An intelligent welding system equipment for LNG storage tanks

By designing the intelligent welding system of LNG storage tanks, the welding waste gas is collected by the accommodating chamber and the recycling chamber, and the welding position is uniformly heated through the preheating device, the problem of difficulty in position cleaning and waste gas collection before welding is solved, and the welding quality and environment are improved Cleanliness.

CN118664151BActive Publication Date: 2024-12-03ZHIJIANG HONGJU SHIPBUILDING CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411012981.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-12-03
Estimated Expiration
2044-07-26

AI Technical Summary

Technical Problem

It is difficult to clean and collect waste gas at the same time before welding, and welding waste gas affects welding quality and environmental pollution.

Method used

An intelligent welding system for LNG storage tanks is designed, including support device, drive device, welding device, protection device, flexible seal structure, preheating device and exhaust gas collection device. The collection of welding exhaust gases is realized through the accommodating chamber and recycling chamber. Preheating at the welding position prevents exhaust gas leakage and affects welding quality.

Benefits of technology

Effectively prevent welding waste gas leakage, improve welding quality, save energy, ensure the cleanliness of the welding environment, and uniformly heat the welding position through the preheating device to avoid thermal expansion, contraction and temperature difference problems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118664151B_ABST
    Figure CN118664151B_ABST
Patent Text Reader

Abstract

The present application relates to the field of welding, and specifically discloses an intelligent welding system equipment for LNG storage tanks, which includes: a supporting device, a driving device and a welding device; a protective device, which is used to form a accommodating chamber capable of accommodating the welding head, a closing portion that is tightly against the tank body and the end body along the first dimension, and an abutting portion that is tightly against the tank body and the end body along the second dimension; a flexible sealing structure, which is used to form an annular tightening area with the abutting portion, the annular tightening area is tightly against the tank body and the end body, and seals the gap between the tank body and the end body; a preheating device; an exhaust gas collecting device; a driving device, which is used to directly or indirectly drive the tank body and the end body to rotate relative to the protective device, the flexible sealing structure, the preheating device and the exhaust gas collecting device. The present application has the effect of improving welding quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of welding, and in particular to an intelligent welding system equipment for LNG storage tanks. Background Art

[0002] LNG smart storage tank welding mainly involves welding the tank body and the end body together. During the welding process, the tank body and the end body are often rotated to form a circular weld between the tank body and the end body with a welding gun, so that the two are fixed together to obtain an LNG smart storage tank.

[0003] Technical solutions in related fields refer to the specification of Chinese patent application number 202110894320.6, which discloses a solution for cleaning the welding position before welding and then welding to increase the welding effect. Chinese patent application number CN202410071758.8 discloses a solution for collecting and treating exhaust gas generated by welding.

[0004] The applicant believes that the above solution has the following disadvantages:

[0005] It is difficult to clean the welding position before welding and collect the waste gas at the same time. The main purpose of collecting welding waste gas is to prevent environmental pollution. However, the welding waste gas located at the welding position will also affect the welding quality. Summary of the invention

[0006] In order to improve the problem that cleaning the welding position before welding is difficult to be applied together with exhaust gas collection, the present application provides an intelligent welding system equipment for LNG storage tanks.

[0007] The LNG tank intelligent welding system equipment provided in this application adopts the following technical solutions:

[0008] An intelligent welding system equipment for LNG storage tanks, comprising: a supporting device, a driving device and a welding device; the supporting device is used to support the tank body, the driving device is used to drive the tank body to rotate, and the welding device is used to form a welding head for welding the tank body and the end body fixed by spot welding; a gap is formed between the tank body and the end body, and an inlet is formed on the end body; the ZTMC also includes: a protective device, used to form a accommodating chamber capable of accommodating the welding head, a closing portion tightly abutting the tank body and the end body along the circumferential direction of the tank body and the end body, and an abutting portion tightly abutting the tank body and the end body along the axial direction of the tank body and the end body; a flexible sealing structure, used to abut against the abutting The joint forms an annular tightening area, which is pressed against the tank body and the end body and seals the gap between the tank body and the end body; a preheating device is used to form an injection structure that can add a high-temperature heat exchange medium from the inlet to the end body and the inside of the tank body; an exhaust gas collecting device is used to form an exhaust gas recovery cavity that can be communicated with the accommodating chamber and a pump body structure that can generate in the exhaust gas recovery cavity to transport the exhaust gas to a collection tank; wherein the driving device is used to directly or indirectly drive the tank body and the end body to rotate relative to the protective device, the flexible sealing structure, the preheating device and the exhaust gas collecting device.

[0009] By adopting the above-mentioned technical solution, the welding head is located in the accommodating chamber, so the welding waste gas generated in the welding process is gathered in the accommodating chamber for the first time, thereby preventing the leakage of welding waste gas and improving the workshop environment; in addition, the recovery cavity and the pump body component can be used to transfer the welding waste gas in the accommodating chamber in time, preventing the welding waste gas from gathering at the welding position and affecting the welding quality, thereby better ensuring the welding quality.

