Active support control method and device for a hybrid energy storage power station with grid connection
By introducing active support control methods for hybrid energy storage power stations with the following/structured grids, and coordinating the network-type and following-type energy storage, the grid frequency and voltage support of new energy grid-connected equipment during high proportional access is solved. The problem of insufficient capacity has improved the stability and response speed of the power grid and reduced the waste of new energy resources.
Patent Information
- Application Number
- CN202411116995.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-08-15
AI Technical Summary
The synchronous operation stability of the grid-connected new energy equipment in the existing power grid depends on the phase-locked loop control parameters, and cannot be supported independently, resulting in insufficient support capacity of the grid frequency and voltage when high proportion of new energy is connected. The response speed of network-type control is slow, making it difficult to avoid instability.
A method for active support and control of hybrid energy storage power stations with the following/structure network is proposed. By determining the power demand of energy storage power stations based on the frequency change rate and frequency deviation of the grid-connected points, and coordinating the network-type energy storage and follow-type energy storage to realize Active support for the power grid, improve the frequency active support capacity and reduce the abandonment of wind and light in new energy stations.
It has improved the stability of the high proportion of new energy power grid, achieved no delay inertia response in the entire station, enhanced the active frequency support capability, and reduced the abandonment of wind and light at new energy stations.
Smart Images

Figure CN118646039B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power grid operation, and in particular to an active support control method and device for a hybrid grid-following / grid-building type energy storage power station. Background Art
[0002] The active support control of energy storage power stations includes inertia, primary frequency regulation, dynamic voltage regulation, etc., all of which simulate the power generation process of traditional synchronous generator sets. Inertia refers to the frequency change rate corresponding to the frequency change process to prevent frequency variation, primary frequency regulation corresponds to the frequency deviation to generate the corresponding active power increment, and dynamic voltage regulation refers to the corresponding voltage deviation to generate the corresponding reactive power increment.
[0003] At present, most of the new energy grid-connected equipment controls the output power by tracking the frequency and phase of the grid voltage and controlling the grid current. This control strategy is grid-following control (GFL). Grid-following control and grid synchronization rely on the phase information of the grid connection point measured by the phase-locked loop, which has the following shortcomings: the stability of the synchronous operation of the converter depends on the phase-locked loop control parameters; it cannot be supported by autonomous inertia, and the voltage and frequency stability of the grid is still provided by the traditional inertial source synchronous generator. As the proportion of new energy continues to increase, the system equivalent inertia will further decrease with the increase in the proportion of power electronic equipment.
[0004] The grid-following converter can provide virtual inertia support to the system and participate in primary frequency modulation by adding virtual inertia control and primary frequency modulation control loops inside it. In addition, compared with the inertia of synchronous machines, the converter virtual inertia control is more flexible and can be set according to the system frequency requirements. If the system pays more attention to the dynamic frequency deviation, the optimal delay of inertia control can be calculated according to the proposed method to minimize the maximum frequency deviation under disturbance. However, in the actual control process, the system frequency signal needs to be detected and transmitted in real time, which affects the converter frequency modulation response speed to a certain extent.
[0005] After the number of synchronous generators is reduced, there must be units in the power grid to serve as voltage sources. After the technical transformation, the grid-following units have the functions of weak grid operation, virtual inertia, fast frequency regulation and stronger transient support, but these upgrades still cannot avoid the instability caused by phase-locked loop control. In areas where a high proportion of new energy is connected to weak power grids, the short-circuit ratio support capacity is insufficient, and there are obstacles to the consumption and stable operation of new energy. The grid-building control strategy can provide fast inertia support, synchronous stability support and transient overvoltage suppression capabilities, thereby improving the short-circuit ratio support capacity of multiple stations in the region.
[0006] Grid-forming control technology provides support to the power grid autonomously, and has good anti-disturbance capability at high penetration rates, providing a solution to the voltage and frequency support problems after the proportion of new energy grid-connected equipment increases. Grid-forming technology (GFM) does not rely on grid voltage information, uses a power control method to achieve stable output, and realizes grid-connected synchronous operation. The external characteristics are similar to the voltage source characteristics of synchronous generators. This characteristic is conducive to supporting system stability, but it also leads to an increase in the current fluctuation range of new energy grid-connected equipment, which brings difficulties to the hardware and protection control of the equipment.
[0007] Similar to the grid-following converter, the grid-building converter can also provide inertia and frequency support for the system through inertia control and frequency droop control, and its support capacity can also be flexibly adjusted. However, the grid-building technology can enable the power electronic device to achieve the same active response external characteristics as the synchronous machine, so the frequency response can be faster.
[0008] Traditional energy storage power station active support methods, for example, each power generation unit of new energy and energy storage responds autonomously to changes in grid frequency and voltage. The specific solution is that each power generation unit monitors the voltage and frequency of the access point separately and responds autonomously to changes in voltage and frequency. However, since the grid-following control requires each grid connection point to monitor the voltage and frequency separately, it is easy to cause inconsistent responses at each point, including inconsistency in time and inconsistency in action volume, while the grid-forming control corresponding to the power angle and voltage of the grid connection point is prone to multi-machine circulation and oscillation.
