A circulating spray type waste gas absorption tower

By setting up a high-pressure chamber in the spray-type exhaust gas absorption tower and using a pressure control device to extend the waste gas residence time, the problem of increasing tower body height in the prior art is solved, and the waste gas treatment efficiency and gas-liquid contact area are improved.

CN118663039BActive Publication Date: 2024-11-15XIAMEN GOLDCURRENCY ADVANCED MATERIAL CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411155603.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-11-15
Estimated Expiration
2044-08-22

AI Technical Summary

Technical Problem

When the existing spray exhaust gas absorption tower improves the efficiency of exhaust gas treatment, it is necessary to increase the tower height to extend the exhaust gas residence time, but this will increase the equipment volume, transportation and installation difficulty, and it will be costly.

Method used

Using a circulating spray type exhaust gas absorption tower, by setting a first high-pressure chamber and a second high-pressure chamber in the spray tower, and controlling the air pressure difference using a pressure control device, extending the residence time of the exhaust gas in the second high-pressure chamber, and increasing the gas-liquid contact efficiency.

Benefits of technology

It achieves a more efficient waste gas treatment effect without increasing the tower height, which is easy to transport and install, while improving the gas-liquid contact area and treatment efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118663039B_ABST
    Figure CN118663039B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of waste gas absorption towers, and in particular to a circulating spray type waste gas absorption tower. Its technical solution includes: a support base, a spray tower fixedly installed on the support base, and also includes a first pressure control device fixedly installed in the spray tower, the first pressure control device blocks the inside of the spray tower and divides the inside of the spray tower into a first high-pressure chamber and a second high-pressure chamber, a second pressure control device, the second pressure control device is installed inside the gas outlet, the second pressure control device blocks the gas outlet, and the second pressure control device dredges the gas outlet when the gas pressure in the second high-pressure chamber reaches a threshold. The present invention increases the residence time of the waste gas inside the second high-pressure chamber, which can ensure a better waste gas removal effect, and increases the gas pressure by extending the gas residence time, thereby increasing the gas outflow speed, which can extend the time of the gas in the spray tower and improve the waste gas treatment effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of waste gas absorption towers, and in particular to a circulating spraying type waste gas absorption tower. Background Art

[0002] The spray type waste gas collection tower, also known as the spray tower or washing tower, is a commonly used industrial waste gas treatment equipment. Its main function is to remove harmful substances in the waste gas through the contact between the spray liquid and the waste gas, so as to achieve the purpose of purifying the gas. The working principle of the spray tower is to pass the waste gas through the tower body, and at the same time spray fine droplets (spray liquid) from the top or side of the tower, so that the waste gas and the droplets are fully in contact. In this process, the pollutants in the waste gas are absorbed, neutralized or chemically reacted by the spray liquid, thereby achieving the purpose of purifying the waste gas.

[0003] When the exhaust gas is treated, the exhaust gas flows into the bottom of the tower and then flows out from the top of the tower. In order to ensure a stable air pressure in the tower and the treatment effect of the exhaust gas, the output speed of the exhaust gas is generally kept equal to the input speed. If the output speed is lower than the input speed, the residence time of the exhaust gas in the tower will be increased, thereby improving the treatment effect of the exhaust gas. However, the air pressure in the tower will gradually increase, which may cause damage to the tower body and the air intake needs to overcome the pressure in the tower, so that the air intake speed is reduced, resulting in reduced efficiency in the treatment of the exhaust gas. In order to make the exhaust gas stay in the tower longer to achieve better treatment effects, the prior art generally adopts the method of increasing the height of the tower body, increasing the movement path of the exhaust gas in the tower, and thereby extending the residence time of the exhaust gas in the tower. However, this method will increase the volume of the tower body, which is not conducive to lightweight, and will increase the cost economically, increase the difficulty of transportation, and increase the difficulty of installation. Summary of the invention

[0004] The purpose of the present invention is to propose a circulating spray type waste gas absorption tower in view of the problems existing in the background technology.

[0005] The technical solution of the present invention is: a circulating spray type waste gas absorption tower, comprising a support base, a spray tower fixedly mounted on the support base, a spray device mounted on the support base and located in the spray tower, the top of the spray tower is provided with an air outlet, the bottom of the spray tower is provided with an air inlet, and further comprising:

[0006] A first pressure control device is fixedly installed in the spray tower, the first pressure control device blocks the inside of the spray tower and divides the inside of the spray tower into a first high-pressure chamber and a second high-pressure chamber, the volume of the second high-pressure chamber is larger than the first high-pressure chamber, the spray device and the air outlet are located at the top of the second high-pressure chamber, the air inlet is located at the bottom of the first high-pressure chamber, and the first pressure control device releases the gas in the first high-pressure chamber into the second high-pressure chamber when the air pressure in the first high-pressure chamber reaches a threshold value;

[0007] A second pressure control device, which is installed inside the air outlet, blocks the air outlet, and clears the air outlet when the air pressure in the second high-pressure chamber reaches a threshold value;

[0008] An air intake device is installed on the support seat and is connected to the air inlet. The air intake device applies pressure to the exhaust gas to press the exhaust gas into the first high-pressure chamber.

[0009] Optionally, the first pressure controlling device includes a first sealing ring fixedly installed in the spray tower, a first pressure-bearing column sliding through the middle of the first sealing ring, a plurality of first sliding rods fixedly installed on the first pressure-bearing column, the first sliding rods penetrate the first sealing ring and extend to the lower side of the first sealing ring, a plurality of first springs fixedly installed on the first sliding rod, the other end of the first spring is fixedly connected to the first sealing ring, a plurality of first blocking rods are arranged in a circular array at the edge of the first sealing ring, the diameter and weight of the first blocking rods are both smaller than the first pressure-bearing column, the first blocking rods slide through the first sealing ring, a first connecting plate is fixedly installed on the first blocking rod, and a first A telescopic rod, a second spring is fixedly installed on the first telescopic rod, the first telescopic rod is fixedly connected to the first sealing ring, a plurality of first exhaust holes and second exhaust holes are provided on the first sealing ring, the first exhaust holes and the second exhaust holes correspond to each other one by one and are coaxially arranged, the first exhaust holes and the second exhaust holes pass through the first sealing ring together, the inner diameter of the second exhaust hole is larger than the first exhaust hole, the first blocking rod is located in the first exhaust hole and the second exhaust hole, a first clamping component for limiting the first blocking rod is provided between the first pressure column and the first blocking rod, the first blocking rod can slide up and down, and a damping component for limiting the descending speed of the first blocking rod is installed on the first sealing ring.

