A hydrogen fuel cell test energy management system and control method thereof

Through the hydrogen fuel cell test energy management system, the energy management controller and energy storage batteries are used to dynamically manage electronic load devices, which solves the problems of equipment redundancy and high cost, and realizes rapid response and safety management of the power of hydrogen fuel cell test equipment. .

CN118671610BActive Publication Date: 2024-11-08ZHEJIANG HAIYI NEW ENERGY TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411154354.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-11-08
Estimated Expiration
2044-08-22

AI Technical Summary

Technical Problem

Each equipment in the existing hydrogen fuel cell testing equipment needs to be equipped with an electronic load device, resulting in equipment redundancy and waste, increasing investment costs, and hindering the development and management of hydrogen fuel cell testing experimental technology.

Method used

Design a hydrogen fuel cell test energy management system, including hydrogen fuel cell testing equipment, multiple voltage regulation devices, electronic load devices, energy storage batteries and power sensors, and realize dynamic management of electronic load devices through energy management controllers, quickly In response to changes in the test equipment demand, match the requested power, and reduce frequent loading and decreasing of electronic load devices through energy storage batteries.

Benefits of technology

It realizes rapid follow-up of hydrogen fuel cell test equipment requested power, dynamically manages energy, avoids excessive dependence on electronic load devices, saves equipment costs, and improves laboratory equipment management level and test safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118671610B_ABST
    Figure CN118671610B_ABST
Patent Text Reader

Abstract

The invention discloses a hydrogen fuel cell test energy management system and a control method thereof, which relate to the technical field of fuel cell test, and comprise a hydrogen fuel cell test device, a multi-channel voltage regulating device, and an electronic load device which are connected in sequence, wherein the multi-channel voltage regulating device is connected in parallel with a test bench auxiliary device, the electronic load device is connected with an energy storage battery and a power sensor, the test bench auxiliary device is respectively connected with the energy storage battery and the electronic load device, the multi-channel voltage regulating device and the electronic load device are connected with an energy management controller, and the energy management controller is respectively connected with the test bench auxiliary device, the energy storage battery and the power sensor; the hydrogen fuel cell test device is provided with a hydrogen fuel cell test bench 1, a hydrogen fuel cell test bench 2, a hydrogen fuel cell test bench 3, ..., a hydrogen fuel cell test bench n, where n is a positive integer, and the technical scheme in the present application can quickly meet the power request in the test process, realize the dynamic management of energy and adapt to different working conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of fuel cell testing, and in particular to a hydrogen fuel cell testing energy management system and a control method thereof. Background Art

[0002] Due to the rapid development of hydrogen energy, hydrogen fuel cell test equipment has developed rapidly, and more and more hydrogen fuel cell test laboratories have purchased a large number of test equipment to meet the needs of research and production. Each test equipment needs to be equipped with an electronic load to consume the electricity generated during the hydrogen fuel cell test process. If each test equipment is equipped with an electronic load device, it will inevitably cause excessive redundancy and waste of equipment. In addition, the excessive investment in equipment leads to a high threshold for starting many test development projects, which is very unfavorable to the development and management of hydrogen fuel cell test experimental technology.

[0003] Therefore, the present application proposes a hydrogen fuel cell test energy management system and a control method thereof to meet the needs of research and production. Summary of the invention

[0004] In view of the defects existing in the prior art, the purpose of the present invention is to provide a hydrogen fuel cell test energy management system and a control method thereof, aiming to solve the technical problems in the related art to a certain extent.

[0005] In order to achieve the above purpose, the technical solution adopted by the present invention is:

[0006] A hydrogen fuel cell test energy management system comprises a hydrogen fuel cell test device, a multi-channel voltage regulating device and an electronic load device connected in sequence, wherein the multi-channel voltage regulating device is connected in parallel with a test bench auxiliary device, the electronic load device is connected with an energy storage battery and a power sensor, the test bench auxiliary device is respectively connected with the energy storage battery and the electronic load device, the multi-channel voltage regulating device and the electronic load device are connected with an energy management controller, and the energy management controller is respectively connected with the test bench auxiliary device, the energy storage battery and the power sensor; the hydrogen fuel cell test device is provided with at least one hydrogen fuel cell test bench.

