A ground fault line identification method, system, device and storage medium
Through the method based on dynamic phase current alignment and Topsis evaluation model, the rapid and accurate identification of single-phase grounding fault lines is achieved, and the problems of poor flexibility and high cost in the existing technology are solved, and a scientific and practical grounding is provided. Line identification method is suitable for troubleshooting of distribution network dispatchers.
Patent Information
- Application Number
- CN202411179085.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-08-27
AI Technical Summary
The existing single-phase grounding fault identification methods are poorly flexible, costly and have high requirements for automation systems, which leads to dispatchers being prone to errors when trying to pull the lines, and the line selection device is aging and parameter updates are not timely, affecting the identification accuracy.
Using a method based on dynamic phase current comparison, the grounding line test pull-in bit table is pre-generated to record the time of the fault phase current occurrence, generate the maximum value of the fault phase current mutation, and comprehensively sort and priority evaluation are carried out based on the Topsis evaluation model. Judgment and try to pull the faulty line to avoid relying on line selection devices and historical data maintenance.
It realizes efficient, fast and accurate fault line identification without relying on line selection devices, reduces the test pull error rate, improves flexibility and real-timeness, reduces costs, and avoids inaccurate line selection results or no line selection .
Smart Images

Figure CN118688579B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of single-phase ground fault line identification, and in particular to a ground fault line identification method, system, device and storage medium. Background Art
[0002] The distribution network is the link that directly supplies power to users. The safety and reliability of its operation is directly related to the quality of electricity consumption of users. Therefore, it is very important to improve the reliability of distribution network operation. Single-phase grounding fault is a common fault type in distribution networks. Distribution networks are mostly small current grounding systems. During single-phase grounding faults, the fault current is small, the line voltage remains unchanged, and it does not affect the power consumption of users. Generally, it is allowed to operate with faults for 1-2 hours. However, continuous grounding will bring harm to the operation of the distribution network. On the one hand, during grounding, the non-fault phase voltage will rise to the line voltage. If there are weak points in the insulation of the distribution line, it is easy to cause breakdown damage. In severe cases, it may cause phase-to-phase short circuit and cause the entire line to trip. On the other hand, if the capacitive current of the distribution line is large, it is easy to cause intermittent arc grounding overvoltage during grounding. The voltage value can reach up to 3.5 times the phase voltage, and it lasts for a long time and spreads throughout the entire system. In severe cases, it will cause large-scale power outages. Therefore, it is extremely important to quickly handle single-phase grounding faults.
[0003] When a single-phase grounding fault occurs in the distribution network of a low-current grounding system, the protection will not trip, and the on-duty dispatcher will be reminded to isolate the fault by sending a grounding alarm signal. At present, the dispatcher mainly uses the short-term power outage method, that is, isolating the grounding point by testing the line. In order to ensure accurate, fast and efficient testing of the fault line and avoid the expansion of the power outage range due to the mistaken pulling of the non-fault line, most substations are equipped with line selection devices to ensure that the fault line can be accurately identified after grounding and the line information can be given. At present, the line selection device mainly uses the following methods to identify the fault line:
[0004] 1. Fault steady-state information line selection method:
[0005] The steady-state information line selection method mainly selects fault lines based on the steady-state characteristics after the fault occurs, including methods based on zero-sequence active power, zero-sequence current, zero-sequence voltage, harmonics, etc. Among them, the zero-sequence current method is a commonly used method, which mainly uses the characteristic that the zero-sequence current amplitude of the fault line is much larger than that of the non-fault line to identify the fault line;
[0006] 2. Fault transient information line selection method:
[0007] The transient information line selection method mainly selects lines based on the transient characteristics after a fault. It is specifically divided into the first half-wave method, the traveling wave method, and the transient line selection method based on wavelet transform. This method is less affected by the compensation effect of the arc suppression coil and has a high judgment accuracy, but it has high requirements on sampling accuracy and hardware equipment, and has a high cost of use.
[0008] 3. Injection signal method:
[0009] The injection signal method is to use a voltage transformer to inject a specific current signal into the grounding line after a fault occurs, or to send a variable frequency constant current signal to enable the protection device to obtain obvious fault characteristics and thus identify the fault line.
[0010] In actual operation, most of the above methods have problems of inaccurate or no line selection due to reasons such as aging of line selection equipment, untimely parameter updates, easy changes in distribution line structure, and harsh on-site environment. Therefore, in order to reduce the error rate of line pulling test, dispatchers urgently need a grounding line identification method that does not rely on line selection devices to guide line pulling test.