[0010] By adopting the above technical solution, the preheating device adds the heat exchange medium to the inside of the end body and the tank body, and the heat exchange medium enters the containing chamber through the gap formed by the spot welding of the end body and the tank body, thereby preheating the inner wall surface and the outer wall surface of the tank body and the end body at the same time, so that during welding, the overall temperature of the tank body and the end body is uniform, avoiding thermal expansion and contraction and avoiding the problem of poor welding quality due to low temperature, thereby improving the quality of welding. In addition, since the heat exchange medium overflows from the inside of the end body and the tank body, the exhaust gas generated by welding in the containing chamber will exert an upward force on the welding exhaust gas under the action of the heat exchange medium, so that the heat exchange medium can blow the welding exhaust gas upward, so that the welding exhaust gas can be separated from the tank body and the end body near the welding head in time, thereby better avoiding the reaction of the welding exhaust gas with the metal after welding, and further improving the quality of welding.

[0011] By adopting the above technical solution, the gap between the tube body and the end body is sealed by a flexible sealing structure, so that the heat exchange medium in the tank body and the end body is located in a closed area, avoiding the heat exchange medium from leaking outward at the gap, thereby playing a role in saving energy. At the same time, the flexible sealing structure can also play a role in insulating the weld after welding, preventing the weld from cooling down quickly. Then, when the diameter of the tank body and the end body to be welded is large, at the moment of welding completion, the temperature difference between the welds at multiple positions is small, thereby playing a role in simultaneous cooling. The purpose of simultaneous cooling is to prevent the temperature difference of the weld from being large due to the long welding time during welding, especially for the circular welding of the tank body and the end body. After welding a circle, the welds are connected end to end. Due to the large temperature difference, a very protruding connection mark will be formed, and the welding effect of the connection mark will be poor. Insulating the weld can avoid this situation.

[0012] By adopting the above-mentioned technical solution, when the tank body and the end body rotate, the abutment part will be tightly pressed against the tank body and the end body, and friction will be generated between the two, so that the abutment part can remove the dust and impurities that affect the welding quality adhering to the tube body and the end body, thereby better ensuring the quality of welding. At the same time, it can also increase the sealing of the protective cover and better prevent the leakage of welding exhaust gas.

[0013] Preferably, a cleaning portion is provided on the abutting portion; the cleaning portion forms a cleaning surface abutting against the end body and the tank body; the cleaning portion also forms an inclined groove inclined relative to the cleaning surface, and a stain receiving opening connected to the inclined groove is formed on the cleaning surface.

[0014] By adopting the above technical solution, the cleaning part is used to increase the cleaning effect of the abutting part on the tank body and the end body. In addition, the inclined groove formed on the cleaning part is used to accommodate the cleaned stains, thereby increasing the cleaning effect on the tank body and the end body to increase the quality of welding.

[0015] Preferably, the protective device also includes a protective cover; the abutting portion and the closing portion are both connected to the protective cover; the protective cover is used to form the accommodating chamber; two of the closing portion and the abutting portion are provided; one of the closing portions is tightly abutted against the tank body, and the other closing portion is tightly abutted against the end body; the abutting portion is used to form an abutting surface between the two closing portions that fits tightly against the end body and the tank body.

[0016] By adopting the above technical solution, one of the sealing parts is tightly pressed against the can body, and the other sealing part is tightly pressed against the end body, so that the welded gap is located in the accommodating chamber. The abutting part is horizontally placed between the end body and the can body, and the abutting surface on the abutting part is tightly pressed against the can body and the end body, thereby increasing the sealing effect.

[0017] Preferably, the protective device also includes a first connecting part, a second connecting part, a sealing part and a power part; the closing part is connected to the first connecting part, the abutting part is connected to the second connecting part, and the end of the abutting part is fixed to the closing part; the second connecting part is fixed to the protective cover; the power part is used to drive the closing part and the first connecting part to move up and down; the sealing part is used to form a sealing surface between the first connecting part and the protective cover that is tightly pressed against the first connecting part and the protective cover.

[0018] By adopting the above-mentioned technical solution, the closing part can move up and down under the action of the power part. Then, when facing tank bodies and end bodies of different sizes, the diameter of the contact position between the closing part and the tank body is larger than the diameter of the contact position between the closing part and the end body, so that the closing part is moved to a suitable position, so that the closing part is tightly pressed against the tank body and better pressed against the end body. When the first connecting part moves with the closing part, a gap is generated between the first connecting part and the protective cover, and the sealing of the closing part when it moves is ensured by the setting of the sealing part.

[0019] Preferably, the abutting portion, the closing portion, the first connecting portion and the second connecting portion are all made of elastic material.

[0020] Preferably, the heat exchange medium is air; the heat exchange medium can be transferred from the tank body and the end body to the accommodating chamber through the gap.

[0021] Preferably, the flexible sealing structure includes: a first flexible belt, a second flexible belt and a tightening member; one end of the first flexible belt is fixed to one of the abutting portions, and the other end is connected to the tightening member; one end of the second flexible belt is fixed to another abutting portion, and the other end is connected to the tightening member; the tightening member is used to tighten the first flexible belt and the second flexible belt on the end body and the tank body to close the gap.

[0022] By adopting the above-mentioned technical solution, the first flexible belt and the second flexible belt tighten the end body and the tank body and close the gap. When the size of the tube body and the end body changes, the flexible deformation of the first flexible belt and the second flexible belt can be utilized to maintain the tight fit with the tank body and the end body, thereby better adapting to the sealing of tank bodies and end bodies of different sizes during welding.

