A bearing ring groove processing superfinishing machine

By introducing automatic loading, unloading and debris absorption functions into the bearing ring channel machining super precision machine, the problems of low production efficiency and debris residue in the prior art are solved, and efficient and continuous bearing sleeves are achieved Ring processing and high-quality surface finish.

CN118617295BActive Publication Date: 2024-12-17KUNSHAN AODELU AUTOMATION TECH
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411115169.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-12-17
Estimated Expiration
2044-08-14

AI Technical Summary

Technical Problem

The existing bearing ring channel machining super-finisher lacks automatic loading and unloading functions, resulting in low production efficiency and the inability to automatically collect debris produced by cutting or grinding during the processing process, resulting in a decrease in the surface quality of the bearing ring. .

Method used

A bearing ring channel machining super-finishing machine including a feeding mechanism, a discharge mechanism and a debris suction mechanism is designed. Automatic feeding and unloading is achieved through a three-axis grinding wheel, and a vacuum cleaner and expansion port are used. The structure automatically collects debris.

Benefits of technology

The continuous processing of bearing rings is achieved, production efficiency is improved, non-production time is reduced, and the processing channel surface is smooth and flawless, meeting high-standard quality requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118617295B_ABST
    Figure CN118617295B_ABST
Patent Text Reader

Abstract

The present invention discloses a bearing ring groove processing superfinishing machine, comprising: an operating table, a first linear module is fixedly installed on the upper surface of the operating table, a second linear module is fixedly installed on the upper surface of the moving block of the first linear module, a third linear module is fixedly installed on one end of the moving block of the second linear module, a grinding wheel is fixedly installed on one end of the moving block of the third linear module, a feeding mechanism is fixedly installed on the upper surface of the operating table, a unloading mechanism is slidably installed in the feeding mechanism, two groups of connecting plates are fixedly installed on the other end of the third linear module, and a debris suction collection mechanism is detachably installed in the two groups of connecting plates. The present application can realize continuous processing of bearing rings without stopping and waiting through the design of the debris suction collection mechanism, the feeding mechanism and the unloading mechanism, through the functions of automatic loading and unloading, and the adsorption function during the grinding process can avoid debris remaining in the ground groove during the grinding process, thereby ensuring that the surface of the bearing ring is smooth and flawless.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bearing ring processing, in particular to a bearing ring groove processing superfinishing machine. Background Art

[0002] The bearing ring groove refers to an arc-shaped groove machined on the inner ring or outer ring of the bearing. This groove is used to accommodate the bearing rolling elements (such as steel balls, rollers, etc.). The rolling elements roll in this groove, thereby realizing the rotation function of the bearing.

[0003] For example, the patent with the national authorized patent announcement number CN105751037B discloses a fully automatic bearing ring inner ring groove grinding and super-finishing machine, including a machine tool, on which a grinding device, a grinding groove detection device and a super-finishing device are provided. It solves the efficiency problem of the existing inner ring groove, and by installing the grinding device, the grinding groove detection device and the super-finishing device together, the inner ring processing efficiency of the bearing ring is improved, and the processing accuracy is highly stable. In addition, the addition of a grinding wheel dresser makes the grinding and super-finishing machine have a longer service life and higher precision.

[0004] However, the above-mentioned fully automatic bearing ring inner ring groove grinding and super-superimposing machine does not have the function of automatic loading and unloading during the bearing ring groove processing, and the staff needs to manually load and unload the workpieces one by one, which will take a long time, resulting in a significant reduction in the production efficiency of the entire processing process, and cannot achieve large-scale continuous production;

[0005] Moreover, in the process of machining the bearing ring groove, the debris from cutting or grinding cannot be automatically collected, which will cause the debris to remain in the groove. In the subsequent machining process, it will rub against the grinding tool or the workpiece surface, causing scratches or indentations on the bearing ring surface, which will lead to a decrease in the surface quality of the bearing ring groove after machining, increase the surface roughness, and affect the performance and precision of the bearing. Summary of the invention

[0006] The object of the present invention is to provide a bearing ring groove processing superfinishing machine to solve the problem that the existing superfinishing machine mentioned in the above background technology does not have the function of automatic loading and unloading during the bearing ring groove processing, and cannot automatically collect the debris produced by cutting or grinding during the groove processing.

