Connector, building element and construction method
Through the interference fit of the locking groove and the clamping head and the design of the clamping and wedge-shaped shear blocks, the problem of low construction efficiency in the existing technology is solved, and the rapid and stable connection of building components is achieved, and the construction efficiency and connection are improved. Resistance performance of nodes.
Patent Information
- Application Number
- CN202411097249.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2024-06-28
- Filing Date
- 2024-08-12
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-08-12
AI Technical Summary
In the construction of existing prefabricated buildings, the connection points need to be connected with slurry, resulting in low construction efficiency. You must wait for the concrete to reach a certain strength or rely on support frames and formwork before the next layer is constructed.
Using connectors including locking grooves and clamping heads, the quick connection of building components is achieved through the interference fit of locking grooves and fasteners, avoiding the use of slurry, and using hoops and wedge-shaped shear blocks to improve the tensile resistance of the connecting nodes. and shear bearing capacity.
The next process construction is carried out without waiting for the slurry to consolidate, which improves construction efficiency and forms rigid connections between components through the shear structure, simplifying the construction process.
Smart Images

Figure CN118639761B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of building connection, and in particular to a connection piece, a building component and a construction method. Background Art
[0002] At present, the connection points of prefabricated building components during the construction process generally need to be connected with grout. For example, after the grouting sleeve is connected to the exposed steel bars of the prefabricated component, the grouting sleeve needs to be filled with grout. For another example, the concrete slurry is cast in place in the core area of the node where the beam and column are connected. Alternatively, the upper part of the composite beam usually also needs to be cast in place with concrete slurry.
[0003] Therefore, the above connection method must wait until the concrete reaches a certain strength or with the help of support frames and formwork before the next layer of construction can be carried out, which affects the construction efficiency. Summary of the invention
[0004] In order to improve construction efficiency, the present application provides a connector, a building component and a construction method.
[0005] The first technical purpose provided by the present application is to provide a connector adopting the following technical solution: the connector is characterized in that: it includes:
[0006] The first connecting portion comprises at least one locking groove, at least one side of the locking groove is provided with an entrance, and the notch of the locking groove is smaller than the internal cavity;
[0007] The second connecting part includes a number of clamps corresponding to the locking grooves,
[0008] The clamp head can enter the locking groove from the entrance of the locking groove, but is restricted from leaving the groove opening, and at least one area between the clamp head and the groove bottom or the groove opening of the locking groove is interference-fitted with a locking insert.
[0009] By adopting the above technical solution, the first connection part is connected to a building component, the second connection part is connected to another building component, and then the clamp of the second connection part is inserted into the locking groove of the first connection part, and then a locking insert with a suitable size is selected and inserted into at least one area between the clamp and the groove bottom or notch of the locking groove to achieve interference fit, so that the first connection part and the second connection part can be firmly connected. Therefore, compared with the prior art, the connection of building components using the first connection part and the second connection part in the present application can be achieved without using slurry, and thus there is no need to wait for the slurry to solidify, thereby speeding up the construction speed and improving the construction efficiency.
[0010] Optionally: the first connecting part includes a first clamp, and a locking groove is provided on two opposite sides of the first clamp; the second connecting part includes a second clamp, and a clamp is provided on two opposite sides of the second clamp.
[0011] By adopting the above technical solution, the first hoop and the second hoop are used to surround the ends of the building components to be connected. The setting of the hoop can fix the relative positions of the two locking grooves and the clamps, preventing the relative positions of the locking grooves and the clamps from changing during the process of being installed on the ends of the first component or the second component, thereby affecting the subsequent splicing connection.
[0012] Optionally, the ends of the first hoop and the second hoop are tilted, the upper and lower locking grooves of the first hoop are staggered accordingly, and the position of the clamp on the second hoop is corresponding to the position of the locking groove on the first hoop.
[0013] By adopting the above technical solution, the inclined ends of the first clamp and the second clamp are used to adapt to the inclination of the ends of the building components to be connected.
[0014] Optionally: a fastener is provided at the slot, and the fastener passes through one side wall of the locking slot and the first connecting portion located in the slot and then is connected to the other side wall of the locking slot.
[0015] By adopting the above technical solution, the fastener locks both sides of the notch, strengthens the structural strength of the notch, and prevents the notch from lateral deformation under the tension of the clamp, thereby improving the tensile bearing capacity of the connection node.