[0010] Optionally, the first clamping assembly includes a plurality of first connecting rods rotatably mounted on the first pressure column, a plurality of first sliding grooves are provided on the first sealing ring, a first clamping block is slidably installed in the first sliding groove, the first clamping block is rotatably connected to the first connecting rod, and the first blocking rod is provided with a first clamping groove used in conjunction with the first clamping block.

[0011] Optionally, the damping assembly includes a plurality of slides and a plurality of oil tanks fixedly mounted on the first blocking ring, and a damping rod slidably mounted in the slide, the damping rod corresponds to the first connecting plate one-to-one and is fixedly connected, and the oil tank is filled with hydraulic oil. A first one-way valve and a second one-way valve are fixedly mounted between the oil tank and the slide, the inner diameter of the first one-way valve is larger than that of the second one-way valve, the first one-way valve allows the hydraulic oil to flow from the oil tank to the slide in one direction, and the second one-way valve allows the hydraulic oil to flow from the slide to the oil tank in one direction, an oil pressure plate is slidably mounted in the oil tank, a third spring is fixedly mounted on the oil pressure plate, and the other end of the third spring is fixedly connected to the inner wall of the oil tank.

[0012] Optionally, the second pressure controlling device includes a second sealing ring fixedly installed in the air outlet, a second pressure-bearing column sliding through the second sealing ring, and a plurality of second sliding rods fixedly installed on the second pressure-bearing column, the second sliding rod penetrating the second sealing ring and extending to the lower side of the second sealing ring, a fourth spring fixedly installed on the second sliding rod, the other end of the fourth spring is fixedly connected to the second sealing ring, a plurality of second connecting plates fixedly installed on the air outlet, a second telescopic rod fixedly installed on the second connecting plate, a second blocking rod fixedly installed on the second telescopic rod, a fifth spring fixedly installed between the second blocking rod and the second telescopic rod, a plurality of third exhaust holes and fourth exhaust holes are provided on the second sealing ring, the third exhaust holes correspond to the fourth exhaust holes one by one and are coaxially arranged, the third exhaust holes and the fourth exhaust holes penetrate the second sealing ring together, the fourth exhaust hole is located above the third exhaust hole and the inner diameter of the fourth exhaust hole is larger than the third exhaust hole, the second blocking rod is located inside the third exhaust hole and the fourth exhaust hole, and a second clamping assembly for limiting the second blocking rod is provided between the second sealing ring and the second blocking rod.

[0013] Optionally, the second clamping assembly includes a plurality of second sliding grooves provided on the second sealing ring, a second clamping block slidably installed in the second sliding grooves, a second connecting rod rotatably installed on the second clamping block, the other end of the second connecting rod is rotatably connected to the second pressure column, and the second blocking rod is provided with a second clamping groove cooperating with the second clamping block.

[0014] Optionally, the air intake device includes a third one-way valve fixedly mounted on the air inlet of the spray tower, a compression tube fixedly mounted on the third one-way valve, a fan fixedly mounted on the compression tube, and a connecting tube fixedly mounted on the fan, a motor cover fixedly mounted on the compression tube, a motor fixedly mounted in the motor cover, a transmission shaft rotatably mounted in the compression tube, the transmission shaft is coaxially fixedly connected to the output shaft of the motor, an eccentric wheel fixedly mounted on the transmission shaft, a third connecting rod rotatably mounted on the eccentric wheel, a piston slidably mounted in the compression tube, the third connecting rod is rotatably connected to the piston, and a plurality of fourth one-way valves are fixedly mounted on the piston.

[0015] Optionally, the spray device includes a water tank fixedly mounted on a support seat, a water pump fixedly mounted on the water tank, and a spray head installed in a spray tower, a water pipe fixedly mounted on the spray head, the water pipe passes through one side of the spray tower and is fixedly connected to the output end of the water pump, the input end of the water pump is connected to the water tank, a flow meter is fixedly mounted on the water pipe, a waste water tank is fixedly mounted on the support seat, and the waste water tank is connected to the first high-pressure chamber.

[0016] Optionally, two buffer seats are fixedly installed in the second high-pressure chamber, the spray head is fixedly installed on one of the buffer seats, and an agitator is fixedly installed on the other buffer seat. The buffer seat includes a support ring fixedly installed in the second high-pressure chamber, a plurality of support rods fixedly installed on the support ring, and a slider slidably installed on the support rod, buffer springs are fixedly installed on both sides of the slider, the other end of the buffer spring is fixedly connected to the support ring, a connecting rod is fixedly installed on the slider, and the spray head is fixedly installed on the plurality of connecting rods on one of the buffer seats.

[0017] Optionally, the agitator includes a mounting block fixedly mounted on a plurality of connecting rods on one of the buffer seats, and vortex blades rotatably mounted on both sides of the mounting block.

[0018] In summary, the present application includes at least one of the following beneficial technical effects:

[0019] When the air pressure inside the first high-pressure chamber gradually increases and increases to the set threshold, the air outlet will flow instantly to release the gas inside the second high-pressure chamber. Since the air pressure inside the second high-pressure chamber is relatively high, the speed of the gas passing through the air outlet will also increase, thereby increasing the gas content passing through the air outlet per unit time. When the flow areas of the air inlet and the air outlet are equal, and the air intake speed of the air inlet remains constant, and the air outlet speed of the air outlet is X times that of the air inlet, then the exhaust time only needs to be one Xth of the time. When the air intake and exhaust volumes per unit time are equal, there will be a certain difference between the air intake time and the air outlet time. During this time difference, the exhaust gas will stay in the second high-pressure chamber, thereby increasing the residence time of the exhaust gas inside the second high-pressure chamber, which can ensure better exhaust gas removal effect. By increasing the air pressure by extending the gas residence time, the gas outflow speed can be increased, which can extend the time of the gas in the spray tower and improve the exhaust gas treatment effect without increasing the height of the spray tower, which is convenient for transportation and installation.

