Anchor bolt positioning tool for steel structure construction hoisting
By using the combined tooling of positioning fixtures and traction components in steel structure construction, the problem of anchor bolts being deflected due to impact in the air is solved, the upper and lower sides of the anchor bolts are synchronously positioned, the positioning accuracy is improved, and the tooling is allowed of sustainable use.
Patent Information
- Application Number
- CN202411154694.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-08-22
AI Technical Summary
During steel structure construction, the suspended lower parts of anchor bolts are easily affected by the impact of poured concrete, causing deviation and affecting positioning accuracy.
A tooling including a horizontal positioning steel plate, a positioning fixture and a traction component is used. The holding unit and traction component of the positioning fixture move synchronously during the pouring process to ensure accurate positioning of the upper and lower sides of the anchor bolts, using magnetic attraction and elastic clamping. The structure limits the movement of the positioning fixture to achieve stable positioning of the anchor bolts.
It effectively reduces the risk of anchor bolts shifting during the pouring process, improves positioning accuracy, and allows the positioning fixture to be used continuously after pouring.
Smart Images

Figure CN118653701B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of steel structure construction, in particular to an anchor bolt positioning tool for steel structure construction hoisting. Background Art
[0002] In steel structure construction, it is usually necessary to complete the equipment foundation first and embed anchor bolts in the equipment foundation. Then, the steel structure components are lifted and transported to the top of the anchor bolts by lifting equipment, and then lowered and manually bolted to the positioning and mounting holes on the steel structure components to form a positioning support for the steel structure components.
[0003] When positioning and connecting through anchor bolts, the most basic method is to use four anchor bolts to position the four corners of the steel structure component respectively, so as to ensure the positioning of the steel structure component. However, the positioning accuracy of the anchor bolts often affects the positioning and installation process of the steel structure component. Once the anchor bolts themselves are offset, it is difficult to align with the positioning and installation holes on the steel structure component for installation. Therefore, the positioning of the anchor bolts themselves is very important.
[0004] The traditional way of positioning anchor bolts is generally to install a positioning steel plate on the template built around the anchor bolts and perform horizontal calibration. After the upper part of the anchor bolt passes through the positioning hole on the positioning steel plate, the anchor bolt is fixed to the horizontal positioning steel plate by a nut to form a horizontal positioning of the anchor bolt. However, since the lower part of the anchor bolt is usually in a suspended state, during the pouring of concrete, the lower part is easily impacted and offset, thereby reducing the positioning accuracy of the anchor bolt. Summary of the invention
[0005] The purpose of the present invention is to provide an anchor bolt positioning tool for hoisting steel structure construction, so as to solve the problem of inaccurate positioning caused by the lower part of the anchor bolt being suspended in the air and easily being offset by the impact of pouring concrete during the current anchor bolt pre-embedded positioning construction.
[0006] The technical solution of the present invention is:
[0007] A foundation bolt positioning tool for steel structure construction hoisting, comprising a horizontally arranged positioning steel plate, a positioning fixture and a traction assembly, wherein the positioning steel plate is provided with four first positioning holes for the foundation bolts to pass through, the positioning fixture is arranged below the positioning steel plate, and is used to horizontally position the lower sides of the four foundation bolts, the positioning fixture comprises four groups of clamping units, each group of clamping units is correspondingly clamped on each foundation bolt, the clamping units comprise a mother clamping plate and a child clamping plate, the mother clamping plate is L-shaped, and a vertically arranged first semi-cylindrical groove is provided on the inner chamfer of the mother clamping plate, The first semi-cylindrical groove is used to clamp on the outer side wall of the anchor bolt, and a second semi-cylindrical groove is provided on the side wall of the sub-clip plate opposite to the first semi-cylindrical groove. The first semi-cylindrical groove cooperates with the second semi-cylindrical groove to form a positioning for the anchor bolt. The sub-clip plate is detachably connected to the inner chamfer of the mother clapboard through a first connecting component, and the mother clapboards in two adjacent groups of clamping units are detachably connected through a second connecting component. The traction component is connected to the mother clapboard in the positioning fixture, and is used to drive the positioning fixture to move vertically during pouring.
[0008] Preferably, the sub-card has two mounting surfaces and two positioning surfaces, the two mounting surfaces are located on the same plane and are arranged parallel to the inner chamfer of the mother card, the second semi-cylindrical groove is located between the two mounting surfaces, the first connecting component is arranged between the mounting surface and the inner chamfer of the mother card, the two positioning surfaces are located at both ends of the mounting surface, and the two positioning surfaces are respectively arranged parallel to two inner walls of the mother card that are perpendicular to each other.
