Pharmaceutical lean production management process automation robot system and method

Through the automatic robot system of drug lean production management process automation, the value flow chart is automatically constructed and analyzed, and waste points are identified and improved measures are provided, which solves the time consumption and error problems caused by artificial dependence in the existing technology, and achieves efficient and accurate production decision support .

CN118627849BActive Publication Date: 2024-11-22INNOVATION CENTER OF YANGTZE RIVER DELTA ZHEJIANG UNIVERSITY

Patent Information

Application Number
CN202411082779.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-11-22
Estimated Expiration
2044-08-08

AI Technical Summary

Technical Problem

The existing value flow chart analysis mainly relies on manual operation, which consumes a lot of time and energy, is prone to errors, and is difficult to meet the needs of scientific decision-making by enterprises.

Method used

Provides an automated robot system for lean production management processes of drugs, build a value flow graph model by automatically grabbing data, identifying waste points, providing real-time dynamic analysis results and improvement measures and suggestions, and improving decision-making timeliness and accuracy.

Benefits of technology

It realizes automated value flow chart analysis, reduces manual errors, provides real-time dynamic analysis results and countermeasures and suggestions, greatly improves the timeliness and accuracy of decisions, and helps managers better grasp the production and operation trends, optimize resource allocation and production processes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118627849B_ABST
    Figure CN118627849B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of data processing, specifically to a pharmaceutical lean production management process automation robot system and method, the method comprising building a value stream map model and generating an ideal value stream map; selecting a time range to be analyzed, reading the order placement and delivery time of each batch of products within the time range, and retrieving the relevant material batch number and each process production data according to the material traceability system to form a current value stream map; comparing the current value stream map with the ideal value stream map, identifying waste and summarizing and counting similar waste; managers can modify the corresponding parameters in the current value stream map, simulate and calculate the predicted value stream map, and estimate the improvement of cost and production cycle. The present invention automatically captures the operation, production and inspection data of pharmaceutical companies for value stream map analysis, avoids personnel errors, reduces manual work, can provide real-time dynamic analysis results and countermeasures, and greatly improves the timeliness and accuracy of decision-making.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of data processing, and in particular to a robotic system and method for automating the process of lean production management of medicines. Background Art

[0002] The comprehensive economic benefit evaluation and analysis of the production process and system of manufacturing enterprises is an effective means to achieve sustainable development of enterprises. The manufacturing production system is usually composed of multiple equipment and multiple processes. How to evaluate and automate the production process has gradually become a concern of the manufacturing industry.

[0003] Value Stream Mapping (VSM) is the most important waste identification and management decision-making tool in lean production. It aims to reveal unnecessary waste in transportation, inventory, waiting, repeated processing, and product failure by collecting, analyzing, displaying and evaluating data on the entire supply, production and sales chain of specific products (clusters). It helps managers to comprehensively and dynamically grasp the production and operation status of the enterprise, so as to adopt measures such as process improvement, process optimization, resource allocation, production line transformation, personnel training, and supply chain collaboration to continuously eliminate waste, improve efficiency and operation quality.

[0004] At present, value stream mapping analysis mainly relies on manual on-site observation, data collection, chart drawing, qualitative judgment, quantitative analysis and other tasks, which requires managers to spend a lot of time and energy, is prone to errors, and cannot meet the needs of scientific decision-making of enterprises.

[0005] Therefore, there is an urgent need for an automated robotic system and method for the lean production management process of pharmaceuticals. Summary of the invention

[0006] In order to overcome the problems existing in the prior art, the purpose of the present invention is to provide a pharmaceutical lean production management process automation robot system and method, which automatically captures data for value stream map analysis, reduces manual consumption, and provides real-time dynamic analysis results and countermeasures and suggestions, greatly improving the timeliness and accuracy of decision-making.

[0007] To achieve the above object, the present invention provides the following technical solution: a method for automating the process of drug lean production management, comprising the following steps:

[0008] S1: Input the drugs to be analyzed, as well as the corresponding inspection items, production procedures and other basic information into the lean production management process automation robot system. The lean production management process automation robot system extracts the corresponding raw material and auxiliary packaging material suppliers and customer data from the resource management system (ERP) to build a value stream map model; the raw material and auxiliary packaging materials are raw materials, auxiliary materials and packaging materials.