[0007] On the basis of the above technical solution, the hydrogen fuel cell test bench includes hydrogen fuel cell test bench 1, hydrogen fuel cell test bench 2, hydrogen fuel cell test bench 3, ..., hydrogen fuel cell test bench n, where n is a positive integer, and the models and specifications of hydrogen fuel cell test bench 1, hydrogen fuel cell test bench 2, hydrogen fuel cell test bench 3, ..., hydrogen fuel cell test bench n are different.

[0008] Based on the above technical solution, the energy storage battery is a lithium battery or a lead-acid battery.

[0009] Based on the above technical solution, the auxiliary equipment of the test bench includes an air supply device for the test equipment, a heat balance management device, a humidification balance control device, a liquid level monitoring and automatic water replenishment device, a combustible gas and toxic gas leakage monitoring and alarm device, and a video monitoring device.

[0010] On the basis of the above technical scheme, the multi-channel voltage regulating device is a multi-channel boost DC / DC converter, which is used to convert the multi-channel voltages of hydrogen fuel cell test bench 1, hydrogen fuel cell test bench 2, hydrogen fuel cell test bench 3, ..., hydrogen fuel cell test bench n of different models and specifications into the same platform voltage.

[0011] On the basis of the above technical solution, the method comprises the following steps:

[0012] S1. According to the test objectives, predetermine the number and model parameters of the hydrogen fuel cell test equipment and the corresponding test bench auxiliary equipment, set the load increase and decrease plan curve of the test equipment, and proceed to the next step;

[0013] S2. Input the required test equipment load increase and decrease plan curve and test target parameters into the integrated test platform host computer, and the integrated test platform host computer sends the test equipment load increase and decrease plan curve to the energy management controller, and proceed to the next step;

[0014] S3, the energy management controller performs weighted average processing on the load increase and decrease plan curve of the test equipment, and obtains the expected target power and the corresponding timetable, and calculates the load increase and decrease plan curve of the electronic load device, and proceeds to the next step;

[0015] S4, the energy management controller receives the power sensor feedback, adjusts the electronic load device in real time until the power sensor is consistent with the expected target power, and proceeds to the next step;

[0016] S5, execute the load-on / off plan curve of the electronic load device and collect the power P1 of the electronic load device before each load-on / off process and the P2 value of the electronic load device after each load-on / off process, and determine whether the load-on / off change rate ΔP meets the set value A range, If satisfied, continue to add or reduce the load according to the load addition or reduction plan curve of the electronic load device, and enter step S7; if not satisfied, enter the next step;

[0017] S6, change the power P2 value of the electronic load device before the next load addition and reduction process to the power value equivalent to P1, collect the power P2 of the electronic load device before the load addition and reduction process and the power P3 of the electronic load device after the load addition and reduction process, and determine whether the load addition and reduction change rate ΔP meets the set value A range, If the conditions are met, the load will continue to be increased or decreased according to the load increase or decrease plan curve of the electronic load device;

[0018] S7, repeat the above steps S5 and S6 until the load change rate The set value A is met, and all load addition and reduction operations are completed according to the load addition and reduction plan curve of the electronic load device.

[0019] S8. End.

[0020] On the basis of the above technical solution, the load increase and decrease plan curve of the test equipment includes the load increase and decrease plan curve of the hydrogen fuel cell test equipment, the power consumption plan curve of the auxiliary equipment, and the charge and discharge plan curve of the energy storage battery.

[0021] On the basis of the above technical solution, the test bench auxiliary equipment adjusts the power consumption curve accordingly according to the load increase and decrease plan curve of the test equipment and sends it to the energy management controller.

[0022] On the basis of the above technical solution, in step S6, the power P2 of the electronic load device before the next load addition and reduction process is changed to P1, and the power difference between P2 and P1 is provided by the energy storage battery.

