A lifting device and construction method for preventing lateral displacement of high-rise connected towers during construction
By designing a high-rise joint tower with lifting mechanism, anti-biasing mechanism and connecting mechanism, the lateral displacement problem caused by the inclination of steel corridors during the construction of high-rise joint building towers is solved, and the tower is realized The stability of the main body and the accuracy and safety of lifting operations.
Patent Information
- Application Number
- CN202411196382.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-08-29
AI Technical Summary
During the construction of high-rise joint building towers, the steel corridor is prone to tilt during the lifting process, resulting in the intensification of the lateral displacement of the tower and the lack of effective anti-lateral displacement and precise positioning technology.
A high-rise joint tower anti-sided lifting device is designed including a lifting mechanism, an anti-biasing mechanism and a connecting mechanism. The device cooperates with the hydraulic lifter and the winch to achieve safe lifting and stability monitoring of the steel corridor, and ensures the stability and precise positioning of the main body of the tower through structures such as reinforcement frames and positioning frames.
It effectively prevents lateral displacement of the tower, improves the safety and efficiency of steel corridor hoisting, and ensures the stability of the main body of the tower and the accuracy of lifting operations.
Smart Images

Figure CN118686290B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building construction, and relates to a lifting device and a construction method for preventing lateral displacement of a high-rise connected tower during construction. Background Art
[0002] As a new type of complex high-rise building, high-rise connected structures have a beautiful appearance. They can not only save the land area required for construction, but also the connecting positions between towers (such as high-altitude corridors) can provide a wide sightseeing view and unique visual effects, so their architectural form is widely used. However, large-span, large-bay, and complex high-altitude connected structures also bring new challenges to construction.
[0003] During the construction of high-rise or super-high-rise connected buildings, relative lateral deformation of the towers is usually caused by uneven tower foundation settlement, uneven tower compression deformation and other reasons. The lateral displacement control of the towers of high-rise connected buildings is an important factor in controlling the installation accuracy of the connected structure. Therefore, it is necessary to actively control the relative horizontal position of the towers.
[0004] During the closing process of the connected structure of the high-rise connected building tower, the steel corridor needs to be hoisted. During the hoisting process of the steel corridor, the top of the steel corridor is usually hoisted by multiple hydraulic lifters. Since the steel corridor needs to be hoisted at a high position, if the steel corridor tilts during the hoisting process, it will often aggravate the lateral displacement of the high-rise connected building tower. For this reason, a high-rise connected tower construction period anti-lateral displacement lifting device and a construction method thereof are proposed, which are safe in construction, easy to disassemble, actively observe whether the steel corridor is tilted, and can actively correct the lateral displacement generated during the tower construction process. Summary of the invention
[0005] In view of this, in order to solve the problem that the steel corridors between the high-rise connected building towers tilt during the hoisting process, which will aggravate the lateral displacement of the high-rise connected building towers, the present invention provides a high-rise connected tower construction period anti-lateral displacement lifting device and construction method, which is safe in construction, easy to disassemble, actively observes whether the steel corridors are tilted, and can actively correct the lateral displacement generated during the tower construction process.
[0006] In order to achieve the above object, the present invention provides the following technical solutions:
[0007] A lifting device for preventing lateral displacement during the construction period of a high-rise connected tower building, comprising: two lifting mechanisms respectively arranged on one side of two tower bodies, the four lifting mechanisms being used to lift a steel corridor;
[0008] The lifting mechanism includes a first fixed frame, which is fixed on one side of the tower body. Two hydraulic lifters that penetrate the first fixed frame are fixedly connected to the surface of the first fixed frame. The output ends of the hydraulic lifters are both provided with first steel wire ropes. The bottoms of the two first steel wire ropes are fixedly connected with the same first hoisting device for hoisting the steel corridor.
[0009] Two anti-deviation mechanisms are arranged on one side of the tower body, and the anti-deviation mechanism includes a second support frame and a winch. The second support frame is fixed on one side of the tower body, and the top of the second support frame is fixedly connected with a fixed frame, and the first guide roller and the second guide roller are rotatably connected in the fixed frame, and the first guide roller and the second guide roller are vertically arranged. The winch is fixed on the surface of one layer of the tower body, and a second steel wire rope is arranged at the output end of the winch, and the bottom of the second steel wire rope is fixedly connected with a second hoist connected with the steel corridor.
[0010] Furthermore, a connecting mechanism for maintaining the stability of the tower bodies is arranged between the two tower bodies, and the connecting mechanism includes four reinforcement frames, which are respectively fixed on one side of the four first fixing frames, and the surfaces of the reinforcement frames are fixedly connected with positioning frames, and connecting frames are fixed between the multiple positioning frames by bolts.
