A supercapacitor charging and discharging safety protection method and device
By analyzing task requirements, simulating, and predicting environmental indicators for real-time charging and discharging of supercapacitors, environmental interference potential energy is obtained, and charging and discharging strategies are optimized. This solves the performance interference problem of supercapacitors under different environmental conditions and improves safety and efficiency.
Patent Information
- Application Number
- CN202411088464.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-08-09
AI Technical Summary
In existing technologies, the performance of supercapacitors is affected by interference under different environmental conditions, impacting charging and discharging safety and efficiency.
By receiving real-time charging and discharging tasks from the target capacitor, an initial charging and discharging strategy is generated. Charging and discharging tasks are simulated and environmental indicators are predicted under standard conditions. The sequence of changes in capacitor state and environmental indicators is obtained. Synchronous interference analysis is performed to obtain the environmental interference potential energy. The initial charging and discharging strategy is fitted and optimized to obtain the optimal charging and discharging strategy and to dynamically adjust the charging and discharging.
This improved the safety and efficiency of supercapacitors under different environmental conditions and enabled the analysis and compensation of environmental interference.
Smart Images

Figure CN118630877B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of energy storage management, and in particular to a supercapacitor charging and discharging safety protection method and device. Background Art
[0002] Supercapacitors, also known as electrochemical capacitors or ultracapacitors, are energy storage devices that combine the advantages of traditional capacitors and batteries and are able to provide or store large amounts of energy in a short period of time. Appropriate safety protection measures need to be taken during the charging and discharging process to ensure its safe and stable operation, extend its service life, and avoid potential risks.
[0003] However, the performance of supercapacitors may vary significantly in different environments, such as high temperature, low temperature, humidity and other environmental conditions. It is a complex task to protect supercapacitors that adapt to various environmental conditions and ensure their safe operation in various harsh environments. Summary of the invention
[0004] The present application provides a supercapacitor charging and discharging safety protection method and device, which are used to solve the technical problem in the prior art that the performance of the supercapacitor is interfered with under different environmental conditions and affects the charging and discharging safety and efficiency.
[0005] In a first aspect of the present application, a supercapacitor charging and discharging safety protection method is provided, the method comprising: receiving a real-time charging and discharging task of a target capacitor, performing task requirement analysis, and generating an initial charging and discharging strategy; using the initial charging and discharging strategy to simulate the charging and discharging task under a standard environment, and obtaining a capacitor state change sequence for the entire charging and discharging process, the capacitor state change sequence comprising a temperature change sequence and a power parameter change sequence; based on the real-time working environment of the target capacitor, performing environmental indicator prediction, and obtaining an environmental indicator change sequence; performing synchronous interference analysis based on the capacitor state change sequence and the environmental indicator change sequence, and obtaining environmental interference potential energy; based on the environmental interference potential energy, performing fitting optimization of the initial charging and discharging strategy, and obtaining an optimal charging and discharging strategy; referring to the optimal charging and discharging strategy, combined with real-time charging and discharging state data and real-time environmental state data, performing dynamic adjustment of charging and discharging of the target capacitor.
[0006] In a second aspect of the present application, a supercapacitor charging and discharging safety protection device is provided, the device comprising: a task requirement analysis module, the task requirement analysis module is used to receive the real-time charging and discharging task of the target capacitor, perform task requirement analysis, and generate an initial charging and discharging strategy; a charging and discharging task simulation module, the charging and discharging task simulation module is used to use the initial charging and discharging strategy to perform charging and discharging task simulation under a standard environment, and obtain a capacitor state change sequence of the entire charging and discharging process, the capacitor state change sequence includes a temperature change sequence and a power parameter change sequence; an environmental indicator prediction module, the environmental indicator prediction module is used to predict the real-time charging and discharging of the target capacitor based on the target capacitor. working environment, predicting environmental indicators and obtaining a sequence of environmental indicator changes; a synchronous interference analysis module, which is used to perform synchronous interference analysis according to the capacitor state change sequence and the environmental indicator change sequence to obtain environmental interference potential; a charge and discharge strategy fitting optimization module, which is used to perform fitting optimization of the initial charge and discharge strategy based on the environmental interference potential to obtain an optimal charge and discharge strategy; a charge and discharge dynamic adjustment module, which is used to refer to the optimal charge and discharge strategy, combined with real-time charge and discharge state data and real-time environmental state data, to perform dynamic charge and discharge adjustment of the target capacitor.
[0007] One or more technical solutions provided in this application have at least the following technical effects or advantages:
[0008] The present application provides a supercapacitor charging and discharging safety protection method and device, which relate to the field of energy storage management technology. The method and device analyze the task requirements of the real-time charging and discharging tasks of the target capacitor, generate an initial charging and discharging strategy, simulate the charging and discharging tasks and predict the environmental indicators under the standard environment, obtain the capacitor state change sequence and the environmental indicator change sequence, obtain the environmental interference potential energy through synchronous interference analysis, perform fitting optimization of the initial charging and discharging strategy, obtain the optimal charging and discharging strategy, and perform dynamic adjustment of charging and discharging. The technical problems of interference with the performance of supercapacitors under different environmental conditions in the prior art and affecting the safety and efficiency of charging and discharging are solved, and the technical effect of improving the working safety and efficiency of supercapacitors under different environmental conditions through environmental interference analysis and compensation is achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0010] Figure 1A schematic diagram of a supercapacitor charging and discharging safety protection method provided in an embodiment of the present application;
[0011] Figure 2 A schematic diagram of a process for obtaining environmental interference potential energy in a supercapacitor charging and discharging safety protection method provided in an embodiment of the present application;
[0012] Figure 3 A schematic diagram of the structure of a supercapacitor charging and discharging safety protection device provided in an embodiment of the present application.