[0009] Through the above arrangement, it is convenient to install and position the sub-card and the mother card, and limit the direction in which the sub-card moves away from the mother card.
[0010] Preferably, the first connecting component includes two plug rods and a limiting structure, the two plug rods are fixed parallely and vertically on the mounting surface of the daughter card, the two plug rods are located on both sides of the second semi-cylindrical groove, and slots for inserting the two plug rods are provided on the side walls of the mother card that are chamfered opposite to the two plug rods, and the limiting structure is arranged between the daughter card and the mother card, and is used to limit and fix the plug rods in the slots when the traction assembly drives the positioning fixture to move vertically.
[0011] Through the above arrangement, when the positioning fixture is driven to move by the traction assembly, the limiting structure is used to limit and fix the insertion rod in the slot to prevent the sub-card from being separated from the mother card.
[0012] Preferably, the limiting structure is a permanent magnet, the permanent magnet is fixed on the innermost slot wall of the slot, and the insertion rod is made of a magnetic metal material that can be adsorbed by the permanent magnet.
[0013] Through the above arrangement, as an optimization solution for the limiting structure, the insertion rod is restricted and fixed in the slot by magnetic attraction.
[0014] Preferably, the limiting structure includes two limiting blocks and two groups of elastic clamping parts, the two limiting blocks are fixed at the two positioning surfaces in a one-to-one manner, and dovetail grooves are opened on the two inner side walls of the mother clamping plate along its length direction, and the ends of the two limiting blocks away from the positioning surfaces are respectively inserted into the two dovetail grooves, and the two groups of elastic clamping parts are respectively arranged in the two dovetail grooves for clamping and limiting the limiting blocks, and the elastic clamping part includes a dovetail slider, a spring and a paddle, the dovetail slider is slidably connected in the dovetail groove, the spring is horizontally arranged in the dovetail groove, the two ends of the spring are respectively connected to the dovetail slider and the groove wall of the dovetail groove, and one end of the paddle extends into the dovetail groove and is fixed to the dovetail slider.
[0015] Through the above arrangement, as another optimization solution for the limiting structure, an elastic clamping part is used to clamp and fix the limiting block provided on the daughter card in the dovetail groove, so as to restrict and fix the insertion rod in the slot.
[0016] Preferably, the four mother pallets are divided into two groups diagonally opposite to each other, one group includes two first mother pallets, and the other group includes two second mother pallets, and a group of second connecting components is provided between adjacent first mother pallets and adjacent second mother pallets, and the second connecting component includes a connecting groove and a connecting rod, the connecting groove is opened on the outer side wall of an end of the second mother pallet facing the first mother pallet, the connecting groove is arranged along the length direction of the second mother pallet, the connecting rod is fixed on the end face of the first mother pallet facing the connecting groove, the shape and size of the connecting rod match the shape and size of the connecting groove, the connecting rod is inserted into the connecting groove, and the traction assembly is connected to the connecting rod.
[0017] The above arrangement facilitates the installation of the positioning fixture, and not only makes the positioning fixture more evenly stressed, but also enables each mother card plate and each child card plate to cooperate with each other to form a limit lock.
[0018] Preferably, the traction assembly includes a traction frame and four movable rods, the traction frame is arranged above the positioning steel plate, the four movable rods are vertically fixed to the bottom of the traction frame, and the positioning steel plate is provided with four second positioning holes for the movable rods to pass through. After the lower ends of the four movable rods pass through the second positioning holes, they are detachably connected to the four connecting rods one by one through a third connecting assembly.
[0019] Through the above arrangement, when the positioning fixture is moved by the traction assembly, the four groups of clamping units are evenly stressed.
[0020] Preferably, the third connecting assembly includes a connecting ear plate and two connecting nuts, the connecting ear plate is fixed to the outer side wall of the connecting rod, the movable rod is a screw rod, the connecting ear plate is provided with a through hole for the screw rod to pass through, the two connecting nuts are arranged on the upper and lower sides of the connecting ear plate, and the two connecting nuts are both threadedly connected to the screw rod.
[0021] Through the above arrangement, the third connecting component can be easily disassembled for continuous use.
[0022] Preferably, the traction frame is a quadrilateral frame, the four movable rods are fixed one by one at the four angles of the quadrilateral frame, a lifting portion is fixed on the top of the quadrilateral frame, a pouring port is opened on the positioning steel plate, and the pouring port is located on the inner side of the quadrilateral frame.
