A calculation method for optimal anchoring parameters in pre-consolidation zone of extremely high and steep slopes

Through the dual control parameters of safety factor and support within the plastic zone, the pre-solidation area height and optimal anchoring measures of ultra-high steep slopes are scientifically determined, and the problem of insufficient pre-solidation area height and anchoring measures in the prior art is solved. , achieving long-term stability and safety of the slope.

CN118673568BActive Publication Date: 2024-11-05CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411139960.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-11-05
Estimated Expiration
2044-08-20

AI Technical Summary

Technical Problem

It is difficult for the prior art to scientifically determine the pre-solidation area height and optimal anchoring measures of ultra-high steep slopes, resulting in engineering safety or waste of materials.

Method used

The dual control parameters of safety factor and support within the plastic area are used to determine the optimal anchoring parameters through on-site survey, numerical simulation calculation and cost evaluation to ensure long-term stability of the slope.

Benefits of technology

It effectively avoids engineering safety risks caused by insufficient pre-solidation zone height or anchoring measures, and avoids waste of materials, ensuring long-term stability and safety of the slope.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118673568B_ABST
    Figure CN118673568B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for calculating the optimal anchoring parameters of the pre-consolidation zone of an ultra-high and steep slope, comprising the following steps: S1: determining the basic characteristics of the topography, rock and soil structure, engineering slope and natural slope height of the ultra-high and steep slope; S2: obtaining the stress-strain curve of the rock and soil, the mechanical parameters of the rock and soil and the degradation characteristics; S3: constructing a mechanical model considering the damage effect of excavation and unloading of the ultra-high and steep slope; S4: setting different anchoring heights and anchoring measure combinations on the environmental slope; S5: solving the slope safety factor for different anchoring measure combinations; S6: screening out the anchoring measure combination that meets the safety factor requirements; S7: obtaining the height data set of the rock and soil entering the plastic zone; S8: screening the anchoring measure combination that meets the safety factor standard and the plastic zone requirements; S9: determining the optimal anchoring parameters. The present invention uses the dual control parameters of the safety factor and the support within the plastic zone to calculate the pre-consolidation zone, which can ensure the long-term stability of the slope.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of ultra-high and steep slope prevention and control, and in particular to a method for calculating optimal anchoring parameters of an ultra-high and steep slope pre-consolidation zone. Background Art

[0002] The extremely high and steep slopes in hydropower projects are composed of engineering slopes and environmental slopes (referring to natural slopes outside the excavation line of the engineering slopes that have an impact on the construction of the project). Due to the needs of the layout of the hub buildings, the excavation often forms engineering slopes as high as 300m to 500m. Above the engineering slopes, there are also environmental slopes as high as hundreds of meters or even thousands of meters with a slope of 50° to 60° or more. During the development process, due to the unloading effect of the excavation of the engineering slope, it is easy to cause local damage to the upper environmental slope. If any unstable geological body on the environmental slope loses stability, its high potential energy will be converted into impact kinetic energy, which may cause great harm to the equipment, buildings and personnel on the lower engineering slope. Therefore, it is necessary to reinforce the environmental slope before excavating the engineering slope.

[0003] For the engineering slope and the environmental slope above it, a new systematic prevention concept of "high defense and pre-consolidation, stable excavation and appropriate protection" has been proposed. The prevention and control methods of "high defense" and "pre-consolidation" are adopted for the upper environmental slope, and the prevention and control methods of "stable excavation" and "appropriate protection" are adopted for the lower engineering slope. Among them, the "pre-consolidation" measure is the most critical step. "Pre-consolidation" means controlling the development of the plastic yield zone of the slope and reducing the impact of the engineering slope excavation on the environmental slope by pre-anchoring the environmental slope that may be affected by the excavation of the engineering slope.

