Environmental load control system and method for deep geotechnical engineering disturbance simulation facility

By designing the environmental load control system for deep geotechnical engineering disturbance simulation facilities, the problem that existing technology cannot accurately control the ultra-high pressure and high temperature environment of large-sized structures has been solved, and stable control of the deep geotechnical engineering test environment has been achieved, improving test efficiency. accuracy and effectiveness.

CN118655941BActive Publication Date: 2024-10-29INST OF ROCK & SOIL MECHANICS CHINESE ACAD OF SCI +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411133532.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-10-29
Estimated Expiration
2044-08-19

AI Technical Summary

Technical Problem

Existing deep geotechnical disturbance simulation facilities cannot accurately and stably control the ultra-high pressure and long-term high temperature environment of large-scale structures, limiting the accuracy and effectiveness of the test.

Method used

An environmental load control system for deep geotechnical engineering disturbance simulation facilities is designed, including a pressure control subsystem and a temperature control subsystem, using thermal oil and resistance heating units, and an electric liquid pressure relief unit and a hydraulic booster. , achieving precise pressure and temperature control of the main cabin and providing a stable high-temperature environment.

Benefits of technology

It achieves the control of stable ultra-high pressure and high-temperature environments for large-scale structures, improves the accuracy and effectiveness of tests, and meets the needs of deep geotechnical engineering simulations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118655941B_ABST
    Figure CN118655941B_ABST
Patent Text Reader

Abstract

The present invention discloses a deep geotechnical engineering disturbance simulation facility environmental load control system and method, in which: the pressure control subsystem includes a main cabin pressurization and pressure relief unit and a pressure stabilization unit; the main cabin pressurization and pressure relief unit is used for pressurizing and depressurizing the main cabin for large flow rate changes, thereby applying or unloading confining pressure; the pressure stabilization unit is used for stabilizing the pressure of the main cabin and pressurizing, stabilizing and depressurizing the actuator for small flow rate conditions, thereby meeting the pressure test requirements; the temperature control subsystem includes a heat transfer oil unit, a resistance heating unit and a cooling water unit; the heat transfer oil unit is used for heating the inside of the main cabin with circulating heat transfer oil to achieve temperature increase; the resistance heating unit is used for heating the outside of the main cabin with resistance heating to achieve preheating, auxiliary heat transfer oil unit temperature increase and continuous heat preservation; the cooling water unit is used for cooling the heat transfer oil in the heat transfer oil unit with circulating cooling water, thereby indirectly cooling the main cabin after the test. The present invention can provide the pressure and temperature required for the test environment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to geotechnical engineering tests, and in particular to an environmental load control system and method for a deep geotechnical engineering disturbance simulation facility. Background Art

[0002] The deep rock mass environment has the characteristics of high ground stress, high geothermal temperature and high karst water pressure. Especially with the increase of underground depth, the high stress field in the deep rock mass accumulates, which makes the implementation of deep geotechnical engineering extremely difficult, so experimental research is needed.

[0003] In order to simulate the deep multi-field coupling environment and engineering disturbance conditions, and to accurately observe and control the evolution of the internal discontinuous structure and external nonlinear behavior of the rock mass, many geotechnical engineering disturbance simulation facilities have been developed for experimental research. However: 1) In the field of geotechnical engineering, it is usually followed that lower pressure is applied to large-scale structures and higher pressure is applied to small-scale structures. The current simulation facilities are generally unable to apply ultra-high pressure to large-scale structures, and cannot accurately and stably control the pressure, especially unable to apply a long-term stable pressure environment to large-scale structures (for example, simulating a 5,000-meter deep geotechnical environment for weeks or even a whole month); 2) The current simulation facilities are generally unable to accurately and stably control the temperature, especially unable to provide a long-term stable high temperature environment (for example, maintaining a deep geotechnical environment of 250°C for weeks or even a whole month). This has limited more accurate and effective experiments. Summary of the invention

[0004] The object of the present invention is to provide an environmental load control system and method for a deep geotechnical engineering disturbance simulation facility, which fully considers the characteristics of the deep geotechnical engineering disturbance simulation facility and can provide the pressure and temperature required for the test environment.

[0005] The technical solution adopted by the present invention is:

[0006] An environmental load control system for a deep geotechnical engineering disturbance simulation facility, comprising a pressure control subsystem for providing a pressure environment for the test and a temperature control subsystem for providing a temperature environment for the test;

[0007] The pressure control subsystem includes a main cabin pressurization and pressure relief unit and a pressure stabilizing unit using heat transfer oil as the working medium; the main cabin pressurization and pressure relief unit is used to pressurize and relieve the main cabin to apply or unload the surrounding pressure under conditions with large flow changes, including an electric liquid booster pump driven by a constant torque variable frequency motor for pressurization, a clean oil tank for oil supply, and a low-level oil tank for storing return oil. The pipeline between the electric liquid booster pump and the main cabin is provided with a manual pressure relief branch, a remote pressure relief branch with different pressure relief rates, a safety protection branch, an emergency remote pressure relief branch, and an emergency manual pressure relief branch. The pressure stabilizing unit is used for stabilizing the pressure of the main cabin and boosting, stabilizing and releasing the pressure of the actuators under the working condition of small flow rate to meet the pressure test requirements, including the hydraulic booster corresponding to the main cabin and each actuator, the servo valve corresponding to each hydraulic booster, the hydraulic pump for supplying pressure to the hydraulic booster, the clean oil tank 2 for oil supply, the pressure relief oil tank for storing pressure relief oil, the monitoring module, and the control module. The monitoring module is used to monitor the status of the hydraulic booster and the sample. The control module can control the corresponding hydraulic booster action through the servo valve closed loop according to the target command and the feedback of the monitoring module;

[0008] The temperature control subsystem includes a heat transfer oil unit, a resistance heating unit and a cooling water unit; the heat transfer oil unit is used to heat the interior of the main cabin with circulating heat transfer oil to achieve temperature rise, and includes a circulating oil pump, a high-level oil tank for supplying oil to the circulating oil pump, and a low-level oil tank 2 for storing the discharged heat transfer oil and circulating it. The high-level oil tank is replenished with oil by an oil replenishment pump, and the outlet end of the circulating oil pump is connected to an electric heater, a first switching valve, an oil storage tank and a second switching valve in sequence. The first switching valve can switch the heat transfer oil to enter or bypass the cooler, the second switching valve can switch the heat transfer oil to flow back to the circulating oil pump or to flow to the third switching valve, and the third switching valve can switch the heat transfer oil to flow from top to bottom or from bottom to top through the interior of the main cabin and then flow out of the interior of the main cabin through The oil flows back to the circulating oil pump through the gas-liquid separator. Shut-off valves are provided on the external pipes at the upper and lower ends of the main cabin. The external pipe at the lower end of the main cabin is connected to the second low-level oil tank through an oil drain pump. The resistance heating unit is used to heat the outside of the main cabin by resistance heating to achieve preheating, auxiliary heating of the heat transfer oil unit and continuous insulation, including an outer shell that can surround the closed main cabin and resistance heating elements distributed on the inner wall of the outer shell; the cooling water unit is used to cool the heat transfer oil in the heat transfer oil unit by circulating cooling water and thereby indirectly cool the main cabin after the test, including a circulating cooling water pump that can deliver circulating cooling water to the cooler, a cooling water tank for supplying water to the circulating cooling water pump, and a cooling tower for dissipating heat from the circulating cooling water after absorbing heat.

[0009] Preferably, in the pressure control subsystem, two parallel electric liquid booster pumps are used; one is a large-flow booster pump, which works when pressurization is required at a boost rate of more than 2MPa / min; the other is a small-flow booster pump, which works when pressurization is required at a boost rate of less than 2MPa / min; the two shall not work at the same time.

[0010] Preferably, in the pressure control subsystem, an ultra-high pressure manual pressure relief valve is provided on the manual pressure relief branch, and two remote pressure relief branches are provided with two parallel ultra-high pressure electric regulating valves and one ultra-high pressure pneumatic needle valve. The ultra-high pressure electric regulating valve adjusts the valve opening through PID to accurately control the pressure relief rate of the main cabin. The two remote pressure relief branches are used individually or in combination according to the required pressure relief rate.

[0011] Preferably, in the pressure control subsystem, ultra-high pressure filters are provided on both the manual pressure relief branch and the remote pressure relief branch, an ultra-high pressure cooler and an electric heating device are provided near the main cabin on the pipeline between the electric liquid booster pump and the main cabin, and a cooling coil is provided in the low-level oil tank.

[0012] Preferably, in the pressure control subsystem, pressure monitoring components are provided on the pipeline between the electric liquid booster pump and the main cabin, the manual pressure relief branch, the remote pressure relief branch with different pressure relief rates, and the air source system for supplying air to each pneumatic valve in the main cabin pressurization and pressure relief unit, and interlocking protection is achieved through the feedback of the pressure monitoring components: when the remote pressure relief valve on any remote pressure relief branch is opened and the air control valve is closed, the electric liquid booster pump cannot be started and operated; when the valve on the pipeline between the electric liquid booster pump and the main cabin is not opened, the electric liquid booster pump cannot be started and operated. start and run; when the cooling coil in the low-level oil tank 1 is not opened, the remote pressure relief valve on any remote pressure relief branch cannot be opened; when the difference between any pressure monitoring device and the other pressure monitoring devices is greater than 10MPa, there will be an alarm indication; when the electric heating device near the main cabin on the pipeline between the electric liquid booster pump and the main cabin is not working, pressurization and pressure relief operations cannot be performed; when the liquid level in the clean oil tank 1 is low, pressurization and pressure relief operations cannot be performed; when the pressure on the air source system is lower than 0.6MPa, the main cabin pressurization and pressure relief unit shall not work, and there will be an alarm indication.