[0020] The gas entering the second high-pressure chamber will instantly diffuse into the second high-pressure chamber, so that the exhaust gas is evenly distributed inside the second high-pressure chamber, and when the high-pressure gas is released, its speed will increase rapidly due to the pressure difference. High-speed airflow helps to break the surface tension of the spray liquid and form smaller droplets, thereby increasing the gas-liquid contact area. The instantaneous release of gas will produce strong turbulence, which helps to mix the gas and the spray liquid and improve the contact efficiency. This can increase the treatment effect of the exhaust gas. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 A schematic diagram of the structure of an embodiment of the present invention is given Figure 1 ;

[0022] Figure 2 A schematic diagram of the structure of an embodiment of the present invention is given Figure 2 ;

[0023] Figure 3 The internal schematic diagram of the spray tower of the present invention is given;

[0024] Figure 4 For the present invention Figure 3 A partial enlarged view of the middle A;

[0025] Figure 5 For the present invention Figure 3 A partial enlarged view of point B in the middle;

[0026] Figure 6 A schematic structural diagram of the air intake device of the present invention is given;

[0027] Figure 7 A schematic diagram of the internal structure position of the spray tower of the present invention is provided;

[0028] Figure 8 The structure schematic diagram of the first pressure control device of the present invention is given as follows: Figure 1 ;

[0029] Fig. 9 For the present invention Figure 8 A partial enlarged view of point C in the middle;

[0030] Fig.10 The structure schematic diagram of the first pressure control device of the present invention is given as follows: Figure 2 ;

[0031] Fig.11 The structure of the damping assembly of the present invention is shown as follows: Figure 1 ;

[0032] Fig.12 The structure of the damping assembly of the present invention is shown as follows: Figure 2 ;

[0033] Fig.13The structure schematic diagram of the second pressure control device of the present invention is given as follows: Figure 1 ;

[0034] Fig.14 The structure schematic diagram of the second pressure control device of the present invention is given as follows: Figure 2 ;

[0035] Fig.15 A structural schematic diagram of the buffer seat of the present invention is given.

[0036] Reference numerals: 1, support base; 2, spray tower; 201, first high-pressure chamber; 202, second high-pressure chamber; 3, first pressure control device; 301, first blocking ring; 302, first pressure column; 303, first sliding rod; 304, first spring; 305, first blocking rod; 306, first connecting plate; 307, first telescopic rod; 308, second spring; 309, first exhaust hole; 310, second exhaust hole; 311, first exhaust hole; 312, first exhaust hole; 313, first exhaust hole; 314, first exhaust hole; 315, first exhaust hole; 316, first exhaust hole; 317, first exhaust hole; 318, first exhaust hole; 319, first exhaust hole; 320, first exhaust hole; 321, first exhaust hole; 322, first exhaust hole; 323, first exhaust hole; 324, first exhaust hole; 325, first exhaust hole; 326, first exhaust hole; 327, first exhaust hole; 328, second exhaust hole; 329, first exhaust hole; 330, first exhaust hole; 331, first exhaust hole; 332, first exhaust hole; 333, first exhaust hole; 334, first exhaust hole; 335, first exhaust hole; 336, first exhaust hole 1. First connecting rod; 312. First slide groove; 313. First clamping block; 314. First clamping groove; 315. Slide cylinder; 316. Damping rod; 317. Oil tank; 318. First one-way valve; 319. Second one-way valve; 320. Oil pressure plate; 321. Third spring; 4. Second pressure control device; 401. Second blocking ring; 402. Second pressure column; 403. Second slide rod; 404. Fourth spring; 405. First Second connecting plate; 406, second telescopic rod; 407, second blocking rod; 408, fifth spring; 409, third exhaust hole; 410, fourth exhaust hole; 411, second slide slot; 412, second clamping block; 413, second connecting rod; 414, second clamping slot; 5, air intake device; 501, connecting pipe; 502, fan; 503, compression pipe; 504, third one-way valve; 505, motor cover; 506, motor; 5 07. Drive shaft; 508. Eccentric wheel; 509. Third connecting rod; 510. Piston; 511. Fourth one-way valve; 6. Spraying device; 601. Water tank; 602. Water pump; 603. Spray head; 604. Water pipe; 605. Flow meter; 606. Waste water tank; 7. Support ring; 701. Support rod; 702. Slider; 703. Buffer spring; 704. Connecting rod; 8. Mounting block; 801. Vortex blade. DETAILED DESCRIPTION

[0037] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and specific embodiments.

[0038] Example

[0039] like Figure 1-3As shown, a circulating spray type waste gas absorption tower proposed in the present invention includes a support base 1, a spray tower 2 fixedly mounted on the support base 1, and a spray device 6 mounted on the support base 1 and located in the spray tower 2. An air outlet is provided at the top of the spray tower 2, and an air inlet is provided at the bottom of the spray tower 2. The waste gas will enter the spray tower 2 through the air inlet, flow in the spray tower 2 to the air outlet, and finally be discharged to the outside of the spray tower 2 through the air outlet. The spray device 6 includes a water tank 601 fixedly mounted on the support 1, a water pump 602 fixedly mounted on the water tank 601, and a spray head 603 mounted in the spray tower 2. A water pipe 604 is fixedly mounted on the spray head 603. The water pipe 604 runs through one side of the spray tower 2 and is fixedly connected to the output end of the water pump 602. The input end of the water pump 602 is connected to the water tank 601. Spray liquid is poured into the water tank, and the water pump 602 is started to extract the spray liquid from the water tank and transport it to the inside of the spray head 603 through the water pipe 604. Finally, the spray liquid is sprayed out through the spray head 603, so that the spray liquid contacts the exhaust gas inside the spray tower 2, so that the spray liquid absorbs the harmful substances in the exhaust gas. A flow meter 605 is fixedly mounted on the water pipe 604, and the flow meter 605 monitors the spray liquid passing through the inside of the water pipe 604. A waste water tank 606 is fixedly mounted on the support base 1, and the waste water tank 606 is communicated with the spray tower 2. The falling spray liquid will enter the waste water tank 606 for unified collection, and the waste water in the waste water tank 606 can be processed and recycled again.

