A method for monitoring abnormal status of MES system in digital workshop

Through the comprehensive status monitoring and abnormal warning mechanism of the workshop, the problem of environmental, production line and equipment status analysis in the digital workshop is solved, and safe, stable, efficient production and intelligent management are achieved.

CN118707913BActive Publication Date: 2024-11-15SHENZHEN YIPU TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411197816.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-11-15
Estimated Expiration
2044-08-29

AI Technical Summary

Technical Problem

The existing technology is difficult to reasonably analyze the environmental risk conditions, production line performance conditions and production equipment conditions in the workshop, and it is impossible to promptly warn of abnormal status, resulting in increased management difficulty of digital workshops and low levels of intelligence and automation.

Method used

The workshop is comprehensively monitored through the workshop environment status monitoring module, production line performance analysis module and equipment status monitoring module, and generate workshop ring state values, production line status values ​​and equipment status values, and the abnormal mechanism triggering module determines whether an abnormality is triggered by the abnormal mechanism triggering module. Early warning mechanism, alarm response module performs early warning display.

Benefits of technology

Effective supervision of digital workshops has been achieved, safe, stable and efficient production has been ensured, the level of intelligence and automation has been significantly improved, and management difficulty has been reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118707913B_ABST
    Figure CN118707913B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of workshop supervision, and specifically is an abnormal state monitoring method of a digital workshop MES system, comprising the following steps: workshop environment monitoring and analysis, workshop production line performance analysis, workshop equipment status monitoring and analysis, abnormal mechanism triggering judgment and alarm response; the present invention performs environmental monitoring on several locations in the workshop through a workshop environment status monitoring module, a workshop production line performance analysis module performs production status monitoring on the production lines in the workshop, a workshop equipment status monitoring module performs operation monitoring on all production equipment of the production lines in the workshop, and an abnormal mechanism triggering module determines whether to trigger an abnormal early warning mechanism based on the workshop environment monitoring analysis results, the production line status analysis results and the equipment status analysis, and can timely warn and remind management personnel to make corresponding improvement and control measures, thereby ensuring safe, stable and efficient production of digital workshops, realizing effective supervision of digital workshops, and having high levels of intelligence and automation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of workshop supervision, and in particular to an abnormal state monitoring method of a digital workshop MES system. Background Art

[0002] Digital workshop refers to a production mode that realizes the full digitization and automation of the production process through information technology, intelligent equipment and data management. This production mode improves production efficiency and quality. With the rapid development of the manufacturing industry, the application of MES system in digital workshops is becoming more and more extensive.

[0003] At present, when managing digital workshops, it is difficult to reasonably analyze the environmental risk conditions, production line performance and production equipment conditions in the workshop and to issue abnormal status warnings in a timely manner, which is not conducive to managers to quickly make corresponding improvement and control measures. It is impossible to ensure the safe, stable and efficient production of digital workshops, and it is impossible to achieve effective supervision of digital workshops. The level of intelligence and automation is low;

[0004] In view of the above technical defects, a solution is now proposed. Summary of the invention

[0005] The purpose of the present invention is to provide a method for monitoring the abnormal state of a digital workshop MES system, which solves the problem that the prior art is difficult to reasonably analyze the environmental risk conditions, production line performance conditions and production equipment conditions in the workshop and to promptly issue abnormal state warnings, and is unable to achieve effective supervision of the digital workshop, and has a low level of intelligence and automation.

[0006] To achieve the above object, the present invention provides the following technical solutions:

[0007] A method for monitoring abnormal status of a digital workshop MES system comprises the following steps:

[0008] Step 1: The workshop environment status monitoring module performs environment monitoring on several locations in the workshop, obtains the workshop environment status value through analysis, and sends the workshop environment status value to the abnormal mechanism triggering module through the processor;

[0009] Step 2: The workshop production line performance analysis module monitors the production status of the production line in the workshop, obtains the production line status value through analysis, and sends the production line status value to the abnormal mechanism trigger module through the processor;

[0010] Step 3: The workshop equipment status monitoring module monitors the operation of all production equipment in the production line of the workshop, obtains the equipment status values ​​of all production equipment through analysis, and sends the equipment status values ​​of all production equipment to the abnormal mechanism triggering module through the processor;

[0011] Step 4: The abnormal mechanism triggering module determines whether to trigger the abnormal warning mechanism based on the workshop environment value, production line status value and equipment status value, generates workshop status warning information when the abnormal warning mechanism is triggered, and sends the workshop status warning information to the alarm response module through the processor;

[0012] Step 5: The alarm response module displays the workshop status warning information upon receipt thereof, and issues a corresponding warning upon receipt of the workshop status warning information.

