An industrial robot management system based on large model technology

Through the industrial robot management system with large-model technology, task allocation is combined with delivery time, process step weights and work status information, the problem of unreasonable task allocation in traditional management methods is solved, production efficiency and quality is improved, and industrial robots are ensured. Reasonable use.

CN118691058BActive Publication Date: 2024-12-06JINAN HAOYUAN INTELLIGENT TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411195376.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-12-06
Estimated Expiration
2044-08-29

AI Technical Summary

Technical Problem

Traditional industrial robot management methods rely on manual experience, resulting in unreasonable task allocation, resulting in overload or idle industrial robots, affecting production efficiency and quality, and it is difficult to adjust task allocation in real time to adapt to changes in the production process.

Method used

Using an industrial robot management system based on large-model technology, the data acquisition unit collects production tasks and industrial robot operation information. The task allocation unit distributes tasks based on the delivery period, process step weights and working status information to generate matching signals to control the industry. The robot performs tasks.

Benefits of technology

It achieves a reasonable matching of production tasks with industrial robots, improves production efficiency and quality, avoids overload or idleness, ensures priority handling of critical tasks, and optimizes production processes and resource allocation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118691058B_ABST
    Figure CN118691058B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of industrial robot management, and discloses an industrial robot management system based on large model technology, comprising a data acquisition unit, a task allocation unit and a matching execution unit. The present invention can reasonably allocate production tasks to the most suitable industrial robots, which ensures that key tasks can be processed first, reduces the waiting time in the production process, improves the overall production efficiency, calculates the execution force of the industrial robots, fully considers the remaining working time of the industrial robots in the working state and the situation of the industrial robots in the idle state, and can accurately evaluate the actual working capacity of the industrial robots at the current moment, so as to more efficiently allocate tasks. By calculating the matching value between the production task and the industrial robot, and allocating tasks in order of the matching value from large to small, it can ensure that each production task can be allocated to the most suitable industrial robot.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of industrial robot management, and in particular to an industrial robot management system based on large model technology. Background Art

[0002] With the continuous development of industrial automation, industrial robots are increasingly used in manufacturing. However, how to efficiently manage and allocate industrial robots to meet the needs of different production tasks has become an important issue facing current industrial production.

[0003] In traditional industrial robot management, task allocation often relies on manual experience and lacks a scientific and reasonable basis. This method easily leads to unreasonable task allocation, overloading or idleness of industrial robots, and affects production efficiency and quality. In addition, traditional management methods also make it difficult to grasp the operation information of industrial robots and the progress of production tasks in real time, and it is impossible to adjust task allocation in time to adapt to changes in the production process.

[0004] With the development of large model technology, new ideas and methods are provided for industrial robot management. Large model technology can analyze and process a large amount of data, thereby achieving more accurate task allocation and management. By collecting the task data of production tasks and the operation information of industrial robots, and using large model technology for analysis and processing, it is possible to achieve a reasonable match between production tasks and industrial robots, and improve production efficiency and quality.

[0005] Therefore, the present invention proposes an industrial robot management system based on large model technology, aiming to solve the problems existing in traditional industrial robot management and improve the efficiency and quality of industrial production. Summary of the invention

[0006] The purpose of the present invention is to provide an industrial robot management system based on large model technology, which solves the technical problems raised in the background technology.

[0007] The purpose of the present invention can be achieved through the following technical solutions:

[0008] An industrial robot management system based on large model technology, comprising:

[0009] A data acquisition unit, used to collect task data of multiple production tasks and operation information of multiple industrial robots;

[0010] A task allocation unit is used to allocate each production task to each industrial robot according to task data and operation information, and generate corresponding matching signals;

[0011] The matching execution unit is used to control the industrial robot to execute corresponding tasks according to the matching signal.

[0012] As a further solution of the present invention: the task data includes but is not limited to the delivery deadline and the step weights corresponding to the process steps;

[0013] The operation information includes but is not limited to the working status information and the remaining working time when performing other tasks, and the working status information includes the idle state and the working state, wherein the idle state refers to that the industrial robot is not working at the current moment, and the working state refers to that the industrial robot is currently performing other tasks.