[0023] Through the above arrangement, the quadrilateral frame can be used to avoid blocking the installation position when installing the four anchor bolts and the positioning steel plate, and the pouring port can be used to avoid obstruction of the positioning steel plate and the positioning fixture during the pouring process.
[0024] Preferably, the lifting portion is a handle or a pull ring.
[0025] The above arrangement facilitates the traction frame to move vertically.
[0026] Compared with the prior art, the present invention has the following beneficial effects:
[0027] 1. The upper part of the four anchor bolts can be horizontally positioned by the positioning steel plate, and the lower part of the four anchor bolts can be horizontally positioned by the positioning fixture, so that the positioning steel plate can be used to realize the synchronous positioning function of the upper and lower sides of the four anchor bolts during the pouring process, thereby reducing the problem of low accuracy of pre-embedded anchor bolts caused by offset during pouring.
[0028] 2. The traction assembly provided can drive the positioning fixture to move synchronously with the increase of the pouring liquid level, while reducing the impact of pouring on the anchor bolts. In conjunction with the detachable connection of the first connecting assembly and the second connecting assembly, the positioning fixture can be easily removed from the anchor bolts after the anchor bolts are cast and pre-embedded and positioned, thereby achieving the purpose of sustainable use of the positioning fixture. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 This is a schematic diagram of the main structure of an anchor bolt positioning tool for hoisting in steel structure construction according to an embodiment of the present invention.
[0030] Figure 2 For the present invention Figure 1 Schematic diagram of the cross-sectional structure at AA in FIG.
[0031] Figure 3 For the present invention Figure 1 A local enlarged schematic diagram of point B in the figure.
[0032] Figure 4 The present invention is a schematic diagram of the three-dimensional structure of a sub-cage in an anchor bolt positioning tool for hoisting steel structure construction according to an embodiment of the present invention.
[0033] Figure 5 The present invention is a schematic diagram of the three-dimensional structure of a first female clamping plate in a foundation bolt positioning tool for hoisting in steel structure construction according to an embodiment of the present invention.
[0034] Figure 6 It is a schematic diagram of the front stereoscopic structure of a second mother clamping plate in a foundation bolt positioning tool for hoisting in steel structure construction according to an embodiment of the present invention.
[0035] Figure 7 The present invention is a schematic diagram of a rear stereoscopic structure of a second mother clamping plate in a foundation bolt positioning tool for hoisting in steel structure construction according to an embodiment of the present invention.
[0036] Figure 8 It is a schematic diagram of the three-dimensional structure of the connection between a dovetail slider and a paddle in an anchor bolt positioning tool for hoisting in steel structure construction according to an embodiment of the present invention.
[0037] Fig. 9 The present invention is a schematic top view of the structure of an anchor bolt positioning tool for hoisting steel structure construction according to an embodiment of the present invention.
[0038] Fig.10 The present invention is a schematic diagram of the top view of the structure of a positioning steel plate in a positioning tool for anchor bolts used for hoisting in steel structure construction according to an embodiment of the present invention.
[0039] Fig.11 The present invention is a schematic structural diagram of an anchor bolt positioning tool for hoisting in steel structure construction during installation and use according to an embodiment of the present invention. DETAILED DESCRIPTION
[0040] The following is combined with Figure 1 To the attached Fig.11 , the specific implementation methods of the present invention are described in detail. In the description of the invention, it should be understood that the terms "center", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention.
[0041] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first" and "second" may explicitly or implicitly include one or more of the features; in the description of the invention, unless otherwise specified, "plurality" means two or more.
[0042] Example
[0043] like Figures 1 to 10 As shown, an embodiment of the present invention provides an anchor bolt positioning tool for steel structure construction hoisting, including a horizontally arranged positioning steel plate 1, a positioning fixture and a traction assembly, the positioning steel plate 1 is provided with four first positioning holes for the anchor bolts 2 to pass through, the positioning fixture is arranged below the positioning steel plate 1, and is used to horizontally position the lower sides of the four anchor bolts 2, the positioning fixture includes four groups of clamping units, each group of clamping units is correspondingly clamped on each anchor bolt 2, the clamping units include a mother clamping plate 31 and a child clamping plate 32, the mother clamping plate 31 is L-shaped, and a vertically arranged first semi-cylindrical groove is provided on the inner chamfer of the mother clamping plate 31 311, the first semi-cylindrical groove 311 is used to clamp on the outer wall of the anchor bolt 2, and the second semi-cylindrical groove 321 is opened on the side wall of the sub-clip plate 32 opposite to the first semi-cylindrical groove 311. The first semi-cylindrical groove 311 and the second semi-cylindrical groove 321 cooperate to form the positioning of the anchor bolt 2, and the sub-clip plate 32 is detachably connected to the inner chamfer of the mother clip plate 31 through the first connecting component, and the mother clip plates 31 in the two adjacent groups of clamping units are detachably connected through the second connecting component. The traction component is connected to the mother clip plate 31 in the positioning fixture, and is used to drive the positioning fixture to move vertically during pouring.