[0011] Furthermore, the connecting frame includes two T-shaped connecting plates, which are respectively fixed to two positioning frames on both sides by bolts. A double-layer middle plate is arranged between the two connecting plates, and the middle plates are respectively located on the upper and lower sides of the connecting plates. A plurality of fixing bolts are arranged between the middle plate and the two connecting plates, and the connecting plate and the middle plate are connected and fixed by a plurality of fixing bolts.
[0012] Furthermore, the circumference of the second steel wire rope is provided with an anti-slip mechanism, which includes a limit frame, which is fixed on the same floor as the winch, and two installation shafts are rotatably connected between the top and bottom of the limit frame, and the circumference of the two installation shafts are fixedly connected with clamps, and the second steel wire rope passes through between the two clamps, and the side of the clamp close to the second steel wire rope is an inclined surface, and a spring is fixedly connected between the clamp and the limit frame.
[0013] Furthermore, a wear-resistant sheet is fixedly connected to one side of the inclined surface of the clamping plate.
[0014] Furthermore, a level box is fixedly connected to the top of the steel corridor, and a level sensor is fixedly connected to the surface of the level box.
[0015] Furthermore, a ball rolls on the bottom inner wall of the horizontal box, and a positioning groove used in conjunction with the ball is provided on the bottom inner wall of the horizontal box.
[0016] Furthermore, a guide assembly for guiding the first steel wire rope is provided on the top of the first fixed frame, and the guide assembly includes a first support frame, and two pairs of limit plates are fixedly connected to the surface of the first support frame, and a plurality of limit plates are inserted with a through limit screw, and nuts are threadedly connected to both ends of the limit screw.
[0017] Furthermore, a connection mechanism for maintaining the stability of the tower body is provided between the two tower bodies; the connection mechanism includes four reinforcement frames, which are respectively fixed on one side of the four first fixed frames. Positioning frames are fixedly connected to the surface of the reinforcement frames, and fixed plates are fixed between the multiple positioning frames by bolts. The ends of the two fixed plates close to each other are respectively connected to the first channel steel and the second channel steel by U-shaped steel. The inner walls of the first channel steel and the second channel steel are welded with hooks. The inner wall of the first channel steel is slidably mounted with a first rectangular plate, and a sliding groove is provided on the top of the first rectangular plate. The first channel steel is fixedly mounted with a sliding plate by at least two bolts, and the bottom of the sliding plate is slidably connected to the top of the first rectangular plate, and the bolts pass through the sliding groove. At least two compression springs are installed between the hook and the first rectangular plate. A fixing groove is provided at the position of the first rectangular plate close to the second channel steel, and through holes are provided on both side walls of the fixing groove, and positioning rods are slid in the through holes. The outer wall of the positioning rod is sleeved with a tension spring, and the two ends of the tension spring are respectively fixed to the first rectangular plate and the positioning rod, and one end of the positioning rod is spherical. The inner wall of the second channel steel is fixed with a second rectangular plate by bolts, and both sides of the second rectangular plate are provided with positioning holes matched with the positioning rods. The bottom of one end of the second rectangular plate is an arc surface, and the second rectangular plate is clamped in the fixing groove, and the bottom of the second rectangular plate contacts the bottom inner wall of the fixing groove.
[0018] Furthermore, the bottoms of the first channel steel and the second channel steel are both fixed with positioning pins by bolts. Two horizontal plates matching with the positioning pins are welded on the top of the steel corridor, and holes are arranged on the horizontal plates, and the positioning pins are inserted into the holes.
[0019] The present invention also provides a construction method for a lateral displacement prevention lifting device for a high-rise connected tower during construction, comprising the following steps:
[0020] S1: Two first fixing frames are fixed on one side of the two tower bodies respectively, and then a hydraulic lifter for hoisting is installed. After the installation is completed, the connecting plate is placed between the two positioning frames and then fixed by bolts. The two connecting plates are connected by an intermediate plate. The distance between the two connecting plates can be adjusted to improve the flexibility of the connection mechanism. At the same time, the connection mechanism is used to support the two tower bodies to prevent the tower bodies from tilting when the steel corridor is hoisted;
[0021] S2: The steel corridor located between the two tower bodies is assembled above the podium, and then the first steel wire rope and the first hoist are lowered by the hydraulic lifter, and the first hoist is hung under the steel corridor. Then the hydraulic lifter is started to lift the steel corridor. After the steel corridor is 20 centimeters off the ground, it is left to stand for 24 hours, and then the steel corridor is lifted to the designed height and welded.
[0022] S3: While the steel corridor is being hoisted, the second steel wire rope and the second hoisting device are lowered by the winch, and the second hoisting device is connected and fixed to the bottom of the steel corridor. Then, during the process of lifting the steel corridor, the winch is started, and the winch winds up the second steel wire rope. The plurality of second steel wire ropes are used to maintain the stability of the steel corridor during the lifting process to prevent shaking caused by wind.
