A power battery cycle life acceleration test platform
By introducing a heat storage box and a cold storage box into the battery test box, using asynchronous battery testing to offset the discharge and charging tests, and combining with the power storage device, the problem of high energy consumption in the battery test box during the cycle life test is solved, and a rapid The simulation of heating and cooling and the recovery of electric energy improve the test efficiency and energy saving effect.
Patent Information
- Application Number
- CN202411094423.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-08-09
AI Technical Summary
When testing the battery cycle life, the existing battery test box consumes huge energy and lacks the ability to quickly heat up or cool down, causing the temperature in the laboratory to rise, affecting the working comfort of testers, and being unable to effectively utilize the heat during discharge.
A power battery cycle life accelerated test platform is designed, including a controller, a master control box and multiple battery test boxes. Waste heat and waste cold are centrally managed through heat storage boxes and cold storage boxes, and asynchronous battery testing is used to hedge discharge. And charging test, supply energy to the heating and cooling system to achieve rapid heating and cooling, and recover electrical energy through the power storage device.
It realizes the simulation of extreme working conditions of rapid heating and cooling, reduces energy consumption, improves test efficiency, avoids additional heating and cooling equipment, saves energy and reduces emissions, and effectively utilizes waste heat and waste cold, reducing energy waste.
Smart Images

Figure CN118625198B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of battery testing, and in particular to an accelerated test platform for cycle life of a power battery. Background Art
[0002] A battery test box is a device used to test battery performance. It evaluates battery capacity, discharge time, internal resistance and other parameters by simulating load conditions in actual use. It can also accelerate battery cycle life testing.
[0003] By using the battery test box, it is possible to simulate the real environment and various harsh environments and working conditions that the battery may encounter during actual use, so as to speed up the cycle life of the test battery.
[0004] However, when testing the cycle life of a battery, an existing battery test box needs to charge and discharge, and needs to simulate the use environment, such as high temperature and low temperature, and also needs to simulate harsh working conditions, such as a high temperature dropping to a low temperature quickly, or a low temperature rising to a high temperature quickly. As a result, the traditional battery test box has a huge energy consumption and insufficient ability to heat up or cool down quickly, and requires external equipment. When discharging the tested battery, a load is used to consume the released energy. However, when the load consumes electricity, it still releases a lot of heat, resulting in the inability to recycle energy, making the heat in the test laboratory considerable and the indoor temperature extremely high, seriously affecting the working comfort of the test personnel.
[0005] Therefore, there is a need for a power battery cycle life acceleration test platform that can achieve rapid heating and cooling to meet the requirements of simulated working conditions and can reduce energy consumption. Summary of the invention
[0006] The technical problem to be solved by the present invention is to provide a power battery cycle life acceleration test platform which can achieve rapid heating and cooling to meet the requirements of simulated working conditions and can reduce energy consumption.
[0007] In order to solve the above technical problems, the technical solution adopted by the present invention is:
[0008] A power battery cycle life acceleration test platform includes a controller, a master control box and a plurality of battery test boxes; the controller controls the operation of the master control box and the plurality of battery test boxes;
[0009] The battery test box comprises a box body, a first valve, a second valve, a refrigeration system, a heating system, and a first temperature sensor; the box body has a battery cell to be tested; the box body is provided with a first inlet and a second inlet, the first valve is arranged on the first inlet; the second valve is arranged on the second inlet; the battery test box performs actions including: charging action, discharging action, rapid heating action, and rapid cooling action;
[0010] The master control box includes a heat storage box, a cold storage box, a power dispatching box, a first air pump and a second air pump. The heat storage box is connected to the first inlets of multiple battery test boxes through the first air pump; the cold storage box is connected to the second inlets of multiple battery test boxes through the second air pump; a second temperature sensor is provided in the heat storage box, and a third temperature sensor is provided in the cold storage box; the battery cells are electrically connected to the refrigeration system, the heating system and the power dispatching box, and the power dispatching box is electrically connected to the refrigeration system, the heating system, the first air pump and the second air pump respectively;
[0011] When the power battery cycle life acceleration test platform is working, the controller obtains data from the first temperature sensor, the second temperature sensor, and the third temperature sensor and simultaneously obtains the working conditions to be performed by the battery test box; the battery test box transports waste heat gas or waste cold gas to the heat storage box or the cold storage box through the first air pump and the second air pump;