[0004] At present, there are few studies on the determination of the scope of the pre-reinforcement zone. The height of the anchorage zone is usually determined based on field experience, and the reinforcement range is 1 / 10~1 / 5 of the height of the engineering slope. If the height of the pre-reinforcement zone is too small or the anchorage measures are insufficient, it will have an adverse impact on the safety of the project; if the height of the pre-reinforcement zone is too large or the anchorage measures are excessive, it will cause waste of engineering materials. Therefore, it is particularly important to propose a method to reasonably determine the height of the pre-reinforcement zone of the ultra-high and steep slope and propose the optimal anchorage measures at the same time. Summary of the invention

[0005] The purpose of the present invention is to overcome the shortcomings of the above-mentioned background technology and provide a method for calculating the optimal anchoring parameters of the pre-consolidation zone of an ultra-high and steep slope. The method uses the dual control parameters of the safety factor and the support within the plastic zone to calculate the pre-consolidation zone, which can ensure the long-term stability of the slope and reasonably determine the optimal anchoring measures and the height of the pre-consolidation zone of the environmental slope on the upper part of the engineering slope.

[0006] To achieve the above object, the present invention provides a method for calculating the optimal anchoring parameters of the pre-consolidation zone of an ultra-high and steep slope, comprising the following steps:

[0007] S1: Based on the results of the on-site investigation, determine the basic characteristics of the topography and geomorphology of the extremely high and steep slopes, the structure of the rock and soil mass, the height of the engineering slopes and the natural slopes;

[0008] S2: Obtain the stress-strain curve, mechanical parameters and degradation characteristics of rock and soil;

[0009] S3: Based on the results obtained in step S2, a mechanical model considering the unloading damage effect of the excavation of the ultra-high and steep slope is constructed;

[0010] S4: Setting different anchoring heights and combinations of anchoring measures on the environmental slope;

[0011] S5: Based on the results obtained in step S1, a numerical simulation calculation model for an extremely high and steep slope is established, and numerical simulation calculation is performed based on the mechanical model considering the damage effect of the excavation and unloading of the extremely high and steep slope constructed in step S3, so as to simulate the excavation process and unloading process of the engineering slope; and the slope safety factor is respectively solved for different combinations of anchoring measures;

[0012] S6: Determine the safety standard according to the slope design specification, and screen out a combination of anchoring measures that meets the safety factor requirements based on the calculation results of step S5;

[0013] S7: Obtain the height data set of the rock mass entering the plastic zone [z j '], and calculate the height data set [z j '] the maximum value z0;

[0014] S8: Screening the combination of anchoring measures that meet the safety factor standard and plastic zone requirements;

[0015] S9: Perform cost comparison based on the anchoring measure combination obtained in step S8, evaluate different anchoring measure combinations, and determine the optimal anchoring parameters.

[0016] As a preferred implementation, in step S2, the stress-strain curve of the rock and soil is obtained by conducting an on-site shear model test; and the mechanical parameters and degradation characteristics of the rock and soil are obtained by conducting an indoor quick shear test.

[0017] As a preferred implementation method, in step S3, the mechanical model considering the unloading damage effect of the ultra-high and steep slope excavation is as follows:

[0018] ;

[0019] In the formula, σ N is the deviatoric stress after unloading at different excavations, ɛ N is the strain after different excavation unloading, G is the stiffness matrix, DN is the total damage variable caused by excavation unloading.

[0020] As a preferred implementation method, in step S4, different anchoring heights and anchoring measure combinations {[h], [q], [d]} are set on the environmental slope, where h is the anchoring area height, and the anchoring area height is set to h1, h2, .....hi respectively; q is the anchoring force of a single anchor cable, and is set to q1, q2, .....qj respectively; d is the anchor array spacing, and is set to d1, d2, .....dk respectively, and a total of i×j×k combinations are set.

[0021] As a preferred implementation, in step S5, for different anchoring measure combinations {[h], [q], [d]}, the slope safety factor is solved respectively using the strength reduction method.

[0022] As a preferred implementation, in step S6, the following formula is used to screen out the anchoring measure combination {[h'], [q'], [d']} that meets the safety factor requirement:

[0023] ;

[0024] In the formula, K is the slope safety factor calculated under different combinations of anchoring measures; [K] is the safety standard determined according to the slope design specifications.