[0023] Preferably, the first flexible belt includes a first flexible wire, a second flexible wire and a belt body; the first flexible wire is located on one side of the belt body, and the second flexible wire is located on the other side of the belt body; when the first flexible belt is tightened on the end body and the tank body, the first flexible wire is tightened on the end body, and the second flexible wire is tightened on the tank body; the second flexible belt is the same as the first flexible belt.

[0024] By adopting the above technical solution, since the diameters of the tank body and the end body are different, the first flexible line is tightly against the end body and the second flexible line is tightly against the tank body, so that the first flexible belt can be better in contact with the end body and the tank body, and even when the size of the tank body and the end body changes, very good sealing can still be guaranteed. In addition, the first flexible line and the second flexible line are in contact with the end body and the tank body, and the belt body is located between the first flexible line and the second flexible line. Then, when the heat exchange medium is filled into the tank body and the end body, the air pressure in the tank body and the end body increases, which will cause the belt body to bulge relative to the tank body and the end body. The heat exchange medium can be accommodated inside the belt body, so that the heat exchange medium can be more fully in contact with the tank body and the end body, better preheating and better insulation of the weld.

[0025] Preferably, the recovery channel and the accommodating chamber form a first interface; the first interface is located at the top of the accommodating chamber.

[0026] By adopting the above technical solution, since the direction in which the heat exchange medium inside the tank body and the end body overflows outward along the gap into the accommodating chamber is vertically upward, the first interface is located at the top of the accommodating chamber, so that the heat exchange medium that overflows outward from the gap of the welding waste gas can directly blow the welding waste gas into the first interface, thereby facilitating the rapid collection of the welding waste gas and preventing the welding waste gas from affecting the welding quality.

[0027] Preferably, the welding device includes a first welding part, a second welding part and a wind force part; the first welding part forms the welding head located in the accommodating chamber; the second welding part is used for welding the tank body and the end body inside the tank body and the end body; the wind force part is used for making the heat exchange medium flow along a preset dimension in a preset area; the welding positions of the first welding part and the second welding part for welding the tank body and the end body match; the welding position is located at the edge of the preset area; the welding position is located in the middle area of ​​the accommodating chamber; the recovery cavity forms a second interface with the accommodating chamber; the second interface is located on the side of the accommodating chamber; a recovery pipeline is arranged in the tank body, and the inlet of the recovery pipeline is used to inhale air flowing along the preset dimension in the tank body.

[0028] By adopting the above technical solution, the first welding piece and the second welding piece can be arranged to weld the inner wall surface and the outer wall surface at the same time in the gap between the tank body and the end body, thereby improving the quality of welding. At the same time, it also avoids the situation that the welding of the inner wall surface and the outer wall surface in a certain order will affect the weld formed by the previous welding. The purpose of setting up the wind force piece is to collect the welding exhaust gas in time, wherein the wind force piece is used to make the heat exchange medium flow along a preset dimension in a preset area, which will clearly divide the weld at the accommodating chamber into two areas, the first area is the unwelded area, and the other is the welded area. After welding, the wind force piece is used to blow the welding exhaust gas to the welded area, so as to prevent the welding exhaust gas from affecting the welding quality. In addition, the heat exchange medium can overflow into the accommodating chamber at the unwelded position. As for the welding exhaust gas, the wind force generated by the heat exchange medium is directly collected by the wind force piece under the action of the wind force piece, so as to realize that the welding exhaust gas in the accommodating chamber will not pass through the gap into the inside of the tank body and the end body, and the welding exhaust gas in the tank body and the end body will not pass through the gap into the accommodating chamber, thereby better ensuring the quality of welding.

[0029] In summary, the present application includes at least one of the following beneficial technical effects:

[0030] 1. By introducing heat exchange medium into the tank body and allowing the heat exchange medium to flow into the containing chamber, the welding position can be preheated to increase the quality of welding; at the same time, the heat exchange medium flowing into the containing chamber can push the welding waste gas at the welding position upward, so that the welding waste gas quickly leaves the welding position, thereby preventing the welding waste gas from affecting the welding quality and further improving the welding quality.

[0031] 2. Seal the gaps by tightening the components to make better use of the heat exchange medium and prevent the heat exchange medium from overflowing, thereby saving energy.

[0032] 3. By setting the closing part and the abutting part, the accommodating chamber is closed, so the welding waste gas cannot overflow, and the effect of preventing the welding waste gas from polluting the environment is better. The abutting part can also play the effect of cleaning the welding position, realizing the combination of collecting welding waste gas and cleaning of the welding position, and further improving the welding effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 is an overall schematic diagram according to an embodiment of the present application;

[0034] Figure 2 It is a structural schematic diagram of a part of the embodiment, mainly showing the Figure 1 structure;

[0035] Figure 3It is a structural schematic diagram of a part of the embodiment, mainly showing the structure of the support wheel and the tank body;

[0036] Figure 4 It is a structural schematic diagram of a part of the embodiment, mainly showing the structure of the driving device, the supporting wheel, the tank body and the fixing bracket;

[0037] Figure 5 It is a structural schematic diagram of a part of the embodiment, mainly showing the structure of the flexible sealing structure and the tank body;

[0038] Figure 6 It is a structural schematic diagram of a part of the embodiment, mainly showing the structure of the flexible sealing structure;

