Power system optimal dispatching method and system considering multi-factor distributed resources

By obtaining real-time operation data of the power system, determining the operation scenarios and building an optimized scheduling solution, the problems of security risks and complementary characteristics in distributed resource scheduling are solved, and efficient resource utilization and economic benefits are achieved.

CN118586564BActive Publication Date: 2024-11-22LISHUI POWER SUPPLY COMPANY OF STATE GRID ZHEJIANG ELECTRIC POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411076236.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-11-22
Estimated Expiration
2044-08-07

AI Technical Summary

Technical Problem

The existing technology fails to fully consider the security risks of distributed resources and complementary characteristics between resources during power system operation, which limits the efficient use of distributed resources and affects the safe operation and economic benefits of power system.

Method used

By obtaining real-time operation data of the power system, determining the operation scenarios, setting up multiple output resource scheduling schemes for each scenario, building operation indicators, calculating the indicator decision value of each scheme, selecting the final optimization scheduling scheme, and distributing the multi-factor Optimize the scheduling of resources and make full use of the complementary characteristics between resources.

Benefits of technology

It realizes efficient utilization of distributed resources, ensures the safe operation of the power system, reduces the system operation cost, and improves economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118586564B_ABST
    Figure CN118586564B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of electric power dispatching, and discloses a method and system for optimizing dispatching of an electric power system considering multi-factor distributed resources, wherein the method comprises acquiring real-time operation data of the electric power system, wherein the real-time operation data comprises output time series data and load time series data of the electric power system; determining an operation scenario of the electric power system according to the real-time operation data, and setting a plurality of output resource dispatching schemes for the operation scenario, wherein the operation scenario comprises types of distributed resources; constructing an operation index of the electric power system, calculating an index decision value of each output resource dispatching scheme based on the operation index, and selecting a final optimized dispatching scheme from a plurality of output resource dispatching schemes according to the calculation results; optimizing and dispatching the multi-factor distributed resources in the electric power system according to the final optimized dispatching scheme, so as to improve the utilization efficiency of the electric power system for distributed resources.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric power dispatching, and in particular to a method and system for optimizing dispatching of an electric power system taking into account multi-element distributed resources. Background Art

[0002] In recent years, distributed photovoltaic, distributed wind power, distributed energy storage, controllable commercial building load, controllable park load, electric vehicle charging / swapping stations and other diversified distributed resources have been widely used and deeply explored, bringing innovative operation modes and optimization space to new power systems. However, how to effectively, safely and economically optimize and coordinate the control of these distributed resources has become one of the current research hotspots.

[0003] At present, some literature has conducted in-depth research on the collaborative optimization of distributed resources. However, the current research on the optimization and coordinated control of distributed resources has not fully considered the safety risks in the operation of the power system and the complementary characteristics of resources. This not only limits the efficient utilization of distributed resources, but also has an adverse impact on the safe operation and economic benefits of the power system.

[0004] It can be seen that how to scientifically manage and safely schedule distributed resources has become a technical problem that needs to be urgently solved by those skilled in the art. Summary of the invention

[0005] The present invention provides a method and system for optimizing the dispatching of an electric power system taking into account multi-factor distributed resources, and solves the problem of how to scientifically manage and safely dispatch distributed resources.

[0006] In order to solve the above technical problems, the first aspect of the present invention provides a method for optimizing the dispatching of a power system considering multi-factor distributed resources, comprising:

[0007] Acquiring real-time operation data of the power system, wherein the real-time operation data includes output time series data and load time series data of the power system;

[0008] Determine an operation scenario of the power system according to the real-time operation data, and set a plurality of output resource scheduling schemes for the operation scenario, wherein the operation scenario includes types of distributed resources;

[0009] Constructing the operation index of the power system, calculating the index decision value of each output resource scheduling scheme based on the operation index, and selecting the final optimized scheduling scheme from a plurality of output resource scheduling schemes according to the calculation results;

[0010] The multi-factor distributed resources in the power system are optimally scheduled according to the final optimal scheduling plan.

[0011] As one of the preferred solutions, determining the operation scenario of the power system according to the real-time operation data and setting a plurality of output resource scheduling schemes for the operation scenario include:

[0012] The real-time operation data is sampled according to a preset time period to obtain a plurality of operation scenarios, and a plurality of output resource scheduling schemes are set for each of the operation scenario samples.

[0013] As one of the preferred solutions, the output resource scheduling solution is expressed by the following formula:

[0014]

[0015] In the formula, is the output resource scheduling scheme flag corresponding to the operation scenario; M is the number of combinations of distributed resources planned for the power system; N is the total number of distributed resources; For resource j to run in combination i; Resource j does not run in combination i.

[0016] As one of the preferred schemes, the operating indicators include power system operation safety indicators and power system operation economic indicators, the power system operation safety indicators include active power margin indicators, reactive power margin indicators and voltage margin indicators, and the power system operation economic indicators include air conditioning operation costs, electric vehicle operation costs and daily production load costs.

[0017] As one of the preferred solutions, the step of calculating the indicator decision value of each output resource scheduling solution based on the operation indicator includes:

[0018] Performing standard processing on the operating indicators corresponding to each output resource scheduling scheme to obtain a standardized processing result;

[0019] Calculating the information entropy value of the operating indicator according to the normalization processing result, and determining the weight of the operating indicator according to the information entropy value of the operating indicator;

[0020] Based on the weight of the operating index, the index decision value of each output resource scheduling scheme is calculated by a linear weighted method.

[0021] A second aspect of the present invention provides a power system optimization dispatching system considering multi-factor distributed resources, comprising:

[0022] A data acquisition module, used to acquire real-time operation data of the power system, wherein the real-time operation data includes output time series data and load time series data of the power system;

[0023] A scheme setting module, used to determine the operation scenario of the power system according to the real-time operation data, and set a number of output resource scheduling schemes for the operation scenario, wherein the operation scenario includes the types of distributed resources;

[0024] A scheme selection module, used to construct the operation index of the power system, calculate the index decision value of each output resource scheduling scheme based on the operation index, and select the final optimized scheduling scheme from a plurality of output resource scheduling schemes according to the calculation results;

[0025] The optimization scheduling module is used to optimize the scheduling of multi-factor distributed resources in the power system according to the final optimization scheduling plan.