[0016] Optionally: the first connecting portion through which the fastener passes is configured as a long hole.
[0017] By adopting the above technical solution, the setting of the long hole can make the depth of the clamp head inserted into the locking groove adjustable, so that the connection between the first connecting part and the second connecting part has a certain tolerance.
[0018] Optionally: a first convex plate and a first groove are respectively provided on both sides between the two pairs of locking grooves on the first clamp, and a second convex plate and a second groove are respectively provided on both sides between the two pairs of clamps on the second clamp, wherein the first convex plate and the second groove are provided with a first convex plate tooth that is compatible with the periphery of the first convex plate and the second groove, and the second convex plate and the first groove are provided with a second convex plate tooth that is compatible with the periphery of the second convex plate.
[0019] By adopting the above technical solution, when the first connecting part and the second connecting part are both connected to the two parts of the building components used to constitute the beam, the first convex plate is snap-connected with the second groove, and the second groove can support the first convex plate; the second convex plate is snap-connected with the first groove, and the first groove can support the second convex plate, thereby forming the shear bearing capacity of the connection node.
[0020] Optionally: a grouting hole or an overflow hole is provided on the first convex plate or the second convex plate.
[0021] By adopting the above technical solution, after the building components to which the first connection part and the second connection part are attached are installed, a filling cavity is formed between the two building components and inside the first connection part and the second connection part. The filling cavity can be filled densely by injecting slurry into the grouting hole, so that the connection node has a higher shear bearing capacity.
[0022] The second technical purpose provided by the present application is to provide a building component adopting the following technical solution: comprising the aforementioned connecting piece, including a first component segment and a second component segment, and the first connecting part and the second connecting part are correspondingly surrounded and arranged at the ends of the first component segment and the second component segment.
[0023] By adopting the above technical solution, the first connecting part is connected to the second connecting part, and then a locking strip is inserted between the bottom or notch of the locking groove of the first connecting part and the clamping head to achieve a quick connection between the first component section and the second component section. Therefore, there is no need to use slurry for reinforcement, that is, there is no need to wait for the slurry to solidify before continuing the next construction process, which speeds up the construction speed and improves the construction efficiency.
[0024] Optionally: a filling cavity is formed between the ends of the first component segment and the second component segment, and the filling cavity is a cavity that opens obliquely upward, and the filling cavity is larger at the top and smaller at the bottom.
[0025] Optionally: a wedge-shaped anti-shear block adapted to the shape of the filling cavity is arranged in the filling cavity, and the trapezoidal anti-shear block is in contact with the ends of the first component segment and the second component segment.
[0026] By adopting the above technical scheme, there will inevitably be construction errors in the distance between the two first component sections in actual construction, so the length of the second component section needs to be made smaller than the net distance between the two first component sections, so that a filling cavity is formed between the ends of the first and second component sections to accommodate the distance error between the two first component sections generated during construction; the contact surface slope of the wedge-shaped shear block matches that of the filling cavity, and the wedge-shaped shear block is inserted from the larger opening at the top of the filling cavity, and then moved to the smaller lower part of the filling cavity until the wedge-shaped shear block is in close contact with the side wall of the filling cavity, so that the second component transmits the vertical force to the first component through the wedge-shaped shear block, thereby forming the shear bearing capacity of the connecting node.
[0027] Optionally: both ends of the second component segment are correspondingly connected to the first component segment, the distance between the opposite surfaces of the two first component segments is larger at the top and smaller at the bottom, and the size of the second component segment along the direction of the connecting line between the first and second components is larger at the top and smaller at the bottom.
[0028] By adopting the above technical solution, since the length dimension of the second member is larger at the top and larger at the bottom, the distance between the two first member sections is larger at the top and smaller at the bottom. Therefore, when the second member has a downward movement tendency under the action of its own gravity or external load, the contact ends of the second member and the two first members tend to be squeezed. Therefore, the inclined setting of the end of the first member and the end face of the second member is beneficial to the improvement of the shear bearing capacity of the connection node.