[0023] S4: During the hoisting process, the second steel wire rope passes between the two clamping plates. Since one side of the clamping plates is smoothly set, the second steel wire rope moves normally. At the same time, the clamping plates keep in contact with the second steel wire rope under the action of the spring. When the steel corridor slides down, the second steel wire rope slides backwards in the two clamping plates. Since a protruding wear-resistant sheet is set on one side of the inclined surface of the clamping plates, friction occurs between the second steel wire rope and the wear-resistant sheet when the second steel wire rope slides backwards. With the cooperation of the spring, the clamping plates rotate around the installation axis, so that the inclined surfaces of the clamping plates are close to each other, biting the second steel wire rope, avoiding danger and improving the safety of hoisting.
[0024] S5: During the hoisting process, the level of the steel corridor is monitored by the horizontal sensor, and the position of the ball in the horizontal box can be observed. When the ball rolls to one end, it means that the steel corridor is tilted, and when the ball remains in the positioning groove, it means that the tilt of the steel corridor is within a reasonable range.
[0025] The beneficial effects of the present invention are:
[0026] The anti-lateral shift lifting device for high-rise connected towers during construction disclosed by the present invention has the following advantages:
[0027] 1. Flexibility in the use of the connection mechanism: The connection plate and the middle plate in the first connection mechanism are connected by fixing bolts, so that the distance between the two connection plates can be adjusted, which improves the flexibility of the connection mechanism and enables it to adapt to the connection requirements between tower bodies with different spacings.
[0028] 2. Improve hoisting efficiency and safety: The hoisting method that uses a hydraulic hoist and a winch not only improves the hoisting efficiency of the steel corridor, but also maintains the stability of the steel corridor during the hoisting process through multiple second steel ropes, effectively avoiding the impact of external factors such as wind on the hoisting operation and ensuring the safety of the hoisting operation.
[0029] 3. Accurate positioning and monitoring: A horizontal plate is set on the top of the steel corridor, and cooperates with the positioning pins at the bottom of the first and second channel steels to achieve accurate positioning of the steel corridor. At the same time, through the combined use of level sensors and level boxes, the horizontal state of the steel corridor is monitored in real time, further ensuring the accuracy and safety of the hoisting operation.
[0030] 4. Enhance the stability of the tower body: By setting up two different connection mechanisms between the tower bodies, a stable connection is established between the two tower bodies, which effectively slows down the lateral movement of the tower bodies, significantly enhances the overall stability, and provides safety protection for subsequent lifting operations.
[0031] 5. Enhance the safety of the hoisting process: an anti-slip mechanism is set up. When the steel corridor slides down, the second steel wire rope can be bitten by the splint in the anti-slip mechanism to prevent the steel corridor from continuing to slide down, thereby avoiding the occurrence of dangerous situations and further enhancing the safety of the hoisting process.
[0032] In summary, the present invention achieves an effective anti-lateral displacement effect on high-rise towers through ingenious structural design and technical combination, improves the efficiency and safety of steel corridor hoisting operations, and has significant beneficial effects. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be described in detail below in conjunction with the accompanying drawings, wherein:
[0034] Figure 1 This is a schematic diagram of the three-dimensional structure of a lifting device for preventing lateral displacement of a high-rise connected tower during construction according to a first embodiment of the present invention;
[0035] Figure 2 It is a cross-sectional view of a lifting device for preventing lateral displacement of a high-rise connected tower during construction according to a first embodiment of the present invention;
[0036] Figure 3 This is a schematic diagram of the installation structure of the lifting mechanism of the anti-lateral shift lifting device for high-rise connected towers during construction according to the first embodiment of the present invention;
[0037] Figure 4 This is a schematic diagram of the structure of the anti-deflection mechanism of the anti-lateral shift lifting device for high-rise connected towers during construction according to the first embodiment of the present invention;
[0038] Figure 5 This is a schematic diagram of the installation structure of the connecting frame of the anti-lateral displacement lifting device during the construction period of a high-rise connected tower according to the first embodiment of the present invention;
[0039] Figure 6 It is a cross-sectional view of a limit frame of a lifting device for preventing lateral displacement during construction of a high-rise connected tower according to a first embodiment of the present invention;
[0040] Figure 7 This is a schematic diagram of the clamping plate structure of a lifting device for preventing lateral displacement of a high-rise connected tower during construction according to a first embodiment of the present invention;
[0041] Figure 8 This is a schematic diagram of the horizontal box structure of a lifting device for preventing lateral displacement of a high-rise connected tower during construction according to a first embodiment of the present invention;
[0042] Fig. 9 This is a schematic structural diagram of a lifting device for preventing lateral displacement of a high-rise connected tower during construction according to a second embodiment of the present invention;
[0043] Fig.10 This is a structural schematic diagram of a connection mechanism of a lifting device for preventing lateral displacement of a high-rise connected tower during construction according to a second embodiment of the present invention;
[0044] Fig.11 for Fig.10 Exploded view of the structure of the middle part;
[0045] Fig.12 It is a schematic structural diagram of a lifting device for preventing lateral displacement of a high-rise connected tower during construction according to a third embodiment of the present invention.
