A multi-layer steel corridor construction structure and method with oblique triangular supports at the bottom

By adopting a bottom-mounted inclined triangular support method during the construction of the steel connecting corridor, and utilizing components such as suspension frames and clamping seats, the safety hazards caused by the superposition of the weight of the triangular support were solved, and the stable alignment and rapid splicing of the steel connecting corridor were achieved.

CN118686289BActive Publication Date: 2024-11-12SHANGHAI CONSTRUCTION FOURTH CONSTRUCTION GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411170239.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-11-12
Estimated Expiration
2044-08-26

AI Technical Summary

Technical Problem

When installing and splicing triangular supports, the weight of the existing steel connecting corridors is superimposed, causing additional burden on the suspended upper steel connecting corridors, which poses safety hazards and risks of equipment damage.

Method used

The construction method adopts a bottom-angled triangular support. By combining the suspension frame and clamping seat with components such as positioning plate, stop block, and anti-sway linkage, a stable gravity support and suspension structure is formed to ensure the alignment and splicing of the upper steel corridor and triangular support.

Benefits of technology

It effectively shortens the suspension length, avoids swaying of the triangular supports, provides initial splicing positioning, ensures stable alignment and rapid splicing of the steel corridor, and reduces safety hazards.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118686289B_ABST
    Figure CN118686289B_ABST
Patent Text Reader

Abstract

The present invention discloses a multi-story steel corridor construction structure and method with an oblique triangular support at the bottom, belonging to the technical field of building construction. A second suspension frame fixed on the top floor of a building provides most of the stable gravity support and suspension for the triangular support. A clamping seat and a positioning plate respectively arranged on the upper steel corridor and the triangular support can provide two positioning points for the spliced ​​steel corridor. Compared with directly lifting the triangular support, this positioning point can shorten the suspension length of the second steel rope, greatly avoid the shaking of the triangular support during the suspension splicing process, and provide the initial splicing positioning for the spliced ​​steel corridor, which is convenient for the subsequent splicing of the steel corridor.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and in particular relates to a multi-layer steel corridor construction structure with oblique triangular supports at the bottom and a method thereof. Background Art

[0002] Steel corridor structure is a widely used structural form in modern buildings. It is usually used to connect two or more buildings, provide convenience for traffic and meet specific building functional requirements. Steel corridors are particularly common in the connection between high-rise buildings due to their light structure, high strength and fast construction. In existing steel corridor buildings, in the reinforcement method of horizontal steel corridors, additional triangular supports can be set at the bottom of the horizontal steel corridor to ensure the overall support capacity of the steel corridor. When installing and splicing the triangular supports, the conventional splicing method is to directly connect the steel ropes on the upper steel corridor, and connect and move the triangular supports upward through the steel ropes. However, during the alignment and splicing process, the weight of the triangular supports is superimposed on the upper steel corridor, which brings additional weight to the suspended upper steel corridor. If the steel rope breaks, it will bring great safety hazards and equipment damage. Summary of the invention

[0003] In view of this, the purpose of the present invention is to provide a multi-story steel corridor construction structure and method with oblique triangular supports at the bottom, and to achieve alignment and splicing of the steel corridors by additionally setting up suspension frames and support positioning points on the two-story steel corridors.

[0004] In order to achieve the above object, the present invention provides the following technical solutions:

[0005] The present invention includes a first suspension frame fixed on the top of the buildings on both sides, the first suspension frame extends a first steel rope downward, and the end of the first steel rope is provided with a fixed seat for clamping the upper steel corridor; it also includes a clamping seat respectively fixed to the transverse steel beam of the upper steel corridor and the oblique steel beam of the triangular support, the clamping seat is rotatably provided with a positioning plate, the positioning plate is provided with a through hole, and a second suspension frame is provided on the top of the building adjacent to the installed triangular support side, the second suspension frame extends a second steel rope downward, the second steel rope passes through the through holes of the two vertical positioning plates respectively, a stop block is provided at the end of the second steel rope, the stop block is supported on the lower side of the lower positioning plate, two of the clamping seats are respectively provided on the front and rear sides of the upper steel corridor, and two of the clamping seats are correspondingly provided on the front and rear sides of the triangular support.