[0029] Optionally: the first clamp and the second clamp are butt-jointed and enclose the filling cavity, a first convex plate and a first groove are respectively provided on both sides of the first clamp, and a second convex plate and a second groove are respectively provided on both sides of the second clamp, wherein the first convex plate is accommodated in the second groove, and the second convex plate is accommodated in the first groove.
[0030] Optionally, the filling cavity is filled with filler.
[0031] The third technical purpose provided by the present application is to provide a construction method using the following technical solution: comprising the following steps:
[0032] S1: Setting the first component segment;
[0033] S2: Arrange the second component segment so that the corresponding first connecting portion is connected to the second connecting portion;
[0034] S3: Using a fastener to pass through one side wall of the locking groove and the first connecting portion located in the groove and then connect to the other side wall of the locking groove;
[0035] S4: providing a locking strip by interference fit in at least one area between the clamp head and the bottom or notch of the locking groove;
[0036] Optionally: also includes S5: arranging a wedge-shaped anti-shear block in the filling cavity, and making the wedge-shaped anti-shear block contact with the end inclined surfaces of the first component segment and the second component segment.
[0037] Optionally: comprising S5: allowing the first protruding plate to be accommodated in the second groove, and the second protruding plate to be accommodated in the first groove;
[0038] S6: Filling the filling cavity with slurry.
[0039] The beneficial effects of the present invention are:
[0040] 1. A locking groove is provided on the upper and lower parts of the first connecting part, and a connecting clamp matched with the locking groove of the first connecting part is provided on the upper and lower parts of the second connecting part. After the clamp is slid into the cavity of the locking groove from the side entrance of the locking groove and put into place, the compression and tensile bearing capacity of the connection between the first connecting part and the second connecting part can be achieved by means of the locking strip and the notch fastener. The first and second connecting parts are installed at the ends of the first and second components, and the bending bearing capacity of the component connection can be formed by the connection of the first and second connecting parts;
[0041] 2. The length of the second component is smaller than the distance between the ends of the two first components. This setting has a certain tolerance for the errors in the construction and installation positions of the components and the distance between the components that must exist in practice.
[0042] 3. The ends of the first member and the second member are arranged to form inclined surfaces with different slopes to form an inclined "V-shaped" cavity of the same size, and then a wedge-shaped shear block is arranged in the cavity. Such a connection structure can form an effective shear bearing capacity between the two members;
[0043] Through the above scheme, the connection between the two prefabricated components has bending and shear bearing capacity, so that a rigid connection between the components can be formed. Therefore, it is not necessary to rely on secondary grouting during the construction process, so continuous installation and construction are possible. Compared with the connection method of pre-embedded steel sleeves and secondary grouting in the background technology, it is more convenient and efficient, and the construction efficiency is improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 This is a schematic diagram of the structure when the first connecting part and the second connecting part of the present application are connected.
[0045] Figure 2 for Figure 1 Schematic diagram of the enlarged structure at point A in the middle.
[0046] Figure 3 This is a schematic diagram of the structure of the connecting groove, the clamp head and the locking strip of the present application.
[0047] Figure 4 This is a schematic diagram of the structure when the first connecting part and the second connecting part of the present application are separated.
[0048] Figure 5 This is a structural schematic diagram when the first connecting part and the second connecting part of the present application have a shear-resistant structure.
[0049] Figure 6 This is a structural schematic diagram of the first connecting part, the second connecting part and the building component of the present application being connected through a wedge-shaped shear block.
[0050] Figure 7 This is a schematic diagram of the structure when the ends of the first connecting section and the second connecting section of the present application are in a step shape.
[0051] Figure 8 This is a structural schematic diagram of the first connecting part and the second connecting part of the present application having a shear-resistant structure and being connected to a building component.
[0052] Fig. 9 This is a schematic diagram of the latch structure at the connection between the convex plate and the concave groove of the present application.
[0053] Description of reference numerals:
[0054] 1. First connecting part; 2. Second connecting part; 3. Locking groove; 4. Clamp; 5. Second connecting plate; 6. Notch; 7. First locking cavity; 8. Second locking cavity; 9. Fastener; 10. Connecting hole; 11. Long hole; 12. First clamp; 13. First side plate; 14. First connecting plate; 15. Second clamp; 16. Second side plate; 17. Grouting hole; 18. Overflow hole; 19. Filling cavity; 20. First convex plate; 201. First convex plate clamping tooth; 21. First groove; 211. First groove clamping tooth; 22. Second convex plate; 221. Second convex plate clamping tooth; 23. Second groove; 231. Second groove clamping tooth; 24. First component section; 25. Second component section; 26. Wedge-shaped shear block; 27. First locking insert; 28. Second locking insert; 29. Lower step groove; 30. Upper step groove. DETAILED DESCRIPTION
[0055] The following is combined with Figure 1-9 This application is described in further detail.