[0009] For another example, the current whole-station coordinated control is mostly independent whole-station coordinated control of new energy stations and energy storage power stations. When realizing active support response through whole-station coordinated control, the specific plan is: measure the voltage and frequency signals of the station grid connection point through the frequency measuring device, and then calculate the reactive and active output that the station needs to increase or decrease according to the voltage and frequency changes, and distribute them equally to each unit. However, the inertia response of the whole-station grid-type control is a virtual inertia response. It is necessary to measure the grid frequency of the station grid connection point first, and then respond through calculation. There is a delay in this process. Because the grid-type control receives instructions and responds slowly, it is not suitable to use whole-station control when performing active support control, and most of them are single-machine autonomous responses. Summary of the invention
[0010] In order to overcome the above-mentioned defects, the present invention proposes an active support control method and device for a hybrid grid-connected energy storage power station.
[0011] In a first aspect, a method for actively supporting and controlling a hybrid energy storage power station with a grid connection is provided, wherein the method for actively supporting and controlling a hybrid energy storage power station with a grid connection comprises:
[0012] Determine the power demand of the grid-connected / grid-connected hybrid energy storage power station in response to the grid-connected point frequency change rate based on the grid-connected point frequency change rate;
[0013] Determine the power demand of the hybrid energy storage power station responding to the frequency deviation of the grid connection point based on the frequency deviation of the grid connection point;
[0014] Based on the power demand of the frequency change rate of the grid connection point in response to the power demand of the frequency deviation of the grid connection point in response to the hybrid grid / grid-building energy storage power station, the grid-building energy storage and the grid-building energy storage in the hybrid grid / grid-building energy storage power station are coordinated to actively support the power grid.
[0015] Preferably, the power demand of the grid-connected / grid-connected hybrid energy storage power station in response to the grid connection point frequency change rate is as follows:
[0016] △P J =△P J0 -△P JG
[0017] In the above formula, △P J To follow / build the grid hybrid energy storage power station to respond to the grid point frequency change rate power demand, △P J0 △P is the power required to respond to the frequency change rate after the grid is disturbed, JG The power grid itself responds to the frequency change rate and power demand of the grid connection point.
[0018] Furthermore, the power required to respond to the disturbance of the power grid according to the frequency change rate is as follows:
[0019] △P J0 =-(T J0 △f1S N ) / f N
[0020] In the above formula, T J0 is the grid inertia time constant, △f1 is the frequency change rate of the grid connection point, S N is the grid capacity, f N is the rated frequency of the power grid.
[0021] Furthermore, the power grid itself responds to the power demand of the frequency change rate of the grid connection point as follows:
[0022] △P JG =-[T JG △f1(S N -P N )] / f N
[0023] In the above formula, T JG P is the equivalent inertia time constant of the power grid without energy storage. N The installed capacity of energy storage.
[0024] Preferably, the grid-connected / grid-connected hybrid energy storage power station responds to the grid connection point frequency deviation power demand as follows:
[0025] △P f =△P f0 -△P fG
[0026] In the above formula, △P f To follow / build a hybrid energy storage power station to respond to the grid connection point frequency deviation power demand, △P f0 △P is the power required to respond to the frequency deviation after the grid is disturbed, fG The power grid itself responds to the frequency deviation power demand at the grid connection point.
[0027] Furthermore, the power required to respond to the frequency deviation power grid after being disturbed is as follows:
[0028] △P f0 =-(K f0 △fS N ) / f N
[0029] In the above formula, K f0 is the primary frequency modulation coefficient of the entire power grid, △f is the frequency deviation of the grid connection point, S N is the grid capacity, f N is the rated frequency of the power grid.
[0030] Furthermore, the power grid itself responds to the frequency deviation power demand of the grid connection point as follows:
[0031] △P fG =-[K f0 △f(S N -P N )] / f N
[0032] In the above formula, P N The installed capacity of energy storage.
[0033] Preferably, the control of the grid-forming energy storage and the grid-forming energy storage in the grid-forming hybrid energy storage power station to coordinate and actively support the power grid based on the power demand of the grid-forming hybrid energy storage power station in response to the grid connection point frequency change rate and the power demand in response to the grid connection point frequency deviation includes:
[0034] When the frequency change rate of the grid connection point does not meet the grid requirements, the grid-connected energy storage in the grid-connected hybrid energy storage power station is controlled to execute the inertia control strategy;
[0035] When the frequency deviation of the grid connection point does not meet the grid requirements, the grid-following energy storage in the grid-following / grid-building hybrid energy storage power station is controlled to execute a frequency regulation control strategy;
[0036] When the grid connection point frequency change rate and the grid connection point frequency deviation do not meet the grid requirements at the same time and the grid-connecting / gridding hybrid energy storage power station responds to the grid connection point frequency change rate power demand and the grid connection point frequency deviation power demand in different directions, the grid-connecting energy storage in the grid-connecting / gridding hybrid energy storage power station stops executing the inertia control strategy.