[0013] Explanation of the reference numerals: task requirement analysis module 11, charge and discharge task simulation module 12, environmental index prediction module 13, synchronization interference analysis module 14, charge and discharge strategy fitting optimization module 15, charge and discharge dynamic adjustment module 16. DETAILED DESCRIPTION
[0014] The present application provides a supercapacitor charging and discharging safety protection method and device, which are used to solve the technical problem in the prior art that the performance of the supercapacitor is interfered with under different environmental conditions and affects the charging and discharging safety and efficiency.
[0015] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0016] It should be noted that the terms "first", "second", etc. in the specification of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product, or server that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or modules that are not clearly listed or inherent to these processes, methods, products, or devices.
[0017] Embodiment 1
[0018] like Figure 1 As shown, the present application provides a supercapacitor charging and discharging safety protection method, the method comprising:
[0019] P10: Receive the real-time charging and discharging tasks of the target capacitor, analyze the task requirements, and generate the initial charging and discharging strategy.
[0020] Specifically, the real-time charge and discharge task of the target capacitor is received. This task is usually issued directly by the upper control system or the user, and contains specific demand parameters, such as target voltage, current, charge and discharge time, number of cycles, etc. These parameters determine the charge and discharge tasks that the supercapacitor needs to complete within a specific time period. Furthermore, the task requirements of the received real-time charge and discharge tasks are parsed, and the charge and discharge task parameters are received and parsed through the task parsing module. The task parsing module has high-precision data processing capabilities and can accurately read and understand various task parameters. At the same time, in order to ensure the correctness and rationality of the task parameters, the received parameters are verified. For example, check whether the target voltage is within the rated range of the capacitor, whether the charging current meets safety standards, etc.
[0021] Furthermore, based on the analyzed task requirements, the current status and historical usage records of the supercapacitor are obtained. By querying the database of the supercapacitor, its recent usage, remaining life and performance parameters can be obtained to provide a basis for strategy formulation, and the initial charge and discharge strategy is formulated through the strategy generation engine. The strategy generation engine combines the technical characteristics, historical data and empirical rules of the supercapacitor to generate a preliminary charge and discharge plan, namely the initial charge and discharge strategy. This strategy includes detailed operating steps, parameter settings and time arrangements for the charging and discharging stages. For example, the initial charge and discharge strategy may stipulate that the first 50% of the charge is performed at a constant current, then charged to the target voltage at a constant voltage, and finally the voltage is maintained for a certain period of time for the buffer stage.
[0022] Exemplarily, when the system receives a charging and discharging task, the task requirement analysis module first analyzes the task parameters in detail. Assume that the task requires charging the supercapacitor to 2.7 volts within 1 hour and discharging it to 1.0 volt thereafter. These parameters are verified by the task analysis module to ensure that they are within the safe operating range of the supercapacitor. Subsequently, the strategy generation engine generates an initial charging and discharging strategy based on the technical specifications and historical data of the capacitor. The strategy stipulates: Charging phase: charge at a constant current of 1 ampere until the voltage reaches 2.5 volts, then switch to constant voltage mode, maintaining a voltage of 2.7 volts until the current drops to 0.1 amperes. Discharging phase: discharge at a constant current of 0.5 amperes until the voltage drops to 1.0 volts.
[0023] P20: Use the initial charge and discharge strategy to simulate the charge and discharge task under a standard environment to obtain a capacitor state change sequence for the entire charge and discharge process, wherein the capacitor state change sequence includes a temperature change sequence and a power parameter change sequence.
[0024] Furthermore, step P20 of the embodiment of the present application further includes:
[0025] P21: Extract standard working environment indicators based on the specification information of the target capacitor; P22: According to the standard working environment indicators, use the initial charge and discharge strategy to simulate the charge and discharge tasks under the standard environment, and record the charge and discharge state data of the simulation process, wherein the charge and discharge state data includes a temperature change sequence and a power parameter change sequence, wherein the power parameter change sequence includes a voltage change sequence, a current change sequence and a power change sequence.
[0026] It should be understood that after the initial charge and discharge strategy is generated, the strategy is used to simulate under standard environmental conditions in order to evaluate the performance and state changes of the supercapacitor. This process aims to understand the performance of the capacitor under ideal conditions and provide data support for subsequent optimization and practical applications. First, based on the specification information of the target capacitor (such as rated voltage, capacity, maximum allowable operating temperature, etc.), by consulting the database or calling the internal algorithm, the standard working environment indicators that match the capacitor are extracted, that is, the ideal working conditions of the supercapacitor in the absence of external interference. These indicators include but are not limited to temperature range, humidity level, air pressure conditions, etc. For example, assuming that the standard environment is room temperature of 25°C, humidity of 50%, and no vibration and electromagnetic interference.