[0011] At present, some scholars have studied the grounding line identification method and given trial pull suggestions. A document proposed a distribution network line pulling ranking table based on line status evaluation optimization. By statistically analyzing the overhead line proportion, line length, number of switchgear and other attributes of the distribution line, the line status is scored to form a pulling ranking table to guide the trial pull. However, the document did not give a specific scoring method and lacked guiding significance. In addition, the distribution line has the characteristics of large number and frequent changes in structural parameters. The accuracy of the ranking table depends on the timely maintenance of a large amount of data. Some scholars proposed a grounding fault location method based on the phase current mutation waveform. The fault line is identified by the phase current mutation size and its change rate. However, this method requires the installation of a special detection device, and has high requirements for sampling accuracy, and the required cost and communication channel quality are high.
[0012] Therefore, there is an urgent need for a grounding line identification method, system, device and storage medium based on dynamic comparison of phase currents to solve the above problems. Summary of the invention
[0013] The object of the present invention is to provide a ground fault line identification method, system, device and storage medium, which can effectively solve the problems of poor flexibility, high cost and high requirements for automation system in existing methods.
[0014] In order to achieve the above object, the present invention is implemented through the following technical solutions:
[0015] In one aspect, the present invention provides a method for identifying a ground fault line, comprising the following steps:
[0016] S1: pre-generate a ground line test pull-down sequence table;
[0017] S2: Sequence the grounding test lines according to the generated sequence table and record the time when the fault phase current occurs;
[0018] S3: Generate the maximum value of the fault phase current mutation according to the time when the fault phase current occurs;
[0019] S4: judging the ground fault line according to the maximum value of the fault phase current mutation;
[0020] S5: If the line is determined to be a faulty line, the line is pulled for a test; if the line is determined to be a non-faulty line, the line is pulled for a test according to a test sequence.
[0021] Preferably, the pre-generated grounding line test pull-out ranking table in step S1 is specifically as follows: the ranking table performs test pull-out experience ranking on the 10kV outgoing line of the busbar where the grounding signal is located, and names the lines in order. .
[0022] Preferably, the ordering of the test pull lines follows the following principles:
[0023] The line with fault symbol or low current grounding line selection alarm is the first priority in the test pull sequence;
[0024] The no-load standby line is the second priority in the test sequence;
[0025] For other 10kV outgoing lines except those in the first and second priority test sequences, a comprehensive ranking is performed based on the Topsis evaluation model according to their evaluation indicators.
[0026] Preferably, the evaluation indicators include: the number of important users served by the line, the line load size, the proportion of overhead lines, the number of historical failures in the past two years, the line length and the number of construction projects in the line corridor.
[0027] Preferably, the comprehensive ranking based on the Topsis evaluation model includes the following steps:
[0028] S101: Construct a test pull priority evaluation matrix and perform standardized calculations;
[0029] S102: performing weighted calculation on the constructed test pull priority evaluation matrix;
[0030] S103: Determine the priority of the grounding test according to the calculation result.
[0031] Preferably, the construction of the test pull priority evaluation matrix in step S101 is specifically as follows: except for the other 10kV outgoing line lines in the first and second priority test pull sequences, the other 10kV outgoing line lines are recorded as According to the evaluation indicators, a priority evaluation matrix is constructed:
[0032]
[0033] in, It is the value of each evaluation index corresponding to each 10kV outgoing line.
[0034] Preferably, the standardized calculation in step S101 includes: standardized calculation of extremely large evaluation indicators and standardized calculation of extremely small evaluation indicators. The extremely large evaluation indicators include: the proportion of overhead lines, the number of historical failures in the past two years, the line length and the number of construction projects in the line corridor; the extremely small evaluation indicators include: the number of important users carried by the line and the size of the line load.
[0035] Preferably, the standardized calculation of the extremely large evaluation index is specifically as follows:
[0036]
[0037] The standardized calculation of the extremely small evaluation index is specifically as follows:
[0038]
[0039] in, It is the standardized value of each 10kV outgoing line under each evaluation index.
[0040] Preferably, the weighted calculation of the constructed test pull priority evaluation matrix in step S102 includes:
[0041] By comparing two by two, the importance of each evaluation index is determined, and the comparison judgment matrix is calculated;
[0042] The obtained judgment matrix is checked for consistency, and the constructed test pull priority evaluation matrix is weighted.
[0043] Preferably, determining the priority of the grounding test in step S103 includes:
[0044] According to the obtained test pull priority evaluation weighted matrix, the optimal solution and the worst solution in the Euclidean space are calculated;
[0045] According to the optimal solution and the worst solution in the Euclidean space, the weighted evaluation value of the test pull priority of each 10kV outgoing line is calculated, and the Euclidean distance between the optimal solution and the worst solution is calculated, and the quality of the test pull priority of each 10kV outgoing line is evaluated;
[0046] Calculate the relative closeness of the weighted evaluation values of the test pull priority of each 10kV outgoing line.
