A filling construction device for gully terrain and a construction method thereof

By designing the gully terrain fill construction device, using inclined surface tamping and layered construction technology, the problems of high construction docking costs and low slope construction efficiency are solved, and the inclined surface tamping and layered filling are achieved, which reduces construction Cost and improve construction efficiency.

CN118686146BActive Publication Date: 2024-11-19SINOHYRDO ENG BUREAU 3 CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411155117.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-11-19
Estimated Expiration
2044-08-22

AI Technical Summary

Technical Problem

In the construction of gully terrain fill in the existing technology, the construction docking cost of sub-regional construction is high, and the slope construction cannot be targeted and oblique compaction measures, resulting in low cost and efficiency.

Method used

A filling construction device for gully terrain was designed, including short inclined span braces, long inclined span braces, winchs, strong ramming hammers and stabilizing units. The inclined strong ramming is achieved through the triangle hammer arm and the hammer high-adjustment base, combined with layering Construction and rectangular recursive fill technology reduces docking costs and improves construction efficiency.

Benefits of technology

The inclined surface reinforcement and layered construction have been achieved, which reduces the construction docking cost, improves construction efficiency, and reduces the limitations of strong compression. It is suitable for construction at different depths and slopes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118686146B_ABST
    Figure CN118686146B_ABST
Patent Text Reader

Abstract

The present invention provides a filling construction device for gully terrain and a construction method thereof, which relate to the technical field of filling land reclamation, including a short diagonal span support, a long diagonal span support, a winch, a triangular hammer arm, a tamping hammer, a plurality of stabilizing units, and a plurality of tension chains. The present invention realizes inclined surface tamping through the filling construction device for gully terrain, so that the inclined base layer can be tamped, and when the bottom area is small, the filling of the inclined surface can be realized in a recursive manner, which greatly reduces the limitations of tamping; through the layered construction method, multiple construction teams can enter the site in turn and construct at the same time, and there is no need to construct a working overlap surface, which reduces construction docking, and greatly improves construction efficiency while reducing docking costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of filling land reclamation, and in particular to a filling construction device for gully terrain and a construction method thereof. Background Art

[0002] "Ditch control and land creation" is a new ditch control model aimed at the special landforms of hilly gully areas, integrating dam system construction, old dam repair, saline-alkali land transformation, development and utilization of wasteland and idle land, and ecological construction.

[0003] The existing technology has different construction methods for filling areas of different depths. The deeper ditch bottom is constructed by strong compaction to eliminate the collapsibility of the soil within a certain depth range of the original valley bottom. Each layer is constructed in different areas, and a working overlap surface is constructed at the junction of the areas to avoid obvious artificial "misalignment" phenomenon.

[0004] The cost of ditch control and land reclamation is relatively high in itself. This method requires a lot of construction docking during the filling process, which consumes a lot of labor costs. In addition, the construction requirements of the working overlap surface are high, and the construction cost is high, which further increases the cost of ditch control and land reclamation. At the same time, the existing technology cannot take targeted oblique compaction measures when constructing on slopes, and can only disperse and digest through local compaction. Summary of the invention

[0005] In view of the above problems, the present invention provides a filling construction device and a construction method for gully terrain, aiming to solve the technical problems of high cost of regional construction docking and strong compaction of slope surface proposed in the above background technology.

[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a filling construction device for gully terrain, comprising a short diagonal span, the upper end of the short diagonal span is rotatably connected to the upper end of a long diagonal span, a winch is provided at the upper part of the long diagonal span, the lower part of the long diagonal span is rotatably connected to one end of a triangular hammer arm, a rammer is provided at the other end of the triangular hammer arm, the upper end of the rammer is connected to the winch through a steel cable, and stabilization units are symmetrically provided at both ends of the lower part of the short diagonal span and the two ends of the lower part of the long diagonal span, and a plurality of the stabilization units are connected by tension chains.

[0007] Furthermore, a hammer height adjustment base is provided at one end of the triangular hammer arm, and the hammer height adjustment base is provided on one side of the dynamic tamping hammer.