[0027] Furthermore, according to the determined standard working environment indicators, a high-precision simulation model or experimental platform is used to start the simulation verification process of the initial charging and discharging strategy. And during the simulation process, the various state change data of the capacitor are recorded, including the temperature change sequence and the power parameter change sequence. Among them, the temperature change sequence reflects the dynamic change of the temperature of the capacitor during the charging and discharging process, while the power parameter change sequence records in detail the evolution trajectory of key parameters such as voltage, current and power. It is worth noting that the detailed record of the power parameter change sequence is crucial for evaluating the performance of the capacitor. The voltage change sequence reveals the rising and falling trend of the voltage across the capacitor, which helps to judge the charging efficiency and discharge stability. The current change sequence directly reflects the current fluctuation during the charging and discharging process, which is of great significance for preventing overcurrent protection. The power change sequence combines the information of voltage and current, and provides an intuitive display of the energy conversion efficiency of the capacitor during the charging and discharging process.
[0028] Exemplarily, first, the system extracts its standard working environment indicators from the specification database of the supercapacitor, such as: rated voltage of 2.7 volts, maximum current of 10 amperes, and standard ambient temperature of 25°C. Then, these environmental conditions are set in the laboratory to ensure that there is no influence of external interference factors. And according to the initial charge and discharge strategy, the simulation of the charge and discharge task begins. Through high-precision temperature sensors and power parameter monitoring devices, the temperature change sequence and power parameter change sequence during the charge and discharge process are recorded. For example, during the charging process, the temperature sensor shows that the capacitor temperature rises from 25°C to 30°C, the voltage rises from 0 volts to 2.7 volts, the current gradually decreases to 0.1 amperes, and the power drops from 10 watts to 0.27 watts. During the discharge process, the temperature remains stable, the voltage drops from 2.7 volts to 1 volt, the current gradually decreases to 0.5 amperes, and the power drops from 5.4 watts to 0.5 watts.
[0029] By simulating the charging and discharging tasks under a standard environment, comprehensive data on capacitor state changes can be obtained, which can provide an important basis for subsequent environmental interference analysis and optimization of charging and discharging strategies.
[0030] P30: Based on the real-time working environment of the target capacitor, environmental index prediction is performed to obtain an environmental index change sequence.
[0031] Furthermore, step P30 of the embodiment of the present application further includes:
[0032] P31: Obtain the historical working environment change sequence of the target capacitor and the historical meteorological change sequence of the target working area, and obtain the environmental prediction model through fusion analysis and training; P32: Obtain real-time working environment data based on the sensor network of the target capacitor; P33: According to the real-time working environment data, combined with the meteorological big data of the target working area, predict the environmental indicators and obtain the environmental indicator change sequence, which includes but is not limited to temperature change sequence, humidity change sequence and air pressure change sequence.
[0033] Optionally, environmental indicators are predicted based on the real-time working environment of the target capacitor to obtain the environmental indicator change sequence, thereby providing data support for the optimization and adjustment of the charging and discharging strategy. First, the historical working environment change sequence of the target capacitor is collected. These sequences record in detail the fluctuations of environmental parameters such as temperature, humidity, and air pressure that the capacitor has experienced in the past period of time. At the same time, the historical meteorological change sequence of the target working area is obtained, including but not limited to temperature, humidity, wind speed, rainfall, etc., which provides an important reference for predicting the future environment. By fusing and analyzing these two types of data, an environmental prediction model is trained using a machine learning algorithm. The model can predict the environmental change trend in the future period of time based on the input environmental data. Commonly used machine learning algorithms include time series analysis (such as ARIMA model), neural networks (such as LSTM), and random forests. During the model training process, repeated debugging and verification are required to ensure the accuracy and reliability of the prediction.
[0034] Furthermore, the working environment data, including current temperature, humidity, air pressure and other parameters, are obtained in real time through the sensor network of the target capacitor. The sensor network includes multiple sensors deployed around the capacitor, which can collect environmental data in real time and transmit it to the data processing center through a wireless or wired network. At the same time, the meteorological big data of the target working area is obtained, including real-time and predicted data provided by the meteorological department, such as temperature, humidity, air pressure, wind speed and precipitation.
[0035] Furthermore, the real-time environmental data collected by the sensor network is integrated with the meteorological big data to form a comprehensive environmental data set. The environmental prediction model is used to analyze the comprehensive data set to predict the changes in environmental indicators in the future. These indicators include but are not limited to temperature change sequences, humidity change sequences, and air pressure change sequences. It can reflect the environmental change scenarios that the target capacitor will face, providing an important reference for the subsequent optimization of charging and discharging strategies.
[0036] P40: Perform synchronous interference analysis according to the capacitor state change sequence and the environmental indicator change sequence to obtain environmental interference potential energy.