[0046] In the figure: 1. tower body; 2. steel corridor; 3. connection mechanism; 4. lifting mechanism; 5. anti-deviation mechanism; 6. connection frame; 7. level box; 8. first fixed frame; 9. hydraulic lifter; 10. first steel wire rope; 11. first sling; 12. first support frame; 13. limit plate; 14. limit screw; 15. reinforcement frame; 16. winch; 17. second support frame; 18. fixed frame; 19. first guide roller; 20. second guide roller; 21. second steel wire rope; 22. second sling; 23. anti-slip mechanism; 24. positioning frame; 25 , connecting plate; 26, middle plate; 27, fixing bolt; 28, limiting frame; 29, mounting shaft; 30, clamping plate; 31, spring; 32, wear-resistant sheet; 33, level sensor; 34, positioning groove; 35, ball bearing; 36, first channel steel; 37, second channel steel; 38, hook; 39, compression spring; 40, sliding plate; 41, first rectangular plate; 42, sliding groove; 43, tension spring; 44, positioning rod; 45, fixing groove; 46, through hole; 47, positioning hole; 48, second rectangular plate; 49, fixing plate; 50, cross plate; 51, positioning pin. DETAILED DESCRIPTION
[0047] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the illustrations provided in the following embodiments only illustrate the basic concept of the present invention in a schematic manner, and the following embodiments and features in the embodiments can be combined with each other without conflict.
[0048] Among them, the drawings are only used for illustrative explanations, and they only represent schematic diagrams rather than actual pictures, and should not be understood as limitations on the present invention. In order to better illustrate the embodiments of the present invention, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of actual products. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted.
[0049] The same or similar numbers in the drawings of the embodiments of the present invention correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right", "front", "rear", etc. indicate the orientation or position relationship, they are based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, the terms describing the position relationship in the drawings are only used for illustrative purposes and cannot be understood as limiting the present invention. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0050] Embodiment 1
[0051] Reference Figure 1-Figure 8 , a lifting device for preventing lateral displacement during the construction period of a high-rise connected tower, comprising: two lifting mechanisms 4 respectively arranged on one side of two tower bodies 1, the four lifting mechanisms 4 being used to lift the steel corridor 2;
[0052] The lifting mechanism 4 includes a first fixed frame 8, which is fixed on one side of the tower body 1. Two hydraulic lifters 9 that penetrate the first fixed frame 8 are fixedly connected to the surface of the first fixed frame 8. The hydraulic lifter 9 is a prior art that uses the hydraulic principle to lift heavy objects. The output ends of the hydraulic lifters 9 are both provided with first steel wire ropes 10. The bottoms of the two first steel wire ropes 10 are fixedly connected with the same first hoist 11 for hoisting the steel corridor 2. The first hoist 11 is hung below the steel corridor 2, and then the steel corridor 2 is hoisted by starting the hydraulic lifter 9.
[0053] Two anti-deviation mechanisms 5 are provided on one side of the tower body 1, and the anti-deviation mechanism 5 includes a second support frame 17 and a winch 16. The second support frame 17 is fixed on one side of the tower body 1, and the top of the second support frame 17 is fixedly connected to a fixed frame 18, and the fixed frame 18 is rotatably connected to a first guide roller 19 and a second guide roller 20, and the first guide roller 19 and the second guide roller 20 are vertically arranged, and the first guide roller 19 and the second guide roller 20 cooperate to facilitate guiding the second steel wire rope 21, and the winch 16 is fixed on the surface of one layer of the tower body 1, and the output end of the winch 16 is provided with a second steel wire rope 21, and the bottom of the second steel wire rope 21 is fixedly connected to a second hoisting device 22 connected to the steel corridor 2. During the hoisting, the winch 16 winds up the second steel wire rope 21, and uses multiple second steel wire ropes 21 to maintain the stability of the steel corridor 2 during the lifting process to avoid shaking due to wind.