[0026] As one of the preferred solutions, the solution setting module is also used to sample the real-time operation data according to a preset time period to obtain multiple operation scenarios, and set several output resource scheduling solutions for each of the operation scenario samples.

[0027] As one of the preferred solutions, the output resource scheduling solution is expressed by the following formula:

[0028]

[0029] In the formula, is the output resource scheduling scheme flag corresponding to the operation scenario; M is the number of combinations of distributed resources planned for the power system; N is the total number of distributed resources; For resource j to run in combination i; Resource j does not run in combination i.

[0030] As one of the preferred schemes, the operating indicators include power system operation safety indicators and power system operation economic indicators, the power system operation safety indicators include active power margin indicators, reactive power margin indicators and voltage margin indicators, and the power system operation economic indicators include air conditioning operation costs, electric vehicle operation costs and daily production load costs.

[0031] As one of the preferred solutions, the solution selection module includes:

[0032] A standardized processing unit, used for performing standardized processing on the operating indicators corresponding to each output resource scheduling scheme to obtain standardized processing results;

[0033] A weight calculation unit, used to calculate the information entropy value of the operation indicator according to the standardization processing result, and determine the weight of the operation indicator according to the information entropy value of the operation indicator;

[0034] A decision value calculation unit is used to calculate the indicator decision value of each output resource scheduling solution through a linear weighted method based on the weight of the operating indicator.

[0035] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:

[0036] The present invention discloses a method and system for optimizing and dispatching a power system considering multi-factor distributed resources, wherein the method includes obtaining real-time operation data of the power system, the real-time operation data including output time series data and load time series data of the power system; determining the operation scenario of the power system according to the real-time operation data, and setting a number of output resource dispatching schemes for the operation scenario, the operation scenario including the types of distributed resources; constructing the operation index of the power system, calculating the index decision value of each output resource dispatching scheme based on the operation index, and selecting the final optimized dispatching scheme from a number of output resource dispatching schemes according to the calculation results; optimizing and dispatching the multi-factor distributed resources in the power system according to the final optimized dispatching scheme. The present invention fully considers the complementary characteristics of multi-factor distributed resources, optimizes and coordinates the operation through resource joint operation optimization and coordinated control, realizes efficient resource utilization, ensures the safe operation of the power system, and reduces the system operation cost to improve the economic benefits of system operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] In order to more clearly illustrate the technical solution of the present invention, the drawings required for use in the implementation mode will be briefly introduced below. Obviously, the drawings described below are only some implementation modes of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0038] Figure 1 It is a flow chart of a method for optimizing and dispatching a power system considering multi-factor distributed resources provided by a certain embodiment of the present invention;

[0039] Figure 2 It is a calculation process diagram of an indicator decision value provided by a certain embodiment of the present invention;

[0040] Figure 3 It is a structural diagram of a power system optimization dispatching system taking into account multi-factor distributed resources provided by a certain embodiment of the present invention. DETAILED DESCRIPTION

[0041] The following is a clear and complete description of the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings and embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. The purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0042] In the description of this application, the terms "first", "second", "third", etc. are used for descriptive purposes only and are not to be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first", "second", "third", etc. may explicitly or implicitly include one or more of the feature. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0043] In the description of the present application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be a connection between the two components. The terms "vertical", "horizontal", "left", "right", "upper", "lower" and similar expressions used herein are for illustrative purposes only, and do not indicate or imply that the system or component referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0044] In the description of this application, it should be noted that, unless otherwise defined, all technical and scientific terms used in the present invention have the same meaning as those commonly understood by those skilled in the art. The terms used in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood by specific circumstances.

[0045] In one embodiment, if Figure 1 As shown, the first aspect of the present invention provides a method for optimizing the dispatching of a power system considering multi-factor distributed resources, comprising:

[0046] S1. Acquire real-time operation data of the power system, wherein the real-time operation data includes output time series data and load time series data of the power system; wherein the output time series data includes output sequence data of various distributed resources, such as wind power sequence, photovoltaic sequence, energy storage sequence, etc., and the load time series data is the load sequence data in the controllable park; then perform pre-processing operations such as cleaning, denoising, and filtering on the collected real-time operation data to improve the quality and reliability of the data.

[0047] S2. Determine the operation scenario of the power system according to the real-time operation data, and set a number of output resource scheduling plans for the operation scenario, wherein the operation scenario includes the types of distributed resources; wherein the output resource scheduling plan also includes relevant data of various distributed resources, such as wind power data, photovoltaic data, energy storage data, controllable park load, etc.

[0048] In one embodiment, step S2 specifically includes:

[0049] The real-time operation data is sampled according to a preset time period to obtain a plurality of operation scenarios, and a plurality of output resource scheduling schemes are set for each of the operation scenario samples.

[0050] Since the distributed resources in the real-time operation data are not static, it is necessary to sample the real-time operation data in segments according to time periods so that the same type of distributed resources can be run in one segment of data as much as possible, which is convenient for adjusting the output plan to achieve optimal energy efficiency. Distributed wind power, distributed photovoltaics and other new energy sources have the characteristics of randomness and volatility. The controllable park load can adapt to these fluctuations by flexibly adjusting electricity consumption to achieve the purpose of supply and demand balance. Therefore, this application optimizes the operation of the power system based on different operation scenarios for the participation of multi-factor distributed resources. Among them, the operation scenario is related to the type of distributed resources in the real-time operation data. If a period of time is T, Wind power series , , , Photovoltaic series , If a period is composed of a period of T, then the operation scenario of this period is the wind and solar operation scenario. Energy storage sequence , , Load demand sequence , Therefore, the operation scenario can be determined according to the type of distributed resources in the real-time operation scenario, and multiple operation scenarios can be obtained after random sampling of real-time operation data.