[0037] Further, such as Figure 2 As shown, step P40 of the embodiment of the present application also includes:
[0038] P41: After time synchronization of the capacitor state change sequence and the environmental indicator change sequence, perform environmental indicator influence fusion to obtain a comprehensive state change sequence; P42: Based on the comprehensive state change sequence, draw the capacitor temperature change curve and the power parameter change curve; P43: According to the capacitor temperature change curve and the power parameter change curve, extract the state mutation node; P44: Perform synchronous interference analysis on the state mutation node and calculate and obtain the environmental interference potential energy.
[0039] In a possible embodiment of the present application, synchronous interference analysis is performed according to the capacitor state change sequence and the environmental indicator change sequence to quantify the degree of interference of the environment on the capacitor charging and discharging process and obtain the environmental interference potential. Specifically, first, the capacitor state change sequence and the environmental indicator change sequence are time synchronized. Since the two sequences may come from different data sources or sampling frequencies, direct comparison may have the problem of time misalignment. Therefore, a time synchronization algorithm is used to ensure that the two sequences are strictly corresponding in time, providing an accurate data basis for subsequent analysis. Subsequently, the environmental indicator impact fusion is performed, that is, the change of environmental indicators is incorporated into the consideration of the capacitor state change. The influence of various environmental indicators on the capacitor state can be learned through a mathematical model or a machine learning algorithm, and then a comprehensive state change sequence is calculated based on the capacitor state change sequence and the environmental indicator change sequence. This sequence contains both the state change information caused by the operation of the capacitor itself and the state change influence caused by environmental factors.
[0040] Furthermore, based on the comprehensive state change sequence, the capacitor temperature change curve and the power parameter change curve are drawn. The temperature change curve can show the temperature change of the capacitor during the entire charging and discharging process, and identify the trend of temperature increase or decrease. The power parameter change curve can show the change of voltage, current and power over time, and analyze the power characteristics of the capacitor under different environmental conditions.
[0041] Furthermore, according to the temperature change curve and the power parameter change curve, by analyzing the slope change, peak value and valley value and other characteristics on the curve, the time point when the capacitor state changes drastically is identified, and the state mutation nodes are extracted. These nodes represent the time point when the capacitor state changes significantly. By identifying these nodes, the specific moment when the environmental interference affects the capacitor charging and discharging process can be accurately located.
[0042] Finally, synchronous interference analysis is performed on the state mutation nodes to evaluate the specific impact of environmental condition changes on capacitor performance. Specifically, the state mutation nodes are compared with the corresponding environmental index changes, the degree of interference of environmental conditions on the capacitor at these nodes is analyzed, and the intensity and scope of environmental interference are calculated using potential energy functions or other mathematical models. The impact of environmental interference on capacitor performance is quantified to obtain environmental interference potential energy. This indicator not only reflects the intensity of environmental interference, but also reveals its specific impact mode and path on the charging and discharging process of the capacitor. For example, at a certain node, the temperature of the capacitor suddenly rises from 30°C to 35°C, and the voltage drops from 2.5 volts to 2.3 volts, which indicates that environmental conditions have a significant impact on the capacitor. Synchronous interference analysis is performed on these state mutation nodes, and it is found that the increase in ambient temperature and changes in humidity are the main factors causing changes in capacitor performance. Through the calculation of the potential energy function, the environmental interference potential energy is obtained as the X value, which quantifies the degree of interference of environmental conditions on the capacitor.
[0043] Furthermore, step P41 of the embodiment of the present application further includes:
[0044] P41-1: Through correlation analysis, a correlation influence model between environmental indicators and capacitor status is established; P41-2: Taking the environmental indicator change sequence as the independent variable and the capacitor status change sequence as the dependent variable, the correlation influence model is introduced for analysis to obtain the comprehensive status change sequence.
[0045] Optionally, the specific process of integrating the impact of environmental indicators can be to first use correlation analysis methods in statistics or machine learning, such as the Pearson correlation coefficient, the Spearman rank correlation coefficient, etc., to quantify the degree of correlation between environmental indicators (such as temperature, humidity, air pressure, etc.) and capacitor states (such as voltage, current, temperature, etc.). By analyzing the changing trends and mutual influences between these indicators, environmental indicators that have a significant impact on the capacitor state are identified, and a correlation influence model is established accordingly. This model describes the physical or mathematical relationship of how changes in environmental indicators affect the capacitor state.
[0046] Furthermore, the environmental index change sequence is used as an independent variable, and the capacitor state change sequence is used as a dependent variable, and the previously established correlation influence model is introduced for analysis. Through the operation and reasoning of the model, the response and change data of the capacitor state under different environmental index changes are simulated to obtain a comprehensive state change sequence.
[0047] For example, by performing a correlation analysis, the Pearson correlation coefficient between the ambient temperature and the capacitor temperature is 0.85, indicating that there is a strong positive correlation between the two. Similarly, the correlation coefficient between humidity and voltage change is 0.65, and the correlation coefficient between air pressure and current change is 0.70. Based on these correlation analysis results, a multivariate linear regression model is established as an association influence model, which describes the comprehensive influence of temperature, humidity and air pressure on the capacitor voltage, current and temperature. Then, the real-time monitored ambient temperature, humidity and air pressure data are input into the model as independent variables, and the voltage, current and temperature of the capacitor are analyzed as dependent variables. Through model calculation, a comprehensive state change sequence is obtained, which integrates the actual influence of environmental conditions on the capacitor state.