[0013] Preferably, in the pressure control subsystem, the monitoring module includes a pressure monitoring device for monitoring the pressure at the low-pressure end and the high-pressure end of the hydraulic booster, a displacement monitoring device for monitoring the displacement of the hydraulic booster piston, and a deformation monitoring device for monitoring the deformation of the sample. The control module can control the corresponding hydraulic booster through a servo valve closed-loop according to the target pressure and the feedback of the pressure monitoring device, can calculate the volume and flow of the medium injected into the actuator or the main cabin according to the feedback of the displacement monitoring device, can control the corresponding hydraulic booster through a servo valve closed-loop according to the required volume and flow of the medium injected into the actuator or the main cabin and the feedback of the displacement monitoring device, and can control the corresponding hydraulic booster through a servo valve closed-loop according to the target deformation of the sample and the feedback of the deformation monitoring device.

[0014] Preferably, in the temperature control subsystem, the electric heater and the circulating oil pump are interlocked: the electric heater is not powered when the circulating oil pump is not started, and the circulating oil pump does not stop working when the electric heater is not powered off. When the circulating oil pump stops working after the electric heater is powered off is manually controlled.

[0015] Preferably, in the temperature control subsystem, the second low-level oil tank is provided with a cooling coil, and the cooling water unit can also cool the cooling coil with circulating cooling water and thereby indirectly cool the heat transfer oil in the second low-level oil tank.

[0016] Preferably, in the temperature control subsystem, two circulating oil pumps are used, one for use and the other for standby; the circulating oil pump is a shielded pump driven by a constant torque explosion-proof variable frequency motor.

[0017] Preferably, in the temperature control subsystem, two shut-off valves are respectively provided on the external pipes at the upper and lower ends of the main cabin, and the shut-off valves are electric high-temperature and ultra-high-pressure gate valves with a caliber not less than DN65.

[0018] Preferably, in the temperature control subsystem, the outer shell is divided into two half shells in the middle, and the two half shells can be moved to close and separate with each other. The joints of the two half shells are provided with sealing grooves, and high-temperature resistant sealing fillers are provided in the sealing grooves. When the two half shells are closed together, a closed cavity can be formed to surround and seal the main cabin; high-temperature resistant furnace lining modules are distributed on the inner wall of the outer shell. After being heated at high temperature, the furnace lining modules expand internally so that they are pressed against each other and a solidified hard layer is generated on the surface; the resistance heating element is wrapped around the insulating porcelain tube, and the insulating porcelain tube is fixed to the inner wall of the outer shell through the insulating porcelain part, and the outer shell body is made of stainless steel.

[0019] A method for controlling environmental loads of a deep geotechnical engineering disturbance simulation facility, based on the above-mentioned deep geotechnical engineering disturbance simulation facility environmental load control system;

[0020] Before the test: first, the resistance heating unit is used to surround and seal the main cabin and heat the outside of the main cabin by resistance heating to achieve preheating; then, the heated heat transfer oil is input into the main cabin by the heat transfer oil unit, and the heat transfer oil is circulated between the main cabin and the electric heater by the circulating oil pump to continuously increase the temperature of the heat transfer oil, and with the assistance of the resistance heating unit, the main cabin reaches the ambient temperature required by the test; then, the connection between the main cabin and the heat transfer oil unit is cut off, and the main cabin is pressurized; then, long-term heat preservation is carried out, at this time, the heat transfer oil unit does not work, and the resistance heating unit ensures that the main cabin is always maintained at the test temperature;

[0021] During the test: first, slowly increase the internal pressure of the actuator through the pressure stabilizing unit, then pressurize the main cabin to the required ambient pressure through the main cabin pressurization and pressure relief unit at the required pressurization rate and stabilize the main cabin through the pressure stabilizing unit, then increase the internal pressure of the actuator at the required pressurization rate through the pressure stabilizing unit, apply a certain pressure to the sample and stabilize the pressure, then accurately control the actuator through the pressure stabilizing unit according to the test requirements to test the sample;

[0022] After the test is completed: turn off the resistance heating unit, turn on the thermal oil unit and turn off the electric heater therein, turn on the cooling water unit, the thermal oil unit allows the thermal oil to circulate in the main cabin and the main cabin external pipelines, the cooling water unit allows the circulating cooling water to cool the thermal oil in the main cabin external pipelines and thus indirectly cool the main cabin, the circulating cooling water after absorbing heat dissipates heat through the cooling tower, and finally reduces the temperature of the thermal oil and the main cabin to below a certain temperature; first, the internal pressure of the actuator is synchronously unloaded to the surrounding pressure at the required rate through the pressure stabilizing unit, and then the main cabin surrounding pressure is unloaded at the required rate through the main cabin pressurization and pressure relief unit, and the internal pressure of the actuator is unloaded to atmospheric pressure through the pressure stabilizing unit.

[0023] Preferably, the working process of the thermal oil unit comprises the steps of:

[0024] S1, oil filling: open the valve on the external oil tank pipeline of the oil replenishment pump, close the valve of the second low-level oil tank connecting the oil replenishment pump pipeline, close the valve on the pipeline connecting the external pipeline at the lower end of the main cabin to the drain pump, switch the first switching valve to the thermal oil bypass cooler, switch the second switching valve to the third switching valve to flow the thermal oil to the thermal oil, open the cut-off valves on the external pipelines at the upper and lower ends of the main cabin, start the oil replenishment pump, fill the entire thermal oil unit with thermal oil through the high-level oil tank, wait for the high-level oil tank to have a liquid level display, indicating that the entire thermal oil unit has been filled, start the circulating oil pump, fully circulate the thermal oil and use the gas-liquid separator to exhaust air in preparation for oil boiling;

[0025] S2, heating the main cabin: first switch the first switching valve to the thermal oil bypass cooler, switch the second switching valve to the thermal oil flow back to the circulating oil pump, start the circulating oil pump, start the electric heater, and heat the oil to the target temperature according to the oil boiling process; then open the cut-off valves on the external pipes at the upper and lower ends of the main cabin, switch the second switching valve to the thermal oil flow to the third switching valve, switch the third switching valve to the thermal oil flow from top to bottom through the main cabin, and inject the thermal oil into the main cabin. If the temperature difference of the thermal oil at the upper and lower ends of the main cabin exceeds a certain value, switch the third switching valve to the thermal oil flow from bottom to top through the main cabin. By changing the flow direction of the thermal oil in the main cabin, the temperature field in the main cabin is made uniform, and the thermal oil temperature is accurately controlled by adjusting the flow rate of the circulating oil pump and the power of the electric heater;

[0026] S3. Cooling the heat transfer oil in the external pipeline of the main cabin: When the temperature of the main cabin reaches the test requirements, the heat transfer oil in the external pipeline of the main cabin needs to be cooled. Cut off the power supply of the electric heater and the cut-off valves on the external pipelines at the upper and lower ends of the main cabin, switch the heat transfer oil back to the circulating oil pump with the second switching valve, and continue to operate the circulating oil pump to prevent the heat transfer oil in the electric heater from coking. At the same time, switch the first switching valve to allow the heat transfer oil to enter the cooler, turn on the cooling water unit, and wait until the heat transfer oil in the external pipeline of the main cabin drops below a certain temperature, then turn off the circulating oil pump;

[0027] S4. Cooling the main cabin: After the main cabin test is completed and the pressure drops to 0 MPa, the main cabin needs to be cooled down. The shut-off valves on the external pipes at the upper and lower ends of the main cabin are opened, the first switching valve is switched to the heat transfer oil entering the cooler, the second switching valve is switched to the heat transfer oil flowing to the third switching valve, the circulating oil pump is started, the resistance heating unit is turned off, and the cooling water unit is turned on, so that the heat transfer oil circulates in the external pipes and the internal pipes of the main cabin. The circulating cooling water cools down the heat transfer oil and indirectly cools down the main cabin, and finally the temperature of the heat transfer oil and the main cabin is reduced to below a certain temperature. Finally, the circulating oil pump and the cooling water unit are turned off;

[0028] S5. Oil drain: open the shut-off valve on the external pipe at the lower end of the main cabin and the valve on the pipe connecting the external pipe at the lower end of the main cabin to the oil drain pump, start the oil drain pump, and pump the heat transfer oil in the main cabin and the heat transfer oil unit into the low-level oil tank 2.

[0029] The beneficial effects of the present invention are:

[0030] This application fully considers the characteristics of deep geotechnical engineering disturbance simulation facilities:

[0031] Regarding pressure control - since the main cabin has a large internal volume and the required flow rate change is relatively large, its pressure increase and pressure relief are achieved by an electric liquid booster pump in conjunction with the valves on each pressure relief branch, so the main cabin pressurization and pressure relief unit is used; at the same time, the pressure stabilization of the main cabin and the pressure increase, stabilization and pressure relief of each actuator require a small flow rate, and high pressure control accuracy is required, which is achieved by an electro-hydraulic servo-controlled hydraulic booster, so a pressure stabilization unit is used; in the main cabin pressurization and pressure relief unit, the danger of ultra-high pressure conditions is fully considered, and each pressure relief branch can have functions such as slow pressure relief, rapid pressure relief, manual pressure relief and manual pressure relief in emergency; in the pressure stabilization unit, the hydraulic booster can convert a smaller pressure into a larger pressure, reducing the danger of ultra-high pressure conditions, and the control module and the monitoring module are used to achieve closed-loop control, and the adjustment is more accurate and fast; the main cabin pressurization and pressure relief unit and the pressure stabilization unit are independent of each other and can be used in conjunction, which can accurately control the pressure of the main cabin and the actuator, thereby providing a pressure test environment.

