A rainwater and sewage classification drainage system for urban underground pipelines
By introducing a dynamic management terminal and filtering mechanism into the rainwater and sewage diversion system, the status of the drainage pipes is adjusted according to the weather and water level conditions, which solves the problem of untimely drainage during heavy rains, realizes rapid rainwater discharge and sewage classification processing, and improves the overall system Performance and maintenance efficiency.
Patent Information
- Application Number
- CN202411096849.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-08-12
AI Technical Summary
During heavy rains, the existing rainwater and sewage diversion system cannot effectively utilize sewage drainage pipes for synergy, resulting in delayed drainage.
A rainwater and sewage classified drainage system including a rainwater drainage unit, a management terminal and a sewage drainage unit is designed. By setting up a sewage tank, filtering mechanism, water level sensor and weather forecast system, and using components such as preliminary rainwater pipes and segmented valves, the system is designed according to the ground Water levels and weather conditions dynamically adjust the status of rainwater and sewage pipes to achieve rapid rainwater drainage and sewage classification treatment.
The drainage system can be dynamically adjusted according to the weather and ground water level conditions to ensure rapid drainage of rainwater. It also reduces the maintenance needs of sewage pipes through the sewage tank and filtering mechanism, improving the efficiency of sewage classification and discharge and the overall performance of the system.
Smart Images

Figure CN118639726B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of rainwater and sewage separation, and in particular to a rainwater and sewage classification drainage system for urban underground pipelines. Background Art
[0002] In order to solve the problem of orderly discharge of rainwater and domestic sewage, the prior art adopts independent drainage systems for classified discharge. For example, the patent with publication number CN114263257A discloses a rainwater and sewage diversion system, which includes sewage pipes, rainwater pipes, and wastewater pipes; the sewage pipes, rainwater pipes, and wastewater pipes are all buried underground in the street; the septic tank of the building unit is connected to the sewage pipe; the rainwater riser of the building unit is connected to the rainwater pipe; the kitchen drain pipe, combined riser and sewage riser of the building unit are connected to the wastewater pipe. Three sets of drainage pipes are used for rainwater, sewage and wastewater, which respectively collect rainwater, domestic sewage (effluent from septic tanks), and domestic wastewater (washing, kitchen and shower drainage except effluent from septic tanks). The water is collected and discharged strictly according to the water quality. Among them, the ground and roof rainwater directly enters the rainwater pipe through the rainwater grate on the road surface, and is discharged to the rainwater main pipe, drainage facilities or natural water bodies outside the road; the effluent from the septic tank of the building unit enters an independent sewage pipe, which is not connected to the domestic wastewater pipe, so as to prevent the odor of the septic tank from flowing back into the room and effectively solve the problem of odor. However, the following problems still exist:
[0003] In the case of heavy rain, timely drainage is required and sewage drainage pipes cannot play a synergistic role. Summary of the invention
[0004] The purpose of the present invention is to provide a rainwater and sewage classification drainage system for urban underground pipelines to solve the above problems.
[0005] To achieve the above-mentioned purpose, the present invention provides a rainwater and sewage classification drainage system for urban underground pipelines, including a rainwater drainage unit, a management terminal and a sewage unit, the sewage unit including a sewage tank, the sewage branch pipes of the building unit are all connected to the sewage tank, the bottom of the sewage tank is connected to the sewage main pipe through a sewage valve, the sewage main pipe is also connected to a number of reserve rainwater pipes through a reserve valve, the tail end of the reserve rainwater pipe is arranged opposite to the inner river; a number of section valves are arranged on the sewage main pipe; the rainwater unit includes a rainwater main pipe, one end of the rainwater main pipe is arranged opposite to the inner river, the other end of the rainwater main pipe is connected to the rainwater riser of the building unit, and the rainwater main pipe is connected to a rainwater well on the ground; a rainwater branch pipe is arranged on the side of the rainwater well, a connecting rainwater valve is arranged on the rainwater branch pipe, and the rainwater branch pipe is connected to the sewage main pipe; the sewage valve, the section valve and the connecting rainwater valve are all electrically connected to the management terminal.