[0009] S2: Based on the value stream map model, managers input the theoretical production cycle, standard labor, quantity of process inputs and outputs, theoretical residence time of materials to be processed, and inspection items and theoretical inspection time of raw and auxiliary packaging materials, intermediate products and finished products of each process to generate an ideal value stream map;

[0010] S3: Select the time range to be analyzed, and the lean production management process automation robot system reads all product batch numbers and corresponding order placement and delivery times within the time range from the resource management system;

[0011] S4: retrieve the material numbers (including raw materials, auxiliary materials, packaging materials and intermediate products) corresponding to the corresponding product batch numbers from the material traceability system, retrieve the process time, actual labor, process input quantity and output quantity, material inventory and inter-process residence time and corresponding production data (equipment operation time, energy consumption measurement, on-the-job personnel and on-the-job time) corresponding to the intermediate products and finished products from the resource management system (ERP) and manufacturing execution system (MES), retrieve the corresponding inspection time and material release time from the laboratory information management system (LIMS), and build the current value stream map according to the value stream map model;

[0012] S5: The lean production management process automation robot system compares the current value stream map with the ideal value stream map, identifies waste points from the corresponding processes one by one, and summarizes and counts similar waste points;

[0013] S6: The manager proposes corresponding improvement measures according to the types of waste and modifies the corresponding parameters in the current value stream map; the types of waste include cost waste, process time waste, labor waste, and energy waste;

[0014] S7: The lean production management process automation robot system simulates and calculates, giving the estimated cost reduction or production cycle reduction for each batch of products after the implementation of improvement measures, and presents it in the form of a predictive value stream map for management personnel's decision-making reference.

[0015] The present invention is further configured as follows: in step S4, the materials include raw and auxiliary packaging materials, intermediate products, finished products and consumables; the process time includes: the time periods of purchase ordering, sampling, warehousing, collection, feeding, discharging, testing, temporary storage, scrapping, warehousing and discharging.

[0016] The present invention is further configured as follows: the production data in step S4 is obtained by the following steps: adding up all the process times of the material to calculate the supply cycle; retrieving and extracting the location information and quantity (weight or number of pieces) of the corresponding production workshop and process production equipment from the manufacturing execution system according to the time segment of the process time corresponding to the material;

[0017] According to the time segment and location information of the process, the corresponding value time (net processing time), number of personnel at the workstation, material handling volume, yield rate or qualified rate, and energy consumption data are listed one by one according to the process;

[0018] Fill the value stream map model with process time and production data to build the current value stream map.

[0019] The present invention is further configured as follows:

[0020] Step S5 compares the corresponding data on the ideal value stream map with the actual value stream map, and performs calculations based on the formula pre-stored in the calculation rule library combined with the process time and production data in the ideal value stream map and the current value stream map, specifically including the following steps:

[0021] S50: Calculate the ratio of the theoretical production cycle of each process to the total duration of the actual production cycle of the process, sort and display them in ascending order;

[0022] S51: Calculate the capital occupation amount according to the material cost (the product of the material quantity and the unit cost) and the temporary storage or waiting time of each process, and sort and display them in descending order; Step S51 calculates the capital occupation cost caused by material retention / waiting, which can be calculated by material quantity × unit cost × retention or waiting time × capital time interest rate;

[0023] S52: Calculate the yield rate (or first pass rate) of each process, sort and display them in descending order according to the loss rate or loss amount;

[0024] S53: Calculate the total labor cost and process labor cost based on the standard labor and additional labor quantity of each process, and sort and display them in descending order;

[0025] S54: Perform year-on-year and month-on-month analysis on the energy consumption data of each process and previous energy consumption data, and sort and display them in descending order according to the increase rate;

[0026] According to the order of steps S50-S54, the process with the first order is selected for priority processing.

[0027] The present invention is further configured as follows: Step S1 specifically selects and confirms the process, types of raw and auxiliary packaging materials, types of intermediate products, and items from incoming inspection to intermediate inspection and then to release inspection of the product to be analyzed according to the variety process and batch table, and builds a value stream map model according to the process, types of raw and auxiliary packaging materials, types of intermediate products, and items from incoming inspection to intermediate inspection and then to release inspection.