[0054] In the present invention, a connecting mechanism 3 for maintaining the stability of the tower main body 1 is arranged between the two tower main bodies 1, and the connecting mechanism 3 includes four reinforcement frames 15, and the four reinforcement frames 15 are respectively fixed on one side of the four first fixing frames 8, and the surfaces of the reinforcement frames 15 are fixedly connected with positioning frames 24, and connecting frames 6 are fixed between the multiple positioning frames 24 by bolts. The two tower main bodies 1 are supported by the connecting frame 6 to improve the stability of the tower main body 1.
[0055] In particular, the connecting frame 6 includes two T-shaped connecting plates 25, and the two connecting plates 25 are respectively fixed to the two positioning frames 24 on both sides by bolts. A double-layer middle plate 26 is arranged between the two connecting plates 25, and the middle plate 26 is respectively located on the upper side and the lower side of the connecting plate 25. A plurality of fixing bolts 27 are arranged between the middle plate 26 and the two connecting plates 25. The connecting plate 25 and the middle plate 26 are connected and fixed by a plurality of fixing bolts 27. The two connecting plates 25 are connected by the middle plate 26, and the distance between the two connecting plates 25 can be adjusted, thereby improving the flexibility of using the connecting mechanism 3.
[0056] It should be noted that Figure 6 The steel wire rope 21 at the left end is connected to the winch 16, and the right end is connected to the second hoist 22. An anti-slip mechanism 23 is set around the circumference of the second steel wire rope 21. The anti-slip mechanism 23 includes a limit frame 28. The limit frame 28 is fixed on the same floor as the winch 16. Two mounting shafts 29 are rotatably connected between the top and bottom of the limit frame 28. The circumferences of the two mounting shafts 29 are fixedly connected with clamps 30. The second steel wire rope 21 passes through the two clamps 30. The sides of the clamps 30 close to the second steel wire rope 21 are all inclined. A spring 31 is fixedly connected between the clamps 30 and the limit frame 28. When the steel corridor 2 slides down, the second steel wire rope 21 slides backward in the two clamps 30, and is then bitten by the two clamps 30 to avoid danger.
[0057] In the present invention, one side of the clamping plate 30 where the inclined surface is arranged is fixedly connected with a wear-resistant sheet 32 , and the wear-resistant sheet 32 is a steel plate.
[0058] In particular, a horizontal box 7 is fixedly connected to the top of the steel corridor 2 , and a horizontal sensor 33 is fixedly connected to the surface of the horizontal box 7 . The horizontal sensor 33 is a prior art and is used to sense the horizontal degree of the steel corridor 2 .
[0059] It should be noted that a ball 35 rolls on the bottom inner wall of the horizontal box 7, and a positioning groove 34 is provided on the bottom inner wall of the horizontal box 7 for use with the ball 35. When the ball 35 rolls to one end, it means that the steel corridor 2 is tilted, and when the ball 35 remains in the positioning groove 34, it means that the degree of inclination of the steel corridor 2 is within a reasonable range.
[0060] In the present invention, a guide assembly for guiding the first steel wire rope 10 is provided on the top of the first fixed frame 8, and the guide assembly includes a first support frame 12, and two pairs of limit plates 13 are fixedly connected to the surface of the first support frame 12, and a plurality of limit plates 13 are inserted between the plurality of limit plates 13. Nuts are threadedly connected at both ends of the limit screws 14. The two pairs of limit plates 13 respectively guide the first steel wire rope 10, which is convenient to use.
[0061] The present invention also provides a construction method for a lateral displacement prevention lifting device for a high-rise connected tower during construction, comprising the following steps:
[0062] S1: Two first fixing frames 8 are respectively fixed on one side of the two tower bodies 1, and then a hydraulic lifter 9 for hoisting is installed. After the installation is completed, a connecting plate 25 is placed between two positioning frames 24, and then fixed by bolts. The two connecting plates 25 are connected by an intermediate plate 26. The distance between the two connecting plates 25 can be adjusted to improve the flexibility of the connection mechanism 3. At the same time, the connection mechanism 3 is used to support the two tower bodies 1 to prevent the tower bodies 1 from tilting when the steel corridor 2 is hoisted;
[0063] S2: The steel corridor 2 located between the two tower bodies 1 is assembled above the podium, and then the first steel wire rope 10 and the first hoist 11 are lowered by the hydraulic lifter 9, and the first hoist 11 is hung under the steel corridor 2, and then the hydraulic lifter 9 is started to lift the steel corridor 2. After the steel corridor 2 is 20 centimeters off the ground, it is left to stand for 24 hours, and then the steel corridor 2 is lifted to the designed height and then welded;
[0064] S3: While the steel corridor 2 is being hoisted, the second steel wire rope 21 and the second hoisting device 22 are lowered by the hoisting machine 16, and the second hoisting device 22 is connected and fixed to the bottom of the steel corridor 2, and then the hoisting machine 16 is started during the process of lifting the steel corridor 2, and the hoisting machine 16 winds up the second steel wire rope 21, and the plurality of second steel wire ropes 21 are used to maintain the stability of the steel corridor 2 during the lifting process to avoid shaking due to the influence of wind;
[0065] S4: During the hoisting process, the second steel wire rope 21 passes between the two clamping plates 30. Since one side of the clamping plates 30 is smoothly arranged, the second steel wire rope 21 moves normally. At the same time, the clamping plates 30 keep in contact with the second steel wire rope 21 under the action of the spring 31. When the steel corridor 2 slides down, the second steel wire rope 21 slides backwards in the two clamping plates 30. Since a protruding wear-resistant sheet 32 is arranged on one side of the inclined surface of the clamping plates 30, friction occurs between the second steel wire rope 21 and the wear-resistant sheet 32 when the second steel wire rope 21 slides backwards. With the cooperation of the spring 31, the clamping plates 30 rotate around the installation shaft 29, so that the inclined surfaces of the clamping plates 30 are close to each other, biting the second steel wire rope 21, avoiding danger and improving the safety of hoisting.