[0047] Preferably, the step S2 is specifically: setting the grounding test line number according to the generated sequence table is 1, the fault phase current comparison starts at The time when the fault occurred .
[0048] Preferably, the step S3 is specifically as follows: according to the time when the fault phase current occurs, the current comparison start time is obtained 、Total number of 10kV outgoing lines And the instantaneous value curve of fault phase current of 10kV outgoing line , and generate the maximum value of the fault phase current mutation, which is recorded as and the line number where it is located .
[0049] Preferably, the step S4 is specifically: comparing the maximum value of the fault phase current mutation Current mutation threshold ,
[0050] like , then determine If it is a faulty line, jump to step S5. Conduct a test pull;
[0051] like , then determine If the line is not faulty, jump to step S5 and try to pull the line according to the traditional test sequence. .
[0052] Preferably, it also includes:
[0053] S6: If the grounding signal disappears after the pull test, the pull test is successful and the judgment process ends;
[0054] If the grounding signal does not disappear after the test pull, the line is still grounded. The grounding test pull line number is increased by 1, and the line test pull time is assigned as the starting value of the phase current dynamic comparison module time interval. Then jump to step S3 and continue to judge and test until the grounding signal is restored.
[0055] On the other hand, a ground fault line identification system is also provided, comprising:
[0056] The grounding test line experience ranking module is used to: pre-generate a grounding line test ranking table and sort the test lines;
[0057] The phase current dynamic comparison module is used to generate the maximum value of the fault phase current mutation according to the time when the fault phase current occurs;
[0058] Ground fault line determination module: determines the ground fault line according to the maximum value of the fault phase current mutation.
[0059] On the other hand, a ground fault line identification device is also provided, comprising a processor and a memory for storing a computer program, wherein when the processor executes the computer program, the steps of any one of the above methods are implemented.
[0060] On the other hand, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by one or more processors, the steps of any one of the above methods are implemented.
[0061] Compared with the prior art, the beneficial effects of the present invention are:
[0062] 1. The present invention proposes a fault line identification method based on phase current dynamic comparison results suitable for distribution network dispatchers to handle single-phase grounding faults, designs a phase current dynamic comparison calculation module, and provides a fault line judgment threshold calculation method, providing a scientific and practical grounding line identification method for dispatchers. The method does not rely on the maintenance of historical data, has good flexibility, high real-time performance, high judgment efficiency and fast speed, and the fault line can be pulled out in one or two rounds of trial pulling;
[0063] 2. Traditional schemes mostly use line test-pulling ranking tables as the basis for line priority test-pulling. However, most existing ranking table methods do not provide a clear ranking calculation method. The present invention provides a ranking calculation method for test-pulling lines based on the Topsis evaluation model, which guides the test-pulling in a scientific and efficient manner, has good generalizability, and is easy to apply.
[0064] 3. The implementation of some existing grounding line identification technologies requires the installation of special detection devices, and has high requirements for sampling accuracy, high cost and high requirements for communication channel quality. This method is based on the line phase current data that is easily obtained through telemetry, does not require the installation of additional detection devices, has low cost, and is easy for dispatchers to check and use immediately;
[0065] 4. Most traditional methods use line selection results as the main basis for grounding line identification. However, due to equipment aging, untimely parameter updates, and other reasons, most existing line selection devices have problems with inaccurate line selection or no line selection. This method does not rely on line selection results, and can effectively avoid erroneous pull-ups when line selection results are inaccurate or no line selection is available. BRIEF DESCRIPTION OF THE DRAWINGS
[0066] Figure 1 is a flow chart of the method of the present invention;
[0067] Figure 2 is a calculation logic diagram of the method of the present invention;
[0068] Figure 3 It is a calculation flow chart of the grounding test line experience sorting module of the present invention;
[0069] Figure 4 It is a calculation flow chart of the phase current dynamic comparison module of the present invention;
[0070] Figure 5It is a wiring diagram of a distribution network in which the neutral point is grounded via an arc suppression coil during a single-phase grounding fault of the present invention;
[0071] Figure 6 It is a schematic diagram of the system structure of the present invention. DETAILED DESCRIPTION
[0072] The present invention will be further described below in conjunction with specific embodiments. It should be understood that these embodiments are only used to illustrate the present invention and are not intended to limit the scope of the present invention. In addition, it should be understood that after reading the content taught by the present invention, those skilled in the art can make various changes or modifications to the present invention, and these equivalent forms fall within the scope limited by the application equally.
[0073] In the present invention, terms such as "upper", "lower", "left", "right", "front", "back", "vertical", "horizontal", "side", "bottom", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings. They are relational words determined only for the convenience of describing the structural relationships of the various parts or elements of the present invention, and do not specifically refer to any part or element in the present invention and should not be understood as limitations on the present invention.