[0025] As a preferred implementation, in step S7, the coordinates (x i , z j ), the data is screened according to the following formula to obtain the height data set entering the plastic zone [z j ']:

[0026] ;

[0027] ;

[0028] In the formula, (x i , z j ) refers to the coordinate within the slope range, z j For different heights, τ (xi,zj) Refers to (x i , z j ) position, σ (xi,zj) Refers to (x i , z j ) position, c Refers to the cohesive strength of rock and soil. φ The internal friction angle of rock and soil. D c Refers to the cohesive strength damage variable of rock and soil mass caused by excavation unloading.D φ Refers to the friction angle damage variable of rock and soil body caused by excavation unloading. H 0 Refers to the height of the project slope;

[0029] The height data set of entering the plastic zone [z j '], that is:

[0030] ;

[0031] In the formula, z 0 is the maximum height of the plastic zone.

[0032] As a preferred implementation, in step S8, the height of the plastic zone is controlled not to exceed the height of the pre-consolidation zone, and the anchoring measure combination {[h'], [q'], [d']} that meets the safety factor requirements obtained in step S6 is screened again according to the following formula to meet the requirements for support in the plastic zone, and obtain the anchoring measure combination {[h''], [q''], [d'']} that meets the safety factor standard and the requirements of the plastic zone:

[0033] ;

[0034] In the formula, h'' is the anchor height after screening; z 0 It is the maximum height of the plastic zone, that is, the distance from the bottom of the slope to the highest point of the plastic zone; H0 is the actual height of the engineering slope.

[0035] As a preferred implementation, in step S9, the anchoring measure combination {[h''], [q''], [d'']} obtained in step S8 is substituted into the following formula for cost comparison:

[0036] ;

[0037] In the formula, M is the relative value of cost, h'' is the anchor height after screening, q'' is the single anchor force after screening, d ’’ is the anchor array spacing after screening.

[0038] As a preferred implementation, in step S9, different anchoring measure combinations {[h''], [q''], [d'']} are evaluated according to the following formula, and [H, Q, D] corresponding to the minimum M value is the optimal anchoring measure combination, that is, the optimal anchoring parameter H is the optimal anchoring height, Q is the optimal single anchoring force, and D is the optimal anchor array spacing:

[0039] ;

[0040] ;

[0041] ;

[0042] ;

[0043] In the formula, M min It refers to the minimum relative value of cost price, h0 is the anchor height when the relative value of cost price is the smallest, q0 is the single anchor force when the relative value of cost price is the smallest, and d0 is the anchor spacing when the relative value of cost price is the smallest.

[0044] As a preferred embodiment, the ultra-high and steep slope is a slope with a height of more than 1000 meters.

[0045] Compared with the prior art, the present invention has the following advantages:

[0046] First, the calculation method of the optimal anchoring parameters of the pre-fixed zone of the ultra-high and steep slope of the present invention is more effective for the prevention and treatment of ultra-high and steep slopes. The height of the anchoring zone and the optimal anchoring measures are scientifically determined, which not only avoids "the height of the pre-fixed zone is too small or the anchoring measures are insufficient, which has an adverse effect on the safety of the project", but also eliminates the impact of "the height of the pre-fixed zone is too large or the anchoring measures are excessive, which causes waste of engineering materials". Pre-anchoring the environmental slopes affected by the excavation of the engineering slopes controls the development of the plastic yield zone of the slopes, reducing the impact of the excavation of the engineering slopes on the environmental slopes. Scientific guidance can avoid accidents during the construction and operation periods of the project, and prepare for a rainy day;

[0047] Secondly, the present invention uses the dual control parameters of safety factor and support within the plastic zone to calculate the pre-consolidation zone, which can ensure the long-term stability of the slope. In the calculation of anchoring measures, the dual control factors of safety factor and plastic zone range are considered to ensure that the long-term deformation of the environmental slope after slope excavation is within a controllable range. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Figure 1 It is a flow chart of a method for calculating the optimal anchoring parameters of the pre-consolidation zone of an extremely high and steep slope;

[0049] Figure 2 is a schematic diagram of the slope profile;

[0050] Figure 3 This is a schematic diagram of anchoring measures;

[0051] Figure 4 for Figure 3 A partial enlarged view of the anchor array at point A in the middle. DETAILED DESCRIPTION

[0052] The following is a detailed description of the implementation of the present invention in conjunction with the implementation cases, but they do not constitute a limitation of the present invention and are only given as examples. At the same time, the advantages of the present invention will become clearer and easier to understand through the description.