[0014] As a further solution of the present invention: wherein, the process step refers to each specific operation link or stage divided in the production process to complete a specific task; and the greater the weight of the step corresponding to the generated task, the greater the impact of the corresponding production task on the entire production process;

[0015] The step weight is a quantitative value that measures the importance, urgency, and impact of a process step in the entire production process, and the step weight is determined by the management personnel based on the importance of each production task.

[0016] As a further solution of the present invention: the allocation mode of the task allocation unit is as follows:

[0017] Step 1. Obtain the delivery deadline of each production task and mark it as JFi, i=1, 2, ... n, n represents the number of production tasks, and obtain the process steps of each production task, then extract the step weights in each process step and mark them as BZi;

[0018] Step 2: Pass , calculate the priority Y of each production task i ;

[0019] Step 3, obtain the working status information of each industrial robot, and obtain the remaining working time of the industrial robot in working state when performing other tasks at the current moment;

[0020] Step 4: Calculate the execution force of the industrial robots based on the working status information of each industrial robot, and obtain the execution force of each industrial robot;

[0021] Step 5: Analyze the matching value K between each production task and each industrial robot based on the execution capability of each industrial robot and the priority of each production task. i,j ;

[0022] Step 6: According to the matching values ​​between each production task and each industrial robot, the production task matched by the industrial robot is determined in descending order of the matching values, and a corresponding matching signal is generated;

[0023] As a further solution of the present invention: in Step 4, the execution force calculation processing method is as follows:

[0024] Among all industrial robots, obtain the remaining working time corresponding to all industrial robots and mark it as Tj, j = 1, 2, ... m; m represents the number of all industrial robots;

[0025] Among them, the remaining working time of the industrial robot in idle state is 0;

[0026] Then through , calculate the execution force X of each industrial robot j .

[0027] As a further solution of the present invention: it is characterized in that in Step 5, the matching values ​​between each production task and each industrial robot are respectively obtained by Calculated;

[0028] In the formula, K i,j Indicates the matching value between the production task and the industrial robot.

[0029] As a further solution of the present invention: In Step 6, the matching of the industrial robot and the production task is determined as follows:

[0030] Among all matching values, get the matching value with the largest value;

[0031] If the matching value with the largest value exists alone, the corresponding production task and industrial robot are obtained and matched, and then the matching values ​​between the production task and other industrial robots are eliminated, and the matching values ​​between the industrial robot and other production tasks are eliminated at the same time, and then the matching value with the largest value is obtained from all the remaining matching values, and the corresponding production task and industrial robot are matched and determined, and a corresponding matching signal is generated;

[0032] If there are multiple matching values ​​with the largest value in parallel, then the corresponding production tasks and industrial robots are obtained, where:

[0033] When there are multiple production tasks and industrial robots corresponding to the maximum matching values ​​in parallel, and they do not overlap with the production tasks and industrial robots corresponding to other maximum matching values, the production tasks and industrial robots are matched and determined, and a corresponding matching signal is generated;

[0034] When there are multiple production tasks and industrial robots corresponding to the maximum matching values ​​in parallel, and any of the production tasks and industrial robots corresponding to other maximum matching values ​​are repeated, a secondary matching determination is performed.

[0035] As a further solution of the present invention: the secondary matching determination method is as follows:

[0036] If there are multiple production tasks corresponding to the maximum matching values ​​that exist in parallel that are repeated, then multiple industrial robots corresponding to the repeated production tasks are extracted, and then the next largest matching values ​​of the multiple industrial robots are obtained, and then the matching values ​​are compared, and then the industrial robot with the smallest matching value is selected, and then the industrial robot is matched with the production tasks corresponding to the multiple maximum matching values ​​that exist in parallel to determine, and generate a corresponding matching signal;

[0037] Similarly, if there are multiple industrial robots corresponding to the maximum matching values ​​that exist in parallel and are repeated, then multiple production tasks corresponding to the industrial robot are extracted, and then the second largest matching value of the multiple production tasks is obtained, and then the matching values ​​are compared, and then the production task with the smallest matching value is selected, and then the production task is matched with the industrial robots corresponding to the multiple maximum matching values ​​that exist in parallel and determined, and a corresponding matching signal is generated;

[0038] And so on, until all production tasks or all industrial robots are assigned.