[0044] In this embodiment, the upper sides of the four anchor bolts 2 can be positioned by the positioning steel plate 1. When installing the four anchor bolts 2, the upper ends of the four anchor bolts 2 are inserted into the upper part of the positioning steel plate 1 through the first positioning holes. The first positioning holes are transitionally matched with the anchor bolts 2, so that the upper part of the anchor bolts 2 is horizontally positioned through the first positioning holes. At the same time, two mounting nuts 21 are threadedly connected to each anchor bolt 2. The two mounting nuts 21 are located on the upper and lower sides of the positioning steel plate 1. The two mounting nuts 21 can be used to vertically position the anchor bolts 2. The lower sides of the anchor bolts 2 are clamped by the four groups of clamping units. When clamping, the first semi-cylindrical groove 311 set on the mother clamping plate 31 is first clamped on the outer side wall of the anchor bolt 2, and then the second semi-cylindrical groove 321 set on the sub-clip plate 32 is clamped on the inner side wall of the anchor bolt 2, and the mother clamping plate 31 and the sub-clip plate 32 are connected together through the first connecting component. The groove 311 and the second semi-cylindrical groove 321 cooperate to form a complete cylindrical groove, and a transition fit is adopted between the cylindrical groove and the anchor bolt 2. The mother clamping plates 31 in the two adjacent groups of clamping units are detachably connected by the second connecting assembly, and the four groups of clamping units can be connected into a whole to form a positioning fixture, forming a horizontal limit for the lower side of the four anchor bolts 2. At the same time, the mother clamping plates 31 in the four groups of clamping units are connected to the traction assembly. In this way, during the pouring process, when the pouring liquid level exceeds the lower ends of the four anchor bolts 2, the traction assembly can drive the positioning fixture to rise synchronously with the pouring liquid level, so that during the pouring process, the positioning fixture can be used to synchronously position the four anchor bolts 2, avoiding the bottom of the four anchor bolts 2 being impacted by concrete during the pouring process and offset, thereby causing positioning errors. After the anchor bolts 2 are poured and embedded for positioning and fixing, the positioning fixture can be removed from the anchor bolts 2, thereby achieving the purpose of sustainable use.
[0045] Further, such as Figures 2 to 4 As shown, as a preferred embodiment of the sub-card 32, the sub-card 32 in this embodiment has two mounting surfaces 322 and two positioning surfaces 323, the two mounting surfaces 322 are located on the same plane, and are arranged parallel to the inner chamfer of the mother card board 31, the second semi-cylindrical groove 321 is located between the two mounting surfaces 322, the first connecting component is arranged between the mounting surface 322 and the inner chamfer of the mother card board 31, the two positioning surfaces 323 are located at both ends of the mounting surface 322, and the two positioning surfaces 323 are respectively arranged parallel to the two inner walls of the mother card board 31 that are perpendicular to each other, and the two positioning surfaces 323 can play a positioning role on the mounting surface 322, so that after the mounting surface 322 is connected to the mother card board 31 through the first connecting component, the two positioning surfaces 323 can be in parallel contact with the two inner walls of the mother card board 31 that are perpendicular to each other, and are restricted by the two inner walls of the mother card board 31 that are perpendicular to each other, refer to Figure 2 , so that the sub-cage 32 cannot move obliquely upward or downward, and it can only move in a direction perpendicular to the chamfer inside the mother chamfer 31, thereby achieving a more accurate positioning process for the anchor bolt 2.
[0046] In specific implementation, Figure 2 As shown, the angle between the inner chamfer of the mother clamp 31 and its adjacent inner wall can be set to 135°, and the angle between the mounting surface 322 and the positioning surface 323 is also 135°, the first semi-cylindrical groove 311 is set in the middle of the inner chamfer, and the second semi-cylindrical groove 321 is set in the middle of the mounting surface 322, so that the anchor bolt 2 can be centered.