[0039] Figure 7 It is a structural schematic diagram of a part of the embodiment, mainly showing the structure of the first flexible belt;

[0040] Figure 8 It is a structural schematic diagram of a part of the embodiment, mainly showing the structure of the protective device;

[0041] Fig. 9 It is a structural schematic diagram of a part of the embodiment, mainly showing the structure of the first connecting part, the second connecting part and some surrounding parts;

[0042] Fig.10 It is a structural schematic diagram of a part of the embodiment, mainly showing the structure of the sealing part and the mounting part;

[0043] Fig.11 It is a structural diagram of a part of the embodiment, mainly showing Figure 1 The structure of the cross section in one direction;

[0044] Fig.12 yes Fig.11 A magnified view of part A;

[0045] Fig.13 It is a structural diagram of a part of the embodiment, mainly showing Figure 1 The structure of the cross section in another direction;

[0046] Fig.14 It is a structural schematic diagram of a part of the embodiment, mainly showing the structure of the closing part;

[0047] Fig.15 It is a structural schematic diagram of a part of the embodiment, mainly showing the structure of the tank body and the end body.

[0048] Reference numerals:

[0049] 1. Support device; 11. Fixed bracket; 12. Support wheel;

[0050] 2. Driving device; 3. Welding device; 31. First welding part; 32. Preset area; 33. Welding position; 34. Separator;

[0051] 4. Tank body; 5. End body; 51. Gap; 52. Inlet;

[0052] 6. Protective device; 61. Accommodating chamber; 62. Closing part; 63. Abutting part; 64. Protective cover; 65. First connecting part; 66. Second connecting part; 67. Sealing part; 671. Mounting part; 68. Power part; 69. Lifting drive part;

[0053] 7. Flexible sealing structure; 71. First flexible belt; 711. First flexible line; 712. Second flexible line; 713. Belt body; 72. Second flexible belt; 73. Tightening member; 731. Guide wheel; 732. Drive wheel; 733. Rotating motor;

[0054] 8. Waste gas collection device; 81. Collection tank; 82. Collection pipeline; 83. First interface. DETAILED DESCRIPTION

[0055] The following is combined with Figure 1-15 This application is described in further detail.

[0056] Example 1

[0057] An intelligent welding system equipment for LNG storage tanks includes: a supporting device 1, a driving device 2 and a welding device 3. The supporting device 1 is used to support the tank body 4, the driving device 2 is used to drive the tank body 4 to rotate, and the welding device 3 is used to form a welding head for welding the tank body 4 and the end body 5 fixed by spot welding; a gap 51 is formed between the tank body 4 and the end body 5, and an inlet 52 is formed on the end body 5. Specifically, the tank body 4 and the end body 5 are first spot welded to fix the tank body 4 and the end body 5. When welding, the present application is mainly for the tank body 4 and the end body 5 after spot welding. The gap 51 formed between the tank body 4 and the end body 5 is the position excluding the welding point. For details of the gap 51, please refer to the attached drawings Fig.15 . The inlet 52 on the end body 5 is an inlet 52 for adding substances into the storage tank, wherein the tank body 4 is a circular tube, and two end bodies 5 are provided, which are respectively fixed to the two ends of the tank body 4, one of the end bodies 5 forms the inlet 52, and the other end body 5 is closed. It is also possible for both end bodies 5 to form the inlet 52. In the present embodiment, the support device 1 is used to place the storage tank, and the support device 1 includes a fixed bracket 11 and a plurality of support wheels 12, and the plurality of support wheels 12 are rotatably connected and arranged on the fixed bracket 11, and the storage tank is placed on the plurality of support wheels 12 to support the storage tank; in another scheme of the present embodiment, the support wheel 12 can also be replaced by a workbench with a groove, and the groove is used to place the storage tank and limit the storage tank.

[0058] In this embodiment, the driving device 2 is used to drive the storage tank to rotate, and the driving device 2 is a driving motor used to drive the support wheel 12 to rotate. When the support wheel 12 is replaced with a workbench with a groove, the driving device 2 is a lift and a driving wheel 732 connected to the lift, and the driving wheel 732 is rotated by a motor. The lift uses the driving wheel 732 to lift the storage tank to make the storage tank leave the workbench, and then the driving wheel 732 drives the storage tank to rotate, thereby realizing the rotation of the storage tank. In this embodiment, the welding device 3 adopts a welding manipulator.

[0059] The LNG tank intelligent welding system equipment also includes: a protective device 6, a flexible sealing structure 7, a preheating device and an exhaust gas collection device 8.

[0060] The protective device 6 is used to form a receiving chamber 61 capable of receiving the welding head, a closing portion 62 pressed against the tank body 4 and the end body 5 along the circumferential direction of the tank body and the end body, and an abutting portion 63 pressed against the tank body 4 and the end body 5 along the axial direction of the tank body and the end body. In this embodiment, the protective device 6 is a cover body, and the abutting portion 63 and the closing portion 62 are both rubber body structures. The closing portion 62 and the abutting portion 63 are used to abut against the tank body 4 and the end body 5, so that the receiving chamber 61 formed by the protective device 6 is sealed relative to the tank body 4 and the end body 5. The welding head is located in the receiving chamber 61, so the welding exhaust gas generated during the welding process is first gathered in the receiving chamber 61, thereby preventing the leakage of welding exhaust gas and improving the workshop environment. When the tank body 4 and the end body 5 rotate, the abutment portion 63 will be pressed against the tank body 4 and the end body 5, and friction will be generated therebetween, so that the abutment portion 63 can remove dust and impurities that are attached to the tube body and the end body 5 and affect the welding quality, thereby better ensuring the welding quality. At the same time, it can also increase the sealing performance of the protective cover 64 and better prevent the leakage of welding exhaust gas.