[0032] Regarding temperature control - a heat transfer oil unit is used to heat the inside of the chamber by driving the external circulation of the heat transfer oil at low pressure. When the main chamber and the internal specimens reach the test temperature, the connection with the heat transfer oil unit can be closed. A resistance heating unit is used to heat the outer surface of the main chamber. The heating efficiency of the main chamber can be improved by preheating and auxiliary heating of the inside and outside of the heat transfer oil unit at the same time. It can also keep the heat continuously, and there is no need to circulate the heat transfer oil unit for a long time. It is easy to control and can also heat the main chamber and the internal specimens evenly. The temperature of the heat transfer oil can be accurately controlled by adjusting the flow of the circulating oil pump and the power of the electric heater. A cooling water unit is used to cool the heat transfer oil in the heat transfer oil unit with circulating cooling water, and then indirectly cool the main chamber, saving oil and water and not polluting the environment. Therefore, it can provide a stable high-temperature environment for deep geotechnical engineering disturbance simulation facilities. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0034] Figure 1 Schematic diagram of the main cabin pressurization and relief unit in an embodiment of the present invention.

[0035] Figure 2 It is a schematic diagram of the air source system of the main cabin pressurization and relief unit in an embodiment of the present invention.

[0036] Figure 3 Schematic diagram of a voltage stabilizing unit in an embodiment of the present invention.

[0037] Figure 4 It is a schematic diagram of the pressure closed-loop control in an embodiment of the present invention.

[0038] Figure 5 1 is a schematic diagram of the displacement closed-loop control principle in an embodiment of the present invention.

[0039] Figure 6 Schematic diagram of a thermal oil unit in an embodiment of the present invention.

[0040] Figure 7 Schematic diagram of a resistance heating unit in an embodiment of the present invention.

[0041] Figure 8 Schematic diagram of a cooling water unit in an embodiment of the present invention.

[0042] Fig. 9 It is a structural block diagram of the environmental load control system of the deep geotechnical engineering disturbance simulation facility in an embodiment of the present invention.

[0043] In the figure:

[0044] 1.1a~1.3a, ball valve; 2a, clean oil tank 1; 3a, electric ball valve; 4.1a~4.2a, filter; 5.1a~5.2a, electric liquid booster pump; 6.1a~6.2a, ultra-high pressure check valve; 7.1a~7.3a, ultra-high pressure manual needle valve; 8.1a~8.6a, ultra-high pressure pneumatic needle valve; 9a, ultra-high pressure manual regulating valve; 10.1a~10.3a, ultra-high pressure filter; 11.1a~11.4a, ultra-high pressure electric regulating valve; 12a, bursting disc; 13a, ultra-high pressure cooler; 14a, electric heating device; 15, main cabin; 16a, low-level oil tank 1 ; 17a, cooling coil; 18a, integrated air compressor; 19a, clean oil tank 2; 20a, manual ball valve; 21.1a~21.2a, filter; 22a, hydraulic pump; 23a, high-pressure fine oil filter; 24a, one-way valve; 25a, pressure gauge stop valve; 26a, proportional relief valve; 27.1a~27.5a, electro-hydraulic servo valve; 28.1a~28.5a, hydraulic booster; 29.1a~29.4a, bursting disc; 30.1a~30.5a, ultra-high pressure cooling filter; 31.1a~31.5a, ultra-high pressure manual needle valve; 32.1~32.4, actuator;

[0045] 1.1b~1.5b, ball valve; 2b, valve; 3b, circulating cooling water pump; 4b, filter; 5b, cooling water tank; 6b, cooling tower; 7b, shell; 8b, low-level oil tank 2; 9.1b~9.4b, ball valve; 10.1b~10.2b, filter; 11b- oil replenishment pump; 12b- high-level oil tank; 13b- gas-liquid separator; 14b- sampler; 15- main cabin; 1 6.1b-16.2b, filter; 17.1b~17.2b, circulating oil pump; 18.1b~18.5b, valve; 19b, electric heater; 20.1b, first switching valve; 20.2, second switching valve; 21b, cooler; 22b, oil storage tank; 23b, third switching valve; 24b, electric valve; 25b, oil drain pump; 26.1b~26.4b, cut-off valve. DETAILED DESCRIPTION

[0046] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.

[0047] Therefore, the following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of the present application for which protection is sought, but merely represents selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0048] The features and performance of the present application are further described in detail below in conjunction with the embodiments.

[0049] Embodiment 1

[0050] A certain project needs to simulate the stress conditions at 5000m underground and perform ultra-high pressure loading on large-size rock samples of 800mm*800mm*800mm, of which: the total volume of the main cabin 15 is 3.3m 3 The maximum working pressure (confining pressure) is 130MPa, the maximum working temperature is 250℃, and the ultra-high pressure and high temperature need to be maintained for 1 month; 4 actuators (32.1~32.4) are used, which are placed in the y and z directions respectively. The maximum working pressure is 150MPa, the pressure control accuracy is ±1%FS, the pressure increase rate is 1~10MPa / min (adjustable), and the ultra-high pressure needs to be maintained for 1 month.

[0051] In order to provide a test environment for the above-mentioned deep geotechnical engineering disturbance simulation facility, this embodiment provides an environmental load control system for a deep geotechnical engineering disturbance simulation facility, such as Fig. 9 As shown, it includes a pressure control subsystem for providing a pressure environment for the test and a temperature control subsystem for providing a temperature environment for the test; the specific contents are as follows.

[0052] 1. About the pressure control subsystem

[0053] The pressure control subsystem includes a main cabin pressurization and pressure relief unit and a pressure stabilization unit using heat transfer oil as the working medium;

[0054] 1. Main cabin pressurization and relief unit

[0055] The main cabin pressurization and pressure relief unit is used to pressurize and relieve the main cabin 15 to apply or unload the surrounding pressure in the working condition with large flow changes, such as Figure 1 As shown, it mainly includes an electric liquid booster pump (5.1a, 5.2a) for pressurization and driven by a constant torque variable frequency motor, a clean oil tank 2a for oil supply, and a low-level oil tank 16a for storing return oil. The pipeline between the electric liquid booster pump (5.1a, 5.2a) and the main cabin 15 is provided with a manual pressure relief branch, a remote pressure relief branch with different pressure relief rates, a safety protection branch, an emergency remote pressure relief branch, and an emergency manual pressure relief branch.

[0056] In order to ensure stable and reliable operation, in this embodiment, preferably: Figure 1 As shown, a manual ball valve 1.2a or an electric ball valve 3a and a filter (4.1a, 4.2a) are provided near the upstream of the electric liquid booster pump (5.1a, 5.2a), and an ultra-high pressure one-way valve (6.1a, 6.2a), an ultra-high pressure manual needle valve (7.1a, 7.2a), an ultra-high pressure pneumatic needle valve (8.1a, 8.2a) and a pressure monitoring component are provided near the downstream of the electric liquid booster pump (5.1a, 5.2a).

[0057] In order to ensure reliable pressure boosting and convenient adjustment, in this embodiment, preferably: Figure 1 As shown, two parallel electric liquid booster pumps (5.1a, 5.2a) are used; one is a large-flow booster pump, which works when the boost rate is required to be above 2MPa / min; the other is a small-flow booster pump, which works when the boost rate is required to be below 2MPa / min; the two pumps cannot work at the same time. The rated output flow of the large-flow booster pump is 28L / min, with an adjustment range of 10%-100%; the rated output flow of the small-flow booster pump is 8L / min, with an adjustment range of 10%-100%; the output flow is changed by adjusting the frequency of the constant-torque variable-frequency motor to achieve arbitrary adjustment of the boost rate of 1 to 10MPa / min.

[0058] In order to ensure reliable pressure relief, in this embodiment, preferably: Figure 1 As shown, a manual pressure relief branch is provided with an ultra-high pressure manual pressure relief valve 9a, one remote pressure relief branch is provided with two parallel ultra-high pressure electric regulating valves (11.1a, 11.2a) and one ultra-high pressure pneumatic needle valve 8.3a, and another remote pressure relief branch is also provided with two parallel ultra-high pressure electric regulating valves (11.3a, 11.4a) and one ultra-high pressure pneumatic needle valve 8.4a. The ultra-high pressure electric regulating valves (11.1a~11.4a) adjust the valve opening through PID to accurately control the pressure relief rate of the main cabin 15. The two remote pressure relief branches are used separately or in combination according to the required pressure relief rate.

[0059] In this embodiment, preferably: Figure 1 As shown, both the manual pressure relief branch and the remote pressure relief branch are provided with ultra-high pressure filters (10.1a~10.3a), the pipeline between the electric liquid booster pump (5.1a, 5.2a) and the main cabin 15 is provided with an ultra-high pressure cooler 13a, and the low-level oil tank 16a is provided with a cooling coil 17a. The medium flowing out of the main cabin 15 contains foreign matter and impurities and is high temperature. The ultra-high pressure filter (10.1a~10.3a) can filter the leaked medium to protect the downstream equipment. The ultra-high pressure cooler 13a is used to cool the high-temperature heat transfer oil during pressure relief. Since the leaked medium cannot be discharged directly, it needs to be discharged to the low-level oil tank 16a for storage. The cooling coil 17a can further cool the medium to room temperature.

[0060] In this embodiment, preferably: Figure 1 As shown, a bursting disc 12a is provided on the safety protection branch, an ultra-high pressure pneumatic needle valve 8.5a is provided on the emergency remote pressure relief branch, and an ultra-high pressure manual needle valve 7.3a is provided on the emergency manual pressure relief branch to ensure reliable emergency pressure relief.

[0061] In this embodiment, preferably: Figure 1 As shown, an electric heating device 14a is provided near the main cabin 15 on the pipeline between the electric liquid booster pump (5.1a, 5.2a) and the main cabin 15. The electric heating device can heat the medium pressed into the main cabin 15 to ensure that the environment in the main cabin 15 and the temperature field of the test piece will not change.

[0062] In this embodiment, preferably, each pneumatic valve in the main cabin pressurization and pressure relief unit is supplied with air by the air source system. Figure 2 As shown, the air source system adopts an integrated air compressor 18a (including a screw air compressor, a refrigerated dryer, a precision filter, an air storage tank, etc.), the main line of which is provided with components such as a pressure sensor and a pressure reducing valve, and each branch line is provided with an electric control valve and a one-way throttle valve.