[0008] Furthermore, the hammer height adjustment base includes a base fixing plate, which is arranged at one end of the triangular hammer arm, and a plurality of hammer height fixing connecting plates are provided on one side of the middle part of the base fixing plate, the lowermost ends of the plurality of hammer height fixing connecting plates are lower than the lowermost end of the base fixing plate, and a fixed seat reinforcing rib plate is respectively provided on one side of the plurality of hammer height fixing connecting plates, and a plurality of connecting bolts are provided in the middle part of the plurality of hammer height fixing connecting plates.

[0009] Furthermore, the rammer includes a hammer body connected to a movable seat, the hammer body connected to the movable seat is arranged at one end of the triangular hammer arm, one side of the hammer body connected to the movable seat is arranged on the rammer body, the middle part of the rammer body is slidably connected to a plurality of shock-absorbing plates, the middle part of the rammer body is provided with a rammer cover, the upper end of the rammer cover is connected to the winch through a steel cable, the two sides of the rammer body are respectively connected to the rammer cover through cover pins, and the plurality of cover pins are respectively connected to the two sides of the rammer body through positioning bolts.

[0010] Furthermore, the hammer body connected to the movable seat includes a movable seat fixing plate, the movable seat fixing plate is arranged on one side of the rammer body, a plurality of hammer body fixing connecting plates are arranged on one side of the middle part of the movable seat fixing plate, and movable seat reinforcing rib plates are symmetrically arranged on one side of the plurality of hammer body fixing connecting plates.

[0011] Furthermore, a shock-absorbing chamber is provided in the middle of the rammer body, a shock-absorbing guide rod is provided in the middle of the shock-absorbing chamber, a plurality of shock-absorbing plates are sleeved on the middle of the shock-absorbing guide rod, cover connecting blocks are symmetrically provided on both sides of the top surface of the rammer body, and a plurality of cover pins are respectively inserted in the middle of the two cover connecting blocks.

[0012] Furthermore, the top surface of the vibration-absorbing plate is provided with anti-adhesion patterns.

[0013] Furthermore, the stabilizing unit includes a mobile base, both ends of the mobile base are rotatably connected to mobile rollers respectively, a bracket connecting shaft is provided in the middle of the mobile base, the bracket connecting shaft is rotatably connected to the lower end of the short diagonal span and the long diagonal span, a plurality of oblique support units are provided on one side of the mobile base, the plurality of oblique support units are arranged in opposite directions, a chain hook is provided on one side of the plurality of oblique support units and one end of the mobile base, and one end of the tension chain is sleeved on the middle of the chain hook.

[0014] Furthermore, the oblique support unit includes a telescopic cylinder inclined at 45°, the fixed end of the telescopic cylinder is arranged on one side of the mobile base, the execution end of the telescopic cylinder is rotatably connected to the top surface of the support plate, and the bottom surface of the support plate is provided with a plurality of ground spikes, and the plurality of ground spikes are all inclined at 45°.

[0015] According to the above technical solution, a method for filling gully terrain is also provided, comprising the following steps:

[0016] S1. Surface cleaning: Transplant and protect trees in the construction area, and classify and treat shallow surface soil according to its organic matter content;

[0017] S2. Base layer compaction: Use the gully terrain filling construction device to perform local compaction on all base layers in the construction area, including the slope surface, to avoid landslides. The gully terrain filling construction device is fixed on the slope through multiple stabilizing units, and the tamping plane of the compaction hammer is always parallel to the slope through the triangular hammer arm;

[0018] S3. Bottom filling: The bottom construction plane of the gully area is relatively small, so the slope recursive filling method is adopted. The height H of the slope recursive filling method is determined according to the minimum construction plane size S of the gully terrain filling construction device. The slope is compacted layer by layer along the slope from one side to the other side using the gully terrain filling construction device, and then the top plane of the slope recursive filling method is compacted twice to obtain the bottom plane;

[0019] S4. Layered construction: Start filling from one side of the bottom plane obtained in step S3 to the other side and use the gully terrain to perform strong compaction with a filling construction device. When the completed area of ​​the first layer reaches the minimum construction plane size S of the construction device, start the second layer of filling; when the completed area of ​​the second layer reaches the minimum construction plane size S of the construction device, start the third layer of filling, and so on;

[0020] S5. Top surface leveling: After the last layer of filling is completed, the engineering ground surface is fully vibrated and rolled to level it, and monitoring and maintenance are carried out.

