A construction site resource integration and allocation system
Optimize resource allocation through Shapley value calculation resource contribution and linear programming model, combine real-time monitoring and historical data, and dynamically adjust resource allocation, solving the problems of uneven resource allocation and inefficiency in existing systems, and improving the efficiency of resource utilization on construction sites and fairness reduces costs.
Patent Information
- Application Number
- CN202411154838.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-12-27
- Estimated Expiration
- 2044-08-22
AI Technical Summary
The existing construction site resource integration and allocation system lacks a dynamic adjustment mechanism, making it difficult to deal with emergencies and historical data integration, resulting in uneven resource allocation and inefficient efficiency, increasing project costs and risks.
The resource contribution evaluation module is used to calculate the resource contribution degree through Shapley value, the resource allocation decision module uses a linear programming model to optimize resource configuration, the resource allocation optimization module monitors the equipment usage status and material consumption rate in real time, adjusts resource allocation dynamically, and analyzes efficiency of progress feedback analysis module and satisfaction, generate an optimized resource allocation plan.
It improves the transparency and accuracy of resource allocation, identifies and rewards efficient resource use, enhances the fairness of allocation, optimizes resource utilization, reduces waste, and reduces costs caused by resource mismatch.
Smart Images

Figure CN118674238B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of resource allocation, and in particular to a construction site resource integration and allocation system. Background Art
[0002] The field of resource allocation technology focuses on how to effectively allocate and manage limited resources to achieve specific goals and maximize resource utilization efficiency. In many industries, especially in construction, manufacturing, software development and service provision, resource allocation is a key operational activity. This technology field uses various computational methods and algorithms, such as linear programming, network flow analysis, queuing theory and simulation models, to optimize the allocation of resources. Resources can include time, manpower, money, equipment and information. Effective resource allocation can not only improve efficiency, but also reduce waste and cost, and increase project success rate.
[0003] Among them, the construction site resource integration and allocation system refers to a system used to manage various resources in a construction project. Its main purpose is to ensure that the resources in the project, such as manpower, machinery and equipment, materials and funds, are optimally configured and utilized. This type of system helps project managers allocate the right resources to the right place at the right time through accurate prediction and planning of resource requirements, thereby improving the efficiency of the construction site, reducing resource waste, speeding up the project progress, and possibly reducing overall costs. By integrating and allocating resources, these systems support complex decision-making and make construction projects more systematic and predictable.
[0004] Existing technologies mainly use static models for resource allocation, which lack the ability to respond to dynamic conditions on the construction site. This model is difficult to adapt to the immediate impact of emergencies on resource demand, resulting in resources being overused or idle in the short term. In addition, existing methods fail to effectively integrate historical data for resource demand forecasting and often rely on subjective judgment, resulting in uneven resource allocation and inefficiency. This limitation of lacking a dynamic adjustment mechanism increases project costs, increases risks and uncertainties, and affects the overall efficiency and cost control of the project. Summary of the invention
[0005] The purpose of the present invention is to solve the shortcomings of the prior art and to propose a construction site resource integration and allocation system.
[0006] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: A construction site resource integration and allocation system comprises:
[0007] The resource contribution evaluation module collects equipment usage time and material consumption of multiple contractors based on equipment scheduling data and material flow records, calculates the current resource contribution by comparing the historical data of multiple contractors, calculates the Shapley value based on the contribution of each contractor, and generates a resource allocation benchmark;
[0008] The resource allocation decision module collects the equipment, materials and labor usage on the current construction site based on the resource allocation benchmark, sorts and optimizes resource requirements through a linear programming model, and formulates a resource allocation plan;
[0009] The resource allocation optimization module monitors the equipment usage status and material consumption rate on the construction site in real time based on the resource allocation plan, compares it with the preset resource usage plan, analyzes the deviation, and adjusts the resource allocation ratio and schedule in time according to the project progress to generate optimized resource allocation;
[0010] The progress feedback analysis module collects and analyzes the project progress data and resource utilization efficiency based on the optimized resource allocation, collects the contractor's evaluation of the current resource allocation through the feedback system, conducts efficiency and satisfaction analysis, and generates optimized efficiency and satisfaction analysis results.