[0053] like Figure 1 As shown, a method for calculating the optimal anchoring parameters of a pre-consolidation zone of an ultra-high and steep slope of the present invention comprises the following steps:

[0054] S1: Based on on-site investigation and geological survey, determine the basic characteristics of the topography and geomorphology of the ultra-high and steep slopes, rock and soil structure, engineering slopes and environmental slopes. Ultra-high and steep slopes are slopes with a height of more than 1,000 meters;

[0055] S2: Conduct large-scale direct shear model tests in typical slope areas, with sample dimensions of length × width × height (50 cm × 50 cm × 50 cm), to obtain the stress-strain characteristic curve of the rock and soil mass; take samples on site and prepare them (cylindrical shape with a diameter of 10 cm and a height of 10 cm) to conduct indoor quick shear tests to obtain the mechanical parameters and degradation characteristics of the rock and soil mass;

[0056] S3: Based on the rock mass stress-strain characteristic curve and the mechanical parameters and degradation characteristics of the rock mass in step S2, a mechanical model considering the excavation unloading damage effect is established, as shown in Formula 1;

[0057] (Formula 1);

[0058] in, σ N is the deviatoric stress after unloading at different excavations, ɛ N is the strain after different excavation unloading, G is the stiffness matrix, D N is the damage variable caused by excavation unloading;

[0059] (Formula 2);

[0060] in, E is the elastic model of rock and soil, v is Poisson's ratio;

[0061] S4: Set different anchoring heights and anchoring measure combinations {[h], [q], [d]} on the environmental slope, where h is the height of the anchoring area, and h1=0.1·H0, h2=0.2·H0, h3=0.3·H0, ... are set respectively, for i groups; q is the anchoring force of a single anchor cable, and q1=1000kN, q2=1500kN, q3=2000kN, ... are set respectively, for j groups; d is the anchor spacing, and d1=4m, d2=5m, d3=6m, ... are set respectively, for k groups, to form an anchoring measure group. The combined data set {[h], [q], [d]} has a total of i×j×k combinations, such as {0.1·H0, 1000kN, 4m}, {0.1·H0, 1000kN, 5m}, {0.1·H0, 1500kN, 4m}, {0.1·H0, 1500kN, 5m}, {0.2·H0, 1000kN, 4m}, {0.2·H0, 1000kN, 5m}, {0.2·H0, 1500kN, 4m}, {0.2·H0, 1500kN, 5m}..... and other combinations. At the same time, in each combination, the condition that the height of the pre-anchoring area is greater than the anchor array spacing must be met, as shown in (Equation 3):

[0062] [h]>[d] (Formula 3);

[0063] S5: Establish a numerical simulation calculation model for ultra-high and steep slopes based on the on-site survey in step S1. The calculation model consists of an environmental slope area and an engineering slope area. Perform numerical simulation calculations based on the model considering the excavation and unloading damage effect in step S3 to simulate the excavation and unloading processes of the engineering slopes. For different combinations of anchoring measures {[h], [q], [d]}, use the strength reduction method to solve the slope safety factor K respectively;

[0064] S6: Based on the location, importance, and degree of instability of the ultra-high and steep slope, the safety standard [K] is determined according to the slope design specification (Code for Slope Design of Water Conservancy and Hydropower Projects (SL386-2007)). Based on the calculation results of step S5, the combination {[h'], [q'], [d']} that meets the safety factor requirements is selected using (Equation 4);

[0065] (Formula 4);

[0066] Where K is the slope safety factor calculated under different combinations of anchoring measures; [K] is the safety standard determined according to the slope design specification;

[0067] S7: When the rock mass reaches the yield strength, it will enter the plastic zone. In order to prevent further damage, the rock mass in the plastic zone needs to be supported. Figure 2 As shown, set the coordinates within the slope range (xi , z j ), data is screened according to equations (5) and (6) to obtain the height data set [z j '];

[0068] (Formula 5);

[0069] (Formula 6);