[0074] In the present invention, terms such as "fixed connection", "connected", "connection", etc. should be understood in a broad sense, indicating that it can be fixedly connected, integrally connected or detachably connected; it can be directly connected or indirectly connected through an intermediate medium. Relevant scientific research or technical personnel in this field can determine the specific meanings of the above terms in the present invention according to specific circumstances, and they should not be understood as limiting the present invention.
[0075] Embodiment 1:
[0076] A ground fault line identification method, such as Figure 1 As shown, the following steps are included:
[0077] S1: pre-generate a ground line test pull-down sequence table;
[0078] S2: Sequence the grounding test lines according to the generated sequence table and record the time when the fault phase current occurs;
[0079] S3: Generate the maximum value of the fault phase current mutation according to the time when the fault phase current occurs;
[0080] S4: judging the ground fault line according to the maximum value of the fault phase current mutation;
[0081] S5: If the line is determined to be a faulty line, the line is pulled for a test; if the line is determined to be a non-faulty line, the line is pulled for a test according to a test sequence.
[0082] The specific process is as follows Figure 2As shown in the figure, the pre-generated grounding line test pull ranking table sorts the 10kV outgoing line of the busbar where the grounding signal is located by test pull experience, and names the lines in order. According to the dispatching regulations, the following principles shall be followed in order to sort the test lines:
[0083] The line with fault symbol or low current grounding line selection alarm is the first priority in the test pull sequence;
[0084] The no-load standby line is the second priority in the test sequence;
[0085] For other 10kV outgoing lines except those in the first and second priority test sequences, a comprehensive ranking is performed based on the Topsis evaluation model according to their evaluation indicators.
[0086] The Topsis method, or the superior-inferior solution distance method, is a comprehensive evaluation method that gives the superiority of the evaluation object by detecting the Euclidean distance between the evaluation object and the optimal solution and the worst solution. In this embodiment, based on the Topsis evaluation model, the priority of the test pull of each 10kV outgoing line under the same bus is evaluated to obtain the line test pull sequence.
[0087] The calculation steps are as follows:
[0088] S101: Construct a test pull priority evaluation matrix and perform standardized calculations.
[0089] Specifically: for For each 10kV outgoing line, the number of important users (evaluation index 1), line load size (evaluation index 2), overhead line ratio (evaluation index 3), number of historical faults in the past two years (evaluation index 4), line length (evaluation index 5), and number of construction works in the line corridor (evaluation index 6) are selected as indicators for evaluating the priority of each line test, and a priority evaluation matrix is constructed:
[0090] (1)
[0091] in, is the value of each evaluation index corresponding to each 10kV outgoing line,
[0092] Standardized calculation can eliminate the numerical dimension and convert the numerical value into a dimensionless value that is convenient for weighted comparison. Among the above evaluation indicators, the proportion of overhead lines, the number of historical faults in the past two years, the line length, and the number of constructions are extremely large indicators, and the importance of the users and the line load size are extremely small indicators. Different standardized calculation methods correspond to different indicator types:
[0093] Standardized calculation of extremely large evaluation indicators, specifically:
[0094] (2)
[0095] Standardized calculation of extremely small evaluation indicators, specifically:
[0096] (3)
[0097] in, It is the standardized value of each 10kV outgoing line under each evaluation index.
[0098] S102: Perform weighted calculation on the constructed test pull priority evaluation matrix.
[0099] Specifically:
[0100] Since the importance of each evaluation index is different, and thus the corresponding weight is also different, in this embodiment, the priority judgment of the grounding test needs to consider decision-making and experience factors such as user importance and historical fault frequency, so the analytic hierarchy process (AHP) is used to determine the weight of each evaluation index:
[0101] First, the importance of each evaluation index is determined by pairwise comparison. The comparison results are quantified according to Table 1, and the comparison judgment matrix is calculated, as shown in formula (4):
[0102] Table 1 Scale table of AHP
[0103]
[0104] (4)
[0105] in, Evaluation index Relative to the evaluation index According to the importance of, the weights of each evaluation index after normalization can be calculated according to formula (5) and formula (6):
[0106] (5)
[0107] , (6)
[0108] in, Representation Matrix Middle Line The elements of the column, Representation Matrix Middle The element in row and column 1, Representation Matrix Middle The element in row and column 1, For evaluation indicators The weight of .