[0007] To achieve the above object, the present invention provides the following technical solutions:

[0008] A bearing ring groove processing superfinishing machine comprises: an operating table, a first linear module is fixedly installed on the upper surface of the operating table, a second linear module is fixedly installed on the upper surface of a moving block of the first linear module, a third linear module is fixedly installed on one end of the moving block of the second linear module, a grinding wheel is fixedly installed on one end of the moving block of the third linear module, and the grinding wheel forms a three-axis linkage through the first linear module, the second linear module and the third linear module;

[0009] Wherein, a feeding mechanism is fixedly installed on the upper surface of the operating table, a discharging mechanism is slidably installed inside the feeding mechanism, and the discharging mechanism can be pulled out to make it connected and flush with the drop opening, and the drop opening is opened on the upper surface of the operating table;

[0010] Among them, two groups of connecting plates are fixedly installed at the other end of the third linear module, and debris suction collection mechanisms are removably installed in the two groups of connecting plates, and the suction ends of the debris suction collection mechanisms extend to both sides of the grinding head of the grinding machine.

[0011] The above-mentioned bearing ring groove processing superfinishing machine, wherein: the feeding mechanism includes a guide plate, the guide plate is fixedly installed on the upper surface of the operating table, a bearing plate is fixedly installed inside the guide plate, one end of the bearing plate is fixedly connected to the piston rod of the first electric push rod, the first electric push rod is fixedly installed on the upper surface of the operating table, one end of the bearing plate is provided with a first arc groove, the first arc groove is flush with the second arc groove, and the second arc groove is provided on one end of the upper surface of the guide plate;

[0012] Wherein, the bearing ring can be clamped inside when the first arc groove is contracted toward the second arc groove.

[0013] The above-mentioned bearing ring groove processing superfinishing machine, wherein: the upper surface of the bearing plate is slidingly fitted with the C-shaped cylinder, support plates are fixedly installed on both sides of the outer surface of the C-shaped cylinder, the C-shaped cylinder is suspended on the upper surface of the bearing plate through the support plates and is slidingly fitted with it, bearing rings can be stacked in the C-shaped cylinder, the upper surface of the C-shaped cylinder is covered with a top cover, and the lower surface of the top cover is fixedly installed with a limiting column, and the limiting column of the top cover can be slidably inserted into the inner ring of the stacked bearing rings.

[0014] The above-mentioned bearing ring groove processing superfinishing machine, wherein: the supporting plate can be pulled by the first electric push rod and drive the first arc groove to be flush with the C-shaped tube, and the first arc groove flush with the C-shaped tube can allow a group of stacked bearing rings in the C-shaped tube to fall into the first arc groove, and can allow the first electric push rod to push the supporting plate again through the first arc groove to push the bearing rings to be clamped in the first arc groove and the second arc groove.

[0015] The above-mentioned bearing ring groove processing superfinishing machine, wherein: the unloading mechanism includes a second electric push rod, the second electric push rod is fixedly installed on the upper surface of the operating table, one end of the piston rod of the second electric push rod is fixedly installed with a closing disk, the closing disk is slidably installed in the guide groove, and the guide groove is opened at one end of the guide plate;

[0016] The closing disk sliding in the guide groove is flush with the center of the second arc groove and can support the clamped bearing ring.

[0017] The above-mentioned bearing ring groove processing superfinishing machine, wherein: a connecting port is opened at the lower end of the guide groove, and the connecting port is flush with the drop port. When the closing disk is pulled out of the guide groove by the second electric push rod, the bearing ring on the upper surface of the closing disk can be dropped to the upper surface of the conveyor belt through the connecting port and the drop port in sequence. The conveyor belt transmission is installed in the docking plate, and the docking plate is fixedly installed on the lower surface of the operating table.

[0018] The above-mentioned bearing ring groove processing superfinishing machine, wherein: two groups of barrier strips are fixedly installed on the upper surface of the docking plate, the two groups of barrier strips slide on the surface of the conveyor belt, the upper surface of the barrier strips touches the lower surface of the operating table, and the drop opening is enclosed.

[0019] The above-mentioned bearing ring groove processing superfinishing machine, wherein: the debris suction collection mechanism includes a vacuum cleaner, and both sides of the outer surface of the collection tube of the vacuum cleaner are connected and installed with suction pipes, and the other end of the suction pipe is fixedly installed with an expansion port.

[0020] The above-mentioned bearing ring groove processing superfinishing machine, wherein: the expansion opening is located on both sides of the grinding head of the grinding machine through the extension of the suction pipe.

[0021] The above-mentioned bearing ring groove processing superfinishing machine, wherein: the two groups of expansion openings are inclined at °, and can move together with the movement of the first linear module, the second linear module and the third linear module, so that during the process of the bearing ring groove processing by the grinding wheel machine, the expansion openings can keep following together.