[0012] When a part of the battery test boxes are performing charging action, the controller determines whether there are other battery test boxes that need to perform discharging action. If so, the controller controls the power dispatch box to charge the battery cell of the battery test box that performs charging action from the battery test box that performs discharging action; when there is a battery test box that performs rapid heating action, the controller determines whether the temperature of the heat storage box is greater than the temperature of the box body through the temperature of the first temperature sensor and the second temperature sensor. If so, the first air pump, the first valve, and the heating system are controlled to work synchronously until the temperature of the heat storage box is equal to the temperature of the box body, and then the first air pump and the first valve are closed, and the heating system is turned off until the preset temperature is reached; if they are in the discharging action at the same time, the battery cell supplies energy to the heating system; when there is a battery test box that performs rapid cooling action, the controller determines whether the temperature of the cold storage box is lower than the temperature of the box body through the temperature of the first temperature sensor and the third temperature sensor. If so, the second air pump, the second valve, and the refrigeration system are controlled to work synchronously until the temperature of the cold storage box is equal to the temperature of the box body, and then the second air pump and the second valve are closed, and the refrigeration system is turned off until the preset temperature is reached; if they are in the discharging action at the same time, the battery cell supplies energy to the refrigeration system.
[0013] Preferably, the box body is also provided with an exhaust port, and the exhaust port is provided with an exhaust valve;
[0014] When there is a battery test box that performs a rapid temperature rise action, the controller determines whether the temperature of the heat storage box is greater than the temperature of the box body through the temperature of the first temperature sensor and the second temperature sensor. If so, the controller controls the first air pump, the first valve, the heating system, and the exhaust valve to work synchronously until the temperature of the heat storage box is equal to the temperature of the box body, and then turns off the first air pump, the first valve, and the exhaust valve, and turns off the heating system after reaching the preset temperature; if it is in a discharge action at the same time, the battery cell supplies energy to the heating system;
[0015] When there is a battery test box that performs a rapid cooling action, the controller determines whether the temperature of the cold storage box is lower than the temperature of the box body through the temperature of the first temperature sensor and the third temperature sensor. If so, the second air pump, the second valve, the refrigeration system, and the exhaust valve are controlled to work synchronously until the temperature of the cold storage box is equal to the temperature of the box body, and then the second air pump, the second valve and the exhaust valve are closed until the preset temperature is reached. The refrigeration system is turned off; if it is in a discharging action at the same time, the battery cell supplies energy to the refrigeration system.
[0016] Preferably, the battery test box further comprises:
[0017] The controller obtains the first temperature sensor, the second temperature sensor, and the third temperature sensor, compares the second temperature sensor with the multiple first temperature sensors, and determines whether there is a battery test box whose box temperature is higher than that of the heat storage box. If so, the battery test box is calibrated as an overheated battery test box, and it is determined whether the overheated battery test box needs to perform a rapid cooling action. If so, the first air pump and the first valve are turned on to send the heat in the overheated battery test box to the heat storage box.
[0018] Preferably, if there are multiple overheated battery test boxes, the battery test box with the highest temperature is selected as the overheated battery test box.
[0019] Preferably, the battery test box further comprises:
[0020] The controller obtains the first temperature sensor, the second temperature sensor, and the third temperature sensor, compares the third temperature sensor with the multiple first temperature sensors, and determines whether there is a battery test box whose box temperature is lower than that of the cold storage box. If so, the battery test box is calibrated as an overcooled battery test box, and it is determined whether the overcooled battery test box needs to perform a rapid heating action. If so, the second air pump and the second valve are turned on to send the cold energy of the overheated battery test box to the cold storage box.
[0021] Preferably, if there are multiple overcooled battery test boxes, the battery test box with the lowest temperature is selected as the overcooled battery test box.
[0022] Preferably, the outer circumference of the cold storage box and the heat storage box is coated with a thermal insulation layer.
[0023] Preferably, the power battery cycle life acceleration test platform further includes a power storage device;
[0024] The power storage device is electrically connected to the controller and the power dispatch box respectively;
[0025] The controller determines whether the power of the discharge action exceeds the power of the charging operation. If so, the controller controls the power dispatch box to send the excess power to the power storage device.