[0037] Furthermore, in the process of controlling the grid-connected energy storage in the hybrid grid-connected energy storage power station to execute the inertia control strategy, the inertia time constant of the grid-connected energy storage is determined based on the power demand of the hybrid grid-connected energy storage power station in response to the frequency change rate of the grid connection point.
[0038] Furthermore, the inertia time constant of the grid-connected energy storage is determined based on the power demand of the grid-connected / grid-connected hybrid energy storage power station in response to the frequency change rate of the grid connection point, including:
[0039] Determine the lower limit of the inertia time constant of the grid-connected energy storage based on the power demand of the grid-connected / grid-connected hybrid energy storage power station in response to the frequency change rate of the grid connection point;
[0040] Build a grid-type single-machine autonomous response simulation model including a power grid, set the inertia time constant of the grid-type energy storage, record the maximum value of the inertia time constant of the grid-type energy storage without oscillation, and obtain the upper limit of the inertia time constant of the grid-type energy storage;
[0041] The inertia time constant of the network-type energy storage is selected within the interval between the upper limit and the lower limit of the inertia time constant of the network-type energy storage.
[0042] Furthermore, the lower limit of the inertia time constant of the grid-type energy storage is as follows:
[0043] T J =-(△P J f N ) / ( P N △f1)
[0044] In the above formula, T J is the lower limit of the inertia time constant of the grid-type energy storage, △P J To follow / build the grid hybrid energy storage power station to respond to the grid connection point frequency change rate power demand, f N is the rated frequency of the power grid, P N is the installed capacity of energy storage, △f1 is the frequency change rate of the grid connection point.
[0045] Furthermore, in the process of controlling the grid-connected energy storage in the grid-connected / connected hybrid energy storage power station to execute a primary frequency regulation control strategy, the primary frequency regulation coefficient of the grid-connected energy storage is determined based on the grid-connected / connected hybrid energy storage power station responding to the grid connection point frequency deviation power demand.
[0046] Furthermore, the primary frequency modulation coefficient of the grid-connected energy storage is determined based on the grid-connected / grid-connected hybrid energy storage power station responding to the grid connection point frequency deviation power demand, including:
[0047] Determine the lower limit of the primary frequency regulation coefficient of the grid-connected energy storage based on the grid-connected / built-in hybrid energy storage power station responding to the grid connection point frequency deviation power demand;
[0048] Build a grid-following whole-station coordinated control simulation model including the power grid, set the primary frequency modulation coefficient of the grid-following energy storage, record the maximum value of the primary frequency modulation coefficient of the grid-following energy storage without oscillation, and obtain the upper limit of the primary frequency modulation coefficient of the grid-following energy storage;
[0049] The primary frequency modulation coefficient of the grid-connected energy storage is selected within the interval between the upper limit and the lower limit of the primary frequency modulation coefficient of the grid-connected energy storage.
[0050] Furthermore, the lower limit of the primary frequency modulation coefficient of the grid-connected energy storage is as follows:
[0051] K fE =-(△P f f N ) / ( P N △f)
[0052] In the above formula, K fE is the lower limit of the primary frequency regulation coefficient of grid-connected energy storage, △P f To follow / build a hybrid energy storage power station to respond to the grid connection point frequency deviation power demand, f N is the rated frequency of the power grid, P N is the installed capacity of energy storage, △f is the frequency deviation of the grid connection point.
[0053] In a second aspect, an active support control device for a hybrid energy storage power station with a grid connection is provided, and the active support control device for a hybrid energy storage power station with a grid connection comprises:
[0054] The first determination module is used to determine the power demand of the grid-connected / grid-connected hybrid energy storage power station in response to the grid-connected point frequency change rate based on the grid-connected point frequency change rate;
[0055] The second determination module is used to determine the power demand of the hybrid energy storage power station in response to the frequency deviation of the grid connection point based on the frequency deviation of the grid connection point;
[0056] A control module is used to control the grid-building energy storage and the grid-building energy storage in the grid-building hybrid energy storage power station to coordinate and actively support the power grid based on the power demand of the grid-building hybrid energy storage power station in response to the frequency change rate of the grid connection point and the power demand of the grid connection point frequency deviation.
[0057] In a third aspect, a computer device is provided, comprising: one or more processors;
[0058] The processor is configured to execute one or more programs;
[0059] When the one or more programs are executed by the one or more processors, the active support control method of the hybrid grid / grid-building type energy storage power station is implemented.
[0060] In a fourth aspect, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed, the active support control method of the hybrid grid-connected / grid-connected energy storage power station is implemented.