[0040] like Figure 3-4 and Figure 7-12As shown, it also includes a first pressure control device 3 fixedly installed in the spray tower 2. The first pressure control device 3 seals the interior of the spray tower 2 and divides the interior of the spray tower 2 into a first high-pressure chamber 201 and a second high-pressure chamber 202. The volume of the second high-pressure chamber 202 is larger than that of the first high-pressure chamber 201. The spray device 6 and the air outlet are located at the top of the second high-pressure chamber 202, and the air inlet is located at the bottom of the first high-pressure chamber 201. When the air pressure in the first high-pressure chamber 201 reaches a threshold, the first pressure control device 3 releases the gas in the first high-pressure chamber 201 into the second high-pressure chamber 202. When the gas in the first high-pressure chamber does not reach the set threshold, the falling spray liquid will gather on the first pressure control device 3. When the exhaust gas continues to enter the first high-pressure chamber 201 through the air inlet, the gas volume inside the first high-pressure chamber 201 will gradually increase, and the gas is compressed inside the first high-pressure chamber 201, so that the air pressure inside the first high-pressure chamber 201 gradually increases. In this process, the gas will be converted from a low-temperature and low-pressure state to a high-temperature and high-pressure state. When the air pressure inside the first high-pressure chamber 201 increases to the threshold, the high-temperature and high-pressure gas inside the first high-pressure chamber 201 will be ejected into the second high-pressure chamber 202, which will drive the spray liquid accumulated on the first pressure control device to move upward. Thereby, the spray liquid that may not be completely reacted will contact the exhaust gas again, improving the utilization rate of the spray liquid. The gas entering the second high-pressure chamber 202 will instantly diffuse into the second high-pressure chamber 202, so that the exhaust gas is evenly distributed inside the second high-pressure chamber 202, and when the high-pressure gas is released, its speed will increase rapidly due to the driving of the pressure difference. High-speed airflow helps break the surface tension of the spray liquid, forming finer droplets, thereby increasing the gas-liquid contact area. The instantaneous release of gas will produce strong turbulence, which helps mix the gas and spray liquid and improve the contact efficiency. This can increase the treatment effect of the exhaust gas.

[0041] Among them, the first pressure controlling device 3 includes a first sealing ring 301 fixedly installed in the spray tower 2, a first pressure column 302 slidingly passing through the middle part of the first sealing ring 301, a plurality of first sliding rods 303 fixedly installed on the first pressure column 302, the first sliding rods 303 pass through the first sealing ring 301 and extend to the lower side of the first sealing ring 301, a plurality of first springs 304 fixedly installed on the first sliding rod 303, and the other end of the first spring 304 is fixedly connected to the first sealing ring 301. When the air pressure inside the first high-pressure chamber 201 gradually increases, the gas will squeeze the first pressure column 302. As the air pressure inside the first high-pressure chamber 201 gradually increases, the first pressure column 302 will gradually rise. In this process, the gas inside the first high-pressure chamber 201 needs to overcome the elastic force of the first spring 304, the gravity of the first pressure column 302, and the air pressure inside the second high-pressure chamber 202 to apply downward pressure to the first pressure column 302. There are multiple first blocking rods 305 in a circular array at the edge of the first blocking ring 301. The diameter and weight of the first blocking rods 305 are smaller than the first pressure column 302. The first blocking rods 305 slide through the first blocking ring 301. A first connecting plate 306 is fixedly installed on the first blocking rod 305. A first telescopic rod 307 is fixedly installed on the first connecting plate 306. A second spring 308 is fixedly installed on the first telescopic rod 307. The first telescopic rod 307 is fixedly connected to the first blocking ring 301. The first blocking ring 301 is provided with multiple first exhaust holes 309 and second exhaust holes 310. The first exhaust holes 309 and the second exhaust holes 310 correspond to each other one by one and are coaxially arranged. The first exhaust holes 309 and the second exhaust holes 310 jointly penetrate the first blocking ring 301. The second exhaust holes 309 and the second exhaust holes 310 The inner diameter of 310 is larger than the first exhaust hole 309. The first blocking rod 305 is located in the first exhaust hole 309 and the second exhaust hole 310. The gas inside the first high-pressure chamber 201 will exert upward pressure on the first blocking rod 305. A first clamping assembly for limiting the first blocking rod 305 is provided between the first pressure-bearing column 302 and the first blocking rod 305. Under the action of the clamping assembly, the first blocking rod 305 is limited so that the first blocking rod 305 cannot rise. When the first blocking rod 305 can rise, under the action of the internal air pressure of the first high-pressure chamber 201, the first blocking rod will fall off from the first exhaust hole 309, so that the high-temperature and high-pressure gas inside the first high-pressure chamber 201 is released into the second high-pressure chamber through the first exhaust hole 309 and the second exhaust hole 310. The first blocking rod 305 can slide up and down, and a damping assembly for limiting the descending speed of the first blocking rod 305 is installed on the first sealing ring 301.Controlling the descending speed of the first blocking rod 305 can extend the circulation time of the first exhaust hole 309, so that when the air pressure inside the first high-pressure chamber 201 is not enough to lift up the first blocking rod 305 and the spray liquid, the first exhaust hole 309 can still circulate for a first period of time. At this time, the used spray liquid will enter the first high-pressure chamber 201 through the first exhaust hole 309, and finally enter the waste water tank 606. It should be noted that the waste water tank 606 should maintain a good sealing state.

[0042] Further, the first clamping assembly includes a plurality of first connecting rods 311 rotatably mounted on the first pressure column 302, a plurality of first sliding grooves 312 are provided on the first blocking ring 301, a first clamping block 313 is slidably mounted in the first sliding grooves 312, the first clamping block 313 is rotatably connected with the first connecting rod 311, and a first clamping groove 314 used in conjunction with the first clamping block 313 is provided on the first blocking rod 305. As the air pressure inside the first high-pressure chamber 201 gradually increases and causes the first pressure column 302 to gradually rise, the rising first pressure column 302 will drive the first connecting rod 311 to rotate, and the rotating first connecting rod 311 will drive the first clamping block 313 to move in a direction away from the first clamping groove 314, and finally the first clamping block 313 will be separated from the first clamping groove 314, at which time the first blocking rod 305 will no longer be limited, and at this time the first blocking rod 305 will rise under the action of the air pressure inside the first high-pressure chamber 201. It should be noted that the air pressure when the first pressure column 302 is pushed to make the first block 313 disengage from the first slot 314 is sufficient to push the lighter first blocking rod 305 out of the first exhaust hole 309, so that the first exhaust hole 309 can be instantly ventilated, thereby enabling the gas inside the first high-pressure chamber 201 to be instantly released, and the gas entering the second high-pressure chamber 202 to stir the original gas inside the second high-pressure chamber 202. After the gas inside the first high-pressure chamber 201 is completely released, under the action of the second spring 308, the first blocking rod 305 is moved down again, so that the first blocking rod 305 blocks the first exhaust hole 309, at which time the first block 313 can enter the first slot 314 again, and under the action of the first spring 304, the first pressure column 302 is reset, and then the above steps are repeated again after the air pressure inside the first high-pressure chamber 201 rises again.