[0063] In this embodiment, preferably, Figure 1 and Figure 2 As shown, the pipeline between the electric liquid booster pump (5.1a, 5.2a) and the main cabin 15, the manual pressure relief branch, the remote pressure relief branch with different pressure relief rates, and the air source system for supplying air to each pneumatic valve in the main cabin pressurization and pressure relief unit are all equipped with pressure monitoring components, and interlocking protection is achieved through the feedback of the pressure monitoring components: when the remote pressure relief valve on any remote pressure relief branch is opened and the air control valve is closed, the electric liquid booster pump (5.1a, 5.2a) cannot be started and operated; when the valve on the pipeline between the electric liquid booster pump (5.1a, 5.2a) and the main cabin 15 is not opened, the electric liquid booster pump (5.1a, 5.2a) a) Cannot start and run; when the cooling coil 17a in the low-level oil tank 16a is not opened, the remote pressure relief valve on any remote pressure relief branch cannot be opened; when the difference between any pressure monitoring device and the other pressure monitoring devices is greater than 10MPa, there is an alarm indication; when the electric heating device 14a near the main cabin 15 on the pipeline between the electric liquid booster pump (5.1a, 5.2a) and the main cabin 15 is not working, the pressurization and pressure relief operation cannot be performed; when the liquid level of the clean oil tank 2a is low, the pressurization and pressure relief operation cannot be performed; when the pressure on the gas source system is lower than 0.6MPa, the main cabin pressurization and pressure relief unit shall not work, and there is an alarm indication. Interlocking protection is used to avoid misoperation.

[0064] 2. Voltage stabilization unit

[0065] The pressure stabilizing unit is used for stabilizing the pressure of the main chamber 15 (e.g., for 1 month) and pressurizing, stabilizing (e.g., for 1 month) and relieving the pressure of the actuator (32.1~32.4) to meet the pressure test requirements, such as Figure 3 As shown, it mainly includes hydraulic boosters (28.1a~28.5a) corresponding to the main cabin 14 and each actuator (32.1~32.4), servo valves corresponding to each hydraulic booster (28.1a~28.5a), a hydraulic pump 22a for supplying pressure to the hydraulic booster (28.1a~28.5a), a clean oil tank 219a for oil supply, a pressure relief oil tank for storing pressure relief oil, a monitoring module, and a control module. The monitoring module is used to monitor the status of the hydraulic booster (28.1a~28.5a) and the sample, and the control module can control the corresponding hydraulic booster (28.1a~28.5a) through the servo valve closed-loop control according to the target command and the feedback of the monitoring module.

[0066] Among them, the working process of the hydraulic booster (28.1a~28.5a) is as follows: low-pressure filling to achieve rapid oil supply; in the boosting stage, high-frequency action is achieved and high-pressure oil is continuously output; automatic pressure maintenance, after reaching mechanical balance, the piston will stop moving, when the pressure on the high-pressure side decreases due to load reduction or leakage and other factors, the high and low pressure pistons will lose mechanical balance and automatically circulate to replenish pressure; unloading.

[0067] In this embodiment, preferably: the monitoring module includes a pressure monitoring component for monitoring the pressure at the low-pressure end and the high-pressure end of the hydraulic booster (28.1a~28.5a), a displacement monitoring component for monitoring the piston displacement of the hydraulic booster (28.1a~28.5a), and a deformation monitoring component for monitoring the deformation of the sample. The control module can control the corresponding hydraulic booster (28.1a~28.5a) through a servo valve closed loop according to the target pressure and the feedback of the pressure monitoring component, see Figure 4 , can calculate the volume and flow rate of the medium injected into the actuator (32.1~32.4) or the main cabin 15 according to the feedback of the displacement monitoring part, can control the corresponding hydraulic booster (28.1a~28.5a) through the servo valve closed loop according to the required volume and flow rate of the medium injected into the actuator (32.1~32.4) or the main cabin 15 and the feedback of the displacement monitoring part, see Figure 5 , can control the corresponding hydraulic booster (28.1a~28.5a) through the servo valve closed-loop control according to the target deformation of the specimen and the feedback from the deformation monitoring part; this setting can not only achieve high-precision control during the test, but also dual closed-loop control of pressure and displacement, which is safer and more reliable.

[0068] In this embodiment, the low-pressure chamber of the hydraulic booster (28.1a~28.5a) uses a pressure sensor with a range of 20MPa, and the high-pressure chamber uses a pressure sensor with a range of 160MPa; the piston rod of the hydraulic booster (28.1a~28.5a) is installed with a magnetostrictive displacement sensor (LVDT), which can accurately measure the displacement data of the piston, and then convert the volume and flow of the medium injected into the actuator and the main cabin; a total of 14 deformation sensors are installed in the sample.

[0069] Among them: the control module processes the data fed back by the monitoring module in real time (data amplification, feedback comparison, difference adjustment, PID operation, etc.) to complete the adjustment of the servo valve drive signal (that is, the adjustment of the target value). The time of such an adjustment cycle is only 20ms at most. Through continuous adjustment, the target can be achieved in a few cycles, so that the system can accurately and quickly respond to the changes in stress and strain of the test piece, ensuring that the control accuracy of the entire system reaches ±1%FS.

[0070] In this embodiment, preferably: Figure 3 As shown, a filter 21.2a is provided near the upstream of the hydraulic pump 22a, and a high-pressure fine oil filter 23a, a one-way valve 24a and a proportional relief valve 26a are provided near the downstream of the hydraulic pump 22a to ensure reliable operation.

[0071] In this embodiment, preferably: Figure 3 As shown, an ultra-high pressure cooling filter (30.1a~30.5a) and an ultra-high pressure manual needle valve (31.1a~31.5a) are provided on the output pipeline of each hydraulic booster (28.1a~28.5a), and the output pipeline of the hydraulic booster (28.2a~28.5a) corresponding to the actuator (32.1~32.4) is connected to the pressure relief tank through a branch with a bursting disc (29.1a~29.4a).

[0072] This subsystem fully considers the characteristics of deep geotechnical engineering disturbance simulation facilities, and the overall design idea is:

[0073] Since the main cabin 15 has a large internal volume (approximately 3.3m 3 ), the required flow rate change is also relatively large, and the pressure increase and pressure relief are achieved by using an electric liquid booster pump (5.1a, 5.2a) in conjunction with the valves on each pressure relief branch, so the main cabin pressurization and pressure relief unit is used;

[0074] At the same time, the pressure stabilization of the main cabin 15 and the pressure boost, stabilization and pressure relief of each actuator require a relatively small flow rate, and require high pressure control accuracy, which is achieved by using an electro-hydraulic servo-controlled hydraulic booster (28.1a~28.5a), so a pressure stabilization unit is used.

[0075] For the main cabin 15, its volume is relatively large. It needs to inject about 170L of medium from 0 to 100MPa (the initial condition is that the main cabin is already filled with medium before pressurization). At this stage, electric liquid booster pumps (5.1a, 5.2a) are selected for pressurization. The electric liquid booster pumps (5.1a, 5.2a) are equipped with constant torque variable frequency motors. The output flow can be changed by adjusting the motor frequency, and the boosting rate of 1 to 10MPa / min can be adjusted arbitrarily. The hydraulic booster 28.1a only intervenes in the work during its pressure maintenance stage; for each actuator (32.1~32.4), its capacity The volume is very small, and the amount of oil required for oil replenishment is not large. The 0-150MPa pressurization stage and the subsequent pressure maintenance stage and pressure relief stage are all completed by the hydraulic booster (28.2a~28.5a); the main cabin 15 has different requirements for pressure stabilization and the requirements for pressurization and pressure maintenance of each actuator (32.1~32.4), and different types of hydraulic boosters need to be selected. The hydraulic booster (28.2a~28.5a) corresponding to the actuator (32.1~32.4) has a designed pressure ratio of 1:10. When the low-pressure chamber input is 15MPa, the high-pressure chamber output pressure is 150MPa.

[0076] In the main cabin pressurization and pressure relief unit, the danger of ultra-high pressure working conditions is fully considered, and each pressure relief branch can have functions such as slow pressure relief, rapid pressure relief, manual pressure relief, and manual pressure relief in emergency conditions;

[0077] In the pressure stabilizing unit, the hydraulic booster (28.1a~28.5a) can convert a smaller pressure into a larger pressure, reducing the danger of ultra-high pressure conditions. In addition, the control module and the monitoring module are used to achieve closed-loop control, making the adjustment more precise and rapid.

[0078] The main cabin pressurization and pressure relief unit and the pressure stabilization unit are independent of each other but can be used in conjunction with each other. They can accurately control the pressure of the main cabin 15 and the actuator (32.1~32.4), thereby providing a pressure test environment and laying a foundation for subsequent rock test and other evaluations.

[0079] 2. About the temperature control subsystem

[0080] The temperature control subsystem includes a thermal oil unit, a resistance heating unit and a cooling water unit;

[0081] 1. Thermal oil unit

[0082] The heat transfer oil unit is used to heat the interior of the main cabin 15 with circulating heat transfer oil to achieve temperature increase. Figure 6As shown, it mainly includes a circulating oil pump (17.1b or 17.2b), a high-level oil tank 12b for supplying oil to the circulating oil pump (17.1b or 17.2b), and a low-level oil tank 8b for storing the discharged heat transfer oil for circulation, wherein: the high-level oil tank 12b is replenished with oil by the replenishing oil pump 11b, and the outlet end of the circulating oil pump (17.1b or 17.2b) is connected to the electric heater 19b, the first switching valve 20.1b, the oil storage tank 22b and the second switching valve 20.2b in sequence, and the first switching valve 20.1b can switch the heat transfer oil to enter or bypass the cooler 2 1b, the second switching valve 20.2b can switch the heat transfer oil to flow back to the circulating oil pump (17.1b or 17.2b) or to the third switching valve 23b. The third switching valve 23b can switch the heat transfer oil to flow from top to bottom or from bottom to top through the inside of the main cabin 15 and then flow out from the inside of the main cabin 15 and then flow back to the circulating oil pump (17.1b or 17.2b) through the gas-liquid separator 13b. The external pipelines at the upper and lower ends of the main cabin 15 are provided with shut-off valves (26.1b~26.4b). The external pipeline at the lower end of the main cabin 15 is connected to the low-level oil tank 8b through the oil drain pump 25b.