[0047] Specifically, Figures 2 to 4 As shown, the first connecting component includes two plug rods 51 and a limiting structure. The two plug rods 51 are parallel and vertically fixed on the mounting surface 322 of the sub-card 32. The two plug rods 51 are located on both sides of the second semi-cylindrical groove 321. A slot 52 for inserting the two plug rods 51 is opened on the side wall of the mother card 31 facing the two plug rods 51 with a chamfered corner. The limiting structure is arranged between the sub-card 32 and the mother card 31, and is used to limit and fix the plug rod 51 in the slot 52 when the traction component drives the positioning fixture to move vertically. When the sub-card 32 is connected to the mother card 31 through the first connecting component, due to the plug The rod 51 is perpendicular to the mounting surface 322, and the mounting surface 322 is arranged parallel to the inner chamfer of the mother card board 31, that is, the insertion rod 51 is perpendicular to the inner chamfer of the mother card board 31. In this way, when connecting, it is only necessary to insert the two insertion rods 51 in the sub-card board 32 into the two slots 52 along the direction perpendicular to the inner chamfer of the mother card board 31. The positioning surfaces 323 on both sides of the sub-card board 32 are restricted by the two inner walls of the mother card board 31 that are perpendicular to each other and cannot move. It is only necessary to restrict and fix the insertion rod 51 in the slot 52 through a limiting structure to keep the sub-card board 32 and the mother card board 31 cooperate to form a clamping and limiting function for the anchor bolt 2.
[0048] Further, as an optional implementation of the limiting structure, Figure 3 As shown, the limiting structure of the present embodiment is a permanent magnet 53, and the permanent magnet 53 is fixed on the innermost groove wall of the slot 52. The material of the insertion rod 51 is a magnetic metal material that can be adsorbed by the permanent magnet 53. The permanent magnet 53 is set to adsorb and fix the insertion rod 51 after the insertion rod 51 is inserted into the slot 52, so as to avoid the problem that the insertion rod 51 is detached from the slot 52, resulting in the inability of the sub-card plate 32 to cooperate with the main card plate 31 to form a clamping and positioning problem for the anchor bolt 2 when the positioning fixture is driven by the traction assembly to move vertically.
[0049] Further, as another optional implementation of the limiting structure, such as Figures 2 to 8As shown, the limiting structure includes two limiting blocks 61 and two groups of elastic clamping parts 63. The two limiting blocks 61 are fixed at the two positioning surfaces 323 respectively in a one-to-one manner. Dovetail grooves 62 are opened on the two inner side walls of the mother clamping plate 31 along its length direction. The ends of the two limiting blocks 61 away from the positioning surfaces 323 are respectively inserted into the two dovetail grooves 62. The two groups of elastic clamping parts 63 are respectively arranged in the two dovetail grooves 62 for clamping and limiting the limiting blocks 61. The elastic clamping part includes a dovetail slider 631, a spring 632 and a paddle 633. The dovetail slider 631 is slidably connected in the dovetail groove 62. The spring 632 is horizontally arranged in the dovetail groove 62. The two ends of the spring 632 are respectively connected to the dovetail slider 631 and the groove wall of the dovetail groove 62. One end of the paddle 633 extends into the dovetail groove 62 and is fixed to the dovetail slider 631.
[0050] In this embodiment, before the daughter card 32 is inserted into the slot 52 and connected to the mother card 31 through the insertion rod 51, the paddle 633 is first pushed in the direction away from the slot 52, driving the dovetail slider 631 to compress the spring 632 so that the dovetail groove 62 leaves space. When the insertion rod 51 is inserted into the slot 52, the two limit blocks 61 provided on the daughter card 32 can be simultaneously inserted into the two dovetail grooves 62 provided on the inner wall of the mother card 31, and then the paddle 633 is released. Under the elastic force of the spring 632, the dovetail slider 631 moves along the dovetail groove 62 to clamp the limit blocks 61 and fix them. It is fixed at the end of the dovetail groove 62, thereby forming a limit for the two limit blocks 61. The sub-card 32 will only be separated from the mother card board 31 when the insertion rod 51 is withdrawn from the slot 52 in a direction perpendicular to the chamfer in the mother card board 31. During the separation of the sub-card board 32, the limit block 61 will be hindered by the clamping force of the dovetail slider 631, so that the insertion rod 51 cannot be separated from the slot 52. Therefore, when the positioning fixture is driven by the traction assembly to move vertically, the problem of the sub-card board 32 being separated and unable to cooperate with the mother card board 31 to form a clamping and positioning for the anchor bolt 2 is avoided.