[0061] The above one or more technical solutions of the present invention have at least one or more of the following beneficial effects:
[0062] The present invention provides a method and device for active support control of a hybrid energy storage power station with grid connection / construction, including: determining the power demand of the hybrid energy storage power station with grid connection / construction in response to the frequency change rate of the grid connection point based on the frequency change rate of the grid connection point; determining the power demand of the hybrid energy storage power station with grid connection / construction in response to the frequency deviation of the grid connection point based on the frequency deviation of the grid connection point; and controlling the grid connection type energy storage and the hybrid energy storage with grid connection in the hybrid energy storage power station with grid connection / construction to coordinate and actively support the power grid based on the power demand of the hybrid energy storage power station with grid connection / construction in response to the frequency change rate of the grid connection point and the power demand of the hybrid energy storage power station with grid connection point. The technical solution provided by the present invention can improve the frequency active support capability of the hybrid energy storage power station with grid connection and grid connection, thereby improving the stability of the power grid with a high proportion of new energy, realizing the delay-free inertia response of the entire station, and reducing the abandonment of wind and solar power at new energy stations. BRIEF DESCRIPTION OF THE DRAWINGS
[0063] Figure 1 It is a flow chart of the main steps of the active support control method of the hybrid energy storage power station with / within the grid according to an embodiment of the present invention. DETAILED DESCRIPTION
[0064] The specific implementation modes of the present invention will be further described in detail below in conjunction with the accompanying drawings.
[0065] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0066] Example 1
[0067] See attached Figure 1 , Figure 11 is a flow chart of the main steps of the active support control method of a hybrid energy storage power station with grid connection according to an embodiment of the present invention. Figure 1 As shown, the active support control method of the hybrid energy storage power station with / within the grid in the embodiment of the present invention mainly includes the following steps:
[0068] Step S101: determining the power demand of the grid-connected / connected hybrid energy storage power station in response to the grid-connected point frequency change rate based on the grid-connected point frequency change rate;
[0069] Step S102: determining the power demand of the grid-connected / grid-connected hybrid energy storage power station in response to the grid-connected point frequency deviation based on the grid-connected point frequency deviation;
[0070] Step S103: Based on the power demand of the grid-connected point frequency change rate in response to the grid-connected point and the power demand of the grid-connected point frequency deviation in response to the grid-connected point, the grid-connected energy storage and the grid-connected energy storage in the grid-connected point hybrid energy storage power station are controlled to coordinate with each other to actively support the power grid.
[0071] In this embodiment, after the power grid is subjected to the most serious disturbance (the frequency change rate is greater than 0.01 Hz / s) or the frequency deviation is greater than 0.05 Hz), the grid-connected / grid-building hybrid energy storage power station is started to provide active support.
[0072] In this embodiment, the power demand of the grid-connected / grid-connected hybrid energy storage power station in response to the grid connection point frequency change rate is as follows:
[0073] △P J =△P J0 -△P JG
[0074] In the above formula, △P J To follow / build the grid hybrid energy storage power station to respond to the grid point frequency change rate power demand, △P J0 △P is the power required to respond to the frequency change rate after the grid is disturbed, JG The power grid itself responds to the frequency change rate and power demand of the grid connection point.
[0075] In one embodiment, the power required to respond to a disturbance in the power grid with respect to the frequency change rate is as follows:
[0076] △P J0 =-(T J0 △f1S N ) / f N
[0077] In the above formula, T J0 is the grid inertia time constant, △f1 is the frequency change rate of the grid connection point, S N is the grid capacity, f N is the rated frequency of the power grid.
[0078] In one embodiment, the power grid itself responds to the power demand of the frequency change rate of the grid connection point as follows:
[0079] △P JG =-[T JG △f1(S N -P N )] / f N
[0080] In the above formula, T JG P is the equivalent inertia time constant of the power grid without energy storage. N The installed capacity of energy storage.
[0081] In this embodiment, the grid-connected / grid-connected hybrid energy storage power station responds to the grid connection point frequency deviation power demand as follows:
[0082] △P f =△P f0 -△P fG
[0083] In the above formula, △P f To follow / build a hybrid energy storage power station to respond to the grid connection point frequency deviation power demand, △P f0 △P is the power required to respond to the frequency deviation after the grid is disturbed, fG The power grid itself responds to the frequency deviation power demand at the grid connection point.
[0084] In one embodiment, the power required to respond to a disturbance in the frequency deviation power grid is as follows:
[0085] △P f0 =-(K f0 △fS N ) / f N
[0086] In the above formula, K f0 is the primary frequency modulation coefficient of the entire power grid, △f is the frequency deviation of the grid connection point, S N is the grid capacity, f N is the rated frequency of the power grid.
[0087] In one embodiment, the power grid itself responds to the power demand of the frequency deviation of the grid connection point as follows:
[0088] △P fG =-[K f0 △f(S N -P N )] / f N
[0089] In the above formula, P N The installed capacity of energy storage.
[0090] In this embodiment, the grid-connected / grid-building hybrid energy storage power station is controlled to coordinate with the grid-connected energy storage in the grid-connected / grid-building hybrid energy storage power station to actively support the power grid based on the power demand of the grid-connected / grid-building hybrid energy storage power station in response to the grid connection point frequency change rate and the power demand of the grid connection point frequency deviation, including:
[0091] When the frequency change rate of the grid connection point does not meet the grid requirements, the grid-connected energy storage in the grid-connected hybrid energy storage power station is controlled to execute the inertia control strategy;
[0092] When the frequency deviation of the grid connection point does not meet the grid requirements, the grid-following energy storage in the grid-following / grid-building hybrid energy storage power station is controlled to execute a frequency regulation control strategy;
[0093] When the grid connection point frequency change rate and the grid connection point frequency deviation do not meet the grid requirements at the same time and the grid-connecting / gridding hybrid energy storage power station responds to the grid connection point frequency change rate power demand and the grid connection point frequency deviation power demand in different directions, the grid-connecting energy storage in the grid-connecting / gridding hybrid energy storage power station stops executing the inertia control strategy.