[0006] Furthermore, an adjustment seat is extended from the upper clamping seat, a transverse sliding groove is provided on the adjustment seat, a sliding seat is slidably provided on the sliding groove, both sides of the adjustment seat are threadedly connected with tightening screws, the tightening screws are respectively pressed against both sides of the sliding seat, and a threaded column is also threadedly connected through the sliding seat, and the end of the threaded column is coaxially rotatably connected with the positioning plate.

[0007] Furthermore, the positioning plate is provided with two insertion holes parallel to the through hole, and also includes an anti-sway connecting rod, which passes through the insertion holes on the upper and lower positioning plates respectively to fix the upper and lower positioning plates in connection.

[0008] Furthermore, the side of the stopper facing the positioning plate is in an arc-shaped depression that cooperates with the positioning plate.

[0009] Furthermore, the clamping seat includes a base plate, a baffle plate extending from one edge of the base plate, and a baffle seat extending from the other edge. The baffle seat is threadedly connected with a locking screw that presses against the side of the clamped beam. A plurality of studs are also extended from the baffle seat. A clamping plate is slidably provided on the studs and presses against the outer side of the clamped beam. A nut for locking the clamping plate is threadedly connected to the studs.

[0010] Furthermore, a non-slip layer is provided on the side of the clamping plate and the bottom plate facing the clamped beam.

[0011] A construction method for a multi-story steel corridor with oblique triangular supports at the bottom, the steps of which are as follows:

[0012] S1. A first suspension frame is set up on the top of the buildings on both sides, and two first suspension frames are set up on the top of each building on each side. The first suspension frame extends a first steel rope downward, and suspends the upper steel corridor through a fixing seat at the end of the first steel rope, so that the upper steel corridor is suspended between the buildings on both sides;

[0013] S2, erecting a second suspension frame on the top of the building near the side where the triangular support is installed, and extending a second steel rope downward from the second suspension frame;

[0014] S3. Complete the construction of the triangular support below the upper steel corridor, pre-fix the clamping seat with an adjustable seat on the crossbeam of the upper steel corridor, pre-fix the clamping seat without an adjustable seat on the inclined beam of the triangular support, and fix two sets of clamping seats on each side of the steel corridor;

[0015] S4, pass the second steel rope through the positioning plate on the upper clamping seat and the positioning plate on the lower clamping seat in sequence, place the block on the bottom side of the lower positioning plate, recycle the second steel rope, suspend the triangular support at a position below the upper steel corridor, move the position of the adjustment seat and adjust the length of the second steel rope so that the triangular support and the upper steel corridor are in a vertical splicing state, and finally lock the adjustment seat;

[0016] S5. Loosen and tighten the tightening screws and rotate the threaded column to adjust the position of the positioning plate on the upper clamping seat, and fine-tune the position of the triangular support until the upper steel corridor and the triangular support joint point are aligned;

[0017] S7, insert the anti-sway connecting rod to fix the upper and lower positioning plates in connection;

[0018] S6. At the same time, recycle the second steel rope and splice the upper steel corridor and triangular support.

[0019] The beneficial effects of the present invention are:

[0020] The present invention clamps the beam-like structure of the upper steel corridor and the triangular support through the clamping seat, and two fixed points are formed on the front and rear sides of the upper steel corridor and the triangular support respectively. A second steel rope is suspended from an additionally arranged second suspension frame, and the second steel rope passes through the positioning plates rotatably arranged on the clamping seat respectively, and is finally blocked by a block. The clamping seat clamped on the beam-like structure can be adjusted along the beam-like structure, and the upper steel corridor and the triangular support can be aligned and in a vertically aligned state by passing the second steel rope through the four supporting points on each layer of the steel corridor. The rotatably arranged positioning plates can be provided for the second after the clamping seat is clamped on the clamped beams with different inclinations. The steel rope passes through to form a suspended state. After the two-story steel corridor is aligned, the second steel rope is retracted to splice the two-story steel corridor. This structure provides most of the stable gravity support and suspension for the triangular support through the second suspension frame fixed on the top floor of the building. The clamping seat and positioning plate respectively arranged on the upper steel corridor and the triangular support can provide two positioning points for the spliced ​​steel corridor. Compared with directly lifting the triangular support, this positioning point can shorten the suspension length of the second steel rope, greatly avoid the shaking of the triangular support during the suspension splicing process, and provide the initial splicing positioning for the spliced ​​steel corridor, which is convenient for the subsequent splicing of the steel corridor.

[0021] Other advantages, objectives and features of the present invention will be described in the following description and will be apparent to those skilled in the art to some extent, or those skilled in the art may be taught from the practice of the present invention. The objectives and other advantages of the present invention may be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to make the purpose, technical solution and beneficial effects of the present invention clearer, the present invention provides the following drawings for illustration:

[0023] Figure 1 This is an overall schematic diagram of the construction structure of a multi-story steel corridor according to an embodiment of the present invention;

[0024] Figure 2 for Figure 1 Detailed schematic diagram of point A;

[0025] Figure 3 It is a side view of the clamping seat;

[0026] Figure 4 is a cross-sectional view of the positioning plate;

[0027] The markings in the attached drawings are as follows: 1. first suspension frame; 2. first steel rope; 21. fixed seat; 3. clamping seat; 31. bottom plate; 32. baffle; 33. baffle seat; 34. locking screw; 35. stud; 36. nut; 37. splint; 38. anti-slip layer; 4. positioning plate; 41. perforation; 42. socket; 5. second suspension frame; 6. second steel rope; 61. block; 7. adjustment seat; 71. slide groove; 72. slide seat; 73. tightening screw; 74. threaded column; 8. anti-sway connecting rod; 91. upper steel corridor; 92. triangular support. DETAILED DESCRIPTION

[0028] like Figure 1~Figure 4 As shown, the present invention discloses a multi-layer steel corridor construction structure and method with an oblique triangular support 92 at the bottom, such as Figure 1 As shown, it includes a first suspension frame 1 fixed on the top of the buildings on both sides, the first suspension frame 1 extends a first steel rope 2 downward, and the end of the first steel rope 2 is provided with a fixing seat 21 for clamping the upper steel corridor 91. The fixing seat 21 is a clamping structure, or a lasso structure of the first steel rope 2, which is used to suspend the upper steel corridor 91 horizontally; Figure 2 As shown, it also includes a clamping seat 3 fixed on the transverse steel beams of the upper steel corridor 91 and the oblique steel beams of the triangular support 92, respectively. The clamping seat 3 is clamped on the beam structure of the upper steel corridor 91 and the triangular support 92. The clamping seat 3 is rotatably provided with a positioning plate 4, and a through hole 41 is provided on the positioning plate 4. A second suspension bracket 5 is provided on the top of the building on the side of the installed triangular support 92. The second suspension bracket 5 extends a second steel rope 6 downward, and the second steel rope 6 passes through the through holes 41 of the two vertical positioning plates 4 respectively. A stop block 61 is provided at the end of the second steel rope 6, and the stop block 61 is supported on the lower side of the lower positioning plate 4. Two of the clamping seats 3 are respectively provided on the front and rear sides of the upper steel corridor 91, and two of the clamping seats 3 are correspondingly provided on the front and rear sides of the triangular support 92.