[0051] In one embodiment, the output resource scheduling scheme is expressed by the following formula:

[0052]

[0053] In the formula, is the output resource scheduling scheme flag corresponding to the operation scenario; M is the number of combinations of distributed resources planned for the power system; N is the total number of distributed resources; For resource j to run in combination i; Resource j does not run in combination i.

[0054] In addition, a constraint condition is set for the output resource scheduling scheme: resource j can only be operated within one scheme combination. This constraint is expressed by the following formula:

[0055]

[0056] According to different scenarios, by combining distributed resources, a candidate output resource scheduling plan is constructed, and relevant parameters of various distributed resources in the power system under the scenario are obtained: installed capacity and voltage of each generator set, among which wind power data include wind power operation and maintenance cost, wind abandonment cost, and wind power output power; photovoltaic data include photovoltaic operation and maintenance cost, photovoltaic abandonment cost, and photovoltaic output power; operation and maintenance cost and demand response cost in controllable park loads; operation and maintenance cost and charge state of energy storage system, etc.

[0057] Since the output resource scheduling plan is related to the real-time operating data corresponding to the operating scenario, the generation process of the output resource scheduling plan is described in detail by taking the wind-solar operating scenario corresponding to a certain section of operating data as an example, which includes the following steps: First, the real-time operating data of the wind-solar section corresponding to the wind-solar operating scenario is obtained, including but not limited to environmental parameters such as wind speed, wind direction, solar radiation intensity, temperature, humidity, and the output power and operating status of the generator set, and these data are clustered to divide similar data points into the same category, which is helpful to better capture the distribution characteristics of the data later; then, the power generation efficiency is optimized by combining the neural network and the gradient descent method, and the preprocessed data is input into the neural network. After training in the network model, a nonlinear relationship model between input data (such as wind speed, solar radiation intensity, etc.) and output power is established, and the dynamic change law of wind and solar resources and the response characteristics of the power generation system are captured. The model parameters are adjusted by the gradient descent method, with the goal of minimizing energy waste and maximizing power generation, and then the scheduling strategy is automatically adjusted according to the changes in real-time data, and a variety of wind and solar resource scheduling schemes are generated and evaluated until the target value of the obtained scheme is within the preset interval, and the above steps are repeated until the preset number of iterations is reached, and the final several wind and solar resource scheduling schemes are output, which is the combination of wind and solar resource scheduling schemes set by this application according to the operation scenario. It should be noted that the preset time period, interval, number of times, etc. proposed in this application are all determined according to actual conditions, and no specific numerical limit is made here. However, this application is aimed at the real-time operation scenario of the power generation system, by collecting real-time operation data, and using adaptive algorithms to adjust and optimize these data to generate a variety of feasible wind and solar resource scheduling schemes, aiming to improve energy utilization efficiency, balance the grid load, and reduce energy waste.

[0058] S3. Construct the operation index of the power system, calculate the index decision value of each output resource scheduling scheme based on the operation index, and select the final optimized scheduling scheme from several output resource scheduling schemes according to the calculation results; specifically, the present application constructs an adjustable capacity index system that considers the characteristics of multi-factor distributed resources to analyze the adjustable capacity of various distributed resources, and considering that there are differences in the degree of resource adjustability after distributed resources such as distributed wind power, distributed photovoltaics, and distributed energy storage are connected to the power system, the present application characterizes the comprehensive adjustment capacity of distributed resources from multiple objectives such as power system operation safety and economy.

[0059] With the increase in the penetration rate of new energy and the occurrence of power grid instability and collapse accidents, the safety of the power system has received great attention. Therefore, in order to improve the credibility of the safety and stability domain, a distributed renewable energy power system operation safety evaluation index is established. In one embodiment, the operation index includes a power system operation safety index, and the power system operation safety index includes an active margin index, a reactive margin index, and a voltage margin index;

[0060] The active power margin of traditional power systems is usually expressed using a PV curve, but this application redefines the active power margin index from the perspective of safety and stability based on the definition of the load power rating and the active power stability margin coefficient of the power system, as shown in the following formula:

[0061]

[0062] In the formula, is the active power stability margin coefficient; is the load power rating; is the actual output at time t; It is the active power margin index; , They are the voltage stability margin before and after the distributed resources are connected; among them, the active margin index reflects the system's ability to withstand disturbances. When When , the power system is critically stable; The smaller it is, the worse the ability to be disturbed.

[0063] The reactive power margin of traditional power systems is usually represented by a PQ curve. However, from the perspective of safety and stability, this application redefines the reactive power margin index according to the definition of the reactive power stability margin coefficient of the power system, as shown in the following formula:

[0064]

[0065] In the formula, is the reactive power stability margin factor; is the critical reactive power; is the reactive power at time t; It is the reactive power margin index; , They are the impact of distributed energy access on the system reactive power stability before and after; in general The value range is around 1. When distributed energy access is used, it can effectively improve the safety and stability of the system; When, the opposite is true.

[0066] Voltage margin indicator Determined by the load node power characteristics and network characteristics, it reflects the deviation of voltage fluctuation, as shown in the following formula:

[0067]

[0068] In the formula, is the voltage stability margin factor; is the critical voltage; for Voltage at the moment; , They are the voltage change degrees before and after distributed energy is connected to the system.

[0069] This application reflects the safety margin of the power system in transmitting active power through the active margin index, evaluates the power system's ability to support reactive power through the reactive margin index, and reflects the system voltage stability margin through the voltage margin index. The power system operation safety indicators constituted by them jointly provide comprehensive stability information support for power operation dispatchers, which helps to ensure the safe, stable and economical operation of the power system.