[0083] The heat transfer oil of the heat transfer oil unit is preferably Mobil 605 heat transfer oil. Mobil 605 heat transfer oil is a high-performance heat transfer oil used in closed systems at -12°C to 315°C. It is formulated with highly refined base oils that are resistant to thermal cracking and chemical oxidation. It has excellent thermal stability, long service life, lower volatility and toxicity, and is not prone to forming deposits or increasing viscosity during use. In addition, Mobil 605 heat transfer oil has excellent heat transfer efficiency, and its ideal viscosity allows it to be easily pumped at startup and operating temperatures. In addition, Mobil 605 heat transfer oil has excellent thermal conductivity, which can help achieve faster heat dissipation. In addition, Mobil 605 heat transfer oil has good resistance to thermal cracking at the recommended operating temperature, so the flash point of the oil will not be significantly reduced under normal use.

[0084] In the thermal oil unit, the high-level oil tank 12b not only supplies oil to the circulating oil pump (17.1b or 17.2b), but also has other important functions, such as: 1) Storing the expansion volume after heating - due to the small diameter of the piping of the liquid phase circulation system, the thermal oil will expand when heated and contract when cooled. For every 100°C increase in the thermal oil temperature, its volume expands by 10% compared with normal temperature. Therefore, the high-level oil tank 12b can absorb its volume change; 2) Exhaust and dehydration - The thermal oil circulation is powered by the circulating oil pump (17.1b or 17.2b). In order to enable the circulating oil pump (17.1b or 17.2b) to exert its specified capacity and avoid the occurrence of cavitation, exhaust and dehydration must be performed. The high-level oil tank 12b is connected to the inlet end of the circulating oil pump (17.1b and 17.2b) through piping. The supply pipe of the thermal oil is always arranged below the lowest point, and the return pipe is always arranged below the lowest point. It is placed above the highest point to ensure that the entire system is in a self-exhaust state. The gas in the heat transfer oil flows to the high-level oil tank 12b. The exhaust valve of the high-level oil tank 12b is opened to restore the system to a normal pressure state. When the pressure of the high-level oil tank 12b exceeds the set value, the safety valve will trip to release the pressure; 3) Safe oil replenishment - due to the leakage of heat transfer oil and the generation of low-boiling substances, the amount of heat transfer oil in the system is insufficient, and it is necessary to replenish it in an appropriate amount. Cold heat transfer oil must not be directly added to the hot heat transfer oil in operation, because if there is water in the heat transfer oil, its volume will expand rapidly after vaporization, the pressure will increase, and the heat transfer oil will spray out. When replenishing oil through the high-level oil tank 12b, the impact on the system is small, and safe oil replenishment can be achieved; 4) When filling oil, first inject the oil into the high-level oil tank 12b, and automatically flow into the heat transfer oil unit pipeline, playing the role of an intermediate tank; 5) When the power is off, use cold oil to replace the heat medium in the main cabin 15; 6) High-level replenishment pressure head.

[0085] The volume of the high-level oil tank 12b is 1.3 times the increased volume of the heat transfer oil in the heat transfer oil unit when it expands at the highest operating temperature. Its design pressure is 0.2MPa. The vertical clearance between the bottom of the high-level oil tank 12b and other components of the heat transfer oil unit is 1.5m. It is equipped with a remote pressure sensor and a liquid level sensor.

[0086] like Figure 6 As shown, in this embodiment, preferably: the low oil tank 2 8b is provided with a cooling coil, and the cooling water unit can also cool the cooling coil with circulating cooling water and thus indirectly cool the heat transfer oil in the low oil tank 2 8b. If the heat transfer oil entering the low oil tank 2 8b is higher than 60°C, the cooling water unit needs to cool the cooling coil and thus indirectly cool the heat transfer oil in the low oil tank 2 8b, and quickly reduce the oil temperature to below 60°C to prevent the heat transfer oil from oxidizing. A screen filter and a magnetic filter can be provided at the input end of the low oil tank 2 8b. The heat transfer oil is recycled, and filtering is conducive to recycling.

[0087] The main functions of the low-level oil tank 28b are: 1) used to store the heat transfer oil in the heat transfer oil unit; 2) to receive the heat transfer oil overflowing from the heat transfer oil unit; 3) to supplement the heat transfer oil required by the heat transfer oil unit under certain circumstances. In addition, the exhaust port of the low-level oil tank 28b should be connected to the safe area and no valve should be installed. The low-level oil tank 28b and the electric heater 19b should be separated by a firewall. The low-level oil tank 28b should be placed at the lowest position of the system. The low-level oil tank 28b should be at a low liquid level during normal operation and be ready to receive external heat transfer oil at any time.

[0088] In this embodiment, preferably: the electric heater 19b and the circulating oil pump (17.1b and 17.2b) are interlocked: the electric heater 19b is not powered on when the circulating oil pump (17.1b and 17.2b) is not started, and the circulating oil pump (17.1b and 17.2b) does not stop working when the electric heater 19b is not powered off. When the circulating oil pump (17.1b and 17.2b) stops working after the electric heater 19b is powered off is manually controlled, which can prevent the heat transfer oil that stops flowing in the electric heater 19b from being locally overheated, fissioned and causing coking due to misoperation.

[0089] like Figure 6 As shown, in this embodiment, preferably: two circulating oil pumps (17.1b and 17.2b) are used, one for use and the other for standby, to improve reliability. The circulating oil pumps (17.1b and 17.2b) preferably use a shielded pump driven by a constant torque explosion-proof variable frequency motor. In general, the oil pump uses an ordinary centrifugal pump with a mechanical seal. The drive of the ordinary centrifugal pump is to connect the impeller shaft of the pump with the electric shaft through a coupling so that the impeller rotates with the motor to work. There is leakage under high temperature and high pressure. Considering the importance of this project and environmental protection requirements, this application selects a shielded pump to drive the heat transfer oil. The shielded pump is a sealless pump. The pump and the drive motor are sealed in a pressure vessel filled with a pumping medium. This pressure vessel has only a static seal, and a wire group is used to provide a rotating magnetic field and drive the rotor. This structure cancels the rotating shaft sealing device of the traditional centrifugal pump, so it can be completely leak-free; at the same time, in order to more accurately control the temperature, it is necessary to more accurately adjust the flow of the heat transfer oil, so this application selects an explosion-proof variable frequency motor drive.

[0090] In this embodiment, preferably: two electric heaters 19b are used, one with a power of 400kW and the other with a power of 200kW. The electric heater 19b is flange mounted and can be quickly replaced. The electric heater 19b includes a stainless steel seamless pipe, a spiral resistance wire evenly distributed in the stainless steel seamless pipe, and a high-temperature crystalline magnesium oxide powder filled in the stainless steel seamless pipe. The high-temperature crystalline magnesium oxide powder has good thermal conductivity and insulation properties. When current passes through the spiral resistance wire, the heat generated is efficiently and evenly diffused to the surface of the stainless steel seamless pipe through the high-temperature crystalline magnesium oxide powder, and then efficiently and evenly transferred to the heat transfer oil to achieve the purpose of heating. This structure has a very long service life and is easy to maintain.

[0091] In this embodiment, preferably: Figure 6 As shown, two shut-off valves are respectively provided on the external pipes at the upper and lower ends of the main cabin 15. The shut-off valves (26.1b~26.4b) are electric high-temperature and ultra-high-pressure gate valves with a diameter not less than DN65. The final working parameters of the main cabin 15 can reach 100MPa and 250℃, while the thermal oil unit can only work at 1MPa and 200℃. Therefore, after the temperature of the main cabin 15 and the test piece reaches 200℃, the pipeline connection needs to be cut off. Two electric high-temperature and ultra-high-pressure gate valves are used for cutting off, which can reliably cut off the connection between the main cabin 15 and the thermal oil unit. At the same time, since the thermal oil unit needs a large flow of thermal oil to circulate between the main cabin 15 and the electric heater 19b when working, the shut-off valve diameter is not less than DN65. The first switching valve 20.1b and the second switching valve 20.2b can use electric three-way ball valves, and the third switching valve 23b can use electric four-way ball valves.

[0092] 2. Resistance heating unit

[0093] The resistance heating unit is used to heat the outside of the main cabin 15 by resistance heating to achieve preheating, auxiliary heating of the heat transfer oil unit and continuous heat preservation, such as Figure 7 As shown, it includes a shell 7b that can surround and close the main cabin 15 and a resistance heating element (not shown in the figure) distributed and installed on the wall of the shell 7b.

[0094] In this embodiment, preferably: Figure 7As shown, the shell 7b is divided into two half shells from the middle, and the two half shells can be moved to close and separate each other. The two half shells are provided with sealing grooves at the joints, and high-temperature resistant sealing fillers are provided in the sealing grooves. The sealing fillers can be soft heat-resistant fiber packings with built-in metal wires. When the two half shells are closed together, a closed cavity can be formed to surround and seal the main cabin 15; the inner wall of the shell 7b is distributed with high-temperature resistant furnace lining modules. After being heated at high temperature, the furnace lining modules expand internally so that they are pressed against each other and a solidified hard layer is generated on the surface. When used at high temperature, the furnace lining modules are pressed due to expansion, and no gaps are generated when used at high temperature for a long time. After high temperature, the solidified hard layer generated on the surface has good strength, anti-scouring and long service life. A refractory fiber shield module can be used. When heated to 160°C, the internal expansion and the surface solidified hard layer are generated. The resistance heating element can be wound on the insulating porcelain tube, and the insulating porcelain tube can be fixed on the inner wall of the shell through the insulating porcelain part. The shell body can be made of stainless steel, which is heat-resistant, corrosion-resistant and has a long service life.