[0023] Compared with the prior art, the advantages of the present invention are:

[0024] (1) Compared with the prior art, the hydrogen fuel cell test energy management system in the present invention can control the electronic load device and the energy storage battery to quickly respond to the demand changes of the hydrogen fuel cell test equipment and the test bench auxiliary equipment, quickly match the requested power under the current test environment conditions, and realize the rapid follow-up of the requested power of the hydrogen fuel cell test equipment. It can dynamically manage the fuel cell energy of each test platform in the laboratory and can execute different control strategies under different working conditions. At the same time, it can also prevent the electronic load device from changing very frequently and quickly, avoid excessive reliance on large electronic load devices, save equipment costs, and help improve the equipment management level of the hydrogen fuel cell test laboratory and enhance the safety of test work.

[0025] (2) A control method for a hydrogen fuel cell test energy management system in the present invention can quickly meet power requests during the test, achieve dynamic management of energy and adapt to different working conditions. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 This is a schematic diagram of the structure of a hydrogen fuel cell test energy management system according to an embodiment of the present invention;

[0027] Figure 2 A control signal processing logic diagram of a control method for a hydrogen fuel cell test energy management system according to an embodiment of the present invention;

[0028] Figure 3This is a logic flow chart of a control method for a hydrogen fuel cell test energy management system in an embodiment of the present invention. DETAILED DESCRIPTION

[0029] The embodiments of the present invention are further described in detail below with reference to the accompanying drawings.

[0030] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present disclosure. Instead, they are merely examples of devices and methods consistent with some aspects of the present disclosure as detailed in the appended claims.

[0031] In the description of the present invention, unless otherwise specified and limited, it should be noted that the terms "installed", "connected" and "connected" should be understood in a broad sense. For example, it can be a mechanical connection or an electrical connection, or it can be the internal connection of two components. It can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to the specific circumstances.

[0032] See also Figure 1 The structural schematic diagram of a hydrogen fuel cell test energy management system in an embodiment of the present invention is shown, comprising a hydrogen fuel cell test equipment, a multi-channel voltage regulating device, and an electronic load device connected in sequence, wherein the multi-channel voltage regulating device is connected in parallel with a test bench auxiliary equipment, the electronic load device is connected with an energy storage battery and a power sensor, the test bench auxiliary equipment is respectively connected with the energy storage battery and the electronic load device, the multi-channel voltage regulating device and the electronic load device are connected with an energy management controller, and the energy management controller is respectively connected with the test bench auxiliary equipment, the energy storage battery and the power sensor; the hydrogen fuel cell test equipment is provided with a hydrogen fuel cell test bench 1, a hydrogen fuel cell test bench 2, a hydrogen fuel cell test bench 3, ..., a hydrogen fuel cell test bench n, where n is a positive integer.

[0033] The multi-channel voltage regulating device in the present application is a multi-channel boost DC / DC converter, which can convert one or more DC power inputs into multiple DC outputs of different voltage levels. In this embodiment, it is used to convert the multi-channel voltages of hydrogen fuel cell test bench 1, hydrogen fuel cell test bench 2, hydrogen fuel cell test bench 3, ..., hydrogen fuel cell test bench n of different models and specifications into the same power supply voltage for unified energy management.

[0034] If the test process needs to test and evaluate hydrogen fuel cell systems of different specifications and models, that is, hydrogen fuel cell test bench 1, hydrogen fuel cell test bench 2, hydrogen fuel cell test bench 3, ..., hydrogen fuel cell test bench n have different power and load curves, at this time, the output voltages of different hydrogen fuel cell test bench 1, hydrogen fuel cell test bench 2, hydrogen fuel cell test bench 3, ..., hydrogen fuel cell test bench n are converted through a multi-channel voltage regulating device and finally passed through an electronic load device for unified real-time dynamic power management.

[0035] The test bench auxiliary equipment includes thermal management device, humidification control device, liquid level monitoring and automatic water replenishment device, humidification control device, combustible gas and toxic gas leakage monitoring and alarm device, and video monitoring device.