[0070] Multi-energy complementarity can significantly reduce the fluctuation of power system load and reduce environmental pollution. When multi-factor distributed energy is added to the power system dispatching system, the traditional power system economic evaluation cannot be directly applied to it. Therefore, it is necessary to combine different scenarios to calculate the total operating cost of distributed resources participating in the optimization and coordinated control within a cycle. Therefore, the operating indicators also include the power system operation economic indicators. , expressed by the following formula:

[0071]

[0072] In the formula, To run a scene collection, is the probability of running scenario s; , , , They are the energy abandonment cost (wind and solar), operation and maintenance cost (wind and solar), energy storage cost and load operation cost (i.e. controllable park operation cost) in the power system. , They are The actual output of wind power and photovoltaic power at each moment; , They are the on-grid electricity prices of wind power and photovoltaic power respectively; and Respectively in The charging and discharging amount of energy storage equipment at all times; in addition, due to the randomness of renewable energy output, the energy abandonment cost mainly includes wind power and photovoltaic power. , Wind power and photovoltaic The planned output at all times; without considering energy storage alone, the operation and maintenance costs include wind power and photovoltaic power. , are the linear cost coefficients of wind farm and photovoltaic power station operation and maintenance respectively; in the energy storage cost, and are the cost coefficients for charging energy storage devices, and are the cost coefficients of energy storage equipment when discharging; , , They are air conditioning operating costs, electric vehicle operating costs and daily production load costs.

[0073] Among them, the load operating cost, that is, the controllable park operating cost, has demand response capabilities and electricity demand characteristics, mainly because it includes a large number of energy-consuming equipment such as air conditioners (AC), electric vehicles (EV) and daily life production loads. Therefore, the power system operation economic indicators include air conditioner operating costs, electric vehicle operating costs and daily production load costs.

[0074] The operating cost of the air conditioner is related to the duration of the air conditioner being turned off and on, and can be expressed by the following formula:

[0075]

[0076] In the formula, is the total number of air conditioners; is the total number of hours in a day; , They are The duration of air conditioning on and off at each time; For the Air conditioning load The actual power at the moment; The regional electricity price.

[0077] Electric vehicles are one of the demand response resources that can be controlled on the demand side. In order to seek a more economical charging optimization control strategy, an EV charging mathematical model considering electricity price, charging efficiency and battery charging state management is established as follows:

[0078]

[0079] In the formula, For The moment Charging power of each EV; is the total number of EVs.

[0080] Daily life production load includes daytime production load and nighttime production load, which mainly designs the modeling and analysis of equipment, systems or processes that generate or consume energy during the daytime and nighttime, and is expressed by the following formula:

[0081]

[0082] In the formula, , They are the total power consumption of the equipment during the day and the total power consumption of the equipment at night; is the total power consumption of the equipment; For Moment Total rated power of the equipment in each plant; is the total number of plant buildings; , Respectively in The power ratio of the equipment during daytime and nighttime operation.

[0083] This application forms an operation indicator system for the power system by combining the power system operation economic indicators composed of air-conditioning operation costs, electric vehicle operation costs and daily production load costs with the power system operation safety indicators. With the system safety and economy as the goals, the complementary characteristics of multi-factor distributed resources are considered, and efficient resource utilization is achieved through operation optimization and coordinated control through resource combination.

[0084] In one embodiment, the calculation process of the indicator decision value is as follows: Figure 2 As shown, including:

[0085] S301, performing standard processing on the operation indicators corresponding to each output resource scheduling scheme to obtain a standardized processing result;

[0086] Specifically, since the various indicators included in the operation index cannot be directly calculated and need to be numerically standardized, the application refers to the sub-indicator whose larger the index value is, the more beneficial it is to the safety and economic operation of the system as a positive indicator, and the larger the index is, the more it causes the system to fail to operate safely, effectively, and economically as a reverse indicator, and the active margin index and reactive margin index are classified as positive indicators, and the voltage margin index and the comprehensive economic index are classified as reverse indicators, and standardized, and the positive indicators are processed by the following formula:

[0087]

[0088] In the formula, To standardize the processing results; The kth indicator in the i-th output resource scheduling plan is a positive indicator.

[0089] The reverse indicator is processed by the following formula:

[0090]

[0091] In the formula, The kth indicator in the i-th output resource scheduling plan is a reverse indicator.

[0092] S302, calculating the information entropy value of the operating indicator according to the standardization processing result, and determining the weight of the operating indicator according to the information entropy value of the operating indicator;

[0093] Specifically, the information entropy value of the operating indicator is calculated by the following formula:

[0094]

[0095] In the formula, is the probability of the kth indicator in the i-th output resource scheduling plan, For the The information entropy value of the indicator, and .

[0096] The weight of the operating indicator is calculated by the following formula:

[0097]

[0098] In the formula, is the weight of the kth indicator, , is the total number of indicators.

[0099] S303, based on the weight of the operation index, calculating the index decision value of each output resource scheduling scheme by a linear weighted method;

[0100] Specifically, the indicator decision value of a single output resource scheduling solution is calculated by linear weighting, as shown in the following formula:

[0101]

[0102] In the formula, For running scenes The decision value of the indicator in the output resource scheduling plan; To run the scene The maximum indicator decision value in the output resource scheduling scheme combination.

[0103] By solving the above model, the scheme with the highest indicator decision value in each output resource scheduling scheme combination under different operating scenarios is selected as the final optimized coordinated control scheme. This application clarifies the priority of each indicator by calculating its weight to provide a basis for subsequent decision-making; quantifies the economic uncertainty of each scheme by calculating the information entropy value of each indicator, and further provides more comprehensive information for decision-making; calculates the indicator decision value of each scheme by linear weighted method, which can ensure the rational allocation and utilization of power resources and improve the overall economic benefits of the power system. It comprehensively considers the economic indicators and uncertainty factors of multiple schemes, which can reduce the risk in the decision-making process and ensure the stable operation of the power system. Considering factors such as energy consumption and environmental benefits when selecting a scheme will help promote the sustainable development of the power system.

[0104] S4. Optimize and dispatch the multi-factor distributed resources in the power system according to the final optimization dispatching scheme. When dispatching resources, the present application fully considers the complementary characteristics of the multi-factor distributed resources, and optimizes and coordinates the operation through the joint use of resources to achieve efficient resource utilization, ensure the safe operation of the power system, and improve the economic benefits of the system operation.