[0028] The present invention also relates to a pharmaceutical lean production management process automation robot system, which is used in conjunction with the pharmaceutical lean production management process automation method described above; comprising:

[0029] A collection robot module, which includes a data interface to call data from a resource management system, a manufacturing execution system, and a laboratory information management system as needed;

[0030] Variety process and batch table, which stores basic information of the variety, including production process, types of raw and auxiliary packaging materials, batches and corresponding production equipment, and theoretical production cycle;

[0031] The material traceability system establishes the raw materials, auxiliary materials, packaging materials and consumables information corresponding to the finished products based on the resource management system, including material name, batch number, supplier, inspection or release time, storage time, storage time, quantity, packaging specification information, and inspection items of various materials;

[0032] Cost relationship table, which stores the cost relationship information of unit materials, including cost amount, labor cost amount of different processes, unit electricity and steam cost amount, and capital cost rate;

[0033] The governance robot module captures and sends data based on the data collected by the collection robot module, and combines the product process and batch table, material traceability system, cost relationship table, calculation rule library and discrimination rule library to form a current value stream map;

[0034] Calculation rule library, used to store formulas in advance, including calculation formulas for value time and non-value time, various cost calculation formulas, and recovery rate calculation formulas;

[0035] The analysis robot module has the following functions: calculating the waste of time, labor, materials and energy based on the differences between the ideal value stream map and the current value stream map; performing simulation optimization based on the improvement measures that managers intend to take, and drawing a predictive value stream map for decision-making reference.

[0036] The present invention is further configured as follows: the storage contents of the variety process and batch table, cost relationship table, and calculation rule library can be increased, decreased, or modified according to actual conditions.

[0037] In summary, the beneficial effects of the above technical solution of the present invention are as follows:

[0038] 1. The pharmaceutical lean production management process automation robot system of the present invention can automatically capture data from ERP, LIMS or MES for value stream map analysis, avoid human errors, reduce manual work, and provide real-time dynamic analysis results and countermeasures and suggestions, greatly improving the timeliness and accuracy of decision-making.

[0039] 2. The present invention can provide analysis results from multiple aspects such as production cycle, cost, labor and energy consumption, which helps managers to better grasp the overall situation and achieve multi-objective optimization.

[0040] 3. Managers can use the predictive value stream mapping tool provided by the present invention to evaluate the impact of one or more improvement measures on other product-related performance indicators, providing support for solving the comprehensive optimization problem of multi-variety co-production. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0042] Figure 1 This is a flow chart of the automation method for the pharmaceutical lean production management process.

[0043] Figure 2 This is a schematic diagram of the automated robotic system for pharmaceutical lean production management processes. DETAILED DESCRIPTION

[0044] In order to enable those skilled in the art to better understand the technical solution of the present invention, the technical solution of the present invention is clearly and completely described below in conjunction with the accompanying drawings of the present invention. Based on the embodiments of the present invention, other similar embodiments obtained by ordinary technicians in the field without making any creative work should all fall within the scope of protection of the present invention.

[0045] The present invention will be further described below in conjunction with the accompanying drawings and preferred embodiments.

[0046] Embodiment 1:

[0047] like Figure 1 As shown in the figure, a preferred embodiment of the present invention is a method for automating the process of lean production management of medicines, comprising the following steps:

[0048] S1: Input the drug to be analyzed, as well as the corresponding inspection items, production process and other basic information into the lean production management process automation robot system. The lean production management process automation robot system extracts the corresponding raw and auxiliary packaging material suppliers and customer data from the resource management system (ERP) to build a value stream map model. This embodiment takes a certain aluminum-plastic packaging tablet product as an example.

[0049] According to the variety process and batch table, select and confirm the process, types of raw and auxiliary packaging materials, types of intermediate products, and items from incoming inspection to intermediate inspection and then to release inspection of the products to be analyzed, and build a value stream map model based on the process, types of raw and auxiliary packaging materials, types of intermediate products, and items from incoming inspection to intermediate inspection and then to release inspection.

[0050] S2: Based on the value stream map model, managers input the theoretical production cycle, standard labor, quantity of process inputs and outputs, theoretical residence time of materials to be processed, and inspection items and theoretical inspection time of raw and auxiliary packaging materials, intermediate products and finished products of each process to generate an ideal value stream map.