[0043] Furthermore, the damping assembly includes a plurality of slides 315 and a plurality of oil tanks 317 fixedly mounted on the first blocking ring 301, a damping rod 316 slidably mounted in the slide 315, the damping rod 316 corresponds to and is fixedly connected to the first connecting plate 306 one by one, and the oil tank 317 is filled with hydraulic oil. A first check valve 318 and a second check valve 319 are fixedly mounted between the oil tank 317 and the slide 315, the inner diameter of the first check valve 318 is larger than the second check valve 319, the first check valve 318 allows the hydraulic oil to flow from the oil tank 317 to the slide 315 in one direction, and the second check valve 319 allows the hydraulic oil to flow from the slide 315 to the oil tank 317 in one direction, and an oil pressure plate 320 is slidably mounted in the oil tank 317, a third spring 321 is fixedly mounted on the oil pressure plate 320, and the other end of the third spring 321 is fixedly connected to the inner wall of the oil tank 317. When the first blocking rod 305 rises, it will drive the damping rod 316 to rise. At this time, under the action of the third spring 321, the oil pressure plate 320 will be pressed down, so that the hydraulic oil inside the oil tank 317 will enter the slide 315 through the first one-way valve 318. When the damping rod 316 descends with the first blocking rod 305, the hydraulic oil inside the slide 315 will need to be pressed into the oil tank 317, and the reflux hydraulic oil will pass through the second one-way valve 319 with a smaller aperture, thereby extending the flow time of the hydraulic oil, thereby reducing the descending speed of the first blocking rod 305.

[0044] like Figure 3 and Figure 5 as well as Figure 13-14 As shown, the exhaust gas absorption tower also includes a second pressure control device 4, which is installed inside the air outlet. The second pressure control device 4 blocks the air outlet. When the air pressure in the second high-pressure chamber 202 reaches a threshold, the second pressure control device 4 clears the air outlet. When the gas inside the first high-pressure chamber 201 gradually enters the second high-pressure chamber 202, the air pressure inside the second high-pressure chamber 202 will gradually increase. When the air pressure inside the second high-pressure chamber 202 increases to the set threshold, the air outlet will instantly circulate to release the gas inside the second high-pressure chamber 202. Since the air pressure inside the second high-pressure chamber 202 is relatively high, the speed at which the gas passes through the air outlet will also increase, thereby increasing the gas content passing through the air outlet per unit time. When the flow areas of the air inlet and the air outlet are equal, and the air intake speed of the air inlet remains constant, and the air outlet speed of the air outlet is X times that of the air inlet, the exhaust time only needs to be one Xth of the time. When the air intake volume and the exhaust volume per unit time are equal, there will be a certain difference between the air intake time and the air outlet time. During this time difference, the exhaust gas will stay in the second high-pressure chamber 202, thereby increasing the residence time of the exhaust gas inside the second high-pressure chamber, which can ensure a better exhaust gas removal effect.

[0045] It should be noted that the second pressure control device 4 includes a second sealing ring 401 fixedly installed in the air outlet, a second pressure column 402 slidingly passing through the second sealing ring 401, and a plurality of second sliding rods 403 fixedly installed on the second pressure column 402, the second sliding rod 403 passes through the second sealing ring 401 and extends to the lower side of the second sealing ring 401, a fourth spring 404 is fixedly installed on the second sliding rod 403, and the other end of the fourth spring 404 is fixedly connected to the second sealing ring 401, a plurality of second connecting plates 405 are fixedly installed on the air outlet, a second telescopic rod 406 is fixedly installed on the second connecting plate 405, a second blocking rod 407 is fixedly installed on the second telescopic rod 406, and a second A fifth spring 408 is fixedly installed between the blocking rod 407 and the second telescopic rod 406, and a plurality of third exhaust holes 409 and fourth exhaust holes 410 are provided on the second blocking ring 401. The third exhaust holes 409 correspond to the fourth exhaust holes 410 one by one and are coaxially arranged. The third exhaust holes 409 and the fourth exhaust holes 410 pass through the second blocking ring 401 together. The fourth exhaust hole 410 is located above the third exhaust hole 409 and the inner diameter of the fourth exhaust hole 410 is larger than the third exhaust hole 409. The second blocking rod 407 is located inside the third exhaust hole 409 and the fourth exhaust hole 410, and a second clamping component for limiting the second blocking rod 407 is provided between the second blocking ring 401 and the second blocking rod 407. Among them, the second clamping assembly includes a plurality of second sliding grooves 411 arranged on the second sealing ring 401, a second clamping block 412 slidably installed in the second sliding grooves 411, a second connecting rod 413 is rotatably installed on the second clamping block 412, the other end of the second connecting rod 413 is rotatably connected to the second pressure column 402, and the second blocking rod 407 is provided with a second clamping groove 414 cooperating with the second clamping block 412.The air pressure inside the second high-pressure chamber 202 will gradually increase under the action of the periodic discharge of gas from the first high-pressure chamber 201, and then the gas inside the second high-pressure chamber will gradually lift the second pressure column 402. According to the working principle of the first pressure control device 3, it can be obtained that when the air pressure inside the second high-pressure chamber 202 increases to a certain extent, the second pressure column 402 rises and drives the second clamping block 412 to fall off the second clamping groove 414, so that the second blocking rod 407 can be instantly raised and disengaged from the third exhaust hole 409, so that the gas inside the second high-pressure chamber 202 is instantly released. When the air pressure inside the second high-pressure chamber 202 is not enough to overcome the elastic force of the fifth spring 408 and the gravity of the second blocking rod 407, the second blocking rod 407 will block the third exhaust hole 409 again and reset the second pressure column 402, and wait for the air pressure inside the second high-pressure chamber 202 to reach the threshold again, and then the above cycle is performed again. It should be noted that when the second high-pressure chamber 202 is exhausted, not all gases will be exhausted. Since the gas below squeezes the upper part, only the gas that first enters the second high-pressure chamber 202 and moves to the upper part will be exhausted. After the gas that first enters the bottom of the second high-pressure chamber 202 is exhausted, the air pressure is reduced and the second blocking rod 407 will block the third exhaust hole 409, so that the gas that enters the second high-pressure chamber 202 later cannot be exhausted, and the gas that enters the second high-pressure chamber 202 later will be exhausted when the third exhaust hole 409 is opened next time, ensuring that the gas that enters the second high-pressure chamber 202 first and later can fully stay in the second high-pressure chamber 202 to ensure the treatment effect of the exhaust gas, and after a part of the gas is discharged from the second high-pressure chamber 202, the gas inside the second high-pressure chamber 202 will be depressurized and diffused again, which helps to break the surface tension of the spray liquid and form finer droplets, thereby increasing the gas-liquid contact area. The instantaneous release of gas will produce strong turbulence, which helps to mix the gas and the spray liquid and improve the contact efficiency. In this way, the treatment effect of the exhaust gas can be increased.