[0070] In the formula, (x i , z j ) refers to the coordinate within the slope range, z j For different heights, τ (xi,zj) Refers to (x i , z j ) position, σ (xi,zj) Refers to (x i , z j ) position, c Refers to the cohesive strength of rock and soil. φ The internal friction angle of rock and soil. D c Refers to the cohesive strength damage variable of rock and soil mass caused by excavation unloading. D φ Refers to the friction angle damage variable of rock and soil body caused by excavation unloading. H 0 Refers to the height of the project slope;

[0071] According to (Equation 7), the height data set of entering the plastic zone [z j '], that is:

[0072] (Formula 7);

[0073] In the formula, z 0 is the maximum height of entering the plastic zone;

[0074] S8: Based on the principle of controlling the height of the plastic zone not to exceed the height of the pre-consolidation zone, the combination {[h'], [q'], [d']} obtained in step S6 is screened again according to (Formula 8), and the combination of anchoring measures {[h''], [q''], [d'']} that meets the requirements of the plastic zone is obtained;

[0075] (Formula 8);

[0076] In the formula, h'' is the anchor height after screening; z 0 is the maximum height of the plastic zone, i.e., the distance from the bottom of the slope to the highest point of the plastic zone; H0 is the actual height of the engineering slope;

[0077] S9: Substitute the anchoring measure combination {[h''], [q''], [d'']} obtained in step S8 into (Formula 9) for cost comparison;

[0078] (Formula 9);

[0079] In the formula, M is the relative value of cost, h'' is the anchor height after screening, q'' is the single anchor force after screening, d ’’ is the anchor array spacing after screening;

[0080] In the combination {[h''], [q''], [d'']} that meets the stability safety standard of the extra-high steep slope and the requirements of the plastic zone in step S8, according to (Equation 10), the combination [H, Q, D] corresponding to the minimum M value is the optimal anchoring measure combination of the environmental slope pre-anchoring area, where H is the optimal anchoring height, Q is the optimal single anchoring force, and D is the optimal anchor array spacing;

[0081] (Formula 10);

[0082] (Formula 11);

[0083] (Formula 12);

[0084] (Formula 13);

[0085] In the formula, M min It refers to the minimum relative value of cost, h0 is the anchor height when the relative value of cost is the minimum, q0 is the single anchor force when the relative value of cost is the minimum, and d0 is the anchor spacing when the relative value of cost is the minimum. The result obtained by (Equation 11) is the height of the pre-reinforcement area of ​​the ultra-high and steep slope, and the results obtained by (Equation 12) and (Equation 13) are the optimal anchoring measures.

[0086] The above are only specific embodiments of the present invention. It should be pointed out that any changes or substitutions that can be easily thought of by any technician familiar with the field within the technical scope disclosed by the present invention should be covered within the protection scope of the present invention, and the rest not described in detail belong to the prior art.