[0109] The weight of each evaluation indicator is: The weight of the number of important users is 0.4185, the line load weight is 0.085, the overhead line ratio weight The weight of the number of historical failures in the past two years is 0.1926. is 0.1926, the line length weight The weight of the construction quantity in the line corridor is 0.0782. is 0.0331;
[0110] Secondly, a consistency check is performed and the maximum feature value of the comparison judgment matrix is calculated according to formula (7):
[0111] , (7)
[0112] According to the above formula, the maximum feature value is 6.2304. According to formula (8), the consistency index is calculated :
[0113] , (8)
[0114] Average random consistency index The values are shown in Table 2. The consistency ratio can be calculated by taking the value and formula (9) :
[0115] Table 2 Average random consistency index Value table
[0116]
[0117] (9)
[0118] Calculated consistency ratio It is 0.03716, which is less than the consistency check threshold of 0.1. Therefore, the weight given in this embodiment has satisfactory consistency. According to the evaluation index weight, the priority evaluation weight matrix can be calculated according to formula (10);
[0119] (10)
[0120] S103: Determine the priority of the grounding test according to the calculation result.
[0121] Specifically:
[0122] After obtaining the priority evaluation weighted matrix, the optimal solution and the worst solution in the Euclidean space can be calculated according to equations (11) and (12).
[0123] Optimal solution: (11)
[0124] Optimal solution: (12)
[0125] According to formula (13) and formula (14), the weighted evaluation value of each 10kV outgoing line test priority and the Euclidean distance between the optimal solution and the worst solution are calculated to evaluate the quality of the 10kV line test priority:
[0126] , (13)
[0127] , (14)
[0128] According to formula (15), the relative closeness of the weighted evaluation value of the test pull priority of each 10kV outgoing line is calculated as:
[0129] , (15)
[0130] Relative proximity of 10kV outgoing lines The larger the value is, the better the evaluation result is and the higher the priority of the line test. The 10kV outgoing lines are sorted according to the relative proximity calculation results to form a grounding test ranking table. The specific process is as follows: Figure 3 shown.
[0131] Step S2, specifically: set the grounding test line number according to the generated sequence table is 1, the fault phase current comparison starts at The time when the fault occurred .
[0132] Step S3, such as Figure 4 As shown, specifically: according to the time when the fault phase current occurs, the current comparison starting time is obtained 、Total number of 10kV outgoing lines And the instantaneous value curve of fault phase current of 10kV outgoing line , and generate the maximum value of the fault phase current mutation, which is recorded as and the line number where it is located , Figure 4 In which k is the line number, For the current moment, For line exist The maximum value of the fault phase current during the period, For line exist The fault phase current value at the moment;
[0133] For a distribution network with a neutral point grounded through an arc suppression coil, during a single-phase grounding fault, the fault phase current of the fault line will increase suddenly to varying degrees depending on the compensation degree of the arc suppression coil, while the three-phase current of the non-fault line will not change significantly. Therefore, this embodiment uses the maximum sudden change of the fault phase current as the basis for fault line identification. The wiring diagram of a distribution network with a neutral point grounded through an arc suppression coil after a single-phase grounding fault occurs is shown in the attached figure. Figure 5 As shown, a phase C ground fault occurs in line 2;
[0134] Attached Figure 5 middle, , , is the three-phase electromotive force of the power supply, is the arc suppression coil inductance, line 1 is a non-fault line, , , is the three-phase capacitance of line 1 to ground, , , is the load impedance of line 1; line 2 is the non-fault line, , , is the three-phase to ground capacitance of line 2, , , is the load impedance of line 2, where the capacitance of each line relative to ground can be considered to be approximately equal, and their values are ;
[0135] In order to analyze the phase current variation characteristics before and after the line fault, according to the attached Figure 5 , list the expressions of each phase current of line 1 and 2 before and after the fault:
[0136] The expression of the three-phase current at the outgoing end of line 1 (non-fault line) before a single-phase grounding fault is:
[0137] (16)
[0138] (17)
[0139] (18)
[0140] The expression of the three-phase current at the outgoing end of line 2 (fault line) before a single-phase grounding fault is:
[0141] (19)
[0142] (20)
[0143] (twenty one)
[0144] in," " represents the electrical quantity before the single-phase grounding fault, , , , , , is the current of each phase at the outgoing terminal of lines 1 and 2, , , , , , is the capacitance current of lines 1 and 2 relative to ground, , , , , , is the load current of each phase of lines 1 and 2, is the system neutral point offset voltage;
[0145] After a single-phase grounding fault, the three-phase current expression at the outgoing end of line 1 (non-fault line) is:
[0146] (twenty two)
[0147] (twenty three)
[0148] (twenty four)
[0149] After a single-phase grounding fault, the three-phase current expression at the outgoing end of line 2 (fault line) is:
[0150] (25)
[0151] (26)
[0152] (27)
[0153] in, is the single-phase grounding current. Before and after the fault, since the line voltage remains unchanged, the load current does not change. The current changes of each phase of lines 1 and 2 before and after the fault are:
[0154] (28)
[0155] (29)
[0156] (30)
[0157] (31)
[0158] (32)
[0159] (33)
[0160] Among them, it can be considered that the system is operating in a three-phase balanced state before the fault. is 0; after the ground fault occurs, the C phase voltage drops to 0, so for- .