[0094] In one embodiment, in the process of controlling the grid-connected energy storage in the hybrid energy storage power station to execute the inertia control strategy, the inertia time constant of the grid-connected energy storage is determined based on the power demand of the hybrid energy storage power station in response to the frequency change rate of the grid connection point.
[0095] In one embodiment, the inertia time constant of the grid-connected energy storage is determined based on the power demand of the grid-connected / grid-connected hybrid energy storage power station in response to the frequency change rate of the grid connection point, including:
[0096] Determine the upper limit of the inertia time constant of the grid-connected energy storage based on the power demand of the grid-connected / grid-connected hybrid energy storage power station in response to the frequency change rate of the grid connection point;
[0097] Build a grid-type single-machine autonomous response simulation model including a power grid, set the inertia time constant of the grid-type energy storage, record the minimum value of the inertia time constant of the grid-type energy storage without oscillation, and obtain the lower limit of the inertia time constant of the grid-type energy storage;
[0098] The inertia time constant of the network-type energy storage is selected within the interval between the upper limit and the lower limit of the inertia time constant of the network-type energy storage.
[0099] In one embodiment, the upper limit of the inertia time constant of the grid-type energy storage is as follows:
[0100] T J =-(△P J f N ) / ( P N △f1)
[0101] In the above formula, TJ is the upper limit of the inertia time constant of the grid-type energy storage, △P J To follow / build the grid hybrid energy storage power station to respond to the grid connection point frequency change rate power demand, f N is the rated frequency of the power grid, P N is the installed capacity of energy storage, △f1 is the frequency change rate of the grid connection point.
[0102] In one embodiment, in the process of controlling the grid-connected energy storage in the grid-connected / connected hybrid energy storage power station to execute a primary frequency regulation control strategy, the primary frequency regulation coefficient of the grid-connected energy storage is determined based on the grid-connected / connected hybrid energy storage power station responding to the grid connection point frequency deviation power demand.
[0103] In one embodiment, the determining of the primary frequency modulation coefficient of the grid-connected energy storage based on the grid-connected / connected hybrid energy storage power station in response to the grid connection point frequency deviation power demand includes:
[0104] Determine the upper limit of the primary frequency modulation coefficient of the grid-connected energy storage based on the power demand of the grid-connected / grid-connected hybrid energy storage power station in response to the frequency deviation of the grid connection point;
[0105] Build a grid-following whole-station coordinated control simulation model including the power grid, set the primary frequency modulation coefficient of the grid-following energy storage, record the minimum value of the primary frequency modulation coefficient of the grid-following energy storage without oscillation, and obtain the lower limit of the primary frequency modulation coefficient of the grid-following energy storage;
[0106] The primary frequency modulation coefficient of the grid-connected energy storage is selected within the interval between the upper limit and the lower limit of the primary frequency modulation coefficient of the grid-connected energy storage.
[0107] In one embodiment, the upper limit of the primary frequency modulation coefficient of the grid-connected energy storage is as follows:
[0108] K fE =-(△P f f N ) / ( P N △f)
[0109] In the above formula, K fE is the upper limit of the primary frequency regulation coefficient of grid-connected energy storage, △P f To follow / build a hybrid energy storage power station to respond to the grid connection point frequency deviation power demand, f N is the rated frequency of the power grid, P N is the installed capacity of energy storage, △f is the frequency deviation of the grid connection point.
[0110] Example 2
[0111] Based on the same inventive concept, the present invention also provides an active support control device for a hybrid energy storage power station with a grid connection, and the active support control device for a hybrid energy storage power station with a grid connection comprises:
[0112] The first determination module is used to determine the power demand of the grid-connected / grid-connected hybrid energy storage power station in response to the grid-connected point frequency change rate based on the grid-connected point frequency change rate;
[0113] The second determination module is used to determine the power demand of the hybrid energy storage power station in response to the frequency deviation of the grid connection point based on the frequency deviation of the grid connection point;
[0114] A control module is used to control the grid-building energy storage and the grid-building energy storage in the grid-building hybrid energy storage power station to coordinate and actively support the power grid based on the power demand of the grid-building hybrid energy storage power station in response to the frequency change rate of the grid connection point and the power demand of the grid connection point frequency deviation.
[0115] Preferably, the power demand of the grid-connected / grid-connected hybrid energy storage power station in response to the grid connection point frequency change rate is as follows:
[0116] △P J =△P J0 -△P JG
[0117] In the above formula, △P J To follow / build the grid hybrid energy storage power station to respond to the grid point frequency change rate power demand, △P J0 △P is the power required to respond to the frequency change rate after the grid is disturbed, JG The power grid itself responds to the frequency change rate and power demand of the grid connection point.