[0026] Preferably, the controller determines whether the power of the charging action exceeds the power of the discharging action. If so, the controller controls the power dispatch box to replenish the electric energy in the power storage device for the charging action until the energy of the power storage device is exhausted.
[0027] Preferably, the controller determines whether the power of the discharge action exceeds the power of the charging action. If so, it determines that the first pump and / or the second pump are in working state. If they are in working state, the controller controls the power dispatch box to supply the excess power to the first pump and / or the second pump first. If there is still excess power, the controller controls the power dispatch box to send the excess power to the power storage device.
[0028] The beneficial effects of the present invention are as follows: by establishing a heat storage box, a cold storage box and an electric power dispatching box, the normal waste heat and waste cold can be concentrated in the heat storage box and the cold storage box through the heat storage box; since different battery test boxes test the battery cells asynchronously, by utilizing the asynchronous characteristics, the electric power dispatching box can hedge the discharge test and the charging test of different electrical properties, thereby avoiding the direct consumption of electric energy by traditional tests, thereby generating a large amount of heat energy; and through the heat storage box and the cold storage box, the battery cells can be in discharge action to supply energy to the heating system and the cooling system, and the electric energy of the battery cells can be utilized in advance to avoid energy waste; at the same time, the existence of the heat storage box and the cold storage box can achieve rapid heating and cooling, further avoiding energy waste while realizing the utilization of waste cold and waste heat, and can achieve the simulation speed of extreme working conditions of rapid heating and cooling, while improving efficiency, no additional heating and cooling equipment is required to accelerate temperature changes, achieving energy saving and emission reduction while reducing consumption and improving efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 This is a schematic diagram of the structure of a power battery cycle life acceleration test platform according to a specific embodiment of the present invention;
[0030] Figure 2 A schematic diagram of the working process of a power battery cycle life acceleration test platform according to a specific embodiment of the present invention;
[0031] Explanation of reference numerals: 1. Controller; 2. Master control box; 21. Heat storage box; 22. Cold storage box; 23. Power dispatching box; 24. First air pump; 25. Second air pump; 3. Battery test box; 31. Box body; 32. First valve; 33. Second valve; 34. Exhaust valve; 4. Power storage device. DETAILED DESCRIPTION
[0032] In order to explain the technical content, achieved objectives and effects of the present invention in detail, the following is an explanation in combination with the implementation modes and the accompanying drawings.
[0033] Please refer to Figure 1 as well as Figure 2 , a power battery cycle life acceleration test platform, comprising a controller 1, a master control box 2 and a plurality of battery test boxes 3; the controller 1 controls the operation of the master control box 2 and the plurality of battery test boxes 3;
[0034] The battery test box 3 includes a box body 31, a first valve 32, a second valve 33, a refrigeration system, a heating system, and a first temperature sensor; the box body 31 has a battery cell to be tested; the box body 31 is provided with a first inlet and a second inlet, the first valve 32 is arranged on the first inlet; the second valve 33 is arranged on the second inlet; the battery test box 3 performs actions including: charging action, discharging action, rapid heating action, and rapid cooling action;
[0035] The master control box 2 includes a heat storage box 21, a cold storage box 22, a power dispatching box 23, a first air pump 24 and a second air pump 25. The heat storage box 21 is connected to the first inlets of the plurality of battery test boxes 3 through the first air pump 24; the cold storage box 22 is connected to the second inlets of the plurality of battery test boxes 3 through the second air pump 25; a second temperature sensor is provided in the heat storage box 21, and a third temperature sensor is provided in the cold storage box 22; the battery cells are electrically connected to the refrigeration system, the heating system and the power dispatching box 23, respectively, and the power dispatching box 23 is electrically connected to the refrigeration system, the heating system, the first air pump 24 and the second air pump 25, respectively;
[0036] When the power battery cycle life acceleration test platform is working, the controller 1 obtains the data of the first temperature sensor, the second temperature sensor, and the third temperature sensor, and simultaneously obtains the working conditions to be performed by the battery test box 3; the battery test box 3 transports the waste heat gas or the waste cold gas to the heat storage box 21 or the cold storage box 22 through the first air pump 24 and the second air pump 25;