[0021] Compared with the prior art, the present invention has the following beneficial effects:

[0022] By using filling construction equipment on gully terrain to achieve slope compaction, the inclined base layer can be compacted, and when the bottom area is small, the slope can be filled recursively, which greatly reduces the limitations of compaction. The layered construction method allows multiple construction teams to enter the site in turn and work at the same time, and there is no need to build a working overlap surface, which reduces construction docking, greatly improving construction efficiency while reducing docking costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the appearance structure of the gully terrain filling construction device of the present invention;

[0024] Figure 2 It is a schematic diagram of the structure disassembly of the filling construction device for gully terrain of the present invention;

[0025] Figure 3 It is a schematic diagram of the triangular hammer arm structure of the present invention;

[0026] Figure 4 It is a schematic diagram of the structure of the hammer height adjustment base of the present invention;

[0027] Figure 5 It is a schematic diagram of the structure of the dynamic tamping hammer of the present invention;

[0028] Figure 6 It is a schematic diagram of the disassembly of the dynamic tamping hammer structure of the present invention;

[0029] Figure 7 This is a schematic diagram of the structure of the hammer body connected to the movable seat of the present invention;

[0030] Figure 8 It is a schematic diagram of the structure of the rammer body of the present invention;

[0031] Fig. 9 It is a schematic diagram of the structure of the stabilizing unit of the present invention;

[0032] Fig.10 It is a schematic diagram of the structure of the stabilizing unit of the present invention;

[0033] Fig.11 This is a schematic diagram of the oblique support unit structure of the present invention. Figure 1 ;

[0034] Fig.12 This is a schematic diagram of the oblique support unit structure of the present invention. Figure 2 ;

[0035] Fig.13 It is a schematic diagram of the filling construction sequence of the present invention.

[0036] In the figure: 1, short diagonal support; 2, long diagonal support; 3, winch; 4, triangular hammer arm; 41, hammer height adjustment base; 411, base fixing plate; 412, hammer height fixing connecting plate; 413, fixed seat reinforcing rib plate; 414, connecting bolt; 5, strong tamping hammer; 51, hammer body connected to movable seat; 511, movable seat fixing plate; 512, hammer body fixing connecting plate; 513, movable seat reinforcing rib plate; 52, tamping hammer Main body; 521, anti-vibration bin; 522, anti-vibration guide rod; 523, cover connecting block; 53, anti-vibration plate; 531, anti-sticking pattern; 54, rammer cover; 55, cover pin; 6, stabilizing unit; 61, moving base; 62, moving roller; 63, bracket connecting shaft; 64, oblique support unit; 641, telescopic cylinder; 642, support plate; 643, ground spike; 65, chain hook; 7, tension chain. DETAILED DESCRIPTION

[0037] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0038] The following describes an embodiment of the present invention based on its overall structure.

[0039] For example, please refer to Figure 1-2 A filling construction device for gully terrain comprises a short diagonal support 1, the upper end of the short diagonal support 1 is rotatably connected to the upper end of a long diagonal support 2, a winch 3 is provided on the upper part of the long diagonal support 2, the lower part of the long diagonal support 2 is rotatably connected to one end of a triangular hammer arm 4, a rammer 5 is provided on the other end of the triangular hammer arm 4, the upper end of the rammer 5 is connected to the winch 3 through a steel cable, and stabilizing units 6 are symmetrically provided at the two ends of the lower part of the short diagonal support 1 and the two ends of the lower part of the long diagonal support 2, and a plurality of stabilizing units 6 are connected by tension chains 7 respectively.

[0040] For example, please refer to Figure 3-4 A hammer height adjustment base 41 is provided at one end of the triangular hammer arm 4, and the hammer height adjustment base 41 is arranged at one side of the ramming hammer 5. The hammer height adjustment base 41 includes a base fixing plate 411, and the base fixing plate 411 is arranged at one end of the triangular hammer arm 4. A plurality of hammer height fixing connecting plates 412 are provided on one side of the middle part of the base fixing plate 411. The lowermost ends of the plurality of hammer height fixing connecting plates 412 are lower than the lowermost end of the base fixing plate 411. A fixed seat reinforcing rib plate 413 is respectively provided on one side of the plurality of hammer height fixing connecting plates 412. A plurality of connecting bolts 414 are provided in the middle part of the plurality of hammer height fixing connecting plates 412. This design can adjust the height of the ramming hammer 5 according to the height of the ramming surface through the hammer height adjustment base 41 in cooperation with the movable seat 51 on the ramming hammer 5; and the triangular hammer arm 4 is used to ensure that the bottom surface of the ramming hammer 5 is always parallel to the ramming surface.