[0013] Furthermore, the specific analysis process of the workshop environment status monitoring module includes:

[0014] The non-good environmental points in the workshop are identified through analysis, and the number of non-good environmental points in the workshop is marked as the non-good environmental detection value, and the position ring values ​​of all positions in the workshop are averaged to obtain the workshop ring measurement value, and the position ring value with the largest value in the workshop is marked as the workshop ring amplitude value; the workshop ring state value is obtained by numerically calculating the non-good environmental detection value, the workshop ring measurement value and the workshop ring amplitude value.

[0015] Furthermore, the analysis and identification process of the environmental non-good points in the workshop is as follows:

[0016] The average temperature and average humidity at the corresponding position in the workshop within a unit time are collected, and the difference between the average temperature and the median of the corresponding preset suitable temperature range is calculated and the absolute value is taken to obtain the position temperature value. Similarly, the position humidity value is obtained; and the average smoke and dust concentration and the average noise decibel value at the corresponding position in the workshop within a unit time are collected and marked as the position smoke value and the position sound value respectively;

[0017] The potential ring value is obtained by numerically calculating the potential temperature value, potential humidity value, potential smoke value and potential sound value, and the potential ring value is numerically compared with the preset potential ring threshold. If the potential ring value exceeds the preset potential ring threshold, the corresponding position will be marked as an environmental non-good point.

[0018] Furthermore, the specific analysis process of the workshop production line performance analysis module is as follows:

[0019] Several detection periods are set within a unit of time, and the production speed of the production line in the workshop during the corresponding detection period is collected. The variance of the production speed of all detection periods is calculated to obtain the non-steady value of the production speed, and the difference between the production speed and the median of the preset appropriate production speed range is calculated and the absolute value is taken to obtain the deviation value of the production speed during the period;

[0020] The production speed deviation values ​​of all detection periods within a unit time are averaged to obtain the production speed deviation value, and the production speed deviation value of the corresponding detection period is compared with the preset production speed deviation threshold value, and the proportion of the number of detection periods whose production speed deviation values ​​exceed the preset production speed deviation threshold value is marked as the production speed abnormality proportion value;

[0021] The defective product rate of the production line in the workshop per unit time is collected, and the production line status value is obtained by numerically calculating the production speed deviation value, the production speed instability value, the production speed abnormality value and the defective product rate.

[0022] Furthermore, the specific analysis process of the workshop equipment status monitoring module includes:

[0023] All production equipment of the production line in the workshop are obtained, and the corresponding production equipment is marked as operation monitoring equipment i, where i is a positive integer; the non-optimal parameters and operation optimization parameters of the operation monitoring equipment i are determined through equipment operation status evaluation and analysis, the number of non-optimal parameters in the operation monitoring equipment i is obtained and marked as non-optimal inspection conditions, and the ratio of the data deviation table value of the corresponding operation parameter to the corresponding preset data deviation table threshold is marked as the data deviation value, and the data deviation values ​​of all non-optimal parameters are averaged to obtain the operation deviation value; the equipment status value is obtained by numerically calculating the non-optimal inspection condition value and the operation deviation value of the operation monitoring equipment i.

[0024] Furthermore, the specific analysis process of equipment operation status evaluation and analysis is as follows:

[0025] Acquire all the operating parameters that need to be monitored when the operation monitoring device i is running, collect the real-time detection data of the corresponding operating parameters, compare the real-time detection data of the corresponding operating parameters with the corresponding preset data requirements, and if the real-time detection data of the corresponding operating parameters does not meet the corresponding preset data requirements, determine that the corresponding operating parameters are in a data deviation state;

[0026] The total time duration of the corresponding operating parameter in the data deviation state per unit time is obtained and marked as the data deviation time condition value, and the average deviation amplitude and the maximum deviation amplitude of the corresponding operating parameter in the data deviation state per unit time are marked as the data segregation value and the data deviation amplitude value respectively;

[0027] The data deviation value of the corresponding operating parameter is obtained by numerically calculating the data deviation value, data segregation value and data deviation amplitude value, and the data deviation value is numerically compared with the corresponding preset data deviation threshold value. If the data deviation value exceeds the preset data deviation threshold value, the corresponding operating parameter is marked as a non-optimal parameter of the operation monitoring device i; if the data deviation value does not exceed the preset data deviation threshold value, the corresponding operating parameter is marked as an optimal operation parameter of the operation monitoring device i.