[0011] As a further solution of the present invention, the step of calculating the current resource contribution is specifically:
[0012] Based on equipment scheduling data and material flow records, collect equipment usage time and material consumption data, and generate equipment usage time and material consumption data;
[0013] From the equipment usage time and material consumption data, the equipment usage time and material consumption are summarized using the formula:
[0014] ;
[0015] Calculate total usage time for multi-contractor equipment and total material consumption , generate the total equipment usage time and total material consumption;
[0016] in, Representing contractors Total device usage time, represents the total material consumption of contractor k, Respectively represent The usage time of the device The consumption of materials, are weight factors, which are used to adjust The usage time of the device The importance of the consumption of items;
[0017] Using the total usage time of the equipment and the total material consumption, combined with historical data comparison, the formula is adopted:
[0018] ;
[0019] Calculate each contractor's current resource contribution , get the resource contribution;
[0020] in, represents the resource contribution of contractor k, is the overall weight of equipment and supplies, is the exponential parameter, is the total number of contractors.
[0021] As a further solution of the present invention, the step of obtaining the resource allocation benchmark is specifically as follows:
[0022] Based on the resource contribution, the Shapley value of each contractor is calculated using the formula:
[0023] ;
[0024] Calculate the Shapley value of multiple contractors;
[0025] in, is the Shapley value of contractor k, Is a contractor collection except Any subset other than is a collection of contractors, is the total number of contractors, is the sum of the resource contributions of set S;
[0026] The Shapley value is standardized using the formula:
[0027] ;
[0028] After standardization, the standardized Shapley values of multiple contractors are obtained;
[0029] Among them, Normalized is the standardized Shapley value, is the sum of the contractor's Shapley values;
[0030] The standardized Shapley value is used to determine a reference point for resource allocation and generate a resource allocation reference.
[0031] As a further solution of the present invention, the step of obtaining the resource configuration solution is specifically as follows:
[0032] Collect the usage of equipment, materials and labor on the construction site, using the formula:
[0033] ;
[0034] Calculate the total usage of multiple types of resources and obtain the total resource usage data.
[0035] in, represents the total usage of resource type k, is the number of items of the resource type, is the usage of the ith item, is the priority weight of project i, is the resource decay coefficient, It is the angle of seasonal changes;
[0036] Analyze the total resource usage data, sort and optimize resource requirements through a linear programming model, and use the formula:
[0037] ;
[0038] Satisfy the constraints:
[0039] ;
[0040] Calculate and obtain resource allocation plan;
[0041] in, is the total cost, is the unit cost of resource k, is the allocated quantity of resource k, is the dynamic adjustment coefficient of resource demand, is the total demand, is the phase angle of resource allocation, It is a resource On demand The contribution coefficient of It’s a demand The minimum demand, It is a resource The efficiency coefficient.
[0042] As a further solution of the present invention, the steps of real-time monitoring of the equipment usage status and material consumption rate on the construction site are specifically:
[0043] Based on the resource allocation scheme, a real-time monitoring system is installed and configured to track the usage status of various devices, using the formula:
[0044] ;
[0045] Calculate the real-time usage of the device and obtain the device usage status data;
[0046] in, Represents the device type The total amount of real-time usage status, is the number of monitoring points of the device type, It is The usage status of a monitoring point under device k, Yes Equipment The attenuation coefficient, is the device operating time, is the periodic adjustment angle of the equipment use;
[0047] Expand the monitoring system to cover the material consumption rate, using the formula:
[0048] ;
[0049] Aggregate the consumption data of multiple materials to generate material consumption rate data;
[0050] in, is the total consumption rate of material type k, is the number of monitoring points for the material type, It is The consumption rate of a monitoring point under material k, is the adjustment factor for the consumption distance, is the distance attenuation coefficient, is the periodic adjustment angle of consumption;
[0051] Integrate the equipment usage status data and the material consumption rate data, using the formula:
[0052] ;
[0053] Calculate the utilization efficiency of equipment and materials, and obtain real-time monitoring of equipment usage status and material consumption rate on the construction site;
[0054] in, Is the resource type Monitoring data, It is an adjustment factor that balances the impact of equipment use and material consumption.
[0055] As a further solution of the present invention, the step of obtaining the optimized resource allocation is specifically:
[0056] Collect and compare real-time monitoring data with the preset resource usage plan, using the formula:
[0057] ;
[0058] Calculate the deviation percentage between actual usage and estimate to get resource usage deviation;
[0059] in, Represents the resource type The percentage deviation, It is the estimated amount of resource usage in the preset plan. is a small positive number used to adjust the bias sensitivity;
[0060] According to the actual progress of the project and the resource usage deviation, adjust the resource allocation ratio using the formula:
[0061] ;
[0062] Adjust and optimize the resource allocation ratio to obtain an adjusted resource allocation plan;
[0063] in, is the adjusted resource allocation, is the adjustment sensitivity coefficient, is the adjustment index;
[0064] Integrate the adjusted resource allocation plan into the project management system to keep resource allocation in sync with project progress, using the formula:
[0065] ;
[0066] Generate optimized resource allocation;
[0067] in, is a resource allocation plan, is the time sensitivity coefficient of the resource, is the total duration of the project.