[0161] According to formulas (28)-(32), after a single-phase grounding fault occurs, the non-fault phase current mutations of the non-fault line and the fault line are both single-phase capacitive currents to ground, and the amplitudes of the mutations are small and equal; according to formula (33), the fault phase current mutation of the fault line is the sum of the capacitive current to ground and the grounding current;
[0162] According to the attached Figure 5 It can be seen that after a single-phase grounding fault, the current flowing into the grounding point includes the ground capacitance current of the non-fault phase of all outgoing lines of the 10kV busbar and the current entering the ground through the arc suppression coil on the power supply side. The grounding current expression is:
[0163] (34)
[0164] in, is the current entering the ground through the arc suppression coil on the power supply side. Therefore, the sudden change of the fault phase current of the fault line before and after the fault is:
[0165] (35)
[0166] According to formula (35), the sudden change of the fault phase current of the fault line is related to the compensation degree of the arc suppression coil:
[0167] When the arc suppression coil cannot compensate the capacitive current well, the fault phase current mutation of the fault line is larger than that of the non-fault line. Therefore, the maximum fault phase current mutation can be used as the basis for fault line identification. When the arc suppression coil can compensate the capacitive current well, the fault phase current mutation of the fault line is small, and its amplitude is close to the ground capacitance current, which is basically consistent with the fault phase current mutation of the non-fault line. It is difficult to identify the fault line. At this time, the line needs to be tested according to the traditional line test sequence. After the test, the fault phase current mutation of the fault line will increase, while the fault phase current mutation of the non-fault line remains unchanged. At this time, the maximum fault phase current mutation can still be used as the basis for fault line identification.
[0168] Therefore, by traversing all 10kV lines through the phase current dynamic comparison module, the line number and mutation amount of the fault phase current with the largest sudden increase after the single-phase grounding fault occurs are obtained, which can be used as the basis for effectively identifying the fault line.
[0169] Step S4 is specifically:
[0170] Compare the maximum value of the fault phase current mutation Current mutation threshold ,like Greater than , then determine If it is a faulty line, jump to step 5; Less than , then determine If it is a non-fault line, jump to step 5;
[0171] in, The calculation method of is as follows:
[0172] (36)
[0173] The range of the fault phase current mutation of the fault line is analyzed. According to formula (35), the amplitude of the fault phase current mutation of the fault line is:
[0174] (37)
[0175] It can be seen that the sudden change of the fault phase current of the fault line is related to the power supply voltage amplitude, the number of 10kV outgoing lines, the line-to-ground capacitance, and the inductance of the arc suppression coil. The arc suppression coil is a compensation device for a small current grounding system. When a single-phase grounding fault occurs, it can generate an inductive current to compensate for the capacitive current flowing into the grounding point, so that the grounding current is lower than the current value required to maintain the arc, thereby achieving the effect of arc extinguishing. According to formula (34), the degree of arc suppression coil compensation for capacitive current is generally divided into the following three cases:
[0176] Full compensation:
[0177] when When the ground current is compensated to 0, it is fully compensated and the detuning degree is defined as:
[0178] (38)
[0179] at this time ;
[0180] Overcompensation:
[0181] when When the ground current is compensated to be inductive, it is over-compensated. ;
[0182] Under-compensation:
[0183] when When the ground current is compensated to be inductive, it is over-compensated. ;
[0184] At present, all substations in operation that are grounded through arc suppression coils use the automatic search function of the arc suppression coil automatic tuning device to determine the coil compensation degree. The arc suppression coil automatic tuning device can automatically search the system capacitance value to determine the arc suppression coil inductance value, so that after a single-phase grounding fault occurs, the fault capacitance current can be effectively compensated. Generally, before the grounding fault occurs, the arc suppression coil inductance value is pre-adjusted under normal system operation to form a slightly over-compensated state with the grid-to-ground capacitance.