[0041] For example, please refer to Figure 5-8The strong rammer 5 includes a hammer body connected to a movable seat 51, which is arranged at one end of the triangular hammer arm 4, and one side of the hammer body connected to the movable seat 51 is arranged on a rammer body 52. ​​The middle part of the rammer body 52 is slidably connected with multiple shock-absorbing plates 53. The middle part of the rammer body 52 is provided with a rammer cover 54, and the upper end of the rammer cover 54 is connected to the winch 3 through a steel cable. The two sides of the rammer body 52 are respectively connected to the rammer cover 54 through cover pins 55, and multiple cover pins 55 are respectively connected to the two sides of the rammer body 52 through positioning bolts. The hammer body connected to the movable seat 51 includes a movable seat fixing plate 511, and the movable seat fixing plate 511 is arranged on one side of the rammer body 52. A plurality of hammer body fixing connecting plates 512 are provided on one side of the middle part of the seat fixing plate 511, and a movable seat reinforcing rib plate 513 is symmetrically provided on one side of the plurality of hammer body fixing connecting plates 512. A shock-absorbing chamber 521 is opened in the middle part of the rammer body 52, and a shock-absorbing guide rod 522 is provided in the middle part of the shock-absorbing chamber 521. A plurality of shock-absorbing plates 53 are all sleeved in the middle part of the shock-absorbing guide rod 522. Cover body connecting blocks 523 are symmetrically provided on both sides of the top surface of the rammer body 52, and a plurality of cover pins 55 are respectively inserted in the middle part of the two cover body connecting blocks 523. The top surface of the shock-absorbing plate 53 is provided with an anti-sticking pattern 531. This design uses a plurality of shock-absorbing plates 53 to offset the bounce-up of the rammer 5 after tamping, thereby improving the stability and safety of the tamping operation.

[0042] For example, please refer to Figure 9-12 The stabilizing unit 6 includes a mobile base 61, both ends of the mobile base 61 are rotatably connected to mobile rollers 62, a bracket connecting shaft 63 is provided in the middle of the mobile base 61, and the bracket connecting shaft 63 is rotatably connected to the lower end of the short diagonal support 1 and the long diagonal support 2, a plurality of oblique support units 64 are provided on one side of the mobile base 61, and the plurality of oblique support units 64 are arranged in opposite directions, a chain hook 65 is provided on one side of the plurality of oblique support units 64 and one end of the mobile base 61, one end of the tension chain 7 is sleeved on the middle of the chain hook 65, and the oblique support unit 64 includes a telescopic cylinder inclined at 45° 641, the fixed end of the telescopic cylinder 641 is arranged on one side of the mobile base 61, the execution end of the telescopic cylinder 641 is rotatably connected to the top surface of the support plate 642, and the bottom surface of the support plate 642 is provided with a plurality of ground spikes 643, and the plurality of ground spikes 643 are all inclined at 45 degrees. This design allows the gully terrain filling construction device to move on a plane through a plurality of moving rollers 62. After reaching the preset position, two telescopic cylinders 641 extend out to support the support plate 642 on the ground to stabilize the entire equipment. Through two oblique support units 64 arranged in opposite directions and inclined, and the inclined ground spikes 643, the grip is increased so that the device can be attached to the slope.

[0043] Embodiment, a method for filling gully terrain, please refer to Fig.13 , including the following steps:

[0044] S1. Surface cleaning: Transplant and protect trees in the construction area, and classify and treat shallow surface soil according to its organic matter content;

[0045] S2. Base layer compaction: Use the gully terrain filling construction device to perform local compaction on all base layers in the construction area, including the slope surface, to avoid landslides. The gully terrain filling construction device is fixed on the slope by a plurality of the stabilizing units 6, and the tamping plane of the compaction hammer 5 is always parallel to the slope by the triangular hammer arm 4;

