumption baseline model, and outputting the energy consumption analysis results of the production equipment based on the deviation value.

4. The production scheduling optimization method based on big data analysis drive according to claim 3 is characterized in that: The specific steps of the parts loss analysis are as follows: S3.1: Perform Gaussian difference on the preprocessed equipment part image, extract key points of the equipment part image, and calculate the dielectric strength of the key points; S3.2: Compare the medium strength of the key point with the feature threshold. If it is greater than or equal to the feature threshold, mark the key point as a feature point, and use the BRIEF descriptor and MLP network to process the feature point to generate a loss feature vector. S3.3: The loss feature vector is converted into a center loss feature through edge projection, a part loss recognition network is constructed, the center loss feature is trained through the part loss recognition network, and the loss category and loss rate of the production equipment parts are output.

5. The production scheduling optimization method based on big data analysis drive according to claim 3 is characterized in that: The specific steps of the signal status analysis are as follows: S3.4: Obtain working signals of the bearings of the production equipment under normal working conditions, use the signals as training sets of the state assessment model, and obtain optimal parameters of the state assessment model through the training sets; S3.5: Divide the Fourier spectrum of the signal into frequency domain boundaries according to the scale space transformation, and divide the Fourier spectrum of the signal into frequency bands with different center frequencies, each frequency band corresponds to an intrinsic mode function; S3.6: Iterate each eigenmode function to calculate the optimal solution that satisfies the minimum sum of bandwidths of each modal component, calculate the power spectrum according to the optimal solution of each modal component, and select the component with the largest energy in the power spectrum as the bearing working eigenvector; S3.7: The bearing working characteristic vector is used as an input parameter of the state assessment model, and the input parameter is classified according to the optimal parameter. The classification result is used as the prediction result of the operation state of the production equipment. The calculation formula of the classification result is: , Among them, C represents the classification result, B represents the bearing working feature vector, represents the optimal kernel parameter, represents the penalty factor, s represents the unit length of the bearing working characteristic vector, represents the bearing working characteristic vector of the sth unit length, K represents the total length of the bearing working characteristic vector, represents the working characteristic vector of the bearing under normal operation of the sth unit length, a represents the Lagrange multiplier, and b represent the parameters of the optimal classification hyperplane, represents the slack variable.

6. A production scheduling optimization system driven by big data analysis, used to implement the production scheduling optimization method driven by big data analysis as described in any one of claims 1 to 5, characterized in that: The system includes an initial planning module, a data acquisition module, a data processing module and an equipment optimization module; The initial planning module is used to determine the production planning scheme of the workshop according to the product requirements of the orders to be produced; The data acquisition module is used to collect real-time data through sensors configured in the production line; The data processing module is used to pre-process the real-time data and determine whether the production equipment is in a normal working state according to the pre-processed real-time data; The equipment optimization module is used to adjust the production planning scheme to adapt to the actual working status of the production equipment.