[0061] The flexible sealing structure 7 is used to form an annular tightening area with the abutment portion 63, and the annular tightening area is pressed against the tank body 4 and the end body 5, and the gap 51 between the tank body 4 and the end body 5 is sealed. The preheating device is used to form an injection structure that can add a heat exchange medium in a high temperature state from the inlet 52 to the inside of the end body 5 and the tank body 4. In this embodiment, the flexible structure is an annular elastic belt 713 structure, and the flexible sealing portion 67 is sleeved on the tank body 4 and the end body 5, so that the gap 51 formed between the tank body 4 and the end body 5 is closed. In this embodiment, the heat exchange medium is air in a high temperature state, and the preheating device adopts an industrial hot air blower, which inputs the air in a high temperature state into the inside of the end body 5 and the tank body 4 along the inlet 52 of the end body 5 through a pipeline.

[0062] By sealing the gap 51 between the tube body and the end body 5 with the flexible sealing structure 7, the heat exchange medium in the tank body 4 and the end body 5 is located in a closed area, and the heat exchange medium is prevented from leaking outward at the gap 51, thereby playing a role in saving energy. At the same time, the flexible sealing structure 7 can also play a role in keeping the weld after welding warm, and prevent the weld from cooling down quickly. Then, when the diameter of the tank body 4 and the end body 5 to be welded is large, at the moment of welding completion, the temperature difference between the welds at multiple positions is small, thereby playing a role in simultaneous cooling. The purpose of simultaneous cooling is to prevent the temperature difference of the weld from being large due to the long welding time during welding, especially for the circular welding of the tank body 4 and the end body 5. After welding a circle, the welds are connected end to end. Due to the large temperature difference, a very protruding connection mark will be formed, and the welding effect of the connection mark will be poor. By keeping the weld warm, this situation is avoided.

[0063] The waste gas collection device 8 is used to form a waste gas recovery cavity that can be communicated with the accommodating chamber 61 and a pump body structure that can generate in the waste gas recovery cavity to transport the waste gas to a collection tank 81. In this embodiment, the pump body component adopts an air pump, and the collection pipe is a tank body 4 for storing welding waste gas. The collection pipe can also be a chemical tank body 4 for treating welding waste gas. The scheme for the waste gas collection device 8 to form a recovery cavity is mainly to set a collection pipeline 82 between the collection pipe and the protective device 6, and the collection pipeline 82 forms a recovery cavity, so as to realize the recovery of the welding waste gas in the accommodating chamber 61. The use of the recovery cavity and the pump body component can timely transfer the welding waste gas in the accommodating chamber 61, prevent the welding waste gas from accumulating at the welding position and affecting the welding quality, thereby better ensuring the quality of welding.

[0064] The driving device 2 is used to directly or indirectly drive the tank body 4 and the end body 5 to rotate relative to the protective device 6, the flexible sealing structure 7, the preheating device and the exhaust gas collecting device 8. The driving device 2 drives the tank body 4 and the end body 5 to rotate, and the welding device 3 is fixed in position, so that the welding device 3 can weld the tank body 4 and the end body 5 and form an annular weld to fix the tank body 4 and the end body 5 together.

[0065] By adopting the above technical solution, the preheating device adds the heat exchange medium into the interior of the end body 5 and the tank body 4, and the heat exchange medium enters the accommodating chamber 61 through the gap 51 formed by the spot welding of the end body 5 and the tank body 4, thereby preheating the inner wall surface and the outer wall surface of the tank body 4 and the end body 5 at the same time, so that during welding, the overall temperature of the tank body 4 and the end body 5 is uniform, avoiding thermal expansion and contraction and avoiding the problem of poor welding quality due to low temperature, thereby improving the quality of welding. In addition, since the heat exchange medium overflows from the interior of the end body 5 and the tank body 4 to the outside, the exhaust gas generated by welding in the accommodating chamber 61 will exert an upward force on the welding exhaust gas under the action of the heat exchange medium, so that the heat exchange medium can blow the welding exhaust gas upward, so that the welding exhaust gas can be separated from the tank body 4 and the end body 5 near the welding head in time, thereby better avoiding the reaction of the welding exhaust gas with the metal after welding, and further improving the quality of welding.

[0066] In other schemes, a cleaning part is provided on the abutting part 63. The cleaning part is a rubber body, and the cleaning part forms a cleaning surface that abuts against the end body 5 and the tank body 4; the cleaning part also forms an inclined groove inclined relative to the cleaning surface, and a stain receiving port connected to the inclined groove is formed on the cleaning surface. The stain receiving port and the inclined groove are used to accommodate stains, prevent the stains from being compacted on the tank body 4 and the end body 5, and better separate the stains from the tank body 4 and the end body 5. The cleaning part is to increase the cleaning effect of the abutting part 63 on the tank body 4 and the end body 5, and the inclined groove formed on the cleaning part is to accommodate the cleaned stains, increase the cleaning effect on the tank body 4 and the end body 5, and improve the quality of welding.