[0118] Furthermore, the power required to respond to the disturbance of the power grid according to the frequency change rate is as follows:
[0119] △P J0 =-(T J0 △f1S N ) / f N
[0120] In the above formula, T J0 is the grid inertia time constant, △f1 is the frequency change rate of the grid connection point, S N is the grid capacity, f N is the rated frequency of the power grid.
[0121] Furthermore, the power grid itself responds to the power demand of the frequency change rate of the grid connection point as follows:
[0122] △P JG =-[T JG △f1(S N -P N )] / f N
[0123] In the above formula, T JGP is the equivalent inertia time constant of the power grid without energy storage. N The installed capacity of energy storage.
[0124] Preferably, the grid-connected / grid-connected hybrid energy storage power station responds to the grid connection point frequency deviation power demand as follows:
[0125] △P f =△P f0 -△P fG
[0126] In the above formula, △P f To follow / build a hybrid energy storage power station to respond to the grid connection point frequency deviation power demand, △P f0 △P is the power required to respond to the frequency deviation after the grid is disturbed, fG The power grid itself responds to the frequency deviation power demand at the grid connection point.
[0127] Furthermore, the power required to respond to the frequency deviation power grid after being disturbed is as follows:
[0128] △P f0 =-(K f0 △fS N ) / f N
[0129] In the above formula, K f0 is the primary frequency modulation coefficient of the entire power grid, △f is the frequency deviation of the grid connection point, S N is the grid capacity, f N is the rated frequency of the power grid.
[0130] Furthermore, the power grid itself responds to the frequency deviation power demand of the grid connection point as follows:
[0131] △P fG =-[K f0 △f(S N -P N )] / f N
[0132] In the above formula, P N The installed capacity of energy storage.
[0133] Preferably, the control of the grid-forming energy storage and the grid-forming energy storage in the grid-forming hybrid energy storage power station to coordinate and actively support the power grid based on the power demand of the grid-forming hybrid energy storage power station in response to the grid connection point frequency change rate and the power demand in response to the grid connection point frequency deviation includes:
[0134] When the frequency change rate of the grid connection point does not meet the grid requirements, the grid-connected energy storage in the grid-connected hybrid energy storage power station is controlled to execute the inertia control strategy;
[0135] When the frequency deviation of the grid connection point does not meet the grid requirements, the grid-following energy storage in the grid-following / grid-building hybrid energy storage power station is controlled to execute a frequency regulation control strategy;
[0136] When the grid connection point frequency change rate and the grid connection point frequency deviation do not meet the grid requirements at the same time and the grid-connecting / gridding hybrid energy storage power station responds to the grid connection point frequency change rate power demand and the grid connection point frequency deviation power demand in different directions, the grid-connecting energy storage in the grid-connecting / gridding hybrid energy storage power station stops executing the inertia control strategy.
[0137] Furthermore, in the process of controlling the grid-connected energy storage in the hybrid grid-connected energy storage power station to execute the inertia control strategy, the inertia time constant of the grid-connected energy storage is determined based on the power demand of the hybrid grid-connected energy storage power station in response to the frequency change rate of the grid connection point.
[0138] Furthermore, the inertia time constant of the grid-connected energy storage is determined based on the power demand of the grid-connected / grid-connected hybrid energy storage power station in response to the frequency change rate of the grid connection point, including:
[0139] Determine the upper limit of the inertia time constant of the grid-connected energy storage based on the power demand of the grid-connected / grid-connected hybrid energy storage power station in response to the frequency change rate of the grid connection point;
[0140] Build a grid-type single-machine autonomous response simulation model including a power grid, set the inertia time constant of the grid-type energy storage, record the minimum value of the inertia time constant of the grid-type energy storage without oscillation, and obtain the lower limit of the inertia time constant of the grid-type energy storage;
[0141] The inertia time constant of the network-type energy storage is selected within the interval between the upper limit and the lower limit of the inertia time constant of the network-type energy storage.
[0142] Furthermore, the upper limit of the inertia time constant of the grid-type energy storage is as follows:
[0143] T J =-(△P J f N ) / ( P N △f1)
[0144] In the above formula, T J is the upper limit of the inertia time constant of the grid-type energy storage, △P J To follow / build the grid hybrid energy storage power station to respond to the grid connection point frequency change rate power demand, f N is the rated frequency of the power grid, P N is the installed capacity of energy storage, △f1 is the frequency change rate of the grid connection point.
[0145] Furthermore, in the process of controlling the grid-connected energy storage in the grid-connected / connected hybrid energy storage power station to execute a primary frequency regulation control strategy, the primary frequency regulation coefficient of the grid-connected energy storage is determined based on the grid-connected / connected hybrid energy storage power station responding to the grid connection point frequency deviation power demand.
[0146] Furthermore, the primary frequency modulation coefficient of the grid-connected energy storage is determined based on the grid-connected / grid-connected hybrid energy storage power station responding to the grid connection point frequency deviation power demand, including:
[0147] Determine the upper limit of the primary frequency modulation coefficient of the grid-connected energy storage based on the power demand of the grid-connected / grid-connected hybrid energy storage power station in response to the frequency deviation of the grid connection point;
[0148] Build a grid-following whole-station coordinated control simulation model including the power grid, set the primary frequency modulation coefficient of the grid-following energy storage, record the minimum value of the primary frequency modulation coefficient of the grid-following energy storage without oscillation, and obtain the lower limit of the primary frequency modulation coefficient of the grid-following energy storage;
[0149] The primary frequency modulation coefficient of the grid-connected energy storage is selected within the interval between the upper limit and the lower limit of the primary frequency modulation coefficient of the grid-connected energy storage.