[0039] Beneficial effects of the present invention:

[0040] The present invention can reasonably allocate production tasks to the most suitable industrial robots by comprehensively considering the delivery deadlines of production tasks, the step weights corresponding to the process steps, and the operating information of the industrial robots; this ensures that key tasks can be processed first, reduces the waiting time in the production process, and improves the overall production efficiency.

[0041] The present invention calculates the execution force of industrial robots, fully considering the remaining working time of industrial robots in working state and the situation of industrial robots in idle state, and can accurately evaluate the actual working capacity of industrial robots at the current moment, so as to more efficiently allocate tasks.

[0042] The present invention introduces the concept of process step weights, which enables the system to prioritize production tasks according to their impact on the entire production process. This helps ensure that important and urgent production tasks are given priority, thereby optimizing the production process and improving the overall quality and stability of production.

[0043] The present invention can ensure that each production task can be assigned to the most suitable industrial robot by calculating the matching value between the production task and the industrial robot and assigning the task in descending order of the matching value. This precise matching method helps to improve the accuracy and consistency of production and further optimize the production process.

[0044] In the present invention, the step weights are determined by the management personnel according to the importance of each production task, which makes production management more flexible. The management personnel can adjust the step weights at any time according to the actual production situation and needs to adapt to different production tasks and production environments.

[0045] In the present invention, when the maximum matching values ​​exist in parallel, the system can ensure the reasonable allocation of production tasks and industrial robots through secondary matching. This flexible allocation method enhances the adaptability of the system and can cope with various complex production situations.

[0046] In the present invention, the data acquisition unit can collect task data of multiple production tasks and operation information of multiple industrial robots in real time, so that the system can timely understand various situations in the production process. This helps managers to find problems in time and take corresponding measures, thereby improving the reliability and stability of production.

[0047] The present invention can avoid overloading or idleness of industrial robots through scientific and reasonable task allocation, give full play to the performance of industrial robots, improve the reliability and stability of production, and reduce production delays and quality problems caused by unreasonable task allocation. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] The present invention will be further described below in conjunction with the accompanying drawings.

[0049] Figure 1 It is a system block diagram of an industrial robot management system based on large model technology of the present invention. DETAILED DESCRIPTION

[0050] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0051] Embodiment 1

[0052] See also Figure 1 As shown, the present invention is an industrial robot management system based on large model technology, comprising:

[0053] A data acquisition unit, used to collect task data of multiple production tasks and operation information of multiple industrial robots;

[0054] Task data includes but is not limited to delivery deadlines and step weights corresponding to process steps;

[0055] The process steps refer to the specific operation links or stages divided in the production process to complete a specific task; and the greater the weight of the step corresponding to the generated task, the greater the impact of the corresponding production task on the entire production process;

[0056] The step weight is a quantitative value that measures the importance, urgency, and impact of the process step in the entire production process;

[0057] In this embodiment, the step weights are set by the management personnel according to the importance of each production task;

[0058] Operation information includes but is not limited to work status information and remaining work time when performing other tasks;

[0059] The working status information includes idle status and working status;

[0060] A task allocation unit, used for allocating various production tasks to various industrial robots;

[0061] The specific allocation method is as follows:

[0062] SS1. Obtain the delivery deadline of each production task and mark it as JFi, i = 1, 2, ... n, n represents the number of production tasks;

[0063] SS2, obtain the process steps of each production task, then extract the step weights in each process step and mark them as BZi;

[0064] SS3, through , calculate the priority Y of each production task i ;

[0065] SS4, obtain the working status information of each industrial robot;

[0066] The working status information includes idle status and working status;