[0067] In other schemes, the recovery cavity and the accommodating chamber 61 form a first interface 83; the first interface 83 is located at the top of the accommodating chamber 61. Since the direction in which the heat exchange medium inside the tank body 4 and the end body 5 overflows outwards into the accommodating chamber 61 along the gap 51 is vertically upward, the first interface 83 is located at the top of the accommodating chamber 61, so that the heat exchange medium overflowing from the gap 51 can directly blow the welding waste gas into the first interface 83, thereby facilitating the rapid collection of the welding waste gas and preventing the welding waste gas from affecting the welding quality.

[0068] In other solutions, a lifting drive member 69 is provided on the fixed bracket 11, and the lifting drive member 69 is used to drive the protective device 6 to move up and down, so that the protective device 6 can be used in conjunction with tank bodies 4 and end bodies 5 of different sizes.

[0069] Example 2

[0070] The difference from Example 1 is:

[0071] The protective device 6 also includes a protective cover 64, a first connecting portion 65, a second connecting portion 66, a sealing portion 67 and a power member 68. The abutting portion 63 and the closing portion 62 are both connected to the protective cover 64. Specifically, the closing portion 62 is connected to the first connecting portion 65, the abutting portion 63 is connected to the second connecting portion 66, the end of the abutting portion 63 is fixed to the closing portion 62, and the second connecting portion 66 is fixed to the protective cover 64. The protective cover 64 is used to form a accommodating chamber 61. The power member 68 is used to drive the closing portion 62 and the first connecting portion 65 to move up and down; the sealing portion 67 is used to form a sealing surface between the first connecting portion 65 and the protective cover 64, which is tightly pressed against the first connecting portion 65 and the protective cover 64. The abutting portion 63, the closing portion 62, the first connecting portion 65 and the second connecting portion 66 are all made of elastic materials.

[0072] Two closing parts 62 and two abutting parts 63 are provided, wherein one closing part 62 abuts against the tank body 4, and the other closing part 62 abuts against the end body 5. The abutting part 63 is used to form an abutting surface between the two closing parts 62 that fits tightly against the end body 5 and the tank body 4. Among them, the first connecting part 65 and the second connecting part 66 are both elastic rubber blocks, the closing part 62 is an elastic rubber block, the abutting part 63 is a metal plate that can be bent and deformed and a rubber pad fixed on the metal plate, the metal plate is abutted against the tank body 4 or the end body 5 through the rubber pad, and the rubber pad is used to increase the sealing after abutment. The sealing part 67 is a plate body, and a mounting part 671 is formed on the sealing part 67, and the mounting part 671 is used to install the first connecting part 65. The protective cover 64 is formed with a first through groove and a second through groove, wherein the first through groove is used to install the mounting portion 671, the first connecting portion 65 and the closing portion 62, wherein the first connecting portion 65 is fixed to the mounting portion 671, and the closing portion 62 is fixed to the first connecting portion 65, and the power member 68 is used to drive the sealing portion 67 to move up and down, so that the mounting portion 671 drives the first connecting portion 65 and the closing portion 62 to move, so that when two closing portions 62 are provided, one closing portion 62 abuts against the end body 5, and the other closing portion 62 abuts against the tank body 4, the closing portion 62 moves downwards and the distance increases, which causes the closing portion 62 and the first connecting portion 65 to move together, and there is a gap between the first connecting portion 65 and the protective cover 64, and the sealing portion 67 is used to block the gap. The above-mentioned abutment method can be normally realized, thereby increasing the sealing performance. One end of the abutting portion 63 is fixed to one of the closing portions 62, and the other end is fixed to another closing portion 62, so that the two ends of the abutting portion 63 abut against the tank body 4 and the end body 5, and the middle of the abutting portion 63 will be deformed and fit against the tank body 4 and the end body 5, so as to better ensure the sealing effect. Under the action of the power member 68, the closing portion 62 can move up and down, so when facing tank bodies 4 and end bodies 5 of different sizes, the diameter of the contact position of the closing portion 62 with the tank body 4 is greater than the diameter of the contact position of the closing portion 62 with the end body 5, so that the closing portion 62 moves to a suitable position, so that the closing portion 62 is tightly pressed against the tank body 4 and better pressed against the end body 5, and when the first connecting portion 65 moves with the closing portion 62, a gap is generated between the first connecting portion 65 and the protective cover 64, and the sealing of the closing portion 62 when moving is ensured by the setting of the sealing portion 67.

[0073] Example 3

[0074] The difference from Example 1 is:

[0075] The flexible sealing structure 7 includes: a first flexible belt 71, a second flexible belt 72 and a tightening member 73. One end of the first flexible belt 71 is fixed to one of the abutting portions 63, and the other end is connected to the tightening member 73; one end of the second flexible belt 72 is fixed to another abutting portion 63, and the other end is connected to the tightening member 73; the tightening member is used to tighten the first flexible belt 71 and the second flexible belt 72 on the end body 5 and the tank body 4 to close the gap 51. The first flexible belt 71 and the second flexible belt 72 tighten the end body 5 and the tank body 4 and close the gap 51. When the size of the tube body and the end body 5 changes, the first flexible belt 71 and the second flexible belt 72 can be used to maintain the fit and tightness with the tank body 4 and the end body 5 by flexible deformation, so as to better adapt to the sealing of tank bodies 4 and end bodies 5 of different sizes when welding.