[0037] When a part of the battery test boxes 3 are performing the charging action, the controller 1 determines whether there are other battery test boxes 3 that need to perform the discharging action. If so, the controller 1 controls the power dispatch box 23 to charge the battery cells of the battery test box 3 that performs the charging action from the battery test box that performs the discharging action; when there is a battery test box 3 that performs the rapid heating action, the controller 1 determines whether the temperature of the heat storage box 21 is greater than the temperature of the box body 31 through the first temperature sensor temperature and the second temperature sensor. If so, the controller 1 controls the first air pump 24, the first valve 32, and the heating system to work synchronously until the temperature of the heat storage box 21 is equal to the temperature of the box body 31, and then closes the first valve 32. The air pump 24 and the first valve 32 are controlled to operate synchronously until the temperature of the cold storage box 22 is equal to the temperature of the box 31, and then the second air pump 25 and the second valve 33 are turned off, and the refrigeration system is turned off after the preset temperature is reached; if they are in the discharge action at the same time, the battery cell supplies energy to the heating system; when there is a battery test box 3 that performs a rapid cooling action, the controller 1 determines whether the temperature of the cold storage box 22 is lower than the temperature of the box body 31 through the temperature of the first temperature sensor and the third temperature sensor. If so, the second air pump 25, the second valve 33 and the refrigeration system are controlled to operate synchronously until the temperature of the cold storage box 22 is equal to the temperature of the box body 31, and then the second air pump 25 and the second valve 33 are turned off, and the refrigeration system is turned off after the preset temperature is reached; if they are in the discharge action at the same time, the battery cell supplies energy to the refrigeration system.
[0038] From the above description, it can be seen that by establishing a heat storage box 21, a cold storage box 22, and an electric power dispatching box 23, the normal waste heat and waste cold can be concentrated in the heat storage box 21 and the cold storage box 22 through the heat storage box 21. Since the tests of the battery cells by different battery test boxes 3 are asynchronous, by utilizing the asynchronous characteristics, the electric power dispatching box 23 can hedge the discharge test and the charging test of different electrical properties, thereby avoiding the traditional test to directly consume electric energy and generate a large amount of heat energy. In addition, through the heat storage box 21 and the cold storage box 22, the heating system and the cooling system can be powered by the battery cells in the discharge action, and the electric energy of the battery cells can be utilized in advance to avoid energy waste. At the same time, the existence of the heat storage box 21 and the cold storage box 22 can achieve rapid heating and cooling, further avoiding energy waste while realizing the utilization of waste cold and waste heat, and can achieve the simulation speed of extreme working conditions of rapid heating and rapid cooling, while improving efficiency without the need for additional heating and cooling equipment to accelerate temperature changes, achieving energy saving and emission reduction while reducing consumption and improving efficiency.
[0039] Furthermore, the box body 31 is also provided with an exhaust port, and the exhaust port is provided with an exhaust valve 34;
[0040] When there is a battery test box 3 that performs a rapid temperature rise action, the controller 1 determines whether the temperature of the heat storage box 21 is greater than the temperature of the box body 31 through the temperature of the first temperature sensor and the second temperature sensor. If so, the controller 1 controls the first air pump 24, the first valve 32, the heating system, and the exhaust valve 34 to work synchronously until the temperature of the heat storage box 21 is equal to the temperature of the box body 31, and then turns off the first air pump 24, the first valve 32, and the exhaust valve 34, and then turns off the heating system after reaching the preset temperature; if it is in a discharge action at the same time, the battery cell supplies energy to the heating system;
[0041] When there is a battery test box 3 that performs a rapid cooling action, the controller 1 determines whether the temperature of the cold storage box 22 is lower than the temperature of the box body 31 through the temperature of the first temperature sensor and the third temperature sensor. If so, the second air pump 25, the second valve 33, the refrigeration system, and the exhaust valve 34 are controlled to work synchronously until the temperature of the cold storage box 22 is equal to the temperature of the box body 31, and then the second air pump 25, the second valve 33 and the exhaust valve 34 are closed, and the refrigeration system is closed after the preset temperature is reached; if it is in a discharging action at the same time, the battery cell supplies energy to the refrigeration system.