[0067] The idle state refers to the industrial robot not working at the current moment, and the working state refers to the industrial robot currently performing other tasks;

[0068] Then, the remaining working time of the industrial robot in working state when performing other tasks at the current moment is obtained;

[0069] SS5. Obtain the remaining working time corresponding to all industrial robots among all industrial robots and mark them as Tj, where j = 1, 2, ... m; m represents the number of all industrial robots;

[0070] Among them, the remaining working time of the industrial robot in idle state is 0;

[0071] SS6, followed by , calculate the execution force X of each industrial robot j ;

[0072] SS7, via , calculate the matching value K between each production task and each industrial robot i,j ;

[0073] SS8. According to the matching values ​​between each production task and each industrial robot, the production task matched to the industrial robot is determined in descending order of the matching values;

[0074] The specific method is:

[0075] Among all matching values, get the matching value with the largest value;

[0076] If the matching value with the largest value exists alone, the corresponding production task and industrial robot are obtained and matched, and then the matching values ​​between the production task and other industrial robots are eliminated, and the matching values ​​between the industrial robot and other production tasks are eliminated at the same time, and then the matching value with the largest value is obtained from all the remaining matching values, and the corresponding production task and industrial robot are matched and determined, and a corresponding matching signal is generated;

[0077] The matching execution unit is used to control the industrial robot to execute corresponding tasks according to the matching signal.

[0078] In this embodiment, by utilizing the powerful data processing capability of the big model, the task data of multiple production tasks and the operation information of multiple industrial robots can be efficiently collected to ensure the accuracy and comprehensiveness of the data; in the task allocation process, when the task allocation unit allocates tasks based on the task data and operation information, the big model is used to quickly analyze and process complex data including delivery deadlines, step weights corresponding to process steps, industrial robot working status information, and remaining working time; through the deep calculation of the big model, the priority of each production task and the execution power of each industrial robot are accurately obtained, and then the matching value between the production task and the industrial robot is calculated;

[0079] This embodiment calculates the priority of the production task by comprehensively considering factors such as the delivery deadline of the production task and the step weights corresponding to the process steps, and calculates the execution power in combination with the working status information of the industrial robot and the remaining working time when executing other tasks, and then obtains the matching value between the production task and each industrial robot, and determines the production task matched to the industrial robot in order from large to small matching values. This can more reasonably assign the production tasks to suitable industrial robots, improve production efficiency, and ensure that the production tasks are completed within the specified time. At the same time, it fully considers the importance and urgency of different production tasks and the working status of the industrial robot to achieve optimal allocation of resources.

[0080] Embodiment 2

[0081] As the second embodiment of the present invention, when the present application is implemented, compared with the first embodiment, the technical solution of the present embodiment is different from that of the first embodiment only in that,

[0082] If there are multiple matching values ​​with the largest value in parallel, then the corresponding production tasks and industrial robots are obtained, where:

[0083] When there are multiple production tasks and industrial robots corresponding to the maximum matching values ​​in parallel, and they do not overlap with the production tasks and industrial robots corresponding to other maximum matching values, the production tasks and industrial robots are matched and determined, and a corresponding matching signal is generated;

[0084] For example:

[0085] Assume that there are three production tasks A, B, C and three industrial robots X, Y, Z, and the matching values ​​between them are as follows:

[0086] The matching value between production task A and industrial robot X is 8;

[0087] The matching value between production task A and industrial robot Y is 7;

[0088] The matching value between production task A and industrial robot Z is 6;

[0089] The matching value between production task B and industrial robot X is 5;

[0090] The matching value between production task B and industrial robot Y is 9;

[0091] The matching value between production task B and industrial robot Z is 4;

[0092] The matching value between production task C and industrial robot X is 7;

[0093] The matching value between production task C and industrial robot Y is 6;

[0094] The matching value between production task C and industrial robot Z is 8;

[0095] First, find the largest matching value among all matching values. Here, the largest matching value is 9, which is the matching value between production task B and industrial robot Y. Since this largest matching value exists alone, production task B is assigned to industrial robot Y, and then the matching values ​​between production task B and other industrial robots, as well as the matching values ​​between industrial robot Y and other production tasks are eliminated.