[0066] S5: During the hoisting process, the level of the steel corridor 2 is monitored by the horizontal sensor 33, and the position of the ball 35 in the horizontal box 7 can be observed. When the ball 35 rolls to one end, it means that the steel corridor 2 is tilted, and when the ball 35 remains in the positioning groove 34, it means that the tilt degree of the steel corridor 2 is within a reasonable range.
[0067] Embodiment 2
[0068] refer to Figure 9-11 The present embodiment is improved on the first embodiment in that another connection mechanism 3 is provided between the two tower bodies 1. The connection mechanism 3 is composed of four reinforcement frames 15. The four reinforcement frames 15 are respectively fixed to one side of the four first fixing frames 8 to ensure their stability. Positioning frames 24 are fixedly connected to the surface of the reinforcement frames 15, and fixing plates 49 are fixed between the multiple positioning frames 24 by bolts. This design is to ensure the overall structural strength of the connection mechanism 3.
[0069] The two ends of the fixed plate 49 are respectively connected to the first channel steel 36 and the second channel steel 37 by U-shaped steel, and both parts can rotate relative to the fixed plate 49. The inner walls of the first channel steel 36 and the second channel steel 37 are welded with hooks 38 to facilitate subsequent lifting operations.
[0070] A first rectangular plate 41 is slidably mounted on the inner wall of the first channel steel 36, and a sliding groove 42 is provided on the top of the plate. The first channel steel 36 is also fixed with a sliding plate 40 by at least two bolts, the bottom of the sliding plate 40 is slidably connected to the top of the first rectangular plate 41, and the bolts penetrate the sliding groove 42, so that the first rectangular plate 41 can slide in the first channel steel 36.
[0071] At least two compression springs 39 are installed between the hook 38 and the first rectangular plate 41, and preferably a hydraulic buffer can also be installed. These springs will play an important role in subsequent operations. A fixing groove 45 is provided at a position of the first rectangular plate 41 near the second channel steel 37, and through holes 46 are provided on both side walls of the fixing groove 45. Positioning rods 44 slide in the through holes 46. The outer wall of the positioning rod 44 is sleeved with a tension spring 43, and the two ends of the tension spring 43 are respectively fixed to the first rectangular plate 41 and the positioning rod 44, and one end of the positioning rod 44 is spherical. Such a design allows the positioning rod 44 to slide in the through hole 46 and be pulled back to its original position by the tension spring 43 when needed.
[0072] A second rectangular plate 48 is fixedly installed on the inner wall of the second channel steel 37 by bolts, and positioning holes 47 are provided on both sides of the plate to match the positioning rods 44. The bottom of one end of the second rectangular plate 48 is an arc surface, and such a design makes it easier for the second rectangular plate 48 to be inserted into the fixing groove 45 during installation. When the second rectangular plate 48 is completely inserted into the fixing groove 45, its bottom will contact the bottom inner wall of the fixing groove 45.
[0073] When installing the connection mechanism 3, firstly, the first channel steel 36 is lifted by the crane and the hook 38, and then the fixing plate 49 is placed between the two positioning frames 24 and fixed by bolts. Next, the first channel steel 36 is slowly laid flat by the crane. Similarly, the second channel steel 37 is lifted by the crane and the hook 38, and the fixing plate 49 is placed between the two positioning frames 24, and then fixed by bolts, and the second channel steel 37 is slowly laid flat by the crane.