[0042] From the above description, it can be seen that through the setting of the exhaust valve 34, the exhaust valve 34, the first valve 32, and the second valve 33 are all in the open state during operation. Through the exhaust valve 34, exhaust can be carried out, so that the box body 31 is in a negative pressure state, which is convenient for the first air pump 24 or the second air pump 25 to deliver gas, improve the efficiency of ventilation, and achieve faster rapid heating or rapid cooling.
[0043] Furthermore, the battery test box 3 transports the waste heat gas or waste cold gas to the heat storage box 21 or the cold storage box 22 through the first air pump 24 and the second air pump 25, further comprising:
[0044] The controller 1 obtains the first temperature sensor, the second temperature sensor, and the third temperature sensor, compares the second temperature sensor with the plurality of first temperature sensors, and determines whether there is a battery test box 3 whose box body 31 has a temperature higher than that of the heat storage box 21. If so, the battery test box 3 is calibrated as an overheated battery test box 3, and it is determined whether the overheated battery test box 3 needs to be cooled quickly. If so, the first air pump 24 and the first valve 32 are turned on to send the heat in the overheated battery test box 3 to the heat storage box 21.
[0045] Further, if there are multiple overheated battery test boxes 3 , the battery test box 3 with the highest temperature is selected as the overheated battery test box 3 .
[0046] Furthermore, the battery test box 3 transports the waste heat gas or waste cold gas to the heat storage box 21 or the cold storage box 22 through the first air pump 24 and the second air pump 25, further comprising:
[0047] The controller 1 obtains the first temperature sensor, the second temperature sensor, and the third temperature sensor, compares the third temperature sensor with the multiple first temperature sensors, and determines whether there is a battery test box 3 whose box body 31 has a temperature lower than that of the cold storage box 22. If so, the battery test box 3 is calibrated as an overcooled battery test box 3, and it is determined whether the overcooled battery test box 3 needs to perform a rapid heating action. If so, the second air pump 25 and the second valve 33 are turned on to send the cold energy of the overheated battery test box 3 to the cold storage box 22.
[0048] Further, if there are multiple overcooled battery test boxes 3 , the battery test box 3 with the lowest temperature is selected as the overcooled battery test box 3 .
[0049] Furthermore, the outer peripheries of the cold storage tank 22 and the heat storage tank 21 are coated with a heat-insulating layer.
[0050] It can be seen from the above description that the thermal insulation effect can be achieved by providing the thermal insulation layer.
[0051] Furthermore, the power battery cycle life acceleration test platform also includes a power storage device 4;
[0052] The power storage device 4 is electrically connected to the controller 1 and the power dispatch box 23 respectively;
[0053] The controller 1 determines whether the power of the discharge operation exceeds the power of the charging operation. If so, the controller 1 controls the power dispatch box 23 to send the excess power to the power storage device 4.
[0054] Furthermore, the controller 1 determines whether the power of the charging action exceeds the power of the discharging action. If so, the controller 1 controls the power dispatch box 23 to replenish the electric energy in the power storage device 4 for the charging action until the energy of the power storage device 4 is exhausted.
[0055] From the above description, it can be seen that through the additional power storage device 4, electric energy can be recycled and utilized to smooth out the peak and fill the valley, thereby avoiding insufficient energy supply during charging or insufficient energy consumption during discharging, and ensuring that the heat released by the tested battery cell can be fully utilized.
[0056] Furthermore, the controller 1 determines whether the power of the discharge action exceeds the power of the charging action. If so, it determines that the first pump and / or the second pump are in working state. If they are in working state, the power dispatch box 23 is controlled to supply the excess power to the first pump and / or the second pump first. If there is still excess power, the power dispatch box 23 is controlled to send the excess power to the power storage device 4.