[0048] Furthermore, step P44 of the embodiment of the present application also includes:
[0049] P44-1: For the state mutation nodes, interference factors are identified respectively to obtain multiple sets of environmental interference factors; P44-2: Based on each state mutation node, combined with the corresponding set of environmental interference factors, environmental interference quantitative calculations are performed respectively to obtain the environmental interference potential energy, which includes environmental interference values of different state mutation nodes.
[0050] Optionally, the specific process of performing synchronous interference analysis may be to first identify interference factors for the identified state mutation nodes, and these interference factors may include a sharp change in temperature, abnormal fluctuations in humidity, sudden rise and fall of air pressure, etc., thereby obtaining multiple sets of environmental interference factors. Each set corresponds to a specific state mutation node, and lists in detail all environmental factors that affect the state change of the capacitor at the node.
[0051] Furthermore, based on each state mutation node and its corresponding set of environmental interference factors, a quantitative calculation of environmental interference is performed. Using a physical model or empirical formula, the change in each interference factor is converted into an impact value on the capacitor state. For example, the heat conduction equation can be used to calculate the impact of temperature changes on the capacitor temperature, or a model of the impact of humidity changes on dielectric properties can be used. By comprehensively considering factors such as the intensity, duration, and mode of action of environmental factors, the environmental interference potential energy at different state mutation nodes, that is, the environmental interference value, can be calculated. These values not only reflect the intensity of environmental interference, but also reveal the specific way and degree of its impact on the capacitor charging and discharging process, which can provide strong data support for subsequent optimization of charging and discharging strategies and improvement of capacitor performance.
[0052] P50: Based on the environmental interference potential energy, the initial charge and discharge strategy is optimized to obtain the optimal charge and discharge strategy.
[0053] Furthermore, step P50 of the embodiment of the present application also includes:
[0054] P51: Based on the environmental interference potential, extract multiple environmental impact indicators of different state mutation nodes and corresponding multiple environmental impact values respectively; P52: Establish an association mapping between the multiple environmental impact indicators and the charge and discharge control parameters; P53: According to the rated range of the charge and discharge control parameters, construct a scheme optimization space; P54: Based on the association mapping and multiple environmental impact values, with the scheme optimization space as a constraint, perform fitting optimization of the initial charge and discharge strategy to obtain the optimal charge and discharge strategy.
[0055] It should be understood that the environmental interference potential is used to perform in-depth fitting optimization of the initial charge and discharge strategy, aiming to find the optimal charge and discharge strategy that can minimize the impact of environmental interference and improve the operating efficiency of the capacitor. Specifically, based on the environmental interference potential, multiple environmental impact indicators and corresponding environmental impact values of different state mutation nodes are extracted. Among them, the environmental impact indicators include environmental parameters such as temperature, humidity, and air pressure. The environmental impact value quantitatively represents the degree of change of each environmental impact indicator at the mutation node. For example, the temperature rises by 10°C and the humidity drops by 15%.
[0056] Furthermore, an association mapping between the multiple environmental impact indicators and the charge and discharge control parameters is established, and the charge and discharge control parameters include charging current, charging voltage, discharge current, discharge voltage, etc. Use regression analysis, machine learning and other technologies to associate the environmental impact indicators with the charge and discharge control parameters to establish a mathematical model or mapping relationship. For example, the impact of ambient temperature on the charging current can be expressed as: in, is the charging current, is the ambient temperature, a and b are the regression coefficients.
[0057] Furthermore, according to the rated range of the charge and discharge control parameters, a solution optimization space is constructed. This space represents the feasible range of the charge and discharge parameters under different environmental conditions. Among them, the rated range can determine the upper and lower limits of each control parameter. For example, the rated range of the charging current is 0.1A to 10A, and the rated range of the charging voltage is 0V to 2.7V. Within these rated ranges, a multi-dimensional solution optimization space is constructed, and each dimension represents the range of variation of a control parameter.
[0058] Finally, based on the association mapping and multiple environmental impact values, the initial charge and discharge strategy is optimized with the solution optimization space as a constraint. The optimal solution is searched in the optimization space through optimization algorithms, such as particle swarm optimization (PSO) and genetic algorithm (GA). For example, using the particle swarm optimization (PSO) algorithm, the charge and discharge parameters are used as particles to perform iterative search in the optimization space. Each particle represents a charge and discharge strategy, and the global optimal solution is found by continuously updating the position. Finally, the optimal charge and discharge strategy is obtained to ensure the safe and efficient operation of supercapacitors under different environmental conditions.
[0059] Furthermore, step P54 of the embodiment of the present application also includes:
[0060] P54-1: Based on the association mapping and multiple environmental impact values, traverse the solution optimization space, perform fitting optimization of the initial charge and discharge strategy, and generate multiple alternative charge and discharge strategies; P54-2: Take the charge and discharge efficiency, charge and discharge cost, and charge and discharge safety level as the optimization objectives, construct an optimization function, optimize the multiple alternative charge and discharge strategies, and obtain the optimal charge and discharge strategy.