[0051] S3: Select the time range to be analyzed, and the lean production management process automation robot system reads all product batch numbers and corresponding order placement and delivery times within the time range from the resource management system.

[0052] S4: retrieve the material numbers (including raw materials, auxiliary materials, packaging materials and intermediate products) corresponding to the corresponding product batch numbers from the material traceability system, retrieve the process time, actual labor, process input quantity and output quantity, material inventory and inter-process residence time and corresponding production data (equipment operation time, energy consumption measurement, on-the-job personnel and on-the-job time) corresponding to the intermediate products and finished products from the resource management system (ERP) and manufacturing execution system (MES), retrieve the corresponding inspection time and material release time from the laboratory information management system (LIMS), and build the current value stream map according to the value stream map model;

[0053] In step S4, the materials include raw and auxiliary packaging materials, intermediate products, finished products and consumables; the process time includes: the time periods of purchase order, sampling, warehousing, collection, feeding, discharging, testing, temporary storage, scrapping, warehousing and outgoing.

[0054] Based on the above information and data, a current value stream map is formed.

[0055] S5: The lean production management process automation robot system compares the current value stream map with the ideal value stream map, identifies waste points from the corresponding process one by one, and summarizes and counts similar waste points; this embodiment takes the production cycle status, cost status, yield rate and qualified rate status as examples.

[0056] The calculation is performed based on the formula stored in the calculation rule library and the data information in the current value stream map, which specifically includes the following steps:

[0057] Calculate the ratio of the theoretical production cycle of each process to the total duration of the actual production cycle of the process, sort and display them in ascending order; the theoretical production cycle is marked in the theoretical value stream diagram, and the actual production cycle is calculated through the process time corresponding to the intermediate product and the finished product in the current value stream diagram;

[0058] For example, it was found that the proportions of extraction process, intermediate inspection process, preparation process and finished product inspection process were 50%, 75%, 38% and 75% respectively, among which the theoretical production cycle of the preparation process accounted for the lowest proportion of the total actual production cycle of the process; the problem of production cycle waste in the preparation process should be dealt with first. The preparation process includes granulation process, total mixing process, tableting process, coating process, appearance inspection process and filling and packaging process.

[0059] Calculate the capital occupation amount based on the material cost of each process, and sort them from large to small. Calculate the current capital occupation amount of each process through the material inventory and the residence time between processes in the current value stream diagram, which can be calculated by material quantity × unit cost × retention or waiting time × capital time interest rate;

[0060] For example, the result is that the capital occupation of raw material 1 is 5.62%, the capital occupation of raw material 2 is 5.44%, the capital occupation of auxiliary material 1 is 4.61%, the capital occupation of auxiliary material 2 is 1.08%, the capital occupation of auxiliary material 3 is 0.81%, and the capital occupation of other auxiliary materials is 0.13%. Among them, the capital occupation of raw material 1, raw material 2 and auxiliary material 1 is relatively large;

[0061] Calculate the first-time qualified rate of materials and the recovery rate of each process, and sort them from large to small according to the loss rate or loss amount; calculate the ideal first-time qualified rate and the recovery rate of each process through the number of inputs and outputs of the process in the ideal value stream diagram; calculate the current first-time qualified rate and the recovery rate of each process through the input and output of each process in the current value stream diagram, and sort them from large to small according to the loss rate or loss amount.

[0062] For example, the losses in the preparation process are 0.57% due to airflow during total mixing, 1.55% due to defective tableting, 0.02% due to defective coating, 2.24% due to defective tablet picking, 0.5% due to defective filling and packaging, and 0.11% due to loss in scrap boxes. Among them, losses due to defective tablet picking and tablet pressing account for the highest proportion, which is greater than 1.5%.

[0063] Conduct year-on-year and month-on-month analysis based on the energy consumption data of each process and previous energy consumption data, and sort and display them in descending order according to the increase rate;

[0064] Compare the corresponding data on the ideal value stream map with the actual value stream map to find out the unreasonable energy loss and select the process to be processed first.

[0065] S6: According to the type of waste, managers propose corresponding improvement measures and modify the corresponding parameters in the current value stream map; for example, the coating process time is shortened by 3 / 4, the OEE of the filling and packaging process equipment is increased to 54.6%, the steam consumption is reduced by 26.18% and the electricity consumption is reduced by 25.5%, the cost price of raw material 1 is reduced by 1%, raw material 2 is changed to homemade, and auxiliary material 1 is changed to recycled and reused.