[0022] Compared with the prior art, the present invention has the following beneficial effects:

[0023] Through the design of the debris suction mechanism, the feeding mechanism, the unloading mechanism, the drop port and the grinding machine, when in use, the staff can stack multiple groups of bearing rings in the vibrating feeding mechanism for storage, and the feeding mechanism can push and clamp the stored bearing rings on the upper surface of the operating table, and then the grinding machine can grind the inner ring of the clamped bearing ring through the linkage of the first linear module, the second linear module and the third linear module to process the groove, and the grinding machine controlled by the linkage of the first linear module, the second linear module and the third linear module has the free movement of the X-axis, the Y-axis and the Z-axis and can provide precise feed control to ensure the depth and accuracy of the grinding process, so that the bearing ring can be accurately positioned in multiple directions during the groove processing process to ensure the accuracy of the processing process;

[0024] After the bearing ring is processed, the feeding mechanism and the unloading mechanism can be started at the same time, so that the feeding mechanism and the unloading mechanism slide toward the outer end together, and the sliding feeding mechanism will release the clamping restriction of the bearing ring, and the sliding unloading mechanism will expand and connect the drop-out port, so that the unclamped bearing ring can be unloaded through the feeding mechanism and the drop-out port, and the feeding mechanism that slides to the end will push another set of bearing rings again and clamp them, and the unloading mechanism after unloading will also reset and slide together to support the other set of bearing rings until they are firmly clamped in by the feeding mechanism, and then they can be ground again, thereby realizing the function of automatic loading and unloading, and the function of automatic loading and unloading can realize continuous processing of the bearing rings, without stopping to wait for manual loading and unloading operations, thereby significantly improving production efficiency, reducing non-production time, and increasing output;

[0025] In the process of grinding the bearing ring with the grinding wheel machine, the debris collection mechanism can be started to absorb and collect the debris generated by grinding, thereby avoiding the debris remaining in the ground groove during the grinding process, ensuring that the surface of the bearing ring is smooth and flawless, and the function of collecting debris can also keep it clean, ensuring that the processed groove surface has a high degree of finish and meets high quality requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the overall structure of the bearing ring groove processing superfinishing machine of the present invention;

[0027] Figure 2 It is a schematic diagram of the operating table structure of the bearing ring groove processing superfinishing machine of the present invention;

[0028] Figure 3 It is a structural schematic diagram of a C-shaped cylinder and a bearing plate of the present invention;

[0029] Figure 4 It is a schematic structural diagram of the first arc groove and the second arc groove of the present invention.

[0030] Figure 5 It is a schematic diagram of the drop port structure of the present invention;

[0031] Figure 6 It is a schematic diagram of the structure of the unloading mechanism of the present invention.

[0032] Figure 7 This is a structural schematic diagram of the feeding mechanism of the present invention introducing the bearing ring into the first arc groove.

[0033] Figure 8 It is a structural schematic diagram of the first arc groove of the present invention pushing the bearing ring.

[0034] Fig. 9 It is a structural schematic diagram of the expansion port of the present invention.

[0035] Fig.10 It is a schematic structural diagram of the debris suction and collection mechanism of the present invention.

[0036] In the figure: 1. operating table; 101. first linear module; 102. second linear module; 103. third linear module; 104. grinding machine; 105. drop port; 106. connecting plate; 2. debris suction collection mechanism; 201. vacuum cleaner; 202. collecting cylinder; 203. suction pipe; 204. expansion port; 3. feeding mechanism; 301. support plate; 302. C-shaped cylinder; 303. top cover; 304. first electric push rod; 305. guide plate; 306. bearing plate; 307. first arc groove; 308. second arc groove; 309. guide groove; 310. connecting port; 4. unloading mechanism; 401. second electric push rod; 402. closing disk; 403. barrier strip; 404. conveyor belt; 405. docking plate. DETAILED DESCRIPTION

[0037] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0038] See also Figure 1-Figure 10 , this embodiment provides the following technical solutions:

[0039] like Figure 1-Figure 2As shown, a bearing ring groove processing superfinishing machine comprises: an operating table 1, a first linear module 101 is fixedly installed on the upper surface of the operating table 1, a second linear module 102 is fixedly installed on the upper surface of the moving block of the first linear module 101, a third linear module 103 is fixedly installed on one end of the moving block of the second linear module 102, a grinding wheel machine 104 is fixedly installed on one end of the moving block of the third linear module 103, and the grinding wheel machine 104 forms a three-axis linkage through the first linear module 101, the second linear module 102 and the third linear module 103;

[0040] A feeding mechanism 3 is fixedly installed on the upper surface of the operating table 1, and a discharging mechanism 4 is slidably installed inside the feeding mechanism 3. The discharging mechanism 4 can be pulled out to make it connected and flush with the drop opening 105, and the drop opening 105 is opened on the upper surface of the operating table 1;

[0041] Among them, two groups of connecting plates 106 are fixedly installed at the other end of the third linear module 103, and the debris suction mechanism 2 is detachably installed in the two groups of connecting plates 106. The suction end of the debris suction mechanism 2 extends to both sides of the grinding head of the grinder 104.