[0095] 3. Cooling water unit

[0096] The cooling water unit is used to cool the heat transfer oil in the heat transfer oil unit with circulating cooling water, thereby indirectly cooling the main cabin 15 after the test. Figure 8 As shown, it mainly includes a circulating cooling water pump 3b that can deliver circulating cooling water to the cooler 21b, a cooling water tank 5b for supplying water to the circulating cooling water pump 3b, and a cooling tower 6b for dissipating heat from the circulating cooling water after absorbing heat; some gas path components are also arranged on its pipeline, such as a ball valve (1.1b~1.5b), a valve 2b, and a filter 4b.

[0097] This subsystem fully considers the characteristics of deep geotechnical engineering disturbance simulation facilities, and the overall design idea is:

[0098] Since the test pieces and other components occupy most of the space inside the main cabin 15, it is impossible to install heating elements in the main cabin 15. Therefore, a heat transfer oil unit is used to heat the interior of the main cabin 15 by driving the heat transfer oil external circulation at low pressure. When the main cabin 15 and the internal test pieces reach the test temperature, the connection between them and the heat transfer oil unit can be closed.

[0099] In addition, the wall thickness of the main cabin 15 reaches 300mm. Although the heat transfer efficiency is low, it will still generate a large temperature difference stress during the heating process. Therefore, a resistance heating unit is used to heat its outer surface. The heating efficiency of the main cabin can be improved by preheating and assisting the heating of the heat transfer oil unit inside and outside at the same time. The key is that it can also keep the heat continuously without the need to circulate the heat transfer oil unit for a long time. It is easy to control and can also make the main cabin 15 and the internal test pieces heated evenly.

[0100] Furthermore, the temperature of the heat transfer oil can be precisely controlled by adjusting the flow rate of the circulating oil pump (17.1b or 17.2b) and the power of the electric heater 19b;

[0101] In addition, for cooling the main cabin 15, since the heat transfer oil itself dissipates heat slowly, a cooling water unit is used to cool the heat transfer oil in the heat transfer oil unit with circulating cooling water, thereby indirectly cooling the main cabin 15. After the cooling water exchanges heat with the heat transfer oil, it enters the cooling tower 6b, dissipates the heat in the water into the atmosphere, and then flows back to the cooling water tank 5b by the water's own weight, thereby saving oil and water and not polluting the environment.

[0102] Therefore, this subsystem can provide a stable high-temperature simulation environment for deep geotechnical engineering disturbance simulation facilities.

[0103] Embodiment 2

[0104] This embodiment discloses a method for controlling environmental loads of a deep geotechnical engineering disturbance simulation facility, which uses the above-mentioned deep geotechnical engineering disturbance simulation facility environmental load control system, and its basic method is:

[0105] Before the test: first, the main cabin 15 is surrounded and sealed by the resistance heating unit, and the outside of the main cabin 15 is heated by resistance heating to achieve preheating; then, the heated heat transfer oil is input into the main cabin 15 by the heat transfer oil unit, and the heat transfer oil is circulated between the main cabin 15 and the electric heater 19b by the circulating oil pump (17.1b or 17.2b), so that the heat transfer oil temperature continues to rise, and with the assistance of the resistance heating unit, the main cabin 15 reaches the ambient temperature required by the test; then the connection between the main cabin 15 and the heat transfer oil unit is cut off, and the main cabin is pressurized; then a long-term heat preservation is carried out (up to one month), at which time the heat transfer oil unit does not work, and the resistance heating unit ensures that the main cabin 15 is always maintained at the test temperature;

[0106] When conducting the test: first, slowly increase the internal pressure of the actuator (32.1~32.4) through the pressure stabilizing unit, then pressurize the main cabin 15 to the required confining pressure at the required pressurization rate through the main cabin pressurization and pressure relief unit, and stabilize the main cabin 15 through the pressure stabilizing unit, then increase the internal pressure of the actuator (32.1~32.4) at the required pressurization rate through the pressure stabilizing unit, apply a certain pressure to the sample and stabilize the pressure, and then accurately control the actuator through the pressure stabilizing unit according to the test requirements to test the sample;

[0107] After the test is completed: turn off the resistance heating unit, turn on the heat transfer oil unit and turn off the electric heater 19b therein, turn on the cooling water unit, the heat transfer oil unit allows the heat transfer oil to circulate in the main cabin 15 and the external pipelines of the main cabin 15, the cooling water unit allows the circulating cooling water to cool the heat transfer oil in the external pipelines of the main cabin 15 and thus indirectly cool the main cabin 15, the circulating cooling water after absorbing heat dissipates heat through the cooling tower 6b, and finally reduces the temperature of the heat transfer oil and the main cabin 15 to below a certain temperature; first, the internal pressure of the actuator (32.1~32.4) is synchronously unloaded to the surrounding pressure at the required rate through the pressure stabilizing unit, and then the main cabin 15 surrounding pressure is unloaded at the required rate through the main cabin pressurization and pressure relief unit, and the internal pressure of the actuator (32.1~32.4) is unloaded to atmospheric pressure through the pressure stabilizing unit.

[0108] Among them, since the thermal oil unit is relatively complex and has more steps to repair, its workflow needs to be designed with emphasis. The workflow of the thermal oil unit includes the following steps:

[0109] S1, oil filling: open the ball valve 9.2b on the external oil tank pipeline of the oil replenishment pump 11b, close the ball valve 9.1b of the pipeline connecting the low-level oil tank 28b to the oil replenishment pump 11b, close the valve 18.3b on the pipeline connecting to the gas-liquid separator 13b between the second switching valve 20.2b and the third switching valve 23b, close the electric valve 24b on the pipeline connecting the external pipeline at the lower end of the main cabin 15 to the oil drain pump 25b, switch the first switching valve 20.1b to the thermal oil bypass cooler 21b, and the second switching valve 20.2b Switch to the third switching valve 24b for the heat transfer oil to flow, open the shut-off valves (26.1b~26.4b) on the external pipelines at the upper and lower ends of the main cabin 15, start the oil replenishment pump 11b, and fill the entire heat transfer oil unit with heat transfer oil through the high-level oil tank 12b. When the liquid level is displayed in the high-level oil tank 12b, it means that the entire heat transfer oil unit has been filled, start the circulating oil pump 17b, fully circulate the heat transfer oil and use the gas-liquid separator 13b to exhaust the air in preparation for boiling the oil. Under the action of the heat transfer oil's own weight, the entire heat transfer oil pipeline and the main cabin 15 can be filled within 1 hour.

[0110] S2, heating the main cabin: first switch the first switching valve 20.1b to the thermal oil bypass cooler 21b, switch the second switching valve 20.2b to switch the thermal oil back to the circulating oil pump 17b, start the circulating oil pump 17b, start the electric heater 19b, close the valve 18.3b on the pipeline connecting the second switching valve 20.2b and the third switching valve 23b to the gas-liquid separator 13b, and heat the oil to the target temperature according to the oil boiling process; then open the cut-off valves (26.1b~26.4b) on the external pipes at the upper and lower ends of the main cabin 15, The second switching valve 20.2b is switched to the third switching valve 24b so that the heat transfer oil flows. The third switching valve 23b is switched to the state where the heat transfer oil flows from top to bottom inside the main cabin, and the heat transfer oil is injected into the main cabin 15. If the temperature difference of the heat transfer oil between the upper and lower ends of the main cabin 15 exceeds a certain value (e.g., 10°C), the third switching valve 23b is switched to the state where the heat transfer oil flows from bottom to top inside the main cabin 15. By changing the flow direction of the heat transfer oil in the main cabin 15, the temperature field in the main cabin 15 is made uniform. The temperature of the heat transfer oil is precisely controlled by adjusting the flow rate of the circulating oil pump 17b and the power of the electric heater 19b.

[0111] S3. Cooling the heat transfer oil in the external pipeline of the main cabin 15: When the temperature of the main cabin 15 reaches the test requirements, the heat transfer oil in the external pipeline of the main cabin 15 needs to be cooled, and the power supply of the electric heater 19b and the cut-off valves (26.1b~26.4b) on the external pipelines at the upper and lower ends of the main cabin 15 are cut off. The second switching valve 20.2b switches the heat transfer oil to flow back to the circulating oil pump 17b. The circulating oil pump 17b continues to operate to prevent the heat transfer oil in the electric heater 19b from coking. At the same time, the first switching valve 20.1b is switched to allow the heat transfer oil to enter the cooler 21b, and the cooling water unit is turned on until the heat transfer oil in the external pipeline of the main cabin 15 drops below a certain temperature (e.g., 80°C), and the circulating oil pump 17b is turned off.

[0112] S4. Cooling the main cabin 15: After the test of the main cabin 15 is completed and the pressure drops to 0 MPa, the main cabin 15 needs to be cooled down. The shut-off valves (26.1b~26.4b) on the external pipes at the upper and lower ends of the main cabin 15 are opened, and the first switching valve 20.1b is switched to allow the heat transfer oil to enter the cooler 21b. The second switching valve 20.2b is switched to allow the heat transfer oil to flow to the third switching valve 24b. The circulating oil pump 17b is started, the resistance heating unit 19b is turned off, and the cooling water unit is turned on, so that the heat transfer oil circulates in the external pipes of the main cabin 15 and the internal pipes of the main cabin 15. The circulating cooling water cools down the heat transfer oil and indirectly cools down the main cabin 15, and finally the temperature of the heat transfer oil and the main cabin 15 is reduced to below a certain temperature (e.g., 80°C). Finally, the circulating oil pump 17b and the cooling water unit are turned off.