[0046] like Figure 1 and Figure 7As shown, the absorption tower also has an air intake device 5, which is installed on the support base 1 and connected to the air inlet. The air intake device 5 applies pressure to the exhaust gas and presses the exhaust gas into the first high-pressure chamber 201. Specifically, the air intake device 5 includes a third one-way valve 504 fixedly installed on the air inlet of the spray tower 2, a compression tube 503 fixedly installed on the third one-way valve 504, a fan 502 fixedly installed on the compression tube 503, and a connecting tube 501 fixedly installed on the fan 502. A motor cover 505 is fixedly installed on the compression tube 503, and a motor 506 is fixedly installed in the motor cover 505. A transmission shaft 507 is rotatably installed in the compression tube 503, and the transmission shaft 507 is coaxially fixedly connected with the output shaft of the motor 506. An eccentric wheel 508 is fixedly installed on the transmission shaft 507, and a third connecting rod 509 is rotatably installed on the eccentric wheel 508. A piston 510 is slidably installed in the compression tube 503, and the third connecting rod 509 is rotatably connected with the piston 510. A plurality of fourth one-way valves 511 are fixedly installed on the piston 510. Under the action of the fan 502, the exhaust gas is transported to the compression pipe 503, and enters between the piston 510 and the third one-way valve 504 through the fourth one-way valve 511. The eccentric wheel 508 is driven to rotate by starting the motor 506. The rotating eccentric wheel 508 will drive the third connecting rod 509 to rotate, and then the piston 510 is pushed to move back and forth through the third connecting rod 509, so that the exhaust gas can be continuously pressed into the first high-pressure chamber 201, so that the air pressure inside the first high-pressure chamber 201 gradually increases, and the third one-way valve 504 can ensure that the gas in the first high-pressure chamber 201 can only enter but not exit.

[0047] like Fig.15As shown, two buffer seats are fixedly installed in the second high-pressure chamber 202, the spray head 603 is fixedly installed on one of the buffer seats, and the agitator is fixedly installed on the other buffer seat. The buffer seat includes a support ring 7 fixedly installed in the second high-pressure chamber 202, a plurality of support rods 701 fixedly installed on the support ring 7, and a slider 702 slidably installed on the support rod 701. Buffer springs 703 are fixedly installed on both sides of the slider 702, and the other end of the buffer spring 703 is fixedly connected to the support ring 7. A connecting rod 704 is fixedly installed on the slider 702, and the spray head 603 is fixedly installed on the plurality of connecting rods 704 on one of the buffer seats. The agitator includes a mounting block 8 fixedly installed on the plurality of connecting rods 704 on one of the buffer seats, and a vortex blade 801 rotatably installed on both sides of the mounting block 8. When the gas inside the first high-pressure chamber 201 is released into the second high-pressure chamber 202, it will impact the sprinkler head 603 and the vortex blade 801. The impact is absorbed by the buffer spring 703, and the vortex blade 801 is driven to rotate under the action of the impact, so that the vortex blade stirs the gas in the second high-pressure chamber. As the amount of gas in the second high-pressure chamber 202 gradually increases, the pressure exerted by the air pressure in the second high-pressure chamber 202 on the first pressure column 302 becomes greater and greater, so that the energy released by the first high-pressure chamber 201 on the second high-pressure chamber 202 gradually increases, thereby increasing the rotation speed of the vortex blade 801, and then the rotation speed of the vortex blade 801 increases with the increase of the gas amount in the second high-pressure chamber 202, so that a large amount of gas can be stirred.