[0006] Preferably, a first water level sensor and a water quality sensor are provided in the sewage tank, the management terminal, the first water level sensor and the water quality sensor are connected to a control terminal, and the control terminal is electrically connected to the management terminal.
[0007] Preferably, a filtering mechanism is provided in the sewage tank, the filtering mechanism includes a filter plate, one end of the filter plate is fixed to one side of the sewage tank by a spring plate, and a telescopic electric push rod is hinged on the other side of the sewage tank, the top of the telescopic electric push rod is hinged to the filter plate, and the telescopic electric push rod is connected to the control terminal.
[0008] Preferably, two arc-shaped rails are arranged in parallel on the side of the other side of the sewage tank, the bottom of the arc-shaped rail is wavy, and a guide rod is arranged on the buoyancy filter plate, and the guide rod is arranged in the arc-shaped guide rail.
[0009] Preferably, a sewage discharge door is provided on one side of the sewage tank, a sewage storage chamber is provided on the outside of the sewage discharge door, a distance sensor is provided on the top of the sewage storage chamber through a mounting frame, a screw conveyor is provided at the bottom of the sewage storage chamber, and both the distance sensor and the screw conveyor are electrically connected to the control terminal; after filtering for a set time, the sewage discharge door is opened, and the telescopic electric push rod is started to shrink, so that the filter plate is tilted, and during the tilting process of the filter plate, the filter plate vibrates under the action of the arc guide rail, so that the debris on the filter plate enters the sewage storage chamber, and when the debris in the sewage storage chamber reaches a set height, the debris is discharged through the screw conveyor.
[0010] Preferably, a second water level sensor is provided on the rainwater grate at the top of the rain drain well, and the second water level sensor is electrically connected to the management terminal.
[0011] Preferably, the management terminal is electrically connected to the weather forecast system for acquiring forecast weather data, determining whether to start the second water level sensor based on the forecast weather data, and starting the second water level sensor to monitor the ground water level when the rainfall in the forecast weather data reaches a set value.
[0012] Preferably, classified rainwater discharge and sewage discharge are performed based on the ground water level data detected by the second water level sensor.
[0013] Preferably, when the water level detected by the second water level sensor is less than or equal to the set value, the sewage main pipe and the rainwater main pipe discharge sewage and rainwater respectively independently. Sewage is discharged through the sewage main pipe, the sewage valve and the section valve are in the open state, and the preparatory valve is in the closed state; rainwater is discharged through the rainwater main pipe, and the connecting rainwater valve is in the closed state.
[0014] Preferably, when the water level detected by the second water level sensor is greater than the set value, both the sewage main pipe and the rainwater main pipe drain rain; the control terminal obtains data from the first water level sensor, and when the water level detected by the first water level sensor is less than or equal to the set value, the sewage main pipe stops discharging sewage, the sewage valve is in a closed state, and the corresponding connected rainwater valve is started to flush the sewage main pipe in the water accumulation section for a set time. After the flushing is completed, the corresponding section valve is closed and the corresponding preparatory valve is opened to drain rainwater through the preparatory rainwater pipe and the rainwater main pipe; when the water level detected by the first water level sensor is greater than the set value, the section valve is opened, and the connected rainwater valve and the preparatory valve are closed in turn, and then the sewage valve is opened.
[0015] Therefore, the present invention adopts the above-mentioned rainwater and sewage classification drainage system for urban underground pipelines, which has the following beneficial effects:
[0016] (1) According to weather conditions and ground waterlogging, activate the reserve rainwater drainage pipe to achieve rapid drainage of rainwater in the corresponding area.
[0017] (2) A sewage tank is set up to temporarily store sewage, making it easier to classify rainwater and sewage and discharge them. At the same time, a filtering mechanism is set up to prevent too much debris from entering the sewage main and reduce the maintenance of the sewage main.