[0185] The arc suppression coil automatic tuning device adjusts the inductance in the following way:
[0186] The reactance of the arc suppression coil corresponding to a certain tap is known, but the system capacitive reactance level Unknown, the automatic tuning device changes the tap position of the arc suppression coil and measures the corresponding tap and Neutral point voltage and And the phase angle difference between them , the actual power grid can be calculated based on the known reactance ;
[0187] Ignoring the losses in the power grid, the corresponding tap and of and There are the following relations:
[0188] (39)
[0189] In the formula, and Corresponding tap and The arc suppression coil inductance level, is the system capacitance level, according to the above formula:
[0190] (40)
[0191] In summary, the arc suppression coil and adjustment steps under normal operating conditions are:
[0192] (1) Change the tap position by one gear;
[0193] (2) Measure the neutral point voltage and the current flowing through the arc suppression coil before and after the tap change;
[0194] (3) Calculate the three-phase-to-ground capacitive reactance of the system according to formula (40), and calculate the grid detuning degree corresponding to the current gear according to formula (38);
[0195] (4) Continue to adjust the tap position until the calculated detuning degree meets the detuning degree setting threshold;
[0196] After a ground fault occurs, in order to avoid damage to the arc suppression coil and its accessories, even if the operating state changes, before the ground fault is isolated, the tuning device will no longer adjust the arc suppression coil position, and the arc suppression coil inductance will remain at the value before the ground fault occurs, that is, the arc suppression coil detuning degree will not change before and after the fault;
[0197] According to formula (30), the sudden change of the fault phase current of the non-fault line during the fault period is:
[0198] (41)
[0199] According to formula (37), the sudden change of the fault phase current of the fault line during the fault period is
[0200] (42)
[0201] Therefore, when the arc suppression coil works in overcompensation ( ;) and under-compensation and When , the fault phase current mutation of the fault line is significantly greater than the fault phase current mutation of the non-fault line. In order to avoid judging the non-fault line as the fault line, let , when the arc suppression coil works in full compensation and under compensation and When the fault phase current mutation of the fault line is smaller than that of the non-fault line, the maximum fault phase current mutation cannot be used as the criterion for the fault line. In this case, the test pull sequence table needs to be called to perform a round of test pull on the 10kV outgoing line. After the test pull, due to constant, becomes larger, so Reduce, when When it is reduced to the over-compensation working range, the maximum fault phase current mutation can still be used as the criterion for the fault line, and formula (43) can be used as the judgment threshold;
[0202] In order to avoid system resonance caused by line power outage, arc suppression coils are usually set to work in an over-compensated state. Even if the arc suppression coil works in an under-compensated state, the detuning degree is small. By testing one line, the arc suppression coil can be easily returned to the over-compensated working range. Therefore, using formula (43) as the judgment threshold can effectively avoid misjudgment and accurately identify the faulty line in 1-2 rounds of test cycles.
[0203] S6: If the grounding signal disappears after the pull test, the pull test is successful and the judgment process ends;
[0204] If the grounding signal does not disappear after the test pull, the line is still grounded. The grounding test pull line number is increased by 1, and the line test pull time is assigned as the starting value of the phase current dynamic comparison module time interval. Then jump to step S3 and continue to judge and test until the grounding signal is restored.
[0205] like Figure 6 As shown, this embodiment also provides a ground fault line identification system, including:
[0206] The grounding test line experience ranking module is used to: pre-generate a grounding line test ranking table and sort the test lines;
[0207] The phase current dynamic comparison module is used to: generate the maximum value of the fault phase current mutation according to the time when the fault phase current occurs;
[0208] Ground fault line determination module: Determine the ground fault line according to the maximum value of the fault phase current mutation.
[0209] Embodiment 2:
[0210] In this embodiment, taking the 10kV#1 busbar of a large-scale city A substation as an example, a trial pull-sorting calculation is performed on its 10kV outgoing line.
[0211] The substation 10kV#1 busbar has a total of 8 10kV outgoing lines. The values of each line under each evaluation index are shown in Table 3:
[0212] Table 3 Evaluation index values of 10kV lines
[0213]
[0214] According to Table 3 and formula (2) and formula (3) in Example 1, the standardized matrix of trial pull priority evaluation is obtained:
[0215]
[0216] According to the weight value of each evaluation index , , , , , And formula (10), calculate the priority evaluation weighted matrix:
[0217]
[0218] According to formula (13) and (14), the distance between the optimal solution and the worst solution can be obtained as shown in Table 4:
[0219] Table 4 Calculation results of distance between optimal solution and worst solution
[0220]
[0221] According to the calculation results of the distance between the best solution and the worst solution in Appendix 4, the relative closeness of each 10kV line can be calculated using formula (15). The relative closeness can reflect the test pull priority of each line. The 10kV lines can be sorted according to the priority. The relative closeness calculation results and the test pull order of the 10kV lines are shown in Table 5.