[0105] In the embodiment of the present application, based on the problem of how to scientifically manage and safely dispatch distributed resources, a method for optimizing and dispatching a power system taking into account multi-factor distributed resources is designed, which realizes obtaining real-time operation data of the power system, wherein the real-time operation data includes output time series data and load time series data of the power system; determining the operation scenario of the power system according to the real-time operation data, and setting a number of output resource dispatching schemes for the operation scenario, wherein the operation scenario includes the type of distributed resources; constructing the operation index of the power system, calculating the index decision value of each output resource dispatching scheme based on the operation index, and selecting the final optimized dispatching scheme from the number of output resource dispatching schemes according to the calculation results; a technical scheme for optimizing and dispatching multi-factor distributed resources in the power system according to the final optimized dispatching scheme; utilizing the complementary characteristics between distributed resources to improve the utilization efficiency of distributed resources by the new power system, thereby improving the safety and economy of the stable operation of the power system.

[0106] It should be noted that although the steps in the above flowchart are shown in sequence according to the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless otherwise specified in this document, there is no strict order restriction for the execution of these steps, and these steps can be executed in other orders.

[0107] In another embodiment, if Figure 3 As shown, the second aspect of the present invention provides a power system optimization dispatching system considering multi-factor distributed resources, including:

[0108] The data acquisition module is used to acquire the real-time operation data of the power system, and the real-time operation data includes the output time series data and load time series data of the power system; wherein the output time series data includes the output sequence data of various distributed resources, such as wind power sequence, photovoltaic sequence, energy storage sequence, etc., and the load time series data is the load sequence data in the controllable park; then the collected real-time operation data is cleaned, denoised, filtered and other pre-processing operations to improve the quality and reliability of the data.

[0109] A scheme setting module is used to determine the operation scenario of the power system according to the real-time operation data, and set a number of output resource scheduling schemes for the operation scenario, wherein the operation scenario includes the types of distributed resources; wherein the output resource scheduling scheme also includes relevant data of various distributed resources, such as wind power data, photovoltaic data, energy storage data, controllable park load, etc.

[0110] In one embodiment, the scheme setting module is specifically used to:

[0111] The real-time operation data is sampled according to a preset time period to obtain a plurality of operation scenarios, and a plurality of output resource scheduling schemes are set for each of the operation scenario samples.

[0112] Since the distributed resources in the real-time operation data are not static, it is necessary to sample the real-time operation data in segments according to time periods so that the same type of distributed resources can be run in one segment of data as much as possible, which is convenient for adjusting the output plan to achieve optimal energy efficiency. Distributed wind power, distributed photovoltaics and other new energy sources have the characteristics of randomness and volatility. The controllable park load can adapt to these fluctuations by flexibly adjusting electricity consumption to achieve the purpose of supply and demand balance. Therefore, this application optimizes the operation of the power system based on different operation scenarios for the participation of multi-factor distributed resources. Among them, the operation scenario is related to the type of distributed resources in the real-time operation data. If a period of time is T, Wind power series , , , Photovoltaic series , If a period is composed of a period of T, then the operation scenario of this period is the wind and solar operation scenario. Energy storage sequence , , Load demand sequence , Therefore, the operation scenario can be determined according to the type of distributed resources in the real-time operation scenario, and multiple operation scenarios can be obtained after random sampling of real-time operation data.

[0113] In one embodiment, the output resource scheduling scheme is expressed by the following formula:

[0114]

[0115] In the formula, is the output resource scheduling scheme flag corresponding to the operation scenario; M is the number of combinations of distributed resources planned for the power system; N is the total number of distributed resources; For resource j to run in combination i; Resource j does not run in combination i.

[0116] In addition, a constraint condition is set for the output resource scheduling scheme: resource j can only be operated within one scheme combination. This constraint is expressed by the following formula:

[0117]

[0118] According to different scenarios, by combining distributed resources, a candidate output resource scheduling plan is constructed, and relevant parameters of various distributed resources in the power system under the scenario, such as the installed capacity and voltage of each generator set, are obtained. Among them, wind power data includes the operation and maintenance cost, wind abandonment cost, and wind power output power of wind power; photovoltaic data includes the operation and maintenance cost, wind abandonment cost, and photovoltaic output power; operation and maintenance cost and demand response cost of controllable park loads; operation and maintenance cost and charge state of energy storage system, etc.

[0119] Since the output resource scheduling plan is related to the real-time operating data corresponding to the operating scenario, the generation process of the output resource scheduling plan is described in detail using a certain section of the wind and solar operating scenario as an example, including the following steps: First, obtain the real-time operating data of the wind and solar segment corresponding to the wind and solar operating scenario, including but not limited to environmental parameters such as wind speed, wind direction, solar radiation intensity, temperature, humidity, and the output power and operating status of the generator set, and cluster these data to divide similar data points into the same category, which will help to better capture the distribution characteristics of the data later; then use a combination of neural network and gradient descent method to optimize the power generation efficiency, and input the preprocessed data into the neural network. The model is trained to establish a nonlinear relationship model between input data (such as wind speed, solar radiation intensity, etc.) and output power, and to capture the dynamic change law of wind and solar resources and the response characteristics of the power generation system. The model parameters are adjusted by the gradient descent method to minimize energy waste and maximize power generation. Then, the scheduling strategy is automatically adjusted according to the changes in real-time data, and a variety of wind and solar resource scheduling schemes are generated and evaluated until the target value of the obtained scheme is within the preset interval, and the above steps are repeated until the preset number of iterations is reached, and the final several wind and solar resource scheduling schemes are output, which is the combination of wind and solar resource scheduling schemes set by this application according to the operation scenario. It should be noted that the preset time period, interval, number of times, etc. proposed in this application are all determined according to actual conditions, and no specific numerical limit is made here. However, this application aims at the real-time operation scenario of the power generation system, collects real-time operation data, and uses adaptive algorithms to adjust and optimize these data to generate a variety of feasible wind and solar resource scheduling schemes, aiming to improve energy utilization efficiency, balance the grid load, and reduce energy waste.