[0056] like Figure 1 As shown, the connector disclosed in the present application includes a first connecting part 1 and a second connecting part 2 that can be quickly connected to each other. The first connecting part 1 and the second connecting part 2 are fixed on the building components to be connected. By connecting the first connecting part 1 and the second connecting part 2, the building components to be connected can be quickly connected and fixed, and after the connection, the preset structural strength requirements can be met, and then the subsequent related construction can be quickly carried out, which speeds up the construction speed and improves the construction efficiency.
[0057] like Figure 1 , 2 As shown, the first connection part 1 includes a locking groove 3, and the second connection part 2 includes a clamp head 4 and a second connection plate 5 connected to the clamp head 4. The locking groove 3 includes a groove cavity with a rectangular interior, and an entrance for the rectangular clamp head 4 to enter is provided at at least one end of the groove cavity in the length direction. In this embodiment, entrances are provided at both ends of the groove cavity. The notch 6 of the locking groove 3 is inwardly contracted to form a channel smaller than the groove cavity, thereby limiting the clamp head 4 from leaving the locking groove 3 at the notch 6.
[0058] like Figure 2 , 3As shown, when the chuck 4 enters the locking groove 3, the second connecting plate 5 is located within the notch 6. The chuck 4 at least divides the locking groove 3 to form a first locking cavity 7 near the bottom of the groove and a second locking cavity 8 near the notch 6, and the second locking cavity 8 is further divided into two by the second connecting plate 5. According to the force conditions at the chuck 4 and the locking groove 3, at least one of the first locking cavity 7 and the second locking cavity 8 is in interference fit with a locking insert.
[0059] The realization of the above interference fit can have various methods. In this embodiment, the width of the second locking cavity 8 is D1, the width value of the corresponding second locking insert 28 is D2, and D1 < D2 < D1 + 1 mm. The width of the first locking cavity 7 is D3, and the width value of the corresponding first locking insert 27 is D4, and D3 < D4 < D3 + 1 mm.
[0060] Chamfers are provided at the ends of the locking inserts (not shown in the figure). When installing the locking inserts, the end with the chamfer is inserted into the first locking cavity 7 or the second locking cavity 8 from the entrance by means of external forces such as hammering or mechanical pressing. Since the materials of the first connecting portion 1 and the second connecting portion 2 are metal materials with a certain elasticity, such as steel or other alloy materials. The locking inserts can be inserted into the first locking cavity 7 or the second locking cavity 8 and closely abut against the inner wall to form an interference fit, thereby restricting the movement of the chuck 4 in any direction within the locking groove 3.
[0061] Of course, in some other embodiments, the locking inserts that cannot be originally inserted into the first locking cavity 7 and the second locking cavity 8 can be cooled to reduce their sizes and then inserted. After the temperature returns, the locking inserts abut against the inner walls of the first locking cavity 7 and the second locking cavity 8 to form an interference fit.
[0062] It is easy to think that in some other embodiments, the cross-sectional shape of the locking groove 3, the shape of the chuck 4, and the shape of the locking inserts are not limited to rectangles, but can be dovetail-shaped, polygonal and other non-specific shapes, as long as the combination of the three can divide the locking groove 3 into multiple parts and enable the locking inserts to be in interference fit therein.
[0063] As Figure 4 shown, a fastener 9 is provided at the notch 6 of the locking groove 3 to connect the two sides of the notch 6. Specifically, connection holes 10 are correspondingly provided on both sides of the notch 6, and a long hole 11 is provided on the second connecting plate 5. The fastener 9 sequentially passes through the connection hole 10 on one side of the notch 6, the long hole 11, and the connection hole 10 on the other side of the notch 6. The fastener 9 can be a bolt or a pin. The setting of the fastener 9 can prevent the notch from deforming under force, thereby improving the tensile bearing capacity of the connection node. The fastener 9 is provided in one or more groups on the locking groove 3 according to the design strength. The setting of the long hole 11 enables the depth of the chuck 4 extending into the locking groove 3 to be adjustable, so that the connection between the first connecting portion 1 and the second connecting portion 2 has a certain tolerance.