[0068] As a further solution of the present invention, the steps for obtaining the optimized efficiency and satisfaction analysis results are specifically as follows:
[0069] Based on the optimized resource allocation data, the project progress information and resource usage are collected, using the formula:
[0070] ;
[0071] Calculate the comprehensive indicators of project progress and resource efficiency, and generate project progress and resource utilization efficiency data;
[0072] in, Represents the comprehensive index of the progress and resource utilization efficiency of project k, is the total number of data points, is the progress or resource efficiency corresponding to the i-th data point, is the resource decay coefficient, From the beginning of the project to the data point time;
[0073] Through the feedback system, the contractors’ evaluation of the current resource allocation is collected, using the formula:
[0074] ;
[0075] Calculate and obtain contractor satisfaction scores;
[0076] in, It is a project contractor satisfaction scores, is the number of reviews, It is The contractor's evaluation score, is the weight;
[0077] Based on the project progress and resource utilization efficiency data and the contractor satisfaction score data, a multi-dimensional analysis of efficiency and satisfaction is conducted using the formula:
[0078] ;
[0079] Express the overall project efficiency and satisfaction in percentage form, and generate optimized efficiency and satisfaction analysis results;
[0080] in, It is a project The comprehensive efficiency and satisfaction analysis results.
[0081] Compared with the prior art, the advantages and positive effects of the present invention are:
[0082] In the present invention, resource contributions are dynamically evaluated using equipment scheduling data and material flow records to improve the transparency and accuracy of resource allocation. Based on the analysis of real-time and historical data, the system can effectively identify and reward contractors who use resources efficiently, thereby enhancing the fairness of allocation. Resource allocation responds to changes in project schedules through real-time monitoring and dynamic adjustment, optimizes resource utilization, and reduces waste. The system provides targeted adjustment suggestions by collecting resource utilization efficiency and project schedule data, thereby enhancing the accuracy of decision support and reducing costs caused by resource mismatch. BRIEF DESCRIPTION OF THE DRAWINGS
[0083] Figure 1 is a system flow chart of the present invention;
[0084] Figure 2 A flowchart of the steps of calculating the current resource contribution of the present invention;
[0085] Figure 3 A flow chart of the steps for obtaining the resource allocation benchmark of the present invention;
[0086] Figure 4 A flowchart of the steps for obtaining the resource allocation solution of the present invention;
[0087] Figure 5 A flowchart of the steps of real-time monitoring of the equipment usage status and material consumption rate on a construction site according to the present invention;
[0088] Figure 6 A flow chart of the steps for obtaining optimized resource allocation of the present invention;
[0089] Figure 7 The figure is a flow chart of the steps for obtaining the optimized efficiency and satisfaction analysis results of the present invention. DETAILED DESCRIPTION
[0090] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0091] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, in the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined.
[0092] Embodiment 1
[0093] See also Figure 1 , a construction site resource integration and allocation system includes:
[0094] The resource contribution evaluation module collects equipment usage time and material consumption of multiple contractors based on equipment scheduling data and material flow records, calculates the current resource contribution by comparing the historical data of multiple contractors, calculates the Shapley value based on the contribution of each contractor, and generates a resource allocation benchmark;
[0095] The resource allocation decision module collects the equipment, materials and labor usage on the current construction site based on the resource allocation benchmark, sorts and optimizes resource requirements through a linear programming model, and formulates a resource allocation plan;
[0096] The resource allocation optimization module monitors the equipment usage status and material consumption rate on the construction site in real time based on the resource allocation plan, compares it with the preset resource usage plan, analyzes the deviation, and adjusts the resource allocation ratio and schedule in time according to the project progress to generate optimized resource allocation;
[0097] The progress feedback analysis module collects and analyzes the project progress data and resource utilization efficiency based on the optimized resource allocation. It collects the contractor's evaluation of the current resource allocation through the feedback system, conducts efficiency and satisfaction analysis, and generates optimized efficiency and satisfaction analysis results.
[0098] The resource allocation benchmark includes resource contribution evaluation, Shapley value, and contribution ranking. The resource allocation plan specifically includes equipment configuration details, material scheduling plan, and human resource distribution. The optimized resource allocation includes resource usage deviation analysis, allocation schedule adjustment, and resource reallocation table.