[0120] A scheme selection module is used to construct the operating indicators of the power system, calculate the indicator decision value of each output resource scheduling scheme based on the operating indicators, and select the final optimized scheduling scheme from several output resource scheduling schemes according to the calculation results; specifically, the present application constructs an adjustable capacity indicator system that considers the characteristics of multi-factor distributed resources to analyze the adjustable capacity of various distributed resources, and considering that there are differences in the degree of resource adjustability after distributed resources such as distributed wind power, distributed photovoltaics, and distributed energy storage are connected to the power system, the present application characterizes the comprehensive adjustment capacity of distributed resources from multiple objectives such as power system operation safety and economy.

[0121] With the increase in the penetration rate of new energy and the occurrence of power grid instability and collapse accidents, the safety of the power system has received great attention. Therefore, in order to improve the credibility of the safety and stability domain, a distributed renewable energy power system operation safety evaluation index is established. In one embodiment, the operation index includes a power system operation safety index, and the power system operation safety index includes an active margin index, a reactive margin index, and a voltage margin index;

[0122] The active power margin of traditional power systems is usually expressed using a PV curve, but this application redefines the active power margin index from the perspective of safety and stability based on the definition of the load power rating and the active power stability margin coefficient of the power system, as shown in the following formula:

[0123]

[0124] In the formula, is the active power stability margin coefficient; is the load power rating; is the actual output at time t; It is the active power margin index; , They are the voltage stability margin before and after the distributed resources are connected; among them, the active margin index reflects the system's ability to withstand disturbances. When When , the power system is critically stable; The smaller it is, the worse the ability to be disturbed.

[0125] The reactive power margin of traditional power systems is usually represented by a PQ curve. However, from the perspective of safety and stability, this application redefines the reactive power margin index according to the definition of the reactive power stability margin coefficient of the power system, as shown in the following formula:

[0126]

[0127] In the formula, is the reactive power stability margin factor; is the critical reactive power; is the reactive power at time t; It is the reactive power margin index; , They are the impact of distributed energy access on the system reactive power stability before and after; in general The value range is around 1. When distributed energy access is used, it can effectively improve the safety and stability of the system; When, the opposite is true.

[0128] Voltage margin indicator Determined by the load node power characteristics and network characteristics, it reflects the deviation of voltage fluctuation, as shown in the following formula:

[0129]

[0130] In the formula, is the voltage stability margin factor; is the critical voltage; for Voltage at the moment; , They are the voltage change degrees before and after distributed energy is connected to the system.

[0131] This application reflects the safety margin of the power system in transmitting active power through the active margin index, evaluates the power system's ability to support reactive power through the reactive margin index, and reflects the system voltage stability margin through the voltage margin index. The power system operation safety indicators constituted by them jointly provide comprehensive stability information support for power operation dispatchers, which helps to ensure the safe, stable and economical operation of the power system.

[0132] Multi-energy complementarity can significantly reduce the fluctuation of power system load and reduce environmental pollution. When multi-factor distributed energy is added to the power system dispatching system, the traditional power system economic evaluation cannot be directly applied to it. Therefore, it is necessary to combine different scenarios to calculate the total operating cost of distributed resources participating in the optimization and coordinated control within a cycle. Therefore, the operating indicators also include the power system operation economic indicators. , expressed by the following formula:

[0133]

[0134] In the formula, To run a scene collection, is the probability of running scenario s; , , , They are the energy abandonment cost (wind and solar), operation and maintenance cost (wind and solar), energy storage cost and load operation cost (i.e. controllable park operation cost) in the power system. , They are The actual output of wind power and photovoltaic power at each moment; , They are the on-grid electricity prices of wind power and photovoltaic power respectively; and Respectively in The charging and discharging amount of energy storage equipment at all times; in addition, due to the randomness of renewable energy output, the energy abandonment cost mainly includes wind power and photovoltaic power. , Wind power and photovoltaic The planned output at all times; without considering energy storage alone, the operation and maintenance costs include wind power and photovoltaic power. , are the linear cost coefficients of wind farm and photovoltaic power station operation and maintenance respectively; in the energy storage cost, and are the cost coefficients for charging energy storage devices, and are the cost coefficients of energy storage equipment when discharging; , , They are air conditioning operating costs, electric vehicle operating costs and daily production load costs.

[0135] Among them, the load operating cost, that is, the controllable park operating cost, has demand response capabilities and electricity demand characteristics, mainly because it includes a large number of energy-consuming equipment such as air conditioners (AC), electric vehicles (EV) and daily life production loads. Therefore, the power system operation economic indicators include air conditioner operating costs, electric vehicle operating costs and daily production load costs.

[0136] The operating cost of the air conditioner is related to the duration of the air conditioner being turned off and on, and can be expressed by the following formula:

[0137]

[0138] In the formula, is the total number of air conditioners; is the total number of hours in a day; , They are The duration of air conditioning on and off at each time; For the Air conditioning load The actual power at the moment; The regional electricity price.

[0139] Electric vehicles are one of the demand response resources that can be controlled on the demand side. In order to seek a more economical charging optimization control strategy, an EV charging mathematical model considering electricity price, charging efficiency and battery charging state management is established as follows:

[0140]

[0141] In the formula, For The moment Charging power of each EV; is the total number of EVs.

[0142] Daily life production load includes daytime production load and nighttime production load, which mainly designs the modeling and analysis of equipment, systems or processes that generate or consume energy during the daytime and nighttime, and is expressed by the following formula:

[0143]

[0144] In the formula, , They are the total power consumption of the equipment during the day and the total power consumption of the equipment at night; is the total power consumption of the equipment; For Moment Total rated power of the equipment in each plant; is the total number of plant buildings; , Respectively in The power ratio of the equipment during daytime and nighttime operation.

[0145] This application forms an operation indicator system for the power system by combining the power system operation economic indicators composed of air-conditioning operation costs, electric vehicle operation costs and daily production load costs with the power system operation safety indicators. With the system safety and economy as the goals, the complementary characteristics of multi-factor distributed resources are considered, and efficient resource utilization is achieved through operation optimization and coordinated control through resource combination.