[0042] Through the design of the debris suction mechanism 2, the feeding mechanism 3, the unloading mechanism 4, the drop port 105 and the grinding machine 104, when in use, the staff can stack multiple groups of bearing rings in the vibrating feeding mechanism 3 for storage, and the feeding mechanism 3 can push and clamp the stored bearing rings on the upper surface of the operating table 1, and then the grinding machine 104 can grind the inner ring of the clamped bearing ring through the linkage of the first linear module 101, the second linear module 102, and the third linear module 103 to process the groove, and the grinding machine 104 controlled by the linkage of the first linear module 101, the second linear module 102, and the third linear module 103 has free movement of the X-axis, the Y-axis and the Z-axis and can provide precise feed control to ensure the depth and accuracy of the grinding process, so that it can realize the precise positioning of the bearing ring in multiple directions during the groove processing, ensuring the accuracy of the processing process;

[0043] The feeding mechanism 3 and the unloading mechanism 4 can be started at the same time after the bearing ring is processed, so that the feeding mechanism 3 and the unloading mechanism 4 can slide toward the outer end together, and the sliding feeding mechanism 3 will release the clamping restriction on the bearing ring, and the sliding unloading mechanism 4 will expand and connect the drop-out port 105, so that the bearing ring that is not clamped can be unloaded through the feeding mechanism 3 and the drop-out port 105, and the feeding mechanism 3 that slides to the end will push and clamp another group of bearing rings again, and the unloading mechanism 4 after unloading will also reset and slide together to support another group of bearing rings until they are firmly clamped therein, and then they can be ground again, thereby realizing the function of automatic loading and unloading, and the function of automatic loading and unloading can realize continuous processing of the bearing rings, without stopping to wait for manual loading and unloading operations, thereby significantly improving production efficiency, reducing non-production time, and increasing output;

[0044] Among them, when the grinding wheel machine 104 is grinding the bearing ring, the debris collection mechanism 2 can be started at the same time to absorb and collect the debris generated by the grinding, thereby avoiding the debris remaining in the ground groove during the grinding process, ensuring that the surface of the bearing ring is smooth and flawless, and the function of collecting debris can also keep it clean, ensuring that the processed groove surface has a high degree of finish and meets high quality requirements.

[0045] like Figure 3-Figure 4 As shown, the feeding mechanism 3 includes a guide plate 305, which is fixedly mounted on the upper surface of the operating table 1, a bearing plate 306 is fixedly mounted inside the guide plate 305, one end of the bearing plate 306 is fixedly connected to the piston rod of the first electric push rod 304, the first electric push rod 304 is fixedly mounted on the upper surface of the operating table 1, one end of the bearing plate 306 is provided with a first arc groove 307, the first arc groove 307 is flush with the second arc groove 308, and the second arc groove 308 is provided at one end of the upper surface of the guide plate 305;

[0046] The first arc groove 307 can clamp the bearing ring inside when it shrinks toward the second arc groove 308 .

[0047] Among them, the upper surface of the bearing plate 306 is slidingly fitted with the C-shaped cylinder 302, and support plates 301 are fixedly installed on both sides of the outer surface of the C-shaped cylinder 302. The C-shaped cylinder 302 is suspended on the upper surface of the bearing plate 306 through the support plate 301 and is slidingly fitted with it. Bearing rings can be stacked in the C-shaped cylinder 302, and the upper surface of the C-shaped cylinder 302 is covered with a top cover 303. The lower surface of the top cover 303 is fixedly installed with a limiting column, and the limiting column of the top cover 303 can be slidably inserted into the inner ring of the stacked bearing rings.

[0048] Among them, the supporting plate 306 can be pulled by the first electric push rod 304 and drive the first arc groove 307 to be flush with the C-shaped cylinder 302, and the first arc groove 307 flush with the C-shaped cylinder 302 can allow a group of bearing rings stacked in the C-shaped cylinder 302 to fall into the first arc groove 307, and can allow the first electric push rod 304 to push the supporting plate 306 again through the first arc groove 307 to push the bearing rings to be clamped in the first arc groove 307 and the second arc groove 308.