[0076] In the present embodiment, the first solution for the tightening member 73 is that the tightening member 73 adopts a tightening buckle, and the first flexible belt 71 and the second flexible belt 72 are fastened together by the tightening buckle to achieve the fixation of the two, and the two can be tightly attached to the tank body 4 and the end body 5 by tightening;

[0077] The second solution of the tightening member 73 in this embodiment is that the tightening member 73 includes: a guide wheel 731, a driving wheel 732 and a rotating motor 733. Among them, the guide wheel 731, the driving wheel 732 and the rotating motor 733 are each provided with two groups, the first group is connected to the first flexible belt 71, and the second group is connected to the second flexible belt 72. Taking the first group as an example, the first flexible belt 71 is fixed to the driving wheel 732, the guide wheel 731 is in contact with the end body 5 and the tank body 4, and the rotating motor 733 drives the driving wheel 732 to rotate, so that the first flexible belt 71 is tightened and only fits on the tank body 4 and the end body 5.

[0078] The preferred solution for the first flexible band 71 and the second flexible band 72 is as follows: the first flexible band 71 includes a first flexible line 711, a second flexible line 712 and a band body 713; the first flexible line 711 is located on one side of the band body 713, and the second flexible line 712 is located on the other side of the band body 713; when the first flexible band 71 is tightened on the end body 5 and the tank body 4, the first flexible line 711 is tightened on the end body 5, and the second flexible line 712 is tightened on the tank body 4; the second flexible band 72 is the same as the first flexible band 71. Since the diameters of the tank body 4 and the end body 5 are different, the first flexible line 711 is tightened against the end body 5 and the second flexible line 712 is tightened against the tank body 4, so that the first flexible band 71 can be better abutted against the end body 5 and the tank body 4, and even when the sizes of the tank body 4 and the end body 5 change, a very good sealing performance can still be guaranteed. In addition, the first flexible wire 711 and the second flexible wire 712 are in contact with the end body 5 and the tank body 4, and the belt body 713 is located between the first flexible wire 711 and the second flexible wire 712. Then, when the heat exchange medium is filled into the tank body 4 and the end body 5, the air pressure in the tank body 4 and the end body 5 increases, causing the belt body 713 to bulge relative to the tank body 4 and the end body 5. The heat exchange medium can be accommodated inside the belt body 713, so that the heat exchange medium can contact the tank body 4 and the end body 5 more comprehensively, so as to better preheat and better insulate the weld.

[0079] Example 4

[0080] The difference from Example 1 is that:

[0081] The welding device 3 includes a first welding part 31, a second welding part and a wind force part. The first welding part 31 forms a welding head located in the accommodating chamber 61; the second welding part is used to weld the tank body 4 and the end body 5 inside the tank body 4 and the end body 5. The first welding part 31 and the second welding part are both welding manipulators, wherein the second welding part is inserted into the inside of the tank body 4 and the end body 5 through the inlet 52 on the end body 5, and then the welding head of the second welding part rotates so that the welding head of the second welding part is facing the position in the tank body 4 and the end body 5 that needs to be welded. The rotation of the welding head of the second welding part is based on the existing technology that the second welding part is a welding manipulator. The wind force part is a small fan in this embodiment, wherein two small fans are provided, namely a first small fan and a second small fan, the first small fan is provided at the welding head of the first welding part 31, and the second small fan is provided at the welding head of the second welding part.

[0082] The wind force piece is used to make the heat exchange medium flow along a preset dimension in a preset area 32. The welding positions 33 of the first welding piece 31 and the second welding piece for welding the tank body 4 and the end body 5 match each other. The welding position 33 is located at the edge of the preset area 32. The welding position 33 is located in the middle area of ​​the accommodating chamber 61. Regarding the specific position of the preset area 32, the preset area 32 is a square three-dimensional area, one end of the preset area 32 is matched with the wind force piece, and also matches with the welding position, so that the exhaust gas generated by welding can be quickly blown from one end of the preset area 32 to the other end.

[0083] The recovery channel forms a second interface with the accommodating chamber 61; the second interface is located at the side of the accommodating chamber 61. A recovery pipeline is arranged in the tank body 4, and the inlet of the recovery pipeline is used to inhale the air flowing along the preset dimension in the tank body 4. The recovery channel is used to recover the welding waste gas in the accommodating chamber 61. Specifically, the welding waste gas in the accommodating chamber 61 flows along the preset dimension under the action of the wind force, and the second interface is arranged in the preset flow direction, so that the welding waste gas in the accommodating chamber 61 can be directly and quickly collected. The recovery pipeline is used to recover the welding waste gas in the tank body 4 and the end body 5. The recovery pipeline is arranged in the preset flow direction, so that the welding waste gas in the tank body 4 and the end body 5 can also be directly and quickly collected. In addition, more specifically, a partition plate 34 is fixedly arranged on the inner wall surface of the accommodating chamber 61, and the partition plate 34 is arranged in the preset area 32. The partition plate 34 is used to block the gap 51 in the preset area 32 to prevent the welding waste gas from contacting the weld on the gap 51.