Claims

1. A method for calculating the optimal anchoring parameters in the pre-consolidation zone of an extremely high and steep slope. Features: The steps include: S1: Based on the results of the on-site investigation, determine the basic characteristics of the topography and geomorphology of the extremely high and steep slopes, the structure of the rock and soil mass, the height of the engineering slopes and the natural slopes; S2: Obtain the stress-strain curve, mechanical parameters and degradation characteristics of rock and soil; S3: Based on the results obtained in step S2, a mechanical model considering the damage effect of unloading during excavation of extremely high and steep slopes is constructed; the mechanical model considering the damage effect of unloading during excavation of extremely high and steep slopes is as follows: In the formula, σ N is the deviator stress after unloading at different excavations, ε N is the strain after different excavation unloading, G is the stiffness matrix, D N is the total damage variable caused by excavation unloading; S4: Set different anchoring heights and anchoring measure combinations {[h], [q], [d]} on the environmental slope, where h is the height of the anchoring area, and the height of the anchoring area is set to h1, h2, .....hi respectively; q is the anchoring force of a single anchor cable, and is set to q1, q2, .....qj respectively; d is the anchor array spacing, and is set to d1, d2, .....dk respectively, and a total of i×j×k combinations are set; S5: Based on the results obtained in step S1, a numerical simulation calculation model for an extremely high and steep slope is established, and numerical simulation calculation is performed based on the mechanical model considering the damage effect of the excavation and unloading of the extremely high and steep slope constructed in step S3, so as to simulate the excavation process and unloading process of the engineering slope; and the slope safety factor is respectively solved for different combinations of anchoring measures; S6: Determine the safety standard according to the slope design specification, and based on the calculation result of step S5, select the anchoring measure combination that meets the safety factor requirement; wherein, the anchoring measure combination {[h'], [q'], [d']} that meets the safety factor requirement is selected using the following formula: K ≥ [K]; Where K is the slope safety factor calculated under different combinations of anchoring measures; [K] is the safety standard determined according to the slope design specification; S7: Obtain the height data set of the rock mass entering the plastic zone [z j '], and calculate the height data set [z j The maximum value z in '] 0 ; Among them, set the coordinates within the slope range (x i , z j ), and the data was screened according to the following formula to obtain the height data set entering the plastic zone [z j ']: z j >H 0 ; In the formula, (x i , z j ) refers to the coordinate within the slope range, z j For different heights, τ (xi,zj) Pointer (x i , z j ) position, σ (xi,zj) Pointer (x i , z j ) position, c refers to the cohesive strength of the rock mass, Refers to the internal friction angle of rock and soil, D c Refers to the cohesive strength damage variable of rock and soil mass caused by excavation unloading. It refers to the friction angle damage variable of rock and soil body caused by excavation unloading, H 0 Refers to the height of the project slope; The height data set of entering the plastic zone [z j The maximum value z in '] 0 ,Right now: With 0 =max[z j ′]; In the formula, z 0 is the maximum height of the plastic zone; S8: Screening a combination of anchoring measures that meets the safety factor standard and the requirements of the plastic zone; wherein the height of the plastic zone is controlled not to exceed the height of the pre-consolidation zone, and the anchoring measure combination {[h'], [q'], [d']} that meets the safety factor requirements obtained in step S6 is screened again according to the following formula to meet the requirements for support in the plastic zone, and obtain an anchoring measure combination {[h"], [q"], [d"]} that meets the safety factor standard and the requirements of the plastic zone: [h”]>z 0 -H 0 ; Where h” is the anchor height after screening; z 0 is the maximum height of the plastic zone, that is, the distance from the bottom of the slope to the highest point of the plastic zone; H 0 is the actual height of the engineering slope; S9: Perform cost comparison based on the anchoring measure combination obtained in step S8, evaluate different anchoring measure combinations, and determine the optimal anchoring parameters.

2. The method for calculating the optimal anchoring parameters of the pre-consolidation zone of the ultra-high and steep slope according to claim 1, Features: In the step S2, the stress-strain curve of the rock and soil is obtained by conducting an on-site shear model test; and the mechanical parameters and degradation characteristics of the rock and soil are obtained by conducting an indoor quick shear test.

3. The method for calculating the optimal anchoring parameters of the pre-consolidation zone of the ultra-high and steep slope according to claim 2, Features: In step S5, for different anchoring measure combinations {[h], [q], [d]}, the slope safety factor is solved respectively using the strength reduction method.

4. The method for calculating the optimal anchoring parameters of the pre-consolidation zone of the ultra-high and steep slope according to claim 3, Features: In step S9, the anchoring measure combination {[h”], [q”], [d”]} obtained in step S8 is substituted into the following formula for cost comparison: In the formula, M is the relative value of cost, h” is the anchor height after screening, q” is the single anchor force after screening, and d” is the anchor array spacing after screening.

5. The method for calculating the optimal anchoring parameters of the pre-consolidation zone of the ultra-high and steep slope according to claim 4, Features: In step S9, different anchoring measure combinations {[h”], [q”], [d”]} are evaluated according to the following formula. When the M value is the smallest, the corresponding [H, Q, D] is the optimal anchoring measure combination, that is, the optimal anchoring parameter H is the optimal anchoring height, Q is the optimal single anchoring force, and D is the optimal anchor array spacing: H=h 0 ; Q=q 0 ; D=d 0 ; Where M min Refers to the minimum value of M, h 0 is the anchoring height when the M value is the smallest, q 0 is the single anchor force when M value is minimum, d 0 is the anchor array spacing when the M value is the smallest.