[0028] Further, in step 4, the abnormal mechanism triggering module determines whether to trigger the abnormal warning mechanism based on the workshop environment value, production line status value and equipment status value. The specific judgment process is as follows:

[0029] Compare the equipment status value of the operation monitoring equipment i with the corresponding preset equipment status threshold. If the equipment status value exceeds the preset equipment status threshold, the operation monitoring equipment i is marked as a poor performance equipment. If there is a poor performance equipment in the production line of the workshop, the abnormal warning mechanism is triggered.

[0030] The workshop environment value and the production line status value are numerically compared with the preset workshop environment threshold and the preset production line status threshold respectively. If the workshop environment value or the production line status value exceeds the corresponding preset threshold, the abnormal warning mechanism is triggered.

[0031] Furthermore, the processor is communicated with the workshop response planning module, which is used to set the detection period and conduct a comprehensive analysis of the production and operation status of the workshop during the detection period. The analysis is used to generate a strict planning signal or a weak planning signal, and the strict planning signal or the weak planning signal is sent to the intelligent terminal of the planning manager via the processor.

[0032] Furthermore, the specific analysis process of the workshop response planning module includes:

[0033] The number of production safety accidents in the workshop during the detection period is collected and marked as the production accident frequency detection value, and the total amount of losses caused by production safety accidents during the detection period is marked as the production accident amount value. The production accident frequency detection value and the production accident amount value are numerically compared with the preset production accident frequency detection threshold and the preset production accident amount threshold respectively. If the production accident frequency detection value or the production accident amount value exceeds the corresponding preset threshold, a strict planning signal is generated.

[0034] Furthermore, if the production accident frequency detection value and the production accident amount value do not exceed the corresponding preset threshold value, several analysis periods are set within the detection period, the number of times the workshop status warning information is generated in the corresponding analysis period is collected and marked as the workshop status warning value, and the workshop status warning value is numerically compared with the preset workshop status warning threshold value. If the workshop status warning value exceeds the preset workshop status warning threshold value, the corresponding analysis period is marked as a non-safe period;

[0035] The number of non-safety periods in the detection period is obtained and the ratio of it to the total number of analysis periods is marked as the non-safety detection value, and the workshop status warning values ​​of all analysis periods are summed up to obtain the workshop status warning frequency value; the response planning comprehensive judgment value is obtained by numerically calculating the production accident frequency detection value, the production accident amount value, the non-safety detection value and the workshop status warning frequency value;

[0036] The response planning comprehensive judgment value is numerically compared with the preset response planning comprehensive judgment threshold. If the response planning comprehensive judgment value exceeds the preset response planning comprehensive judgment threshold, a strict planning signal is generated; if the response planning comprehensive judgment value does not exceed the preset response planning comprehensive judgment threshold, a weak planning signal is generated.

[0037] Compared with the prior art, the present invention has the following beneficial effects:

[0038] 1. In the present invention, the workshop environment status monitoring module performs environmental monitoring on several locations in the workshop, the workshop production line performance analysis module performs production status monitoring on the production line in the workshop, the workshop equipment status monitoring module performs operation monitoring on all production equipment in the production line in the workshop, and the abnormal mechanism triggering module comprehensively analyzes and accurately determines whether to trigger the abnormal early warning mechanism, thereby ensuring the safe, stable and efficient production of the digital workshop, realizing effective supervision of the digital workshop, and having a high level of intelligence and automation;