[0046] S3. Bottom filling: The bottom construction plane of the gully area is relatively small, so the slope recursive filling method is adopted. The height H of the slope recursive filling method is determined according to the minimum construction plane size S of the gully terrain filling construction device. The slope is compacted layer by layer along the slope from one side to the other side using the gully terrain filling construction device, and then the top plane of the slope recursive filling method is compacted twice to obtain the bottom plane;

[0047] S4. Layered construction: Start filling from one side of the bottom plane obtained in step S3 to the other side and use the gully terrain to perform strong compaction with a filling construction device. When the completed area of ​​the first layer reaches the minimum construction plane size S of the construction device, start the second layer of filling; when the completed area of ​​the second layer reaches the minimum construction plane size S of the construction device, start the third layer of filling, and so on;

[0048] S5. Top surface leveling: After the last layer of filling is completed, the engineering ground surface is fully vibrated and rolled to level it, and monitoring and maintenance are carried out.

[0049] The operating principle of the gully terrain filling construction device: first, the gully terrain filling construction device can be moved on the plane through a plurality of moving rollers 62. After reaching the preset position, the two telescopic cylinders 641 on the four stabilizing units 6 extend out to support the support plate 642 on the ground to stabilize the entire equipment. The two oblique support units 64 arranged in opposite directions and inclined, as well as the inclined ground spikes 643, increase the grip so that the device can be attached to the inclined surface; the height of the tamping hammer 5 can be adjusted according to the height of the tamping surface by means of the hammer height adjustment base 41 and the movable seat 51 on the tamping hammer 5; the winch 3 is started, the tamping hammer 5 is lifted by the steel cable, and the upper end of the tamping hammer 5 is released to allow the tamping hammer 5 to fall freely; the triangular hammer arm 4 is used to ensure that the bottom surface of the tamping hammer 5 is always parallel to the tamping surface; the tamping operation on the plane or inclined surface is realized; after completion, the telescopic cylinder 641 is retracted and moved to the next tamping point for continuous operation.

[0050] Although an embodiment of the present invention has been shown and described, this specific embodiment is merely an explanation of the present invention and is not a limitation of the invention. The specific features, structures, materials or characteristics described may be combined in a suitable manner in any one or more embodiments or examples. After reading this specification, those skilled in the art may make modifications, substitutions and variations to the embodiments without creative contributions as needed without departing from the principles and purpose of the present invention. However, as long as they are within the scope of the claims of the present invention, they are protected by patent law.

Claims

1. A filling construction device for gully terrain, comprising a short diagonal span support (1), characterized in that: The upper end of the short diagonal strut (1) is rotatably connected to the upper end of the long diagonal strut (2), a winch (3) is provided on the upper part of the long diagonal strut (2), the lower part of the long diagonal strut (2) is rotatably connected to one end of a triangular hammer arm (4), a tamping hammer (5) is provided on the other end of the triangular hammer arm (4), the upper end of the tamping hammer (5) is connected to the winch (3) via a steel cable, and stabilizing units (6) are symmetrically provided at both ends of the lower part of the short diagonal strut (1) and the lower end of the long diagonal strut (2), and a plurality of stabilizing units (6) are connected to each other via tension chains (7); The strong rammer (5) comprises a hammer body connected to a movable seat (51), wherein the hammer body connected to the movable seat (51) is arranged at one end of the triangular hammer arm (4), and one side of the hammer body connected to the movable seat (51) is arranged on a rammer body (52), and a plurality of anti-vibration plates (53) are slidably connected to the middle of the rammer body (52), and a rammer cover (54) is arranged in the middle of the rammer body (52), and the upper end of the rammer cover (54) is connected to the winch (3) through a steel cable, and the two sides of the rammer body (52) are respectively connected to the rammer cover (54) through cover pins (55), and the plurality of cover pins (55) are respectively connected to the two sides of the rammer body (52) through positioning bolts; The stabilizing unit (6) comprises a movable base (61), the two ends of the movable base (61) are respectively rotatably connected to movable rollers (62), a bracket connecting shaft (63) is provided in the middle of the movable base (61), the bracket connecting shaft (63) is rotatably connected to the lower ends of the short diagonal strut (1) and the long diagonal strut (2), a plurality of oblique support units (64) are provided on one side of the movable base (61), the plurality of oblique support units (64) are arranged in opposite directions, a chain hook (65) is provided on one side of the plurality of oblique support units (64) and one end of the movable base (61), and one end of the tension chain (7) is sleeved on the middle of the chain hook (65).