[0096] The remaining matching values ​​are:

[0097] The matching value between production task A and industrial robot X is 8;

[0098] The matching value between production task A and industrial robot Z is 6;

[0099] The matching value between production task C and industrial robot X is 7;

[0100] The matching value between production task C and industrial robot Z is 8;

[0101] Find the largest matching value among the remaining matching values ​​again. Here, the largest matching value is 8, and there are two matching values ​​in parallel, namely the matching value between production task A and industrial robot X, and the matching value between production task C and industrial robot Z;

[0102] Since the corresponding production tasks and industrial robots do not overlap, production task A can be directly assigned to industrial robot X, and production task C can be assigned to industrial robot Z;

[0103] In this way, all production tasks and industrial robots are allocated;

[0104] When there are multiple production tasks and industrial robots corresponding to the maximum matching values ​​in parallel, and any of the production tasks and industrial robots corresponding to other maximum matching values ​​are repeated, a secondary matching determination is performed;

[0105] The secondary match is determined as follows:

[0106] If there are multiple production tasks corresponding to the maximum matching values ​​that exist in parallel that are repeated, then multiple industrial robots corresponding to the repeated production tasks are extracted, and then the next largest matching values ​​of the multiple industrial robots are obtained, and then the matching values ​​are compared, and then the industrial robot with the smallest matching value is selected, and then the industrial robot is matched with the production tasks corresponding to the multiple maximum matching values ​​that exist in parallel to determine, and generate a corresponding matching signal;

[0107] Similarly, if there are multiple industrial robots corresponding to the maximum matching values ​​that exist in parallel and are repeated, then multiple production tasks corresponding to the industrial robot are extracted, and then the second largest matching value of the multiple production tasks is obtained, and then the matching values ​​are compared, and then the production task with the smallest matching value is selected, and then the production task is matched with the industrial robots corresponding to the multiple maximum matching values ​​that exist in parallel and determined, and a corresponding matching signal is generated;

[0108] And so on, until all production tasks or all industrial robots are assigned;

[0109] The following is an example of how to determine the secondary match:

[0110] Assume that there are four production tasks D, E, F, G and four industrial robots W, X, Y, Z, and the matching values ​​between them are as follows:

[0111] The matching value between production task D and industrial robot W is 7;

[0112] The matching value between production task D and industrial robot X is 8;

[0113] The matching value between production task D and industrial robot Y is 8;

[0114] The matching value between production task D and industrial robot Z is 6;

[0115] The matching value between production task E and industrial robot W is 5;

[0116] The matching value between production task E and industrial robot X is 4;

[0117] The matching value between production task E and industrial robot Y is 6;

[0118] The matching value between production task E and industrial robot Z is 7;

[0119] The matching value between production task F and industrial robot W is 6;

[0120] The matching value between production task F and industrial robot X is 7;

[0121] The matching value between production task F and industrial robot Y is 5;

[0122] The matching value between production task F and industrial robot Z is 8;

[0123] The matching value between production task G and industrial robot W is 8;

[0124] The matching value between production task G and industrial robot X is 6;

[0125] The matching value between production task G and industrial robot Y is 7;

[0126] The matching value between production task G and industrial robot Z is 5;

[0127] First, find the largest matching value among all matching values. Here, the largest matching value is 8, and there are multiple matching values ​​in parallel, namely, the matching value between production task D and industrial robot X, the matching value between production task D and industrial robot Y, and the matching value between production task G and industrial robot W;

[0128] Since the production tasks are repeated and correspond to multiple industrial robots, that is, production task D corresponds to industrial robots X and Y, and production task G corresponds to industrial robot W, a secondary matching is performed to determine;

[0129] Extract the industrial robots X and Y corresponding to the production task D and obtain their second largest matching values. Assume that the second largest matching value of industrial robot X is 4 and the second largest matching value of industrial robot Y is 6. Comparing these two second largest matching values, the second largest matching value of industrial robot X is the smallest.