[0066] S7: The lean production management process automation robot system simulates and calculates, and gives the estimated cost reduction or production cycle reduction for each batch of products after the implementation of the improvement measures, and displays it in the form of a predicted value stream map for management personnel to make reference. In this example, it is estimated that the cost per piece will be reduced by 5.8 cents, and the annualized profit will be more than 4 million yuan.

[0067] Embodiment 2:

[0068] like Figure 2 As shown, the present invention also relates to a pharmaceutical lean production management process automation robot system, which is used in conjunction with the pharmaceutical lean production management process automation method described above; comprising:

[0069] A collection robot module, which includes a data interface to call data from a resource management system, a manufacturing execution system, and a laboratory information management system as needed;

[0070] Variety process and batch table, which stores basic information of the variety, including production process, types of raw and auxiliary packaging materials, batches and corresponding production equipment, and theoretical production cycle;

[0071] The material traceability system establishes the raw materials, auxiliary materials, packaging materials and consumables information corresponding to the finished products based on the resource management system, including material name, batch number, supplier, inspection or release time, storage time, storage time, quantity, packaging specification information, and inspection items of various materials;

[0072] Cost relationship table, which stores the cost relationship information of unit materials, including cost amount, labor cost amount of different processes, unit electricity and steam cost amount, and capital cost rate;

[0073] The governance robot module captures and sends data based on the data collected by the collection robot module, and combines the product process and batch table, material traceability system, cost relationship table, calculation rule library and discrimination rule library to form a current value stream map;

[0074] Calculation rule library, used to store formulas in advance, including calculation formulas for value time and non-value time, various cost calculation formulas, and recovery rate calculation formulas;

[0075] The analysis robot module has the following functions: calculating the waste of time, labor, materials and energy based on the differences between the ideal value stream map and the current value stream map; performing simulation optimization based on the improvement measures that managers intend to take, and drawing a predictive value stream map for decision-making reference.

[0076] The storage contents of the variety process and batch table, cost relationship table, and calculation rule library can be increased, decreased, or modified according to actual conditions.

[0077] Finally, it should be noted that the above content is only used to illustrate the technical solution of the present invention, rather than to limit the scope of protection of the present invention. Simple modifications or equivalent substitutions of the technical solution of the present invention by ordinary technicians in this field do not deviate from the essence and scope of the technical solution of the present invention.

Claims

1. The pharmaceutical lean production management process automation method is characterized by: The following steps are involved: S1: Input the drugs to be analyzed, the corresponding inspection items, and the basic information of the production process into the lean production management process automation robot system. The lean production management process automation robot system extracts the corresponding raw material and auxiliary packaging material suppliers and customer data from the resource management system to build a value stream map model; S2: Based on the value stream map model, managers input the theoretical production cycle, standard labor, quantity of process inputs and outputs, theoretical residence time of materials to be processed, and inspection items and theoretical inspection time of raw and auxiliary packaging materials, intermediate products and finished products of each process to generate an ideal value stream map; S3: Select the time range to be analyzed, and the lean production management process automation robot system reads all product batch numbers and corresponding order placement and delivery times within the time range from the resource management system; S4: retrieve the material number corresponding to the corresponding product batch number from the material traceability system, retrieve the process time, actual labor, process input quantity and output quantity, material inventory and inter-process residence time and corresponding production data corresponding to the intermediate products and finished products from the resource management system and manufacturing execution system, retrieve the corresponding inspection time and material release time from the laboratory information management system, and build the current value stream map according to the value stream map model; S5: The lean production management process automation robot system compares the current value stream map with the ideal value stream map, identifies waste from the corresponding processes one by one, and summarizes and counts the same type of waste; The calculation is performed based on the formula stored in the calculation rule library combined with the process time and production data in the ideal value stream map and the current value stream map, which specifically includes the following steps: S50: Calculate the ratio of the theoretical production cycle of each process to the total duration of the actual production cycle of the process, sort and display them in ascending order; S51: Calculate the capital occupation amount according to the material cost, temporary storage or residence time of each process, sort and display them in descending order; S52: Calculate the yield rate or first-time qualified rate of each process, sort and display them from large to small according to the loss rate or loss amount; S53: Calculate the total labor cost and process labor cost based on the standard labor and additional labor quantity of each process, and sort and display them in descending order; S54: Perform year-on-year and month-on-month analysis on the energy consumption data of each process and previous energy consumption data, and sort and display them in descending order according to the increase rate; According to the order of steps S50-S54, the process with the first order is selected for priority processing; S6: Managers propose corresponding improvement measures based on the type of waste and modify the corresponding parameters in the current value stream map; S7: The lean production management process automation robot system simulates and calculates the estimated cost reduction or production cycle reduction for each batch of products after the implementation of improvement measures, and displays it in the form of a predictive value stream map for management decision-making reference.