[0150] Furthermore, the upper limit of the primary frequency modulation coefficient of the grid-connected energy storage is as follows:
[0151] K fE =-(△P f f N ) / ( P N △f)
[0152] In the above formula, K fE is the upper limit of the primary frequency regulation coefficient of grid-connected energy storage, △P f To follow / build a hybrid energy storage power station to respond to the grid connection point frequency deviation power demand, f N is the rated frequency of the power grid, P N is the installed capacity of energy storage, △f is the frequency deviation of the grid connection point.
[0153] Example 3
[0154] Based on the same inventive concept, the present invention also provides a computer device, which includes a processor and a memory, wherein the memory is used to store a computer program, the computer program includes program instructions, and the processor is used to execute the program instructions stored in the computer storage medium. The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. It is the computing core and control core of the terminal, which is suitable for implementing one or more instructions, and is specifically suitable for loading and executing one or more instructions in the computer storage medium to implement the corresponding method flow or corresponding function, so as to implement the steps of the active support control method of a hybrid energy storage power station with / with a network in the above embodiment.
[0155] Example 4
[0156] Based on the same inventive concept, the present invention also provides a storage medium, specifically a computer-readable storage medium (Memory), which is a memory device in a computer device for storing programs and data. It can be understood that the computer-readable storage medium here can include both built-in storage media in a computer device and, of course, extended storage media supported by the computer device. The computer-readable storage medium provides a storage space that stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by a processor are also stored in the storage space, and these instructions can be one or more computer programs (including program codes). It should be noted that the computer-readable storage medium here can be a high-speed RAM memory or a non-volatile memory, such as at least one disk memory. The processor can load and execute one or more instructions stored in the computer-readable storage medium to implement the steps of a method for active support control of a hybrid energy storage power station with / with a network in the above embodiment.
[0157] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0158] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0159] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0160] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0161] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. An active support control method for a hybrid energy storage power station with a grid connection, characterized in that: The method comprises: Determine the power demand of the grid-connected / grid-connected hybrid energy storage power station in response to the grid-connected point frequency change rate based on the grid-connected point frequency change rate; Determine the power demand of the hybrid energy storage power station responding to the frequency deviation of the grid connection point based on the frequency deviation of the grid connection point; Based on the power demand of the frequency change rate of the grid connection point in response to the power demand of the frequency deviation of the grid connection point in response to the hybrid grid / grid-building energy storage power station, the grid-building energy storage and the grid-building energy storage in the hybrid grid / grid-building energy storage power station are coordinated to actively support the power grid; The power demand of the grid-connected / grid-connected hybrid energy storage power station in response to the grid connection point frequency change rate is as follows: △P J =△P J0 -△P JG In the above formula, △P J To follow / build the grid hybrid energy storage power station to respond to the grid point frequency change rate power demand, △P J0 △P is the power required to respond to the frequency change rate after the grid is disturbed, JG The power grid itself responds to the power demand of the frequency change rate at the grid connection point; The power required to respond to the disturbance of the frequency change rate grid is as follows: △P J0 =-(T J0 △f1S N ) / f N In the above formula, T J0 is the grid inertia time constant, △f1 is the frequency change rate of the grid connection point, S N is the grid capacity, f N is the rated frequency of the power grid; The power demand of the power grid itself in response to the frequency change rate of the grid connection point is as follows: △P JG =-[T JG △f1 (S N -P N )] / f N In the above formula, T JG P is the equivalent inertia time constant of the power grid without energy storage. N The installed capacity of energy storage; The power demand of the hybrid grid-connected / grid-connected energy storage power station in response to the grid connection point frequency deviation is as follows: △P f =△P f0 -△P fG In the above formula, △P f To follow / build a hybrid energy storage power station to respond to the grid connection point frequency deviation power demand, △P f0 △P is the power required to respond to the frequency deviation after the grid is disturbed, fG For the power grid itself to respond to the frequency deviation power demand at the connection point; The power required to respond to the frequency deviation after the grid is disturbed is as follows: △P f0 =-(K f0 △fS N ) / f N In the above formula, K f0 is the primary frequency modulation coefficient of the entire power grid, △f is the frequency deviation of the grid connection point, S N is the grid capacity, f N is the rated frequency of the power grid; The power grid itself responds to the frequency deviation power demand of the grid connection point as follows: △P fG =-[K f0 △f(S N -P N )] / f N In the above formula, P N The installed capacity of energy storage; The control of the grid-connected energy storage and the grid-connected energy storage in the grid-connected hybrid energy storage power station in coordination with each other to actively support the power grid based on the grid-connected hybrid energy storage power station responding to the grid connection point frequency change rate power demand and responding to the grid connection point frequency deviation power demand includes: When the frequency change rate of the grid connection point does not meet the grid requirements, the grid-connected energy storage in the grid-connected hybrid energy storage power station is controlled to execute the inertia control strategy; When the frequency deviation of the grid connection point does not meet the