[0049] Through the design of the first electric push rod 304, the guide plate 305, the bearing plate 306, the first arc groove 307, the second arc groove 308 and the C-shaped cylinder 302, when processing the bearing ring, multiple groups of bearing rings can be stacked and placed in the C-shaped cylinder 302 for storage, and then the top cover 303 can be installed on the upper surface of the C-shaped cylinder 302, and the top cover 303 installed on the upper end of the C-shaped cylinder 302 will also drive the limit column fixedly installed on the lower surface to be inserted into the inner ring of the stacked bearing rings, so that the bearing rings can be The sleeve can be in a vertical shape when falling from the C-shaped cylinder 302, which prevents possible tilting or misalignment and ensures the accuracy and stability of automatic loading. After the bearing rings are stacked, the first electric push rod 304 is started to pull the bearing plate 306 at one end of the piston rod to slide on the lower surface of the C-shaped cylinder 302 until the first electric push rod 304 pulls the first arc groove 307 opened at one end of the bearing plate 306 to be flush with the C-shaped cylinder 302, and then the C-shaped cylinder 302 that is flush with the first arc groove 307 is stopped. 2, the bottom is no longer blocked, and a group of stacked bearing rings in the C-shaped cylinder 302 will fall vertically into the first arc groove 307, while the remaining bearing rings will touch the upper surface of the bearing rings in the first arc groove 307 and be fixed in the C-shaped cylinder 302. Then, the first electric push rod 304 can be started again to push the carrier plate 306, so that the carrier plate 306 can block the bottom of the C-shaped cylinder 302, and at the same time, the bearing rings in the first arc groove 307 can be pushed to slide on the upper surface of the guide plate 305 and approach the second arc groove 308. With the continuous pushing of the first electric push rod 304, the bearing rings can be clamped in the first arc groove 307 and the second arc groove 308, and then they can be processed by the grinding machine 104. This automatic feeding function can reduce manual intervention and improve production efficiency. The feeding and positioning reduce human operation errors and production line stoppage time, and the stable clamping and accurate positioning ensure the accuracy of the bearing rings during the processing, thereby improving the processing quality.

[0050] like Figure 5-Figure 8 As shown, the unloading mechanism 4 includes a second electric push rod 401, which is fixedly mounted on the upper surface of the operating table 1, and a closing disk 402 is fixedly mounted on one end of the piston rod of the second electric push rod 401, and the closing disk 402 is slidably mounted in the guide groove 309, and the guide groove 309 is opened at one end of the guide plate 305;

[0051] The closing disk 402 sliding in the guide groove 309 is flush with the center of the second arc groove 308 and can support the clamped bearing ring.

[0052] Among them, a connecting port 310 is opened at the lower end of the guide groove 309, and the connecting port 310 is flush with the drop port 105. When the closing disk 402 is pulled out of the guide groove 309 by the second electric push rod 401, the bearing ring on the upper surface of the closing disk 402 can drop to the upper surface of the conveyor belt 404 through the connecting port 310 and the drop port 105 in turn. The conveyor belt 404 is transmission-installed in the docking plate 405, and the docking plate 405 is fixedly installed on the lower surface of the operating table 1.

[0053] Among them, two groups of barrier strips 403 are fixedly installed on the upper surface of the docking plate 405, and the two groups of barrier strips 403 slide on the surface of the conveyor belt 404. The upper surface of the barrier strips 403 touches the lower surface of the operating platform 1 and encloses the drop opening 105.

[0054] Through the design of the second electric push rod 401, the closing disk 402, the barrier strip 403 and the conveyor belt 404, after the bearing ring is processed, the first electric push rod 304 and the second electric push rod 401 can be started at the same time, and the first electric push rod 304 will pull the first arc groove 307 at one end of the carrier plate 306 to fall off the surface of the bearing ring, so as to release the clamping purpose, and the second electric push rod 401 will pull the closing disk 402 to slide into the guide groove 309, and during the sliding process of the closing disk 402, the shaft on the upper surface The bearing ring will touch one end of the second arc groove 308 and slide on the surface of the closing disk 402 at the same time, and the closing disk 402 that slides into the guide groove 309 will expand the connecting port 310 at the lower end, so that the bearing ring can fall on the surface of the conveyor belt 404 through the connecting port 310 and the drop port 105 in turn and be transported away for the next processing or centralized collection operation. Through this automatic unloading function, the production line downtime is reduced, the processing process is made smoother, and the overall efficiency of the production line is greatly improved.

[0055] like Figure 9-10 As shown, the debris suction mechanism 2 provided in this embodiment includes a vacuum cleaner 201 , and suction pipes 203 are installed on both sides of the outer surface of the collection tube 202 of the vacuum cleaner 201 , and an expansion port 204 is fixedly installed on the other end of the suction pipe 203 .