2. The pharmaceutical lean production management process automation method according to claim 1, characterized in that: In step S4, the materials include raw and auxiliary packaging materials, intermediate products, finished products and consumables; the process time includes: the time periods of purchase order, sampling, warehousing, collection, feeding, discharging, testing, temporary storage, scrapping, warehousing and discharging.

3. The method for automating the pharmaceutical lean production management process according to claim 2, characterized in that: The production data in step S4 is obtained by the following steps: adding up all the process times of the material to calculate the delivery cycle; retrieving and extracting the corresponding production workshop, production equipment and quantity data from the manufacturing execution system according to the time segment of the corresponding process of the material; According to the process time segment and location information, the corresponding process time, number of personnel at the workstation, material handling volume, yield rate or qualified rate, and equipment operating time data are listed one by one according to the process; Fill the process time and production data into the value stream map model to build the current value stream map.

4. The pharmaceutical lean production management process automation method according to claim 1, characterized in that: Step S1 specifically includes selecting and confirming the process, types of raw and auxiliary packaging materials, types of intermediate products, and items from incoming inspection to intermediate inspection and then to release inspection of the product to be analyzed according to the product process and batch table, and building a value stream map model according to the process, types of raw and auxiliary packaging materials, types of intermediate products, and items from incoming inspection to intermediate inspection and then to release inspection.

5. A robot system for automating the lean production management process of pharmaceuticals, used in conjunction with the method for automating the lean production management process of pharmaceuticals as described in any one of claims 1 to 4; characterized in that: include: A collection robot module, which includes a data interface to call data from a resource management system, a manufacturing execution system, and a laboratory information management system as needed; Variety process and batch table, which stores basic information of the variety, including production process, types of raw and auxiliary packaging materials, batches and corresponding production equipment, and theoretical production cycle; The material traceability system establishes the raw materials, auxiliary materials, packaging materials and consumables information corresponding to the finished products based on the resource management system, including material name, batch number, supplier, inspection or release time, storage time, storage time, quantity, packaging specification information, and inspection items of various materials; Cost relationship table, which stores the cost relationship information of unit materials, including cost amount, labor cost amount of different processes, unit electricity and steam cost amount, and capital cost rate; The governance robot module captures and sends data based on the data collected by the collection robot module, and combines the product process and batch table, material traceability system, cost relationship table, calculation rule library and discrimination rule library to form a current value stream map; Calculation rule library, used to store formulas in advance, including calculation formulas for value time and non-value time, various cost calculation formulas, and recovery rate calculation formulas; The analysis robot module has the following functions: calculating the waste of time, labor, materials and energy based on the differences between the ideal value stream map and the current value stream map; performing simulation optimization based on the improvement measures that managers intend to take, and drawing a predictive value stream map for decision-making reference.

6. The pharmaceutical lean production management process automation robot system according to claim 5, characterized in that: The storage contents of the variety process and batch table, cost relationship table, and calculation rule library can be increased, decreased, or modified according to actual conditions.

Citation Information

Patent Citations

  • A production process modeling and product data tracking system

    CN109583762A

  • Cloud intelligent manufacturing platform based on artificial intelligence production management mode, and processing method

    CN113780990A

  • Production line dynamic value flow analysis method and system based on production line dynamic value flow graph

    CN113919813A

  • Intelligent construction informatization integrated management platform

    CN115759637A

  • Lean production method based on digital analysis of industrial simulation software

    CN115857460A

Cited By

  • Drug production cost optimization and prediction system and method based on data analysis

    CN119886472A