[0113] S5, oil drain: open the shut-off valves (26.3b, 26.4b) on the external pipeline at the lower end of the main cabin 15, the valve electric valve 24b and valve 9.4b on the pipeline connecting the external pipeline at the lower end of the main cabin 15 to the oil drain pump 25b, start the oil drain pump 22b, pump the heat transfer oil in the main cabin 15 and the heat transfer oil unit into the low-level oil tank 8b, and drain the heat transfer oil in the main cabin 15 to the low-level oil tank 8b for no more than 30 minutes.

[0114] The system can complete a series of geotechnical engineering tests, including three-way pressure synchronous loading test, three-way pressure asynchronous loading test, three-way stress gradient loading test, main cabin constant pressure control test, constant velocity displacement loading test, displacement gradient loading test, deformation closed-loop control test, stress and strain coupling loading test, multi-terminal control loading test, PLC external data test, pressure unloading test, etc. It can observe and control the evolution of internal structure or external behavior of large-scale rock samples in detail, and provide support and guarantee for the development of new theories and methods of deep geotechnical engineering, performance testing of deep geotechnical engineering materials and equipment, and exploration of new processes for deep geotechnical engineering design and construction. Two tests are listed below.

[0115] Test 1, taking the constant minimum principal strain rate control test as an example, for the rock sample without pore pressure:

[0116] Step S1, slowly increasing the internal pressure of the actuator (32.1-32.4) through a voltage stabilizing unit and making the actuator (32.1-32.4) contact the sample, and controlling the output pressure of the actuator (32.1-32.4) to prevent the sample from being eccentric and the contact force from being too large;

[0117] Step S2: pressurize the main cabin 15 to the required ambient pressure ( X = y = Z ) and stabilize the main cabin pressure through the pressure stabilizing unit;

[0118] Step S3: Increase the internal pressure of the actuator (in the Y direction and the Z direction) at a constant rate through the pressure stabilizing unit to apply a certain pressure (s y =s z ) after voltage stabilization;

[0119] Step S4, increasing the internal pressure (z) of a pair of actuators to a set value and stabilizing the pressure (the time can be set) at a constant minimum principal strain rate (i.e., expansion rate, strain in the direction perpendicular to the free surface) through a voltage stabilizing unit, and then repeating loading-unloading-stabilizing or unloading-loading-stabilizing until the sample is destroyed; the whole process is set in advance to limit the stress on the sample and the deformation of the actuator (32.1~32.4), and if it exceeds the set value, it will be automatically terminated, or it will be manually terminated according to the test situation;

[0120] Step S5, unloading the internal pressure of the actuator (Y direction and Z direction) to the confining pressure synchronously at a constant contraction rate through the pressure stabilizing unit;

[0121] Step S6: unload the surrounding pressure of the main cabin 15 at a constant pressure reduction rate through the main cabin pressurization and pressure relief unit, and unload the internal pressure of the actuator (32.1-32.4) to atmospheric pressure through the pressure stabilizing unit.

[0122] Test 2, taking the three-axis constant stress control test as an example, for the rock sample without pore pressure:

[0123] Step S1, slowly increase the internal pressure of the actuator (32.1-32.4) to 2-5 MPa through a pressure stabilizing unit and stabilize the pressure;

[0124] Step S2: pressurize the main cabin 15 to the required ambient pressure (s) at a constant pressurization rate through the main cabin pressurization and pressure relief unit. X =s y =s Z ) and stabilizing the pressure of the main cabin 15 through the pressure stabilizing unit; synchronously increasing the internal pressure of the actuator (32.1~32.4) and stabilizing the pressure at the same constant pressure increasing rate through the pressure stabilizing unit;

[0125] Step S3: Increase the internal pressure of the actuator (in the Y direction and the Z direction) at a constant pressure increasing rate through the pressure stabilizing unit, and apply a certain pressure (s y =s z ) after voltage stabilization;

[0126] Step S4, increasing the internal pressure (Z direction) of a pair of actuators to a set value at a constant pressure increasing rate through a voltage stabilizing unit and stabilizing the pressure (the time can be set); the stress of the specimen and the deformation limit of the actuator (32.1~32.4) are set in advance during the whole process, and if the set value is exceeded, the test is automatically terminated, or manually terminated according to the test situation;

[0127] Step S5, unloading the internal pressure of the actuator (Y direction and Z direction) to the confining pressure synchronously at a constant contraction rate through the pressure stabilizing unit;

[0128] Step S6, unloading the surrounding pressure of the main cabin 15 at a constant pressure reduction rate through the main cabin pressurization and pressure relief unit, and unloading the internal pressure of the actuator (32.1-32.4) to atmospheric pressure through the pressure stabilizing unit.

[0129] The embodiments described above are part of the embodiments of the present application, rather than all of the embodiments. The detailed description of the embodiments of the present application is not intended to limit the scope of the present application for protection, but merely represents the selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.

Claims

1. An environmental load control system for a deep geotechnical engineering disturbance simulation facility, characterized in that: It includes a pressure control subsystem for providing a pressure environment for the test and a temperature control subsystem for providing a temperature environment for the test; The pressure control subsystem includes a main cabin pressurization and pressure relief unit and a pressure stabilizing unit using heat transfer oil as the working medium; the main cabin pressurization and pressure relief unit is used to pressurize and relieve the main cabin to apply or unload the surrounding pressure under conditions with large flow changes, including an electric liquid booster pump driven by a constant torque variable frequency motor for pressurization, a clean oil tank for oil supply, and a low-level oil tank for storing return oil. The pipeline between the electric liquid booster pump and the main cabin is provided with a manual pressure relief branch, a remote pressure relief branch with different pressure relief rates, a safety protection branch, an emergency remote pressure relief branch, and an emergency manual pressure relief branch. The pressure stabilizing unit is used for stabilizing the pressure of the main cabin and boosting, stabilizing and releasing the pressure of the actuators under the working condition of small flow rate to meet the pressure test requirements, including the hydraulic booster corresponding to the main cabin and each actuator, the servo valve corresponding to each hydraulic booster, the hydraulic pump for supplying pressure to the hydraulic booster, the clean oil tank 2 for oil supply, the pressure relief oil tank for storing pressure relief oil, the monitoring module, and the control module. The monitoring module is used to monitor the status of the hydraulic booster and the sample. The control module can control the corresponding hydraulic booster action through the servo valve closed loop according to the target command and the feedback of the monitoring module; The temperature control subsystem includes a heat transfer oil unit, a resistance heating unit and a cooling water unit; the heat transfer oil unit is used to heat the interior of the main cabin with circulating heat transfer oil to achieve temperature rise, and includes a circulating oil pump, a high-level oil tank for supplying oil to the circulating oil pump, and a low-level oil tank 2 for storing the discharged heat transfer oil and circulating it. The high-level oil tank is replenished with oil by an oil replenishment pump, and the outlet end of the circulating oil pump is connected to an electric heater, a first switching valve, an oil storage tank and a second switching valve in sequence. The first switching valve can switch the heat transfer oil to enter or bypass the cooler, the second switching valve can switch the heat transfer oil to flow back to the circulating oil pump or to flow to the third switching valve, and the third switching valve can switch the heat transfer oil to flow from top to bottom or from bottom to top through the interior of the main cabin and then flow out of the interior of the main cabin through The oil flows back to the circulating oil pump through the gas-liquid separator. Shut-off valves are provided on the external pipes at the upper and lower ends of the main cabin. The external pipe at the lower end of the main cabin is connected to the second low-level oil tank through an oil drain pump. The resistance heating unit is used to heat the outside of the main cabin by resistance heating to achieve preheating, auxiliary heating of the heat transfer oil unit and continuous insulation, including an outer shell that can surround the closed main cabin and resistance heating elements distributed on the inner wall of the outer shell; the cooling water unit is used to cool the heat transfer oil in the heat transfer oil unit by circulating cooling water and thereby indirectly cool the main cabin after the test, including a circulating cooling water pump that can deliver circulating cooling water to the cooler, a cooling water tank for supplying water to the circulating cooling water pump, and a cooling tower for dissipating heat from the circulating cooling water after absorbing heat.

2. The deep geotechnical engineering disturbance simulation facility environmental load control system according to claim 1, characterized in that: In the pressure control subsystem, two parallel electric liquid booster pumps are used; one is a large-flow booster pump, which works when pressurization is required at a boost rate of more than 2MPa / min; the other is a small-flow booster pump, which works when pressurization is required at a boost rate of less than 2MPa / min; the two pumps shall not work at the same time.

3. The deep geotechnical engineering disturbance simulation facility environmental load control system according to claim 1, characterized in that: In the pressure control subsystem, an ultra-high pressure manual pressure relief valve is provided on the manual pressure relief branch, and two remote pressure relief branches are provided with two parallel ultra-high pressure electric regulating valves and one ultra-high pressure pneumatic needle valve. The ultra-high pressure electric regulating valve adjusts the valve opening through PID to accurately control the pressure relief rate of the main cabin. The two remote pressure relief branches are used individually or in combination according to the required pressure relief rate.

4. The deep geotechnical engineering disturbance simulation facility environmental load control system according to claim 1, characterized in that: In the pressure control subsystem, ultra-high pressure filters are installed on the manual pressure relief branch and the remote pressure relief branch, an ultra-high pressure cooler and an electric heating device are installed near the main cabin on the pipeline between the electric liquid booster pump and the main cabin, and a cooling coil is installed in the low-level oil tank.

5. The deep geotechnical engineering disturbance simulation facility environmental load control system according to claim 1, characterized in that: In the pressure control subsystem, pressure monitoring components are installed on the pipeline between the electric liquid booster pump and the main cabin, the manual pressure relief branch, the remote pressure relief branch with different pressure relief rates, and the air source system that supplies air to each pneumatic valve in the main cabin pressurization and pressure relief unit. Interlocking protection is achieved through the feedback of the pressure monitoring components: when the remote pressure relief valve on any remote pressure relief branch is opened and the air control valve is closed, the electric liquid booster pump cannot be started and operated; when the valve on the pipeline between the electric liquid booster pump and the main cabin is not opened, the electric liquid booster pump cannot be started and operated. Operation; when the cooling coil in the low-level oil tank 1 is not opened, the remote pressure relief valve on any remote pressure relief branch cannot be opened; when the difference between any pressure monitoring device and the other pressure monitoring devices is greater than 10MPa, there will be an alarm indication; when the electric heating device near the main cabin on the pipeline between the electric liquid booster pump and the main cabin is not working, pressurization and pressure relief operations cannot be performed; when the liquid level in the clean oil tank 1 is low, pressurization and pressure relief operations cannot be performed; when the pressure on the air source system is lower than 0.6MPa, the main cabin pressurization and pressure relief unit shall not work, and there will be an alarm indication.