[0039] 2. In the present invention, the workshop response planning module conducts a comprehensive analysis of the production and operation status of the workshop during the detection period, and generates a strict planning signal or a weak planning signal through analysis, so that the planning management personnel can reasonably formulate a subsequent supervision plan for the digital workshop, and strengthen the subsequent production supervision of the digital workshop when the strict planning signal is received, so as to further ensure the workshop production safety, production efficiency and production quality, and significantly reduce the planning and management difficulty of the digital workshop. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] In order to facilitate understanding by those skilled in the art, the present invention is further described below in conjunction with the accompanying drawings;

[0041] Figure 1 This is a flow chart of the method of Embodiment 1 of the present invention;

[0042] Figure 2 This is a system block diagram of Embodiment 1 of the present invention;

[0043] Figure 3 This is a system block diagram of Embodiment 2 of the present invention. DETAILED DESCRIPTION

[0044] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0045] Embodiment 1: Figure 1-2 As shown, the present invention proposes a method for monitoring abnormal conditions of a digital workshop MES system (i.e., Manufacturing Execution System), comprising the following steps:

[0046] Step 1: The workshop environment status monitoring module performs environmental monitoring on several locations in the workshop, obtains the workshop environment status value through analysis, and sends the workshop environment status value to the abnormal mechanism trigger module through the processor to provide data support for the analysis and judgment process of the abnormal mechanism trigger module; the specific analysis process of the workshop environment status monitoring module is as follows:

[0047] The average temperature and average humidity at the corresponding position in the workshop within a unit time are collected, and the difference between the average temperature and the median of the corresponding preset suitable temperature range is calculated and the absolute value is taken to obtain the position temperature value. Similarly, the position humidity value is obtained; and the average smoke and dust concentration and the average noise decibel value at the corresponding position in the workshop within a unit time are collected and marked as the position smoke value and the position sound value respectively;

[0048] The position ring value MP is obtained by numerically calculating the position temperature value MF, the position humidity value MR, the position smoke value MK and the position sound value MY through the formula MP=(tu1*MF+tu2*MR+tu3*MK+tu4*MY) / 4, wherein tu1, tu2, tu3 and tu4 are preset proportional coefficients with values ​​greater than zero, and the larger the value of the position ring value MP, the worse the environmental conditions at the corresponding position;

[0049] The position ring value MP is numerically compared with the preset position ring threshold. If the position ring value MP exceeds the preset position ring threshold, it indicates that the environmental condition at the corresponding position is poor, and the corresponding position is marked as a non-good environmental point;

[0050] The number of environmental non-good points in the workshop is marked as the environmental non-good detection value, and the position ring values ​​of all positions in the workshop are averaged to obtain the workshop ring measurement value, and the position ring value with the largest value in the workshop is marked as the workshop ring amplitude;

[0051] The workshop environment value HX is obtained by numerically calculating the environmental detection value HN, the workshop environment value HY and the workshop environment amplitude HF through the formula HX=sq1*HN+(sq2*HY+sq3*HF) / 2; wherein, sq1, sq2 and sq3 are preset proportional coefficients, sq1>sq2>sq3>0; and the larger the value of the workshop environment value HX, the worse the overall workshop environment condition of the digital workshop is.

[0052] Step 2: The workshop production line performance analysis module monitors the production status of the production line in the workshop, obtains the production line status value through analysis, and sends the production line status value to the abnormal mechanism trigger module through the processor to provide data support for the analysis and judgment process of the abnormal mechanism trigger module; the specific analysis process of the workshop production line performance analysis module is as follows:

[0053] Several detection periods are set within a unit of time, and the production speed of the production line in the workshop during the corresponding detection period is collected. The variance of the production speed of all detection periods is calculated to obtain the non-steady value of the production speed, and the difference between the production speed and the median of the preset appropriate production speed range is calculated and the absolute value is taken to obtain the deviation value of the production speed during the period;

[0054] The average of the time period production speed deviation values ​​of all detection time periods within a unit time is calculated to obtain the production speed deviation value, and the time period production speed deviation value of the corresponding detection time period is compared with the preset time period production speed deviation threshold, and the number of detection time periods whose time period production speed deviation value exceeds the preset time period production speed deviation threshold is marked as the production speed abnormality value; and the defective product rate of the production line in the workshop within a unit time (that is, the data value of the percentage of the number of defective products produced within a unit time) is collected;

[0055] By formula The production speed deviation value XP, the production speed unstable value XW, the production speed abnormality value XL and the defective product rate XD are numerically calculated to obtain the production line status value XM; among them, su1, su2, su3, su4 are preset proportional coefficients whose values ​​are greater than zero, and the larger the value of the production line status value XM, the worse the production performance of the production line in the digital workshop.