[0051] Further, such as Figure 2 , Figure 5 , Figure 6 and Figure 7As shown, the four mother pallets 31 are diagonally divided into two groups, one of which includes two first mother pallets 31a, and the other group includes two second mother pallets 31b. A group of second connecting components is provided between adjacent first mother pallets 31a and adjacent second mother pallets 31b. The second connecting component includes a connecting groove 71 and a connecting rod 72. The connecting groove 71 is opened on the outer side wall of one end of the second mother pallet 31b facing the first mother pallet 31a. The connecting groove 71 is arranged along the length direction of the second mother pallet 31b. The connecting rod 72 is fixed on the end face of the first mother pallet 31a facing the connecting groove 71. The shape and size of the connecting rod 72 match the shape and size of the connecting groove 71. The connecting rod 72 is inserted into the connecting groove 71, and the traction component is connected to the connecting rod 72.
[0052] In this embodiment, refer to Figure 2 When installing the positioning fixture, first install the two second mother clamps 31b on the two anchor bolts 2 set at the lower left and upper right, and connect the sub-clip 32 with the second mother clamp 31b to form a clamping and positioning for the two anchor bolts 2 set at the lower left and upper right, and then install the two first mother clamps 31a on the two anchor bolts 2 set at the upper left and lower right, and at the same time, insert the connecting rods 72 set at both ends of the first mother clamp 31a into the connecting grooves 71 opened on the second mother clamp 31b set adjacent to it, so that the four mother clamps 31 are connected into a whole to form a positioning fixture, and then connect the connecting rod 72 to the traction assembly. The installation along the diagonal line can not only make the positioning fixture more evenly stressed, but also enable each mother clamp 31 and each sub-clip 32 to cooperate with each other to form a limit lock.
[0053] Further, such as Figure 1 , Fig. 9 and Fig.10 As shown, the traction assembly includes a traction frame 41 and four moving rods 42. The traction frame 41 is arranged above the positioning steel plate 1, and the four moving rods 42 are vertically fixed at the bottom of the traction frame 41. The positioning steel plate 1 is provided with four second positioning holes for the moving rods 42 to pass through. After the lower ends of the four moving rods 42 pass through the second positioning holes, they are detachably connected to the four connecting rods 72 one by one through the third connecting assembly, wherein the second positioning holes and the moving rods 42 are transitionally matched, so that the moving positioning of the moving rods 42 can be achieved. Therefore, when the traction frame 41 drives the four moving rods 42 to move, the second positioning holes are used to keep the moving rods 42 able to move vertically, and then the four moving rods 42 are used to drive the four connecting rods 72 to move synchronously through the third connecting assembly, thereby realizing the overall vertical movement process of the positioning fixture and making the four groups of clamping units evenly stressed.
[0054] Specifically, Figure 1 , Figure 2 and Figure 5As shown, the third connecting component includes a connecting ear plate 81 and two connecting nuts 82. The connecting ear plate 81 is fixed to the outer wall of the connecting rod 72. The moving rod 42 is a screw. A through hole for the screw to pass through is opened on the connecting ear plate 81. The two connecting nuts 82 are arranged on the upper and lower sides of the connecting ear plate 81. The two connecting nuts 82 are both threadedly connected to the screw. The through hole arranged on the connecting ear plate 81 is transitionally matched with the moving rod 42, which can form a horizontal positioning function for the moving rod 42 after the moving rod 42 passes through the connecting ear plate 81. The connecting ear plate 81 can be fixed to the moving rod 42 by the two connecting nuts 82, so that when the moving rod 42 is driven to move vertically by the traction frame 41, the positioning fixture can be driven to move synchronously.
[0055] Further, such as Figure 1 , Fig. 9 and Fig.10 As shown, the traction frame 41 is a quadrilateral frame, and the four moving rods 42 are fixed one by one at the four corners of the quadrilateral frame. A lifting portion 43 is fixed on the top of the quadrilateral frame. A pouring port 11 is provided on the positioning steel plate 1, and the pouring port 11 is located on the inner side of the quadrilateral frame. By setting the traction frame 41 as a quadrilateral frame, it is possible to connect the four moving rods 42 while avoiding blocking the installation positions of the positioning steel plate 1 and the four anchor bolts 2, so that the nuts 21 can be installed conveniently and the positioning steel plate 1 can be used to horizontally position the four anchor bolts 2. The pouring port 11 can be used to facilitate pouring, and the obstruction of the positioning steel plate 1 and the positioning fixture to pouring can be avoided during the pouring process.