[0099] See also Figure 2 , the steps to calculate the current resource contribution are as follows:
[0100] Based on equipment scheduling data and material flow records, collect equipment usage time and material consumption data, and generate equipment usage time and material consumption data;
[0101] From the equipment usage time and material consumption data, summarize the equipment usage time and material consumption using the formula:
[0102] ;
[0103] Calculate total usage time for multi-contractor equipment and total material consumption , generate the total equipment usage time and total material consumption;
[0104] in, Representing contractors Total device usage time, Representing contractors The total consumption of materials, Respectively represent The usage time of the device The consumption of materials, are weight factors, which are used to adjust The usage time of the device The importance of the consumption of items;
[0105] Using the total equipment usage time and total material consumption, combined with historical data comparison, the formula is adopted:
[0106] ;
[0107] Calculate each contractor's current resource contribution , get the resource contribution;
[0108] in, Indicates contractor The resource contribution of is the overall weight of equipment and supplies, is the exponential parameter, is the total number of contractors.
[0109] formula:
[0110] ;
[0111] This formula is used to calculate the contractor Total device usage time ,in It is The usage time of each device, It is the weight factor corresponding to the device usage time.
[0112] Parameter explanation and examples:
[0113] : No. The usage time of each device, assumed to be hours.
[0114] : The weight factor of device usage time is set according to the importance and efficiency of the device, and generally ranges from 0 to 1.
[0115] Assume data:
[0116] contractor There are three devices.
[0117] Device 1 usage time Hours, weight .
[0118] Device 2 usage time Hours, weight .
[0119] Device 3 usage time Hours, weight .
[0120] Calculation process:
[0121] ;
[0122] This value indicates that the contractor The device was used for a total of 5.3 hours after taking weight into account.
[0123] formula:
[0124] ;
[0125] This formula is used to calculate the contractor Total material consumption ,in It is The consumption of materials, It is the weight factor corresponding to material consumption.
[0126] Parameter explanation:
[0127] : No. The consumption of a material can be in any unit, such as kilograms, liters, etc.
[0128] : Weight factor for material consumption, set according to the importance and cost of the material, usually ranging from 0 to 1.
[0129] Assume data:
[0130] contractor Consumes three different supplies.
[0131] Material 1 consumption Unit, weight .
[0132] Material 2 consumption Unit, weight .
[0133] Material 3 consumption Unit, weight .
[0134] Calculation process:
[0135] ;
[0136] This value indicates that the total material consumption of contractor k is 9.5 units after taking the weight into account.
[0137] formula:
[0138] ;
[0139] This formula is used to calculate the contractor Resource contribution ,in and is the overall weight of equipment and supplies, and is the exponential parameter.
[0140] Parameter explanation and examples:
[0141] : The overall weight of equipment and supplies, assuming .
[0142] : Exponential parameter, increasing nonlinearity, assuming .
[0143] Assume data:
[0144] Total device usage time Hour, hours (result from formula 1).
[0145] Total material consumption unit, unit.
[0146] Calculation process:
[0147] ;
[0148] This value indicates that the contractor The resource contribution of is 0.067135, which means that the contractor’s contribution is smaller than that of other contractors, reflecting the impact of equipment usage time and material consumption.
[0149] See also Figure 3 , the specific steps for obtaining the resource allocation benchmark are:
[0150] Based on resource contribution, the Shapley value of each contractor is calculated using the formula:
[0151] ;
[0152] Calculate the Shapley value of multiple contractors;
[0153] in, is the Shapley value of contractor k, Is a contractor collection except Any subset other than is a collection of contractors, is the total number of contractors, is the sum of the resource contributions of set S;
[0154] The Shapley value is standardized using the formula:
[0155] ;
[0156] After standardization, the standardized Shapley values of multiple contractors are obtained;
[0157] Among them, Normalized is the standardized Shapley value, is the sum of the contractor's Shapley values;
[0158] The standardized Shapley value is used to determine the benchmark point of resource allocation and generate the resource allocation benchmark.
[0159] formula:
[0160] ;
[0161] Parameter Explanation
[0162] : The Shapley value of contractor k, which represents the average marginal contribution of contractor k to the total contribution.
[0163] : The subset of contractors except contractor k.
[0164] : The collection of all contractors.
[0165] : Total number of contractors.
[0166] : The sum of resource contributions of set S.
[0167] Calculation process
[0168] Suppose there are three contractors , the individual contribution of each contractor is The total contribution when working together is .contractor The Shapley value of is calculated as follows:
[0169] Calculate all subsets Not included ,Right now .
[0170] For each subset ,calculate :
[0171] ;
[0172] calculate :
[0173] ;
[0174] formula:
[0175] ;
[0176] Parameter Explanation
[0177] :contractor The standardized Shapley value of .
[0178] : The original Shapley value.