[0064] like Figure 1 As shown, in one embodiment, the first connecting portion 1 further includes a first hoop 12, which is used to surround and fix on the outside of the building component to be connected. In this embodiment, it is a rectangular component composed of two oppositely arranged first side panels 13 and two oppositely arranged first connecting panels 14 connected in sequence.
[0065] The second connecting portion 2 further comprises a second hoop 15 , which is also used to be fixed on the outside of the building component to be connected. In this embodiment, the second hoop 15 is a rectangular member consisting of two oppositely disposed second side panels 16 and two oppositely disposed second connecting panels 5 .
[0066] The connecting groove is arranged at the end of the first connecting plate 14 , and the clamping head 4 is fixedly connected to the end of the second connecting plate 5 .
[0067] The arrangement of the two locking grooves 3 and the clamping head 4 can make the connection between the first clamping hoop 12 and the second clamping hoop 15 more stable.
[0068] Of course, in other embodiments, the first clamp 12 and the second clamp 15 can be made into a cylindrical shape or a multi-faceted cylindrical shape according to the shape of the building component to be connected.
[0069] like Figure 5 As shown, in one embodiment, a shearing structure is also provided. The shearing structure includes a first convex plate 20 and a first groove 21 respectively provided on the two first side plates 13 in the first hoop 12, and a second convex plate 22 and a second groove 23 respectively provided on the two second side plates 16 in the second hoop 15. When the first connecting part 1 is connected to the second connecting part 2, the first convex plate 20 can be accommodated in the second groove 23, and the second convex plate 22 can be accommodated in the first groove 21. Thus, the movement of the first connecting part 1 and the second connecting part 2 in the plane direction of the first side plate 13 or the second side plate 16 is limited.
[0070] Specifically, when the first connecting part 1 and the second connecting part 2 are both connected to the ends of two precast beam sections, when one of the sections is displaced downward, due to the clamping connection restriction between the first protrusion 20 and the second groove 23 and the clamping connection restriction between the second protrusion 22 and the first groove 21, the combined connection body formed by the first connecting part 1 and the second connecting part 2 has shear bearing capacity.
[0071] In the present embodiment, the first convex plate 20, the second convex plate 22, the first groove 21, and the second groove 23 are all configured to be rectangular, but in other embodiments, their shapes may be semicircular, rounded rectangular, etc.
[0072] In addition, when the anti-shear structure is provided, a grouting hole 17 and an overflow hole 18 are provided at one end of the first clamp 12 or the second clamp 15 corresponding to each other.
[0073] After the building components to which the first connecting portion 1 and the second connecting portion 2 are attached are installed, a filling cavity 19 is formed between the two building components and inside the first connecting portion 1 and the second connecting portion 2. Injecting slurry into the grouting hole 17 can fill the filling cavity 19 densely, thereby making the connection point have a higher structural strength.
[0074] like Figure 6-7 As shown, the present application also discloses a building component, including a first component segment 24 and a second component segment 25, which are surrounded and arranged at the ends of the first component segment 24 and the second component segment 25 corresponding to the first connecting portion 1 and the second connecting portion 2. The first component segment 24 and the second component segment 25 can be quickly connected by connecting the first connecting portion 1 and the second connecting portion 2, and then inserting a locking strip into the corresponding area.
[0075] like Figure 2 , 6 As shown, in one embodiment, it includes two first component segments 24 which are actually square beam segments and a second component segment 25, and the second component is connected between the two first component segments 24. One end of the two first component segments 24 is connected to other building components, such as columns, walls, etc.
[0076] Furthermore, a filling cavity 19 is formed between the first component segment 24 and the second component segment 25. The first connecting portion 1 or the second connecting portion 2 is connected to the ends of the second component segment 25 and the first component segment 24 so that the first component segment 24 and the second component segment 25 can be connected. For example, in one embodiment, the first connecting portion 1 is connected to the end of the first component segment 24, and the second connecting portions 2 are connected to both ends of the second component segment 25.