[0057] Embodiment 1
[0058] A power battery cycle life acceleration test platform comprises a controller 1, a master control box 2 and a plurality of battery test boxes 3; the controller 1 controls the operation of the master control box 2 and the plurality of battery test boxes 3;
[0059] The battery test box 3 includes a box body 31, a first valve 32, a second valve 33, a refrigeration system, a heating system, and a first temperature sensor; the box body 31 has a battery cell to be tested; the box body 31 is provided with a first inlet and a second inlet, the first valve 32 is arranged on the first inlet; the second valve 33 is arranged on the second inlet; the battery test box 3 performs actions including: charging action, discharging action, rapid heating action, and rapid cooling action;
[0060] The master control box 2 includes a heat storage box 21, a cold storage box 22, a power dispatching box 23, a first air pump 24 and a second air pump 25. The heat storage box 21 is connected to the first inlets of the plurality of battery test boxes 3 through the first air pump 24; the cold storage box 22 is connected to the second inlets of the plurality of battery test boxes 3 through the second air pump 25; a second temperature sensor is provided in the heat storage box 21, and a third temperature sensor is provided in the cold storage box 22; the battery cells are electrically connected to the refrigeration system, the heating system and the power dispatching box 23, respectively, and the power dispatching box 23 is electrically connected to the refrigeration system, the heating system, the first air pump 24 and the second air pump 25, respectively;
[0061] When the power battery cycle life acceleration test platform is working, the controller 1 obtains the data of the first temperature sensor, the second temperature sensor, and the third temperature sensor, and simultaneously obtains the working conditions to be performed by the battery test box 3; the battery test box 3 transports the waste heat gas or the waste cold gas to the heat storage box 21 or the cold storage box 22 through the first air pump 24 and the second air pump 25;
[0062] When a part of the battery test boxes 3 are performing the charging action, the controller 1 determines whether other battery test boxes 3 need to perform the discharging action. If yes, the controller 1 controls the power dispatch box 23 to charge the battery cells of the battery test box 3 performing the charging action from the battery test box performing the discharging action.
[0063] The box body 31 is also provided with an exhaust port, and the exhaust port is provided with an exhaust valve 34;
[0064] When there is a battery test box 3 that performs a rapid temperature rise action, the controller 1 determines whether the temperature of the heat storage box 21 is greater than the temperature of the box body 31 through the temperature of the first temperature sensor and the second temperature sensor. If so, the controller 1 controls the first air pump 24, the first valve 32, the heating system, and the exhaust valve 34 to work synchronously until the temperature of the heat storage box 21 is equal to the temperature of the box body 31, and then turns off the first air pump 24, the first valve 32, and the exhaust valve 34, and then turns off the heating system after reaching the preset temperature; if it is in a discharge action at the same time, the battery cell supplies energy to the heating system;
[0065] When there is a battery test box 3 that performs a rapid cooling action, the controller 1 determines whether the temperature of the cold storage box 22 is lower than the temperature of the box body 31 through the temperature of the first temperature sensor and the third temperature sensor. If so, the second air pump 25, the second valve 33, the refrigeration system, and the exhaust valve 34 are controlled to work synchronously until the temperature of the cold storage box 22 is equal to the temperature of the box body 31, and then the second air pump 25, the second valve 33 and the exhaust valve 34 are closed, and the refrigeration system is closed after the preset temperature is reached; if it is in a discharging action at the same time, the battery cell supplies energy to the refrigeration system.
[0066] The battery test box 3 transports the waste heat gas or waste cold gas to the heat storage box 21 or the cold storage box 22 through the first air pump 24 and the second air pump 25, and further includes:
[0067] The controller 1 obtains the first temperature sensor, the second temperature sensor, and the third temperature sensor, compares the second temperature sensor with the plurality of first temperature sensors, and determines whether there is a battery test box 3 whose box body 31 has a temperature higher than that of the heat storage box 21. If so, the battery test box 3 is calibrated as an overheated battery test box 3, and it is determined whether the overheated battery test box 3 needs to be cooled quickly. If so, the first air pump 24 and the first valve 32 are turned on to send the heat in the overheated battery test box 3 to the heat storage box 21.
[0068] If there are multiple overheated battery test boxes 3 , the battery test box 3 with the highest temperature is selected as the overheated battery test box 3 .
[0069] The battery test box 3 transports the waste heat gas or waste cold gas to the heat storage box 21 or the cold storage box 22 through the first air pump 24 and the second air pump 25, and further includes:
[0070] The controller 1 obtains the first temperature sensor, the second temperature sensor, and the third temperature sensor, compares the third temperature sensor with the multiple first temperature sensors, and determines whether there is a battery test box 3 whose box body 31 has a temperature lower than that of the cold storage box 22. If so, the battery test box 3 is calibrated as an overcooled battery test box 3, and it is determined whether the overcooled battery test box 3 needs to perform a rapid heating action. If so, the second air pump 25 and the second valve 33 are turned on to send the cold energy of the overheated battery test box 3 to the cold storage box 22.