[0029] This construction structure is clamped on the beam structure of the upper steel corridor 91 and the triangular support 92 by the clamping seat 3, and two fixed points are formed on the front and rear sides of the upper steel corridor 91 and the triangular support 92 respectively. The second steel rope 6 is suspended from the additionally arranged second suspension frame 5, and the second steel rope 6 passes through the positioning plate 4 rotatably arranged on the clamping seat 3 respectively, and is finally blocked by the block 61. The clamping seat 3 clamped on the beam structure can be adjusted along the beam structure. The second steel rope 6 passes through the four fulcrums on each layer of the steel corridor, so that the upper steel corridor 91 and the triangular support 92 can be aligned and in a vertical alignment state. The rotatably arranged positioning plate 4 can be clamped on the clamped beam with different inclinations by the clamping seat 3. After it is put up, the second steel rope 6 is passed through to form a suspended state. After the two-story steel corridor is aligned, the second steel rope 6 is retracted to splice the two-story steel corridor. This structure provides most of the stable gravity support and suspension to the triangular support 92 through the second suspension frame 5 fixed on the top floor of the building. The clamping seat 3 and the positioning plate 4 respectively arranged on the upper steel corridor 91 and the triangular support 92 can provide two positioning points for the spliced ​​steel corridor. Compared with directly lifting the triangular support 92, this positioning point can shorten the suspension length of the second steel rope 6, greatly avoid the shaking of the triangular support 92 during the suspension splicing process, and provide the initial splicing positioning for the spliced ​​steel corridor, which is convenient for the subsequent steel corridor splicing.

[0030] In a further solution, Figure 2 and Figure 3 As shown, an adjustment seat 7 is extended on the upper clamping seat 3, and a horizontal slide groove 71 is provided on the adjustment seat 7. A slide seat 72 is slidably provided on the slide groove 71. The two sides of the adjustment seat 7 are respectively threadedly connected with tightening screws 73, and the tightening screws 73 are respectively pressed against the two sides of the slide seat 72. A threaded column 74 is also threadedly connected on the slide seat 72, and the end of the threaded column 74 is coaxially rotatably connected with the positioning plate 4.

[0031] In this structure, the upper clamping seat 3 provides a horizontal movement fine-tuning structure for the triangular support 92. The horizontal position of the upper positioning plate 4 is adjusted by loosening or tightening the two locking screws 73 and rotating the threaded column 74. By adjusting the four positioning plates 4 separately, the splicing points of the triangular support 92 and the upper steel corridor can be aligned. When the second steel rope 6 is retracted, the splicing points can be quickly found and connected.

[0032] In a further solution, Figure 2 and Figure 4 As shown, the positioning plate 4 is provided with two insertion holes 42 parallel to the through hole 41, and also includes an anti-sway connecting rod 8, which passes through the insertion holes 42 on the upper and lower positioning plates 4 respectively to fix the upper and lower positioning plates 4 in connection.

[0033] In this structure, by adding two sockets 42 and an anti-sway link 8, the upper and lower positioning plates 4 are fixedly connected. After the splicing points are aligned, the shaking between the upper steel corridor 91 and the triangular support 92 can be further reduced by fixing the anti-sway link 8. As the second steel rope 6 is recovered, the anti-sway link 8 can also move along the positioning plate 4 to ensure that the splicing points of the two steel corridors are aligned at all times.

[0034] In a further solution, Figure 2 As shown, the side of the stopper 61 facing the positioning plate 4 is an arc-shaped depression that matches the positioning plate 4. This structure can ensure that the stopper 61 stably supports the lower positioning plate 4, and with the different inclination angles of the inclined beams of the triangular support 92, the stopper 61 can ensure the wrapping support of the lower positioning plate 4, and also avoid wear between components.

[0035] In a further solution, Figure 2 and Figure 3 As shown, the clamping seat 3 includes a base plate 31, a baffle 32 is extended from one edge of the base plate 31, and a baffle seat 33 is extended from the other edge. A locking screw 34 is threadedly connected to the baffle seat 33 and abuts against the side of the clamped beam. A plurality of studs 35 are also extended from the baffle seat 33. A clamping plate 37 is slidably provided on the stud 35 and a nut 36 for locking the clamping plate 37 is threadedly connected to the stud 35.