[0036] join Figure 2 The figure shows a control signal processing logic diagram of a control method for a hydrogen fuel cell test energy management system in an embodiment of the present invention. In this embodiment, the hydrogen fuel cell test bench planned test curve 1, the hydrogen fuel cell test bench planned test curve 2, ..., the hydrogen fuel cell test bench planned test curve n are fitted with a target time power curve to obtain an expected time power curve. During the control signal processing of this method, the input end of the energy management controller is connected to the hydrogen fuel cell test equipment and the test bench auxiliary equipment, and the output end is connected to the electronic load device and the power sensor. The energy management controller further performs optimization control processing and outputs the electronic load load increase and decrease plan curve, and collects feedback data from the electronic load device in real time. The energy management controller finally achieves consistency between the power sensor and the expected target power through continuous feedback adjustment, that is, completes all fuel cell system test tasks according to the expected time power curve.

[0037] See also Figure 3 The figure shows a logic flow chart of a control method of a hydrogen fuel cell test energy management system in an embodiment of the present invention. The energy management controller receives the load increase and decrease plan curve of the hydrogen fuel cell test equipment, the auxiliary equipment power consumption plan curve, and the energy storage battery charge and discharge plan curve, and performs weighted average processing on the three plan curves to obtain the expected target power and the corresponding schedule. According to the calculated expected target power and the corresponding schedule, the load increase and decrease plan curve of the electronic load device is formulated, and then the power sensor is controlled to be consistent with the expected target power.

[0038] Among them, the test equipment load increase and decrease plan curve is determined by the tester inputting the required test target parameters into the integrated test bench host computer, and the integrated test bench host computer sends the test equipment load increase and decrease plan curve to the energy management controller. The test bench auxiliary equipment adjusts the power consumption curve accordingly according to the test equipment load increase and decrease plan curve, and sends the auxiliary equipment power consumption plan curve to the energy management controller. The energy storage battery adjusts the charge and discharge time curve of this test according to its SOC size and the test equipment load increase and decrease plan curve, and sends the energy storage battery charge and discharge plan curve to the energy management controller.

[0039] The load-on / off planning curve of the electronic load device is executed, and the power P1 of the electronic load device before each load-on / off process and the P2 value of the electronic load device after each load-on / off process are collected to determine whether the load-on / off change rate ΔP meets the set value A. If it is satisfied, the load will continue to be increased or decreased according to the load increase or decrease plan curve of the electronic load device; if it is not satisfied, the P2 power value of the plan curve before the next load process is changed to the P1 power value, that is, the next loading / unloading operation is changed to make the current P2 power value of the electronic load device consistent with the P1 power, and then the P3 power value is increased or decreased. After that, it is judged again whether the load increase or decrease change rate ΔP meets the set value A range, that is, If it is satisfied, the load will continue to be increased or decreased according to the load increase or decrease plan curve of the electronic load device. If it is not satisfied, the last load increase or decrease operation of the electronic load device will be repeated until the load increase or decrease change rate ΔP meets the set value A range.

[0040] In this embodiment, the energy storage battery is a lithium battery, a lead-acid battery, a sodium battery, or a combination of the two. In step S6, the power P2 of the electronic load device before the next loading and unloading process is changed to P1, and the power difference between P2 and P1 is provided by the energy storage battery, so that the electronic load device can reduce frequent loading.

[0041] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0042] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0043] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0044] The present invention is not limited to the above-mentioned embodiments. For ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention, and these improvements and modifications are also considered to be within the scope of protection of the present invention. The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.