[0222] Table 5 Calculation results of relative proximity and 10kV line test sorting
[0223]
Claims
1. A method for identifying a ground fault line, characterized in that: The following steps are involved: S1: pre-generate a grounding line test pull-down sequence table; S2: Sequence the grounding test lines according to the generated sequence table and record the time when the fault phase current occurs; S3: Generate the maximum value of the fault phase current mutation according to the time when the fault phase current occurs; S4: judging the ground fault line according to the maximum value of the fault phase current mutation; S5: If the line is judged to be a faulty line, a line pull test is performed; If the line is determined to be a non-faulty line, the line is pulled according to the test pulling sequence; The pre-generated grounding line test pull ranking table in step S1 is specifically as follows: the ranking table sorts the 10kV outgoing lines of the busbar where the grounding signal is located by test pull experience, and names the lines in order. ; The ordering of the test lines follows the following principles: The line with fault symbol or low current grounding line selection alarm is the first priority in the test pull sequence; The no-load standby line is the second priority in the test sequence; For other 10kV outgoing lines except those in the first and second priority test pulling sequences, a comprehensive ranking is performed based on the Topsis evaluation model according to their evaluation indicators, which include: the number of important users carried by the line, the line load size, the proportion of overhead lines, the number of historical faults in the past two years, the line length, and the number of constructions in the line corridor. The comprehensive ranking based on the Topsis evaluation model includes the following steps: S101: Construct a test pull priority evaluation matrix and perform standardized calculations; S102: performing weighted calculation on the constructed test pull priority evaluation matrix; S103: Determine the priority of the grounding test according to the calculation result; The step S101 of constructing the test pull priority evaluation matrix is specifically as follows: except for the first and second priority test pull sequences, the other 10kV outgoing lines are recorded as According to the evaluation indicators, a priority evaluation matrix is constructed: in, are the values of each evaluation index corresponding to each 10kV outgoing line; The standardized calculation in step S101 includes: standardized calculation of extremely large evaluation indicators and standardized calculation of extremely small evaluation indicators. The extremely large evaluation indicators include: overhead line ratio, number of historical faults in the past two years, line length, and number of construction works in the line corridor; the extremely small evaluation indicators include: number of important users carried by the line and line load size. The standardized calculation of extremely large evaluation indicators is specifically: The standardized calculation of the extremely small evaluation index is specifically as follows: in, It is the standardized value of each 10kV outgoing line under each evaluation index; The step S102 of performing weighted calculation on the constructed test pull priority evaluation matrix includes: By comparing two by two, the importance of each evaluation index is determined, and the comparison judgment matrix is calculated; Perform consistency check on the obtained judgment matrix and perform weighted calculation on the constructed test pull priority evaluation matrix; Determining the priority of the grounding test in step S103 includes: According to the obtained test pull priority evaluation weighted matrix, the optimal solution and the worst solution in the Euclidean space are calculated; According to the optimal solution and the worst solution in the Euclidean space, the weighted evaluation value of the test pull priority of each 10kV outgoing line is calculated, and the Euclidean distance between the optimal solution and the worst solution is calculated, and the quality of the test pull priority of each 10kV outgoing line is evaluated; Calculate the relative closeness of the weighted evaluation values of the test pull priority of each 10kV outgoing line; The step S3 is specifically as follows: according to the time when the fault phase current occurs, the current comparison start time is obtained. 、Total number of 10kV outgoing lines And the instantaneous value curve of fault phase current of 10kV outgoing line , and generate the maximum value of the fault phase current mutation, which is recorded as and the line number where it is located ; The step S5 further comprises: If the ground signal disappears after the pull test, the pull test is successful and the judgment process ends; If the grounding signal does not disappear after the test pull, the line is still grounded. The grounding test pull line number is increased by 1, and the line test pull time is assigned as the starting value of the phase current dynamic comparison module time interval. Then jump to step S3 and continue to judge and test until the grounding signal is restored.
2. A ground fault line identification method according to claim 1, characterized in that: The step S2 specifically includes: setting the grounding test line number according to the generated sequence table is 1, the fault phase current comparison starts at The time when the fault occurred .
3. A ground fault line identification method according to claim 1, characterized in that: The step S4 is specifically as follows: comparing the maximum value of the sudden change of the fault phase current Current mutation threshold , like , then determine If it is a faulty line, jump to step S5. Conduct a test pull; like , then determine If the line is not faulty, jump to step S5 and try to pull the line according to the traditional test sequence. .
4. A system based on the ground fault line identification method according to claim 1, characterized in that: include: The grounding test line experience ranking module is used to: pre-generate a grounding line test ranking table and sort the test lines; The phase current dynamic comparison module is used to: generate the maximum value of the fault phase current mutation according to the time when the fault phase current occurs; Ground fault line determination module: Determine the ground fault line according to the maximum value of the fault phase current mutation.
5. A ground fault line identification device, characterized in that: The method comprises a processor and a memory for storing a computer program, wherein when the processor executes the computer program, the steps of the method according to any one of claims 1 to 3 are implemented.
6. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by one or more processors, the steps of the method according to any one of claims 1 to 3 are implemented.