[0077] In the beam formed by two first component segments 24 and one second component segment 25, the end of the second component segment 25 is close to the end of the beam. When the upper part of the connector is subjected to tensile stress and the lower part is subjected to compressive stress, that is, the upper clamping head 4 of the second component segment 25 has a tendency to move toward the middle of the beam, at this time, at least a second locking insert 28 needs to be set in the second locking cavity 8 at this position to limit the displacement of the clamping head 4; conversely, the lower clamping head 4 of the second component segment 25 has a tendency to move toward the end of the beam, at this time, at least a first locking insert 27 needs to be set in the first locking cavity 7 at this position to limit the displacement of the clamping head 4. When the upper part of the connector is subjected to compressive stress and the lower part is subjected to tensile stress, at least a first locking insert 27 needs to be set in the first locking cavity 7 at the upper clamping head 4 of the connection part to limit the displacement of the clamping head 4, and at least a second locking insert 28 needs to be set in the second locking cavity 8 at the lower clamping head 4 to limit the displacement of the clamping head 4.
[0078] like Figure 6 As shown, the distance between the two opposite end faces of the two first components 24 is larger at the top and smaller at the bottom, and the lengthwise dimension of the second component segment 25 is larger at the top and smaller at the bottom. In order to eliminate the inevitable distance error between the two first components in actual construction, the length of the second component segment needs to be smaller than the designed distance between the two first component segments, so that the filling cavity 19 forms a V-shape with a larger top and a smaller bottom.
[0079] In one embodiment, Figure 4 , 6 As shown, the ends of the first component segment 24 and the second component segment 25 are both arranged as inclined surfaces, and the ends of the first side plate 13 and the second side plate 16 are arranged in the same inclined manner. α Smaller than the angle between the end surface of the first component segment 24 and its bottom surface β , so that the filling cavity 19 forms an inclined V-shaped space.
[0080] A wedge-shaped shear block 26 is also provided in the filling cavity 19. During installation, after the wedge-shaped shear block 26 is inserted into the upper part of the filling cavity 19, the wedge-shaped shear block 26 moves downward until it is tightly pressed against the two side walls of the filling cavity 19. The wedge-shaped shear block 26 contacts the ends of the first component segment 24 and the second component segment 25, so that any displacement of the second component segment 25 can be transmitted to the first component segment 24 through the wedge-shaped shear block 26, so that the connection node has shear bearing capacity.
[0081] In one embodiment, Figure 7 As shown, the ends of the first component segment 24 and the second component segment 25 are both arranged in a stepped shape. That is, a lower step groove 29 is arranged at the lower side of the end of the second component segment 25, and an upper step groove 30 is arranged at the upper side of the end of the first component segment 24. The lower step groove 29 overlaps the upper step groove 30, so that after the first component segment 24 and the second component segment 25 are installed, the end of the second component segment 25 is at least partially located above the end of the first component segment 24.
[0082] It can be understood that, whether the ends of the first component segment 24 and the second component segment 25 are set as an inclined surface or set as a step, in order to form the shear bearing capacity after the first component segment 24 is connected to the second component segment 25, a slope surface is set at the ends of the first component 24 and the second component 25, and the angle of the slope surface is α、βCooperating with each other, the filling cavity 19 forms an inclined "V-shaped" space. The "V-shaped" space can be used to accommodate the distance error between the two first components that is inevitable during construction; secondly, the "V-shaped" space is larger at the top and smaller at the bottom, so that the inserted wedge-shaped shear block 26 can always form a close contact with the first component and the second component; in addition, the inclined setting of the "V-shaped" space can make it so that when the second component 25 has a tendency to move downward relative to the first component 24 under the action of gravity or external load during the construction process, it is blocked by the first component, thereby forming the shear bearing capacity of the connection between the two components.
[0083] like Figure 5 , 8 As shown, when the shear structure is present, no wedge-shaped shear block 26 is provided in the filling cavity 19 .
[0084] After the building components to which the first connecting portion 1 and the second connecting portion 2 are attached are installed, a filling cavity 19 is formed between the two building components and inside the first connecting portion 1 and the second connecting portion 2. Injecting slurry into the grouting hole 17 can fill the filling cavity 19 densely, thereby making the connection point have a higher structural strength.