[0036] The clamping seat 3 of this structure can adapt to clamped beams of different lengths and widths, clamp the four sides of the clamped beam, and ensure that the position of the clamping seat 3 on the clamped beam is determined. Preferably, the clamping plate 37 and the bottom plate 31 are provided with an anti-slip layer 38 on the side facing the clamped beam, which can further ensure that the position of the clamping seat 3 on the clamped beam is determined.

[0037] A method for constructing a multi-layer steel corridor with oblique triangular supports 92 at the bottom adopts the above multi-layer steel corridor construction structure, and the steps are as follows:

[0038] S1. A first suspension frame 1 is set up on the top of the buildings on both sides. Two first suspension frames 1 are set up on the top of each building. The first suspension frame 1 extends a first steel rope 2 downward. The upper steel corridor 91 is suspended through a fixing seat 21 at the end of the first steel rope 2, so that the upper steel corridor 91 is suspended between the buildings on both sides.

[0039] S2, erecting a second suspension frame 5 on the top of the building near the installation side of the triangular support 92, and extending a second steel rope 6 downward from the second suspension frame 5;

[0040] S3. Build the triangular support 92 below the upper steel corridor 91, pre-fix the clamping seat 3 with the adjustment seat 7 on the crossbeam of the upper steel corridor 91, pre-fix the clamping seat 3 without the adjustment seat 7 on the inclined beam of the triangular support 92, and fix two sets of clamping seats 3 on each side of the steel corridor;

[0041] S4, pass the second steel rope 6 through the positioning plate 4 on the upper clamping seat 3 and the positioning plate 4 on the lower clamping seat 3 in sequence, block the block 61 at the bottom side of the lower positioning plate 4, recycle the second steel rope 6, suspend the triangular support 92 at a position below the upper steel corridor 91, move the position of the adjustment seat 7 and adjust the length of the second steel rope 6 so that the triangular support 92 and the upper steel corridor 91 are in a vertical splicing state, and finally lock the adjustment seat 7;

[0042] S5, loosen and tighten the tightening screw 73 and rotate the threaded column 74, adjust the position of the positioning plate 4 on the upper clamping seat 3, and fine-tune the position of the triangular support 92 until the joint points of the upper steel corridor 91 and the triangular support 92 are aligned;

[0043] S7, insert the anti-sway connecting rod 8 to fix the upper and lower positioning plates 4 in connection;

[0044] S6. At the same time, the second steel rope 6 is recovered and the upper steel corridor 91 and the triangular support 92 are spliced.

[0045] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made in form and details without departing from the scope defined by the claims of the present invention.

Claims

1. A multi-storey steel corridor construction structure with oblique triangular supports (92) at the bottom, characterized in that: The invention comprises a first suspension frame (1) fixed on the top of the buildings on both sides, wherein the first suspension frame (1) extends downwardly from a first steel rope (2), and the end of the first steel rope (2) is provided with a fixing seat (21) for clamping the upper steel corridor (91); and further comprises a clamping seat (3) respectively fixed to the transverse steel beam of the upper steel corridor (91) and the oblique steel beam of the triangular support (92), wherein the clamping seat (3) is rotatably provided with a positioning plate (4), and a through hole (41) is provided on the positioning plate (4), and a side of the triangular support (92) installed adjacent to the positioning plate (4) is provided with a through hole (41). A second suspension frame (5) is provided on the top of the building, a second steel rope (6) is extended downward from the second suspension frame (5), the second steel rope (6) respectively passes through the through holes (41) of two vertical positioning plates (4), a stopper (61) is provided at the end of the second steel rope (6), the stopper (61) is supported on the lower side of the positioning plate (4) at the lower position, two clamping seats (3) are respectively provided on the front and rear sides of the upper steel corridor (91), and two clamping seats (3) are correspondingly provided on the front and rear sides of the triangular support (92).