[0179] Calculation process
[0180] Assuming the contractor The Shapley values are . The normalized Shapley value is calculated as follows:
[0181] Total Shapley Value: ,
[0182]
[0183] See also Figure 4 , the specific steps for obtaining the resource allocation plan are:
[0184] Collect the usage of equipment, materials and labor on the construction site, using the formula:
[0185] ;
[0186] Calculate the total usage of multiple types of resources and obtain the total resource usage data.
[0187] in, Indicates the resource type Total usage, is the number of items of the resource type, It is The usage of each project, It is a project The priority weight of is the resource decay coefficient, It is the angle of seasonal changes;
[0188] Analyze the total resource usage data, sort and optimize resource requirements through a linear programming model, and use the formula:
[0189] ;
[0190] Satisfy the constraints:
[0191] ;
[0192] Calculate and obtain resource allocation plan;
[0193] in, is the total cost, It is a resource The unit cost, It is a resource The number of allocations, is the dynamic adjustment coefficient of resource demand, is the total demand, is the phase angle of resource allocation, It is a resource The contribution coefficient to demand i, It’s a demand The minimum demand, It is a resource The efficiency coefficient.
[0194] formula:
[0195] ;
[0196] Parameter details:
[0197] : Total usage of resource type k.
[0198] : The number of items of this resource type.
[0199] : The usage of the i-th item.
[0200] : The priority weight of project i.
[0201] : The decay coefficient of resources, which affects the decay of resources over time.
[0202] : From the perspective of seasonal changes, it affects the periodicity of resource utilization.
[0203] Derivation process and examples:
[0204] Suppose there are 3 projects using a certain device, among which:
[0205] Hour, ,
[0206] Hour, ,
[0207] Hour, .
[0208] Calculate the adjusted usage for each item:
[0209] Project 1: ,
[0210] Project 2: ,
[0211] Project 3: ,
[0212] Total usage: Hour.
[0213] formula:
[0214] ,
[0215] Parameter details:
[0216] : Total cost.
[0217] :resource unit cost.
[0218] :resource The number of allocations.
[0219] : Dynamic adjustment coefficient of resource demand.
[0220] : Total demand.
[0221] : The phase angle of resource allocation.
[0222] :resource On demand The contribution coefficient of .
[0223] :need minimum demand.
[0224] :resource The efficiency coefficient.
[0225] Derivation process and examples:
[0226] Assume there are two resources:
[0227] Resource 1: Unit cost, Dispensing amount, ;
[0228] Resource 2: Unit cost, Dispensing amount, ;
[0229] Requirements constraints:
[0230] ;
[0231] Compute total cost and constraint satisfaction:
[0232] Total cost: ;
[0233] Constraint calculation: (Here we assume Adjust to a smaller value to suit the actual situation)
[0234] See also Figure 5 ,The specific steps for real-time monitoring of equipment usage status and material consumption rate on the construction site are:
[0235] Based on the resource allocation plan, install and configure a real-time monitoring system to track the usage status of various devices, using the formula:
[0236] ;
[0237] Calculate the real-time usage of the device and obtain the device usage status data;
[0238] in, Represents the device type The total amount of real-time usage status, is the number of monitoring points of the device type, It is Monitoring points on the device The following usage status, Yes Equipment The attenuation coefficient, is the device operating time, is the periodic adjustment angle of the equipment use;
[0239] Expand the monitoring system to cover the material consumption rate, using the formula:
[0240] ;
[0241] Aggregate the consumption data of multiple materials to generate material consumption rate data;
[0242] in, Is the material type The total consumption rate, is the number of monitoring points for the material type, It is Monitoring points in materials The consumption rate under is the adjustment factor for the consumption distance, is the distance attenuation coefficient, is the periodic adjustment angle of consumption;
[0243] Integrate equipment usage status data and material consumption rate data, using the formula:
[0244] ;
[0245] Calculate the utilization efficiency of equipment and materials, and obtain real-time monitoring of equipment usage status and material consumption rate on the construction site;
[0246] in, Is the resource type Monitoring data, It is an adjustment factor that balances the impact of equipment use and material consumption.
[0247] formula:
[0248] ;
[0249] Parameter explanation:
[0250] :Device Type The total amount of real-time usage status.
[0251] : The number of monitoring points of this device type.
[0252] : The usage status of the i-th monitoring point under device k.
[0253] : Attenuation coefficient of device i.
[0254] : Equipment running time.
[0255] : Periodic adjustment angle of device use.
[0256] Calculation process:
[0257] Assume there are two devices The usage is monitored.
[0258] Usage status of device 1 Unit utilization rate, attenuation coefficient (decay per hour), running time Hours, periodic angle .