[0056] Step 3: The workshop equipment status monitoring module monitors the operation of all production equipment in the production line of the workshop, obtains the equipment status values ​​of all production equipment through analysis, and sends the equipment status values ​​of all production equipment to the abnormal mechanism trigger module through the processor to provide data support for the analysis and judgment process of the abnormal mechanism trigger module; the specific analysis process of the workshop equipment status monitoring module is as follows:

[0057] Obtain all production equipment of the production line in the workshop, mark the corresponding production equipment as operation monitoring equipment i, where i is a positive integer; obtain all operating parameters (such as voltage, current, etc.) that need to be monitored when the operation monitoring equipment i is running, collect real-time detection data of the corresponding operating parameters, and compare the real-time detection data of the corresponding operating parameters with the corresponding preset data requirements. If the real-time detection data of the corresponding operating parameters does not meet the corresponding preset data requirements, it is determined that the corresponding operating parameters are in a data deviation state;

[0058] The total time duration of the corresponding operating parameter in the data deviation state per unit time is obtained and marked as the data deviation time condition value, and the average deviation amplitude and the maximum deviation amplitude of the corresponding operating parameter in the data deviation state per unit time are marked as the data segregation value and the data deviation amplitude value respectively;

[0059] By formula The data deviation value RWi, the data segregation value RPi and the data deviation amplitude value RFi are numerically calculated to obtain the data deviation table value RLi of the corresponding operation parameter; wherein eq1, eq2 and eq3 are preset proportional coefficients with values ​​greater than zero, and the larger the value of the data deviation table value RLi, the more abnormal the parameter performance of the corresponding operation parameter of the operation monitoring device i in unit time is, and the greater the adverse effect on the safe and stable operation of the operation monitoring device i is;

[0060] The data deviation table value RLi is numerically compared with the corresponding preset data deviation table threshold. If the data deviation table value RLi exceeds the preset data deviation table threshold, it indicates that the parameter performance of the corresponding operating parameter is relatively abnormal, and the corresponding operating parameter is marked as a non-optimal parameter of the operation monitoring device i; if the data deviation table value RLi does not exceed the preset data deviation table threshold, it indicates that the parameter performance of the corresponding operating parameter is relatively normal, and the corresponding operating parameter is marked as an optimal operation parameter of the operation monitoring device i;

[0061] The number of non-optimal parameters in the operation monitoring device i is obtained and marked as non-optimal inspection condition values, and the ratio of the data deviation table value of the corresponding operation parameter to the corresponding preset data deviation table threshold is marked as the data deviation value, and the data deviation values ​​of all non-optimal parameters are averaged to obtain the operation deviation value;

[0062] The non-optimal inspection condition value SLi and the operation deviation value SWi of the operation monitoring equipment i are numerically calculated through the formula SYi=(hp1*SLi+hp2*SWi) / (hp1+hp2) to obtain the equipment status value SYi; wherein hp1 and hp2 are preset proportional coefficients, hp2>hp1>0; and, the larger the numerical value of the equipment status value SYi, the worse the operation performance of the operation monitoring equipment i in unit time, and the greater the operation risk of the corresponding production equipment.

[0063] Step 4: The abnormal mechanism trigger module determines whether to trigger the abnormal warning mechanism based on the workshop environment value, production line status value and equipment status value. When the abnormal warning mechanism is triggered, the workshop status warning information is generated, and the workshop status warning information is sent to the alarm response module through the processor; the specific judgment process is as follows:

[0064] Compare the equipment status value of the operation monitoring equipment i with the corresponding preset equipment status threshold. If the equipment status value exceeds the preset equipment status threshold, the operation monitoring equipment i is marked as a poor performance equipment. If there is a poor performance equipment in the production line of the workshop, the abnormal warning mechanism is triggered.

[0065] The workshop environment value and the production line status value are numerically compared with the preset workshop environment threshold and the preset production line status threshold respectively. If the workshop environment value or the production line status value exceeds the corresponding preset threshold, the abnormal warning mechanism is triggered.