[0056] Further, as an optional implementation of the lifting portion 43, as Figure 1 and Fig. 9 As shown, the lifting portion 43 in this embodiment is a handle, which is welded and fixed on the top of the quadrilateral frame. The traction frame 41 can be lifted conveniently by the handle. There are four handles so that the force is evenly distributed. As an optional implementation of the lifting portion 43, the lifting portion 43 is a pull ring (not shown in the figure), which is welded and fixed on the top of the quadrilateral frame. It has the same function as the handle. In actual construction, one end of the traction rope can be fixed to the handle or the pull ring, and the other end of the traction rope can be connected to a winch or other mechanical equipment capable of lifting, so as to automatically drive the traction frame 41 to pull the positioning fixture to move vertically synchronously with the pouring liquid level. Compared with manual operation, it has the advantage of precise movement, and can fix the height of the traction frame 41 and the positioning fixture after pouring the concrete, so that it is located above the poured concrete. After waiting for the concrete to solidify and pre-embed the anchor bolts to position them, it is convenient for construction personnel to remove the traction assembly and the positioning fixture.
[0057] The overall use principle of the present invention is as follows:
[0058] like Fig.11As shown, during the pre-embedded construction of the anchor bolts, a positioning template 91 is set in the excavated foundation pit, and after the positioning steel plate 1, the positioning fixture and the traction assembly are assembled with the four anchor bolts 2 respectively, the positioning steel plate 1 is horizontally fixed to the top of the positioning template 91 through the positioning bracket 92, and then concrete is poured through the pouring port 11. During the pouring process, the positioning steel plate 1 forms a horizontal positioning of the upper side of the four anchor bolts 2, and the positioning fixture forms a horizontal positioning of the lower side of the four anchor bolts 2. When the concrete covers the lower ends of the four anchor bolts 2 and is about to contact the positioning fixture, the positioning fixture is pulled by the traction frame 41 to follow The pouring liquid level rises vertically synchronously. During the vertical movement of the positioning fixture, the horizontal limiting process of the four anchor bolts 2 can be maintained, reducing the impact of the concrete on the anchor bolts 2. Until it moves above the specified concrete pouring liquid level, the height of the positioning fixture is kept unchanged. When the concrete and the anchor bolts 2 are solidified and fixed, the positioning steel plate 1, the positioning fixture and the traction assembly can be removed from the anchor bolts 2. During disassembly, first separate the traction assembly and the positioning fixture, then remove the traction assembly from the positioning steel plate 1, then remove the positioning steel plate 1 from the anchor bolts 2, and finally remove the positioning fixture from the anchor bolts 2.
[0059] The above disclosures are only several preferred specific embodiments of the present invention. However, the embodiments of the present invention are not limited thereto. Any changes that can be conceived by those skilled in the art should fall within the protection scope of the present invention.
Claims
1. A foundation bolt positioning tool for steel structure construction hoisting, comprising a horizontally arranged positioning steel plate (1), wherein the positioning steel plate (1) is provided with four first positioning holes for foundation bolts (2) to pass through, characterized in that: Also includes: A positioning fixture is arranged below the positioning steel plate (1) and is used to horizontally position the lower sides of the four anchor bolts (2). The positioning fixture comprises four groups of clamping units, each group of clamping units correspondingly clamps on each anchor bolt (2). The clamping units comprise a mother clamping plate (31) and a child clamping plate (32). The mother clamping plate (31) is L-shaped, and a vertically arranged first semi-cylindrical groove (311) is provided on the inner chamfer of the mother clamping plate (31). The first semi-cylindrical groove (311) is used to clamp on the anchor bolts (2). On the outer side wall of the anchor bolt (2), a second semi-cylindrical groove (321) is provided on the side wall of the sub-card (32) facing the first semi-cylindrical groove (311); the first semi-cylindrical groove (311) cooperates with the second semi-cylindrical groove (321) to form a positioning for the anchor bolt (2); the sub-card (32) is detachably connected to the inner chamfer of the mother card (31) via a first connecting component; and the mother card (31) in two adjacent groups of holding units are detachably connected via a second connecting component; The traction assembly is connected to the mother clamping plate (31) in the positioning clamp and is used to drive the positioning clamp to move vertically during pouring.
2. The anchor bolt positioning tool for steel structure construction and hoisting according to claim 1 is characterized in that: The sub-card (32) has two mounting surfaces (322) and two positioning surfaces (323); the two mounting surfaces (322) are located on the same plane and are arranged parallel to the inner chamfer of the mother card (31); the second semi-cylindrical groove (321) is located between the two mounting surfaces (322); the first connecting component is arranged between the mounting surface (322) and the inner chamfer of the mother card (31); the two positioning surfaces (323) are located at both ends of the mounting surface (322), and the two positioning surfaces (323) are respectively arranged parallel to two inner walls of the mother card (31) that are perpendicular to each other.