[0259] Usage status of device 2 Unit utilization rate, attenuation coefficient (decay per hour), running time Hours, periodic angle .
[0260] calculate:
[0261] ;
[0262] formula:
[0263] ;
[0264] Parameter explanation:
[0265] :Material Type The total consumption rate.
[0266] : The number of monitoring points for this material type.
[0267] :The i-th monitoring point is in the material The consumption rate below.
[0268] : Adjustment factor for consumption distance.
[0269] : Distance attenuation coefficient.
[0270] : The periodic adjustment angle of consumption.
[0271] Calculation process:
[0272] Assume that the consumption rates of two resource points are monitored.
[0273] The consumption rate of the supply point Unit / hour, distance factor , attenuation coefficient , periodic angle .
[0274] Consumption rate of supply point 2 Unit / hour, distance factor , attenuation coefficient , periodic angle .
[0275] calculate:
[0276] ;
[0277] formula:
[0278] ;
[0279] Parameter explanation:
[0280] : Resource type Comprehensive monitoring data represents the combined efficiency of equipment usage status and material consumption rate.
[0281] : Equipment usage and material consumption data obtained from the above respectively.
[0282] : It is an adjustment coefficient that balances the impact of equipment use and material consumption, and is used to control the sensitivity of synthetic data.
[0283] Calculation process:
[0284] Continue to use and The results:
[0285] ;
[0286] Assumption adjustment factor For a simple example.
[0287] calculate:
[0288] According to the formula, first calculate and The weighted average of , and then applying the adjustment factor:
[0289] ;
[0290] This value It can be interpreted as a comprehensive indicator that reflects the overall efficiency of equipment use and material consumption. It combines the usage status and consumption rate of two different types of resources and adjusts the coefficient To balance the impact of the two, so that this indicator will not deviate excessively due to the extreme value of one side.
[0291] See also Figure 6 , the steps for obtaining optimized resource allocation are as follows:
[0292] Collect and compare real-time monitoring data with the preset resource usage plan, using the formula:
[0293] ;
[0294] Calculate the deviation percentage between actual usage and estimate to get resource usage deviation;
[0295] in, Represents the resource type The percentage deviation, It is the estimated amount of resource usage in the preset plan. is a small positive number used to adjust the bias sensitivity;
[0296] According to the actual progress of the project and the deviation of resource usage, adjust the resource allocation ratio using the formula:
[0297] ;
[0298] Adjust and optimize the resource allocation ratio to obtain an adjusted resource allocation plan;
[0299] in, is the adjusted resource allocation, is the adjustment sensitivity coefficient, is the adjustment index;
[0300] Integrate the adjusted resource allocation plan into the project management system to keep resource allocation in sync with project progress, using the formula:
[0301] ;
[0302] Generate optimized resource allocation;
[0303] in, is a resource allocation plan, is the time sensitivity coefficient of the resource, is the total duration of the project.
[0304] formula:
[0305] ;
[0306] Parameter explanation and derivation process:
[0307] : Actual resource usage data, assuming 1000 units
[0308] : The estimated usage in the preset resource usage plan, assumed to be 950 units
[0309] : A small positive number used to adjust the bias sensitivity, assumed to be 0.05 (this is a small value used to ensure that the logarithmic function is greater than 1 internally)
[0310] Calculation process:
[0311] Calculate the deviation ratio :
[0312] ;
[0313] Calculate the adjusted deviation:
[0314] ;
[0315] Calculate the final deviation value :
[0316] ;
[0317] formula:
[0318] ;
[0319] Parameter explanation and derivation process:
[0320] : Adjust the sensitivity coefficient, assuming it is 0.5
[0321] : Adjustment index, reflecting the impact of nonlinear adjustment, assumed to be 2
[0322] Calculation process:
[0323] Calculate the adjustment factor:
[0324] ;
[0325] Calculate adjusted resource allocation:
[0326] ;
[0327] formula:
[0328] ;
[0329] Parameter explanation and derivation process:
[0330] Parameter explanation and derivation process:
[0331] : The time sensitivity coefficient of the resource, assumed to be 4
[0332] : Total duration of the project, assuming 16 days
[0333] Calculation process:
[0334] Compute time sensitivity adjustments:
[0335] ;
[0336] Calculate the final resource allocation:
[0337] ;
[0338] See also Figure 7 , the specific steps for obtaining the optimized efficiency and satisfaction analysis results are:
[0339] Based on the optimized resource allocation data, collect the project progress information and resource usage, using the formula:
[0340] ;
[0341] Calculate the comprehensive indicators of project progress and resource efficiency, and generate project progress and resource utilization efficiency data;
[0342] in, Representative Projects Comprehensive indicators of progress and resource utilization efficiency, is the total number of data points, It is The progress or resource efficiency corresponding to each data point, is the resource decay coefficient, From the beginning of the project to the data point time;
[0343] Through the feedback system, the contractors’ evaluation of the current resource allocation is collected, using the formula:
[0344] ;
[0345] Calculate and obtain contractor satisfaction scores;
[0346] in, It is a project contractor satisfaction scores, is the number of reviews, It is The contractor's evaluation score, is the weight;
[0347] Based on the project progress and resource utilization efficiency data and contractor satisfaction score data, a multi-dimensional analysis of efficiency and satisfaction is conducted using the formula:
[0348] ;
[0349] Express the overall project efficiency and satisfaction in percentage form, and generate optimized efficiency and satisfaction analysis results;
[0350] in, It is a project The comprehensive efficiency and satisfaction analysis results.