[0056] The expansion opening 204 is located on both sides of the grinding head of the grinding machine 104 through the extension of the suction pipe 203 .

[0057] Among them, the two groups of expansion openings 204 are inclined at 45° and can move together with the movement of the first linear module 101, the second linear module 102 and the third linear module 103, so that during the process of the bearing ring groove being processed by the grinding machine 104, the expansion openings 204 can keep following.

[0058] Through the design of the vacuum cleaner 201, the collection tube 202, the suction pipe 203 and the expansion port 204, the vacuum cleaner 201 can be started together when the grinder 104 is grinding the bearing ring, and the vacuum cleaner 201 will absorb and collect the debris generated by grinding through the expansion ports 204 of the suction pipes 203 on both sides of the collection tube 202, thereby avoiding the debris from remaining in the ground channel during the grinding process, ensuring that the surface of the bearing ring is smooth and flawless, and the function of collecting debris can also keep it clean, ensuring that the processed channel surface has a high degree of finish and meets high quality standards The vacuum cleaner 201 is fixedly installed at one end of the third linear module 103, so that during the grinding process of the bearing ring by the grinder 104, the third linear module 103 can drive the expansion port 204 of the vacuum cleaner 201 to move together for adsorption and collection operations. By keeping the surface of the bearing ring free of debris, it can be ensured that the processed groove surface has a high degree of smoothness and meets high quality requirements. In addition, a clean working environment is not only beneficial to the health of the operator, but also can improve work efficiency and comfort, reduce the cleaning work caused by the scattering of debris, and reduce the labor intensity of the operator.

[0059] The working steps of this scheme are summarized and sorted out according to the above technical scheme: when processing the bearing rings, multiple groups of bearing rings can be stacked and placed in the C-shaped cylinder 302 for storage, and then the top cover 303 can be installed on the upper surface of the C-shaped cylinder 302, and the top cover 303 installed on the upper end of the C-shaped cylinder 302 will also drive the limit column fixedly installed on the lower surface to insert into the inner ring of the stacked bearing rings, so that the bearing sleeve can be vertical in the process of falling from the C-shaped cylinder 302, preventing possible tilting or misalignment, and ensuring the accuracy and stability of automatic feeding. After the bearing rings are stacked, the first electric push rod 304 is started to pull the bearing plate 306 at one end of the piston rod to slide on the lower surface of the C-shaped cylinder 302 until the first electric push rod 304 is started. The push rod 304 can stop after pulling the first arc groove 307 opened at one end of the carrier plate 306 to be flush with the C-shaped cylinder 302, and the bottom of the C-shaped cylinder 302 flush with the first arc groove 307 is no longer blocked, and a group of stacked bearing rings in the C-shaped cylinder 302 will fall vertically into the first arc groove 307, and the remaining bearing rings will touch the upper surface of the bearing rings in the first arc groove 307 and be fixed in the C-shaped cylinder 302. Then, the first electric push rod 304 can be started again to push the carrier plate 306, so that the carrier plate 306 can block the bottom of the C-shaped cylinder 302, and at the same time, it will push the bearing ring in the first arc groove 307 to slide on the upper surface of the guide plate 305 and approach the second arc groove 308. The continuous pushing of the electric push rod 304 can clamp the bearing ring in the first arc groove 307 and the second arc groove 308, and then the grinding machine 104 can grind the inner ring of the clamped bearing ring through the linkage of the first linear module 101, the second linear module 102, and the third linear module 103 to process the groove. The grinding machine 104 controlled by the linkage of the first linear module 101, the second linear module 102, and the third linear module 103 has free movement of the X-axis, the Y-axis and the Z-axis and can provide precise feed control to ensure the depth and accuracy of the grinding process, so that the bearing ring can be accurately positioned in multiple directions during the groove processing to ensure the processing process. After the bearing ring is processed, the first electric push rod 304 and the second electric push rod 401 can be started at the same time, and the first electric push rod 304 will pull the first arc groove 307 at one end of the carrier plate 306 to fall off from the surface of the bearing ring, so as to release the clamping force, and with the continuous pulling, another group of bearing rings can fall into the first arc groove 307 again for filling, and the second electric push rod 401 will pull the closing disk 402 to slide into the guide groove 309, and during the sliding process of the closing disk 402, the bearing ring on the upper surface will touch one end of the second arc groove 308 and slide on the surface of the closing disk 402 at the same time, and the closing disk 402 that slides into the guide groove 309 will expand the connecting port 310 at the lower end,Then, the bearing rings can be sequentially dropped onto the surface of the conveyor belt 404 through the connecting port 310 and the drop port 105 and transported away for the next processing or centralized collection operation. Through this automatic loading and unloading function, the production line downtime is reduced, the processing process is smoother, and the overall efficiency of the production line is greatly improved.