2. The multi-story steel corridor construction structure with oblique triangular supports (92) at the bottom according to claim 1 is characterized in that: An adjustment seat (7) is extended from the upper clamping seat (3), a transverse slide groove (71) is provided through the adjustment seat (7), a slide seat (72) is slidably provided on the slide groove (71), both sides of the adjustment seat (7) are respectively threadedly connected with tightening screws (73), the tightening screws (73) are respectively pressed against both sides of the slide seat (72), and a threaded column (74) is also threadedly connected through the slide seat (72), and the end of the threaded column (74) is coaxially rotatably connected with the positioning plate (4).

3. The multi-story steel corridor construction structure with oblique triangular supports (92) at the bottom according to claim 1 is characterized in that: The positioning plate (4) is provided with two insertion holes (42) parallel to the through hole (41), and also includes an anti-sway connecting rod (8), wherein the anti-sway connecting rod (8) passes through the insertion holes (42) on the upper and lower positioning plates (4) respectively, so that the upper and lower positioning plates (4) are fixedly connected.

4. The multi-story steel corridor construction structure with oblique triangular supports (92) at the bottom according to claim 1 is characterized in that: The side of the stopper (61) facing the positioning plate (4) is in the form of an arc-shaped depression that matches the positioning plate (4).

5. The multi-story steel corridor construction structure with oblique triangular supports (92) at the bottom according to claim 1 is characterized in that: The clamping seat (3) comprises a bottom plate (31), a baffle (32) extending from one edge of the bottom plate (31), a baffle seat (33) extending from the other edge, a locking screw (34) being threadedly connected to the baffle seat (33) and resting against the side surface of the clamped beam, a plurality of studs (35) extending from the baffle seat (33), a clamping plate (37) being slidably provided on the studs (35) and resting against the outer side surface of the clamped beam, and a nut (36) for locking the clamping plate (37) being threadedly connected to the studs (35).

6. The multi-story steel corridor construction structure with oblique triangular supports (92) at the bottom according to claim 5 is characterized in that: The clamping plate (37) and the bottom plate (31) are provided with an anti-slip layer (38) on the side facing the clamped beam.

7. A method for constructing a multi-story steel corridor with an oblique triangular support (92) at the bottom, using a multi-story steel corridor construction structure with an oblique triangular support (92) at the bottom as claimed in any one of claims 1 to 6, the steps of which are as follows: S1. erecting first suspension frames (1) on the tops of the buildings on both sides, with two first suspension frames (1) being erected on the tops of the buildings on each side, and extending first steel ropes (2) downward from the first suspension frames (1), and suspending the upper steel corridor (91) through the fixing seats (21) at the ends of the first steel ropes (2), so that the upper steel corridor (91) is suspended between the buildings on both sides; S2, erecting a second suspension frame (5) on the top of the building adjacent to the side where the triangular support (92) is installed, and extending a second steel rope (6) downward from the second suspension frame (5); S3. Completely build a triangular support (92) below the upper steel corridor (91), pre-fix a clamping seat (3) with an adjustment seat (7) on the crossbeam of the upper steel corridor (91), and pre-fix a clamping seat (3) without an adjustment seat (7) on the inclined beam of the triangular support (92), and fix two sets of clamping seats (3) on each side of the steel corridor; S4, passing the second steel rope (6) through the positioning plate (4) on the upper clamping seat (3) and the positioning plate (4) on the lower clamping seat (3) in sequence, placing the stopper (61) on the bottom side of the lower positioning plate (4), retrieving the second steel rope (6), suspending the triangular support (92) at a position below the upper steel corridor (91), moving the position of the adjustment seat (7) and adjusting the length of the second steel rope (6) so that the triangular support (92) and the upper steel corridor (91) are in a vertical splicing state, and finally locking the adjustment seat (7); S5, loosen and tighten the tightening screw (73) and rotate the threaded column (74), adjust the position of the positioning plate (4) on the upper clamping seat (3), and fine-tune the position of the triangular support (92) until the splicing points of the upper steel corridor (91) and the triangular support (92) correspond; S7, inserting the anti-sway connecting rod (8) to fix the upper and lower positioning plates (4) together; S6. At the same time, the second steel rope (6) is recovered and the upper steel corridor (91) and the triangular support (92) are spliced.