[0084] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. An intelligent welding system for LNG tanks, characterized by: include: Support device, driving device and welding device; The supporting device is used to support the tank body, the driving device is used to drive the tank body to rotate, and the welding device is used to form a welding head for welding the tank body and the end body fixed by spot welding; a gap is formed between the tank body and the end body, and an inlet is formed on the end body; Features: The welding system equipment also includes: A protective device, used to form a receiving chamber capable of receiving the welding head, a closing portion pressed against the tank body and the end body in the circumferential direction of the tank body and the end body, and a contact portion pressed against the tank body and the end body in the axial direction of the tank body and the end body; A flexible sealing structure, used to form an annular tightening area with the abutting portion, wherein the annular tightening area abuts against the tank body and the end body and seals the gap between the tank body and the end body; A preheating device is used to form an injection structure capable of injecting a heat exchange medium in a high temperature state from the inlet into the end body and the inside of the tank body; An exhaust gas collection device, used to form an exhaust gas recovery cavity that can communicate with the accommodating chamber and a pump body structure that can generate a pump in the exhaust gas recovery cavity to transport the exhaust gas to a collection tank; Wherein, the driving device is used to directly or indirectly drive the tank body and the end body to rotate relative to the protective device, the flexible sealing structure, the preheating device and the exhaust gas collecting device; the protective device also includes a protective cover; the abutting portion and the closing portion are both connected to the protective cover; the protective cover is used to form the accommodating chamber; the protective device also includes a first connecting portion, a second connecting portion, a sealing portion and a power member; The closing portion is connected to the first connecting portion, the abutting portion is connected to the second connecting portion, an end of the abutting portion is fixed to the closing portion; and the second connecting portion is fixed to the protective cover; The power member is used to drive the closing portion and the first connecting portion to move upward and downward; the sealing portion is used to form a sealing surface between the first connecting portion and the protective cover that is tightly pressed against the first connecting portion and the protective cover.

2. According to claim 1, an intelligent welding system equipment for LNG storage tanks is characterized by: A cleaning portion is arranged on the abutting portion; the cleaning portion forms a cleaning surface abutting against the end body and the tank body; the cleaning portion also forms an inclined groove inclined relative to the cleaning surface, and a stain receiving opening communicating with the inclined groove is formed on the cleaning surface.

3. The intelligent welding system equipment for LNG storage tanks according to claim 2 is characterized in that: Two of the sealing parts and the abutting parts are provided; one of the sealing parts abuts against the can body, and the other sealing part abuts against the end body; the abutting part is used to form an abutting surface between the two sealing parts that fits tightly against the end body and the can body.

4. The intelligent welding system equipment for LNG storage tanks according to claim 3 is characterized in that: The abutting portion, the closing portion, the first connecting portion, and the second connecting portion are all made of elastic materials.

5. An intelligent welding system equipment for LNG storage tanks according to any one of claims 1 to 4, characterized in that: The heat exchange medium is air; the heat exchange medium can be transferred from the tank body and the end body to the accommodating chamber through the gap.

6. The intelligent welding system equipment for LNG storage tanks according to claim 5 is characterized by: The flexible sealing structure comprises: a first flexible belt, a second flexible belt and a tightening member; One end of the first flexible belt is fixed to one of the abutting portions, and the other end is connected to the tightening member; one end of the second flexible belt is fixed to another abutting portion, and the other end is connected to the tightening member; The tightening member is used to tighten the first flexible belt and the second flexible belt on the end body and the tank body to close the gap.

7. The intelligent welding system equipment for LNG storage tanks according to claim 6 is characterized by: The first flexible belt comprises a first flexible line, a second flexible line and a belt body; The first flexible line is located on one side of the belt body, and the second flexible line is located on the other side of the belt body; When the first flexible belt is tightened on the end body and the tank body, the first flexible wire is tightened on the end body, and the second flexible wire is tightened on the tank body; The second flexible band is identical to the first flexible band.

8. The LNG tank intelligent welding system equipment according to claim 1 is characterized by: The recovery channel and the accommodating chamber form a first interface; the first interface is located at the top of the accommodating chamber.

9. The intelligent welding system equipment for LNG storage tanks according to claim 8 is characterized in that: The welding device comprises a first welding member, a second welding member and a wind force member; the first welding member forms the welding head located in the accommodating chamber; The second welding piece is used for welding the tank body and the end body inside the tank body and the end body; The wind force member is used to make the heat exchange medium flow along a preset dimension in a preset area; the welding positions of the first welding member and the second welding member for welding the tank body and the end body match; the welding position is located at the edge of the preset area; the welding position is located in the middle area of ​​the accommodating chamber; The recovery cavity forms a second interface with the accommodating chamber; the second interface is located at the side of the accommodating chamber; a recovery pipeline is arranged in the tank body, and the inlet of the recovery pipeline is used to inhale air flowing along a preset dimension in the tank body.

Citation Information

Patent Citations

  • Storage tank body welding device

    CN113333997A

  • Automatic welding equipment for automobile parts

    CN117583795A

  • Metal thin-walled cylinder hot machining deformation-preventing flexible tool structure and deformation-preventing method

    CN112743190A

  • Intelligent welding system equipment for LNG (Liquefied Natural Gas) storage tank

    CN117600708A

  • Pipeline welding argon filling device

    CN207057882U