[0048] The working principle of this embodiment is as follows: under the action of the fan 502, the exhaust gas is transported to the compression pipe 503, and enters between the piston 510 and the third one-way valve 504 through the fourth one-way valve 511, and the piston 510 is driven to move back and forth by starting the motor 506, so that the exhaust gas can be continuously pressed into the first high-pressure chamber 201, so that the air pressure inside the first high-pressure chamber 201 gradually increases. As the air pressure inside the first high-pressure chamber 201 gradually increases, the first pressure column 302 gradually rises, and the rising first pressure column 302 will drive the first connecting rod 311 to rotate, and the rotating first connecting rod 311 will drive the first clamping block 313 to move in the direction away from the first clamping groove 314, and finally the first clamping block 313 will be disengaged from the first clamping groove 314. At this time, the first blocking rod 305 will no longer be limited, and the first blocking rod 305 will rise under the action of the air pressure inside the first high-pressure chamber 201. The air pressure when the first pressure column 302 is pushed to make the first block 313 disengage from the first slot 314 is sufficient to push the lighter first blocking rod 305 out of the first exhaust hole 309, allowing the first exhaust hole 309 to flow instantly, thereby enabling the gas inside the first high-pressure chamber 201 to be released instantly, causing the high-temperature and high-pressure gas inside the first high-pressure chamber 201 to reduce pressure and diffuse in the second high-pressure chamber 202, and causing the gas entering the second high-pressure chamber 202 to stir the original gas inside the second high-pressure chamber 202.After the gas in the first high-pressure chamber 201 is released, the first blocking rod 305 moves down again under the action of the second spring 308, so that the first blocking rod 305 blocks the first exhaust hole 309, and the gas pressure in the second high-pressure chamber 202 will gradually increase under the action of the periodic discharge of gas from the first high-pressure chamber 201, so that the gas in the second high-pressure chamber will gradually lift the second pressure column 402, and the second block 412 will fall off the second slot 414 under the action of the rising of the second pressure column 402, so that the second blocking rod 407 can be instantly raised and disengaged from the third exhaust hole 409, so that the gas in the second high-pressure chamber 202 is instantly released. When the gas pressure in the second high-pressure chamber 202 is not enough to overcome the elastic force of the fifth spring 408 and the gravity of the second blocking rod 407, the second blocking rod 407 will block the third exhaust hole 409 again and reset the second pressure column 402, waiting for the gas pressure in the second high-pressure chamber 202 to rise. When the threshold is reached again, the above cycle is performed again. When the second high-pressure chamber 202 is exhausted, not all gases will be exhausted. Since the gas below squeezes the upper part, only the gas that first enters the second high-pressure chamber 202 and moves to the upper part will be exhausted. After the gas that first enters the bottom of the second high-pressure chamber 202 is exhausted, the air pressure is reduced and the second blocking rod 407 will block the third exhaust hole 409, so that the gas that enters the second high-pressure chamber 202 later cannot be exhausted, and the gas that enters the second high-pressure chamber 202 later will be exhausted when the third exhaust hole 409 is opened next time, ensuring that the gas that enters the second high-pressure chamber 202 first and later can fully stay in the second high-pressure chamber 202 to ensure the treatment effect of the exhaust gas, and after a part of the gas is discharged from the second high-pressure chamber 202, the gas inside the second high-pressure chamber 202 will be depressurized and diffused again, which helps to break the surface tension of the spray liquid and form finer droplets, thereby increasing the gas-liquid contact area. The instantaneous release of gas will produce strong turbulence, which helps to mix the gas and the spray liquid and improve the contact efficiency. This can increase the effect of treating exhaust gas.

[0049] The above specific embodiments are only several optional embodiments of the present invention. Based on the technical solutions of the present invention and the relevant inspirations of the above embodiments, those skilled in the art can make various alternative improvements and combinations to the above specific embodiments.

Claims

1. A circulating spray type waste gas absorption tower, comprising a support base (1), a spray tower (2) fixedly mounted on the support base (1), and a spray device (6) mounted on the support base (1) and located in the spray tower (2), wherein the top of the spray tower (2) is provided with an air outlet, and the bottom of the spray tower (2) is provided with an air inlet. It is characterized in that Also includes: A first pressure control device (3) is fixedly installed in a spray tower (2), the first pressure control device (3) blocks the interior of the spray tower (2) and divides the interior of the spray tower (2) into a first high-pressure chamber (201) and a second high-pressure chamber (202), the volume of the second high-pressure chamber (202) is larger than the volume of the first high-pressure chamber (201), the spray device (6) and the air outlet are located at the top of the second high-pressure chamber (202), the air inlet is located at the bottom of the first high-pressure chamber (201), and when the air pressure in the first high-pressure chamber (201) reaches a threshold, the first pressure control device (3) releases the gas in the first high-pressure chamber (201) into the second high-pressure chamber (202), the first The pressure control device (3) comprises a first sealing ring (301) fixedly installed in the spray tower (2), and a first pressure column (302) slidingly passing through the middle of the first sealing ring (301); a plurality of first sliding rods (303) are fixedly installed on the first pressure column (302); the first sliding rods (303) pass through the first sealing ring (301) and extend to the lower side of the first sealing ring (301); a plurality of first springs (304) are fixedly installed on the first sliding rods (303); the other end of the first spring (304) is fixedly connected to the first sealing ring (301); a plurality of first blocking rods (305) are arranged in a circular array at the edge of the first sealing ring (301); The diameter and weight of the first blocking rod (305) are both smaller than the first pressure column (302); the first blocking rod (305) slides through the first blocking ring (301); a first connecting plate (306) is fixedly mounted on the first blocking rod (305); a first telescopic rod (307) is fixedly mounted on the first connecting plate (306); a second spring (308) is fixedly mounted on the first telescopic rod (307); the first telescopic rod (307) is fixedly connected to the first blocking ring (301); a plurality of first exhaust holes (309) and second exhaust holes (310) are provided on the first blocking ring (301); the first exhaust holes (309) and the second exhaust holes (310) are connected to each other. The holes (310) correspond to each other and are coaxially arranged. The first exhaust hole (309) and the second exhaust hole (310) both penetrate the first blocking ring (301). The inner diameter of the second exhaust hole (310) is larger than that of the first exhaust hole (309). The first blocking rod (305) is located in the first exhaust hole (309) and the second exhaust hole (310). A first clamping component for limiting the position of the first blocking rod (305) is provided between the first pressure column (302) and the first blocking rod (305). The first blocking rod (305) can slide up and down. A damping component for limiting the descending speed of the first blocking rod (305) is installed on the first blocking ring (301). A second pressure control device (4), the second pressure control device (4) is installed inside the air outlet, the second pressure control device (4) blocks the air outlet, and when the air pressure in the second high-pressure chamber (202) reaches a threshold, the second pressure control device (4) clears the air outlet, the second pressure control device (4) comprises a second sealing ring (401) fixedly installed in the air outlet, a second pressure-bearing column (402) slidingly passing through the second sealing ring (401), and a plurality of second sliding rods (403) fixedly installed on the second pressure-bearing column (402), the second sliding rods (403) passing through the second sealing ring (401) and extending to the lower side of the second sealing ring (401), a fourth spring (404) fixedly installed on the second sliding rod (403), the other end of the fourth spring (404) being fixedly connected to the second sealing ring (401), a plurality of second connecting plates (405) fixedly installed on the air outlet, and a second extending plate (405) fixedly installed on the second connecting plate (405) a retractable rod (406), a second blocking rod (407) is fixedly mounted on the second telescopic rod (406), a fifth spring (408) is fixedly mounted between the second blocking rod (407) and the second telescopic rod (406), a plurality of third exhaust holes (409) and fourth exhaust holes (410) are provided on the second blocking ring (401), the third exhaust holes (409) and the fourth exhaust holes (410) correspond to each other one by one and are coaxially arranged, the third exhaust holes (409) and the fourth exhaust holes (410) pass through the second blocking ring (401) together, the fourth exhaust hole (410) is located above the third exhaust hole (409) and the inner diameter of the fourth exhaust hole (410) is larger than the third exhaust hole (409), the second blocking rod (407) is located inside the third exhaust hole (409) and the fourth exhaust hole (410), and a second clamping assembly for limiting the second blocking rod (407) is provided between the second blocking ring (401) and the second blocking rod (407); An air intake device (5) is mounted on the support seat (1) and is connected to the air intake port, and the air intake device (5) applies pressure to the exhaust gas to press the exhaust gas into the first high-pressure chamber (201).