[0071] If there are multiple overcooled battery test boxes 3 , the battery test box 3 with the lowest temperature is selected as the overcooled battery test box 3 .
[0072] The outer peripheries of the cold storage box 22 and the heat storage box 21 are coated with a heat preservation layer.
[0073] Embodiment 2
[0074] A power battery cycle life acceleration test platform, which is the same as that of the first embodiment and will not be repeated, wherein:
[0075] The power battery cycle life acceleration test platform also includes a power storage device 4;
[0076] The power storage device 4 is electrically connected to the controller 1 and the power dispatch box 23 respectively;
[0077] The controller 1 determines whether the power of the discharge operation exceeds the power of the charging operation. If so, the controller 1 controls the power dispatch box 23 to send the excess power to the power storage device 4.
[0078] The controller 1 determines whether the power of the charging action exceeds the power of the discharging action. If so, the controller 1 controls the power dispatch box 23 to replenish the electric energy in the power storage device 4 for the charging action until the energy of the power storage device 4 is exhausted.
[0079] The controller 1 determines whether the power of the discharge action exceeds the power of the charging action. If so, it determines that the first pump and / or the second pump are in working state. If they are in working state, the controller 1 controls the power dispatch box 23 to supply the excess power to the first pump and / or the second pump first. If there is still excess power, the controller 1 controls the power dispatch box 23 to send the excess power to the power storage device 4.
[0080] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent transformations made using the contents of the present invention's specification and drawings, or directly or indirectly applied in related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A power battery cycle life acceleration test platform, It is characterized in that It includes a controller, a master control box and multiple battery test boxes; the controller controls the operation of the master control box and the multiple battery test boxes; The battery test box comprises a box body, a first valve, a second valve, a refrigeration system, a heating system, and a first temperature sensor; the box body has a battery cell to be tested; the box body is provided with a first inlet and a second inlet, the first valve is arranged on the first inlet; the second valve is arranged on the second inlet; the battery test box performs actions including: charging action, discharging action, rapid heating action, and rapid cooling action; The master control box includes a heat storage box, a cold storage box, a power dispatching box, a first air pump and a second air pump. The heat storage box is connected to the first inlets of multiple battery test boxes through the first air pump; the cold storage box is connected to the second inlets of multiple battery test boxes through the second air pump; a second temperature sensor is provided in the heat storage box, and a third temperature sensor is provided in the cold storage box; the battery cells are electrically connected to the refrigeration system, the heating system and the power dispatching box, and the power dispatching box is electrically connected to the refrigeration system, the heating system, the first air pump and the second air pump respectively; When the power battery cycle life acceleration test platform is working, the controller obtains data from the first temperature sensor, the second temperature sensor, and the third temperature sensor and simultaneously obtains the working conditions to be performed by the battery test box; the battery test box transports waste heat gas or waste cold gas to the heat storage box or the cold storage box through the first air pump and the second air pump; When a part of the battery test boxes are performing charging action, the controller determines whether there are other battery test boxes that need to perform discharging action. If so, the controller controls the power dispatch box to charge the battery test box that performs discharging action to the battery cell of the battery test box that performs charging action; when there is a battery test box that performs rapid heating action, the controller determines whether the temperature of the heat storage box is greater than the temperature of the box body through the temperature of the first temperature sensor and the second temperature sensor. If so, the first air pump, the first valve, and the heating system are controlled to work synchronously until the temperature of the heat storage box is equal to the temperature of the box body, and then the first air pump and the first valve are closed, and the heating system is turned off until the preset temperature is reached; if they are in the discharging action at the same time, the battery cell supplies energy to the heating system; when there is a battery test box that performs rapid cooling action, the controller determines whether the temperature of the cold storage box is less than the temperature of the box body through the temperature of the first temperature sensor and the third temperature sensor. If so, the second air pump, the second valve, and the refrigeration system are controlled to work synchronously until the temperature of the cold storage box is equal to the temperature of the box body, and then the second air pump and the second valve are closed, and the refrigeration system is turned off until the preset temperature is reached; if they are in the discharging action at the same time, the battery cell supplies energy to the refrigeration system.