[0018] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a schematic diagram of the structure of a rainwater and sewage classification drainage system for urban underground pipelines according to the present invention;
[0020] Figure 2 This is a schematic diagram of the sewage tank structure of the present invention;
[0021] Figure 3 It is a schematic diagram of the arc track structure of the present invention.
[0022] Reference numerals
[0023] 1. Rainwater drainage unit; 11. Rainwater drainage main pipe; 12. Rainwater drainage riser; 13. Rainwater drainage well; 14. Rainwater drainage branch pipe; 15. Connecting rainwater drainage valve; 16. Second water level sensor;
[0024] 2. Sewage unit; 21. Sewage tank; 22. Sewage branch pipe; 23. Sewage main pipe; 24. Sewage valve; 25. Section valve; 26. First water level sensor; 27. Water quality sensor; 28. Sewage door;
[0025] 3. Prepare rainwater drainage pipe; 31. Prepare valve;
[0026] 4. Filter mechanism; 41. Filter plate; 42. Spring plate; 43. Telescopic electric push rod; 44. Arc track; 45. Guide rod; 46. Wave bottom;
[0027] 5. Dirt storage chamber; 6. Screw conveyor; 7. Distance sensor. Specific implementation methods
[0028] Example
[0029] In the description of the present invention, it should be noted that the terms "upper", "lower", "inside", "outside", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the invented product is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In the description of the present invention, it should also be noted that, unless otherwise clearly specified and limited, the terms "set", "install", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0030] The embodiments of the present invention are described in detail below in conjunction with the accompanying drawings.
[0031] like Figure 1 As shown, a rainwater and sewage classification drainage system for urban underground pipelines includes a rainwater drainage unit 1, a management terminal (not shown) and a sewage drainage unit 2. The sewage drainage unit 2 includes a sewage tank 21. The sewage branch pipes 22 of the building unit are all connected to the sewage tank. The bottom of the sewage tank is connected to the sewage main pipe 23 through a sewage valve 24. The sewage main pipe 23 is also connected to a plurality of reserve rainwater drainage pipes 3 through a reserve valve 31. The tail end of the reserve rainwater drainage pipe 3 is arranged opposite to the inner river. The sewage main pipe 23 is provided with a plurality of branch pipes 22. Section valve 25; the rain drainage unit 1 includes a rain drainage main pipe 11, one end of which is arranged opposite to the inner river, and the other end of the rain drainage main pipe 11 is connected to the rain drainage riser 12 of the building unit, and the rain drainage main pipe 11 is connected to the rain drainage well 13 on the ground; a rain drainage branch pipe 14 is arranged on the side of the rain drainage well 13, and a connecting rain drainage valve 15 is arranged on the rain drainage branch pipe 14, and the rain drainage branch pipe 14 is connected to the sewage main pipe 23; the sewage valve 24, the section valve 25 and the connecting rain drainage valve 15 are all electrically connected to the management terminal.