[0066] Step 5. The alarm response module displays the workshop status warning information when it receives it, and issues a corresponding warning when it receives the workshop status warning information to remind the management personnel to make corresponding improvement and control measures in time, so as to ensure the safe, stable and efficient production of the digital workshop, realize the effective supervision of the digital workshop, and significantly reduce the management difficulty of the management personnel.

[0067] Embodiment 2: Figure 3 As shown, the difference between this embodiment and the first embodiment is that the processor is communicatively connected to the workshop response planning module, and the workshop response planning module is used to set the detection period, preferably, the detection period is fifteen days; and the production and operation status of the workshop during the detection period is comprehensively analyzed to generate a strict planning signal or a weak planning signal through the analysis;

[0068] The strict planning signal or weak planning signal is sent to the intelligent terminal of the planning manager through the processor, so that the planning manager can reasonably formulate a subsequent supervision plan for the digital workshop. When the strict planning signal is received, the subsequent production supervision of the digital workshop is strengthened, which is conducive to ensuring the production safety, production efficiency and production quality of the workshop, and significantly reducing the planning management difficulty of the planning manager; the specific analysis process of the workshop response planning module is as follows:

[0069] The number of production safety accidents in the workshop during the detection period is collected and marked as the production accident frequency detection value, and the total amount of losses caused by production safety accidents during the detection period is marked as the production accident amount value. The production accident frequency detection value and the production accident amount value are numerically compared with the preset production accident frequency detection threshold and the preset production accident amount threshold. If the production accident frequency detection value or the production accident amount value exceeds the corresponding preset threshold, indicating that the production management status of the digital workshop during the detection period is poor, a strict planning signal is generated.

[0070] Furthermore, if the production accident frequency detection value and the production accident amount value do not exceed the corresponding preset threshold value, several analysis periods are set within the detection period, the number of times the workshop status warning information is generated in the corresponding analysis period is collected and marked as the workshop status warning value, and the workshop status warning value is numerically compared with the preset workshop status warning threshold value. If the workshop status warning value exceeds the preset workshop status warning threshold value, the corresponding analysis period is marked as a non-safe period;

[0071] The number of non-safety periods in the detection period is obtained and the ratio of the number of non-safety periods to the total number of analysis periods is marked as a non-safety detection value, and the workshop status warning values ​​of all analysis periods are summed up to obtain a workshop status warning frequency value;

[0072] The production accident frequency inspection value GP, the production accident amount value GS, the non-safety inspection value GF and the workshop status alarm frequency value GN are numerically calculated by the formula GY=c1*GP+c2*GS+c3*GF+c4*GN to obtain the response planning comprehensive judgment value GY; wherein, c1, c2, c3, c4 are preset proportional coefficients with values ​​greater than zero, and the larger the value of the response planning comprehensive judgment value GY is, the worse the production management status of the digital workshop is in general during the inspection period, and the greater the difficulty of production management of the digital workshop is;

[0073] The response planning comprehensive judgment value GY is numerically compared with the preset response planning comprehensive judgment threshold. If the response planning comprehensive judgment value GY exceeds the preset response planning comprehensive judgment threshold, it indicates that the production management status of the digital workshop during the detection period is generally poor, and the subsequent production supervision of the digital workshop needs to be strengthened, then a strict planning signal is generated; if the response planning comprehensive judgment value GY does not exceed the preset response planning comprehensive judgment threshold, it indicates that the production management status of the digital workshop during the detection period is generally good, then a weak planning signal is generated.

[0074] The working principle of the present invention is as follows: when in use, the workshop environment status monitoring module is used to perform environmental monitoring on several locations in the workshop and obtain the workshop environment value of the digital workshop; the workshop production line performance analysis module monitors the production status of the production lines in the workshop and obtains the production line status value; the workshop equipment status monitoring module monitors the operation of all production equipment of the production lines in the workshop to obtain the equipment status values ​​of all production equipment; the abnormal mechanism triggering module determines whether to trigger the abnormal early warning mechanism based on the workshop environment value, the production line status value and the equipment status value; when the abnormal early warning mechanism is triggered, the workshop status early warning information is generated; the alarm response module displays the workshop status early warning information and issues an early warning to remind the management personnel to make corresponding improvement and control measures in time, thereby ensuring the safe, stable and efficient production of the digital workshop, realizing effective supervision of the digital workshop, significantly reducing the management difficulty of the management personnel, and having a high level of intelligence and automation.