2. A circulating spray type exhaust gas absorption tower according to claim 1, It is characterized in that The first clamping assembly comprises a plurality of first connecting rods (311) rotatably mounted on the first pressure column (302); the first blocking ring (301) is provided with a plurality of first sliding grooves (312); a first clamping block (313) is slidably mounted in the first sliding groove (312); the first clamping block (313) is rotatably connected to the first connecting rod (311); and the first blocking rod (305) is provided with a first clamping groove (314) for use with the first clamping block (313).

3. A circulating spray type exhaust gas absorption tower according to claim 2, It is characterized in that The damping assembly comprises a plurality of slide cylinders (315) and a plurality of oil tanks (317) fixedly mounted on the first blocking ring (301), and a damping rod (316) slidably mounted in the slide cylinder (315). The damping rod (316) corresponds to the first connecting plate (306) one by one and is fixedly connected. The oil tank (317) is filled with hydraulic oil. A first one-way valve (318) and a second one-way valve (319) are fixedly mounted between the oil tank (317) and the slide cylinder (315). The first one-way valve (318) is The inner diameter is larger than that of the second one-way valve (319), the first one-way valve (318) allows the hydraulic oil to flow from the oil tank (317) to the slide cylinder (315) in one direction, and the second one-way valve (319) allows the hydraulic oil to flow from the slide cylinder (315) to the oil tank (317) in one direction. An oil pressure plate (320) is slidably installed in the oil tank (317), and a third spring (321) is fixedly installed on the oil pressure plate (320), and the other end of the third spring (321) is fixedly connected to the inner wall of the oil tank (317).

4. A circulating spray type waste gas absorption tower according to claim 1, It is characterized in that The second clamping assembly comprises a plurality of second slide grooves (411) provided on the second sealing ring (401), a second clamping block (412) slidably mounted in the second slide grooves (411), a second connecting rod (413) rotatably mounted on the second clamping block (412), the other end of the second connecting rod (413) being rotatably connected to the second pressure column (402), and the second blocking rod (407) being provided with a second clamping groove (414) cooperating with the second clamping block (412).

5. A circulating spray type exhaust gas absorption tower according to claim 4, It is characterized in that The air intake device (5) comprises a third one-way valve (504) fixedly mounted on the air intake of the spray tower (2), a compression pipe (503) fixedly mounted on the third one-way valve (504), a fan (502) fixedly mounted on the compression pipe (503), and a connecting pipe (501) fixedly mounted on the fan (502); a motor cover (505) fixedly mounted on the compression pipe (503); a motor (506) fixedly mounted inside the motor cover (505); and a motor (506) fixedly mounted inside the compression pipe (503). A transmission shaft (507) is rotatably mounted, the transmission shaft (507) is coaxially fixedly connected to the output shaft of the motor (506), an eccentric wheel (508) is fixedly mounted on the transmission shaft (507), a third connecting rod (509) is rotatably mounted on the eccentric wheel (508), a piston (510) is slidably mounted in the compression tube (503), the third connecting rod (509) is rotatably connected to the piston (510), and a plurality of fourth one-way valves (511) are fixedly mounted on the piston (510).

6. A circulating spray type exhaust gas absorption tower according to claim 5, It is characterized in that The spray device (6) comprises a water tank (601) fixedly mounted on a support base (1), a water pump (602) fixedly mounted on the water tank (601), and a spray head (603) mounted in a spray tower (2); a water pipe (604) fixedly mounted on the spray head (603); the water pipe (604) runs through one side of the spray tower (2) and is fixedly connected to the output end of the water pump (602); the input end of the water pump (602) is in communication with the water tank (601); a flow meter (605) is fixedly mounted on the water pipe (604); and a waste water tank (606) is fixedly mounted on the support base (1); the waste water tank (606) is in communication with the first high-pressure chamber (201).

7. A circulating spray type exhaust gas absorption tower according to claim 6, It is characterized in that Two buffer seats are fixedly installed in the second high-pressure chamber (202), the spray head (603) is fixedly installed on one of the buffer seats, and an agitator is fixedly installed on the other buffer seat. The buffer seat comprises a support ring (7) fixedly installed in the second high-pressure chamber (202), a plurality of support rods (701) fixedly installed on the support ring (7), and a slider (702) slidably installed on the support rods (701). Buffer springs (703) are fixedly installed on both sides of the slider (702), and the other end of the buffer spring (703) is fixedly connected to the support ring (7). A connecting rod (704) is fixedly installed on the slider (702), and the spray head (603) is fixedly installed on the plurality of connecting rods (704) on one of the buffer seats.

8. A circulating spray type exhaust gas absorption tower according to claim 7, It is characterized in that The agitator comprises a mounting block (8) fixedly mounted on a plurality of connecting rods (704) on one of the buffer seats, and vortex blades (801) rotatably mounted on both sides of the mounting block (8).

Citation Information

Patent Citations

  • Multi-chamber waste gas treatment technology catalytic waste gas treatment device

    CN110141939A

  • Desulphurization tower outlet flue gas washing device

    CN204485597U

  • Closed mercury-containing flue gas treatment device

    CN209393020U

  • Exhaust gas cleaning apparatus

    JP2007136438A

  • Exhaust spray tower

    WO2020042379A1