[0130] Then, the industrial robot X is matched with the production task D, and the matching values ​​between the production task D and other industrial robots, and the matching values ​​between the industrial robot X and other production tasks are eliminated;

[0131] The remaining matching values ​​are:

[0132] The matching value between production task E and industrial robot W is 5;

[0133] The matching value between production task E and industrial robot Y is 6;

[0134] The matching value between production task E and industrial robot Z is 7;

[0135] The matching value between production task F and industrial robot W is 6;

[0136] The matching value between production task F and industrial robot Y is 5;

[0137] The matching value between production task F and industrial robot Z is 8;

[0138] The matching value between production task G and industrial robot W is 8;

[0139] The matching value between production task G and industrial robot Y is 7;

[0140] The matching value between production task G and industrial robot Z is 5;

[0141] Find the largest matching value among the remaining matching values ​​again. Here, the largest matching value is 8, which is the matching value between production task F and industrial robot Z. Since this largest matching value exists alone, production task F is assigned to industrial robot Z, and then the matching values ​​between production task F and other industrial robots, and the matching values ​​between industrial robot Z and other production tasks are eliminated;

[0142] The remaining matching values ​​are:

[0143] The matching value between production task E and industrial robot W is 5;

[0144] The matching value between production task E and industrial robot Y is 6;

[0145] The matching value between production task G and industrial robot W is 8;

[0146] The matching value between production task G and industrial robot Y is 7;

[0147] Find the largest matching value among the remaining matching values ​​again. Here, the largest matching value is 8, which is the matching value between production task G and industrial robot W. Since this largest matching value exists alone, production task G is assigned to industrial robot W, and then the matching values ​​between production task G and other industrial robots, as well as the matching values ​​between industrial robot W and other production tasks are eliminated;

[0148] The remaining matching values ​​are:

[0149] The matching value between production task E and industrial robot Y is 6;

[0150] Finally, the production task E is assigned to the industrial robot Y;

[0151] In this way, all production tasks and industrial robots are allocated.

[0152] Based on the first embodiment, this embodiment further considers the situation where the maximum matching values ​​exist in parallel. When the maximum matching value exists alone, the allocation plan can be quickly determined; when the maximum matching values ​​exist in parallel and the corresponding production tasks and industrial robots do not overlap, the allocation can also be directly determined, thereby improving the efficiency and accuracy of the allocation.

[0153] For the situation where there are multiple production tasks and industrial robots corresponding to the maximum matching values ​​in parallel and any of them are repeated, the allocation conflict can be properly resolved through the secondary matching determination method, ensuring that all production tasks and industrial robots can be reasonably allocated, further improving the reliability and stability of the system allocation.

[0154] Embodiment 3

[0155] As the third embodiment of the present invention, when the present application is specifically implemented, compared with the first and second embodiments, the technical solution of this embodiment is to combine the solutions of the first and second embodiments mentioned above for implementation.

[0156] This embodiment combines the solutions of embodiment one and embodiment two for implementation, integrating the advantages of both. It can not only reasonably allocate production tasks under normal circumstances, but also properly handle various complex allocation situations, such as the parallel existence and duplication of maximum matching values. It greatly improves the adaptability of the industrial robot management system and the scientific nature of allocation, and can better meet the diversified needs in actual production, further improving production efficiency and resource utilization efficiency.

[0157] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters and thresholds in the formula are set by technicians in this field according to actual conditions.