2. The power battery cycle life acceleration test platform according to claim 1, It is characterized in that The box body is also provided with an exhaust port, and the exhaust port is provided with an exhaust valve; When there is a battery test box that performs a rapid temperature rise action, the controller determines whether the temperature of the heat storage box is greater than the temperature of the box body through the temperature of the first temperature sensor and the second temperature sensor. If so, the controller controls the first air pump, the first valve, the heating system, and the exhaust valve to work synchronously until the temperature of the heat storage box is equal to the temperature of the box body, and then turns off the first air pump, the first valve, and the exhaust valve, and turns off the heating system after reaching the preset temperature; if it is in a discharge action at the same time, the battery cell supplies energy to the heating system; When there is a battery test box that performs a rapid cooling action, the controller determines whether the temperature of the cold storage box is lower than the temperature of the box body through the temperature of the first temperature sensor and the third temperature sensor. If so, the second air pump, the second valve, the refrigeration system, and the exhaust valve are controlled to work synchronously until the temperature of the cold storage box is equal to the temperature of the box body, and then the second air pump, the second valve and the exhaust valve are closed until the preset temperature is reached. The refrigeration system is turned off; if it is in a discharging action at the same time, the battery cell supplies energy to the refrigeration system.
3. The power battery cycle life acceleration test platform according to claim 1, It is characterized in that The battery test box further comprises: The controller obtains the first temperature sensor, the second temperature sensor, and the third temperature sensor, compares the second temperature sensor with the multiple first temperature sensors, and determines whether there is a battery test box whose box temperature is higher than that of the heat storage box. If so, the battery test box is calibrated as an overheated battery test box, and it is determined whether the overheated battery test box needs to perform a rapid cooling action. If so, the first air pump and the first valve are turned on to send the heat in the overheated battery test box to the heat storage box.
4. The power battery cycle life acceleration test platform according to claim 3, It is characterized in that If there are multiple overheated battery test boxes, the battery test box with the highest temperature is selected as the overheated battery test box.
5. The power battery cycle life acceleration test platform according to claim 3, It is characterized in that The battery test box further comprises: The controller obtains the first temperature sensor, the second temperature sensor, and the third temperature sensor, compares the third temperature sensor with the multiple first temperature sensors, and determines whether there is a battery test box whose box temperature is lower than that of the cold storage box. If so, the battery test box is calibrated as an overcooled battery test box, and it is determined whether the overcooled battery test box needs to perform a rapid heating action. If so, the second air pump and the second valve are turned on to send the cold energy of the overheated battery test box to the cold storage box.
6. The power battery cycle life acceleration test platform according to claim 5, It is characterized in that If there are multiple overcooling battery test boxes, the battery test box with the lowest temperature is selected as the overcooling battery test box.
7. The power battery cycle life acceleration test platform according to claim 1, It is characterized in that The outer peripheries of the cold storage box and the heat storage box are coated with a heat preservation layer.
8. The power battery cycle life acceleration test platform according to claim 1, It is characterized in that The power battery cycle life acceleration test platform also includes a power storage device; The power storage device is electrically connected to the controller and the power dispatch box respectively; The controller determines whether the power of the discharge action exceeds the power of the charging operation. If so, the controller controls the power dispatch box to send the excess power to the power storage device.
9. The power battery cycle life acceleration test platform according to claim 8, It is characterized in that The controller determines whether the power of the charging action exceeds the power of the discharging action. If so, the controller controls the power dispatch box to replenish the electric energy in the power storage device for the charging action until the energy of the power storage device is exhausted.
10. The power battery cycle life acceleration test platform according to claim 9, It is characterized in that The controller determines whether the power of the discharge action exceeds the power of the charging action. If so, it determines that the first pump and / or the second pump are in working state. If they are in working state, the controller controls the power dispatch box to supply the excess power to the first pump and / or the second pump first. If there is still excess power, the controller controls the power dispatch box to send the excess power to the power storage device.
Citation Information
Patent Citations
Automatic charging and discharging test system of batteries
CN106199446A
Composite test system for battery
CN108458931A
Method for testing accelerated cycle life of power battery of electric vehicle
CN111929601A
Thermal and cold cycle simulation system for battery charge and discharge test
CN116593922A
Multifunctional environmental test chamber
CN202478948U