[0060] In summary: the bearing ring groove processing superfinishing machine has the functions of automatic loading and unloading, and can realize continuous processing of bearing rings without stopping to wait for manual loading and unloading operations, thereby significantly improving production efficiency, reducing non-production time, and increasing output. The adsorption function during the grinding process can avoid debris remaining in the ground groove during the grinding process, ensuring that the surface of the bearing ring is smooth and flawless, and the function of collecting debris can also keep it clean, ensuring that the processed groove surface has a high degree of finish and meets high quality requirements.

[0061] Parts not involved in the present invention are the same as the prior art or can be implemented by the prior art. Although the embodiments of the present invention have been shown and described, it is understood by those skilled in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A bearing ring groove processing superfinishing machine, characterized in that: include: An operating table (1), wherein a first linear module (101) is fixedly mounted on the upper surface of the operating table (1), a second linear module (102) is fixedly mounted on the upper surface of a movable block of the first linear module (101), a third linear module (103) is fixedly mounted on one end of the movable block of the second linear module (102), a grinding wheel machine (104) is fixedly mounted on one end of the movable block of the third linear module (103), and the grinding wheel machine (104) forms a three-axis linkage through the first linear module (101), the second linear module (102) and the third linear module (103); A feeding mechanism (3) is fixedly mounted on the upper surface of the operating table (1), a discharging mechanism (4) is slidably mounted inside the feeding mechanism (3), and the discharging mechanism (4) can be pulled out and unfolded so as to be connected and flush with the drop opening (105), and the drop opening (105) is opened on the upper surface of the operating table (1); Two groups of connecting plates (106) are fixedly mounted on the other end of the third linear module (103), and debris suction mechanisms (2) are detachably mounted in the two groups of connecting plates (106), wherein the suction ends of the debris suction mechanisms (2) extend to both sides of the grinding head of the grinding machine (104); The feeding mechanism (3) comprises a guide plate (305), the guide plate (305) is fixedly mounted on the upper surface of the operating table (1), a bearing plate (306) is fixedly mounted inside the guide plate (305), one end of the bearing plate (306) is fixedly connected to the piston rod of the first electric push rod (304), the first electric push rod (304) is fixedly mounted on the upper surface of the operating table (1), one end of the bearing plate (306) is provided with a first arc groove (307), the first arc groove (307) is flush with the second arc groove (308), and the second arc groove (308) is provided at one end of the upper surface of the guide plate (305); The first arc groove (307) can clamp the bearing ring in the process of shrinking toward the second arc groove (308); The upper surface of the bearing plate (306) is slidably fitted with the C-shaped cylinder (302), and support plates (301) are fixedly installed on both sides of the outer surface of the C-shaped cylinder (302). The C-shaped cylinder (302) is suspended on the upper surface of the bearing plate (306) through the support plates (301) and is slidably fitted with the bearing rings. Bearing rings can be stacked in the C-shaped cylinder (302). The upper surface of the C-shaped cylinder (302) is covered with a top cover (303). The lower surface of the top cover (303) is fixedly installed with a limiting column, and the limiting column of the top cover (303) can be slidably inserted into the inner ring of the stacked bearing rings. The bearing plate (306) can be pulled by the first electric push rod (304) and drive the first arc groove (307) to be flush with the C-shaped cylinder (302), and the first arc groove (307) flush with the C-shaped cylinder (302) can allow a group of bearing rings stacked in the C-shaped cylinder (302) to fall into the first arc groove (307), and the first electric push rod (304) can push the bearing plate (306) through the first arc groove (307) again to push the bearing rings to be clamped in the first arc groove (307) and the second arc groove (308); The unloading mechanism (4) comprises a second electric push rod (401), the second electric push rod (401) is fixedly mounted on the upper surface of the operating table (1), a closing disk (402) is fixedly mounted on one end of the piston rod of the second electric push rod (401), the closing disk (402) is slidably mounted in a guide groove (309), and the guide groove (309) is provided at one end of the guide plate (305); The closing disk (402) slidingly pushed in the guide groove (309) is flush with the center of the second arc groove (308) and can support the clamped bearing ring; A connecting opening (310) is provided at the lower end of the guide groove (309), and the connecting opening (310) is flush with the drop opening (105). When the closing disk (402) is pulled out of the guide groove (309) by the second electric push rod (401), the bearing ring on the upper surface of the closing disk (402) can be sequentially dropped to the upper surface of the conveyor belt (404) through the connecting opening (310) and the drop opening (105). The conveyor belt (404) is transmission-mounted in the docking