[0351] formula:
[0352] ;
[0353] Parameter explanation:
[0354] :project A comprehensive indicator of progress and resource utilization efficiency.
[0355] : The total number of data points.
[0356] : The progress or resource efficiency corresponding to the i-th data point.
[0357] : Resource decay coefficient.
[0358] : The time from the start of the project to data point i.
[0359] Parameter setting and calculation examples:
[0360] Assume there are 3 data points , the progress or resource efficiency of each data point is , the resource attenuation coefficients are The time intervals are 1, 2, and 3 months respectively. .
[0361] Calculation process:
[0362] ;
[0363] formula:
[0364] ;
[0365] Parameter explanation:
[0366] :project contractor satisfaction scores.
[0367] : Number of reviews.
[0368] : No. The contractor's evaluation score.
[0369] : Weight, indicating the importance or reliability of the evaluation.
[0370] Parameter setting and calculation examples:
[0371] Assume there are 3 reviews The evaluation scores are , the weights are .
[0372] Calculation process:
[0373] ;
[0374] formula:
[0375] ;
[0376] Parameter explanation:
[0377] : Comprehensive efficiency and satisfaction analysis results, expressed as percentage.
[0378] : Progress and satisfaction scores obtained from the first two steps.
[0379] Parameter setting and calculation examples:
[0380] Based on the above calculation results ;
[0381] Calculation process:
[0382] ;
[0383] The above are only preferred embodiments of the present invention and are not intended to limit the present invention in other forms. Any technician familiar with the profession may use the technical contents disclosed above to change or modify them into equivalent embodiments with equivalent changes and apply them to other fields. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A construction site resource integration and allocation system, characterized in that: The system comprises: The resource contribution evaluation module collects equipment usage time and material consumption of multiple contractors based on equipment scheduling data and material flow records, calculates the current resource contribution by comparing the historical data of multiple contractors, calculates the Shapley value based on the contribution of each contractor, and generates a resource allocation benchmark; The resource allocation decision module collects the equipment, materials and labor usage on the current construction site based on the resource allocation benchmark, sorts and optimizes resource requirements through a linear programming model, and formulates a resource allocation plan; The steps for obtaining the resource configuration scheme are specifically as follows: Collect the usage of equipment, materials and labor on the construction site, using the formula: ; Calculate the total usage of multiple types of resources and obtain the total resource usage data. in, Indicates the resource type Total usage, is the number of items of the resource type, It is The usage of each project, It is a project The priority weight of is the resource decay coefficient, It is the angle of seasonal changes; Analyze the total resource usage data, sort and optimize resource requirements through a linear programming model, and use the formula: ; Satisfy the constraints: ; Calculate and obtain resource allocation plan; in, is the total cost, It is a resource The unit cost, It is a resource The number of allocations, is the dynamic adjustment coefficient of resource demand, is the total demand, is the phase angle of resource allocation, It is a resource On demand The contribution coefficient of It’s a demand The minimum demand, It is a resource The efficiency coefficient of The resource allocation optimization module monitors the equipment usage status and material consumption rate on the construction site in real time based on the resource allocation plan, compares it with the preset resource usage plan, analyzes the deviation, and adjusts the resource allocation ratio and schedule in time according to the project progress to generate optimized resource allocation; The steps of real-time monitoring of the equipment usage status and material consumption rate on the construction site are specifically as follows: Based on the resource allocation scheme, a real-time monitoring system is installed and configured to track the usage status of various devices, using the formula: ; Calculate the real-time usage of the device and obtain the device usage status data; in, Represents the device type The total amount of real-time usage status, is the number of monitoring points of the device type, It is Monitoring points on the device The following usage status, Yes Equipment The attenuation coefficient, is the device operating time, is the periodic adjustment angle of the equipment use; Expand the monitoring system to cover the material consumption rate, using the formula: ; Aggregate the consumption data of multiple materials to generate material consumption rate data; in, Is the material type The total consumption rate, is the number of monitoring points for the material type, It is Monitoring points in materials The consumption rate under is the adjustment factor for the consumption distance, is the distance attenuation coefficient, is the periodic adjustment angle of consumption; Integrate the equipment usage status data and the material consumption rate data, using the formula: ; Calculate the utilization efficiency of equipment and materials, and obtain real-time monitoring of equipment usage status and material