[0061] Optionally, the specific process of optimizing the charging and discharging strategy may be to first use a traversal algorithm or an optimization algorithm (such as a particle swarm optimization algorithm) to search for possible charging and discharging strategies in the optimization space, and record the environmental conditions and charging and discharging parameters corresponding to each possible strategy to generate multiple candidate charging and discharging strategies. Furthermore, with charging and discharging efficiency, charging and discharging cost, and charging and discharging safety level as optimization targets, an optimization function is constructed: ; Among them, O is fitness, E is charge and discharge efficiency, C is charge and discharge cost, S is charge and discharge safety level, is the weight coefficient.
[0062] Furthermore, the multiple candidate charging and discharging strategies are respectively substituted into the optimization function for fitness calculation, the system evaluates the comprehensive performance of each strategy, and uses a multi-objective optimization algorithm (such as a genetic algorithm or a particle swarm optimization algorithm) to optimize the multiple candidate charging and discharging strategies. Under the premise of satisfying all constraints, a set of solutions that achieve the best balance between multiple optimization objectives is found. The optimal charging and discharging strategy is selected from the solution set, which achieves the best comprehensive performance between charging and discharging efficiency, cost and safety.
[0063] P60: Referring to the optimal charge and discharge strategy, combined with the real-time charge and discharge status data and the real-time environmental status data, the charge and discharge of the target capacitor are dynamically adjusted.
[0064] Specifically, the charge and discharge of the target capacitor is controlled based on the optimal charge and discharge strategy, and during the control process, the state data and environmental data of the charge and discharge process are monitored in real time, including but not limited to the key parameters of the capacitor such as voltage, current, temperature, and remaining capacity. These data reflect the current operating state and performance of the capacitor and are an important basis for dynamic adjustment.
[0065] According to the optimal charge and discharge strategy, combined with the real-time monitored data, the charge and discharge process is dynamically adjusted, for example, using an adaptive control algorithm or a fuzzy control algorithm to dynamically fine-tune the optimal charge and discharge strategy according to real-time data. For example, at a certain moment, according to the optimal charge and discharge strategy, the system preset charging current should be 3 amperes at an ambient temperature of 30°C, but the real-time monitored ambient temperature is 32°C, then the charging current should be adjusted immediately to avoid the risk of overheating of the equipment. Through real-time monitoring and dynamic adjustment, the effective execution of the optimal charge and discharge strategy is ensured, and it can respond to environmental changes and capacitor state changes in real time, adjust the charge and discharge parameters, improve the safety and efficiency of supercapacitors, and ensure their stable operation in various complex environments.
[0066] In summary, the embodiments of the present application have at least the following technical effects:
[0067] The present application analyzes the task requirements of the real-time charging and discharging tasks of the target capacitor, generates an initial charging and discharging strategy, simulates the charging and discharging tasks and predicts environmental indicators under a standard environment, obtains the capacitor state change sequence and the environmental indicator change sequence, obtains the environmental interference potential through synchronous interference analysis, performs fitting optimization of the initial charging and discharging strategy, obtains the optimal charging and discharging strategy, and performs dynamic adjustment of charging and discharging.
[0068] The technical effect of improving the working safety and efficiency of supercapacitors under different environmental conditions is achieved through environmental interference analysis and compensation.
[0069] Embodiment 2
[0070] Based on the same inventive concept as the supercapacitor charging and discharging safety protection method in the aforementioned embodiment, Figure 3 As shown, the present application provides a supercapacitor charging and discharging safety protection device, and the device and method embodiments in the present application are based on the same inventive concept. Among them, the device includes:
[0071] The task requirement analysis module 11 is used to receive the real-time charging and discharging task of the target capacitor, perform task requirement analysis, and generate an initial charging and discharging strategy.
[0072] The charging and discharging task simulation module 12 is used to use the initial charging and discharging strategy to perform charging and discharging task simulation under a standard environment, and obtain a capacitor state change sequence for the entire charging and discharging process, wherein the capacitor state change sequence includes a temperature change sequence and a power parameter change sequence.
[0073] The environmental indicator prediction module 13 is used to predict the environmental indicators based on the real-time working environment of the target capacitor and obtain an environmental indicator change sequence.
[0074] The synchronous interference analysis module 14 is used to perform synchronous interference analysis according to the capacitor state change sequence and the environmental indicator change sequence to obtain environmental interference potential energy.
[0075] The charging and discharging strategy fitting optimization module 15 is used to perform fitting optimization of the initial charging and discharging strategy based on the environmental interference potential energy to obtain the optimal charging and discharging strategy.
[0076] The charging and discharging dynamic adjustment module 16 is used to refer to the optimal charging and discharging strategy and combine the real-time charging and discharging state data and the real-time environmental state data to perform dynamic charging and discharging adjustment of the target capacitor.
[0077] Furthermore, the charging and discharging task simulation module 12 is also used to perform the following steps:
[0078] Based on the specification information of the target capacitor, standard working environment indicators are extracted; according to the standard working environment indicators, the initial charge and discharge strategy is used to simulate the charge and discharge tasks under the standard environment, and the charge and discharge state data of the simulation process are recorded, wherein the charge and discharge state data include a temperature change sequence and a power parameter change sequence, wherein the power parameter change sequence includes a voltage change sequence, a current change sequence and a power change sequence.