[0085] like Figure 1-4 As shown in , 6, the present application also discloses a construction method, comprising the following construction steps:
[0086] S1: hoist and install two first component segments 24 to keep them horizontal and at the same height;
[0087] S2: hoisting the second component segment 25 so that the corresponding clamping head 4 enters the locking groove 3;
[0088] S3: Use a bolt fastener 9 to pass through one side wall of the locking groove 3 and the first connecting portion 1 located in the notch 6 and then be screwed into the other side wall of the locking groove 3;
[0089] S4: According to the positions of the clamp head 4 and the locking groove 3, the first locking strip 27 is inserted into the first locking cavity 7, and the second locking strip 28 is inserted into the second locking cavity 8, and an interference fit is achieved;
[0090] S5: Place the wedge-shaped shear block 26 in the filling cavity 19 , so that the wedge-shaped shear block 26 contacts the end surfaces of the first component segment 24 and the second component segment 25 .
[0091] Among them, Figure 5 , 8 As shown, when there is a shear structure, it includes:
[0092] S5: The first protruding plate 20 is accommodated in the second groove 23, and the second protruding plate 22 is accommodated in the first groove 21;
[0093] S6: Fill the filling cavity 19 with slurry.
[0094] In summary, the connection of building components can be achieved by designing a connector having a first connection part 1 and a second connection part 2, and by arranging the connector at the end of the building component to be constructed, and connecting the first connection part 1 and the second connection part 2. Then, the inclined "V-shaped" space formed by the inclination of the end surface of the building component to be connected and the wedge-shaped shear block 26 ensure the shear bearing capacity at the connection node.
[0095] The embodiments of this specific implementation method are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore, all equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A connector, characterized in that: include A first connecting portion (1) is used to connect to the end of a prefabricated building beam, comprising at least one locking groove (3), at least one side of the locking groove (3) is provided with an entrance, and the notch (6) of the locking groove (3) is smaller than the internal cavity; The second connecting portion (2) is used to be connected to the end of another prefabricated beam, and comprises a number of clamps (4) corresponding to the number of the locking grooves (3) and a second connecting plate (5) connected to the clamps (4). The clamping head (4) can enter the locking groove (3) from the entrance of the locking groove (3), but is restricted from leaving the notch (6), and at least one area between the clamping head (4) and the groove bottom or the notch (6) of the locking groove (3) is interference-fitted with a locking insert; the clamping head (4) at least divides the locking groove (3) into a first locking cavity (7) near the groove bottom and a second locking cavity (8) near the notch (6), wherein the second locking cavity (8) is further divided into two by the second connecting plate (5); The first connecting portion (1) comprises a first clamp (12), and a locking groove (3) is provided on two opposite sides of the first clamp (12); the second connecting portion (2) comprises a second clamp (15), and a clamp (4) is provided on two opposite sides of the second clamp (15); The ends of the first clamp (12) and the second clamp (15) are arranged obliquely, the angle α between the end surface of the second component segment (25) and its bottom surface is smaller than the angle β between the end surface of the first component segment (24) and its bottom surface, the locking grooves (3) respectively arranged on the first clamp (12) are arranged in an up-down staggered manner, and the clamps (4) respectively arranged on the second clamp (15) are arranged in an up-down staggered manner; The second connecting portion (2) further comprises a second hoop (15), which is also used to be fixed to the end of the prefabricated building beam to be connected. The second connecting portion (2) comprises a rectangular member consisting of two second side plates (16) arranged opposite to each other and two second connecting plates (5) arranged opposite to each other. When the clamp (4) enters the locking groove (3), the second connecting plate (5) is located in the notch (6), and the clamp (4) at least divides the locking groove (3) into a first locking cavity (7) close to the groove bottom and a second locking cavity (8) close to the notch (6), wherein the second locking cavity (8) is further divided into two by the second connecting plate (5); according to the force conditions at the clamp (4) and the locking groove (3), at least one of the first locking cavity (7) and the second locking cavity (8) is interference-fitted with a locking insert; When the upper part of the connecting piece is subjected to tensile stress and the lower part is subjected to compressive stress, at least a second locking strip (28) needs to be arranged in the second locking cavity (8) at the upper clamp (4) of the connecting part, and at least a first locking strip (27) needs to be arranged in the first locking cavity (7) at the lower clamp (4) to limit the displacement of the clamp (4); when the upper part of the connecting piece is subjected to compressive stress and the lower part is subjected to tensile stress, at least a second locking strip (28) needs to be arranged in the second locking cavity (8) at the lower clamp (4) of the connecting part, and at least a first locking strip (27) needs to be arranged in the first locking cavity (7) at the upper clamp (4) to limit the displacement of the clamp (4).