3. The anchor bolt positioning tool for steel structure construction and hoisting according to claim 2 is characterized in that: The first connection component comprises: Two insertion rods (51) are fixed parallely and vertically on the mounting surface (322) of the sub-card (32), the two insertion rods (51) are located on both sides of the second semi-cylindrical groove (321), and slots (52) for inserting the two insertion rods (51) are provided on the side wall of the inner chamfer of the mother card (31) facing the two insertion rods (51); The limiting structure is arranged between the sub-card (32) and the main card (31) and is used to limit and fix the insertion rod (51) in the slot (52) when the traction component drives the positioning fixture to move vertically.
4. The anchor bolt positioning tool for steel structure construction and hoisting according to claim 3 is characterized in that: The limiting structure is a permanent magnet (53), the permanent magnet (53) is fixed on the innermost slot wall of the slot (52), and the material of the insertion rod (51) is a magnetic metal material that can be adsorbed by the permanent magnet (53).
5. The anchor bolt positioning tool for steel structure construction and hoisting according to claim 3 is characterized in that: The limiting structure comprises: Two limit blocks (61) are fixed on the two positioning surfaces (323) in a one-to-one correspondence, and dovetail grooves (62) are provided on the two inner side walls of the mother clamping plate (31) along the length direction thereof, and ends of the two limit blocks (61) away from the positioning surfaces (323) are respectively inserted into the two dovetail grooves (62); Two groups of elastic clamping parts (63) are respectively arranged in two dovetail grooves (62) and are used to clamp and limit the limit block (61). The elastic clamping parts include a dovetail slider (631), a spring (632) and a paddle (633). The dovetail slider (631) is slidably connected in the dovetail groove (62). The spring (632) is horizontally arranged in the dovetail groove (62). Two ends of the spring (632) are respectively connected to the dovetail slider (631) and the groove wall of the dovetail groove (62). One end of the paddle (633) extends into the dovetail groove (62) and is fixed to the dovetail slider (631).
6. The anchor bolt positioning tool for steel structure construction and hoisting according to claim 3 is characterized in that: The four mother pallets (31) are divided into two groups at a diagonal angle to each other, one group includes two first mother pallets (31a), and the other group includes two second mother pallets (31b). A group of second connecting components is provided between adjacent first mother pallets (31a) and adjacent second mother pallets (31b). The second connecting component includes a connecting groove (71) and a connecting rod (72). The connecting groove (71) is provided on an outer side wall of an end of the second mother pallet (31b) facing the first mother pallet (31a). The connecting groove (71) is provided along the length direction of the second mother pallet (31b). The connecting rod (72) is fixed on an end surface of the first mother pallet (31a) facing the connecting groove (71). The shape and size of the connecting rod (72) match those of the connecting groove (71). The connecting rod (72) is inserted into the connecting groove (71), and the traction component is connected to the connecting rod (72).
7. The anchor bolt positioning tool for steel structure construction and hoisting according to claim 6 is characterized in that: The traction assembly comprises a traction frame (41) and four moving rods (42); the traction frame (41) is arranged above the positioning steel plate (1); the four moving rods (42) are vertically fixed to the bottom of the traction frame (41); the positioning steel plate (1) is provided with four second positioning holes for the moving rods (42) to pass through; the lower ends of the four moving rods (42) pass through the second positioning holes and are detachably connected to the four connecting rods (72) in a one-to-one correspondence via a third connecting assembly.
8. The anchor bolt positioning tool for steel structure construction and hoisting according to claim 7 is characterized in that: The third connecting assembly comprises a connecting ear plate (81) and two connecting nuts (82); the connecting ear plate (81) is fixed to the outer side wall of the connecting rod (72); the moving rod (42) is a screw rod; a through hole for the screw rod to pass through is provided on the connecting ear plate (81); the two connecting nuts (82) are arranged on the upper and lower sides of the connecting ear plate (81), and the two connecting nuts (82) are both threadedly connected to the screw rod.
9. The anchor bolt positioning tool for steel structure construction and hoisting according to claim 7 is characterized in that: The traction frame (41) is a quadrilateral frame, the four moving rods (42) are fixed one by one at four angles of the quadrilateral frame, a lifting portion (43) is fixed on the top of the quadrilateral frame, and a pouring port (11) is provided on the positioning steel plate (1), and the pouring port (11) is located on the inner side of the quadrilateral frame.
10. The anchor bolt positioning tool for steel structure construction and hoisting according to claim 9, characterized in that: The lifting portion (43) is a handle or a pull ring.
Citation Information
Patent Citations
Foundation bolt positioning device
CN111733864A
Pre-burying construction method for raft foundation anchor bolts of high-rise steel structure deep foundation pit
CN114575372A