[0158] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. An industrial robot management system based on large model technology, characterized in that: include: A data acquisition unit, used to collect task data of multiple production tasks and operation information of multiple industrial robots; A task allocation unit is used to allocate each production task to each industrial robot according to task data and operation information, and generate corresponding matching signals; The allocation method of the task allocation unit is as follows: Step 1. Obtain the delivery deadline of each production task and mark it as JFi, i=1, 2, ... n, n represents the number of production tasks, and obtain the process steps of each production task, then extract the step weights in each process step and mark them as BZi; Step 2: Pass , calculate the priority Y of each production task i ; Step 3, obtain the working status information of each industrial robot, and obtain the remaining working time of the industrial robot in working state when performing other tasks at the current moment; Step 4: Calculate the execution force of the industrial robots based on the working status information of each industrial robot, and obtain the execution force of each industrial robot; The execution force calculation is processed as follows: Among all industrial robots, obtain the remaining working time corresponding to all industrial robots and mark it as Tj, j = 1, 2, ... m; m represents the number of all industrial robots; Among them, the remaining working time of the industrial robot in idle state is 0; Then through , calculate the execution force X of each industrial robot j ; Step 5: Analyze the matching value K between each production task and each industrial robot based on the execution capability of each industrial robot and the priority of each production task. i,j ; Among them, the matching value between each production task and each industrial robot is Calculated; In the formula, K i,j Indicates the matching value between the production task and the industrial robot; Step 6: According to the matching values ​​between each production task and each industrial robot, the production task matched by the industrial robot is determined in descending order of matching values; The matching of industrial robots and production tasks is determined as follows: Among all matching values, get the matching value with the largest value; If the matching value with the largest value exists alone, the corresponding production task and industrial robot are obtained and matched, and then the matching values ​​between the production task and other industrial robots are eliminated, and the matching values ​​between the industrial robot and other production tasks are eliminated at the same time, and then the matching value with the largest value is obtained from all the remaining matching values, and the corresponding production task and industrial robot are matched and determined, and a corresponding matching signal is generated; If there are multiple matching values ​​with the largest value in parallel, then the corresponding production tasks and industrial robots are obtained, where: When there are multiple production tasks and industrial robots corresponding to the maximum matching values ​​in parallel, and they do not overlap with the production tasks and industrial robots corresponding to other maximum matching values, the production tasks and industrial robots are matched and determined, and a corresponding matching signal is generated; When there are multiple production tasks and industrial robots corresponding to the maximum matching values ​​in parallel, and any of the production tasks and industrial robots corresponding to other maximum matching values ​​are repeated, a secondary matching determination is performed; The secondary match is determined as follows: If there are multiple production tasks corresponding to the maximum matching values ​​that exist in parallel that are repeated, then multiple industrial robots corresponding to the repeated production tasks are extracted, and then the next largest matching values ​​of the multiple industrial robots are obtained, and then the matching values ​​are compared, and then the industrial robot with the smallest matching value is selected, and then the industrial robot is matched with the production tasks corresponding to the multiple maximum matching values ​​that exist in parallel to determine, and generate a corresponding matching signal; And so on, until all production tasks or all industrial robots are assigned; If there are multiple industrial robots corresponding to the maximum matching values ​​that exist in parallel, the multiple production tasks corresponding to the industrial robots are extracted, and then the second largest matching value of the multiple production tasks is obtained, and then the matching values ​​are compared, and then the production task with the smallest matching value is selected, and then the production task is matched with the industrial robots corresponding to the multiple maximum matching values ​​that exist in parallel, and a corresponding matching signal is generated; And so on, until all production tasks or all industrial robots are assigned; The matching execution unit is used to control the industrial robot to execute corresponding tasks according to the matching signal.

2. The industrial robot management system based on large model technology according to claim 1 is characterized in that: Task data includes but is not limited to delivery deadlines and step weights corresponding to process steps; The operation information includes but is not limited to the working status information and the remaining working time when performing other tasks, and the working status information includes the idle state and the working state, wherein the idle state refers to that the industrial robot is not working at the current moment, and the working state refers to that the industrial robot is currently performing other tasks.

3. The industrial robot management system based on large model technology according to claim 2 is characterized in that: in, The process steps refer to the specific operation links or stages divided in the production process to complete a specific task; and the greater the weight of the step corresponding to the generated task, the greater the impact of the corresponding production task on the entire production process; The step weight is a quantitative value that measures the importance, urgency, and impact of a process step in the entire production process, and the step weight is determined by the management personnel based on the importance of each production task.