Claims

1. A control method for a hydrogen fuel cell test energy management system, the method is used to control a hydrogen fuel cell test energy management system, characterized in that: A hydrogen fuel cell test energy management system, comprising a hydrogen fuel cell test device, a multi-channel voltage regulating device, and an electronic load device connected in sequence, wherein the multi-channel voltage regulating device is connected in parallel with a test bench auxiliary device, the electronic load device is connected with an energy storage battery and a power sensor, the test bench auxiliary device is respectively connected with the energy storage battery and the electronic load device, the multi-channel voltage regulating device and the electronic load device are connected with an energy management controller, and the energy management controller is respectively connected with the test bench auxiliary device, the energy storage battery and the power sensor; the hydrogen fuel cell test device is provided with at least one hydrogen fuel cell test bench; the hydrogen fuel cell test bench comprises a hydrogen fuel cell test bench 1, a hydrogen fuel cell test bench 2, a hydrogen fuel cell test bench 3, ..., a hydrogen fuel cell test bench Table n, n is a positive integer, hydrogen fuel cell test bench 1, hydrogen fuel cell test bench 2, hydrogen fuel cell test bench 3, ..., hydrogen fuel cell test bench n are of different models and specifications; the energy storage battery is a lithium battery or a lead-acid battery; the test bench auxiliary equipment includes an air supply device for the test equipment, a heat balance management device, a humidification balance control device, a liquid level monitoring and automatic water replenishment device, a combustible gas and toxic gas leakage monitoring and alarm device, and a video monitoring device; the multi-channel voltage regulating device is a multi-channel boost DC / DC converter, which is used to convert the multi-channel voltages of hydrogen fuel cell test bench 1, hydrogen fuel cell test bench 2, hydrogen fuel cell test bench 3, ..., hydrogen fuel cell test bench n of different models and specifications into the same platform voltage; A control method for a hydrogen fuel cell test energy management system comprises the following steps: S1. According to the test objectives, predetermine the number and model parameters of the hydrogen fuel cell test equipment and the corresponding test bench auxiliary equipment, set the load increase and decrease plan curve of the test equipment, and proceed to the next step; S2. Input the required test equipment load increase and decrease plan curve and test target parameters into the integrated test platform host computer, and the integrated test platform host computer sends the test equipment load increase and decrease plan curve to the energy management controller, and proceed to the next step; S3, the energy management controller receives the load increase and decrease plan curve of the hydrogen fuel cell test equipment, the power consumption plan curve of the auxiliary equipment, and the charge and discharge plan curve of the energy storage battery, and performs weighted average processing on the three plan curves to obtain the expected target power and the corresponding schedule, and calculates the load increase and decrease plan curve of the electronic load device, and then proceeds to the next step; S4, the energy management controller receives the power sensor feedback, adjusts the electronic load device in real time until the power sensor is consistent with the expected target power, and proceeds to the next step; S5, execute the load-adding and unloading plan curve of the electronic load device and collect the power P1 of the electronic load device before each load-adding and unloading process and the P2 value of the electronic load device after each load-adding and unloading process. The power difference between P2 and P1 is provided by the energy storage battery. It is judged whether the load-adding and unloading change rate ΔP meets the set value A range, ΔP=|P1-P2| / P1≧A. If it meets, continue to add and unload according to the load-adding and unloading plan curve of the electronic load device, and enter step S7; if it does not meet, enter the next step; S6, change the power P2 value of the electronic load device before the next load addition and reduction process to the power value equivalent to P1, and collect the power P2 of the electronic load device before the load addition and reduction process and the power P3 of the electronic load device after the load addition and reduction process, and judge whether the load addition and reduction change rate ΔP meets the set value A range, ΔP=|P2-P3| / P2≧A, if it meets, continue to add and reduce the load according to the load addition and reduction plan curve of the electronic load device; S7, repeat the above steps S5 and S6 until the load change rate ΔP meets the set value A, and complete all load addition and reduction operations according to the load addition and reduction plan curve of the electronic load device; S8. End.

2. The control method of a hydrogen fuel cell test energy management system according to claim 1, characterized in that: The test equipment load increase and decrease plan curve includes a hydrogen fuel cell test equipment load increase and decrease plan curve, an auxiliary equipment power consumption plan curve, and an energy storage battery charge and discharge plan curve.

3. The control method of a hydrogen fuel cell test energy management system according to claim 1, characterized in that: The test bench auxiliary equipment adjusts the power consumption curve accordingly according to the test equipment load increase and decrease plan curve and sends it to the energy management controller.

4. The control method of a hydrogen fuel cell test energy management system according to claim 1, characterized in that: In the step S6, the power P2 of the electronic load device before the next load addition and reduction process is changed to P1, and the power difference between P2 and P1 is provided by the energy storage battery.