consumption rate on the construction site; in, Is the resource type Monitoring data, It is an adjustment factor to balance the impact of equipment use and material consumption; The steps for obtaining the optimized resource allocation are specifically as follows: Collect and compare real-time monitoring data with the preset resource usage plan, using the formula: ; Calculate the deviation percentage between actual usage and estimate to get resource usage deviation; in, Represents the resource type The percentage deviation, It is the estimated amount of resource usage in the preset plan. is a small positive number used to adjust the bias sensitivity; According to the actual progress of the project and the resource usage deviation, adjust the resource allocation ratio using the formula: ; Adjust and optimize the resource allocation ratio to obtain an adjusted resource allocation plan; in, is the adjusted resource allocation, is the adjustment sensitivity coefficient, is the adjustment index; Integrate the adjusted resource allocation plan into the project management system to keep resource allocation in sync with project progress, using the formula: ; Generate optimized resource allocation; in, is a resource allocation plan, is the time sensitivity coefficient of the resource, is the total duration of the project; The progress feedback analysis module collects and analyzes the project progress data and resource utilization efficiency based on the optimized resource allocation, collects the contractor's evaluation of the current resource allocation through the feedback system, conducts efficiency and satisfaction analysis, and generates optimized efficiency and satisfaction analysis results.
2. The construction site resource integration and allocation system according to claim 1, characterized in that: The steps of calculating the current resource contribution are specifically as follows: Based on equipment scheduling data and material flow records, collect equipment usage time and material consumption data, and generate equipment usage time and material consumption data; From the equipment usage time and material consumption data, the equipment usage time and material consumption are summarized using the formula: ; Calculate total usage time for multi-contractor equipment and total material consumption , generate the total equipment usage time and total material consumption; in, Representing contractors Total device usage time, Representing contractors The total consumption of materials, Respectively represent The usage time of the device The consumption of materials, are weight factors, which are used to adjust The usage time of the device The importance of the consumption of items; Using the total usage time of the equipment and the total material consumption, combined with historical data comparison, the formula is adopted: ; Calculate each contractor's current resource contribution , get the resource contribution; in, Indicates contractor The resource contribution of is the overall weight of equipment and supplies, is the exponential parameter, is the total number of contractors.
3. The construction site resource integration and allocation system according to claim 1, characterized in that: The steps for obtaining the resource allocation benchmark are specifically as follows: Based on the resource contribution, the Shapley value of each contractor is calculated using the formula: ; Calculate the Shapley value of multiple contractors; in, Is a contractor The Shapley value of Is a contractor collection except Any subset other than is a collection of contractors, is the total number of contractors, Is a collection The sum of the resource contributions of The Shapley value is standardized using the formula: ; After standardization, the standardized Shapley values of multiple contractors are obtained; Among them, Normalized is the standardized Shapley value, is the sum of the contractor's Shapley values; The standardized Shapley value is used to determine a reference point for resource allocation and generate a resource allocation reference.
4. The construction site resource integration and allocation system according to claim 1, characterized in that: The steps for obtaining the optimized efficiency and satisfaction analysis results are specifically as follows: Based on the optimized resource allocation data, the project progress information and resource usage are collected, using the formula: ; Calculate the comprehensive indicators of project progress and resource efficiency, and generate project progress and resource utilization efficiency data; in, Representative Projects Comprehensive indicators of progress and resource utilization efficiency, is the total number of data points, It is The progress or resource efficiency corresponding to each data point, is the resource decay coefficient, From the beginning of the project to the data point time; Through the feedback system, the contractors’ evaluation of the current resource allocation is collected, using the formula: ; Calculate and obtain contractor satisfaction scores; in, It is a project contractor satisfaction scores, is the number of reviews, It is The contractor's evaluation score, is the weight; Based on the project progress and resource utilization efficiency data and the contractor satisfaction score data, a multi-dimensional analysis of efficiency and satisfaction is conducted using the formula: ; Express the overall project efficiency and satisfaction in percentage form to generate optimized efficiency and satisfaction analysis results.