[0032] like Figure 2As shown, a first water level sensor 26 and a water quality sensor 27 are provided in the sewage tank 21. The management terminal, the first water level sensor 26 and the water quality sensor 27 are connected to a control terminal (not shown in the figure). The control terminal is electrically connected to the management terminal. The corresponding sensors and control terminals are conventionally set in the field and will not be described in detail here. A filtering mechanism 4 is provided in the sewage tank 21. The filtering mechanism 4 includes a filter plate 41. One end of the filter plate 41 is fixed to one side of the sewage tank 21 by a spring plate 42. The spring plate 42 includes a fixed plate and a plurality of springs arranged on the fixed plate. An elastic metal plate, such as spring steel, is also provided on the fixed plate. While playing a supporting role, it can cause the filter plate 41 to deform when it is tilted. A telescopic electric push rod 43 is hinged on the other side of the sewage tank 21. The top of the telescopic electric push rod 43 is hinged to the filter plate 41. The telescopic electric push rod 43 is connected to the control terminal to realize the tilting and leveling of the filter plate 41. As shown Figure 3 As shown, two arc-shaped rails 44 are arranged in parallel on the side of the other side of the sewage tank 21, and the bottom of the arc-shaped rail 44 is wavy. A guide rod 45 is arranged on the buoyancy filter plate 41, and the guide rod 45 is arranged in the arc-shaped rail. A sewage discharge door 28 is arranged on one side of the sewage tank 21, and a sewage storage chamber 5 is arranged outside the sewage discharge door 28. A distance sensor 7 is arranged on the top of the sewage storage chamber 5 through a mounting frame to detect the height of the debris in the sewage storage chamber 5. A screw conveyor 6 is arranged at the bottom of the sewage storage chamber 5 for conveying debris. The distance sensor 7 and the screw conveyor 6 are both electrically connected to the control terminal. After filtering for a set time, the sewage discharge door 28 is opened, and the telescopic electric push rod 43 is started to shrink, so that the filter plate 41 tilts, and during the tilting process of the filter plate 41, it vibrates under the action of the wavy bottom 46 of the arc-shaped rail, so that the debris on the filter plate 41 enters the sewage storage chamber 5. When the debris in the sewage storage chamber 5 reaches the set height, the debris is discharged through the screw conveyor 6.
[0033] A second water level sensor 16 is provided on the rainwater grate at the top of the rainwater drain well 13. The second water level sensor 16 is electrically connected to the management terminal for monitoring the height of the ground water level.
[0034] The management terminal is electrically connected to the weather forecast system, and is used to obtain forecast weather data, and determine whether to start the second water level sensor 16 according to the forecast weather data. When the rainfall in the forecast weather data reaches the set value, the second water level sensor 16 is started to monitor the ground water level. Rainwater and sewage are classified according to the ground water level data detected by the second water level sensor 16. When the water level detected by the second water level sensor 16 is less than or equal to the set value, the sewage main pipe 23 and the rain main pipe 11 are used to discharge sewage and rain respectively and independently. Sewage is discharged through the sewage main pipe 23, the sewage valve 24 and the sectional valve 25 are in an open state, and the preparatory valve 31 is in a closed state; rainwater is discharged through the rain main pipe 11, and the connected rain valve 15 is in a closed state. When the water level detected by the second water level sensor 16 is greater than the set value, both the sewage main pipe 23 and the rainwater main pipe 11 drain rainwater; the control terminal obtains the data of the first water level sensor 26, and when the water level detected by the first water level sensor 26 is less than or equal to the set value, the sewage main pipe 23 stops discharging sewage, the sewage valve 24 is in a closed state, and the corresponding connected rainwater valve 15 is started to flush the sewage main pipe 23 in the water accumulation section for a set time. After flushing, the corresponding section valve 25 is closed and the corresponding preparatory valve 31 is opened to drain rainwater through the preparatory rainwater pipe 3 and the rainwater main pipe 11; when the water level detected by the first water level sensor 26 is greater than the set value, the section valve 25 is opened, and the connected rainwater valve 15 and the preparatory valve 31 are closed in turn, and then the sewage valve 24 is opened.
[0035] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that they can still modify or replace the technical solution of the present invention with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the present invention.