[0146] In one embodiment, the calculation process of the indicator decision value includes:

[0147] A standardized processing unit, used for performing standardized processing on the operating indicators corresponding to each output resource scheduling scheme to obtain standardized processing results;

[0148] Specifically, since the various indicators included in the operation index cannot be directly calculated and need to be numerically standardized, the application refers to the sub-indicator whose larger the index value is, the more beneficial it is to the safety and economic operation of the system as a positive indicator, and the larger the index is, the more it causes the system to fail to operate safely, effectively, and economically as a reverse indicator, and the active margin index and reactive margin index are classified as positive indicators, and the voltage margin index and the comprehensive economic index are classified as reverse indicators, and standardized, and the positive indicators are processed by the following formula:

[0149]

[0150] In the formula, To standardize the processing results; The kth indicator in the i-th output resource scheduling plan is a positive indicator.

[0151] The reverse indicator is processed by the following formula:

[0152]

[0153] In the formula, The kth indicator in the i-th output resource scheduling plan is a reverse indicator.

[0154] A weight calculation unit, used to calculate the information entropy value of the operation indicator according to the standardization processing result, and determine the weight of the operation indicator according to the information entropy value of the operation indicator;

[0155] Specifically, the information entropy value of the operating indicator is calculated by the following formula:

[0156]

[0157] In the formula, is the probability of the kth indicator in the i-th output resource scheduling plan, For the The information entropy value of the indicator, and .

[0158] The weight of the operating indicator is calculated by the following formula:

[0159]

[0160] In the formula, is the weight of the kth indicator, , is the total number of indicators.

[0161] A decision value calculation unit, used to calculate the indicator decision value of each output resource scheduling scheme by a linear weighted method based on the weight of the operation indicator;

[0162] Specifically, the indicator decision value of a single output resource scheduling solution is calculated by linear weighting, as shown in the following formula:

[0163]

[0164] In the formula, To run the scene The decision value of the indicator in the output resource scheduling plan; To run the scene The maximum indicator decision value in the output resource scheduling scheme combination.

[0165] By solving the above model, the scheme with the highest indicator decision value in each output resource scheduling scheme combination under different operating scenarios is selected as the final optimized coordinated control scheme. This application clarifies the priority of each indicator by calculating its weight to provide a basis for subsequent decision-making; quantifies the economic uncertainty of each scheme by calculating the information entropy value of each indicator, and further provides more comprehensive information for decision-making; calculates the indicator decision value of each scheme by linear weighted method, which can ensure the rational allocation and utilization of power resources and improve the overall economic benefits of the power system. It comprehensively considers the economic indicators and uncertainty factors of multiple schemes, which can reduce the risk in the decision-making process and ensure the stable operation of the power system. Considering factors such as energy consumption and environmental benefits when selecting a scheme will help promote the sustainable development of the power system.

[0166] The optimization scheduling module is used to optimize the scheduling of the multi-factor distributed resources in the power system according to the final optimization scheduling plan. When scheduling resources, the present application fully considers the complementary characteristics of the multi-factor distributed resources, and optimizes and coordinates the operation through the joint resources to achieve efficient resource utilization, ensure the safe operation of the power system, and improve the economic benefits of the system operation.

[0167] It should be noted that each module in the above-mentioned power system optimization and dispatching system based on considering multi-factor distributed resources can be fully or partially implemented by software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules. For the specific definition of a power system optimization and dispatching system considering multi-factor distributed resources, please refer to the above definition of a power system optimization and dispatching method considering multi-factor distributed resources. The two have the same functions and effects, which will not be repeated here.

[0168] In summary, the present invention relates to the field of power dispatching technology, and discloses a method and system for optimizing dispatching of a power system considering multi-factor distributed resources, wherein the method includes obtaining real-time operation data of the power system, the real-time operation data including output time series data and load time series data of the power system; determining the operation scenario of the power system according to the real-time operation data, and setting a number of output resource dispatching schemes for the operation scenario, the operation scenario including the type of distributed resources; constructing operation indicators of the power system, calculating the indicator decision value of each output resource dispatching scheme based on the operation indicators, and selecting a final optimized dispatching scheme from a number of output resource dispatching schemes according to the calculation results; optimizing the dispatching of multi-factor distributed resources in the power system according to the final optimized dispatching scheme; so as to improve the utilization efficiency of distributed resources by the power system.

[0169] Each embodiment in this specification is described in a progressive manner, and the same or similar parts of each embodiment can be directly referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment. It should be noted that the technical features of the above-mentioned embodiments can be combined arbitrarily. In order to make the description concise, all possible combinations of the technical features in the above-mentioned embodiments are not described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0170] The above-mentioned embodiments only express several preferred implementation modes of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for ordinary technicians in the technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention, and these improvements and substitutions should also be regarded as the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be based on the protection scope of the claims.

Claims

1. A method for optimizing the dispatching of a power system considering multi-factor distributed resources, characterized in that: include: Acquiring real-time operation data of the power system, wherein the real-time operation data includes output time series data and load time series data of the power system; Determine an operation scenario of the power system according to the real-time operation data, and set a plurality of output resource scheduling schemes for the operation scenario, wherein the operation scenario includes types of distributed resources; Constructing the operation index of the power system, calculating the index decision value of each output resource scheduling scheme based on the operation index, and selecting the final optimized scheduling scheme from a plurality of output resource scheduling schemes according to the calculation results; Optimizing the scheduling of multi-factor distributed resources in the power system according to the final optimization scheduling plan; Determining the operation scenario of the power system according to the real-time operation data, and setting a plurality of output resource scheduling schemes for the operation scenario, includes: Sampling the real-time operation data according to a preset time period to obtain multiple operation scenarios, and setting a number of output resource scheduling schemes for each of the operation scenario samples; The operation index includes an electric power system operation safety index, and the electric power system operation safety index includes an active power margin index, a reactive power margin index and a voltage margin index; Active power margin index is as follows: In the formula, is the active power stability margin coefficient; is the load power rating; is the actual output at time t; It is the active power margin index; , They are the voltage stability margin before and after the distributed resources are connected; Reactive margin index is as follows: In the formula, is the reactive power stability margin factor; is the critical reactive power; is the reactive power at time t; It is the reactive power margin index; , They are the impact of distributed energy access on the system reactive power stability before and after; Voltage margin indicator , as follows: In the formula, is the voltage stability margin factor; is the critical voltage; for Voltage at the moment; , They are the voltage change degrees before and after the distributed energy is connected to the system; The operation scenario is a wind-solar operation scenario, and the generation process of the output resource scheduling plan includes the following steps: first, obtaining the real-time operation data of the wind-solar segment corresponding to the wind-solar operation scenario, including wind speed, wind direction, solar radiation intensity, temperature, humidity, and output power and operating status of the generator set, and clustering these data to divide similar data points into the same category; inputting the preprocessed data into a neural network model for training to establish a nonlinear relationship model between input data and output power, adjusting the model parameters through the gradient descent method, with the goal of minimizing energy waste and maximizing power generation, automatically adjusting the scheduling strategy according to changes in real-time data, generating a variety of wind-solar resource scheduling plans and evaluating them until the target value of the obtained plan is within a preset interval, and repeating the above steps until a preset number of iterations is reached, and outputting the final several wind-solar resource scheduling plans.