plate (405), and the docking plate (405) is fixedly mounted on the lower surface of the operating table (1); Two groups of barrier strips (403) are fixedly mounted on the upper surface of the docking plate (405), and the two groups of barrier strips (403) slide on the surface of the conveyor belt (404), and the upper surfaces of the barrier strips (403) touch the lower surface of the operating table (1) and enclose the drop opening (105); The debris suction collection mechanism (2) comprises a dust collector (201), and both sides of the outer surface of the collection cylinder (202) of the dust collector (201) are connected and installed with suction pipes (203), and the other end of the suction pipe (203) is fixedly installed with an expansion port (204); The expansion openings (204) are located on both sides of the grinding head of the grinding machine (104) through the extension of the suction pipe (203); the two groups of the expansion openings (204) are inclined at 45 degrees and can move together with the movement of the first linear module (101), the second linear module (102) and the third linear module (103), so that during the process of the grinding machine (104) processing the groove of the bearing ring, the expansion openings (204) can keep following; When processing the bearing rings, multiple groups of bearing rings are stacked and placed in a C-shaped cylinder (302) for storage, and then a top cover (303) is installed on the upper surface of the C-shaped cylinder (302). The top cover (303) installed on the upper end of the C-shaped cylinder (302) drives the limit column fixedly installed on the lower surface to be inserted into the inner ring of the stacked bearing rings, so that the bearing sleeves can be in a vertical shape during the process of falling from the C-shaped cylinder (302), and can prevent tilting or dislocation, thereby ensuring the accuracy and stability of automatic feeding; After the bearing rings are stacked, the first electric push rod (304) is started to pull the bearing plate (306) at one end of the piston rod to slide on the lower surface of the C-shaped cylinder (302) until the first electric push rod (304) pulls the first arc groove (307) opened at one end of the bearing plate (306) to be flush with the C-shaped cylinder (302), and then stops. The bottom of the C-shaped cylinder (302) flush with the first arc groove (307) is no longer blocked, and a group of the stacked bearing rings in the C-shaped cylinder (302) will fall vertically into the first arc groove (307), and the remaining bearing rings will hit the upper surface of the bearing rings in the first arc groove (307) and be confined in the C-shaped cylinder (302); Then, the first electric push rod (304) is started again to push the bearing plate (306), so that the bearing plate (306) can block the bottom of the C-shaped cylinder (302), and at the same time, the bearing ring in the first arc groove (307) is pushed to slide on the upper surface of the guide plate (305) and approach the second arc groove (308), and as the first electric push rod (304) continues to push, the bearing ring can be clamped in the first arc groove (307) and the second arc groove (308); Subsequently, the grinding wheel machine (104) grinds the inner ring of the clamped bearing ring through the linkage of the first linear module (101), the second linear module (102), and the third linear module (103), so as to process the groove. The grinding wheel machine (104) controlled by the linkage of the first linear module (101), the second linear module (102), and the third linear module (103) enables the grinding wheel machine (104) to move freely along the X-axis, the Y-axis, and the Z-axis and to provide precise feed control, thereby ensuring the depth and precision of the grinding process, and further enabling the bearing ring to be accurately positioned in multiple directions during the groove processing, thereby ensuring the precision of the processing process; After the processing of the bearing ring is completed, the first electric push rod (304) and the second electric push rod (401) are started simultaneously, and the first electric push rod (304) pulls the first arc groove (307) at one end of the bearing plate (306) to fall off from the surface of the bearing ring, thereby releasing the clamping force, and with continued pulling, another set of bearing rings can fall into the first arc groove (307) again for filling; The second electric push rod (401) will pull the closing disk (402) to slide into the guide groove (309). During the sliding process of the closing disk (402), the bearing ring on the upper surface will contact one end of the second arc groove (308) and slide on the surface of the closing disk (402) at the same time; The closing disk (402) that slides into the guide groove (309) will expand the communication port (310) at the lower end, thereby enabling the bearing ring to sequentially pass through the communication port (310) and the drop port (105) and fall onto the surface of the conveyor belt (404) to be transported away for the next processing or centralized collection operation.

Citation Information

Patent Citations

  • Fully automatic inner ring groove grinding machine for bearing ring

    CN105751037B

  • Feeding and discharging device of lock cylinder automatic groove broacher and feeding and discharging technology thereof

    CN108581587A

  • Centrally-fastening fastening mechanism facilitating unloading and conveying

    CN112917390A

  • Grinding wheel grooving device for online detection and real-time groove profile correction

    CN113352237A

  • High-hardness plate trepanning and edging system