2. A gully terrain filling construction device according to claim 1, characterized in that: A hammer height adjustment base (41) is provided at one end of the triangular hammer arm (4), and the hammer height adjustment base (41) is arranged on one side of the powerful tamping hammer (5).

3. A gully terrain filling construction device according to claim 2, characterized in that: The hammer height adjustment base (41) comprises a base fixing plate (411), the base fixing plate (411) is arranged at one end of the triangular hammer arm (4), a plurality of hammer height fixing connecting plates (412) are arranged on one side of the middle part of the base fixing plate (411), the lowermost ends of the plurality of hammer height fixing connecting plates (412) are lower than the lowermost end of the base fixing plate (411), a fixing seat reinforcing rib plate (413) is respectively arranged on one side of the plurality of hammer height fixing connecting plates (412), and a plurality of connecting bolts (414) are arranged in the middle part of the plurality of hammer height fixing connecting plates (412).

4. The gully terrain filling construction device according to claim 1, characterized in that: The hammer body connected movable seat (51) comprises a movable seat fixing plate (511), and the movable seat fixing plate (511) is arranged on one side of the rammer body (52). A plurality of hammer body fixing connecting plates (512) are arranged on one side of the middle part of the movable seat fixing plate (511), and movable seat reinforcing rib plates (513) are symmetrically arranged on one side of the plurality of hammer body fixing connecting plates (512).

5. The gully terrain filling construction device according to claim 1, characterized in that: A shock-stop chamber (521) is provided in the middle of the rammer body (52), a shock-stop guide rod (522) is provided in the middle of the shock-stop chamber (521), a plurality of shock-stop plates (53) are sleeved in the middle of the shock-stop guide rod (522), cover body connecting blocks (523) are symmetrically provided on both sides of the top surface of the rammer body (52), and a plurality of cover pins (55) are respectively inserted in the middle of two cover body connecting blocks (523).

6. The gully terrain filling construction device according to claim 1, characterized in that: The top surface of the vibration-proof plate (53) is provided with anti-adhesion patterns (531).

7. The gully terrain filling construction device according to claim 1, characterized in that: The oblique support unit (64) comprises a telescopic cylinder (641) arranged at an angle of 45°, wherein a fixed end of the telescopic cylinder (641) is arranged at one side of the movable base (61), and an execution end of the telescopic cylinder (641) is rotatably connected to the top surface of a support plate (642), and a plurality of ground spikes (643) are arranged on the bottom surface of the support plate (642), and the plurality of ground spikes (643) are all arranged at an angle of 45°.

8. A method for filling construction for gully terrain, based on a device for filling construction for gully terrain according to any one of claims 1 to 7, characterized in that: The following steps are involved: S1. Surface cleaning: Transplant and protect trees in the construction area, and classify and treat shallow surface soil according to its organic matter content; S2. Base layer compaction: using the gully terrain filling construction device to perform local compaction on all base layers in the construction area, including compaction of the slope surface, to avoid landslides. The gully terrain filling construction device is fixed on the slope surface by a plurality of the stabilizing units (6), and the tamping plane of the compaction hammer (5) is always parallel to the slope surface by the triangular hammer arm (4); S3. Bottom filling: The bottom construction plane of the gully area is relatively small, so the slope recursive filling method is adopted. The height H of the slope recursive filling method is determined according to the minimum construction plane size S of the gully terrain filling construction device. The slope is compacted layer by layer along the slope from one side to the other side using the gully terrain filling construction device, and then the top plane of the slope recursive filling method is compacted twice to obtain the bottom plane; S4. Layered construction: Start filling from one side of the bottom plane obtained in step S3 to the other side and use the gully terrain to perform strong compaction with a filling construction device. When the completed area of ​​the first layer reaches the minimum construction plane size S of the construction device, start the second layer of filling; when the completed area of ​​the second layer reaches the minimum construction plane size S of the construction device, start the third layer of filling, and so on; S5. Top surface leveling: After the last layer of filling is completed, the engineering ground surface is fully vibrated and rolled to level it, and monitoring and maintenance are carried out.