Claims
1. A rainwater and sewage classification drainage system for urban underground pipelines, comprising a rainwater drainage unit and a management terminal, characterized in that: It also includes a sewage unit, which includes a sewage tank, and the sewage branch pipes of the building unit are all connected to the sewage tank. The bottom of the sewage tank is connected to the sewage main pipe through a sewage valve. The sewage main pipe is also connected to a number of preparatory rain drainage pipes through a preparatory valve, and the tail end of the preparatory rain drainage pipe is arranged opposite to the inner river; a number of section valves are arranged on the sewage main pipe; the rain drainage unit includes a rain drainage main pipe, one end of the rain drainage main pipe is arranged opposite to the inner river, and the other end of the rain drainage main pipe is connected to the rain drainage riser of the building unit, and the rain drainage main pipe is connected to the rain drainage well on the ground; a rain drainage branch pipe is arranged on the side of the rain drainage well, and a connecting rain drainage valve is arranged on the rain drainage branch pipe, and the rain drainage branch pipe is connected to the sewage main pipe; the sewage valve, the section valve and the connecting rain drainage valve are all electrically connected to the management terminal; A first water level sensor and a water quality sensor are arranged in the sewage tank, and the management terminal, the first water level sensor and the water quality sensor are connected to a control terminal, and the control terminal is electrically connected to the management terminal; A filtering mechanism is provided in the sewage tank, and the filtering mechanism includes a filtering plate, one end of the filtering plate is fixed to one side of the sewage tank through a spring plate, and a telescopic electric push rod is hinged on the other side of the sewage tank, the top of the telescopic electric push rod is hinged to the filtering plate, and the telescopic electric push rod is connected to the control terminal; Two arc tracks are arranged in parallel on the side of the other side of the sewage tank, the bottom of the arc track is wavy, and a guide rod is arranged on the buoyancy filter plate, and the guide rod is arranged in the arc guide rail.
2. A rainwater and sewage classification drainage system for urban underground pipelines according to claim 1, characterized in that: A sewage discharge door is provided on one side of the sewage tank, a sewage storage chamber is provided on the outside of the sewage discharge door, a distance sensor is provided on the top of the sewage storage chamber through a mounting frame, a screw conveyor is provided at the bottom of the sewage storage chamber, and both the distance sensor and the screw conveyor are electrically connected to the control terminal; after filtering for a set time, the sewage discharge door is opened, and the telescopic electric push rod is started to shrink it, so that the filter plate is tilted, and during the tilting process of the filter plate, it vibrates under the action of the arc guide rail, so that the debris on the filter plate enters the sewage storage chamber, and when the debris in the sewage storage chamber reaches the set height, the debris is discharged through the screw conveyor.
3. A rainwater and sewage classification drainage system for urban underground pipelines according to claim 2, characterized in that: A second water level sensor is arranged on the rainwater grate at the top of the rainwater drain well, and the second water level sensor is electrically connected to the management terminal.
4. A rainwater and sewage classification drainage system for urban underground pipelines according to claim 3, characterized in that: The management terminal is electrically connected to the weather forecast system for obtaining forecast weather data and determining whether to start the second water level sensor based on the forecast weather data. When the rainfall in the forecast weather data reaches a set value, the second water level sensor is started to monitor the ground water level.
5. A rainwater and sewage classification drainage system for urban underground pipelines according to claim 4, characterized in that: Classify rainwater and sewage discharge according to the ground water level data detected by the second water level sensor.
6. A rainwater and sewage classification drainage system for urban underground pipelines according to claim 5, characterized in that: When the water level detected by the second water level sensor is less than or equal to the set value, the sewage main pipe and the rainwater main pipe discharge sewage and rainwater respectively independently. Sewage is discharged through the sewage main pipe, the sewage valve and the section valve are in the open state, and the preparatory valve is in the closed state; rainwater is discharged through the rainwater main pipe, and the connecting rainwater valve is in the closed state.
7. A rainwater and sewage classification drainage system for urban underground pipelines according to claim 6, characterized in that: When the water level detected by the second water level sensor is greater than the set value, both the sewage main pipe and the rain main pipe will drain rain; the control terminal obtains the data of the first water level sensor, and when the water level detected by the first water level sensor is less than or equal to the set value, the sewage main pipe stops discharging sewage, the sewage valve is in a closed state, and the corresponding connected rain drain valve is started to flush the sewage main pipe in the water accumulation section for a set time. After the flushing is completed, the corresponding sectional valve is closed and the corresponding preparatory valve is opened to drain rain through the preparatory rain drain pipe and the rain main pipe; when the water level detected by the first water level sensor is greater than the set value, the sectional valve is opened, and the connected rain drain valve and the preparatory valve are closed in turn, and then the sewage valve is opened.