[0075] The above formulas are all dimensionless and numerical calculations. The formula is a formula obtained by collecting a large amount of data and performing software simulation to obtain the most recent real situation. The preset parameters in the formula are set by technicians in this field according to actual conditions. The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the contents of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that technicians in the relevant technical field can understand and use the present invention well. The present invention is only limited by the claims and their full scope and equivalents.

Claims

1. A method for monitoring abnormal status of a digital workshop MES system, characterized in that: The following steps are involved: Step 1: The workshop environment status monitoring module performs environment monitoring on several locations in the workshop, obtains the workshop environment status value through analysis, and sends the workshop environment status value to the abnormal mechanism triggering module through the processor; Step 2: The workshop production line performance analysis module monitors the production status of the production line in the workshop, obtains the production line status value through analysis, and sends the production line status value to the abnormal mechanism trigger module through the processor; Step 3: The workshop equipment status monitoring module monitors the operation of all production equipment on the production line in the workshop, obtains the equipment status values ​​of all production equipment through analysis, and sends the equipment status values ​​of all production equipment to the abnormal mechanism triggering module through the processor; Step 4: The abnormal mechanism triggering module determines whether to trigger the abnormal warning mechanism based on the workshop environment value, production line status value and equipment status value, generates workshop status warning information when the abnormal warning mechanism is triggered, and sends the workshop status warning information to the alarm response module through the processor; Step 5: The alarm response module displays the workshop status warning information upon receiving it, and issues a corresponding warning upon receiving the workshop status warning information; In step 1, the specific analysis process of the workshop environment status monitoring module includes: The non-good environmental points in the workshop are identified through analysis, and the number of non-good environmental points in the workshop is marked as the non-good environmental detection value, and the position ring values ​​of all positions in the workshop are averaged to obtain the workshop ring measurement value, and the position ring value with the largest value in the workshop is marked as the workshop ring amplitude value; the workshop ring state value is obtained by numerically calculating the non-good environmental detection value, the workshop ring measurement value and the workshop ring amplitude value; The analysis and identification process of the environmental non-good points in the workshop is as follows: The average temperature and average humidity at the corresponding position in the workshop within a unit time are collected, and the difference between the average temperature and the median of the corresponding preset suitable temperature range is calculated and the absolute value is taken to obtain the position temperature value. Similarly, the position humidity value is obtained; and the average smoke and dust concentration and the average noise decibel value at the corresponding position in the workshop within a unit time are collected and marked as the position smoke value and the position sound value respectively; The potential ring value is obtained by numerically calculating the potential temperature value, the potential humidity value, the potential smoke value and the potential sound value. If the potential ring value exceeds the preset potential ring threshold, the corresponding position is marked as an environmental non-good point; In step 2, the specific analysis process of the workshop production line performance analysis module is as follows: Several detection periods are set within a unit time, and the production speed of the production line in the workshop during the corresponding detection period is collected. The variance of the production speed of all detection periods is calculated to obtain the non-steady value of the production speed, and the difference between the production speed and the median of the preset suitable production speed range is calculated and the absolute value is taken to obtain the deviation value of the production speed during the period; The production speed deviation values ​​of all detection periods within a unit time are averaged to obtain the production speed deviation value, and the production speed deviation value of the corresponding detection period is compared with the preset production speed deviation threshold value, and the proportion of the number of detection periods whose production speed deviation values ​​exceed the preset production speed deviation threshold value is marked as the production speed abnormality proportion value; And collect the defective product rate of the production line in the workshop per unit time, and obtain the production line status value by numerically calculating the production speed deviation value, production speed instability value, production speed abnormality value and defective product rate; In step three, the specific analysis process of the workshop equipment status monitoring module includes: All production equipment of the production line in the workshop are obtained, and the corresponding production equipment is marked as operation monitoring equipment i, where i is a positive integer; the non-optimal parameters and operation optimization parameters of the operation monitoring equipment i are determined through equipment operation status evaluation and analysis, the number of non-optimal parameters in the operation monitoring equipment i is obtained and marked as non-optimal inspection condition values, and the ratio of the data deviation table value of the corresponding operation parameter to the corresponding preset data deviation table threshold is marked as the data deviation value, and the data deviation values ​​of all non-optimal parameters are averaged to obtain the operation deviation value; the equipment status value is obtained by numerically calculating the non-optimal inspection condition value and the operation deviation value of the operation monitoring equipment i; In step 4, the abnormal mechanism trigger module determines whether to trigger the abnormal warning mechanism based on the workshop environment value, production line status value and equipment status value. The specific judgment process is as follows: Compare the equipment status value of the operation monitoring equipment i with the corresponding preset equipment status threshold. If the equipment status value exceeds the preset equipment status threshold, the operation monitoring equipment i is marked as a poor performance equipment. If there is a poor performance equipment in the production line of the workshop, the abnormal warning mechanism is triggered. The workshop environment value and the production line status value are numerically compared with the preset workshop environment threshold and the preset production line status threshold respectively. If the workshop environment value or the production line status value exceeds the corresponding preset threshold, the abnormal warning mechanism is triggered.