2. The connector according to claim 1, characterized in that: A fastener (9) is provided at the slot (6), and the fastener (9) passes through one side wall of the locking slot (3) and the second connecting portion (2) located in the slot (6) and is connected to the other side wall of the locking slot (3).
3. The connector according to claim 2, characterized in that: The first connection portion (1) through which the fastener (9) passes is provided with a long hole (11).
4. The connector according to claim 1, characterized in that: A first convex plate (20) and a first groove (21) are respectively arranged on both sides between the two pairs of locking grooves (3) on the first clamp (12), and a second convex plate (22) and a second groove (23) are respectively arranged on both sides between the two clamping heads (4) on the second clamp (15), wherein the first convex plate (20) is clamped and connected to the second groove (23) via a first convex plate clamping tooth (201), and the second convex plate (22) is clamped and connected to the first groove (21) via a second convex plate clamping tooth (221).
5. A building component, comprising the connecting piece according to any one of claims 2 to 4, characterized in that: It comprises a first component segment (24) and a second component segment (25), wherein the first connecting portion (1) and the second connecting portion (2) are correspondingly arranged around the ends of the first component segment (24) and the second component segment (25).
6. A building element according to claim 5, characterized in that: Both ends of the second component segment (25) are correspondingly connected to the first component segment (24), the distance between the two opposite end faces of the two first component segments (24) is larger at the top and smaller at the bottom, and the dimension of the second component segment (25) along the direction of the line connecting the first and second components is larger at the top and smaller at the bottom.
7. The building element according to claim 6, characterized in that: A filling cavity (19) is formed between the ends of the first component segment (24) and the second component segment (25); the filling cavity (19) is a cavity that opens obliquely upward, and the filling cavity (19) is larger at the top and smaller at the bottom.
8. The building element according to claim 7, characterized in that: A wedge-shaped shear block (26) is arranged in the filling cavity (19), and the wedge-shaped shear block (26) contacts the ends of the first component segment (24) and the second component segment (25).
9. The building element according to claim 7, characterized in that: The first clamp (12) and the second clamp (15) are butt-jointed and enclose a filling cavity (19), and a first convex plate (20) on the first clamp (12) and a second convex plate (22) on the second clamp (15) are provided with grouting holes (17) or overflow holes (18).
10. The building element according to any one of claims 7 to 9, characterized in that: The filling cavity (19) is filled with filler.
11. A construction method implemented by the building component according to any one of claims 7 to 9, characterized in that: The steps include: S1: Setting a first component segment (24); S2: Arranging a second component segment (25) so that the corresponding first connecting portion (1) is connected to the second connecting portion (2); S3: using a fastener (9) to pass through one side wall of the locking groove (3) and the first connecting portion (1) located in the notch (6) to connect to the other side wall of the locking groove (3); S4: a locking insert is provided in at least one region between the clamping head (4) and the groove bottom or the groove opening (6) of the locking groove (3) by interference fit.
12. The construction method according to claim 11, characterized in that: The method further comprises S5: arranging a wedge-shaped anti-shear block (26) in the filling cavity (19), and making the wedge-shaped anti-shear block (26) contact the ends of the first component segment (24) and the second component segment (25).
13. The construction method according to claim 11, characterized in that: The method further comprises S5: causing the first protruding plate (20) to be snap-connected in the second groove (23), and causing the second protruding plate (22) to be snap-connected in the first groove (21); S6: Filling the filling cavity (19) with filler.
Citation Information
Patent Citations
Turbine rotor device with pressing structure
CN111305908A
Fabricated shear wall building structure and construction method thereof
CN113585522A
Fabricated building wall and construction method
CN114753520A
PVC hollow wallboard connecting structure
CN204151905U
A wall male-female assembly structure with good thermal insulation performance
CN209163124U