[0074] During the installation process, when the arc surface of the second rectangular plate 48 contacts the top wall of the fixing groove 45, the second rectangular plate 48 will push the first rectangular plate 41 to slide in the first channel steel 36 and compress the compression spring 39. As the second rectangular plate 48 continues to rotate horizontally, its bottom will contact the spherical parts of the two positioning rods 44 and squeeze the positioning rods 44, forcing them to slide outward, and at the same time stretching the tension spring 43. When the positioning hole 47 moves to align with the positioning rod 44, the tension spring 43 will drive the positioning rod 44 to insert into the positioning hole 47 to position it. At this time, the second channel steel 37 also rotates to a horizontal state, and the bottom of the second rectangular plate 48 also contacts the bottom inner wall of the fixing groove 45.
[0075] Through such an installation method, the two tower bodies 1 can be effectively squeezed, so that the lateral movement between the two tower bodies 1 is slowed down, thereby enhancing the overall stability.
[0076] Embodiment 3
[0077] refer to Fig.12 The improvement of this embodiment over the second embodiment is that positioning pins 51 are fixedly installed at the bottom of the first channel steel 36 and the second channel steel 37 by bolts. This design is to enable accurate positioning of the steel corridor 2 during the subsequent lifting process.
[0078] Two horizontal plates 50 are welded on the top of the steel corridor 2 to match the positioning pins 51. The horizontal plates 50 are provided with holes, and the size and position of the holes match the positioning pins 51. During the process of hoisting the steel corridor 2, the positioning pins 51 will be accurately inserted into the holes of the horizontal plates 50, so that the first channel steel 36 and the second channel steel 37 can be used to firmly position the steel corridor 2.
[0079] Through such a design, when the steel corridor 2 is hoisted to the predetermined position, it can maintain a stable posture, which greatly facilitates the subsequent installation of the steel corridor 2. In the whole process, the coordinated use of the positioning pins 51 and the cross plate 50 plays a key role, which ensures the stability and accuracy of the steel corridor 2 during the hoisting process.
[0080] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution, which should be included in the scope of the claims of the present invention.
Claims
1. A lifting device for preventing lateral displacement of high-rise connected towers during construction, characterized in that: include: Two lifting mechanisms (4) are respectively arranged on one side of the two tower bodies (1), and the four lifting mechanisms (4) are used to lift the steel corridor (2); The lifting mechanism (4) comprises a first fixing frame (8), the first fixing frame (8) being fixed to one side of the tower body (1), the surface of the first fixing frame (8) being fixedly connected to two hydraulic lifters (9) penetrating the first fixing frame (8), the output ends of the hydraulic lifters (9) being provided with first steel wire ropes (10), the bottoms of the two first steel wire ropes (10) being fixedly connected to the same first lifting device (11) for lifting the steel corridor (2); Two anti-deviation mechanisms (5) are provided on one side of the tower body (1), and the anti-deviation mechanism (5) includes a second support frame (17) and a winch (16). The second support frame (17) is fixed on one side of the tower body (1), and the top of the second support frame (17) is fixedly connected to a fixed frame (18). The fixed frame (18) is rotatably connected to a first guide roller (19) and a second guide roller (20). The first guide roller (19) and the second guide roller (20) are vertically arranged. The winch (16) is fixed on the surface of one layer of the tower body (1), and a second steel wire rope (21) is provided at the output end of the winch (16). The bottom of the second steel wire rope (21) is fixedly connected to a second sling (22) connected to the steel corridor (2); The top of the steel corridor (2) is fixedly connected to a horizontal box (7), the surface of the horizontal box (7) is fixedly connected to a horizontal sensor (33), a ball (35) rolls on the bottom inner wall of the horizontal box (7), and a positioning groove (34) used in conjunction with the ball (35) is provided on the bottom inner wall of the horizontal box (7); A connection mechanism (3) for maintaining the stability of the tower main body (1) is arranged between the two tower main bodies (1). The connection mechanism (3) comprises four reinforcement frames (15). The four reinforcement frames (15) are respectively fixed to one side of four first fixing frames (8). The surfaces of the reinforcement frames (15) are fixedly connected to positioning frames (24). A fixing plate (49) is fixed between the plurality of positioning frames (24) by bolts. One end of the two fixing plates (49) close to each other is rotatably connected to a first channel steel (36) and a second channel steel (37) by U-shaped steel. The inner walls of the first channel steel (36) and the second channel steel (37) are both welded with a hook (38). A first rectangular plate (41) is slidably mounted on the inner wall of the first channel steel (36). A sliding groove (42) is arranged on the top of the first rectangular plate (41). A sliding plate (40) is fixedly mounted on the first channel steel (36) by at least two bolts. The bottom of the sliding plate (40) is slidably connected to the top of the first rectangular plate (41). The bolts penetrate the sliding groove (42). A groove (42) is formed between the hook (38) and the first rectangular plate (41), at least two compression springs (39) are installed between the hook (38) and the first rectangular plate (41), a fixing groove (45) is provided at a position close to the second channel steel (37) on the first rectangular plate (41), through holes (46) are provided on both side walls of the fixing groove (45), positioning rods (44) slide in the through holes (46), and tension springs (43) are provided on the outer wall of the positioning rod (44), and the two ends of the tension spring (43) are respectively fixed to the first rectangular plate (41). and a positioning rod (44), one end of the positioning rod (44) is spherical, a second rectangular plate (48) is fixedly mounted on the inner wall of the second channel steel (37) by bolts, both sides of the second rectangular plate (48) are provided with positioning holes (47) matching with the positioning rod (44), the bottom of one end of the second rectangular plate (48) is an arc surface, the second rectangular plate (48) is clamped in the fixing groove (45), and the bottom of the second rectangular plate (48) is in contact with the bottom inner wall of the fixing groove (45).