2. The method for optimizing and dispatching a power system considering multi-factor distributed resources according to claim 1, characterized in that: The output resource scheduling scheme is expressed by the following formula: In the formula, It is the output resource scheduling scheme flag corresponding to the operation scenario; M is the number of combinations of distributed resources planned for the power system; N is the total number of distributed resources; For resource j to run in combination i; Resource j does not run in combination i.

3. The method for optimizing and dispatching a power system considering multi-factor distributed resources according to claim 1, characterized in that: The operation index includes the power system operation economic index, and the power system operation economic index includes air conditioning operation cost, electric vehicle operation cost and daily production load cost.

4. The method for optimizing and dispatching a power system considering multi-factor distributed resources according to claim 1, characterized in that: The calculating the indicator decision value of each output resource scheduling scheme based on the operation indicator includes: Performing standard processing on the operating indicators corresponding to each output resource scheduling scheme to obtain a standardized processing result; Calculating the information entropy value of the operating indicator according to the normalization processing result, and determining the weight of the operating indicator according to the information entropy value of the operating indicator; Based on the weight of the operating index, the index decision value of each output resource scheduling scheme is calculated by a linear weighted method.

5. A power system optimization dispatching system considering multi-factor distributed resources, characterized in that: include: A data acquisition module, used to acquire real-time operation data of the power system, wherein the real-time operation data includes output time series data and load time series data of the power system; A scheme setting module, used to determine the operation scenario of the power system according to the real-time operation data, and set a number of output resource scheduling schemes for the operation scenario, wherein the operation scenario includes the types of distributed resources; A scheme selection module, used to construct the operation index of the power system, calculate the index decision value of each output resource scheduling scheme based on the operation index, and select the final optimized scheduling scheme from a plurality of output resource scheduling schemes according to the calculation results; An optimization scheduling module, used for optimizing the scheduling of multi-factor distributed resources in the power system according to the final optimization scheduling plan; The scheme setting module is further used to sample the real-time operation data according to a preset time period to obtain multiple operation scenarios, and set a number of output resource scheduling schemes for each of the operation scenario samples; The operation index includes an electric power system operation safety index, and the electric power system operation safety index includes an active power margin index, a reactive power margin index and a voltage margin index; Active power margin index is as follows: In the formula, is the active power stability margin coefficient; is the load power rating; is the actual output at time t; It is the active power margin index; , They are the voltage stability margin before and after the distributed resources are connected; Reactive margin index is as follows: In the formula, is the reactive power stability margin factor; is the critical reactive power; is the reactive power at time t; It is the reactive power margin index; , They are the impact of distributed energy access on the system reactive power stability before and after; Voltage margin indicator , as follows: In the formula, is the voltage stability margin factor; is the critical voltage; for Voltage at the moment; , They are the voltage change degrees before and after the distributed energy is connected to the system; The operation scenario is a wind-solar operation scenario, and the generation process of the output resource scheduling plan includes the following steps: first, obtaining the real-time operation data of the wind-solar segment corresponding to the wind-solar operation scenario, including wind speed, wind direction, solar radiation intensity, temperature, humidity, and output power and operation status of the generator set, and clustering these data to classify similar data points into the same category; The preprocessed data is input into the neural network model for training to establish a nonlinear relationship model between the input data and the output power. The model parameters are adjusted by the gradient descent method to minimize energy waste and maximize power generation. The scheduling strategy is automatically adjusted according to the changes in real-time data, and a variety of wind and solar resource scheduling schemes are generated and evaluated until the target value of the obtained scheme is within the preset range. The above steps are repeated until the preset number of iterations is reached, and the final several wind and solar resource scheduling schemes are output.

6. The power system optimization dispatching system considering multi-factor distributed resources according to claim 5, characterized in that: The output resource scheduling scheme is expressed by the following formula: In the formula, It is the output resource scheduling scheme flag corresponding to the operation scenario; M is the number of combinations of distributed resources planned for the power system; N is the total number of distributed resources; For resource j to run in combination i; Resource j does not run in combination i.

7. The power system optimization dispatching system considering multi-factor distributed resources according to claim 5, characterized in that: The operation index includes the power system operation safety index, and the power system operation economic index includes the air conditioning operation cost, the electric vehicle operation cost and the daily production load cost.

8. The power system optimization dispatching system considering multi-factor distributed resources according to claim 5, characterized in that: The scheme selection module includes: A standardized processing unit, used for performing standardized processing on the operating indicators corresponding to each output resource scheduling scheme to obtain standardized processing results; A weight calculation unit, used to calculate the information entropy value of the operation indicator according to the standardization processing result, and determine the weight of the operation indicator according to the information entropy value of the operation indicator; A decision value calculation unit is used to calculate the indicator decision value of each output resource scheduling solution through a linear weighted method based on the weight of the operating indicator.