[0079] Furthermore, the environmental indicator prediction module 13 is also used to perform the following steps:
[0080] Obtain the historical working environment change sequence of the target capacitor and the historical meteorological change sequence of the target working area, and obtain the environmental prediction model through fusion analysis and training; obtain real-time working environment data based on the sensor network of the target capacitor; perform environmental indicator prediction based on the real-time working environment data and the meteorological big data of the target working area to obtain the environmental indicator change sequence, which includes but is not limited to the temperature change sequence, the humidity change sequence and the air pressure change sequence.
[0081] Furthermore, the synchronization interference analysis module 14 is further configured to perform the following steps:
[0082] After time synchronization of the capacitor state change sequence and the environmental indicator change sequence, the environmental indicator influence is integrated to obtain a comprehensive state change sequence; based on the comprehensive state change sequence, the capacitor temperature change curve and the power parameter change curve are drawn; according to the capacitor temperature change curve and the power parameter change curve, the state mutation node is extracted; synchronous interference analysis is performed on the state mutation node to calculate and obtain the environmental interference potential energy.
[0083] Furthermore, the synchronization interference analysis module 14 is further configured to perform the following steps:
[0084] Through correlation analysis, a correlation influence model between environmental indicators and capacitor states is established; the environmental indicator change sequence is used as an independent variable, the capacitor state change sequence is used as a dependent variable, the correlation influence model is introduced for analysis, and the comprehensive state change sequence is obtained.
[0085] Furthermore, the synchronization interference analysis module 14 is further configured to perform the following steps:
[0086] For the state mutation nodes, interference factors are identified respectively to obtain multiple sets of environmental interference factors; based on each state mutation node, in combination with the corresponding set of environmental interference factors, environmental interference quantitative calculations are performed respectively to obtain the environmental interference potential energy, which includes environmental interference values of different state mutation nodes.
[0087] Furthermore, the charging and discharging strategy fitting optimization module 15 is also used to perform the following steps:
[0088] Based on the environmental interference potential, multiple environmental impact indicators of different state mutation nodes and corresponding multiple environmental impact values are extracted respectively; an association mapping between the multiple environmental impact indicators and the charge and discharge control parameters is established; according to the rated range of the charge and discharge control parameters, a scheme optimization space is constructed; based on the association mapping and multiple environmental impact values, the initial charge and discharge strategy is fitted and optimized with the scheme optimization space as a constraint to obtain the optimal charge and discharge strategy.
[0089] Furthermore, the charging and discharging strategy fitting optimization module 15 is also used to perform the following steps:
[0090] Based on the association mapping and multiple environmental impact values, the scheme optimization space is traversed to perform fitting optimization of the initial charge and discharge strategy to generate multiple alternative charge and discharge strategies; taking the charge and discharge efficiency, charge and discharge cost, and charge and discharge safety level as optimization targets, an optimization function is constructed to optimize the multiple alternative charge and discharge strategies to obtain the optimal charge and discharge strategy.
[0091] It should be noted that the above-mentioned sequence of the embodiments of the present application is only for description and does not represent the advantages and disadvantages of the embodiments. And the above-mentioned specific embodiments of this specification are described. In addition, the processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0092] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.
[0093] This specification and the drawings are merely exemplary illustrations of the present application and are deemed to cover any and all modifications, variations, combinations or equivalents within the scope of the present application. Obviously, a person skilled in the art may make various modifications and variations to the present application without departing from the scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the present application and its equivalents, the present application intends to include these modifications and variations.