6. The deep geotechnical engineering disturbance simulation facility environmental load control system according to claim 1, characterized in that: In the pressure control subsystem, the monitoring module includes a pressure monitoring device for monitoring the pressure at the low-pressure end and the high-pressure end of the hydraulic booster, a displacement monitoring device for monitoring the displacement of the hydraulic booster piston, and a deformation monitoring device for monitoring the deformation of the sample. The control module can control the corresponding hydraulic booster through a servo valve closed-loop according to the target pressure and the feedback of the pressure monitoring device, can calculate the volume and flow of the medium injected into the actuator or the main cabin according to the feedback of the displacement monitoring device, can control the corresponding hydraulic booster through a servo valve closed-loop according to the required volume and flow of the medium injected into the actuator or the main cabin and the feedback of the displacement monitoring device, and can control the corresponding hydraulic booster through a servo valve closed-loop according to the target deformation of the sample and the feedback of the deformation monitoring device.

7. The deep geotechnical engineering disturbance simulation facility environmental load control system according to claim 1, characterized in that: In the temperature control subsystem, the electric heater and the circulating oil pump are interlocked: the electric heater is not powered on when the circulating oil pump is not started, and the circulating oil pump does not stop working when the electric heater is not powered off. When the circulating oil pump stops working after the electric heater is powered off is manually controlled.

8. The deep geotechnical engineering disturbance simulation facility environmental load control system according to claim 1, characterized in that: In the temperature control subsystem, the low-level oil tank 2 is provided with a cooling coil, and the cooling water unit can also cool the cooling coil with circulating cooling water and thus indirectly cool the heat transfer oil in the low-level oil tank 2.

9. The deep geotechnical engineering disturbance simulation facility environmental load control system according to claim 1, characterized in that: In the temperature control subsystem, two circulating oil pumps are used, one for use and the other for standby; the circulating oil pump is a shielded pump driven by a constant torque explosion-proof variable frequency motor.

10. The deep geotechnical engineering disturbance simulation facility environmental load control system according to claim 1, characterized in that: In the temperature control subsystem, two shut-off valves are provided on the external pipes at the upper and lower ends of the main cabin. The shut-off valves are electric high-temperature and ultra-high-pressure gate valves with a diameter not less than DN65.

11. The deep geotechnical engineering disturbance simulation facility environmental load control system according to claim 1, characterized in that: In the temperature control subsystem, the outer shell is divided into two half shells in the middle, and the two half shells can be moved to close and separate each other. The joints of the two half shells are provided with sealing grooves, and high-temperature resistant sealing fillers are provided in the sealing grooves. When the two half shells are closed together, a closed cavity can be formed to surround and seal the main cabin; high-temperature resistant furnace lining modules are distributed on the inner wall of the outer shell. After being heated at high temperature, the furnace lining modules expand internally so that they are pressed against each other and a solidified hard layer is generated on the surface; the resistance heating element is wrapped around the insulating porcelain tube, and the insulating porcelain tube is fixed to the inner wall of the outer shell through the insulating porcelain part, and the outer shell body is made of stainless steel.

12. A method for controlling environmental loads of a deep geotechnical engineering disturbance simulation facility, characterized in that: Based on the deep geotechnical engineering disturbance simulation facility environmental load control system as described in any one of claims 1 to 11; Before the test: first, the main cabin is enclosed by the resistance heating unit and the outside of the main cabin is heated by resistance heating to achieve preheating; then, the heated heat transfer oil is input into the main cabin by the heat transfer oil unit, and the heat transfer oil is circulated between the main cabin and the electric heater by the circulating oil pump, so that the temperature of the heat transfer oil continues to rise, and with the assistance of the resistance heating unit, the main cabin reaches the ambient temperature required by the test; Then cut off the connection between the main cabin and the thermal oil unit, and pressurize the main cabin; then keep warm for a long time, at which time the thermal oil unit does not work, and the resistance heating unit ensures that the main cabin is always maintained at the test temperature; During the test: first, slowly increase the internal pressure of the actuator through the pressure stabilizing unit, then pressurize the main cabin to the required ambient pressure through the main cabin pressurization and pressure relief unit at the required pressurization rate and stabilize the main cabin through the pressure stabilizing unit, then increase the internal pressure of the actuator at the required pressurization rate through the pressure stabilizing unit, apply a certain pressure to the sample and stabilize the pressure, then accurately control the actuator through the pressure stabilizing unit according to the test requirements to test the sample; After the test is completed: turn off the resistance heating unit, turn on the thermal oil unit and turn off the electric heater therein, turn on the cooling water unit, the thermal oil unit allows the thermal oil to circulate in the main cabin and the main cabin external pipelines, the cooling water unit allows the circulating cooling water to cool the thermal oil in the main cabin external pipelines and thus indirectly cool the main cabin, the circulating cooling water after absorbing heat dissipates heat through the cooling tower, and finally reduces the temperature of the thermal oil and the main cabin to below a certain temperature; first, the internal pressure of the actuator is synchronously unloaded to the surrounding pressure at the required rate through the pressure stabilizing unit, and then the main cabin surrounding pressure is unloaded at the required rate through the main cabin pressurization and pressure relief unit, and the internal pressure of the actuator is unloaded to atmospheric pressure through the pressure stabilizing unit.

13. The method for controlling environmental loads of a deep geotechnical engineering disturbance simulation facility according to claim 12, characterized in that: The workflow of the thermal oil unit includes the following steps: S1, oil filling: open the valve on the external oil tank pipeline of the oil replenishment pump, close the valve of the second low-level oil tank connecting the oil replenishment pump pipeline, close the valve on the pipeline connecting the external pipeline at the lower end of the main cabin to the drain pump, switch the first switching valve to the thermal oil bypass cooler, switch the second switching valve to the third switching valve to flow the thermal oil to the thermal oil, open the cut-off valves on the external pipelines at the upper and lower ends of the main cabin, start the oil replenishment pump, fill the entire thermal oil unit with thermal oil through the high-level oil tank, wait for the high-level oil tank to have a liquid level display, indicating that the entire thermal oil unit has been filled, start the circulating oil pump, fully circulate the thermal oil and use the gas-liquid separator to exhaust air in preparation for oil boiling; S2, heating the main cabin: first switch the first switching valve to the thermal oil bypass cooler, switch the second switching valve to the thermal oil flow back to the circulating oil pump, start the circulating oil pump, start the electric heater, and heat the oil to the target temperature according to the oil boiling process; Then open the shut-off valves on the external pipes at the upper and lower ends of the main cabin, switch the second switching valve to the third switching valve so that the heat transfer oil flows to the heat transfer oil, switch the third switching valve to the heat transfer oil flowing from top to bottom through the main cabin, and inject the heat transfer oil into the main cabin. If the temperature difference of the heat transfer oil at the upper and lower ends of the main cabin exceeds a certain value, switch the third switching valve to the heat transfer oil flowing from bottom to top through the main cabin. By changing the flow direction of the heat transfer oil in the main cabin, the temperature field in the main cabin is made uniform, and the heat transfer oil temperature is accurately controlled by adjusting the flow rate of the circulating oil pump and the power of the electric heater. S3. Cooling the heat transfer oil in the external pipeline of the main cabin: When the temperature of the main cabin reaches the test requirements, the heat transfer oil in the external pipeline of the main cabin needs to be cooled. Cut off the power supply of the electric heater and the cut-off valves on the external pipelines at the upper and lower ends of the main cabin, switch the heat transfer oil back to the circulating oil pump with the second switching valve, and continue to operate the circulating oil pump to prevent the heat transfer oil in the electric heater from coking. At the same time, switch the first switching valve to allow the heat transfer oil to enter the cooler, turn on the cooling water unit, and wait until the heat transfer oil in the external pipeline of the main cabin drops below a certain temperature, then turn off the circulating oil pump; S4. Cooling the main cabin: After the main cabin test is completed and the pressure drops to 0 MPa, the main cabin needs to be cooled down. The shut-off valves on the external pipes at the upper and lower ends of the main cabin are opened, the first switching valve is switched to the heat transfer oil entering the cooler, the second switching valve is switched to the heat transfer oil flowing to the third switching valve, the circulating oil pump is started, the resistance heating unit is turned off, and the cooling water unit is turned on, so that the heat transfer oil circulates in the external pipes and the internal pipes of the main cabin. The circulating cooling water cools down the heat transfer oil and indirectly cools down the main cabin, and finally the temperature of the heat transfer oil and the main cabin is reduced to below a certain temperature. Finally, the circulating oil pump and the cooling water unit are turned off; S5. Oil drain: open the shut-off valve on the external pipe at the lower end of the main cabin and the valve on the pipe connecting the external pipe at the lower end of the main cabin to the oil drain pump, start the oil drain pump, and pump the heat transfer oil in the main cabin and the heat transfer oil unit into the low-level oil tank 2.

Citation Information

Patent Citations

  • Simulation device and simulation method for rock mechanics experiment temperature, humidity and acid environment control

    CN110186763A

  • False sea test chamber voltage stabilization control system

    CN115407645A

  • Ultra-large deep engineering disaster physical simulation facility

    CN116413138A

  • Device for measuring and controlling oil consumption of engine

    CN215640145U

  • Broadband rock permeability measurement system

    KR1020170129341A