2. The abnormal state monitoring method of a digital workshop MES system according to claim 1 is characterized in that: The specific analysis process of equipment operation status evaluation and analysis is as follows: Acquire all the operating parameters that need to be monitored when the operation monitoring device i is running, collect the real-time detection data of the corresponding operating parameters, and if the real-time detection data of the corresponding operating parameters does not meet the corresponding preset data requirements, determine that the corresponding operating parameters are in a data deviation state; The total time duration of the corresponding operating parameter in the data deviation state per unit time is obtained and marked as the data deviation time condition value, and the average deviation amplitude and the maximum deviation amplitude of the corresponding operating parameter in the data deviation state per unit time are marked as the data segregation value and the data deviation amplitude value respectively; The data deviation value of the corresponding operating parameter is obtained by numerically calculating the data deviation value, data segregation value and data deviation amplitude value. If the data deviation value exceeds the preset data deviation threshold, the corresponding operating parameter is marked as a non-optimal parameter of the operation monitoring device i; if the data deviation value does not exceed the preset data deviation threshold, the corresponding operating parameter is marked as an optimal operation parameter of the operation monitoring device i.

3. The abnormal state monitoring method of a digital workshop MES system according to claim 1 is characterized in that: The processor is communicated with the workshop response planning module, which is used to set the detection period and conduct a comprehensive analysis of the production and operation status of the workshop during the detection period. The analysis is used to generate a strict planning signal or a weak planning signal, and the strict planning signal or the weak planning signal is sent to the intelligent terminal of the planning manager via the processor.

4. The abnormal state monitoring method of a digital workshop MES system according to claim 3 is characterized in that: The specific analysis process of the workshop response planning module includes: The number of production safety accidents in the workshop during the detection period is collected and marked as the production accident frequency detection value, and the total amount of losses caused by production safety accidents during the detection period is marked as the production accident amount value. If the production accident frequency detection value or the production accident amount value exceeds the corresponding preset threshold, a strict planning signal is generated.

5. The abnormal state monitoring method of a digital workshop MES system according to claim 4 is characterized in that: If the production accident frequency detection value and the production accident amount value do not exceed the corresponding preset threshold value, several analysis periods are set within the detection period, and the number of times the workshop status warning information is generated in the corresponding analysis period is collected and marked as the workshop status warning value. If the workshop status warning value exceeds the preset workshop status warning threshold value, the corresponding analysis period is marked as a non-safe period; The number of non-safety periods in the detection period is obtained and the ratio of the number of non-safety periods to the total number of analysis periods is marked as a non-safety detection value, and the workshop status warning values ​​of all analysis periods are summed up to obtain a workshop status warning frequency value; The comprehensive judgment value of the response plan is obtained by numerically calculating the production accident frequency detection value, production accident amount value, non-safety detection value and workshop status alarm frequency value; If the response planning comprehensive judgment value exceeds the preset response planning comprehensive judgment threshold, a strict planning signal is generated; If the response planning comprehensive judgment value does not exceed the preset response planning comprehensive judgment threshold, a weak planning signal is generated.