Claims
1. A supercapacitor charging and discharging safety protection method, characterized in that: The method comprises: Receive the real-time charging and discharging tasks of the target capacitor, analyze the task requirements, and generate the initial charging and discharging strategy; Using the initial charge and discharge strategy, a charge and discharge task simulation is performed under a standard environment to obtain a capacitor state change sequence in the entire charge and discharge process, wherein the capacitor state change sequence includes a temperature change sequence and a power parameter change sequence; Based on the real-time working environment of the target capacitor, environmental index prediction is performed to obtain an environmental index change sequence; Perform synchronous interference analysis according to the capacitor state change sequence and the environmental indicator change sequence to obtain environmental interference potential energy; Based on the environmental interference potential energy, performing fitting optimization of the initial charge and discharge strategy to obtain an optimal charge and discharge strategy; Referring to the optimal charge and discharge strategy, combined with real-time charge and discharge status data and real-time environmental status data, dynamically adjust the charge and discharge of the target capacitor; The initial charge and discharge strategy is used to simulate the charge and discharge task under the standard environment to obtain the capacitor state change sequence of the entire charge and discharge process, including: Based on the specification information of the target capacitor, the specification information includes the rated voltage, capacity, and maximum allowable operating temperature, extracting standard operating environment indicators, wherein the standard environment refers to the ideal working conditions of the supercapacitor without external interference, and the indicators include temperature range, humidity level, and air pressure conditions; According to the standard working environment indicator, using the initial charge and discharge strategy, a charge and discharge task simulation under a standard environment is performed, and the charge and discharge state data of the simulation process is recorded, wherein the charge and discharge state data includes a temperature change sequence and a power parameter change sequence, wherein the power parameter change sequence includes a voltage change sequence, a current change sequence, and a power change sequence; Wherein, based on the real-time working environment of the target capacitor, environmental index prediction is performed to obtain an environmental index change sequence, including: Obtain the historical working environment change sequence of the target capacitor and the historical meteorological change sequence of the target working area, and obtain the environmental prediction model through fusion analysis and training; Acquiring real-time working environment data based on a sensor network of the target capacitor; According to the real-time working environment data, combined with the meteorological big data of the target working area, the environmental index is predicted to obtain an environmental index change sequence, which includes but is not limited to a temperature change sequence, a humidity change sequence and an air pressure change sequence; Wherein, performing synchronous interference analysis according to the capacitor state change sequence and the environmental indicator change sequence to obtain environmental interference potential energy includes: After time synchronization of the capacitor state change sequence and the environmental indicator change sequence, environmental indicator influence fusion is performed to obtain a comprehensive state change sequence; Based on the comprehensive state change sequence, plotting a capacitor temperature change curve and a power parameter change curve; Extracting a state mutation node according to the capacitor temperature change curve and the power parameter change curve; Perform synchronous interference analysis on the state mutation node to calculate and obtain environmental interference potential energy; Wherein, based on the environmental interference potential energy, the initial charge and discharge strategy is fitted and optimized to obtain the optimal charge and discharge strategy, including: Based on the environmental interference potential, extracting multiple environmental impact indicators of different state mutation nodes and corresponding multiple environmental impact values; Establishing a correlation mapping between the plurality of environmental impact indicators and charge and discharge control parameters; Constructing a solution optimization space according to the rated range of the charge and discharge control parameters; Based on the association mapping and multiple environmental impact values, the initial charge and discharge strategy is optimized by fitting with the solution optimization space as a constraint to obtain an optimal charge and discharge strategy.
2. A supercapacitor charging and discharging safety protection method as claimed in claim 1, characterized in that: After the capacitor state change sequence and the environmental indicator change sequence are time synchronized, the environmental indicator influence fusion is performed to obtain a comprehensive state change sequence, including: Through correlation analysis, the correlation influence model between environmental indicators and capacitor status is established; The environmental indicator change sequence is used as an independent variable, the capacitor state change sequence is used as a dependent variable, and the correlation influence model is introduced for analysis to obtain the comprehensive state change sequence.
3. A supercapacitor charging and discharging safety protection method as claimed in claim 1, characterized in that: Performing synchronous interference analysis on the state mutation node to calculate and obtain environmental interference potential energy includes: For the state mutation nodes, interference factors are identified respectively to obtain multiple sets of environmental interference factors; Based on each state mutation node, in combination with a corresponding set of environmental interference factors, environmental interference quantitative calculations are performed respectively to obtain the environmental interference potential energy, which includes environmental interference values of different state mutation nodes.
4. A supercapacitor charging and discharging safety protection method as claimed in claim 1, characterized in that: Based on the association mapping and multiple environmental impact values, the initial charge and discharge strategy is optimized by taking the solution optimization space as a constraint to obtain an optimal charge and discharge strategy, including: Based on the association mapping and multiple environmental impact values, traverse the solution optimization space, perform fitting optimization of the initial charge and discharge strategy, and generate multiple alternative charge and discharge strategies; Taking the charging and discharging efficiency, charging and discharging cost, and charging and discharging safety level as optimization objectives, an optimization function is constructed to optimize the multiple alternative charging and discharging strategies to obtain the optimal charging and discharging strategy.
5. A supercapacitor charging and discharging safety protection device, characterized in that: For executing the method according to any one of claims 1 to 4, the device comprises: A task requirement analysis module, the task requirement analysis module is used to receive the real-time charging and discharging task of the target capacitor, perform task requirement analysis, and generate an initial charging and discharging strategy; A charge and discharge task simulation module, wherein the charge and discharge task simulation module is used to use the initial charge and discharge strategy to perform charge and discharge task simulation under a standard environment, and obtain a capacitor state change sequence in the entire charge and discharge process, wherein the capacitor state change sequence includes a temperature change sequence and a power parameter change sequence; An environmental indicator prediction module, the environmental indicator prediction module is used to predict the environmental indicators based on the real-time working environment of the target capacitor and obtain an environmental indicator change sequence; A synchronous interference analysis module, the synchronous interference analysis module is used to perform synchronous interference analysis according to the capacitor state change sequence and the environmental indicator change sequence to obtain environmental interference potential energy; A charging and discharging strategy fitting optimization module, wherein the charging and discharging strategy fitting optimization module is used to perform fitting optimization of the initial charging and discharging strategy based on the environmental interference potential energy to obtain an optimal charging and discharging strategy; A charge and discharge dynamic adjustment module is used to refer to the optimal charge and discharge strategy and combine the real-time charge and discharge state data and the real-time environmental state data to perform dynamic charge and discharge adjustment of the target capacitor.