2. The device for preventing lateral displacement of high-rise connected towers during construction according to claim 1 is characterized in that: The circumference of the second steel wire rope (21) is provided with an anti-slip mechanism (23), the anti-slip mechanism (23) comprises a limit frame (28), the limit frame (28) is fixed on the same floor as the winch (16), two installation shafts (29) are rotatably connected between the top and bottom of the limit frame (28), the circumference of the two installation shafts (29) are fixedly connected with clamping plates (30), the second steel wire rope (21) passes between the two clamping plates (30), the side of the clamping plates (30) close to the second steel wire rope (21) is an inclined surface, and a spring (31) is fixedly connected between the clamping plates (30) and the limit frame (28).
3. The device for preventing lateral displacement of high-rise connected towers during construction according to claim 2 is characterized in that: A wear-resistant sheet (32) is fixedly connected to one side of the clamping plate (30) where the inclined surface is arranged.
4. The device for preventing lateral displacement of high-rise connected towers during construction according to claim 3 is characterized in that: A guide assembly for guiding the first steel wire rope (10) is arranged at the top of each of the first fixing frames (8), the guide assembly comprising a first support frame (12), two pairs of limit plates (13) being fixedly connected to the surface of the first support frame (12), a limit screw (14) penetrating between the plurality of limit plates (13), and nuts being threadedly connected to both ends of the limit screw (14).
5. The device for preventing lateral displacement of high-rise connected towers during construction according to claim 4 is characterized in that: The bottoms of the first channel steel (36) and the second channel steel (37) are both fixed with positioning pins (51) by bolts, and the top of the steel corridor (2) is welded with two transverse plates (50) that match the positioning pins (51), and the transverse plates (50) are provided with holes, and the positioning pins (51) are inserted into the holes.
6. A construction method for a high-rise connected tower anti-lateral shift lifting device during construction according to claim 5, characterized in that: The following steps are involved: S1: Two first fixing frames (8) are respectively fixed on one side of the two tower bodies (1), and then a hydraulic lifter (9) for lifting is installed. After the installation is completed, a connecting mechanism (3) is used to support the two tower bodies (1) to prevent the tower bodies (1) from tilting when the steel corridor (2) is lifted; S2: The steel corridor (2) located between the two tower bodies (1) is assembled above the podium, and then the first steel wire rope (10) and the first sling (11) are lowered by the hydraulic lifter (9), and the first sling (11) is hung below the steel corridor (2). Then, the hydraulic lifter (9) is started to lift the steel corridor (2). After the steel corridor (2) is 20 centimeters off the ground, it is left to stand for 24 hours, and then the steel corridor (2) is lifted to the designed height and then welded; S3: while the steel corridor (2) is being hoisted, the second steel wire rope (21) and the second hoisting device (22) are lowered by the winch (16), and the second hoisting device (22) is connected and fixed to the bottom of the steel corridor (2), and then, during the process of lifting the steel corridor (2), the winch (16) is started, and the winch (16) winds up the second steel wire rope (21), and the plurality of second steel wire ropes (21) are used to maintain the stability of the steel corridor (2) during the lifting process, so as to avoid shaking due to wind. S4: When the steel corridor (2) slides downward, the second steel wire rope (21) slides backward inside the two clamping plates (30) and is then caught by the two clamping plates (30), thereby avoiding danger and improving the safety of hoisting. S5: During the hoisting process, the level of the steel corridor (2) is monitored by the level sensor (33), and the position of the ball (35) in the level box (7) is observed. When the ball (35) rolls to one end, it means that the steel corridor (2) is tilted, and when the ball (35) remains in the positioning groove (34), it means that the degree of inclination of the steel corridor (2) is within a reasonable range.
Citation Information
Patent Citations
Emergency disposal equipment and use method thereof for integral lifting aerial corridor between ultra-high group towers
CN111764498A
Conjoined structure lifting device for preventing tower from laterally moving and lifting method of conjoined structure lifting device
CN114961297A