grid requirements, the grid-following energy storage in the grid-following / grid-building hybrid energy storage power station is controlled to execute a frequency regulation control strategy; When the grid connection point frequency change rate and the grid connection point frequency deviation do not meet the grid requirements at the same time and the grid-connected / grid-forming hybrid energy storage power station responds to the grid connection point frequency change rate power demand and the grid connection point frequency deviation power demand in different directions, stop the grid-forming energy storage in the grid-forming / grid-forming hybrid energy storage power station from executing the inertia control strategy; In the process of controlling the grid-connected energy storage in the hybrid energy storage power station to execute the inertia control strategy, the inertia time constant of the grid-connected energy storage is determined based on the power demand of the hybrid energy storage power station in response to the frequency change rate of the grid connection point; The method of determining the inertia time constant of the grid-connected energy storage based on the power demand of the grid-connected / grid-connected hybrid energy storage power station in response to the frequency change rate of the grid connection point includes: Determine the lower limit of the inertia time constant of the grid-connected energy storage based on the power demand of the grid-connected / grid-connected hybrid energy storage power station in response to the frequency change rate of the grid connection point; Build a grid-type single-machine autonomous response simulation model including a power grid, set the inertia time constant of the grid-type energy storage, record the maximum value of the inertia time constant of the grid-type energy storage without oscillation, and obtain the upper limit of the inertia time constant of the grid-type energy storage; Selecting the inertia time constant of the network-type energy storage within the interval between the upper limit and the lower limit of the inertia time constant of the network-type energy storage; The lower limit of the inertia time constant of the grid-type energy storage is as follows: T J =-(△P J f N ) / ( P N △f1) In the above formula, T J is the lower limit of the inertia time constant of the grid-type energy storage, △P J To follow / build the grid hybrid energy storage power station to respond to the grid connection point frequency change rate power demand, f N is the rated frequency of the power grid, P N is the installed capacity of energy storage, △f1 is the frequency change rate of the grid connection point; In the process of controlling the grid-connected energy storage in the grid-connected / connected hybrid energy storage power station to execute the primary frequency regulation control strategy, the primary frequency regulation coefficient of the grid-connected energy storage is determined based on the grid-connected / connected hybrid energy storage power station responding to the grid connection point frequency deviation power demand; The method of determining the primary frequency modulation coefficient of the grid-following energy storage based on the grid-following / grid-building hybrid energy storage power station in response to the grid connection point frequency deviation power demand includes: Determine the lower limit of the primary frequency regulation coefficient of the grid-connected energy storage based on the grid-connected / built-in hybrid energy storage power station responding to the grid connection point frequency deviation power demand; Build a grid-following whole-station coordinated control simulation model including the power grid, set the primary frequency modulation coefficient of the grid-following energy storage, record the maximum value of the primary frequency modulation coefficient of the grid-following energy storage without oscillation, and obtain the upper limit of the primary frequency modulation coefficient of the grid-following energy storage; Selecting a primary frequency modulation coefficient of the grid-connected energy storage within the interval between an upper limit and a lower limit of the primary frequency modulation coefficient of the grid-connected energy storage; The lower limit of the primary frequency regulation coefficient of the grid-connected energy storage is as follows: K fE =-(△P f f N ) / ( P N △f) In the above formula, K fE is the lower limit of the primary frequency regulation coefficient of grid-connected energy storage, △P f To follow / build a hybrid energy storage power station to respond to the grid connection point frequency deviation power demand, f N is the rated frequency of the power grid, P N is the installed capacity of energy storage, △f is the frequency deviation of the grid connection point.
2. A device based on the active support control method of the hybrid energy storage power station with grid connection according to claim 1, characterized in that: The device comprises: The first determination module is used to determine the power demand of the grid-connected / grid-connected hybrid energy storage power station in response to the grid-connected point frequency change rate based on the grid-connected point frequency change rate; The second determination module is used to determine the power demand of the hybrid energy storage power station in response to the frequency deviation of the grid connection point based on the frequency deviation of the grid connection point; A control module is used to control the grid-building energy storage and the grid-building energy storage in the grid-building hybrid energy storage power station to coordinate and actively support the power grid based on the power demand of the grid-building hybrid energy storage power station in response to the frequency change rate of the grid connection point and the power demand of the grid connection point frequency deviation.
3. A computer device, characterized in that: include: one or more processors; The processor is configured to execute one or more programs; When the one or more programs are executed by the one or more processors, the active support control method for the grid-connected / grid-connected hybrid energy storage power station as described in claim 1 is implemented.
4. A computer-readable storage medium, characterized in that: A computer program is stored thereon, and when the computer program is executed, the active support control method of the grid-connected / grid-connected hybrid energy storage power station as claimed in claim 1 is implemented.
Citation Information
Patent Citations
Hybrid energy storage frequency modulation control method and device for wind power plant station
CN113270904A
Network construction and network following adaptive fusion control device, method and equipment and storage medium
CN117154826A